Attachment 13 Specification Guide 02220 Demolition.pdf

PDF 212 KB Posted

Attached to
FRP MATOC Midwest Region W912DY-20-R-0068 Federal contract opportunity
Solicitation number
W912DY20R0068
Issued by
Department of the Army Corps of Engineers Engineering Support Center Huntsville

About this file

This solicitation is for an indefinite delivery/indefinite quantity multiple award task order contract to provide demolition and abatement services at Department of Defense and other federal agency locations throughout a 10-state Midwest region. Services include planning, coordination, execution of building and facility removal/demolition, as well as emergency response to disasters. The North American Industry Classification code is 238910. Awards will be made to multiple contractors on a lowest price technically acceptable basis. The period of performance is one base year with four option years. The agency is the Department of the Army Corps of Engineers Engineering Support Center Huntsville.

View the file

Other files for this federal contract opportunity

Other files attached to FRP MATOC Midwest Region W912DY-20-R-0068, newest first.
File Type Posted
W912DY-20-R-0068 CONFORMED COPY 18 Aug.pdf PDF
Attachment 18 Estimated Quantities Rev 03 18 Aug.xlsx XLSX spreadsheet
Attachment 18 - Estimated Quantities Rev 02.xlsx XLSX spreadsheet
W912DY-20-R-0068 Amendment 0004 18 Aug.pdf PDF
Attachment 18 - Estimated Quantities Rev 01.xlsx XLSX spreadsheet
Attachment 18 - Estimated Quantities Rev 02.xlsx XLSX spreadsheet
W912DY-20-R-0068 0003.docx DOCX document
Attachment 19 - ProjNet Questions and Answers.pdf PDF
Attachment 3 - Experience Reporting Form Rev 01.pdf PDF
Attachment 17 Sample Task Order Attachment B Rev 01.xlsx XLSX spreadsheet
FRP Region 3 W912DY20R0068 ProjNet Questions 3 August Revised.pdf PDF
Attachment 14 Specification Guide 02221 ExBackSite.pdf PDF
Attachment 16 - Sample Task Order.pdf PDF
Attachment 9 Work Plans Sub-Plans and Appendices.pdf PDF
Attachment 6- Letter of Commitment (Key Subcontractor).pdf PDF
Attachment 11 - Safety and Health Program Requirements.pdf PDF
Attachment 8 - Monthly Progress Report Format.pdf PDF
Attachment 12 - Demolition and Recycling Final Report.pdf PDF
Attachment 5 - Small Business Participation Commitment.pdf PDF
Attachment 3 - Experience Reporting Form.pdf PDF
Attachment 17 - Sample Task Order Attachment B.XLSX XLSX spreadsheet
Attachment 4- Past Performance Questionnaire.pdf PDF
Attachment 2 - Quality Assurance Surveillance Plan.pdf PDF
Attachment 18 - Estimated Quantities.xlsx XLSX spreadsheet
Attachment 10 Accident Prevention Plan Checklist.pdf PDF
Attachment 15 - Descriptive Data for ECPs and REAs.pdf PDF
Attachment 1 - Performance Requirements Summary.pdf PDF
W912DY20R0068 0001 conform.pdf PDF
W912DY20R0068 0001.pdf PDF
Attachment 7 - FRP Small Business Decision Matrix.pdf PDF
A.07.23 FY20 FRP MW Region MATOC Combined Synopsis.pdf PDF
Attachment 11 - Safety and Health Program Requirements.pdf PDF
Attachment 8 - Monthly Progress Report Format.pdf PDF
W912DY20R0068.pdf PDF
Attachment 18 - Estimated Quantities.xlsx XLSX spreadsheet
Attachment 3 - Experience Reporting Form.pdf PDF
Attachment 7 - FRP Small Business Decision Matrix.pdf PDF
Attachment 16 - Sample Taks Order.pdf PDF
Attachment 6- Letter of Commitment ( Key Subcontractor).pdf PDF
Attachment 9 Work Plans SubPlans and Appendices.pdf PDF
Attachment 14 Specification Guide 02221 ExBackSite.pdf PDF
Attachment 1 - Performance Requirements Summary.pdf PDF
Attachment 17 - Sample Task Order Attachment B.xlsx XLSX spreadsheet
Attachment 13 Specification Guide 02220 Demolition.pdf PDF
Attachment 5 - Small Business Commitment Document.pdf PDF
Attachment 12 - Demolition and Recycling Final Report.pdf PDF
Attachment 4- Past Performance Questionnaire.pdf PDF
Attachment 10 - Accident Prevention Plan Checklist.pdf PDF
Attachment 15 - Descriptive Data for ECPs and REAs.pdf PDF
Attachment 2 - Quality Assurance Surveillance Plan.pdf PDF
Show all 50

FRP MATOC Midwest Region W912DY-20-R-0068 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 13 – Specification Guide 02220 – Demolition

PART 1 - GENERAL

1.1 REFERENCES

The publications listed below form a part of this Specification to the extent referenced. The publications are referred to within the text by the basic designation only. The most current version of each document shall be used.

