Attachment 19 - ProjNet Questions and Answers.pdf

PDF 139 KB Posted

Attached to
FRP MATOC Midwest Region W912DY-20-R-0068 Federal contract opportunity
Solicitation number
W912DY20R0068
Issued by
Department of the Army Corps of Engineers Engineering Support Center Huntsville

About this file

This document provides details on a federal solicitation for Facilities Reduction Program (FRP) Midwest Region Multiple Award Task Order Contract (MATOC) services. The solicitation seeks demolition and abatement services for excess federal facilities located in eleven Midwestern states. Services include planning, coordination, and execution of building and facility removal/demolition at multiple Department of Defense and other federal agency locations. The period of performance is a one year base period followed by three one-year option periods. The North American Industry Classification code is 238910. The solicitation response due date was 15 March 2021 and contract award was also scheduled for 15 March 2021.

View the file

Other files for this federal contract opportunity

Other files attached to FRP MATOC Midwest Region W912DY-20-R-0068, newest first.
File Type Posted
W912DY-20-R-0068 CONFORMED COPY 18 Aug.pdf PDF
Attachment 18 Estimated Quantities Rev 03 18 Aug.xlsx XLSX spreadsheet
Attachment 18 - Estimated Quantities Rev 02.xlsx XLSX spreadsheet
W912DY-20-R-0068 Amendment 0004 18 Aug.pdf PDF
CONFORMED COPY W912DY20R0068.pdf PDF
W912DY-20-R-0068 0003.pdf PDF
Attachment 18 - Estimated Quantities Rev 01.xlsx XLSX spreadsheet
W912DY-20-R-0068 0002.pdf PDF
Attachment 3 - Experience Reporting Form Rev 01.pdf PDF
Attachment 17 Sample Task Order Attachment B Rev 01.xlsx XLSX spreadsheet
FRP Region 3 W912DY20R0068 ProjNet Questions 3 August Revised.pdf PDF
Attachment 12 - Demolition and Recycling Final Report.pdf PDF
Attachment 5 - Small Business Participation Commitment.pdf PDF
Attachment 3 - Experience Reporting Form.pdf PDF
Attachment 17 - Sample Task Order Attachment B.XLSX XLSX spreadsheet
Attachment 4- Past Performance Questionnaire.pdf PDF
Attachment 2 - Quality Assurance Surveillance Plan.pdf PDF
Attachment 18 - Estimated Quantities.xlsx XLSX spreadsheet
Attachment 10 Accident Prevention Plan Checklist.pdf PDF
Attachment 13 Specification Guide 02220 Demolition.pdf PDF
Attachment 15 - Descriptive Data for ECPs and REAs.pdf PDF
Attachment 1 - Performance Requirements Summary.pdf PDF
W912DY20R0068 0001 conform.pdf PDF
W912DY20R0068 0001.pdf PDF
Attachment 7 - FRP Small Business Decision Matrix.pdf PDF
Attachment 14 Specification Guide 02221 ExBackSite.pdf PDF
Attachment 16 - Sample Task Order.pdf PDF
Attachment 9 Work Plans Sub-Plans and Appendices.pdf PDF
Attachment 6- Letter of Commitment (Key Subcontractor).pdf PDF
Attachment 11 - Safety and Health Program Requirements.pdf PDF
A.07.23 FY20 FRP MW Region MATOC Combined Synopsis.pdf PDF
Attachment 7 - FRP Small Business Decision Matrix.pdf PDF
Attachment 16 - Sample Taks Order.pdf PDF
Attachment 6- Letter of Commitment ( Key Subcontractor).pdf PDF
Attachment 9 Work Plans SubPlans and Appendices.pdf PDF
Attachment 14 Specification Guide 02221 ExBackSite.pdf PDF
Attachment 1 - Performance Requirements Summary.pdf PDF
Attachment 17 - Sample Task Order Attachment B.xlsx XLSX spreadsheet
Attachment 13 Specification Guide 02220 Demolition.pdf PDF
Attachment 5 - Small Business Commitment Document.pdf PDF
Attachment 12 - Demolition and Recycling Final Report.pdf PDF
Attachment 4- Past Performance Questionnaire.pdf PDF
Attachment 10 - Accident Prevention Plan Checklist.pdf PDF
Attachment 15 - Descriptive Data for ECPs and REAs.pdf PDF
Attachment 2 - Quality Assurance Surveillance Plan.pdf PDF
Attachment 11 - Safety and Health Program Requirements.pdf PDF
Attachment 8 - Monthly Progress Report Format.pdf PDF
W912DY20R0068.pdf PDF
Attachment 18 - Estimated Quantities.xlsx XLSX spreadsheet
Attachment 3 - Experience Reporting Form.pdf PDF
Show all 50

FRP MATOC Midwest Region W912DY-20-R-0068 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Inquiry Contractor Report All Inquiries

Project: FY20 FRP Midwest Region MATOC Review: FY20 FRP Midwest Region MATOC (00001) (sorted by CommentID ) Displaying 21 inquiries.

