W912DY-20-R-0068 0003.docx

DOCX document 216 KB Posted

Attached to
FRP MATOC Midwest Region W912DY-20-R-0068 Federal contract opportunity
Solicitation number
W912DY20R0068
Issued by
Department of the Army Corps of Engineers Engineering Support Center Huntsville

About this file

This document provides details for a multiple award task order contract (MATOC) solicitation for facilities reduction services in the Midwest region. The solicitation seeks to procure commercial demolition and abatement services through a streamlined process to support the removal of excess federal facilities located in Minnesota, Wisconsin, Illinois, Ohio, Indiana, Michigan, Kentucky, Virginia, West Virginia, Missouri, and Iowa. Services will include planning, coordination, execution of building and facility removal/demolition, as well as potential emergency response. The period of performance is 24 months for the base period and three 12-month optional ordering periods, with an additional potential six-month extension. The shared contract capacity is set at $95 million. Task orders will be on a firm-fixed-price basis.

View the file

Other files for this federal contract opportunity

Other files attached to FRP MATOC Midwest Region W912DY-20-R-0068, newest first.
File Type Posted
W912DY-20-R-0068 CONFORMED COPY 18 Aug.pdf PDF
Attachment 18 Estimated Quantities Rev 03 18 Aug.xlsx XLSX spreadsheet
CONFORMED COPY W912DY20R0068.pdf PDF
W912DY-20-R-0068 0003.pdf PDF
Attachment 18 - Estimated Quantities Rev 01.xlsx XLSX spreadsheet
Attachment 18 - Estimated Quantities Rev 02.xlsx XLSX spreadsheet
Attachment 19 - ProjNet Questions and Answers.pdf PDF
W912DY-20-R-0068 0002.pdf PDF
Attachment 3 - Experience Reporting Form Rev 01.pdf PDF
Attachment 17 Sample Task Order Attachment B Rev 01.xlsx XLSX spreadsheet
FRP Region 3 W912DY20R0068 ProjNet Questions 3 August Revised.pdf PDF
Attachment 12 - Demolition and Recycling Final Report.pdf PDF
Attachment 5 - Small Business Participation Commitment.pdf PDF
Attachment 3 - Experience Reporting Form.pdf PDF
Attachment 17 - Sample Task Order Attachment B.XLSX XLSX spreadsheet
Attachment 10 Accident Prevention Plan Checklist.pdf PDF
Attachment 13 Specification Guide 02220 Demolition.pdf PDF
Attachment 15 - Descriptive Data for ECPs and REAs.pdf PDF
Attachment 1 - Performance Requirements Summary.pdf PDF
W912DY20R0068 0001 conform.pdf PDF
W912DY20R0068 0001.pdf PDF
Attachment 7 - FRP Small Business Decision Matrix.pdf PDF
Attachment 14 Specification Guide 02221 ExBackSite.pdf PDF
Attachment 16 - Sample Task Order.pdf PDF
Attachment 9 Work Plans Sub-Plans and Appendices.pdf PDF
Attachment 6- Letter of Commitment (Key Subcontractor).pdf PDF
Attachment 11 - Safety and Health Program Requirements.pdf PDF
Attachment 8 - Monthly Progress Report Format.pdf PDF
Attachment 4- Past Performance Questionnaire.pdf PDF
Attachment 2 - Quality Assurance Surveillance Plan.pdf PDF
A.07.23 FY20 FRP MW Region MATOC Combined Synopsis.pdf PDF
Attachment 7 - FRP Small Business Decision Matrix.pdf PDF
Attachment 16 - Sample Taks Order.pdf PDF
Attachment 6- Letter of Commitment ( Key Subcontractor).pdf PDF
Attachment 9 Work Plans SubPlans and Appendices.pdf PDF
Attachment 14 Specification Guide 02221 ExBackSite.pdf PDF
Attachment 1 - Performance Requirements Summary.pdf PDF
Attachment 12 - Demolition and Recycling Final Report.pdf PDF
Attachment 4- Past Performance Questionnaire.pdf PDF
Attachment 10 - Accident Prevention Plan Checklist.pdf PDF
Attachment 15 - Descriptive Data for ECPs and REAs.pdf PDF
Attachment 2 - Quality Assurance Surveillance Plan.pdf PDF
Attachment 11 - Safety and Health Program Requirements.pdf PDF
Attachment 8 - Monthly Progress Report Format.pdf PDF
W912DY20R0068.pdf PDF
Attachment 18 - Estimated Quantities.xlsx XLSX spreadsheet
Attachment 3 - Experience Reporting Form.pdf PDF
Attachment 17 - Sample Task Order Attachment B.xlsx XLSX spreadsheet
Attachment 13 Specification Guide 02220 Demolition.pdf PDF
Attachment 5 - Small Business Commitment Document.pdf PDF
Show all 50

FRP MATOC Midwest Region W912DY-20-R-0068 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DY20R0068

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

BLOCK 14 CONTINUATION PAGE

5. Section M is updated to reflect revised evaluation factors, as indicated with highlighted and stricken text.

6. All other terms and conditions remain unchanged.

The following have been deleted:

BOCK 14 CONTINUATION PAGE

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 4001

The PSC code P500 has been added.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

FACILITIES REDUCTION PROGRAM (FRP)