AIR-CONDITIONING, HEATING, AND REFRIGERATION INSTITUTE (AHRI)

AHRI Guideline K (2015) Containers for Recovered Non-Flammable

Fluorocarbon Refrigerants

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI A10.6 (2006) Safety & Health Program Requirements for Demolition Operations -

American National Standard for Construction and Demolition Operations

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety - Safety and Health Requirements

U.S. DEFENSE LOGISTICS AGENCY (DLA)

DLAI 4145.25 (June 2000) Storage and Handling of Liquefied and Gaseous Compressed

Gases and Their Full and Empty Cylinders

U.S. DEPARTMENT OF DEFENSE (DOD)

DOD 4000.25-1-M (2000) Requisitioning and Issue Procedures

MIL-STD-129R (2014) Military Marking for Shipment and Storage

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 61-SUBPART M National Emission Standard for Asbestos

40 CFR 82 Protection of Stratospheric Ozone

49 CFR 173.301 General Requirements for Shipment of Compressed Gases in Cylinders and

Spherical Pressure Vessels

1.1 DUST CONTROL

The amount of dust resulting from demolition shall be controlled to prevent the spread of fugitive dust to the atmosphere and to avoid creation of a nuisance in the surrounding area. Use of water shall not be permitted when it shall result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution. The contractor shall include his dust abatement system in the Environmental Work Plan set forth in Specification Section 01430.

1.2 PROTECTION

1.2.1. Existing Work

Before beginning any cutting or demolition work, the Contractor shall carefully survey the existing work and examine the drawings and specifications to determine the extent of the work.

The Contractor shall take all necessary precautions to insure against damage to existing work to remain in place, to be reused, or to remain the property of the Government, and any damage to such work shall be repaired or replaced as approved by the COR at no additional cost to the

Government. The Contractor shall carefully coordinate the work of this section with all other work. The Contractor shall insure that structural elements are not overloaded and be responsible for preventing structural overloads that could result in unplanned collapse.

1.2.2. Trees

Trees within the project site which might be damaged during demolition, and which are indicated to be left in place, shall be protected by a 1.8 m (6 foot) (6 foot) high fence. The fence shall be securely erected a minimum of 1.5 m( 5 feet) from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Any tree designated to remain that is damaged during the work under this contract shall be replaced in kind or as approved by the

Contracting Officer.

1.2.3. Facilities

Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, may remain standing without additional bracing, shoring, of lateral support until demolished, unless directed otherwise by the Contracting Officer. The Contractor shall ensure that no elements determined to be unstable are left unsupported and shall be responsible for placing and securing bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.

1.3 BURNING

Any burning at the project site, or anywhere on the Installation, is prohibited.

1.4 RODENT AND VERMIN EXTERMINATION

Rodent and Vermin Extermination, if required, shall be performed in compliance with other requirements of these specifications.

1.5 CONSTRUCTION EQUIPMENT LIST

A Construction Equipment List of all major equipment to be used in this section shall be submitted to the COR.

1.6 USE OF EXPLOSIVES

Use of explosives shall not be permitted unless specifically permitted in advance for this project.

PART 2 – PRODUCTS

2.1 FILL MATERIALS

Fill material shall conform to the description and definition as prescribed in Specification

Section 02221 of this document. In addition, fill material shall be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 3 inches in any dimension.

Unless specifically prohibited elsewhere in these specifications, concrete materials, crushed to a size of minus 6” may be used for fills more than 24” below finish grade.

PART 3 – EXECUTION

3.1 EXISTING FACILITIES TO BE REMOVED

3.1.1 Structures

[List of facilities to be removed provided in specific task order.]

3.1.2 Utilities and Related Equipment

All utility services within the demolition limits, as shown on the drawings, shall be removed to the locations shown on the drawings. If no drawings are provided, the base contract shall default to a 15-foot distance from the base of the foundation walls in a horizontal measurement.

3.1.3 Limits of Removal

Remove all above ground structures, paving and slabs, tanks and equipment and piping as shown on the drawings. If no drawings are provided, the base contract shall default to a 15-foot distance from the base of the foundation walls in a horizontal measurement.

3.2 BELOW GRADE CONSTRUCTION

Foundations, basements, concrete slabs on ground, footings, piers and other below-grade construction shall be demolished and removed to a grade of 48” below finish grade unless specified otherwise. Any concrete slabs below minus 48” that are permitted to remain, must be fractured on 6’ centers to permit the migration of ground water.

Underground Storage Tanks shall be removed in accordance with Federal, state, and local regulations.

3.3 FILLING BASEMENTS AND VOIDS

Basements and voids, resulting from the demolition of structures, shall be completely filled with acceptable fill material and graded as prescribed in Specification Section 02221 of this document. For basements, sumps or depressions more than 48” below finish grades, the contractor shall utilize crushed concrete materials for backfill. Slabs to remain shall be fractured as described in 3.2 above. See Specification Section 02221 for specifications on the use of crushed backfill materials.

Prior to filling, basements and voids shall be free of standing water, frost, frozen material, trash, and debris.

After fill has been placed, and compacted to meet the requirements of Technical Exhibit 7,the surface of the fill shall be graded to meet adjacent contours and to provide positive surface water drainage.

3.4 DISPOSITION OF REMOVED MATERIAL

Contractor shall load and haul all materials from the site except for any concrete or masonry that is to be crushed for use as backfill. Contractor shall load and haul all metals determined to be non-hazardous, to a recycling facility. Demolished materials shall be removed on a regular basis as set forth in the schedule or as approved by the COR.

The contractor shall remove and dispose of the demolished materials as described in the contract.

The Government shall not be responsible for the condition of the structures to be demolished.

3.5 CLEANUP

Debris and rubbish shall be removed from the surrounding work area and disposed of as set forth in these specifications. Debris shall be removed and transported in a manner as to prevent spillage on streets or adjacent areas.

3.5.1 Regulations:

In addition to Federal and state regulations, local regulations regarding hauling and disposal may apply.

END OF SECTION

File details come from the government source that posted it. Updated .