About this file

This synopsis announces a proposed contract action for minor renovation and repair services for Squadron Operations Building 2215 at Mountain Home Air Force Base in Idaho. The project scope includes replacing the roof and HVAC system, remodeling restrooms to meet ADA requirements, adding exterior windows and skylights, and relocating interior walls and providing new interior finishes throughout the 61,472 square foot facility. The contract value is estimated between $5-10 million. The solicitation will be limited to eligible 8(a) firms located in Idaho, Oregon, Utah, or Washington, and 8(a) participants in good standing serviced by an SBA office outside those states but having a bona fide branch office within the specified geographical boundaries. The solicitation number is W912DW19R0028 and will be posted on FBO.gov on or about July 31, 2019.

Plumbing - Drawings

View the file

Other files

File Type Posted
AWARD NOTICE - Bldg 2215.pdf PDF
Amendment_0008_Building_2215_MHAFB.pdf PDF
Amendment_0007_SF_30.pdf PDF
00_31_24_Part1.pdf PDF
00_31_24_Part2.pdf PDF
00_31_24_Part3.pdf PDF
MHAFB_Facility2215_Auditorium_Seating_Dwg_A-110_Excerpt.pdf PDF
Site_Visit_Pre-Proposal_PPT_Slides_10-10-19.pdf PDF
Site_Visit_Attendee_List_10-10-19.pdf PDF
Amendment_0006_Building_2215_MHAFB.pdf PDF
Amendment_0005_Building_2215_MHAFB.pdf PDF
General.pdf PDF
Amendment_0004_Building_2215_MHAFB.pdf PDF
Mechanical_Part_1.pdf PDF
Fire_Protection.pdf PDF
Architecture.pdf PDF
Structural.pdf PDF
Mechanical_Part_2.pdf PDF
Civil.pdf PDF
Electrical.pdf PDF
Amendment_0003_Building_2215_MHAFB.pdf PDF
Amendment_0002_W912DW19R0028_Building_2215.pdf PDF
Amendment_0001_W912DW19R0028_Building_2215_SF_30.pdf PDF
B2215_roof_report_Part_1.pdf PDF
B2215_roof_report_Part_2.pdf PDF
Attendance_Sheet_-_Site_Visit.pdf PDF
Pre-Proposal_Conference_and_Site_Visit_Slides.pdf PDF
FY19_MHAFB_Squad_Ops_Facility_2215_Specifications.PDF PDF
MHAFB_Facility2215_Drawings_Part_6.pdf PDF
MHAFB_Facility2215_Drawings_Part_1.pdf PDF
MHAFB_Facility2215_Drawings_Part_4.pdf PDF
MHAFB_Facility2215_Drawings_Part_2.pdf PDF
MHAFB_Facility2215_Drawings_Part_3.pdf PDF
RFP_W912DW19R0028_MHAFB_Bldg_2215.pdf PDF
MHAFB_Facility2215_Drawings_Part_5.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D e s ig n e d b y

C h e ck e d b y

D ra w n b y

C a d F il e

D a te

P ro je ct

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e et

S u it e

5P -0

1.

d g n

S p e c

P ro je ct

B o is e I d a h o

2-

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 8:18:59 AM

SHEET of

/2

/2

F A

C

IL

IT

Y

Q Y Z

H

-8

R E P

A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

IG

N

682783

P-001

C h k B y

682783_2215P-001.dgn

T P

R

IC

E

J P

IG

M A

N

682783682783

P L

U M

B

IN

G

Y = F - FLOOR CLEANOUT

W - WALL CLEANOUT

HUB DRAIN

FLOOR DRAIN

ROOF DRAIN

HOSE VALVE

OVERFLOW ROOF DRAIN

BACKFLOW PREVENTER

BALANCE VALVE (RHW)

Y = P WITH PRIMED TRAP

Y = P WITH PRIMED TRAP

Z" YCO-X

Z" HD-XY

Z = OUTLET SIZE IN INCHES

Z = OUTLET SIZE IN INCHES

Z = OUTLET SIZE IN INCHES

Z = OUTLET SIZE IN INCHES

Z = OUTLET SIZE IN INCHES

Z" RD-X

Z" OD-X

EXISTING PIPE (SCREENED)

NEW PIPE

EXISTING PIPE TO BE ABANDONED

EXISTING PIPE TO BE REMOVED

ANCHOR

CAP

ELBOW, 90 DEGREE

ELBOW UP

ELBOW DOWN

CROSS

TEE

TEE UP

TEE DOWN

LATERAL

LATERAL DOWN

LATERAL UP

ELBOW, 45 DEGREE

CONCENTRIC REDUCER

ECCENTRIC REDUCER

UNION

GROOVED END JOINT

STEEL BELLOWS EXPANSION JOINT

STRAINER

SIGHT GLASS

PRESSURE SWITCH

SAFETY SHOWER

EYEWASH

HOSE RACK (TYPE AS INDICATED)

THERMOMETER

PRESSURE GAUGE WITH COCK

FLEXIBLE PIPE CONNECTION

COMBINATION UNIT

SAFETY SHOWER\EYEWASH

CLEANOUT PLUG

PLUMBING SYMBOLS VALVE SYMBOLS

GATE

BUTTERFLY

GLOBE

BALL

PLUG OR COCK

SWING CHECK

BALL CHECK

X = NO. IN SPECS

PRESSURE RELIEF

AIR AND/OR VACUUM RELEASE

HOSE VALVE (HV- X) OR (V-X)

REGULATED SIDE

DOUBLE LINESINGLE LINE

OR

OR

OR

OR

OR

OR

PRESSURE CONTROL (INTERNAL PILOT)

S

S

PS

ABBREVIATIONS

ABBREVIATION DESCRIPTION

ABBREVIATION

FLOW STREAM IDENTIFICATION

SYMBOL DESCRIPTION

GENERAL NOTES:

S

H E

D U

L E

S

A B

B R

E V

IA

T

IO

N S

L

E G

E N

D S

VAC

CA

WSFU

WCO

WC

VTR

US

UR

SK

SH

PF

MS

LAV

GPM

FS

FD

FCO

(E)

DFU

CO

VACUUM

COMPRESSED AIR

WATER SUPPLY FIXTURE UNIT

WALL CLEANOUT

WATER CLOSET

VENT THROUGH ROOF

UTILITY SINK

URINAL

SINK

SHOWER

PLUMBING FIXTURE (PER SCHEDULE)

MOP SINK

LAVATORY

GALLONS PER MINUTE

FLOOR SINK

FLOOR DRAIN

FLOOR CLEANOUT

EXISTING

DRAINAGE FIXTURE UNIT

CLEANOUT

G

CD

VAC (E)

VAC

CA (E)

CA

RD

G

ICW

ROS

SS (E)

V

SS

DHWR

DHW

DCW

CONDENSATE DRAIN

VACUUM LINE EXISTING

VACUUM LINE

COMPRESSED AIR EXISTING

COMPRESSED AIR

ROOF DRAIN

NATURAL GAS

INDUSTRIAL COLD WATER (NON-POTABLE)

REVERSE OSMOSIS WATER

SANITARY WASTE, EXISTING

SANITARY VENT

SANITARY WASTE, NEW

DOMESTIC HOT WATER RETURN

DOMESTIC HOT WATER

DOMESTIC COLD WATER

P-600 FOR ADDITIONAL INFORMATION

** REFER TO PIPING SCHEDULE ON SHEET

103 149

X = SEQUENTIAL NUMBERING

X = SEQUENTIAL NUMBERING

Z" FD-XY

X = SEQUENTIAL NUMBERING

X = SEQUENTIAL NUMBERING

X = SEQUENTIAL NUMBERING

Y = P WITH PRIMED TRAP

Z = OUTLET SIZE IN INCHES

Z" FS-XY

X = SEQUENTIAL NUMBERING

FLOOR SINK

SOLENOID VALVE

S

ES SHUT-OFF SWITCH

EMERGENCY NATURAL GAS

INSULATED MATERIALS AS SPECIFIED.

ISOLATE ALL COPPER PIPING FROM BEARING ON FERROUS HANGERS, ETC., WITH ELECTRICALLY J.

ON EXTERIOR OF INSULATION FOR SUPPORT OF PIPING AT HANGERS, UNISTRUT, ETC.

BARRIER AS PER SPECIFICATIONS. CONTRACTOR TO PROVIDE CALCIUM INSERTS AND METAL SADDLES

ALL PIPING INSULATION SERVING COLD WATER PIPING SHALL BE INSTALLED WITH UNBROKEN VAPOR I.

MATERIALS. SEE SPECIFICATIONS.

PIPE OPENING THROUGH FIRE RATED WALLS SHALL BE CAULKED WITH APPROVED FIRE RATED H.

UNLESS NOTED OTHERWISE.

ALL OPENINGS IN WALLS AND FLOOR FOR PIPING SHALL BE CORE DRILLED OR SAW CUT, FULL DEPTH, G.

IN CODE REQUIRED WORKING SPACE OR DEDICATED SPACE PER NEC.

BEFORE PROCEEDING WITH WORK. DO NOT INSTALL PLUMBING PIPING ABOVE ELECTRICAL PANELS OR

COORDINATE LOCATION OF ALL PLUMBING EQUIPMENT AND PIPPING WITH OTHER TRADES ON THE SITE F.

EQUIPMENT PADS PRIOR TO PLACEMENT OF PIPING.

COORDINATE EXACT LOCATION OF ALL FLOOR DRAINS AND FLOOR SINKS WITH EQUIPMENT AND E.

INSTALL FLOOR DRAIN AND FLOOR SINK RIMS FLUSH WITH THE FINISHED FLOOR.D.

ALL FLOOR SINKS AND FLOOR DRAINS.

PRIME FLOOR DRAINS, FLOOR SINKS AND HUB DRAINS. 3/8" TRAP PRIMER PIPING SHALL BE ROUTED TO C.

CONSTRUCTION.

AND APPLICABLE CODES. VERIFY CONDITIONS FOR CONNECTION TO EXISTING PIPING PRIOR TO

PROVIDE AND INSTALL A COMPLETE SYSTEM IN COMPLIANCE WITH THE DRAWINGS, SPECIFICATIONS

PLUMBING DRAWINGS ARE GENERALLY DIAGRAMMATIC. IT IS THE CONTRACTOR'S RESPONSIBILITY TO B.

INSTALL BRANCH PIPING AS SHOWN ON PROJECT DOCUMENTS AND REDUCE AT FIXTURE CONNECTIONS.

PIPE SIZES SHOWN ON PLUMBING CONNECTION SCHEDULE ARE INDIVIDUAL FIXTURE CONNECTION SIZES. A.

