Attachment 7 - FRP Small Business Decision Matrix.pdf
PDF 112 KB Posted
- Attached to
- FRP MATOC Midwest Region W912DY-20-R-0068 Federal contract opportunity
- Solicitation number
- W912DY20R0068
About this file
This document provides details on a federal contract opportunity for demolition and abatement services. The Facilities Reduction Program Midwest MATOC solicitation seeks contractors to provide demolition and abatement services for excess federal facilities located in eleven Midwestern states. General work includes planning, coordination, and execution of building and facility removal and demolition at multiple Department of Defense and other federal agency locations. Projects may also include emergency response to disasters. The North American Industry Classification code for this contract is 238910. The objective is to provide a streamlined process for quick response demolition and abatement service contracts to support excess facility removal, saving energy and maintenance costs while maximizing landfill diversion and recycling credits.
View the file
Other files for this federal contract opportunity
Show all 50
FRP MATOC Midwest Region W912DY-20-R-0068 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DY-18-R-0063
Attachment 7 – Small Business Decision Matrix Project: Example Project
Risk Factors:
Size/Dollar
Value:
Multiple Mobilizations, varying site restorations, long duration
$1,581,842
Complexity - 40% Risk - 40% Examples (or similar complexities) Rank Examples (or similar risk) Rank
337 Development Services 1 Short duration, adequate infrastructure 1
ACM/ORM Assessment
Location, close to large city, airports, easy access to material and personnel
ACM/ORM Assessment + Medical Level 1 Assessment
Short duration without adequate infrastructure
ACM/ORM Assessment + Medical Level 2 Assessment
Long duration with adequate infrastructure
Demolition of simple structures with complete ACM/ORM Assessment already completed
0-6 months fieldwork duration without adequate infrastructure
ACM/ORM Assessment and Demolition of Simple Structures
6-12 months fieldwork Long duration with adequate infrastructure
Demolition of complex structures with complete ACM/ORM Assessment and or Medical Assessment already completed
Over 12 months fieldwork Long duration with adequate infrastructure, multiple mobilizations
ACM/ORM Assessment, Medical Assessment, and Demolition of Complex Structures
Negative publicity, High political visibility, reporting
Demolition of "Hardened" Structures 9 Remote locations with complex logistics 9 Demolition of extremely complex, damaged, and or hazardous, structures
Remote locations with complex logistics
Rank Evaluation
Composite Rank 6.2 Resulting decision is - Unrestricted
Process:
* Requirements will be reviewed to determine if they will be competed as Small Business or Unrestricted
* Complexity (40%), Size (20%), and Risk (40%) will be considered
* Each factor will receive a rating from 1 – 10
* Any requirement that receives a combined factor rating of 5 or below will be considered for competition by Small Business
* After the current year, the PDT may adjust the decision point either up or down
Size - 20% Examples Rank
< 50k 1
< 100k
< 250k
< 600k
< 750k
< 1M
< 1.5M
< 2M
< 3M 9
>4M
File details come from the government source that posted it. Updated .