MULTIPLE AWARD TASK ORDER CONTRACT

15 July 20 April 2020

U.S. Army Corps of Engineers U.S. Army Engineering and Support Center, Huntsville Huntsville, Alabama

Table of Contents

1.0GENERAL INFORMATION3
1.1Introduction.3
1.2Objective3
1.4.Service Contract Labor Standards and Construction Wage Rate Requirements.7
1.5Contractor Quality Control7
1.6Government Quality Assurance.8
1.7Contracting Officer Representative (COR).8
1.8Post Award Conference/Periodic Progress Meetings8
1.9Anti-Terrorism (AT) and Operation Security Requirements8
1.10Safety and Health11
1.11Contractor Travel.14
1.12Data Rights14
1.13Ordering14
1.14Pre-Proposal Conference and Site Investigation.15
1.15Prosecution of Work.16
1.16Conditions Affecting the Work16
1.17Authorities/Technical Direction.16
1.18Permits.17
1.19Demolition Waste Management and Diversion.17
1.20Licenses, Bonds, and Insurance18
1.21Deliverables/Submittals18
1.22Unforeseen Site Conditions and Execution Issues19
1.24Cleanup20
1.25Performance Schedule.20
1.26Liquidated Damages.20
1.27Weather Delays20
1.28Suspension of Field Activities.20
2.0DEFINITIONS and ACRONYMS20
2.1Definitions20
2.2Acronyms24
3.0GOVERNMENT- FURNISHED PROPERTY, ITEMS, and SERVICES25
3.1Government-Furnished Facilities25
3.2Government-Furnished Information26
3.3Government-Furnished Landfill(s)/Borrow Pit(s)26
3.4Government-Furnished Utilities26
4.0CONTRACTOR-FURNISHED ITEMS and SERVICES.26
4.1General.26
4.2Contractor Responsibility27
5.0Contractor Management and Personnel Requirements.27
5.1Contractor Management.27
5.2Personnel Duties, Qualifications, and Training27
5.3Identification of Contractor Employees32
6.0SPECIFIC TASKS32
6.1Task Order Proposals.32
6.2Emergency Response33
6.3Summary of Work34
7.0REFERENCES36
7.1National Electrical Code (NEC)36
7.2National Fire Protection Association (NFPA) Codes36
7.3NFPA 101, Code for Safety to Life for Structures and Buildings36
7.4Army Installation Fire Prevention Standards36
7.5USACE Safety and Health Requirements Manual, EM 385-1-136
7.6American National Standard for Construction and Demolition Operations – Safety and Health37
7.7Program Requirements for Demolition Operations – Reference ANSI/ASSE A10.6 – 2006 (R2016)37
7.829 CFR 1910 – Occupational Safety and Health Administration Regulations (Standards)37
7.929 CFR 1925 – Safety and Health Standards for Federal Service Contracts37
7.1029 CFR 1926 –Safety and Health Regulations for Construction37
7.11National Demolition Association – Demolition Safety Manual37

1.0 GENERAL INFORMATION

1.1 Introduction. This is a non-personal services Multiple Award Task Order Contract (MATOC) acquisition for the Midwest Region using performance-based task orders to provide facility reduction services. Army Engineering and Support Center, Huntsville (CEHNC) customers include U.S. Army, Army Material Command, U.S. Army Reserve Command, Defense Logistics Agency, U.S. Air Force, Missile Defense Agency, Joint Munitions Command, National Aeronautics and Space Administration, U.S. Marine Corps (USMC), various USACE Districts, and other Federal Departments or Agencies.

Projects under the Midwest Region MATOC will be located in states detailed at paragraph 1.3.5, Place of Performance. The contracts awarded will include performance based, firm-fixed price task orders for a wide range of demolition services, to include abatement of asbestos-containing materials (ACM), disposal of other regulated material (ORM), and facility demolition. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform demolition services as defined in this Performance Work Statement (PWS).

1.2 Objective. The purpose of this acquisition is to reduce the Federal Government’s inventory of excess (no longer needed) facilities, thereby saving energy and maintenance cost; eliminating safety hazards, nuisances and unsightly structures, and freeing up valuable Government real estate for future development. General work activities performed under this contract include planning, coordination, and execution of building and facility removal/demolition. Projects may also include emergency response to disasters, such as hurricanes, floods, tornadoes, terrorist activities.

1.3 Scope. This contract is for commercial facility reduction services, to include demolition, abatement, site restoration, and related services. General work activities performed under this contract include planning, coordination, and execution of building and facility removal/demolition.

Major features of work include, but are not limited to, removal, demolition, and/or deconstruction (when economically feasible) of small to very large buildings and structures and includes the removal of:

· Asbestos Containing Materials (ACM) by abatement;

· Other Regulated Materials (ORM) by the appropriate disposal procedure

· trees and vegetation;

· parking lots, drives, sidewalks, roadways, other paved surfaces;

· utility lines, services, connections;

· above or underground storage tanks;

· outbuildings such as sheds, gazebos, carports, barns; and

· other activities pertaining to abatement, demolition, destruction, reduction and site restoration.

Other Major features of work may include:

· site and building assessments and or characterizations;

· environmental assessments;

· environmental sampling;

· utility disconnects, terminations, cutting and capping, de-energizing;

· rerouting of utility lines, services, connections;

· recycling of materials and or redirection of debris waste streams;

· site restoration;

· data collection, analysis, and/or reporting;

· hazardous and non-hazardous debris transportation;

· value engineering; and

· other activities pertaining to abatement, demolition, destruction, reduction and site restoration.