Id Discipline Sheet Detail Spec

8730291 Contracting Section J Attachment 5

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can the format of the Section J, Attachment 5 form be altered in order to list additional businesses?

On: Jul 28 2020.

Government Response. . Yes. There is not a page limitation for Small Business Participation Commitment documents. However, offerors shall adhere to the template provided in Attachment 5. On: Aug 07 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8730865 Other SF33

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The combined synopsis states that contract award is 15 March 2021. If this is the case, does our offer need to be valid through 15 March 2021? I am referring to Block 12 of the SF33.

On: Jul 28 2020.

Government Response. . Yes. Your offer shall be valid through 15 Mar 2021. On:

Aug 07 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8730868 Other L.6.1.3/FAR 9.103(a)

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that we do NOT need to submit our Financial Capability [IAW FAR 9.103(a)] including: present commitments, certified statements, annual financial statements, number of years in business, current credit report, credit/trade references, capability to obtain sufficient financial resources and bonding company information with our proposal.

Government Response. . Representations and Certifications and other Statements of Offerors are not considered for evaluation, but are required as part of the Offeror's proposal of this solicitation. Offeror shall complete the information requested in this

Section in its entirety, and also complete "Representations and Certifications" in System for Award Management (SAM) per FAR 52.204-8, Annual Representations and Certifications. On: Aug 07 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8730869 Other L.6.3.1.1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Given the current situation with COVID, it can be difficult to obtain completed PPQs from our references. Will the government accept previously completed PPQs in response to L.6.3.1.1?

Government Response. . Yes. In addition, reference Section L.6.3.1.1. : If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before the solicitation closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). On: Aug 07 2020

8730993 Contracting Section C

PWS

1.10.6 Experience

Modification Rate

(EMR).

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

1.10.6 Experience Modification Rate (EMR). - is an EMR letter required with this bid submittal? If so, where should it be provided in our proposal.

Government Response. . Reference RFP Amendment 0002 for revision to Proposal Volume Table, VOLUME 0 –

ACKNOWLEDGMENTS/AGREEMENTS/CERTIFICATIONS.

Offeror shall transmit its Experience Modification Rate worksheet at Tab (D) -- Experience Modification Rate (EMR) worksheet. On: Aug 07 2020

8732059 Other L.6.2.1

The last paragraph in L.6.2.1 is nearly identical to the information required in L.6.2.2.1. Can you please confirm that due to page limitations, we are only required to provide this information once, in response to L.6.2.2.1?

On: Jul 29 2020.

Government Response. . No. Solicitation paragraph L.6.2.1, references Experience in Facilities Reduction/Demolition. Solicitation paragraph, L.6.2.2.1, references Technical Approach. Page limits are referenced in the Proposal Volumes Table at Section L.5. On: Aug 07 2020

8732665 Environmental Attachment 3, ERF

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section L, Page 109 of 124, L.6.2.1 - Volume I, Tab A: Experience in Facilities Reduction/Demolition states that "The Offeror shall submit not less than sixty percent (60%) of the projects as those substantially performed by the Prime and NOT key subcontractors."

This implies that the proposed FRP Prime contractor should submit 60% of the Attachment 3 projects regardless if the FRP Prime's role was as a prime or a subcontractor on the Attachment 3 project; and, that our proposed "key subcontractors" shall not provide 60% of the Attachment 3 projects.

Section M, Page 119 of 124, Factor 1, Element 1: Experience in Facilities Reduction/Demolition states that "The Offeror shall submit not less than sixty percent (60%) of the projects as those substantially performed by the Prime and NOT as a subcontractor."

This implies that the proposed FRP Prime contractor should submit 60% of the Attachment 3 projects only if their role was AS a Prime and not AS a subcontractor on the Attachment 3 project; and, no criteria as to how many Attachment 3 projects our "key subcontractors" can provide.

"Key subcontractors" is defined as a subcontractor who will perform at least 20% of the total contract value.

Section L and Section M appear to conflict. Could the government please clarify?

On: Jul 29 2020.