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P

ECIRP DET

29 APR 2019

A

B

2 3 4

C

D

S

D e s ig n e d b y

C h e ck e d b y

D ra w n b y

C a d F il e

D a te

P ro je ct

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e et

S u it e

5P -1

0.

d g n

S p e c

P ro je ct

B o is e I d a h o

2-

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:27:58 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

KEY PLAN

PLAN TRUE

N

A C

B D

Q Y Z

H

-8

R E P

A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-110 k B y

M E

C H

A N

IC

A L

682783_2215P-110.dgn

T P

R

IC

E

J P

IG

M

682783682783

1/16" = 1'-0"

O V E

R A

L L P

L U

M B

IN

G P

L A

N

LINE

MATCH P-111

P-112 LINE

MATCH

P-114

P-113

L

IN

E

M A

T C

H

P -1

P -1

P -1

P -1

P -1

P -1

L

IN

E

M A

T C

H

OVERALL PLUMBING PLAN

DB-1

CH-1

CAB-1

CAB-2

CAB-3

CAB-4

GENERAL NOTES

KEYED NOTES

CH-2

POC FOR NEW

NATURAL GAS

LINE

RO UNIT

HU-1

HU-2

HB-1HB-1

HB-1

HB-1HB-1

HB-1 HB-1

HB-1

HB-1

BOIL-1

BOIL-2

BOIL-3

3/4" DHWR

1 1/2 DHW

2" DCW

149106

3" DCW (E)

2" DCW (E)

1" DHW (E)

3/4" DHWR (E)

2 1/2" DCW (E)

1" DHW (E)

3/4" DHWR (E)

1 1/2" ICW

RPBP-1

1 1/2" ICW

3/4" CA (E)

2 1/2" VAC

2" VAC

3/4" CA

3/4" CA

3/4" CA

3/4" CA

2" VAC

FOR AIR COMPRESSOR

NEW LOCATION

2 1/2" VAC

X

THE ROOF DECK ONLY.

ROOF OR WITHIN THE INSULATION, JOINTS TO BE BELOW

INSULATION. DO NOT LOCATE PIPE JOINTS ABOVE THE

REMAIN AS REQUIRED TO ACCOMMODATE NEW ROOF AND

EXTEND EXISTING ROOF VENTS THAT ARE INTENDED TO

NEW ROOF AND INSULATION. CONTRACTOR SHALL

AND PATCH BACK ROOF AS REQUIRED TO ACCOMMODATE

CONTRACTOR SHALL REMOVE ALL UNUSED ROOF VENTS B.

CONFIRM INFORMATION BEFORE BEGINNING ANY WORK.

AVAILABLE INFORMATION. CONTRACTOR SHALL

INFORMATION SHOWN ON DRAWINGS IS BASED ON BESTA.

222222

2 2

2 2

HYDRONIC PIPING

SEE 1/M-403 FOR

HYDRONIC PIPING

SEE M-404 FOR

FUTURE USE

TEE & CAP FOR

FUTURE USE

TEE & CAP FOR

2" VAC (E)

2 1/2" VAC (E)

3/4" CA (E)

RESUME ICW SERVICE TO EXISTING TRAP PRIMER.7.

DEMOLITION PHASE.

RECONNECT TO EXISTING ICW LINES THAT REMAIN FROM

EXTEND PROTECTED WATER SUPPLY AS SHOWN AND

INSTALL NEW BACKFLOW PREVENTER AT 24" AFF. 6.

WILL BE RELOCATED TO AFE PARA ROOM 162.

LINES IN AT THIS APPROXIMATE LOCATION. EQUIPMENT

CUT AND CAP COMPRESSED AIR (CA) AND VACUUM (VAC)5.

P-113 FOR ADDITIONAL INFORMATION.

DEMO'D AND THE OTHER TO REMAIN SEE 4/M-500 AND

EXISTING NATURAL GAS METERS. ONE METER TO BE 4.

PREVENTER LOCATION.

LEFT FROM DEMOLITION PHASE) TO NEW BACKFLOW

EXTEND 1-1/2" CW FROM ISOLATION VALVE (OVERHEAD, 3.

CONDITIONS.

ROOF DRAIN RD-1. COORDINATE WITH EXISTING

EXISTING ROOF DRAINS TO BE REPLACED WITH NEW 4” 2.

TIE-INS.

P-401 FOR CONTINUATION AND SEE P-112 & P-114 FOR

DOMESTIC HOT AND COLD WATER BRANCH LINES, SEE1.

2" VAC (E)

2" DCW (E)

1 1/2" DHW (E)

3/4" DHWR (E)

DHW, DCW

POC: DHWR,

WATER SERVICE

EXISTING INCOMING

VALVE

EXISTING ISOLATION

2 1/2" VAC (E)

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P

U

P P L

Y

OPER

COMP

MUNS

AFE

CHEM

HAZ

BENC

AFE

MAIN SHOP

AFE

MAIN SHOP

AFE

WALKWAY

STORAGE

AFE

AUDITORIUM

ROOM

MECHANICAL

ROOM

ELECTRICAL

VEST

PARA ROOM

AFE

TRAINING

AFE

D e s ig n e d b y

C h e ck e d b y

D ra w n b y

C a d F il e

D a te

P ro je ct

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e et

S u it e

5P -1

1.

d g n

S p e c

P ro je ct

B o is e I d a h o

2-

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:29:09 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

PLAN TRUE

N

A C

B D

Q Y Z

H

-8

R E P

A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-111 k B y

M E

C H

A N

IC

A L

682783_2215P-111.dgn

T P

R

IC

E

J P

IG

M

1/8" = 1'-0"

P L

U M

B

IN

G P

L A

N A

R E

A A

AREA A PLUMBING PLAN

LINE

MATCH P-111

P-112

L

IN

E

M A

T C

H

P -1

P -1

GENERAL NOTES

KEYED NOTESX

CONFIRM INFORMATION BEFORE BEGINNING ANY WORK.

AVAILABLE INFORMATION. CONTRACTOR SHALL

INFORMATION SHOWN ON DRAWINGS IS BASED ON BEST A.

107 149

DRAWING P-113

SEE KEYNOTE 15 AT

TO SOLENOID VALVE,

ELECTRICAL PLANS.

ST120SLFWB-GAS SHUT-OFF. COORDINATE WITH

SHUT-OFF. SWITCH EQUIVALENT TO A PILLA

WITH A 4x4 WALL BOX. LABEL EMERGENCY GAS

RESET BY PULLING BUTTON. 40MM MUSHROOM BUTTON

PUSH BUTTON NATURAL GAS SHUT-DOWN SWITCH, 18.

PF-6.

NEAREST FLOOR SINK. 1/2" DHW & DCW LINES TO SERVE

PF-6, LAUNDRY SINK. DRAIN INDIRECTLY TO THE 17.

BE DEMOLISHED.

ELECTRICAL ROOM. ABANDONED WATER LINES ARE TO

LINES. WATER LINES ARE TO ROUTED OUTSIDE OF

DOMESTIC WATER LINES TO NEW DOMESTIC WATER

POINT OF CONNECTION, CONNECTING EXISTING 16.

DETAIL, AND M-300 FOR ELEVATION VIEW.

EQUIPMENT. SEE 9/M-502 FOR WALL PENETRATION

NOT TO BE RAN ABOVE ELECTRICAL PANELS OR

ARE ROUTED OUTSIDE OF ELECTRICAL ROOM AND ARE

NEW ROUTE FOR DHW, DCW, AND DHWR. WATER LINES 15.

DRAIN / FLOOR SINK.

ROUTE CONDENSATE DRAINS TO THE NEAREST FLOOR 14.

EXISTING CONNECTION FOR HOUSE VACUUM LINE.13.

AIR COMPRESSOR.

CLEARANCES FOR FC-9. RECONNECT TO RELOCATED

THIS NEW LOCATION TO ACCOMMODATE EQUIPMENT

RELOCATE STUB DOWN FOR AIR COMPRESSOR LINE TO 12.

VACUUM STATION.

EXISTING STUB DOWN FOR COMPRESSOR REEL AND/OR 11.

BEFORE THE WALL PENETRATION.

CUT AND CAP VACUUM AND COMPRESS AIR LINES 10.

ADDITIONAL CLEARANCE FOR FC-7.

TO EAST SIDE OF VACUUM CYLINDER TO PROVIDE

NEW LOCATION OF COMPRESSOR. MOVE COMPRESSOR 9.

CONDUCTIVE HANGERS AND SUPPORTS.

OF THE TUBING SHALL BE SUPPORTED WITH

COMPRESSION COUPLING AND FITTINGS. ALL SECTIONS

STEEL VACUUM TUBING WITH COMPATIBLE

EQUIVALENT TO A SPENCER TURBINE XXT20 GALV.

DETAIL 9/M-501 & 3/M-502. VACUUM PIPING SHALL BE

COMPRESSED AIR AND VACUUM STATIONS, REFER TO 8.

IN TO EXISTING VAC SYSTEM.

FIELD ROUTE VACUUM LINE TO MECHANICAL ROOM. TIE 7.

ROOM. TIE IN TO EXISTING COMPRESSED AIR SYSTEM.

FIELD ROUTE COMPRESSED AIR LINES TO MECHANICAL 6.

3/4" ICW DOWN TO HB-1, TYP 3.5.

1 1/2" TEE AND CAP NATURAL GAS LINE FOR FUTURE USE.4.

PROVIDE 3/4" TO EACH HUMIDIFIER UNIT.

FIELD ROUTE 1" GAS LINE TO PICK UP HU-1 & HU-2. 3.

VERIFY LOCATION OF BRANCH WATER LINES.2.

INSTALLATION DETAIL.

D.4 ON SHEET PD901. SEE 5/P-500 FOR NEW

RECIRCULATION PUMP, PUMP-1-DHW. REFER TO PHOTO

BE REPLACED WITH NEW WATER HEATER WH-1 AND

EXISTING WATER HEATER AND RECIRCULATION PUMP TO 1.