Task order PWS shall direct the required capabilities and/or performance characteristics of the supplies, services, and equipment provided under the proposed contracts. The Contractor determines how to meet the government objectives and how to achieve appropriate performance quality results. IAW FAR 37.102, this is a performance-based acquisition and uses performance based acquisition methods to the maximum extent practicable.

1.3.1. The Contractor shall provide a full range of professional services in a proficient, productive, and knowledgeable manner for efficient and effective accomplishment of all contract work. Each task order awarded under this contract is for firm fixed price (FFP) unless circumstances warrant an award based on Labor Hour reimbursement. In this case, the KO shall convert task order to FFP after the Government confirms the full extent of the project. Contractor shall conduct all work pursuant to all applicable Federal, State, and local laws, regulations, and requirements. Required facility demolition/removal services may include, but are not limited to:

1.3.1.1. Securing the site and facilities;

1.3.1.2. Assessing and/or characterizing the complete facility prior to abatement and demolition via the execution of an environmental survey or assessment, which will include destructive sampling and laboratory testing of samples;

1.3.1.3. Developing and submitting a site-specific Demolition Work Plan (DWP), which will include and address a(n):

· Accident Prevention Plan

· Demolition Procedures and Engineering Controls

· Waste Management Plan

· Material Handling Procedures and Sampling Plan

· Engineering Assessment Determination of Demolition Viability

· Environmental Protection Plan

· ACM Abatement and Regulated Materials Removal Plan

· Environmental Compliance Plan

· Natural Resources and Wildlife Management

· Cultural and Historic Resources Management

· Clean Water Act

· Storm Water Pollution Prevention Plan

· Erosion and Sediment Control Plan

· Spill Pollution Prevention Plan

· Solid Waste Management

· Materials Handling, Packaging, Disposal, and Transportation

· Access/Egress and Security Controls

· Fire Protection and Prevention Plan, if applicable

· Quality Control Plan

· Project Schedule Detail Work Plan

1.3.1.4. Disconnecting electrical service and disconnecting and capping all other utilities;

1.3.1.5. Abating ACM, and its proper handling, storage, packaging, transport, and final disposal;

1.3.1.6. Removing ORM, and its proper handling, storage, packaging, transport, and disposal;

1.3.1.7. Removing and disposal of underground/above ground (UST/AST) storage tanks;

1.3.1.8. Demolition of facilities;

1.3.1.9. Transportation and disposal of demolition debris materials;

1.3.1.10. Site-restoration, as directed in the task order PWS; and

1.3.1.11. Tracking and submission of required submittals and reports.

1.3.2. The contractor shall not perform Munitions and Explosives of Concern (MEC) remediation activities. However, on a case-by-case basis, the Contractor may be required to assess the presence of explosives within a facility using an Expray, Dropex, or similar method of explosive constituent sampling. In addition, as directed in the task order PWS, the Contractor may be required to provide UXO avoidance support. Government EOD will dispose of any MEC discovered.

1.3.3. Period of Performance. The MATOC ordering period includes a 24-month base and three (3) 12-month optional ordering periods. The MATOC includes FAR clause 52.217-8, allowing an additional six (6) month extension. The Government will exercise contract option periods at Obtaining all required permits and making required notifications;

1.3.4. Contract Capacity. The shared contract capacity for this Midwest Region MATOC, including all subsequent task orders issued shall not exceed $95,000,000.00. The minimum guarantee for the base performance period of this IDIQ contract is $2,500.00. The KO will obligate the minimum guarantee against this contract line item at the time of the basic contract award. Upon issuance of task order awards with an aggregate value exceeding $2,500.00, the KO will deobligate the minimum guarantee from this contract line item. For each successful contractor, there will be a one time “minimum guarantee award amount” during the life of the contract, which includes all option years, if exercised.

1.3.5. Place of Performance. Contractor is responsible for performing the services required under this contract at various Federal facilities located in Minnesota, Wisconsin, Illinois, Ohio, Indiana, Michigan, Kentucky, Virginia, West Virginia, Missouri, and Iowa., as directed in the task order PWS.

1.3.6. Type of Contract. This MATOC is Firm Fixed-Price (FFP). CEHNC will issue FFP project specific performance-based task orders under the base contract.

1.3.6.1. Performance-based service tasks orders/contracts:

· Describe the requirements in terms of results required rather than methods of performing the work;

· Use measurable performance standards (e.g., terms of quality, timeliness, quantity, etc.); and

· Specify procedures for reductions in fee and/or price for deficient services.

1.3.6.2. By using performance-based contract methods, Contractors have the freedom to determine how best to meet the Government’s performance objectives. This maximizes Contractor control of work processes and allows for innovation in approaching various work requirements. This ensures Contractors achieve required performance quality levels. KO will issue performance-based task orders with a task order-specific Quality Assurance Surveillance Plan (QASP), in accordance with (IAW) Federal Acquisition Regulation (FAR) 37.102.