Government Response. . Reference Factor 1, Element 1, Experience in Facilities Reduction/Demolition, "Offerors shall be required to submit a minimum of three (3), up to a maximum of five (5) projects on the Experience Reporting Form, see Section J, Attachment 3. The Offeror shall submit not less than sixty percent (60%) of the projects as those substantially performed by the Prime and NOT as a subcontractor."

On: Aug 07 2020

8732668 Environmental Sample Task Order

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Sample Task Order, Attachment 16, Appendix D, Detailed Site Notes, page 31 of 45, provides information on recycling and disposal facilities including distances from the installation and tipping fees. Yet, the Technical Evaluation Criteria, on page 45 of 45, requests names and locations of recycling and disposal facilities. Can the government please clarify of names of facilities are required in the Sample Task Order proposal?

Government Response. . Yes, reference Section L.6.2.2.2. This is the responsibility of the offeror. On: Aug 07 2020

8732672 Environmental Contract Duration

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 4, Section A.9, includes an additional 6-month option; however, Section 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) on page 91 states that the contract shall not exceed 60 months. Can the government please clarify and indicate which durations we should use in the Small Business Subcontracting Plan?

Government Response. . Reference Section A, A.3, "This contract has four ordering periods consisting of one 24-month base period and three (3) 12-month optional ordering periods."

The MATOC includes FAR clause 52.217-8, allowing an additional six (6) month extension, as well.

Small Business Subcontracting Plan is applicable to all work that may be awarded under the Base contract and all option period(s). On: Aug 07 2020

8733029 Other Attachment 17

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

There are several formula errors on Attachment 17 - Sample Task Order Attachment B, (for example, the Section #2 Price cell does not include the warehouse, and the Base Total Price does not include the Section #1 Price). Can the Offeror correct the formula errors on the spreadsheet so that everything adds up the way it should?

On: Jul 29 2020.

Government Response. . Reference RFP Amendment 0002 for revised Attachment 17, Sample Task Order Attachment B, Rev 01. On: Aug 07 2020

8734546 Environmental Attachment 3 Detail

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

On Attachment 3, Experience Reporting Form item "w" states, "If work supported involves multiple facilities and types, identify the percentage of total facilities square footage attributed to medical treatment facilities;" however, the RFP Scope of Work (SOW) does not mention medical facilities. Can we or the government revise this item so that it aligns with the SOW?

On: Jul 30 2020.

Government Response. . Reference RFP Amendment 0002 for revised Attachment 3, Experience Reporting Form, Rev 01. On: Aug 07 2020

8739116 General 1.10.6 1.10.6

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 1.10.6 directs Contractors to provide an EMR letter from its insurance agent/carrier.

Section L.5.6 is similarly clear in requiring Contractors to place information within the appropriate volume. However, Section L.6 does not state in what Volume the EMR letter should be submitted. Under what Volume (0 through IV) should Contractors submit the EMR letter? Similarly, if Contractors must submit the information in Section 1.10.6, do Contractors have to submit as part of this proposal the other information contained in Section 1.10 that are submittals generally required upon award of a TO (Corporate Heath and Safety Plan, SVAAPP, APP, AHA, etc.) and, if so, in what Volume (0 through IV) should Contractors submit this information?

On: Aug 03 2020.

Government Response. . Reference RFP Amendment 0002 for revision to Section L.5, Proposal Volume Table, VOLUME 0 –

ACKNOWLEDGMENTS/AGREEMENTS/CERTIFICATIONS.

Offeror shall transmit its Experience Modification Rate worksheet at Tab (D) -- Experience Modification Rate (EMR) worksheet. On: Aug 07 2020

8740364 Environmental PPQs

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

May we use PPQs that we just had completed for the FRP Northeast solicitation last month, so that we don't have to request them again so soon from the same clients?

Government Response. . Yes. Reference L.6.2.1 Volume I, Tab A: Experience in Facilities. Reduction/Demolition Projects shall demonstrate the Offeror's experience in abatement and demolition of facilities. Projects should be recent and relevant to the scope of this solicitation. On: Aug 07 2020

8740393 Environmental Volume 0

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Volume 0, Tab A requires us to submit an "Offeror Acknowledgment Letter." Will the government be providing a template for this letter or should we write our own?

Government Response. . Please reference Section L.6.1.1 Volume 0, Tab A:

Offeror Acknowledgment Letter -- "Offerors must submit a letter acknowledging receipt of the Combined Synopsis Solicitation, Attachments, and Amendments, and include signed SF33 and any/all signed SF30's as backup documentation" On: Aug 07 2020

8740399 General RFP Instructions to

Offerors

Given the 10 page limit on VOLUME 1 FACTOR 1 (Tab B Technical Approach), should the Sample Task Order demolition approach (work methods, means, and sequence), and Gantt chart schedule be included in Volume 4 (Tab B – Sample Task Order Attachment B) where they will not be counted against the 10 page limit?