DB-1

CAB-3

CH-1

CH-2

1 1/2" DHW (E)

3/4" DHWR (E)

2" DCW (E)

3/4" DHWR (E)

1 1/2" DHW (E)

2" DCW (E)

DN TO HB-1

3/4" ICW

3/4" G

3/4" ROS

1" G

2 1/2" VAC (E)

11 1213

2" VAC (E)

2" VAC

2 1/2" VAC

3/4" CA

3/4" CA

3/4" CA (E)

3/4" CA (E)

3/4" CA (E)

2 1/2" VAC (E)

3/4" CD

1" ICW

1 1/2" CD

1" CD

1 1/4" CD

1 1/4" CD

1 1/4" CD

1 1/2" G

VALVE

ISOLATION

ET-2GMU-2

AS-21" CD

EXISTING

HOUSE VAC

CA POC

VAC POC

DN TO HB-1

1/2" ICW

RO UNIT

3/4" DN TO HB-1

1" CD

TYP UNO

3/4" CD

3/4" ICW

OF THIS AREA

FOR ENLARGED PLAN

SEE SHEET M-404

FC-2

FC-1

FC-6

FC-4

FC-5

FC-3

FC-8

FC-9

FC-7

HU-1HU-2

FC-16

FC-11

FC-14 FC-12

FC-13

FC-15

1 1/2" G

1 1/2" ICW

1 1/2" ICW

HYDRONIC PIPING

SEE M-403 FOR

TANK

RO STORAGE

3/4" DHWR

1 1/2" DHW

2" DCW

PUMP-1-DHW

M-504

M-501

M-502

ESFC-10

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P

U

P P L

Y

VEST

OFFICE

OPER

COMP

CORRIDOR

C

O R

R

ID

O R

C O

R R

ID

O R

C O

R R

ID

O R

TRNG

SERE

C O

R R

ID

O R

PHYSIO

AERO

ROOM

CONFERENCE

MAIN

MAN

AERO

STOR

UDM

CONTROL

UDM

UDM

ROOM

CONFERENCE OPS

RANGE

WOMEN

JAN

OFFICE

C O

R R

ID

O R

2 174 175

176 178

FLT/CC

OSO

MGR

P5

CHAPLAIN

OSOTSCHED

AIR SPACE

ROOM

HERITAGE

CVN 1

CVN 2 CVN 3

MEN

B

C

D

D e s ig n e d b y

C h e ck e d b y

D ra w n b y

C a d F il e

D a te

P ro je ct

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e et

S u it e

5P -1

2.

d g n

S p e c

P ro je ct

B o is e I d a h o

2-

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:30:37 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

PLAN TRUE

N

A C

B D

Q Y Z

H

-8

R E P

A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-112 k B y

M E

C H

A N

IC

A L

682783_2215P-112.dgn

T P

R

IC

E

J P

IG

M

P L

U M

B

IN

G P

L A

N A

R E

A B

AREA B PLUMBING PLAN

LINE

MATCH P-111

P-112

P -1

P -1

L

IN

E

M A

T C

H

GENERAL NOTES

SHEET NOTES

3 4

CAB-1

2" DCW (E)

1 1/2" DHW (E)

3/4" DCW (E)

3/4" DHWR (E)

1" DHW (E)

X KEYED NOTES

INFORMATION BEFORE BEGINNING ANY WORK.

AVAILABLE INFORMATION. CONTRACTOR SHALL CONFIRM

INFORMATION SHOWN ON DRAWINGS IS BASED ON BEST A.

AND TIE-INS FOR NEW WORK IN AREA B.

APPROXIMATE LOCATION OF EXISTING SANITARY SEWER

TO P-115 FOR FURTHER DETAILS REGARDING

SANITARY SEWER NOT SHOWN ON THIS SHEET. REFER A.

2 1/2" VAC

3/4" CA

3/4" CA

2" VAC

M-501

M-502

108 149

3/4" DHWR (E)

2 1/2" DCW (E)

P-401 FOR NEW PLUMBING WORK.

PLUMBING. SEE ENLARGED PLAN A AT

FOR DEMOLITION OF EXISTING

SEE DETAIL 1-PLAN B ON SHEET PD100

10 10

DOMESTIC HOT WATER. SET TO 1 GPM.

#LFCSM-61-S (OR EQUAL) LEAD-FREE, RATED FOR

CONNECTION TO MAIN. VALVE SHALL BE WATTS

PROVIDE BALANCING VALVE ON HWR BRANCH PIPING 10.

WATER DISTRIBUTION.

RESTROOM. SEE A/P-401 FOR CONTINUATION OF NEW

MAIN. REDUCE 1" DHW (E) TO 3/4" AND EXTEND TO

TIE-IN NEW 2" DCW WITH ISOLATION VALVE TO PIPING 9.

CONDUCTIVE HANGERS AND SUPPORTS.

SECTIONS OF TUBING SHALL BE SUPPORTED WITH

COMPRESSION COUPLINGS AND FITTINGS. ALL

XXT20 GALV. STEEL VACUUM TUBING WITH COMPATIBLE

PIPING SHALL BE EQUIVALENT TO A SPENCER TURBINE

DETAIL 9/M-501 & 3/M-502 RESPECTIVELY. VACUUM

COMPRESSED AIR AND VACUUM STATIONS, REFER TO 8.

NEW WATER DISTRIBUTION.

ISOLATION VALVES. SEE A/P-401 FOR CONTINUATION OF

TIE-IN NEW 1" DHW, 3/4" DHWR AND 2" DCW WITH 7.

AT 1” DHW (E).

CAP 1-1/4” DCW (E) AND PROVIDE NEW ISOLATION VALVE 6.

WATER DISTRIBUTION.

EACH SYSTEM. SEE A/P-401 FOR CONTINUATION OF NEW

A NEW 3/4" DHWR. PROVIDE NEW ISOLATION VALVES AT

RE-USE 2” DCW (E) AND 1” DHW (E) TO RESTROOM. TIE-IN 5.

DOWN TO EXISTING SINK.

CAP 1/2" DCW (E) AND 1/2" DHW (E). REMOVE PIPING 4.

DRINKING FOUNTAIN, PF-8.

EXTEND 1/2" DCW WITH ISOLATION VALVE TO NEW 3.

3/4" DCW (E) TO EXISTING HOSE BIBB TO REMAIN AS-IS2.

BE REMOVED FROM SERVICE AND CAPPED.

EXISTING 1/2" DCW DOWN TO TRAP PRIMERS. PIPING TO 1.

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P

WCCS AREA

VAULT

SECURE

AUDITORIUM

C O

R R

ID

O R

C O

R R

ID

O R

ROOM

MECHANICAL

ROOM

MECHANICAL

STORAGE

SERE

FLT CHF

AFE

SUPT

AFE

SAD

COMMON AREA

INTEL

PLANNING

INTEL

OSK

ROOM 1

ROOM 2

C H

A S

E

ROOM 3

TRAINING

AFE

D e s ig n e d b y

C h e ck e d b y

D ra w n b y

C a d F il e

D a te

P ro je ct

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e et

S u it e

5P -1

3.

d g n

S p e c

P ro je ct

B o is e I d a h o

2-

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:31:49 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

PLAN TRUE

N

A C

B D

Q Y Z

H

-8

R E P

A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

1.B

M-504

1" CD

1 1/4" CD

1" CD

1 1/4" CD

1" CD

2" VAC (E)

3/4" CA (E)

SEE KEYNOTE 15

TO SOLENOID VALVE,

P-113 k B y

M E

C H

A N

IC

A L

682783_2215P-113.dgn

T P

R

IC

E

J P

IG

M

P L

U M

B

IN

G P

L A

N A

R E

A C

AREA C PLUMBING PLAN

X

109 149

GENERAL NOTES

CONFIRM INFORMATION BEFORE BEGINNING ANY WORK.

AVAILABLE INFORMATION. CONTRACTOR SHALL

INFORMATION SHOWN ON DRAWINGS IS BASED ON BEST A.

KEYED NOTESX

PROVIDE CAP & TEE FOR FUTURE USE.3.

NEAREST FLOOR DRAIN.

PIPING (1" MIN) FROM FIXED AIR GAP FITTING DOWN TO

INFORMATION ON TIE-IN LOCATION. EXTEND DRAIN

SEE PHOTO D.1 ON SHEET PD901 FOR ADDITIONAL 2.

INSURE SYSTEM ACCURACY.

INSTALL PER MANUFACTURES RECOMMENDATIONS TO

STRAINER. ENTIRE ASSEMBLY SHALL BE LEAD FREE.

THE BASE WATER SHOP. FURNISH WITH INTEGRAL

TIE TO THE BUILDING DDC SYSTEM. COORDINATE WITH

SWEEP HAND REGISTRATION AND A PULSED OUTPUT TO

A BADGER 2" RECORDALL TURBO 200. FURNISH WITH

INSTALL NEW DOMESTIC WATER METER EQUIVALENT TO 1.

KEYED NOTES (CONT)

ELECTRICAL PLANS.

ST120SLFWB-GAS SHUT-OFF. COORDINATE WITH

SHUT-OFF. SWITCH EQUIVALENT TO A PILLA

WITH A 4x4 WALL BOX. LABEL EMERGENCY GAS

RESET BY PULLING BUTTON. 40MM MUSHROOM BUTTON

PUSH BUTTON NATURAL GAS SHUT-DOWN SWITCH, 16.

EQUIVALENT TO A 2" ASCO MODEL 8214-G-281-120/60.

INDICATOR OF VALVE POSITION. PROVIDE VALVE

NATURAL GAS SERVICE AND 120 VOLTS WITH VISUAL

BE A 2-POSITION, 2" VALVE, UL OR FM LISTED FOR

NATURAL GAS SOLENOID SHUT-OFF VALVE. VALVE SHALL 15.

TO RESUME SERVICE.

RECONNECT TO EXISTING TRAP PRIMER SUPPLY PIPING

EXTEND 1/2" ICW PIPING DOWN EXPOSED ON WALL AND 14.

CAP EXISTING BRANCH LINES.13.

LINES AT THIS APPROXIMATE LOCATION.

CUT AND CAP EXISTING VACUUM AND COMPRESSED AIR 12.

TO NEW FLOOR SINK LOCATIONS.

POINT OF CONNECTION. EXTEND NEW TRAP ARM PIPING 11.

NECESSARY, REFER TO STRUCTURAL DRAWING SD-110

COORDINATE SAW-CUTTING AND FLOOR PATCHING AS

FOR THE FAN COIL UNITS IN MECHANICAL ROOM 144.

NEW FLOOR SINK WILL SERVE THE CONDENSATE DRAINS

CORRIDOR. EXTEND TRAP ARM TO THE NEW LOCATION.

NEW FLOOR SINK OUTSIDE THE PATH OF THE NEW

CHANGE FLOOR DRAIN TO A FLOOR SINK AND RELOCATE 10.

STRUCTURAL DRAWING SD-110.

AND FLOOR PATCHING AS NECESSARY, REFER TO

MECHANICAL ROOM 155. COORDINATE SAW-CUTTING

DRAINS FOR FAN COIL UNITS AND BOILERS IN

LOCATION. FLOOR SINK WILL SERVE CONDENSATE

NEW CORRIDOR. EXTEND TRAP ARM TO THE NEW

RELOCATE FLOOR SINK OUTSIDE OF THE PATH OF THE 9.

3/4" ICW DOWN TO HB-1, TYPICAL 4.8.

CONDITIONS.