1.3.7. Work Week. For proposal preparation, Contractor shall assume that the work week encompasses Monday through Friday beginning at 0700 and concluding at 1700 excluding holidays unless otherwise directed/allowed in the task order PWS. For each task order awarded against this MATOC, the Contractor shall propose a work week schedule, detailing the number of days and hours/day per work week, for each phase of field activities. For each task order, the Contractor shall submit a schedule as part of the Work Plan and shall update as needed by letter for acceptance by the Contracting Officer's Representative (COR). If the COR rejects the proposed work week schedule, the Contractor will propose a new schedule and the same process will be repeated until an acceptable schedule is provided. Once the schedule is set, Contractor shall request changes in writing for acceptance of the KO.

1.3.8. Recognized Holidays. The following are Federal holidays. Government offices will not be open.

New Year's DayLabor Day
Martin Luther King Jr.'s BirthdayColumbus Day
President's DayVeteran's Day
Memorial DayThanksgiving Day
Independence DayChristmas Day

NOTE: For this MATOC, the days between Christmas Day and New Year’s Day (26 December through 31 December) are non-working days. Contractor is responsible for accounting for all Holidays and non-working days in its schedules.

1.4. Service Contract Labor Standards and Construction Wage Rate Requirements. Contractor services are subject to Federal Acquisition Regulation (FAR) 52.222-41, Service Contract Labor Standards, FAR 52.222-6, Construction Wage Rate Requirements, and/or 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts). In the task order Requests for Proposal, CEHNC will incorporate current wage determination tables applicable to the geographic area(s). Official wage determinations are located at https://beta.sam.gov.

1.5 Contractor Quality Control.

1.5.1 Quality Control Program (QCP). The Contractor shall develop and maintain an effective quality control program to ensure services are performed IAW this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that its work complies with the requirements of the contract. The Contractor shall develop quality control procedures that address the areas identified in Appendix A, Performance Requirements Summary (PRS).

1.5.2 Corporate Quality Control and Surveillance Plan. Contractor shall develop, document, and implement an effective quality control and surveillance program for this contract and document in a plan. The Contractor shall submit Quality Control (QC) Plan within 30 calendar days of task order award. Contractor QC Plan shall include at a minimum the following documents: (a) Corporate QC Manager appointment letter, (b) QC organizational structure (organization chart), (c) inspection procedures, (d) recordkeeping procedures, (e) report templates, and (f) any other information as required for describing its QC program. The Contractor shall follow the three-phase inspection process (preparatory, initial, and follow-up) or other Government-accepted inspection methodology and include sample forms for each definable feature. After acceptance of the QC Plan, the contractor shall submit any proposed changes to the Government through USACE’s Resident Management System (RMS) for acceptance by the COR.

1.6 Government Quality Assurance. The Government shall assess Contractor performance under this contract IAW the QASP. The QASP defines Government roles and responsibilities for quality assurance, types of work and required outcomes (as defined by the performance metrics), Government evaluation methods used for assessing Contractor performance, and the frequency of surveillance. In addition, the QASP provides Surveillance Activity Checklists and Corrective Action Request (CAR) forms the Government will use to document and evaluate Contractor’s performance to ensure compliance with accepted work and safety plans.

As directed in the task order QASP, the Government will evaluate the work performance in terms of how well the Contractor satisfies the requirements of the contract, the extent to which the Contractor performs work IAW its technical proposal, clarity of documentation, and Contractor’s timely accomplishment of work

The Government may conduct QA inspections at any time on all phases and types of work performed. If any Government QA review identifies a process/work product failure or identifies noncompliance with safety practices, the COR shall issue the Contractor a Contract Deficiency Report (CDR).

1.7 Contracting Officer Representative (COR). The COR shall be identified by separate letter for each task order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to ensure that the Contractor performs the technical requirements of the contract; perform necessary inspections of Contractor work; maintain written and oral communications with the Contractor regarding technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notify the KO and Contractor of deficiencies; coordinate availability of Government Furnished Property (GFP); and coordinate site access for Contractor personnel. The COR’s designation letter from the KO will state the responsibilities and limitations of the COR, and highlight that the COR has no authority to accept changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.

1.8 Post Award Conference/Periodic Progress Meetings. Contractor agrees to attend any post award conference convened by the KO or COR. The KO, COR, and other Government personnel, as appropriate, shall meet periodically with Contractor to review the Contractor’s performance. Government/Contractor shall take appropriate action(s) to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.9 Anti-Terrorism (AT) and Operation Security Requirements. Antiterrorism and Operations Security: Per the guidelines of OPORD 2013-74: Integrating Antiterrorism and Operations Security (OPSEC) into the USACE Acquisition Process, the following OPSEC provisions apply to this requirement:

1.9.1 AT Level I Training. All contractor and subcontractor employees who require access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date. Upon request, the contractor shall submit certificates of completion for each trained contractor and subcontractor employee to the COR within five (5) calendar days after completion of training. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the Requesting Activity Anti-Terrorism Office in presentation form which will be documented via memorandum.