Government Response. . Reference Section L.6.2.2, Volume I, Tab B: Technical Approach. Yes, the project schedule is excluded from the page limitation. On: Aug

8740520 Other Wage Rates

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can you please provide the wage rates for the sample task order?

Government Response. . Davis-Bacon Act wage determinations apply to abatement activities, and Service Contract Act wage determinations apply to services activities. Wage Determinations are listed at: https://beta.sam.gov/search?index=wd

8749589 Other Sample Task Order

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

1. Sample Task Order. Can we expect there to be any soil remediation required? If so, how will the added remediation be handled?

2. Sample Task Order. Number 5 / 21,831 sf: Could crushed concrete fill be used in lieu of gravel for Building?

3. Sample Task Order. Concrete Pad 4in Thick with Wire Fabric: Could crushed concrete fill be used in lieu of gravel for Concrete Pad/ 100 SY?

4. Sample Task order. Are there any as-builts available for review?

5. Sample Task order. Will Alabama state law allow crushed concrete for fill in basements?

6. Sample Task order. For value engineering purposes on site restoration, could we seed vs.

sod?

7. Sample Task Order. What are the specifications for the contractor to be considered complete concerning established grass or seeding? For how long must contractor maintain grass or seeding (watering duration/care) or growth before Government acceptance.

8. Sample Task Order: Are any of the buildings located on the flight line?

9. Sample Task Order. Are any of the buildings located in secure areas that will require additional security clearances?

10. Sample Task Order. Are the buildings unoccupied?

11. Sample Task Order. Are the buildings structurally sound with no evidence of storm damage or other?

12. Sample Task Order. Can buildings be abated and/or demolished concurrently?

13. Attach 16, Page 14, 4.2.2 Table of Submittals, Item #24: Will this submittal have to be engineered?

On: Aug 06 2020.

Government Response. . Questions 1-13 -- Reference L.6.2.2.2 A sample task order is enclosed in Section J, Attachment 16 to determine Offerors' understanding of the scope of services required. It is incumbent on the offeror to determine the technically acceptable means and methods required to perform the work in the sample task order at the lowest price. On: Aug 07 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8749590 Other Past Performance

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

May an offeror show past performance and PPQ of a Key Subcontractor? If so, is there a percentage limit (%) of the number of projects that can be used of a Key Subcontractor?

Government Response. . Reference Factor 1, Element 1, Experience in Facilities Reduction/Demolition, is revised to state, "Offerors shall be required to submit a minimum of three (3), up to a maximum of five (5) projects on the Experience Reporting Form, The Offeror shall submit not less than sixty percent (60%) of the projects as those substantially performed by the Prime and NOT as a subcontractor."

8749591 Other None

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

May an offeror submit a proposal as a Large Business, as well as, submit a proposal as a Small Business Concern JV?

Government Response. . Reference Sections L.6.1.2.1 Letters of Commitment and L.6.1.2.3 Contractor Team Arrangement. On: Aug 07 2020

8749593 Other Acknowledgment

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Do you want us to sign the SF33 and SF30 with the word DRAFT watermark included or will you be issuing revised SF 33 and SF30 for Amendment 0001 without the DRAFT watermark?

Government Response. . Reference RFP Amendment 0002 for revisions to SF33 and SF30s to remove the "DRAFT" watermarks from the documents. On: Aug 07

8749605 Other Experience/Technical

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The following sentence: "the offerer should demonstrate capability to operate three independent projects, in different geographic locations, at once, without overlapping project level resources." exists in both the last paragraph of the instructions for volume 1 tab A experience, and the first paragraph of the instructions for volume 1 tab B technical approach.

Which section requires this discussion? Because of page count limitations duplication limits other information being provided. additionally, it appears only experience forms are allowable in Tab A via interpretation from page counts (2 ea max 10) indicating that this factor is evaluated through the dates of relevant projects submitted.

Government Response. . Reference RFP Amendment 0002 for Revised Section L.6.2.1, para 4, Offeror shall describe its experience operating three independent projects, in different geographic locations, at once, without overlapping project level resources.

Reference RFP Amendment 0002 for Revised Section L.6.2.2.1, Offeror shall describe its technical approach for operating three independent projects, in different geographic locations, at once, without overlapping project level resources On: Aug

Report Complete

File details come from the government source that posted it. Updated .