DRAIN. COORDINATE FINAL LOCATION WITH EXISTING

NEW 4" ROOF DRAIN RD-1 TO REPLACE EXISTING ROOF 7.

CONDITIONS.

COORDINATE THE FINAL LOCATION WITH EXISTING

EXISTING BOILER BACK TO THE 2” MAIN LINE.

APPROXIMATE LOCATION. DEMOLISH THE LINE TO THE

CONNECT TO EXISTING 2” GAS LINE AT THIS 6.

AT BOTH INLET AND OUTLET OF NEW METER.

d. PROVIDE NEW PIPING SUPPORT FROM BUILDING WALL

RE-CONNECT TO BUILDING PIPING TO RESUME SERVICE.

APPROVED METALLIC TUBING PER UFC 3-600-4-29.1.4.

METER OUTLET WITH A FULL SWING JOINT OR LOOP OF

c. REPLACE EXISTING GAS SUPPLY PIPING SECTION AT

WILL BE TIED INTO THE DDC SYSTEM.

b. PROVIDE GAS METER WITH A PULSED OUTPUT THAT

CFH AT 2.0 PSI OUTLET PRESSURE.

a. GAS METER TO BE CAPABLE OF NOT LESS THAN 1,500

TO MEET THE FOLLOWING CONDITIONS:

REVISE AND UPDATE THE GAS METER AND REGULATOR 5.

LOCATION AND FINAL SIZING OF GAS REGULATOR.

HEATER RATED FOR 200 CFH. COORDINATE FINAL

OUTLET GAS PRESSURE SUITABLE FOR EXISTING

SUITABLE FOR 2.0 PSI INLET GAS PRESSURE WITH AN

VENTLESS/VENT-LIMITED PRESSURE REGULATOR

RADIANT HEATERS, TYPICAL OF 2. PROVIDE A NEW

EXISTING 1” NATURAL GAS RUN OUT TO EXISTING 4.

ES

16 15

1 1/2" ICW

RPBP-1

1 1/2" DCW

LINE

MATCH P-113

P-114

P -1

P -1

L

IN

E

M A

T C

H

4 4

6" RD (E)

6" RD (E)

3" DCW (E)

2" G (E) 2" G (E)

3" DCW (E)

2" G

HYDRONIC PIPING

SEE M-403 FOR

CO (E)

NATURAL GAS

INCOMING

EXISTING

M-500

1 1/2" G

1" G

3/4" G

1 1/4" G

1 1/2" ICW

AS-1

ET-1

GMU-1

FC-21

FC-18

FC-17

FC-27

FC-26

FC-23

FC-22

FC-28

BOIL-1

BOIL-2

BOIL-3

3" DCW (E)

FC-24

FC-20

FC-19

FC-25

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P

B

C

D

VAULT

CRYPTO

OFFICE

EXEC

OSS CC

UFC

SEC ADMINADMIN

BRF

VEST

C O

R R

ID

O R

CORRIDOR

C O

R R

ID

O R

C O

R R

ID

O R

OSK

ROOM

MOM

MEN

WOMEN

JAN

ROOM

CONFERENCE

GLO

OFC

GLO

SGT

1STUMP

PLN

MSN

STOR

ADMIN

DO

COMM

SUPT

SQ

TRNG

SERE

TRNG

SERE

C O

R R

ID

O R

C O

R R

ID

O R

HARMSERE

ROOM

CONFERENCE

MAIN

VEST

CORRIDOR

113 114 115

106 107

119 120

122 124

126125

185 186

188 189

170 171

C O

R R

ID

O R

SUPT

HARM

VEST

CVN 1

CVN 2 CVN 3

CVN 4

CVN 5

CVN 7

CVN 6

C V

N

CVN 10

CVN 9

2 3 4

D e s ig n e d b y

C h e ck e d b y

D ra w n b y

C a d F il e

D a te

P ro je ct

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e et

S u it e

5P -1

4.

d g n

S p e c

P ro je ct

B o is e I d a h o

2-

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:33:06 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

PLAN TRUE

N

A C

B D

Q Y Z

H

-8

R E P

A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-114 k B y

M E

C H

A N

IC

A L

682783_2215P-114.dgn

T P

R

IC

E

J P

IG

M

P L

U M

B

IN

G P

L A

N A

R E

A D

AREA D PLUMBING PLAN

LINE

MATCH P-111

P-112

L

IN

E

M A

T C

H

P -1

P -1

GENERAL NOTES

CONFIRM INFORMATION BEFORE BEGINNING ANY WORK.

AVAILABLE INFORMATION. CONTRACTOR SHALL

INFORMATION SHOWN ON DRAWINGS IS BASED ON BEST A.

CAB-2

CAB-1

X

KEYED NOTES CONTINUEDX

1" DHW (E)

2 1/2" DCW (E)

1" DHW (E)

2" DCW (E)

SHEET NOTES

AND TIE-INS FOR NEW WORK IN AREA D.

APPROXIMATE LOCATION OF EXISTING SANITARY SEWER

TO P-116 FOR FURTHER DETAILS REGARDING

SANITARY SEWER NOT SHOWN ON THIS SHEET. REFER A.

KEYED NOTES

3/4" DHWR (E)

110 149

P-401 FOR NEW PLUMBING WORK.

PLUMBING. SEE ENLARGED PLAN B AT

FOR DEMOLITION OF EXISTING

SEE DETAIL 1-PLAN C ON SHEET PD100

3/4" DHWR (E)2" DCW (E)

3" DCW (E)

3/4" DCW (E)

DOMESTIC HOT WATER. SET TO 1 GPM.

#LFCSM-61-S (OR EQUAL) LEAD-FREE, RATED FOR

CONNECTION TO MAIN. VALVE SHALL BE WATTS

PROVIDE BALANCING VALVE ON HWR BRANCH PIPING 9.

B/P-401 FOR CONTINUATION.

EXTEND PIPING INTO RESTROOM. FOR NEW WORK SEE

RE-USE 3/4" DHW (E) WITH NEW ISOLATION VALVE.

MAIN, EXTEND NEW PIPING AS REQUIRED TO EXISTING 2".

TIE-IN A NEW 2" DCW WITH ISOLATION VALVE TO PIPING 8.

CAP 1-1/4" DCW (E). 7.

RESTROOM. SEE B/P-401 FOR CONTINUATION.

ISOLATION VALVES TO PIPING MAINS. EXTEND INTO

TIE-IN A NEW 1" DCW, 1" DHW AND 3/4" DHWR WITH 6.

9 9

DISTRIBUTION.

B/P-401 FOR CONTINUATION OF NEW WATER

DHWR WITH ISOLATION VALVES TO PIPING MAINS. SEE

RESTROOM FIXTURES. TIE-IN A NEW 1" DHW AND 3/4"

SEPARATE ISOLATION VALVE AND EXTEND TO NEW

DRINKING FOUNTAIN AND REDUCE 2" TO 1-1/2" WITH

PROVIDE 1/2" DCW BRANCH WITH ISOLATION VALVE FOR

RE-USE 2” DCW (E), INSTALL NEW ISOLATION VALVE. 5.

DOWN TO EXISTING SINK.

CAP 1/2” DCW (E) AND 1/2” DHW (E), REMOVE PIPING 4.

DRINKING FOUNTAIN, PF-8.

EXTEND 1/2" DCW WITH ISOLATION VALVE TO NEW 3.

3/4" DCW (E) TO EXISTING HOSE BIBB TO REMAIN AS-IS.2.

BE REMOVED FROM SERVICE AND CAPPED.

EXISTING 1/2" DCW DOWN TO TRAP PRIMERS. PIPING TO 1.

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P

P P L

Y

OPER

COMP

MUNS

AFE

CHEM

HAZ

BENC

AFE

MAIN SHOP

AFE

MAIN SHOP

AFE

WALKWAY

STORAGE

AFE

AUDITORIUM

ROOM

MECHANICAL

ROOM

ELECTRICAL

VEST

PARA ROOM

AFE

TRAINING

AFE

A

D e s ig n e d b y

C h e ck e d b y

D ra w n b y

C a d F il e

D a te

P ro je ct

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e et

S u it e

5P -1

5.

d g n

S p e c

P ro je ct

B o is e I d a h o

2-

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:34:24 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

PLAN TRUE

N

A C

B D

Q Y Z

H

-8

R E P

A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-115 k B y

M E

C H

A N

IC

A L

682783_2215P-115.dgn

T P

R

IC

E

J P

IG

M A

N

682783682783

1/8" = 1'-0"

LINE

MATCH P-111

P-112

L

IN

E

M A

T C

H

P -1

P -1

GENERAL NOTES

KEYED NOTESX

DRAINS

3" TO ACID

DRAIN

2" ACID

FCO (E)

TANK (E)

ACID NEUTRALIZING

P L

A N A

R E

A A

S A

N

IT

A R

Y S

E W

E R F

O U

N D

A T

IO

N

4" SS (E)

FCO (E)

FD (E)

SEPARATOR

3" TO OIL

SEPARATOR

4" TO OIL

FCO (E)

FCO (E)

FCO (E)

AREA A SANITARY SEWER FOUNDATION PLAN

111 149

4" SS (E)

FD (E)

FD (E)

FD (E)

FD (E)

FD (E)

FD (E)

FD (E)

NEW 2" SS

2" FS-1P

FD (E)

FD (E)

FD (E)

FOOTAGE.

FOUND AS A RESULT OF THE JETTING OR CAMERA

CONTRACTING OFFICER OF ANY IDENTIFIED ISSUES

ADDITIONALLY, PROVIDE A WRITTEN REPORT TO THE

OFFICE CAN USE FOR IDENTIFYING ISSUES.

WITH REFERENCE DRAWINGS THAT THE CONTRACTING

OWNER FOUR COPIES OF THE DRAIN CAMERA VIDEO

MARKERS. CONTRACTOR SHALL TURN OVER TO

CAMERA FOOTAGE SHALL INCLUDE DISTANCE

CONTRACTOR SHALL UTILIZE A DRAIN CAMERA.

FOLLOWING THE CLEANING OF PIPING, THE

SYSTEM THAT WILL RESULT IN WATER DAMAGE.

PIPING TO AVOID PUSHING WATER INTO AREAS OF THE

JET AND HOT WATER. COORDINATE WITH EXISTING

SANITARY SEWER LINE CLEAN USING MINIMUM 3000 PSI

CONTRACTOR SHALL HYDRO-JET ALL OF THE EXISTING B.

WORK.

CONFIRM INFORMATION BEFORE BEGINNING ANY

BEST AVAILABLE INFORMATION. CONTRACTOR SHALL

INFORMATION SHOWN ON DRAWINGS IS BASED ON A.

1/2" TRAP PRIMER

SUPPLY

PIPING IN PLACE.

COPPER TUBING, NO JOINTS ALLOWED. SECURE

ON RECESSED FLOOR SURFACE. PIPING TO BE ROLLED

ROUTE (4) 1/4" TRAP PRIMER SUPPLY LINES EXPOSED 4.

EXISTING FLOOR DRAIN RIM.

TERMINATE 1/2" TRAP PRIMER SUPPLY PIPING OVER 3.

NEAREST FLOOR SINK.

PF-6 UTILITY SINK. RUN AS AN INDIRECT WASTE TO THE 2.

FOR ASSUMED VALVE LOCATION.

EXISTING BACKWATER VALVE. SEE DRAWING P-116

SUNKEN FLOOR FLOOR DRAINS PROTECTED BY 1.

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P

P P L

Y

VEST

OFFICE

OPER

COMP

CORRIDOR

C O

R R

ID

O R

C O

R R

ID

O R

C O

R R

ID

O R

C O

R R

ID

O R

PHYSIO

AERO

MAN

AERO

STOR

UDM

CONTROL

UDM

UDM

ROOM

CONFERENCE OPS

RANGE

WOMEN

JAN

OFFICE

C O

R R

ID

O R

2 174 175

176 178

FLT/CC

OSO

MGR

P5

CHAPLAIN

OSOTSCHED

AIR SPACE

ROOM

HERITAGE

CVN 2

MEN

B

C

D

D e s ig n e d b y

C h e ck e d b y

D ra w n b y

C a d F il e

D a te

P ro je ct

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e et

S u it e

5P -1

6.

d g n

S p e c

P ro je ct

B o is e I d a h o

2-

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:35:37 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

PLAN TRUE

N

A C

B D

Q Y Z

H

-8

R E P

A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-116 k B y

M E

C H

A N

IC

A L

682783_2215P-116.dgn

T P

R

IC

E

1/8" = 1'-0"

LINE

MATCH P-115

P-116

P -1

P -1

L

IN

E

M A

T C

H

GENERAL NOTES

KEYED NOTESX

FCO (E)

33" SS (E)

2" SS (E)

4" SS (E)

4" SS

NEW

4" SS

NEW

4" SS

NEW

P L

A N A

R E

A B

S A

N

IT

A R

Y S

E W

E R F

O U

N D

A T

IO

N

C B

U T T E

R F

IE

L D

4" SS (E)

4" SS (E)

AREA B SANITARY SEWER FOUNDATION PLAN

112 149

P-401 FOR NEW PLUMBING WORK.

PLUMBING. SEE ENLARGED PLAN A AT

FOR DEMOLITION OF EXISTING

SEE DETAIL 1-PLAN B ON SHEET PD100

12" SS (E)

4" SS (E)

ROOM 153

TO

4" SS (E)

FOOTAGE.

FOUND AS A RESULT OF THE JETTING OR CAMERA

CONTRACTING OFFICER OF ANY IDENTIFIED ISSUES

ADDITIONALLY, PROVIDE A WRITTEN REPORT TO THE

OFFICE CAN USE FOR IDENTIFYING ISSUES.

WITH REFERENCE DRAWINGS THAT THE CONTRACTING

OWNER FOUR COPIES OF THE DRAIN CAMERA VIDEO

MARKERS. CONTRACTOR SHALL TURN OVER TO

CAMERA FOOTAGE SHALL INCLUDE DISTANCE

CONTRACTOR SHALL UTILIZE A DRAIN CAMERA.

FOLLOWING THE CLEANING OF PIPING, THE

SYSTEM THAT WILL RESULT IN WATER DAMAGE.

PIPING TO AVOID PUSHING WATER INTO AREAS OF THE

JET AND HOT WATER. COORDINATE WITH EXISTING

SANITARY SEWER LINE CLEAN USING MINIMUM 3000 PSI

CONTRACTOR SHALL HYDRO-JET ALL OF THE EXISTING B.

WORK.

CONFIRM INFORMATION BEFORE BEGINNING ANY

BEST AVAILABLE INFORMATION. CONTRACTOR SHALL

INFORMATION SHOWN ON DRAWINGS IS BASED ON A.

SEE DRAWING P-401.

RECESSED FLOOR FROM NEW RESTROOM BUILD-OUT.

ROUTE (4) 1/2" TRAP PRIMER SUPPLY LINES EXPOSED ON 6.

SCHEDULED.

CLEANOUT AND BACKWATER VALVE, BWV-1, AS

THE EXISTING VALVE AND REPLACE WITH A NEW FLOOR

NEW VALVE. CONTRACTOR TO VERIFY THE LOCATION OF

EXISTING BACKWATER VALVE TO BE REPLACED WITH 5.

CAP EXISTING 2" SS THAT SERVES KITCHEN SINK.4.

UNIFORM SLOPE AFTER CROSSING.

FLOOR DRAINS) AT POINT OF CROSSING. MAINTAIN

THE EXISTING DRAIN LINE (WHICH SERVES ROOM 153

ELEVATE NEW 4" SS DRAIN LINE TO CLEAR THE TOP OF 3.

SANITARY SEWER SYSTEM.

LATERALS. SEE A/P-401 FOR CONTINUATION OF NEW

POINT OF CONNECTION FOR NEW 4" SS RESTROOM 2.

STUBS.

CAP AND ABANDON OLD RESTROOM SANITARY SEWER 1.

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P

WCCS AREA

VAULT

SECURE

AUDITORIUM

C O

R R

ID

O R

C O

R R

ID

O R

ROOM

MECHANICAL

ROOM

MECHANICAL

STORAGE

SERE

FLT CHF

AFE

SUPT

AFE

SAD

COMMON AREA

INTEL

PLANNING

INTEL

OSK

ROOM 1

ROOM 2

C H

A S

E

ROOM 3

TRAINING

AFE

D e s ig n e d b y

C h e ck e d b y

D ra w n b y

C a d F il e

D a te

P ro je ct

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e et

S u it e

5P -1

7.

d g n

S p e c

P ro je ct

B o is e I d a h o

2-

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:36:55 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

PLAN TRUE

N

A C

B D

Q Y Z

H

-8

R E P

A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-117 k B y

M E

C H

A N

IC

A L

T P

R

IC

E

J P

IG

M A

N

682783682783

1/8" = 1'-0"

LINE

MATCH

P -1

P -1

L

IN

E

M A

T C

H

GENERAL NOTES

P L

A N A

R E

A C

S A

N

IT

A R

Y S

E W

E R F

O U

N D

A T

IO

N

AREA C SANITARY SEWER FOUNDATION PLAN

P-117

P-118

682783_2215P-117.dgn

4" SS (E)

4" SS (E)

4" SS (E)

4" SS (E)

FD-1 (E)

FD (E)

FD (E)

4" SS (E)

FCO (E)

KEYED NOTESX

2" SS

113 149

FCO (E)

FCO (E)

FCO (E)

FD (E)

FD (E)FD (E)

FD (E)

FD (E)

FD (E)

FCO (E)

FCO (E)

FD (E)

2" FS-1P

2" FS-1P

2" FS-1P

CAMERA FOOTAGE.

ISSUES FOUND AS A RESULT OF THE JETTING OR

TO THE CONTRACTING OFFICER OF ANY IDENTIFIED

ISSUES. ADDITIONALLY, PROVIDE A WRITTEN REPORT

CONTRACTING OFFICE CAN USE FOR IDENTIFYING

WITH REFERENCE DRAWINGS THAT THE

OWNER FOUR COPIES OF THE DRAIN CAMERA VIDEO

MARKERS. CONTRACTOR SHALL TURN OVER TO

CAMERA FOOTAGE SHALL INCLUDE DISTANCE

CONTRACTOR SHALL UTILIZE A DRAIN CAMERA.

FOLLOWING THE CLEANING OF PIPING, THE

SYSTEM THAT WILL RESULT IN WATER DAMAGE.

PIPING TO AVOID PUSHING WATER INTO AREAS OF THE

PSI JET AND HOT WATER. COORDINATE WITH EXISTING

SANITARY SEWER LINE CLEAN USING MINIMUM 3000

CONTRACTOR SHALL HYDRO-JET ALL OF THE EXISTING B.

WORK.

CONFIRM INFORMATION BEFORE BEGINNING ANY

BEST AVAILABLE INFORMATION. CONTRACTOR SHALL

INFORMATION SHOWN ON DRAWINGS IS BASED ON A.

FD (E)

SECURE PIPING IN PLACE.

ROLLED COPPER TUBING, NO JOINTS ALLOWED.

ON RECESSED FLOOR SURFACE. PIPING TO BE

ROUTE (4) 1/4" TRAP PRIMER SUPPLY LINES EXPOSED 6.

EXISTING FLOOR DRAIN RIM.

TERMINATE 1/2" TRAP PRIMER SUPPLY PIPING OVER 5.

OUT.

COIL EQUIPMENT TO AVOID COVERING THE CLEAN

WORK AND COORDINATE THE PLACEMENT OF FAN

LOCATED. VERIFY LOCATION PRIOR TO BEGINNING

APPROXIMATE LOCATION, WHICH COULD NOT BE

EXISTING DRAWINGS SHOW A CLEANOUT IN THIS 4.

RE-USE FLOOR SINK WHERE POSSIBLE.

EXTEND TRAP ARM TO THE NEW DRAIN LOCATION.

CONNECT AT THIS APPROXIMATE LOCATION AND 3.

REFER TO STRUCTURAL DRAWING SD-110.

SAW-CUTTING AND FLOOR PATCHING AS NECESSARY,

BOILERS IN MECHANICAL ROOM 144. COORDINATE

CONDENSATE DRAINS FOR FAN COIL UNITS AND

NEW LOCATION. NEW FLOOR SINK WILL SERVE

OF THE NEW CORRIDOR. EXTEND TRAP ARM TO THE

RELOCATE NEW FLOOR SINK OUTSIDE OF THE PATH

CHANGE FLOOR DRAIN TO A FLOOR SINK AND 2.

SD-110.

AS NECESSARY, REFER TO STRUCTURAL DRAWING

COORDINATE SAW-CUTTING AND FLOOR PATCHING

BOILERS, BFPD AND OTHER EQUIPMENT.

SERVE CONDENSATE DRAINS FOR FAN COIL UNITS,

SINK TO SERVE MECH ROOM 144. FLOOR SINK WILL

LOCATION IN MECH ROOM 155. TIE-IN A 2ND FLOOR

THE NEW CORRIDOR. EXTEND TRAP ARM TO NEW

RELOCATE FLOOR SINK OUTSIDE OF THE PATH OF 1.

SUPPLY

1/2" TRAP PRIMER

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P

52 3 4

C

D

VAULT

CRYPTO

OFFICE

EXEC

OSS CC

UFC

SEC ADMINADMIN

BRF

VEST

C O

R R

ID

O R

CORRIDOR

C O

R R

ID

O R

C O

R R

ID

O R

OSK

ROOM

MOM

MEN

WOMEN

JAN

ROOM

CONFERENCE

GLO

OFC

GLO

SGT

1STUMP

PLN

MSN

STOR

ADMIN

DO

COMM

SUPT

SQ

TRNG

SERE

TRNG

SERE

C O

R R

ID

O R

C O

R R

ID

O R

HARMSERE

ROOM

CONFERENCE

MAIN

VEST

CORRIDOR

113 114 115

106 107

119 120

122 124

126125

185 186

188 189

170 171

C O

R R

ID

O R

SUPT

HARM

VEST

CVN 1

CVN 2 CVN 3

CVN 4

CVN 5

CVN 7

CVN 6

C V

N

CVN 10

CVN 9

D e s ig n e d b y

C h e ck e d b y

D ra w n b y

C a d F il e

D a te

P ro je ct

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e et

S u it e

5P -1

8.

d g n

S p e c

P ro je ct

B o is e I d a h o

2-

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:38:03 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

PLAN TRUE

N

A C

B D

Q Y Z

H

-8

R E P

A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-118

H

K B

Y M

E C

H A

N

IC

A L

682783_2215P-118.dgn

T P

R

IC

E

682783682783

1/8" = 1'-0"

LINE

MATCH P-115

P-116

L

IN

E

M A

T C

H

P -1

P -1

KEYED NOTESX

4" FCO (E)

C B

U T T E

R F

IE

L D

4" FCO (E)

SERVES 3 LAVS

POC FOR NEW 2" SS

4" SS (E)

NEW 4" SS

P L

A N A

R E

A D

S A

N

IT

A R

Y S

E W

E R F

O U

N D

A T

IO

N

AREA D SANITARY SEWER FOUNDATION PLAN

4" SS (E)

114 149

P-401 FOR NEW PLUMBING WORK.

PLUMBING. SEE ENLARGED PLAN B AT

FOR DEMOLITION OF EXISTING

SEE DETAIL 1-PLAN C ON SHEET PD100

3" SS (E) 3" SS (E)

FCO (E)

4" SS (E)4" SS (E)

GENERAL NOTES

FOOTAGE.

FOUND AS A RESULT OF THE JETTING OR CAMERA

CONTRACTING OFFICER OF ANY IDENTIFIED ISSUES

ADDITIONALLY, PROVIDE A WRITTEN REPORT TO THE

OFFICE CAN USE FOR IDENTIFYING ISSUES.

WITH REFERENCE DRAWINGS THAT THE CONTRACTING

OWNER FOUR COPIES OF THE DRAIN CAMERA VIDEO

MARKERS. CONTRACTOR SHALL TURN OVER TO

CAMERA FOOTAGE SHALL INCLUDE DISTANCE

CONTRACTOR SHALL UTILIZE A DRAIN CAMERA.

FOLLOWING THE CLEANING OF PIPING, THE

SYSTEM THAT WILL RESULT IN WATER DAMAGE.

PIPING TO AVOID PUSHING WATER INTO AREAS OF THE

JET AND HOT WATER. COORDINATE WITH EXISTING

SANITARY SEWER LINE CLEAN USING MINIMUM 3000 PSI

CONTRACTOR SHALL HYDRO-JET ALL OF THE EXISTING B.

WORK.

CONFIRM INFORMATION BEFORE BEGINNING ANY

BEST AVAILABLE INFORMATION. CONTRACTOR SHALL

INFORMATION SHOWN ON DRAWINGS IS BASED ON A.

BUILD-OUT. SEE DRAWING P-401.

ON RECESSED FLOOR FROM NEW RESTROOM

ROUTE (4) 1/2" TRAP PRIMER SUPPLY LINES EXPOSED 5.

SCHEDULED.

FLOOR CLEANOUT AND BACKWATER VALVE, BWV-1, AS

OF THE EXISTING VALVE AND REPLACE WITH A NEW

NEW VALVE. CONTRACTOR TO VERIFY THE LOCATION

EXISTING BACKWATER VALVE TO BE REPLACED WITH 4.

NO LONGER IN SERVICE, VERIFY LOCATION.

ABANDONED 3" SS TO FORMER MOM ROOM 124 SINK. 3.

SANITARY SEWER SYSTEM. VERIFY LOCATION.

LATERALS. SEE B/P-401 FOR CONTINUATION OF NEW

POINT OF CONNECTION FOR NEW 4" SS RESTROOM 2.

STUBS. VERIFY LOCATION BEFORE SAWCUTTING.

CAP AND ABANDON OLD RESTROOM SANITARY SEWER 1.

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P

WOMEN

MEN

OFFICE

JAN.

JAN.

MEN

WOMEN

WOMEN

MEN

OFFICE

JAN.

JAN.

MEN

WOMEN

D e s ig n e d b y

C h e ck e d b y

D ra w n b y

C a d F il e

D a te

P ro je ct

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e et

S u it e

5P -4

1.

d g n

S p e c

P ro je ct

B o is e I d a h o

2-

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:40:21 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

Z

H

-8

R E P

A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-401 k y

H A

N N

O N

682783_2215P-401.dgn

E N

L A

R G

E D P

L A

N S

A

ENLARGED RESTROOM AREA

1/4"=1'-0"

B

ENLARGED RESTROOM AREA

1/4"=1'-0"

B S

H A

N N

O N

P L

U M

B

IN

G

WATER

WATER

PF-2

PF-2

PF-2

PF-4

PF-8

PF-2

PF-7

PF-8

PF-2

PF-2

PF-4

PF-7

PF-2

PF-8

PF-2

1" DHW 3/4" DHW2" DCW

3/4" DHW

3/4" DCW

(TYP)

VALVES

ISOLATION

(TYP)

VALVES

ISOLATION 3/4" DHW

3/4" DCW

3/4" DHW

PF-7PF-7

4" SS

4" SS 4" SS

4" SS

4" SS2" SS

1 1/2" V

3" V

1 1/2" V

3" SS

2" V

2" V

2" SS

1 1/2" V

2" V

3" FD-1P

3" FD-1P

3" FD-1P

3" FD-1P

1" DCW

1" DCW 1 1/4" DCW

TYP 4

PF-3,

1 1/2" DCW

1 1/2" DCW

3/4" DHW

3/4" DCW

1 1/2" DCW

1 1/2" DCW

4" FCO

1 1/2" DCW

1" DCW

3/4" DHW

3/4" DHW

1/2" DCW

2" V

GENERAL NOTES

SHEET NOTESX

11 1 1

1 1 1 1

2" DCW2" DCW

1 1/2" DCW

1 1/4" DCW

3/4" DCW

2" DCW

1" DHW

1 1/4" DCW

2" DCW

1 1/4" DCW

1" DCW

2" DCW

1 1/4" DCW

1 1/2" DCW

1 1/2" DCW

1 1/4" DCW

1" DCW

1 1/4" DCW

1" DHW

1" DCW

1" DHW

1" DCW

2 2

1" DHW

3/4" DHWR

PF-8

N

PLAN TRUE

N

N

PLAN TRUE

N

3/4" DHWR

3/4" DHWR 3/4" DHWR

4" SS

115 149

ISOMETRIC VIEW OF PIPING.

REFER TO P-900 SERIES OF DRAWINGS FOR C.

LOCATION OF TIE-INS FOR SS, DCW, DHW, DHWR.

REFER TO PLUMBING PLAN SHEETS P-112, P-114 FOR B.

TIE-INS.

LATERAL BRANCHES FOR NEW AND EXISTING

PROVIDE ISOLATION VALVES FOR ALL DCW & DHW A.

4" VTR

4" V UP T0

3" WCO

4" FCO

4" FCO

TYP 2

PF-1

TYP 2

PF-3

TYP 2

PF-1

TYP 3

PF-5

TYP 3

PF-5

1 1/2" V

4" VTR

3" V UP T0

4" FCO

4" VTR

4" V UP T0

4" FCO

2" V

3/4" DCW

TYP 3

PF-1

TYP 2

PF-3

TYP 3

PF-5

TYP 3

PF-5

TYP 3

PF-1

TYP 5

PF-1

TYP 4

PF-1

TYP 5

PF-5

1/2" DHW

TYP 5

PF-1

1" DCW

TYP 5

PF-5

TYP 4

PF-1

TYP 5

PF-5

TYP 4

PF-3

TYP 4

PF-1

TYP 4

PF-1

TYP 5

PF-5

1/2" DCW

4" FCO

2" SS2" SS

3" SS

4" SS

3" SS

3" WCO

2" WCO

3" WCO

SANITARY SEWER

SANITARY SEWER

4" VTR

4" V UP T0

SEE DRAWING P-112

FLOW CONTROL VALVE

SEE DRAWING P-112

FLOW CONTROL VALVE

SEE DRAWING P-114

FLOW CONTROL VALVE

SEE DRAWING P-114

FLOW CONTROL VALVE

ROLLED COPPER WITH NO JOINTS ALLOWED.

AND ROUTING IN FIELD. SUPPLY TUBING SHALL BE

QUANTITY FOR FLOOR DRAIN LOCATION. VERIFY

INITIAL ROUTING, AND DRAWINGS P-115 AND P-117

SUB-FLOOR. SEE DRAWINGS P-116 AND P-118 FOR

EACH OF THE EXISTING FLOOR DRAINS WITHIN

TERMINATE ONE SUPPLY LINE OVER THE RIM OF

ROUTE EXPOSED WITHIN RAISED FLOOR VOID.

SEAL ANNULAR SPACE WATER-TIGHT, AND THEN

EXISTING VERTICAL WALL FACE WITH 2" SLEEVE,

TUBING SECTIONS TOGETHER AND PENETRATE

MAIN FLOOR NEW FLOOR SLAB. ROUTE (4) SUPPLY

SUPPLY TUBING IN WALL AND DOWN TO BELOW

EACH OF THESE FOUR FLUSH VALVES. ROUTE

PROVIDE TRAP PRIMER DIVERTER FITTINGS AT 3.

DIAGRAM AT DRAWINGS P-901 AND P-902.

CONTINUATION. COORDINATE WITH PIPE SIZING

REFER TO DRAWINGS P-116 AND P-118 FOR2.

DIAGRAM AT DRAWINGS P-903 AND P-904.

CONTINUATION. COORDINATE WITH PIPE SIZING

REFER TO DRAWINGS P-112 AND P-114 FOR 1.

1 1/4" DCW

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P s ig n e d b y

C h e ck e d b y

D ra w n b y

C a d F il e

D a te

P ro je ct

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e et

S u it e

5P -5

0.

d g n

S p e c

P ro je ct

B o is e I d a h o

2-

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:41:28 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

Z

H

-8

R E P

A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

AND PAILHOOK

SPOUT WITH HOSE END

VACUUM BREAKER

SERVICE FAUCET WITH

H C

DRAIN

3" DIA. P-TRAP

1 1/2" TAILPIECE

WALL

OR SINK

LAVATORY

SUPPORT

FLUSH VALVE

TAILPIECE

FINISHED FLOOR

NTS

MOP SINK DETAIL

NTS

FLUSH VALVE SUPPORT DETAIL

NTS

NTS

WALL-HUNG DRINKING WATER COOLER

BRACE

SPOUT

VENT UP, SEE PLANS

LAVATORY DETAIL

SEE PLANS

1 1/2" VENT,

FLOOR

TRAP

INTEGRAL

BARS

SIDE PUSH

FRONT AND

SEE PLANS

VENT UP,

DRAWINGS.

FIXTURE RIM HEIGHT AS PER ARCHITECTURAL 1.

NOTES:

FOUNTAIN

DRINKING

HIGH/LOW

FILLER

BOTTLE

HEIGHTS.

REFER TO ARCHITECTURAL DRAWINGS FOR RIM 2.

INSTRUCTIONS.

INSTALL ACCORDING TO MANUFACTURER'S 1.

NOTES:

SEE PLANS

3" DRAIN,

VENT UP NEAREST WALL

BACKSPLASH

SS

EDGE

METAL

1 1/2" P-TRAP

ESCUTCHEON

PLATED

CHROME

FINISHED FLOOR

SEE PLANS

2" VENT,

SUPPORT

FLUSH VALVE

TAILPIECE

SEE PLANS

4" DRAIN,

4X2

BUSHING,

2" VENT

WIDE SIDE

HANDLE TO

INSTALL FLUSH

FLOOR

SEE PLANS

TO DRAIN,FLOOR

SEE PLANS

TO DRAIN,

FLOOR FLOOR

FLOOR

FLANGE

TOILET

WALL WALL

SEE PLANS

2" DRAIN,

TRAP COVER.

PROVIDE ADA COMPLIANT2.

DRAWING.

AS PER ARCHITECTURAL

FIXTURE RIM HEIGHT 1.

NOTES:

(140°F)

WH-1

GAS COCK

FLEX CONNECTOR

DRAIN VALVE

FLOOR

4" EQUIPMENT PAD

PIPE TO FD

RELIEF VALVE

P AND T

SHUT OFF VALVE

POC

THERMOMETER

POC

POC

TYP

UNION,

4" VENT

PUMP-1-DHW

1 1/2" CW

1 1/2" HW

(120°F)

EDT-1

EXPANSION TANK

5 GALLON

2 PSI

GAS PIPE

AS REQUIRED

VENTLESS REGULATOR

NTS

GAS WATER HEATER

W/ RECIRC PUMP DETAIL

THAN THE SUPPLY WATER TEMPERATURE AFTER 30 MINUTES OF OPERATION.

SENSOR. ALARM IF THE RETURN WATER TEMPERATURE IS MORE THAN 10 DEGREES COOLER

MONITOR THE RETURN AND SUPPLY WATER TEMPERATURE WITH A STRAP ON TEMPERATURE

AND TURN PUMP OFF APPROXIMATELY 30 MINUTES AFTER THE BUILDING IS UNOCCUPIED.

OF THE BUILDING. START PUMP APPROXIMATELY 30 MINUTES BEFORE BUILDING OCCUPANCY

PUMP-1-DHW: PUMP SHALL BE ENABLED FROM THE DDC SYSTEM BASED ON THE SCHEDULE

NOTES:

MIXING VALVE, TMV-1

THERMOSTATIC

P-500 k B y

682783_2215P-500.dgn

T P

R

IC

E

M R

A R

IN

E

T A

IL

S

P L

U M

B

IN

G

116 149

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P s ig n e d b y

C h e c k e d b y

D ra w n b y

C a d F il e

D a te

P ro je c t

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e e t

S u it e

P -6

.d g n

S p e c

P ro je c t

B o is e I d a h o

-7

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 4:11:05 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

Z H

-8

R E

P A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-600 k

682783_2215P-600.dgn

S

H A

N N

O N

P L

U M

B

IN

G

T P

R

IC

E

S C

H E

D U

L E

S

117 149

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P s ig n e d b y

C h e c k e d b y

D ra w n b y

C a d F il e

D a te

P ro je c t

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e e t

S u it e

P -9

.d g n

S p e c

P ro je c t

B o is e I d a h o

-7

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:44:12 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

Z H

-8

R E

P A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-901 k

H A

N N

O N

682783_2215P-901.dgn

S A

N

IT

A R

Y R

IS

E R

A

B S

H A

N N

O N

P L

U M

B

IN

G

SANITARY RISER

NTS

PF-1

PF-1

PF-1

PF-1

PF-1

PF-1

PF-1

PF-1

PF-1

PF-2

PF-3

PF-3

PF-3

PF-3

PF-5

PF-5

PF-9

PF-8

PF-5

PF-5

PF-5

PF-5

PF-5

PF-7

PF-5

PF-5

PF-1

PF-1

PF-1

PF-5

PF-3

1 1/2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

4" V

3" V

3" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

3" V

2" V

2" V

2" V

3" SS

4" SS

4" SS

4" SS

3" SS

3" SS

4" SS

4" SS

4" SS

4" SS

4" SS

1 1/2" SS

2" SS

2" SS

4" SS

4" SS

4" SS

4" SS

4" SS

4" SS

4" SS

4" SS

1 1/2" V 1 1/2" V

1 1/2" V

2" SS

2" SS

2" SS

2" SS

2" SS

2" SS

2" SS

2" SS

2" SS

4" SS

4" SS

4" SS

4" SS

2" SS

3" SS

2" SS2" SS

2" SS

2" SS

4" SS

4" SS

4" SS

4" SS

3" FD-1P

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V

2" V 2" V

2" V

2" V

2" V

1 1/2" V

4" VTR

4" V UP T0

2" V 2" V

PF-1

4" SS

2" V

4" SS

118 149

OF CONNECTION

SEE P-112 FOR POINT

OF CONNECTION

SEE P-112 FOR POINT

4" VTR

4" V UP T0

4" V

4" V

2" SS

4" FCO

PF-2

4" FCO 4" FCO

4" FCO

3" FCO

3" FCO

3" FD-1P

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P s ig n e d b y

C h e c k e d b y

D ra w n b y

C a d F il e

D a te

P ro je c t

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e e t

S u it e

P -9

.d g n

S p e c

P ro je c t

B o is e I d a h o

-7

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:45:33 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

Z H

-8

R E

P A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-902 k

H A

N N

O N

682783_2215P-902.dgn

S A

N

IT

A R

Y R

IS

E R

B

B S

H A

N N

O N

P L

U M

B

IN

G

SANITARY RISER

NTS

PF-5

PF-5

PF-5

PF-5

PF-5

PF-1

PF-1

PF-3

PF-8

PF-7

4" SS

PF-1

PF-1

3" FD-1P

3" FD-1P

PF-5

4" SS

4" SS

2" SS

4" SS

4" SS

4" SS

3" SS

4" SS

4" SS

4" SS

2" SS

2" SS

2" SS

2" SS

2" SS

3" SS

4" SS

4" SS

4" SS

4" SS

2" SS

4" SS

2" SS

2" SS

2" SS

2" V

2" V

2" V

2" V

2" V

2" V

2" V 2" V

2" V

2" V

2" V

2" V

4" V

4" V

2" V

2" V

2" V

2" V

2" V

2" V 2" V

2" V

2" V

3" SS

1 1/2" V

1 1/2" V

1 1/2" V

4" SS

PF-2

PF-1

3" SS

4" SS

PF-3

2" SS 4" SS

PF-2

2" V

2" V

2" V

119 149

OF CONNECTION

SEE P-114 FOR POINT

OF CONNECTION

SEE P-114 FOR POINT

4" VTR

4" V UP T0

4" VTR

4" V UP T0

4" FCO

4" FCO

4" FCO

3" WCO

2" WCO

2" WCO

2" SS

2" WCO

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P s ig n e d b y

C h e c k e d b y

D ra w n b y

C a d F il e

D a te

P ro je c t

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e e t

S u it e

P -9

.d g n

S p e c

P ro je c t

B o is e I d a h o

-7

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:46:58 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

Z H

-8

R E

P A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-903 k

H A

N N

O N

682783_2215P-903.dgn

C

B S

H A

N N

O N

P L

U M

B

IN

G

NTS

WATER RISER

W A

T E

R R

IS

E R

PF-8

PF-4

PF-2

PF-2

PF-7

2" DCW

1" DHW

2" DCW

(TYP)

VALVES

ISOLATION

3/4" DHW

3/4" DCW

2" DCW

1" DHW

3/4" DHW

3/4" DCW

1 1/2" DCW

1 1/2" DCW

1" DCW

1 1/2" DCW

TYP 4

PF-3,

1 1/4" DCW

1" DCW

3/4" DCW

1" DCW

1 1/4" DCW

1 1/2" DCW

TYP, 5

PF-5

TYP 4

PF-1,

TYP 4

PF-1,

3/4" DHW

TYP 3

PF-5,

1/2" DHW

1" DHW

1 1/4" DCW

TYP, 5

PF-1,

2" DCW

2" DCW

1" DHW

2" DCW

3/4" DHW

OF CONNECTION, TYP 11

SEE P-112 FOR POINT

3/4" DHWR

3/4" DHWR

3/4" DHWR

3/4" DHW

3/4" DCW

3/4" DHWR

3/4" DCW

120 149

1" DCW

1/2" DHW

1/2" DCW

OF PIPING.

DOES NOT ACCURATELY REPRESENT SCALE (SIZE)

AND SIZE ANNOTATIONS. MODELING SOFTWARE

DIAGRAM IS SHOWN FOR CONCEPTUAL ROUTING

NOTE:

1" DCW

1 1/4" DCW

1/2" DCW (E)

PF-5

PF-5

1 1/2" DCW

ACCESS PANEL. PDI SIZE AA

SHOCK ABSORBER WITH

ACCESS PANEL. PDI SIZE B

SHOCK ABSORBER WITH

1 1/4" DCW

PDI SIZE B

WITH ACCESS PANEL.

SHOCK ABSORBER

GENERAL NOTES

REFER TO DRAWING A/P-401 FOR PIPE ROUNTING.A.

PDI SIZE AA

ACCESS PANEL, TYP 2.

SHOCK ABSORBER WITH

ACCESS PANEL. PDI SIZE B

SHOCK ABSORBER WITH

ACCESS PANEL. PDI SIZE C

SHOCK ABSORBER WITH

PDI SIZE A

ACCESS PANEL, TYP 2.

SHOCK ABSORBER WITH

ACCESS PANEL. PDI SIZE B

SHOCK ABSORBER WITH

ACCESS PANEL. PDI SIZE B

SHOCK ABSORBER WITH

ACCESS PANEL. PDI SIZE A

SHOCK ABSORBER WITH

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P s ig n e d b y

C h e c k e d b y

D ra w n b y

C a d F il e

D a te

P ro je c t

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e e t

S u it e

P -9

.d g n

S p e c

P ro je c t

B o is e I d a h o

-7

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:48:14 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

Z H

-8

R E

P A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

P-904 k

H A

N N

O N

682783_2215P-904.dgn

D

B S

H A

N N

O N

P L

U M

B

IN

G

NTS

W A

T E

R R

IS

E R

PF-8

PF-1

PF-2

PF-7

3/4" DHW

3/4" DCW

3/4" DHW

3/4" DHW

3/4" DHW

WATER RISER

OF CONNECTION, TYP 6

SEE P-114 FOR POINT

TYP 3

PF-5,

1/2" DCW

1 1/2" DCW

1" DCW

1" DCW

1 1/4" DCW

1 1/2" DCW

1 1/4" DCW

1 1/2" DCW

3/4" DCW TYP 3

PF-1,

TYP 2

PF-3,

1" DCW

1" DHW

3/4" DHWR

1" DHW

1" DCW

3/4" DCW

1/2" DCW

(TYP)

VALVES

ISOLATION

2" DCW

PF-1

1" DHW

1" DCW

121 149

PF-5

OF PIPING.

DOES NOT ACCURATELY REPRESENT SCALE (SIZE)

AND SIZE ANNOTATIONS. MODELING SOFTWARE

DIAGRAM IS SHOWN FOR CONCEPTUAL ROUTING

NOTE:

1" DCW

PF-5

PF-2

PF-5

GENERAL NOTES

REFER TO DRAWING B/P-401 FOR PIPE ROUNTING.A.

ACCESS PANEL. PDI SIZE A

SHOCK ABSORBER WITH

PDI SIZE A

WITH ACCESS PANEL.

SHOCK ABSORBER

PDI SIZE B

SHOCK ABSORBER

1 1/2" DCW

1" DHW

3/4" DHWR

PDI SIZE A

ACCESS PANEL, TYP 2.

SHOCK ABSORBER WITH

ACCESS PANEL. PDI SIZE B

SHOCK ABSORBER WITH

ACCESS PANEL. PDI SIZE A

SHOCK ABSORBER WITH

ACCESS PANEL. PDI SIZE B

SHOCK ABSORBER WITH

PDI SIZE AA

ACCESS PANEL, TYP 2.

SHOCK ABSORBER WITH

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P s ig n e d b y

C h e c k e d b y

D ra w n b y

C a d F il e

D a te

P ro je c t

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e e t

S u it e

P

D .d g n

S p e c

P ro je c t

B o is e I d a h o

-7

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:49:41 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

Z H

-8

R E

P A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S k B y

682783_2215PD100.dgn

T P

R

IC

E

J P

IG

M

GENERAL NOTES

KEYED NOTESX

NTS

D E

M O

L

IT

IO

N

6 6

1 1 2

3 7

3 3 8

CAP 1 1/4" DCW-E, REUSE 3/4" DHW-E AND DWHR-E.8.

CUT AND CAP WATER LINES, NOT TO BE REUSED.7.

REMOVE AND DISPOSE OF ALL PLUMBING FIXTURES.6.

A-150.

ROOF DECKING. SEE ROOF PLAN FOR MORE DETAILS,

THE ROOF SHALL BE EXTENDED TO PENETRATE NEW

VENTS NOT PART OF THE DEMOLITION THAT PENETRATE

VENTS AND VENTS THROUGH ROOF. ANY INDIVIDUAL

REMOVE ALL INDIVIDUAL FIXTURE VENTS, BRANCH 5.

CORRIDOR AND CAP.

REMOVE ALL WATER LINES BACK TO THE MAIN 4.

REUSE WATER LINE STUB FOR NEW WORK3.

CUT AND CAP DRAIN STUB, NOT TO BE REUSED.2.

REUSE DRAIN STUB FOR NEW WORK.1.

RESTROOM PLUMBING DEMO PLAN

BATHROOM DEMO.

AND AD-114 FOR ADDITIONAL INFORMATION ON

DRAWINGS. REFER TO ARCHITECT DRAWINGS AD-112

LABELS ARE NOT CONSISTENT WITH CURRENT

DEMO PLAN IN BASED ON OLD DRAWINGS. FIXTURE B.

THE CONTRACTING OFFICER.

WORK. REPORT ANY SUBSTANTIAL DISCREPANCIES TO

CONDITIONS BEFORE BEGINNING ANY DEMOLITION

INFORMATION. CONTRACTOR SHALL VERIFY EXISTING

INFORMATION SHOWN IS BASED ON BEST AVAILABLE A.

PD100

104 149

P L

U M

B

IN

G

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P s ig n e d b y

C h e ck e d b y

D ra w n b y

C a d F il e

D a te

P ro je ct

C H

M H

IL

L

S y m b o l

A p p ro v D a te

D e s c ri p ti o n

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442

E a s t F ro n t S tr e et

S u it e

5P D 1.

d g n

S p e c

P ro je ct

B o is e I d a h o

2-

FILENAME: PLOT DATE: PLOT TIME:2019\04\23 3:51:24 PM

SHEET of

/2

/2

F A

C

IL

IT

Y

Z

H

-8

R E P

A

IR

S

Q U

A D O

P S

C E

R T

IF

IE

D F

IN

A L D

E S

SEE P-113

k B y

682783_2215PD901.dgn

T P

R

IC

E

J P

IG

M

GENERAL NOTES

KEYED NOTESX

D E

M O

L

IT

IO

N P

H O

T O

S

DEMO PHOTO

NTS

DEMO PHOTO

NTS

DEMO PHOTO

NTS

DEMO PHOTO

NTS

DEMO PHOTO

NTS

THE CONTRACTING OFFICER.

WORK. REPORT ANY SUBSTANTIAL DISCREPANCIES TO

CONDITIONS BEFORE BEGINNING ANY DEMOLITION

INFORMATION. CONTRACTOR SHALL VERIFY EXISTING

INFORMATION SHOWN IS BASED ON BEST AVAILABLE A.

D.1 D.2

D.3

D.5D.4

DEMO PHOTO

NTS

D.6

9 10

DEMO IMAGE

NTS

D.7

P-113

PD901

MD101 MD100

MD100

MD100

MD100 MD100

DEMO IMAGE

NTS

D.8

P-113

105 149

P L

U M

B

IN

G

NEW WORK.

THE FCU'S IN MECHANICAL ROOM 144, SEE P-113 FOR

CORRIDOR 146 TO SERVE CONDENSATE DRAINS FOR

ARM WILL BE EXTENDED OUT OF PATH OF NEW

DEMO CONCRETE AND REMOVE FLOOR DRAIN. TRAP 16.

IN MECHANICAL ROOM 155, SEE P-113 FOR NEW WORK.

TO SERVE CONDENSATE DRAINS FOR BOILERS & FCU'S

WILL BE EXTENDED OUT OF PATH OF NEW CORRIDOR 146

DEMO CONCRETE AND REMOVE FLOOR SINK. TRAP ARM 15.

SCHEDULE.

REPLACED WITH NEW. SEE PLUMBING FIXTURE

ROOF DRAIN TO REMAIN, ROOF DRAIN BODY TO 14.

DOWNSTREAM OF EXISTING VALVE.

VALVE TO REMAIN. NEW PIPING SHALL START

13. EXISTING ISOLATION VALVE AND PIPING UPSTREAM OF

FLANGE. BUILDING SIDE OF FLANGE TO REMAIN.

12. NEW PIPING TO CONNECT AT THE EXISTING 2" PIPE

REFER TO ROOF DRAWINGS FOR FUTURE WORK, A-150.

NEEDED DUE TO CHANGE IN ROOF PITCH IN THIS AREA.

DEMOLISH LATERAL ROOF DRAINS. NO LONGER 11.

AREA.

SEE C-101 AND C-501 FOR SITE IMPROVEMENTS IN THIS 10.

SEE KEY NOTE 5 ON SHEET P-113.9.

EXISTING GAS METER AND PIPING TO BE DEMOLISHED.8.

SEE P-117, NEAR NEW CORRIDOR 146.7.

PATCHING OF WALLS WITH THE OTHER TRADES.

LOCATION AS SHOWN ON P-111. COORDINATE THE

THE ELECTRICAL ROOM 157 AND RELOCATE TO NEW

DEMO ALL DOMESTIC WATER LINES THAT RUNS THRU 6.

DEMOLISHED.

EXISTING DRINKING FOUNTAIN AND PIPING TO BE 5.

EXISTING LOUVER.4.

THE NEW WATER HEATER.

REQUIRED TO ACCOMMODATE THE INSTALLATION OF

REPLACED. POTABLE WATER PIPING TO BE MODIFIED AS

EXISTING WATER HEATER TO BE DEMOLISHED AND 3.

REMAIN IN PLACE.

LOCATION OF NEW WATER METER. ISOLATION VALVE TO

EXTERIOR NORTH WALL. REFER TO SHEET P-113 FOR

PIPING FOR APPROXIMATELY 15' DOWNSTREAM FROM

PIPING DOWNSTREAM OF ISOLATION VALVE. DEMOLISH

DEMOLISH EXISTING PRESSURE REDUCING VALVE AND 2.

PIPING UNDER NEW WORK PHASE.

CONNECTION OF NEW BACKFLOW PREVENTER SUPPLY

APPROXIMATELY 9' AFF. RETAIN ISOLATION VALVE FOR

LOCATED ON EAST WALL OF MECHANICAL ROOM 144

EXISTING BACKFLOW PREVENTER TO BE DEMOLISHED. 1.

O H

A

DI FO

E

T A

T S

DERETSIGE

R R

E E

NI

GNE LANOISSE

F

O R

P

682783_2215P-001
682783_2215P-110
682783_2215P-111
682783_2215P-112
682783_2215P-113
682783_2215P-114
682783_2215P-115
682783_2215P-116
682783_2215P-117
682783_2215P-118
682783_2215P-401
682783_2215P-500
682783_2215P-600
682783_2215P-901
682783_2215P-902
682783_2215P-903
682783_2215P-904
682783_2215PD100
682783_2215PD901

File details come from the government source that posted it. Updated .