1.9.2 Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractor(s) employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures, as provided by COR and/or installation government representative. The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

1.9.2.1 Background Checks for Installation Access. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB), applicable installation, facility and area commander installation/facility access and local security policies and procedures. Installation personnel will conduct background checks on all visitors 18 years of age and older to determine if the person requesting unescorted access presents a potential threat to the good order, discipline, or health and safety on the installation. All access applicants will provide a valid and original form of ID (State driver’s license, passport, and so forth, which complies with Public Law 109-13 (The REAL ID Act of 2005)). Installation will check applicant’s background through NCIC-III and TSDB to identify wanted persons, known or appropriately suspected terrorists (KST), missing persons, foreign fugitives, wanted persons, gang affiliations, protection orders, immigration violators, identity theft, supervised releases, violent persons, and the National Sex Offender Registry. Failure to provide requested information will result in the denial of an authorized access pass (or equivalent) and denial of entry. Delays in gaining access to a facility shall not be a valid basis for delay charges.

1.9.2.2 Contractor personnel requiring access to the military installation in connection with the contract shall have access to only those parts of the installation or building(s) where their presence is required. While on the job, Contractor employees shall display identification as may be required under the Special Contract Requirements entitled "Identification of Employees." Vehicles operating on the military installation are subject to search by security personnel at any time.

1.9.3 Suspicious Activity Reporting Training. Contractor and all associated sub-contractors shall receive a brief/training on the local suspicious activity reporting program (e.g., iWATCH, CorpsWatch, or See Something, Say Something). Locally developed training will inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the PM, security representative or law enforcement entity. Contractor and all associated sub-contractors shall complete this training within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT five (5) calendar days after the completion of the training.

1.9.4 Operations Security (OPSEC) Training. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR within five (5) calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/or http://www.cdse.edu/catalog/operations-security.html. If provided by the Requiring Activity’s OPSEC Officer, Contractor shall document via memorandum to COR.

1.9.5 Sensitive or Restricted Areas. Government Designated Authority (GDA) shall escort all contract employees, including subcontractor employees, who are not in possession of the appropriate security clearance or access privileges in areas where exposure to classified and/or sensitive materials and/or sensitive or restricted areas may occur. The contractor will coordinate with the COR and/or the facility security office for access when required.

1.9.6 Pre-Screen Candidates Using E-Verify Program. Contractor shall pre-screen candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to ensure that they meet the established employment eligibility requirements. Contractor must ensure that candidates have two valid forms of Government-issued identification prior to enrollment to ensure correctness of information entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than three (3) business days after the initial contract award.

1.9.7 Transportation Worker Identification Credential (TWIC). Installation may grant TWIC holders unescorted access to the installation after completion of identity proofing and initial vetting through NCIC-III and TSDB and based on a valid purpose for entry to deliver commodities, provide services, or other actions approved by the commander or director. Transportation workers shall provide additional documentation, e.g., commercial driver's license, government bill of lading, or other documentation, which identifies the requirement or need to enter the installation.

1.9.8 Physical Security. The Contractor shall provide site security (e.g. fencing or guard service) as directed in the task order PWS. However, at a minimum, the Contractor shall maintain the site and all other Contractor-controlled areas in such a manner as to minimize the risk of injury or accident to site personnel or others who may be in the area. Work on or near roadways shall be carefully marked with lights and barricades that meet State and local regulations or, where such regulations are not applicable, deemed adequate to minimize the risk of an accident.

Open excavations that pose a danger to site personnel or others shall be fenced to prevent accidental entry. Contractor shall shore side slopes of excavations or leave at a safe angle of repose, as defined by OSHA 1926.650-652 and EM 385-1-1, Section 25. Contractor shall leave all equipment, when not in operation, in a safe manner (e.g., wheels blocked, buckets on the ground, etc.). Near residential areas, recreational areas, or other areas where children may be present, the Contractor shall give special consideration to site security/safety needs.

1.9.9 Foreign Nationals. IAW Engineering Regulation, ER 380-1-18 (http://www.usace.army.mil/inet/usace-docs/eng-regs/er.htm), Section 4, foreign nationals, including subcontractor employees, who work on USACE contracts or task orders shall be accepted by the HQUSACE Foreign Disclosure Officer or higher before beginning work on the contract/task order. The contractor shall submit the names of all foreign nationals proposed for performance under this contract/task order, along with documentation verifying the legal admission into the United States and the foreign national’s authority to work in the U.S. to the KO. The KO will forward information CEHNC Security Officer for review and acceptance.

1.10 Safety and Health. IAW FAR 52.236-13, Alt I, Accident Prevention, the Contractor shall comply with the latest version of U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Engineering Manual (EM) 385-1-1 (EM 385-1-1), including revisions in effect at the time of the solicitation, as well as all applicable Federal, State, and local laws, regulations, and requirements. EM 385-1-1 and its changes are available at: http://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/

1.10.1 Corporate Safety and Health Program. Contractor shall develop and maintain a written Corporate Safety and Health Program (SHP) in compliance with the requirements of the Occupational Safety and Health Administration (OSHA), EM 385-1-1, 29 CFR 1910, 29 CFR 1926, 29 CFR 1960, and FAR 52.236-13.

1.10.2 Site Visit Abbreviated Accident Prevention Plan (SVAAPP). The Contractor shall submit an SVAAPP for Government review and acceptance prior to commencement of any site visit not covered under an Accident Prevention Plan. The Contractor shall prepare a "fill-in-the-blank" template SVAAPP and submit to CEHNC Safety Office (SO) for acceptance prior to all site visits. The SVAAPP shall be adapted to sites specified in the individual task/delivery orders and shall be prepared prior to each site visit. Contractor shall submit SVAAPPs electronically, in PDF format, to the SO and Project Manager (PM) for review and acceptance. Upon acceptance, by the SO, the Contractor shall submit final SVAAPP, including tracking submittal via Form 4025 through RMS. Final acceptance threshold is an acceptance transmittal of the SVAAPP via RMS (note: an e-mail from the SO does not constitute full acceptance of an SVAAPP). Contractor may obtain a sample SVAAPP by contacting SO. Prior to performing site visits or surveys, SO must accept SVAAPP and Contractor must receive partial Notice to Proceed (NTP) from KO. Government may update submission or acceptance requirements in the task order PWS.

1.10.3 Accident Prevention Plan (APP). The Contractor shall submit an APP prior to performance of any fieldwork activities. APP's shall address applicable items listed in EM 385-1-1, Appendix A (Minimum Basic Outline for Accident Prevention Plans), in addition to other applicable requirements of EM 385-1-1 and OSHA. The Contractor shall develop APP specifically to address site-specific work activities and shall address any unusual or unique aspects of the project or activity directed in the task order PWS. The Contractor shall coordinate with facility representatives or facility contractor, to obtain installation first aid resources, emergency phone numbers, response plans, site evacuation plans, lockout tag-out procedures, permit-required activities, previously-identified confined spaces, evacuation drills, known or potential hazardous or toxic environments/agents, etc., and include the information in the APP. The APP shall also include site-specific Activity Hazard Analysis (AHAs) for the project. The APP shall detail and document how the Contractor intends to accomplish the safety and health requirements of OSHA, EM 385-1-1, and other Federal, State, and local laws, regulations, and requirements prior to mobilization to perform any work not included under the SVAAPP. SO must accept APP and Contractor must receive Notice to Proceed (NTP) from KO. Government may update submission or acceptance requirements in the task order PWS.

1.10.4 Addendums to the APP - The Contractor shall verity that the current APP covers additional work added to the PWS through requests for proposal, engineering change proposals, or contract modifications. If the accepted APP does NOT cover pending work effort, the contractor shall submit an addendum to the APP for Government review and acceptance, prior to performing additional work.

1.10.5 Activity Hazard Analysis (AHA). Before beginning each activity, task, or Definable Feature of Work (DFOW) involving a type of work that presents hazards not experienced in previous project operations, or where a new crew or subcontractor will perform the work, the Prime Contractor(s) must prepare an AHA. If the Prime Contractor requires a subcontractor, or sub tier-contractor or supplier performing the work, to develop an AHA, the Prime Contractor SSHO shall review and approve before submitting to the SO for review and acceptance. The Prime Contractor shall review AHAs periodically (at least annually in conjunction with APP review) and update as necessary when procedures, scheduling, or hazards change.

1.10.6 Experience Modification Rate (EMR). The Contractor shall provide experience modification worksheet indicating its EMR for the last three (3) years and a letter from its insurance agent, insurance carrier, or state fund (on their letterhead) verifying the EMR data furnished.

1.10.7 Site and Safety Health Officer (SSHO). The Contractor must employ a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). The task order PWS will dictate SSHO requirements.

1.10.8 Exposure Hour and Mishap Reporting

1.10.8.1 Exposure Hour Reporting (Monthly Man-hour reporting) - IAW EM 385-1-1, the Contractor shall complete a monthly summary report of accident experience, exposure, Restricted Duty (RD), and Lost Work Days (LWD). Contractor shall describe total hours associated where workers were exposed to activity hazards and forwarded to the GDA no later than close of business (COB) the 7th day of the following month.

The Contractor shall submit monthly exposure hour report in RMS at the task order level. Information cut-off date will be the last day of each month. The monthly submission must include the title of the report, i.e., Accident Exposure Data Report, contract number, task order number, project site, month and year for which the report is made, a point of contact listing both email address and telephone number, and number of lost workday accidents to include total days lost. If Contractor worked zero hours on the project/task order, a report showing "zero (0)" is required. Government may change the form or submission method as necessary.

1.10.8.2 Mishap Reporting. Contractor shall report mishaps IAW EM 385-1-1, paragraph 01.D, Contractor shall notify KO and SO as soon as practical, but no more than twenty-four hours, after any mishaps, including recordable accidents, incidents, and near misses. Contractor shall submit all mishap notifications as directed in the task order PWS.

1.10.9 Preparatory and Initial Control Phase Meetings (Kick-off Meetings). IAW EM-385-1-1 Section 01.A.14.c and Appendix A, the Contractor may not know all site-specific information (e.g., subcontractors, type of fall protection, cranes specifications, or other load handling equipment etc.) at the time it submits the APP. However, Contractor shall provide remaining site-specific information at preparatory meeting for each phase of work, along with the appropriate AHAs, for Government review and acceptance. Work shall not begin until the GDA accepts the AHA with Risk Assessment Code (RAC) for the work activity and the Contractor discusses the work activity with appropriate personnel performing the work the Contractor, its subcontractor(s), and Government on-site representatives. Contractor shall extend notifications of these meetings to USACE PM, KO, Engineer, and SO for the given task order.

1.10.10 Traffic Control Plan. For any work that is to take place in or near roadways, the contractor shall submit a traffic control plan for acceptance prior to commencing any work. Contractor shall develop traffic control plan IAW EM 385- 1-1, State-specific guidelines and regulations, and installation-specific requirements.

1.11 Contractor Travel. The Contractor will be required to travel to facilities located throughout the Continental United States (CONUS), Alaska, Hawaii, US Territories, and Possessions during the performance of this contract to attend site visits, meetings, etc. Contractor travel shall be included in FFP task order proposals.

For modification requests for proposals, engineering change proposals, or requests for equitable adjustment, Contractor shall include price proposals for additional travel, if applicable, consistent with the substantive provisions of the Federal Travel Regulation for travel in the contiguous United States and Joint Travel Regulations for travel in Alaska, Hawaii, and United States Territories and its Possessions. Profit is not authorized on travel costs.

1.12 Contract Submissions. The Government has unlimited rights to all written submissions produced under this contract. The information and materials collected or produced by the Contractor, subcontractor(s), or associates during the performance of services under this contract shall become the property of the Government. Contractor shall keep any copies of such submissions confidential.

Contractor, its subcontractors, or its associates shall not use or sell any project information, documents, or materials without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.13 Ordering. The only authorized ordering office is CEHNC. CEHNC will award task orders against the basic ID/IQ contracts using the fair opportunity procedures pursuant to Section 863 of the National Defense Authorization Act for FY 2009, Public Law 110-118, and FAR PART 16.5, in addition to the competitive source selection procedures identified in Section 863 of Public Law 110-417. Each order exceeding $2,500.00 will be awarded on a competitive basis in accordance with FAR 16.505, unless an exception described in FAR 16.505 (b)(2)(i) through (iv) applies.

Task orders will be competed and awarded against the basic ID/IQ contract on an as-needed basis as requirements arise. In order to determine if a set aside for small businesses is appropriate for the task order specific competition, the Government will consider the following: 1) capability of the contractors to perform at the level of complexity required for successful completion of the task; 2) any relevant past performance of the contractors, including but not limited to quality, timeliness and cost control; 3) potential impact on other orders placed with the contractors; 4) minimum order requirements; and 5) any other factor necessary to determine whether or not to set aside a task order for small business participation.

1.14 Pre-Proposal Conference and Site Investigation. Contractors are not required to but are strongly encouraged to attend pre-proposal conferences/site visits or preview project sites prior to submission of task order proposals. During pre-proposal conferences, the Contractor will have access to additional project information, such as local transportation routes, availability of onsite landfills and stockpile areas, hours of operation, special conditions, limitation/restrictions, and additional specifications, as required. In addition, the Contractor shall have an opportunity to view and assess the project area(s). See 1.10.2 for SVAAPP requirement for site investigations. The SVAAPP is not required for conferences or meetings.

1.15 Prosecution of Work. The Contractor shall furnish sufficient technical supervisory and administrative personnel at all times to ensure successful prosecution of the work IAW the contract and task orders issued under the basic contract. The Contractor shall check all data, notes, and other work products. The description of work stated herein provides a general understanding of function the Contractor will perform. Individual task orders will contain specific performance-based requirements, which may or may not be described below.

1.16 Conditions Affecting the Work. The Contractor is responsible for identifying and verifying all general and specific technical project terms, conditions, and circumstances before proposing on this contract or any subsequent task order resulting from this contract. Contractor shall verify all general and local conditions that could affect the work or its cost, including, but not limited to: (1) all Federal, State, and Local government requirements related to storage, handling, transportation, and disposal of demolition debris and regulated materials, (2) the availability of water, electric power, and haul routes, (3) the topography and conditions of the ground, Federal, State, and local laws, regulations, and requirements, and (4) the mechanical equipment and materials required to perform the work, (5) availability of workforce. The Contractor shall determine the character, quality, and quantity of surface and subsurface materials or obstacles expected at the work location, insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government. Failure of the Contractor to take the actions described and acknowledged in this paragraph shall not relieve the Contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work at the proposed price. See FAR Clause 52.236-2.

1.17 Authorities/Technical Direction. Contractor shall not perform work beyond the original scope of the contract without written direction of the KO. If Contractor performs any work outside the scope of the contract without written KO direction, it will be at Contractor’s risk. Only the Contracting Officer can direct changes to the work. The Contractor shall take no direction that changes the terms and conditions of this contract action or its scope, or that impacts the price or schedule of the contract, from any Government employee or any person other than the KO. Contractor shall promptly report to the KO direction given by any person other than the KO. The KO will authorize changes in a written, official, signed modification to the contract.

1.18 Permits. IAW FAR 52.236-7 Permits and Responsibilities, the Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and local codes, laws, regulations, and requirements applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

1.19 Demolition Waste Management. Federal law mandates that the Government apply sound environmental principles in the design, construction, use, and removal of facilities. As such, the Contractor shall: (1) practice efficient waste management when removing, collecting, sizing, cutting, separating demolition debris and (2) use all reasonable means to divert demolition waste from landfills and incinerators and to facilitate their recycling or reuse and (3) be in compliance with all Federal, State and local laws, regulations, and requirements pertaining to the management, transportation and disposal of such material. The current diversion goal of this MATOC is 60% by weight or as directed in the task order PWS. Unless directed in the task order PWS, Contractor shall provide all containers, bins, and storage areas to facilitate effective waste management.

Contractor shall transport and dispose of all regulated materials resulting from the performance of this work IAW all Federal, State, and local laws, regulations, and requirements. The Contractor shall not dispose of any regulated materials/waste in any dumpster, sanitary sewer, storm sewer, or dispose of regulated materials/waste by any other means on Government property. The Contractor shall provide copies of all waste analyses, waste profiles, and manifests and/or bills of lading for the transportation and disposal of all regulated materials, to include asbestos or asbestos containing materials, to the COR. The Contractor shall immediately contain and clean up all spills or releases of regulated materials IAW all applicable Federal, State, and local laws, regulations, and requirements and shall immediately report to the installation Fire Department and the Department of Public Works – Environmental Office for additional guidance. The Contractor must also notify the KO of a spill incident or release as soon as possible but no later than 60 minutes after the incident is under control.

1.19.1 Dismantling and Demolition of Property. Except where specified or reserved by the Government in other sections, all materials and equipment disassembled, demolished, or transported shall become the property of the Contractor and shall be removed from Government property and recycled or disposed IAW all Federal, State, and local laws, regulations, and requirements.

1.19.2 Management. The Contractor shall be responsible for the proper handling, storage, and management of regulated and non-regulated demolition debris and waste IAW all Federal, State, and local laws, regulations and requirements and shall ensure compliance by all subcontractors, vendors, and suppliers. Demolition debris and waste includes all products generated by the removal of a facility. In the management of waste, Contractor shall consider the availability of recycling markets, the condition of the material, the ability to provide the material in suitable condition and in a quantity acceptable for recycling, and time constraints imposed by internal project completion mandates. The Contractor shall be responsible for implementation of any special programs involving rebates or similar incentives related to recycling of waste. Revenues or other savings obtained for salvage or recycling shall accrue to the Contractor; however, such savings shall be listed and accounted for in Contractor’s final bid price. Contractor shall ensure proposed landfills and waste disposal sites have applicable certification(s) required to receive waste debris and regulated materials to the extent required by Federal, State, and local laws, regulations, and requirements.

1.19.3 Waste Disposition Records. Contractor shall maintain records documenting the type and quantity of waste generated for each facility demolished as part of this contract. Contractor shall make these records available to the COR during demolition and deliver a copy of the records to the COR upon completion of the project, as part of the final report. The Contractor shall prepare a Project Demolition Materials and Quantity Report containing segregated data for metals/steel salvage, cementitious materials, wood timbers, all other recyclable and/or reusable materials, and all other debris. Contractor report shall also identify other debris material diverted from landfills.

1.20 Licenses, Bonds, and Insurance. Licenses, Bonds, and Insurance. The Contractor, or its designated subcontractor, shall possess applicable licenses, bonds, and insurance required to perform ACM abatement and removal activities of all ORM in the State/Locality in which work Contractor will perform work. Similarly, the Contractor or its designated subcontractor shall possess applicable licenses, bonds, and insurance to perform demolition work in the State/Locality in which work Contractor will perform work. Work shall not proceed until the COR accepts all permits and licenses and the KO accepts all payment and performance bonds and insurance documents, as stated in the MATOC or directed in the task order PWS.

1.21 Deliverables/Submittals. Contractor shall provide all submittals as directed in the task order PWS. Contractor shall prepare submittals and submit to COR using RMS. Contractor shall ensure all submittals have a title page and header identifying the contract and task order numbers, project name, project location, report type, and date of submittal. Contractor shall ensure reports are standard size (8 ½- by 11-inch), with drawings no larger than 11- by 17-inch. Contractor shall ensure drawings are drafted IAW recognized and generally accepted good engineering practices and provide sufficient detail to show interrelations of major features. Contractor shall ensure submittals are legible and suitable for reproduction. Contractor shall number pages sequentially.

1.21.1 Partial Submittals. Without prior approval, the COR will not accept partial submittals.

1.21.2 Revisions. Government will review submittals for adequacy and will provide Contractor written comments as necessary. Contractor shall incorporate all review comments by revising and reissuing affected pages. If major revisions are necessary, Contractor shall resubmit entire document. Contractor shall mark affected pages with revision number and date of correction on the bottom right corner of the page. Contractor shall provide a table immediately following the title/cover page indicating the revision number, date of revision, and list of changes made from previous iteration. Contractor-provided table shall indicate all revisions and associated changes.

1.21.3 Distribution. Contractor shall submit documents via RMS. The Contractor shall reproduce and distribute all documents as directed in the Task Order PWS, as directed in the task order PWS, Contractor shall submit documents via regular mail, a carrier service that will provide overnight service (if necessary), email, or Government-accepted file transfer protocol.

1.21.4 Acceptance of Submittals. Contractor shall not mobilize or start any on-site work activities until Government acceptance of such submittals. Government acceptance is conditional. The Government reserves the right to require the Contractor to make changes in its Work Plan and operations, including removal and/or replacement of personnel, as necessary, to obtain the quality specified.

1.22 Unforeseen Site Conditions and Execution Issues. Upon discovery of any unforeseen site conditions or other significant developments affecting the contract, the Contractor shall advise the KO or COR as soon as possible, but not later than within 24 hours of the event. In the case of unclear direction, the Contractor shall obtain clarification of any direction or contract requirement it does not fully understand from the KO or COR.

1.23 Environmental Protection. The Contractor shall perform all work in a manner that minimizes the pollution of air, water, and land IAW Federal, State, and local laws, regulations, and requirements.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .