MHAFB_Facility2215_Drawings_Part_1.pdf

PDF 24 MB Posted

Attached to
Repair and Minor Renovation of Squadron Operations Building 2215 at Mountain Home Air Force Base, Idaho
Solicitation number
W912DW19R0028
Issued by

About this file

This notice announces a proposed 8(a) contract for repair and renovation of a squadron operations building at Mountain Home Air Force Base in Idaho. The project scope includes replacing the roof and HVAC system, remodeling restrooms to comply with ADA standards, adding exterior windows and skylights, relocating interior walls, and providing new interior finishes throughout the 61,472 square foot facility. The contract value is estimated between $5 million and $10 million. The solicitation will be issued on July 31, 2019 via the Federal Business Opportunities website. The opportunity is limited to eligible 8(a) firms located in Idaho, Oregon, Utah, or Washington. Interested vendors must register with the FBO website and add the solicitation to their watchlist to receive automatic updates.

RFP W912DW19R0028 - Drawings Package 1 of 6

View the file

Other files

File Type Posted
AWARD NOTICE - Bldg 2215.pdf PDF
Amendment_0008_Building_2215_MHAFB.pdf PDF
Amendment_0007_SF_30.pdf PDF
00_31_24_Part1.pdf PDF
00_31_24_Part2.pdf PDF
00_31_24_Part3.pdf PDF
MHAFB_Facility2215_Auditorium_Seating_Dwg_A-110_Excerpt.pdf PDF
Site_Visit_Pre-Proposal_PPT_Slides_10-10-19.pdf PDF
Site_Visit_Attendee_List_10-10-19.pdf PDF
Amendment_0006_Building_2215_MHAFB.pdf PDF
Amendment_0005_Building_2215_MHAFB.pdf PDF
General.pdf PDF
Amendment_0004_Building_2215_MHAFB.pdf PDF
Mechanical_Part_1.pdf PDF
Fire_Protection.pdf PDF
Architecture.pdf PDF
Plumbing.pdf PDF
Structural.pdf PDF
Mechanical_Part_2.pdf PDF
Civil.pdf PDF
Electrical.pdf PDF
Amendment_0003_Building_2215_MHAFB.pdf PDF
Amendment_0002_W912DW19R0028_Building_2215.pdf PDF
Amendment_0001_W912DW19R0028_Building_2215_SF_30.pdf PDF
B2215_roof_report_Part_1.pdf PDF
B2215_roof_report_Part_2.pdf PDF
Attendance_Sheet_-_Site_Visit.pdf PDF
Pre-Proposal_Conference_and_Site_Visit_Slides.pdf PDF
FY19_MHAFB_Squad_Ops_Facility_2215_Specifications.PDF PDF
MHAFB_Facility2215_Drawings_Part_6.pdf PDF
MHAFB_Facility2215_Drawings_Part_4.pdf PDF
MHAFB_Facility2215_Drawings_Part_2.pdf PDF
MHAFB_Facility2215_Drawings_Part_3.pdf PDF
RFP_W912DW19R0028_MHAFB_Bldg_2215.pdf PDF
MHAFB_Facility2215_Drawings_Part_5.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

WCCS AREA

VAULT

SECURE

C O

R

ID

ROOM

MECHANICAL

STORAGE

SERE

FLT CHF

AFE

SUPT

SAD

COMMON AREA

INTEL

PLANNING

ROOM 1

ROOM 2

H

A S

E

ROOM 3

D e s ig n d b y h e c k e ra w a d F il te

P ro je c t

M

IL

L m o l p v s c ri p ti

Drawing Number:

A B C D E F G H

GUNFIGHTERS

HOME OF THE

COMBAT COMMAND

AIR

DEPARTMENT OF

MOUNTAIN HOME AFB.

THE AIR FORCE

MOUNTAIN HOME

AFB

U.S. AIR FORCE

366 CES/CECD

1030 LIBERATOR ST.

MOUNTAIN HOME AFB, ID

83648-5442 t F t S tr e u it

-1

.d g e c je c t

B is e I d a h

-7

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:06:54 PM

SHEET of

/2

IT

Y

KEY PLAN

N

PLAN TRUE

A C

B D

Q

Z

-8

IR

U

T

IF

IE

IN

IG

682783

A-113

KEYED NOTES

GENERAL NOTES

X

FLOOR PLAN - AREA C

1/8"=1'-0"

J

LEGEND:

G

682783_2215A-113.dgn

LINE

MATCH

A-114

148B

141B

142C

142B

139A

138A

134A

155D

MECH RM

AUDITORIUM

30'-0"

SEE A-111

TYP

OSK

144A

132A

133B

6"

10'-8"

5'-6"

5'-6"

A-403

A-503

CONC. FLR.

ACCESS FLR.

131B

EXISTING ITEMS TO REMAIN

NEW OR MODIFIED ITEMS

IS

FIN.

FIN.

FINISHED

W-22

1313 1313

8 11 11

UP

6'-0"

4'-0"

27 149

W

IC

4'-9"

2" x 2" x 48" SATIN STAINLESS STEEL CORNER GUARD15.

NEW ROOF DRAIN OUTLET, SEE PLUMBING DRAWINGS

SPLASH BLOCK AT EXISTING ROOF DRAIN OUTLET AND 14.

NEW DOWNSPOUT, SEE A-150 AND DETAIL 3/A-50313.

EXISTING DOOR THAT WAS REMOVED

NEW DOOR TO BE PAINTED GREEN TO MATCH 12.

NEW FINISH

EXISTING OVERHEAD DOOR TO REMAIN, PREPARE FOR 11.

FINAL FINISH

WHERE WALL ITEMS WERE REMOVED, PREPARE FOR

PATCH WALL WHERE WALL WAS DEMOLISHED OR 10.

REMOVEABLE RAMP, SLOPE 1:129.

TRANSLUCENT WALL PANEL8.

EACH SIDE

ALIGN FINAL FACE OF NEW FINISH WITH EXISTING

MATCHING THE ADJACENT WALL CONSTRUCTION.

INFILL OPENING WITH WALL CONSTRUCTION TO 7.

REQUIRED FOR NEW WORK

REINSTALL RAISED FLOOR SYSTEM, MODIFY AS 6.

EXISTING WALL MURAL TO BE PROTECTED5.

NEW GYPSUM WALL BOARD ON EXISTING STUDS4.

SHEET A-401

DRINKING FOUNTAIN, SEE PLUMBING DRAWINGS AND 3.

RAISED FLOOR CENTERED IN ROOM2.

OFFICER, SEE 6/A-503

COORDINATE EXACT LOCATION WITH CONTRACTING

2'-2" x 2'-0" ACCESS FLOOR INSPECTION COVER, 1.

GUARDS.

ALL OUTSIDE CORNERS TO RECEIVE CORNER G.

ICD 705).

PAINTED FROM TRUE FLOOR TO TRUE CEILING (IAW

PERIMETER WALL ASSEMBLY SHALL BE FINISHED AND

WITHIN SECURED BOUNDARY AREAS, THE ENTIRE F.

FOR WALL TYPES, SEE SHEET A-001E.

WINDOWS AS REQUIRED.

REPAIR AND PATCH WALL ADJACENT TO NEW D.

DAMAGE REPAIRED FOR FINAL WALL FINISH.

ALL EXISTING WALLS TO HAVE ALL HOLES AND WALL C.

INTERIOR AND WINDOW SCHEDULES.

SEE SHEETS A-601, A-610 AND A-611 FOR DOOR, B.

NOTE 1/A-001.

EXISTING FINISHES UNLESS NOTED OTHERWISE, SEE

DIMENSIONS ARE FACE OF STUD OR FACE OF A.

2019-04-25T09:24:31-0600

John Reseigh

I am approving this document

CRYPTO

OFFICE

EXEC

OSS CC

UFC

SEC ADMINADMIN

BRF

VEST

CORRIDOR

MOM

MEN

WOMEN

JAN

CONFERENCE

GLO

OFC

SGT

1STUMP

PLN

MSN

STOR

ADMIN

DO

COMM

SQ

TRNG

HARMSERE

MAIN

113 114 115

106 107

119 120

122 124

126125

185 186

170 171

HARM

CVN 1

CVN 3

CVN 4

CVN 5

CVN 7

CVN 6

V

CVN 10

CVN 9

3 4 e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:08:37 PM

FLOOR PLAN - AREA D

682783_2215A-114.dgn

A-113

171A 117A

127A

128A

128B

130A

186A

112A

115B

110A

113B

103A

A1

111A

104A103B

192A 192B

191A

170B

W-11

126A

1'-9"

J J

W-12 W-13 W-14 W-15 W-16

4'-0"9'-4"4'-0"

2'-8"

4'-0"8'-0"4'-0"

2'-8"

4'-0"10'-8"4'-0"4'-0"4'-0"8'-0"

187B

J J

C C

TYP12

12 1112

W-10

W-17

9 9

6'-0"

A-401

28 149

12 12

GUARDS.

ALL OUTSIDE CORNERS TO RECEIVE CORNER G.

ICD 705).

PAINTED FROM TRUE FLOOR TO TRUE CEILING (IAW

PERIMETER WALL ASSEMBLY SHALL BE FINISHED AND

WITHIN SECURED BOUNDARY AREAS, THE ENTIRE F.

FOR WALL TYPES, SEE SHEET A-001E.

WINDOWS AS REQUIRED.

REPAIR AND PATCH WALL ADJACENT TO NEW D.

DAMAGE REPAIRED FOR FINAL WALL FINISH.

ALL EXISTING WALLS TO HAVE ALL HOLES AND WALL C.

INTERIOR AND WINDOW SCHEDULES.

SEE SHEETS A-601, A-610 AND A-611 FOR DOOR, B.

NOTE 1/A-001.

EXISTING FINISHES UNLESS NOTED OTHERWISE, SEE

DIMENSIONS ARE FACE OF STUD OR FACE OF A.

2" x 2" x 48" SATIN STAINLESS STEEL CORNER GUARD12.

FINISH

WALL ITEMS WERE REMOVED, PREPARE FOR FINAL

PATCH WALL WHERE WALL WAS DEMOLISHED OR WHERE 11.

THRESHOLD10.

NEW DOWNSPOUT, SEE A-150 AND DETAIL 3/A-5039.

EXISTING VAULT DOOR TO REMAIN AND BE PROTECTED.8.

LOCATION

RELOCATE EXISTING CELL PHONE LOCKERS TO THIS 7.

REQUIRED FOR NEW WORK

REINSTALL RAISED FLOOR SYSTEM, MODIFY AS 6.

NEW GYPSUM WALL BOARD ON EXISTING STUDS5.

LOCKERS, SEE DETAIL 11/A-4034.

AND A-402 DRAWINGS

DRINKING FOUNTAIN, SEE PLUMBING AND SHEETS A-401 3.

NEW WINDOW, TYP2.

OFFICER, SEE 6/A-503

COORDINATE EXACT LOCATION WITH CONTRACTING

2'-2" x 2'-0" ACCESS FLOOR INSPECTION COVER, 1.

2019-04-25T09:24:56-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:10:37 PM

2 4

A-150

1/16"=1'-0"

682783_2215A-150.dgn

ROOF PLAN

RIDGE

4 4

4 4 4

4 5

8'-0"16'-4"55'-3"13'-8"11'-2"21'-2"18'-0"27'-2"33'-6"

25'-8"8'-0"13'-6"12'-0"21'-7"12'-0"69'-1"49'-4"

RIDGE

20'-5" 16'-4" 14'-6" 18'-6" 16'-0" 12'-4"

26'-6" 67'-0" 5'-7"

A-201

A-2011

A-510

A-511

17 1

COPING

SIM AT

TYP OF 3

29 149

WITH MECHANICAL.

PREFABRICATED EQUIPMENT CURBS, COORDINATE C.

OPENINGS ETC. WITH MECHANICAL AND PLUMBING

COORDINATE ROOF PENETRATIONS, CURBED B.

WITHIN EXISTING SCUPPER OPENINGS.

EXISTING. NEW SCUPPERS ARE TO BE INSTALLED

SCUPPERS AND ROOF DRAIN HEIGHT MATCHES

PARAPET WALL AT ROOF DRAINS SO THAT EXISTING

MATCH HEIGHT OF EXISTING ROOF INSULATION AT

NEW POLYISO ROOF INSULATION (RIGID/TAPERED) TO A.

DECK

RIGID INSULATION OVER EXISTING METAL ROOF

OVER HIGH DENSITY COVER BOARD OVER R-30 MIN.

NEW FULLY ADHEARED EPDM ROOFING SYSTEM 21.

INDICATED

WALK MAT ADHEARED TO EPDM ROOFING SYSTEM AS 20.

RIGID INSULATION BUILD UP AREA19.

ROOF PENETRATION, SEE 11/A-51118.

ROOF/OVERFLOW DRAIN. SEE 3/A-51117.

TAPERED INSULATION CRICKET16.

PROTECT DURING CONSTRUCTION

EXISTING CANOPY ROOF BELOW TO REMAIN, 15.

BLOCK AT ROOF DRAIN PIPE AT GRADE

COLLECTOR HEAD, SEE 3/A-503. CONCRETE SPLASH 14.

ROOF TO WALL EDGE FLASHING, SEE 7/A-51113.

OVER EPDM UNDER COPING CAP

20 GA. (4" x 4") BREAK SHAPE CORNER FLASHING 12.

EXPANSION JOINT WALL TO STEP UP 8", SEE 8/A-51011.

INDICATES CHANGE IN ROOF SLOPE10.

SKYLIGHT/SOLAR TUBE, SEE 9/A-5119.

NEW EXPANSION JOINT, SEE 4/A-5108.

NEW SKYLIGHT, SEE 2/A-5037.

NEW COPING AND FLASHING, SEE 1/A-510 AND 2/A-5106.

TAPERED INSULATION OVER EXISTING METAL ROOF

OVER HIGH DENSITY COVER BOARD OVER R-30 MIN.

NEW FULLY ADHEARED EPDM ROOFING SYSTEM 5.

COLLECTOR HEAD, SEE 10/A-510

NEW ROOF DRAIN, OVERFLOW SCUPPER AND 4.

PLUMBING AND HVAC VENTS, SEE 11/A-5113.

12/A-511

ROOF TOP HOOD AND CURBING, SEE 8/A-511 AND 2.

CMU PARAPET EXTENSION1.

4'-4 1/2 "

33'-10"

2019-04-25T09:25:19-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it

-2 e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:13:07 PM

682783_2215A-201.dgn

IO

IA

PARTIAL ELEVATION AT ROOF PARAPET

1/4"=1'-0"

14'-0"

ROOF SECTION

INTERIOR SPACE INTERIOR SPACE

INTERIOR SPACE

ROOF SECTION

A-510 A-510

OPP.

NEW CMU PARAPET EXTENSION

EXISTING CMU WALL

NEW COPING

ROOF SLOPE

"SLOPE

SLOPE

CMU WALL

EXISTING INTERIOR

STRUCTURE

DECK AND ROOF

EXISTING METAL

CHANGE

ROOF SLOPE

NEW ROOF SYSTEM

35 149

CMU WALL,

EXISTING

RIGID INSULATION BUILD-UP AREA, SEE SHEET A-150

1/2"±:12 3/8"±:12

3/8"±:12

5/8"±:12

2019-04-25T09:36:09-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it

-4 e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:15:40 PM

JAN.

JAN.

IN 3

PIPES

EXPOSED

INSULATE

LAVATORIES & MIRRORS

DEPTH

17" MIN. LAV.

OR VANITY

TOP OF LAV

MIN

8"

LAV

WATER CLOSET

ACCESSIBLE

TPD

12"

3'-0" MAX

SIDE

ON WIDE

44" A.F.F.

EXCEED

NOT TO

CONTROL

FLUSH

MAX

54" MIN

42" MIN

GB-3

36"

WC WC

2'-0"

12"

36"

7"-9"

THAN 44" A.F.F.

NO MORE

FLUSH

URINALS

URINAL

MIN.

14"

6" MAX 8" MIN

DF

DRINKING FOUNTAIN

17"-18"

IB

AUTOMATED PAPER TOWEL

PTD-1

SLOT

DISPENSING

SOAP DISPENSER

SD

IB

MB

ALARM OR

LIGHT SWITCH,

THERMOSTAT

SIGNAGEMOP HOOKS

ALARMS

DISPENSERS

MISC.

11"

SINK

FRONT OF

MAX FROM

MAX

BOTTLE FILLER

DISPENSER

MG

16"-18"

682783_2215A-401.dgn

ENLARGED RESTROOM AREA

ENLARGED RESTROOM AREA

5'-2" 6'-1" 5'-2"

5'-6"5'-2"5'-0"

5'-8"3'-0"3'-0"3'-0"3'-0"

2'-6" 2'-7" 2'-7" 2'-7" 2'-7"

11'-0"

2"

A-402

168A

167A

CODE FOR BUILDING CONSTRUCTION

INTERNATIONAL ACCESSIBILITY

PTD

TOILET ACCESSORY LEGEND

SOAP DISPENSER

DRINKING FOUNTAIN

TOILET PARTITION

URNAL SCREEN

WC WATER CLOSET

IP

NOTE: DIMENSIONS ARE CLEAR, MINIMUM FINISHED DIMENSIONS

INSULATE EXPOSED PIPES

NOTE: DIMENSIONS ARE CLEAR, MINIMUM FINISHED DIMENSIONS

CLWALL

KEYED NOTESX

TTDJ

WCTTDJ

WC

TTDJ WC

TTDJ WC

LAV LAV LAV

S S S S

TTDJ TTDJ

TTDJ TTDJ TTDJ

16'-2" 4'-5"17'-8"

A-112

3'-0"3'-0"3'-0"5'-9"

66 6

6 66

GRAB BAR, SIZE AS SHOWNGB-"X"

12'-6"

5'-6"6'-6"

1'-6"

7'-10 1/2 "18'-4 1/2 "

4'-6"13'-2"

1'-6"

TYP.

PAPER TOWEL DISPENSER

36 149

MH

MH

6.

5.

4.

3.

2.

1.

ABAABA

ABA

ABA URINAL NON ABA URINAL

MG MIRROR 24 X 36

MT

MT MIRROR, TILT 24 X 36

TTDJ TOILET TISSUE DISPENSER

MH MOP AND BROOM HOLDER (24")

URINALS

7 7

UNLESS NOTED OTHERWISE.

ALL DOORS ARE DIMENSIONED 4-INCHES FROM FACE OF STUD

INTERIOR HINGED - 5 LB.SLIDING - 5 LB.EXTERIOR - 8.5 LB.

DOOR OPENING FORCE:

GRAB BARS SHALL NOT ROTATE WITHIN THEIR FITTINGS.

LOAD BETWEEN FASTENER AND SUPPORTING STRUCTURE.

OF 250 LBS. SHALL BE LESS THAN THE ALLOWABLE WITHDRAWAL

250 LB. PLUS MAXIMUM MOMENT FROM THE APPLICATION

TENSILE FORCE INDUCED BY DIRECT TENSION FORCE OF

LATERAL LOAD OF FASTENER OR SUPPORT STRUCTURE.

APPLICATION OF 250 LB. FORCE SHALL BE LESS THAN ALLOWABLE

SHEAR FORCE INDUCED ON FASTENER OR MOUNTING DEVICE FROM

- 250 LB. SHEAR STRESS

- 250 LB. BENDING MOMENT

THE FOLLOWING STRUCTURAL STRENGTHS:

GRAB BARS ARE TO BE CONSTRUCTED AND INSTALLED TO MEET

OF THE ARCHITECTURAL BARRIERS ACT (ABA).

AND OTHER FIXTURES AND ITEMS SHALL MEET THE REQUIREMENTS

INSTALLATION OF ACCESSIBLE TOILET AND BATH ACCESSORIES

ACCESSORIES, FOR SELECTED MODEL INFORMATION.

SEE SPECIFICATION SECTION 10 28 13, TOILET AND BATH

OF DOOR

NOTES:

RESTROOM SIGN FORMATS

BRAILLE

GRADE 2

SIGN TYPE AS SCHEDULED SIGN TYPE AS SCHEDULED

ALL DOOR NAMEPLATES IN A BUILDING WILL BE THE SAME FINAL SIZE. .

OF THE SUBCONTRACTOR.

GRAPHIC DESIGN OF THE SIGN AND FINAL SIZES OF SIGNS ARE THE RESPONSIBILITY

ESTABLISH THE DESIRED MESSAGE AND APPLICATION FOR EACH SIGN. THE EXACT

PROJECT ARE IN THE PROPER OSHA OR ADA FORMAT. THIS DRAWING IS MEANT TO

SIGN SUBCONTRACTOR IS RESPONSIBLE TO MAKE SURE ALL SIGNS USED ON THIS

OF ALL DOUBLE DOOR LOCATIONS

MOUNT SIGNS ON RIGHT HAND DOOR

FRAME

FACE

SYMBOL

TEXT

1/2"R 1/2"R

1"

1/2"

1"

1/2"

1/8"

4"

1/8"

NO SCALE

SIGN MOUNTING LOCATIONS

SIGNAGE

F

K

LATCH SIDE

8" 8"

ADA RESTROOM SIGNAGE, SEE DETAIL 1, THIS SHEET7.

2" x 2" x 48" SATIN STAINLESS STEEL CORNER GUARD6.

SERVICE SINK, SEE 1/P-500 ON PLUMBING DRAWINGS5.

NO WORK REQUIRED

CLEAR FLOOR SPACE FOR ACCESSIBILITY COMPLIANCE. 4.

TILE TRANSITION STRIP3.

EXISTING WALL

FINAL FACE OF NEW FINISH TO MATCH FINAL FINISH OF 2.

INFILL DOOR OPENING, SEE A-112 AND A-1141.

2019-04-25T09:36:28-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:19:37 PM

682783_2215A-402.dgn

WALL ELEVATION - RM 165

WALL ELEVATION - RM 166

P P

SURINAL

A-401 A-401 A-401 A-401

A-401 A-401

WALL ELEVATION - RM 103

3/8"=1'-0"

12 x 24 FIELD TILE

SCHLUTER METAL TRIM

12 x 12 ACCENT TILE

SCHLUTER METAL TRIM

12 x 24 FIELD TILE

FLOOR LINE

CEILING LINE

FILLER

BOTTLE

SEE PLAN

CORNER GUARD,

IP,

IP,

RESTROOM WALL TILE PATTERN

37 149

ABA ABA

(TYPICAL ALL WALLS)

2019-04-25T09:36:47-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it

-0 e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 4:14:07 PM

5/8" GWB, EA

SIDE.

20 GA, 6" MTL

STUD @ 16" O.C.

5/8" GWB

20 GA, 3 5/8" MTL

3 5/8" 20 GA. MTL

STUDS @ 24" O.C.

"A

EXISTING GWB

20 GA, 3 1/2" MTL

EXTERIOR

INTERIOR

VAPOR RETARDER

OVER WALL STUDS

INFILL

WALL

CMU WALL INFILL

(MATCH EXISTING)

20 GA, 8" MTL

2" RIGID INSULATION

(R-14)

3 1/2" SOUND BATT

INSULATION (R-13)

5 1/2" SOUND BATT

INSULATION (R-19)

EXISTING BATT

INSULATIONATION, IF

NOT INSTALLED

ADD 3 1/2" BATT

INSUALTION (R-13)

5/8" GWB W/ 20 GA,

3 5/8" MTL STUD INFILL

(MATCH EXIST)

@ 16" O.C.

BATT INSULATION

(R-13)

NOT USED

(2) LAYER 5/8" GWB

EXSITING CMU WALL

NEW CMU TO

MATCH EXISTING

SEE STRUCTURAL

DETAIL ON S-502

AT SIM. PROVIDE

TO STEEL DECK ABOVE

WALL TO EXTEND FULL HEIGHT6.

SEALANT

SEALED WITH ACOUSTIC

ALL PENETRATIONS TO BE 5.

TO WALL STUDS

BE FASTENDED SECURLY

BATT INSULATIONATION SHALL 4.

OF ACOUSTICAL SEALANT

IN 2 CONTINUOUS BEADS

AT 32" O.C. MAX. SET TRACK

AND BOTTOM W/ ANCHORS

CONTINUOUS TRACK TOP

AT NEW WALLS, 16 GA. 3.

NEW WALL TRACK

GROUT IN ALL VOIDS ABOVE

FIRE SAFE OR NON-SHRINK2.

METAL STUDS AND GWB

EXISTING WALL SYSTEM IS1.

NOTE:

AT SIM OMIT SOUND

A-001

S

CONCRETE

METAL STUD WALL (PLAN)

GYPSUM WALLBOARD

RIGID INSULATION

ACOUSTICAL TILE

PLYWOOD

WOOD, ROUGH NON-CONTINUOUS

WOOD, ROUGH CONTINUOUS

WOOD, FINISHED

CMU WALL (PLAN)

CMU WALL (SECTION)

GROUT

GRANULAR FILL

EARTH OR FINISH GRADE

GENERAL ARCHITECTURAL NOTES ARCH/STRUCT MATERIAL SYMBOLS

SYMBOL LEGEND

INDICATES PAIR OF DOORS

OR

110.50

DIRECTION OF SLOPE DOWN

XX101 ROOM IDENTIFIER

DOOR IDENTIFIER

WINDOW IDENTIFIER

LOUVER IDENTIFIER

W-1

XX-A-301

XXW-1

XXL-1 L-1

INTERIOR ELEVATION INDICATOR

S-1 SIGNAGE IDENTIFIER

ARCHITECTURAL/STRUCTURAL LEGEND

SYMBOL LEGEND

SPOT ELEVATION INDICATOR (IN FEET)

ELEVATION DATUM (IN FEET)

GRID / COLUMN INDICATOR

EL XX.XX

XXXX

ROOM NAMEROOM NAME

ARCHITECTURAL WALL TYPES (IN SEMI-RECESSED CABINET)

"X" = NUMBER IN SPECIFICATIONS

FIRE EXTINGUISHER

F.EXT-X

INACTIVE

ACTIVE

REQUIRED

POINTERS AS

DIRECTION OF

QUANTITY AND

(IF SHOWN)

INDICATOR

"XX" = FACILITY DOOR LETTER

ROOM NUMBER

682783_2215A-001.dgn

ADDITIONAL NOTES.

REFER TO ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL AND OTHER CATEGORIES OR DRAWINGS FOR

VERIFY ALL ROUGH-IN DIMENSIONS FOR EQUIPMENT PROVIDED IN THIS CONTRACT, OR BY OTHERS.

AT THE BUILDING FACE, OR ON THE SECTION END EXCEPT AS NOTED.

LINE OF EXISTING GRADES, AS SHOWN ON THE BUILDING ELEVATIONS AND SECTIONS ARE APPROXIMATE. THEY ARE

BOTTOM, INTERSECTION, DOOR FRAMES, AND OTHER PENETRATIONS.

AT SOUND INSULATED WALLS, FULL HEIGHT PARTITIONS SHALL BE SEALED BOTH SIDES WITH ACOUSTIC SEALANT: TOP, WALL TO EDGE OF ROUGH OPENING AT CONCRETE WALLS, 8" AT CMU WALLS.

SHALL BE 4-INCHES FROM FACE OF STUD (WALL) TO FACE OF ROUGH OPENING. DIMENSION SHALL BE 6" FROM FACE OF

WHERE DOOR IS LOCATED NEAR CORNER OF ROOM AND IS NOT LOCATED BY DIMENSION ON PLAN OR DETAILS, DIMENSION

REPETITIVE FEATURES ARE NOT DRAWN IN THEIR ENTIRETY AND SHALL BE COMPLETELY PROVIDED AS IF DRAWN IN FULL.

DEPRESSED FLOORS AND CURBS, SEE STRUCTURAL DRAWINGS.

"FLOOR LINE" REFERS TO TOP OF CONCRETE SLABS. FINISH FLOORING IS INSTALLED ABOVE THE FLOOR LINE. FOR

MASONRY, FACE OF STUDS AND FACE OF CONCRETE WALLS.

UNLESS OTHERWISE INDICATED, PLAN DIMENSIONS ARE TO COLUMN GRID ON CENTERLINES, NOMINAL SURFACE OF

INSULATION (R-19)

5 1/2" SOUND BATT

20 GA, 6" MTL

18.

17.

16.

15.

14.

13.

12.

11.

10.

9.

8.

7.

6.

5.

4.

3.

14 149

WEIGHING MORE THAN 31 LBS.

REFER TO S-001 GENERAL STRUCTURAL NOTES FOR ANTI -TERRORISM (AT) BRACING AND SUPPORT REQUIREMENTS FOR EQUIPMENT

REFER TO SHEET A-610 AND A-611 INTERIOR FINISH AND WINDOW SCHEDULES.

REFER TO THE PLUMBING DRAWINGS FOR FLOOR DRAIN LOCATIONS.

VERIFY ACTUAL REQUIRED CLEAR DISTANCES FOR ALL FIXTURES AND EQUIPMENT PRIOR TO CONSTRUCTION.

ACCESSORIES. SEE ALSO SHEET A-401, AND A-402.

PROVIDE BLOCKING AT ALL MILLWORK, CABINETS, WALL MOUNTED EQUIPMENT, FURNITURE, AND TOILET

FOR DOOR SCHEDULES SEE DRAWING A-601 AND A-602.

FOR WINDOW DESCRIPTIONS SEE SPECIFICATION SECTION 08 51 13.

FOR DOOR AND HARDWARE DESCRIPTIONS SEE SPECIFICATION SECTION 08 71 00.

FOR APPLICABLE CODES AND LIFE SAFETY PLAN, SEE DRAWING G-003.

MECHANICAL, ELECTRICAL AND OTHER EQUIPMENT.

FURRING, CURBS, ANCHORS AND INSERTS. PROVIDE ALL BASES AND BLOCKING REQUIRED FOR ACCESSORIES, VERIFY SIZE AND LOCATION OF, AND PROVIDE: REQUIRED OPENINGS THROUGH FLOORS AND WALLS, ACCESS DOORS, 2019-04-25T09:22:39-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:21:27 PM

682783_2215A-403.dgn

WALL ELEVATION - RM 121

WALL ELEVATION - RM 122

WALL ELEVATION - RM 164

WALL ELEVATION - RM 137

WALL ELEVATION - 121

(3) TOTAL

2'-4"1'-6"3'-0"1'-6"3'-0"3'-0"

2'-4"1'-6"3'-0"1'-6"3'-0"3'-0" 3'-0" 1'-6"

1'-6"3'-0"

TPD WC

URINAL URINAL

B C BAA

A-404

SIM

SIM

A-404A-404 A-404 A-404

IP, TYP

IP, TYP

A-112 A-113

38 149

LOCKER WALL

WALL ELEVATION SECTION

LOCKERS

FLOOR FINISH

METAL STUD

CEILING

SUSPENDED

AT 24" 0.C.

METAL STUD BRACE

METAL TRACK

LOCKERS

CLIP

TRIM SUPPORT

CONT. METAL

GYPSUM BOARD

1x8 TRIM

1x8 TRIM

ABA

INSTALLED

MICROWAVE, FURNISHED BY OTHERS, CONTRACTOR 3.

REFRIGERATOR, OWNER FURNISHED CONTRACTOR 2.

ICE MAKER, OWNER FURNISHED CONTRACTOR 1.

2019-04-25T09:37:07-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it

-0 e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 4:16:57 PM

A-002

IA

DOWNSPOUTDS

DOORDR

DIRECTIONDIR

DIMENSIONDIM

DIAMETERDIA

DRINKING FOUNTAINDF

DEMOLITIONDEMO

DELETEDEL

DEGREEDEG

DOUBLEDBL

DEPTH, DEEPD

CLOCKWISE, CASEMENT WINDOWCW

CABINET UNIT HEATERCUH

CENTER, CONTOURCTR

CERAMIC TILE FLOORCTF

CERAMIC TILE BASECTB

CERAMIC TILE, COUNTCT

CASEWORKCSWK

CARPETCPT

CONCRETECONC

COMBINATION, COMBINEDCOMB

COMMONCOM

COLUMNCOL

CONCRETE MASONRY UNITCMU

CLEAR, COLOR, COOLERCLR

COLUMN LINE, CONTRACT LIMIT LINECLL

CEILING HEIGHTCLG HT

CEILINGCLG

CLASSIFICATIONCLASS

CENTER LINE, CLASS, CLOSECL

CONTROL JOINT, CONSTRUCTION JOINTCJ

CIRCLECIR

CORNER GUARDCG

CONTRACTOR FURNISHED OWNER INSTALLEDCFOI

CONTRACTOR FURNISHED CONTRACTOR INSTALLEDCFCI

CERAMICCER

CEMENTCEM

COUNTER CLOCKWISECCW

CEMENTITIOUS BACKER BOARDCBB

CERAMIC BASE, CORNER BEADCB

CAVITYCAV

CEILING ATTENUATION CLASSCAC

CABINETCAB

CARPET AND PADC & P

BOTH WAYSBW

BUILT UP ROOFINGBUR

BETWEENBTWN

BASEMENTBSMT

BOTH SIDESBS

BOTTOMBOT

BOTTOM OF STEELBOS

BELOWBLW

BUILT INBLT IN

BUILDINGBLDG

BITUMINOUSBITUM

BELOW FINISHED FLOORBFF

BOTH FACESBF

BOARDBD

BULLETIN BOARD, BASEBOARDBB

BACK TO BACKB/B

ACOUSTICAL WALL TREATMENTAWT

ARCHITECTURAL WOODWORKAW

AVERAGEAVG

AUXILIARYAUX

ASSEMBLYASSY

AS REQUIREDAR

APPROXIMATEAPPROX

APPROVEDAPPD

AMOUNTAMT

ALUMINUMALUM

ALTERNATEALT

ALIGNMENTALNMT

ALLOWANCEALLOW

AIR HANDLING UNITAHU

ABOVE FINISHED FLOORAFF

ADMINISTRATIONADMIN

ADJACENT, ADJOINING, ADJUSTABLEADJ

ADDITIONALADDL

ACOUSTICAL CEILING TILEACT

ACCESS PANELACS PNL

ACOUSTICAL INSULATIONACOUS INSUL

UNIT AIR CONDITIONING UNITA/C

ABBREVIATION TERM

EXTRUDED POLYSTYRENE BOARDXPS

TRANSFERXFER

WATERWTR

WEIGHTWT

WEATHERSTRIPWS

WHERE OCCURSWO

WALL HUNGWH

WINDOWWDW

WOOD DOOR, WOODWD

WALL CLEANOUTWCO

WATER CLOSETWC

WITHOUTW/O

WITHW/

WIDE, WESTW

VENT THROUGH ROOFVTR

VERIFYVRFY

VAPOR RETARDERVR

VOLUMEVOL

VOLATILE ORGANIC COMPOUNDVOC

VERIFY IN FIELDVIF

VERTICALVERT

VINYL COMPOSITION TILEVCT

VINYL BASEVB

VARIESVAR

UNLESS OTHERWISE NOTEDUON

UNLESS NOTED OTHERWISEUNO

UNDERWRITERS LABORATORIESUL

UNDERCUT DOORUCD

TYPICALTYP

TUBE STEELTS

TOP OF TO

THROUGHTHRU

THRESHOLDTHRES

THICKNESSTHK

TOP OF FINISH FLOORTFF

TO FLOOR BELOWTFB

TO FLOOR ABOVETFA

TRENCH DRAINTD

TREADT

CLNG SUSPENDED CEILINGSUSP

STRUCTURALSTRUCT

STANDARDSTD

SOUND TRANSMISSION CLASSSTC

STANDING SEAM (ROOF)SS

SPOT ELEVATIONSP EL

SOUND INSULATIONSND INS

SHEET METALSM

SIMILARSIM

SQUARE FOOT (FEET)SF

SOLID CORE WOOD DOORSCWD

SPLASH BLOCKSB

SOUTHS

682783_2215A-002.dgn

15 149

KICKPLATEKPL

KNOCKOUT PANELKOP

KNOCKOUTKO

KITCHENKIT

JANITORJAN

INSECT SCREENIS

INSULATED PANELIP

INTERIORINT

INSULATED METAL PANELINSUL PNL

INSULATIONINSUL

INSTALLINSTL

INSULATED METAL WALL PANELIMWP

INSIDE FACEIF

INSIDE DIMENSION, INSIDE DIAMETERID

INTERNATIONAL BUILDING CODEIBC

I

HEAVYHVY

HEIGHTHT

HORIZONTALHORIZ

HANDRAILHNDRL

HOLLOW METALHM

HEADERHDR

HEAVY DUTY, HARDBOARDHD

HOLLOW COREHC

HOSE BIBBHB

HAZARD, HAZARDOUSHAZ

HIGH, HATCH (ROOF)H

BD GYPSUM BOARDGYP

GYPSUM WALL BOARDGWB

GROUTGT

GRADE LINEGR LIN

GROUND FLOORGR FL

GLAZINGGLZ

GROUND LEVELGL

GRADE CLEANOUTGCO

GENERAL CONTRACTORGC

GYPSUM BOARDGB

GAGEGA

FUTUREFUT

FURNITURE, FURNISHFURN

FOOTINGFTG

FOOT, FEET, FIRE TREATEDFT

FULL SIZE, FAR SIDEFS

FRAME, FIRE RESISTENT, FIRE RATINGFR

FLAG POLE, FIRE PROOF, FIRE PROTECTIONFP

FACE OF WALLFOW

FACE OF STUD, FACE OF SLABFOS

FACE OF MASONRYFOM

FACE OF FINISHFOF

FACE OF CONCRETE, FACE OF CURBFOC

FACTORY MUTUALFM

FLOORFLR

FLOORINGFLG

FLOOR LINEFL

FIXTUREFIXT

FINISHFIN

FILLETFIL

FIGUREFIG

FROM FLOOR BELOWFFB

FROM FLOOR ABOVEFFA

FINISH FACEFF

FIRE EXTINGUISHER CABINETFEC

FIRE EXTINGUISHERFE

FOUNDATIONFDTN

FLOOR DRAINFD

FACTORYFCTY

FLOOR CLEAN OUTFCO

FABRICFAB

FEMALEF

EXTERIOR, EXTINGUISHEREXT

EXISTINGEXIST

EACH WAYEW

EXISTING ROOF DRAINERD

EQUIVALENTEQUIV

EQUIPMENTEQUIP

EQUALEQ

EXPANDED POLYSTYRENEEPS

ETHYLENE PROPYLENE DIENE MONOMER RUBBEREPDM

EDGE OF SLABEOS

ELEVATORELEV

ELEVATION, EACH LAYEREL

EXPANSION JOINTEJ

EXTERIOR INSULATION AND FINISH SYSTEMEIFS

ELECTRIC HAND DRYEREHD

EXTERIOR FINISH, EACH FACEEF

EACHEA

EASTE

REVEALRVL

RIGHTRT

REINFORCING STEELRST

ROUGH OPENINGRO

RAILINGRLG

RIGHT HAND, ROOF HATCHRH

ROOFINGRFG

REVISIONREV

REQUIREDREQD

REQUIREREQ

REPLACEREPL

REFERENCEREF

RIGID INSULATION, SOLIDRDG INS

ROOF DRAINRD

REFLECTED CEILING PLANRCP

RUBBER BASERB

RISER, RADIUSR

PURLINSPUR

PARTITIONPTN

PRESSURE TREATED, PAINTEDPT

PROPERTYPROP

PAIRPR

POSITIVEPOS

PANELPNL

PLYWOODPLYWD

PLATE GLASSPL GL

PROPERTY LINEPL

PERPENDICULARPERP

PERIMETERPERIM

PARALLELPAR

ORIENTED STRAND BOARDOSB

OVERFLOW ROOF DRAINORD

OUTSIDE RADIUSOR

OPTIONALOPT

OPPOSITEOPP

OPENINGOPNG

OUTSIDE FACE OF STUDSOFS

OWNER FURNISHED OWNER INSTALLEDOFOI

OUTSIDE FACEOF

OUTSIDE DIMENSION, OUTSIDE DIAMETEROD

ON CENTEROC

OVERALLOA

NEAR SIDE, NARROW STILENS

NOISE REDUCTION COEFFICIENTNRC

NOISE REDUCTIONNR

NUMBERNO

NOT IN CONTRACTNIC

NATIONAL FIRE PROTECTION ASSOCIATIONNFPA

NEAR FACENF

NARROWNAR

NOT APPLICABLENA

NORTHN

MULLIONMULL

METAL ROOFMTLR

METALMTL

MOUNTINGMTG

METAL THRESHOLDMT

MOP SINKMS

MODELMOD

MASONRY OPENINGMO

MILLWORKMLWK

MITERMIT

MISCELLANEOUSMISC

MINIMUM, MINUTEMIN

MIDDLEMID

MANUFACTURERMFR

MANUFACTUREDMFD

MILL FINISHMF

MEMBRANEMEMB

MEDIUMMED

METAL DECKMD

MAKE UP AIR UNITMAU

MATERIALMATL

LAYERLYR

LARGELRG

LOWPOINTLPT

LINE OF SIGHTLOS

LOCATIONLOC

LEFT HANDLH

LINEAR FOOTLF

LAVATORYLAV

ANGLEL

2019-04-25T09:23:02-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:23:30 PM

3/4"=1'-0"

1'-0"

TYPICAL CABINET M-WAVE CABINETDRAWER CABINET

(S

1'-8"

(VERIFY)

(D

IL

(DETAIL A THIS SHEET)

1 1/2 "

CABINET KEYNOTES

682783_2215A-404.dgn

PROVIDED BY OTHERS

MICROWAVE , (3) TOTAL. 13.

FLOOR LINE12.

BASE AS SPECIFIED11.

3/4" CABINET DOOR10.

DRAWER FACE9.

INTERMEDIATES

3/4" SIDES, BOTTOM AND 8.

FACE OF FINISHED WALL7.

GLIDES

FULL EXTENSION DRAWER 6.

SPLASH

3/4" SOLID SURFACE BACK 5.

ROUNDOVER

1 1/2" SOLID SURFACE 4.

COUNTERTOP

3/4" SOLID SURFACE 3.

BACK

1/4" TEMPERED HARD BOARD 2.

CABINET LINER

ADJUSTABLE SHELVES W/ 1.

2019-04-25T09:37:25-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it

-5 e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:26:24 PM

3" = 1'-0"

/4

DOOR SILL

DOOR AS SCHEDULED

HM FRAME

W+1"

METAL STUDS

HOLLOW METAL

DOOR AS SCHEDULED,

1/2 "

5/8" GYPSUM BOARD

ANCHORS

STANDARD JAMB

MANUFACTURER'S

SCHEDULED

FLOORING AS

3/4 "5 3/4 "

EXTERIOR

DOOR SHOE AS

IN SEALANT

SCHEDULED, SET

THRESHOLD AS

FLOOR FINISH AS

3"=1'-0"

DOOR JAMB - H.M.

DOOR SILL

DOOR HEAD - H.M.

SLAB, SEE CIVIL

PAVING OR CONC.

DOOR AS

RAINDRIP WHERE

EXISTING CMU

BOTH SIDES

AROUND

SEALANT, ALL

INSULATION

FRAMING

GWB

REPAIR

STUD FRAM'G

NEW METAL

7'-4" A.F.F.

WALL BOARD

NEW GYPSUM

GROUT HEAD SOLID

HOLLOW METAL FRAME

THERMALLY BROKEN

TRANSLUCENT PANEL - HEAD

TRANSLUCENT PANEL - JAMB

TRANSLUCENT PANEL - SILL

3/4 "

TRANSLUCENT PANEL

GROUT HEAD SOLID

HOLLOW METAL FRAME

THERMALLY BROKEN

EXISTING R.O.

EXISTING LOUVER

OPENING, VERIFY

FASTENERS

SHIMS AND

TO DRAIN

SLOPE FLASHING

SILL FLASHING

PREFINISHED

SILL FLASHING

PREFINISHED

TO DRAIN

FLASHING

.O

WINDOW SILL

SOLID SURFACE

REQUIRMENTS

WINDOW MFR'S

FASTENERS PER

SPECIFIED.

AND GLAZING AS

WINDOW FRAMES

BLAST RESISTANT

WINDOW HEAD

WINDOW JAMB

WINDOW SILL

A-501

682783_2215A-501.dgn

2019-04-25T09:37:42-0600

John Reseigh

I am approving this document

AD110

OVERALL FLOOR PLAN - DEMOLITION

682783_2215AD110.dgn

AD111

AD112

AD113

AD114

AD114 FOR DETAILED DEMOLITION

OF DEMOLITION WORK, SEE AD111, AD112, AD113, AND

THIS PLAN IS INTENDED TO GIVE AND OVERALL LAYOUT B.

FOR ADDITIONAL INFORMATION

REFER TO ELECTRICAL AND MECHANICAL DEMOLITION A.

EXISTING ITEMS

DEMOLISHED AND REMOVED ITEMS

16 149

BENC

MUNS

ELECTRICAL

AREA

WCCS

TRAINING

MAIN SHOP

WALKWAY

OPER

COMP

PARA ROOM

CHEM

HAZ

HERITAGE

UDM

FLT/CC

OSO

MAN

AERO

176 178177

MGR

P5

CHAPLAIN

SCHED

AIR SPACE

OSOT

OPS

RANGE

PHSYSO

KRIPTO

125 126

R BRF

115OFFICE

SEC

UMP

108 SGT

1ST

CVN 2

167B

120B

168 JANJAN

121B 123B

2 3 4 e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 3:02:15 PM

2019-04-25T09:42:19-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:28:11 PM

3" = 1'-0" 3" = 1'-0"

1 2

DOOR AS SCHEDULED,

FOAM

FILL W/ SOUND ATTENUATION

HOLLOW METAL FRAME,

ISOLATOR

SOLID NEOPRENE SOUND

FOAM

FILL W/ SOUND ATTENUATION

HOLLOW METAL FRAME,

STC DOOR ASSEMBLY

THRESHOLD INCLUDED IN

STC DOOR BOTTOM AS

STC45 RATED DOOR HEAD - H.M.

STC45 RATED DOOR JAMB - H.M.

STC45 RATED DOOR SILL

3/4 "5 3/4 "D

3/4 "5 3/4 "D

STC45 RATED DOOR HEAD - H.M.

STC45 RATED DOOR JAMB - H.M.

SWEEP

IN BED OF SEALANT

THRESHOLD SET

DOOR JAMB - ALUMINUM

DOOR HEAD - ALUMINUM

DOOR SILL - ALUMINUM

AS SPECIFIED

AND GLAZING

DOOR, FRAME,

A-502

682783_2215A-502.dgn

2019-04-25T09:38:02-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 3:05:00 PM

BENC

MUNS

ELECTRICAL

WALKWAY

CHEM

HAZ

682783_2215AD111.dgn

FLOOR PLAN - AREA A DEMOLITION

7 7

COVER LOCATIONS

NEW ACCESS FLOOR INSPECTION

SEE SHEETS A-111 THRU A-114 FOR

FLOOR VENTS. ALLOWANCE FOR 200.

DEMOLISH ALL EXISTING HVAC

12 12 12 12

17 149

FINAL WALL FINISH.

DOOR TRIM. PATCH WALL AS REQUIRED. PREPARE FOR

DEMOLISH AND REMOVE ALL CHAIR RAILS AND WOOD D.

MECHANICAL VENTS UNLESS NOTED OTHERWISE.

AT RAISED ACCESS FLOOR, PATCH/INFILL ALL C.

PROTECTION AND PLUMBING FOR ADDITIONAL WORK.

SEE STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE B.

FINISH.

OTHERWISE. PREPARE AS REQUIRED FOR FINAL FLOOR

RAISED ACCESS FLOOR PANEL SYSTEM UNLESS NOTED

DEMOLISH ALL FLOOR FINISHES TO CONCRETE OR A.

PROTECT DURING CONSTRUCTION

EXISTING BASE CABINET AND HOOD TO REMAIN, 18.

CONSTRUCTION

EXISTING EYEWASH TO REMAIN, PROTECT DURING 17.

MECHANICAL DRAWINGS. PATCH WALL AS REQUIRED

AND VACUUM EQUIPMENT AS INDICATED ON

REMOVE AND RELOCATE EXISTING COMPRESSED AIR 16.

ARTWORK ON WALL AND SALVAGE TO OWNER

REMOVE A PORTION OF GYPSUM BOARD AT PAINTED 15.

PREPARE FOR NEW FINISH

DEMOLISH WOOD ACCESS PANEL AND PATCH, 14.

MATCH ADJACENT WALL SURFACE

PREPARE WALL AS REQUIRED FOR FINAL FINISH.

CABINET TO OWNER. PATCH OPENING IN WALL AND

DEMOLISH AND SALVAGE FIRE EXTINGUISHER AND 13.

DEMOLISH AND REMOVE EXISTING LOUVER12.

MATCH ADJACENT WALL SURFACE

PREPARE WALLS AS REQUIRED FOR FINAL FINISH.

PATCH AND FILL ALL HOLES IN WALLS THIS ROOM. 11.

REQUIRED TO RECEIVE FINAL FINISH

REPAIR WALL WHERE CABINET WAS REMOVED AS

CABINET. SALVAGE TO OWNER STOCK. PATCH AND

REMOVE WALL MOUNTED FIRE EXTINGUISHER 10.

OF FRAME WALL AS REQUIRED FOR NEW DOOR

REMOVE EXISTING DOOR AND FRAME AND A PORTION 9.

REMOVE EXISTING DOOR, PROTECT FRAME AND 8.

ENTIRETY

REMOVE ACOUSTICAL WALL AND CHAIR RAIL IN ITS 7.

FOR NEW WORK

REMOVE WALL COVERING FROM WALL AND PREPARE 6.

REMOVE FRAME WALLS AS INDICATED5.

PANELS AS REQUIRED TO CONSTRUCT NEW WALL

REMOVE PORTION OF RAISED ACCESS FLOORING 4.

RAISED ACCESS FLOORING PANELS

REMOVE EXISTING OSB FLOORING FROM OVER 3.

INDICATED ON SHEET A-111

REMOVE EXISTING DOOR(S) AND FRAME, REPLACE AS 2.

VAPOR TRANSMISSION

TO BE SEALED TIGHT AS NOT TO ALLOW WATER

PANELS AS REQUIRED TO EXISTING PERIMETER. WALL

REMOVE EXISTING RAISED ACCESS FLOORING 1.

2019-04-25T09:42:38-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:31:49 PM

BREAK SHAPE DETAIL

1 1/2" = 1'-0"

682783_2215A-503.dgn

FLOOR SLAB

CONCRETE

LID FRAMING

METAL STUD BOARD, TYP

5/8" GYPSUM WALL

BOARD, TYP

METAL STUD WALL

FLOOR SLAB

EXISTING CONCRETE

FLOOR SYSTEM

EXISTING ACCESS

EXISTING METAL ROOF DECK

EXISTING ROOF GIRDER/TRUSS

NOT SHOWN

ADJACENT CEILINGS

AC112

SKYLIGHT EXIT CORRIDOR

NEW SKYLIGHT

TRUSS

EXISTING ROOF GIRDER/

EXISTING METAL ROOF DECK

NEW SUSPENDED

EXISTING PARTITION WALL

NEW FLOORING AS

WALL FRAMING

NEW METAL STUD

INTERIOR SOUND WALL

BOARD EA. SIDE

TYPES

A-001 FOR WALL

STRUCTURE, SEE

WALL TYPE J TO

WALL FRAMING,

NEW METAL STUD

ABOVE CEILING

BOARD, EXREND 6"

WALL FRAMING

3 5/8" METAL STUD

BOTTOM OF WALL

SKYLIGHT OPENING

FLOOR INSPECTION COVER

1 1/2"=1'-0"

EXISTING METAL ROOF

FOR PADLOCK REMOVED

2' x 2' ACUDOR W/ STAPLE

NEW FLOORING AS SCHEDULED

EXISTING ACCESS FLOOR SYSTEM

PEDESTALS

INTERFERE W/SUPPORT

POSITIONED AS NOT TO

ACCESS COVER TO BE

STRUCTURE AS REQ'D.

FRAMING, BRACE TO

3 5/8" METAL STUD WALL

PLAN

NEW WINDOW

3" MIN

FROM ABOVE

DOWNSPOUT

OR DOOR AS OCCURS

TO CLEAR WINDOW

ADJUST DOWNSPOUT

SCUPPER

HEAD

COLLECTOR

NEW WINDOW

3" MIN

SCUPPER

SECTIONELEVATIONELEVATION

COLLECTOR HEAD AND DOWNSPOUT

SPLASHBLOCK

DRAIN OUTLET

EXISTING ROOF

DRAIN OUTLET

EXISTING ROOF

A-113, A-114, A-111, A-112

A-111A-113

DOORS IS SIMILAR

DOWNSPOUTS AT

DOORS IS SIMILAR

DOWNSPOUTS AT

4" x 6" DOWNSPOUT

WALL ELEVATIONS AND SECTION

10/A-510

9/A-510 AND

HEAD, SEE

COLLECTOR

WALL TYPE A

MODIFY AS REQ'D.

FLOOR SYSTEM,

RAISED ACCESS

ACOUSTICAL SEALANT

SYSTEM AS REQ'D.

FLOOR SUPPORT

THRESHOLDAS SCHEDULED

FLOOR FINISH

1 1/2" METAL DECK

2" CONCRETE OVER

STUDS AT 16" O.C.

4" 18GA METAL

BOTTOM OF DECK

STOP WELDED TO

LIGHT GA. POUR

AS SCHEDULED

DOOR AND FRAME

FLOOR INFILL AT NEW WALL/DOOR

A-111

PLATFORM FLOOR FRAMING

SLAB

EXISTING CONCRETE

O.C.

CHANNELS AT 12"

10" 16 GA STEEL

PLYWOOD

3/4" FIRE TREATED

FINISHES IN ROOM

TO MATCH FLOOR

FINISHED FLOORING

STADIUM SEATING LAYOUT

NTS

(TYP) (TYP)

ADA

30"

30"

(T

(T

COPING CAP

BREAK SHAPE

UNDER BREAK SHAPE

BUTYL SEALANT

BREAK SHAPE AND SEAL

SAW KERF CMU FOR

2019-04-25T09:38:21-0600

John Reseigh

I am approving this document

OPER

COMP

HERITAGE

FLT/CC

OSO

MAN

176 178177

MGR

P5

CHAPLAIN

SCHED

AIR SPACE

OSOT

OPS

RANGE

PHSYSO

CVN 2

167B e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 3:07:31 PM

682783_2215AD112.dgn

FLOOR PLAN - AREA B DEMOLITION

4 6

3 3

TYP3

13 13

BE PROTECTED DURING CONSTRUCTION

EXISTING FOLDING PARTITION DOOR TO REMAIN AND 22.

REMOVE EXISTING DOOR, PROTECT FRAME AND 21.

19 19

21 21

18 149

2 2

MECHANICAL DRAWINGS, PATCH WALL AS REQUIRED

AND ACCESS EQUIPMENT AS INDICATED ON

REMOVE AND RELOCATE EXISTING COMPRESSED AIR 20.

REPAIR WALL AS REQUIRED TO RECEIVE FINAL FINISH

EXTINGUISHER TO OWNER STOCK. PATCH AND

DEMOLISH FIRE EXTINGUISHER CABINET AND 19.

REMOVE A PORTION OF WALL, SEE A-11218.

CURTAINS

REMOVE FRAME WALL, STOREFRONT SYSTEM AND 17.

REMOVE FRAME WALL AND WINDOW16.

EXTERIOR CMU AS REQUIRED FOR NEW WINDOW, SEE

REMOVE GYPSUM BOARD, FRAME WALL AND 15.

FOUNTAIN, SEE A-112

AND FRAME WALLS AS REQUIRED FOR NEW DRINKING

REMOVE DRINKING FOUNTAIN AND A PORTION OF CMU 14.

WORK, SEE A-112

REMOVE PORTIONS OF WALL AS REQUIRED FOR NEW 13.

REMOVE A PORTION OF WALL FOR NEW DOOR, SEE 12.

GRAB BARS ETC.

REMOVE RESTROOM PARTITIONS, ACCESSORIES, 11.

NOT USED10.

NOT USED9.

REMOVE PLUMBING FIXTURES 8.

FOR NEW WORK

REMOVE WALL COVERING FROM WALL AND PREPARE 6.

RELATED ITEMS AND WALL COVERINGS

REMOVE FRAME WALLS, DOORS AND FRAMES AND 5.

REMOVE PORTION OF RAISED ACCESS FLOORING 4.

TO BE REINSTALLED

RAMP, RAILING AND ALL ASSOCIATED ITEMS. FLOOR

REMOVE UPPER RAISED ACCESS FLOOR SYSTEM, 3.

INDICATED ON SHEET A-112

TO ALLOW WATER VAPOR TRANSMISSION

PERIMETER WALL. WALL TO BE SEALED TIGHT AS NOT

PANELS AS REQUIRED TO MODIFY EXISTING

REMOVE EXISTING RAISED ACCESS FLOORING 1.

2019-04-25T09:42:58-0600

John Reseigh

I am approving this document

AREA

WCCS

e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 3:09:22 PM

682783_2215AD113.dgn

AD-114

FLOOR PLAN - AREA C DEMOLITION

MECH RM KEYED NOTES

AD113

15 15

16 16

19 149

MATCH HAS BEEN PROVIDED FOR NEW DOOR

DOOR TO BE REMOVED AND SALVAGED UNTIL COLOR 17.

DURING CONSTRUCTION

OVERHEAD DOOR TO REMAIN AND BE PROTECTED 16.

FOR NEW FINISH

REMOVE EXISTING DOOR, PROTECT FRAME AND PREP 15.

PREPARE FOR FINAL FINISH

DEMOLISH ACCESS PANEL AND PATCH WALL, 14.

MECHANICAL DRAWINGS, PATCH WALL AS REQUIRED

AND VACUUM EQUIPMENT AS INDICATED ON

REMOVE AND RELOCATE EXISTING COMPRESSED AIR 13.

CABINET TO OWNER

DEMOLISH AND SALVAGE FIRE EXTINGUISHER AND 12.

DEMOLISH AND REMOVE EXISTING LOUVER11.

SURFACE

REQUIRED FOR WALL TYPE, MATCH ADJACENT WALL

PATCH AND FILL HOLES IN WALLS THIS ROOM AS 10.

REMOVE PORTION OF RAISED ACCESS FLOORING 9.

RAISED ACCESS FLOORING PANELS

REMOVE EXISTING OSB FLOORING FROM OVER 8.

WORK

SIDE OF WALL AS INDICATED AND PREPARE FOR NEW

REMOVE GYPSUM BOARD AND WALL COVERING FROM 6.

ITS ENTIRETY

DEMOLISH AND REMOVE WALL, DOOR AND FRAME IN 5.

CORRIDOR, SEE A-113

REMOVE PORTION OF WALL AS REQUIRED FOR NEW 4.

REMOVE EXISTING LOUVER3.

INDICATED ON SHEET A-113

RELATED ITEMS

REMOVE EXISTING RAISED FLOOR AREA AND ALL 1.

2019-04-25T09:43:18-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:49:29 PM

1 42 1 1/2" = 1'-0" 1 1/2" = 1'-0"

TOP OF WALL AND CRICKET TOP OF SIDE WALL AND ROOF

ROOF RIDGE

1 1/2"=1'-0" 1 1/2"=1'-0"

ROOF INSULATION TRANSITION ROOF AT SLOPE CHANGE

1 1/2"=1'-0" 1 1/2"=1'-0"

ROOF EXPANSION JOINT

1/2" CEMENT BOARD

EPDM ROOFING SYSTEM

WRAPPED OVER NAILER

COPING HOLD

DOWN CLEAT

EPDM EDGE FLASHING

1/2" COVER

BOARD

EPDM ROOFING

SYSTEM

RIGID INSUL.

SEE A-150

EXISTING STRUCTURE

EXISTING METAL DECK

NEW CMU PARAPET EXTENSION

" 5

"COPING HOLD

NEW CMU

WIDTH

BELLOW FLASHINGEPDM FLASHING

UNDER BELLOW

JOINT

1/2" CEMENT

SLOPED WOOD

NAILER, EA SIDE

INTERIOR WALL

3 5/8" METAL WALL

FRAMING AT 24" O.C.

ROOF EXPANSION JOINT

BEYOND, SEE DETAIL 4

THIS SHEET

RIGID INSULATION, TRANSITION

INSULATION TO BUILD UP ROOF

SLOPE TO ALIGN WITH RIGID

RIGID INSULATION, TRANSITION

INSULATION TO BUILD UP ROOF

SLOPE TO ALIGN WITH RIGID

INSULATION AT ROOF SLOPE

CHANGE AS INDICATED ON

DETAIL 7 THIS SHEET

ROOF SLOPE CHANGE 8

SEE DETAL

8 THIS SHEET

3 5/8" METAL WALL

FRAMING AT 24" O.C.

BELLOW FLASHING

SEAL BELLOW

FLASHING END

NEW COPING

BELLOW FLASHING,

SEE DETAIL 8 THIS

SHEET

3"

INTERNAL WALL AND ROOF

AT COPING

COVER WALL END

WITH FLASHING

SIMILAR TO COPING

SEAL FLASHING

EDGES

SEAL FLASHING

INTERNAL

INTERIOR CMU WALL AND ROOF

4"8" x 8" SCUPPER

SEAL ALL

COLLECTOR HEAD

1'-0"

1'- 0"

1'-4"

8" x 8" SCUPPER

BEYOND

NEW ROOF DRAIN AT

EXISTING LOCATION,

SEE PLUMBING

EXISTING SCUPPER

OPENING

COLLECTOR HEAD AND SCUPPER

COLLECTOR HEAD, OVERFLOW SCUPPER AND ROOF DRAIN

3" MIN. RIGID

SLOPED WOOD NAILER, EA SIDE

EPDM FLASHING UNDER

BELLOW JOINT

(2) #4 HORIZONTAL

REBAR AT TOP OF

1. FOR CMU REQUIREMENTS

SEE DRAWING S-001 GENERAL

STRUCTURAL NOTES

A-150 A-150

A-150, A-201 A-150, A-201

A-150, A-201A-150

A-150 A-201

#4 VERTICAL REBAR

ADHESIVE DOWEL

AT 32" O.C. W/

4 1/2" EMBED

(CENTER IN WALL)

COLLECTOR HEAD,

22 GA. PREFINISHED

4" x 6" DOWNSPOUT, 22 GA. PREFINISHED

TAPERED

CRICKET,

GYP THERMAL

BARRIER GYP THERMAL BARRIER

GYP THERMAL BARRIER

BARRIER

682783_2215A-510.dgn

2019-04-25T09:38:38-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:51:35 PM

1 2

TUBE SKYLIGHT/SOLAR TUBE

SKYLIGHT CURB

ROOF AND OVER FLOW DRAIN

1'-6"2'-0"

TO THE EDGE OF SUMP

CL CL

ROOF DRAIN OVERFLOW DRAIN

2" OVERFLOW

DRAIN RIM

3" MINIMUM RIGID ROOF

INSULATION AT ROOF DRAIN

A-302

TOP OF SIDE WALL AND ROOF

TOP OF COPING AT SIM.

CRICKET AS

OCCURS AT

SIM.

" COPING HOLD

PARAPET AT LOW ROOF

"COPING HOLD

SOLAR TUBE FLASHING

SOLAR TUBE

SOLAR TUBE

LIGHT SHAFT

INDICATES CONDITION

WHERE SOLAR TUBE

LIGHT SHAFT REQUIRES

ALIGNMENT WITH CEILING

GRID

" GALVANIZED JOINT REGLET

COLOR TO MATCH COPING

EXISTING CMU FLUTE LINE

AND TOP OF PARAPET/

" EPDM ROOFING

SUSPENDED CEILING

LIGHT DIFFUSER

ROOF TO WALL EDGE FLASHING

WRAPPED OVER 4x12

GALVANIZED FLASHING

4x12 FASTENED TO

DECK AND CMU WALL

SEE 1/A-510

3"

EDGE FLASHING

VERT. GALVANIZED

FLASHING RUN UNDER

COPING ABOVE, SEAL

AT COPING BELOW,

COLOR TO MATCH

TERMINATION

BAR

EDGE STRIP

TAPERED RIGID

CEMENT

EPDM

6" METAL STUDS

METAL WALL

R-19 INSULATION

SKYLIGHT

5/8" GYPSUM

SKYLIGHT

ROOF LINE

AS OCCURS

CRICKET

INSULATION,

INSULATION,

CRICKET

ROOF LINE

AS OCCURS

PRE-FABRICATED

INSULATED

ROOF CURB

SUPPORT

ANGLE

LINER PANEL

WHERE SPECIFIED

DUCT PENETRATION

EQUIPMENT CURBROOF PENETRATIONWALL FLASHING

IM

DUCT OR PIPE

DRAWBAND

METAL UMBRELLA

LINER PANEL

WHERE

SPECIFIED

EPDM FLASHING

MECHANICAL EQUIPMENT

ATTACH AS RECOMMENDED

BY MANUFACTURER

NEOPRENE PAD

METAL

COUNTERFLASHING

PIPE

CUT-OFF MASTIC

DRAW BAND

ROOFING

FACTORY

PREFABRICATED

PIPE SEAL

FACE OF EXISTING

MASONRY WALL

TERMINATION BAR

ROOF

ROOF INSULATION,

682783_2215A-511.dgn

2019-04-25T09:38:56-0600

John Reseigh

I am approving this document

KRIPTO

125 126

R BRF

115OFFICE

SEC

UMP

108 SGT

1ST

120B

JANJAN

121B 123B

3 4 e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 3:11:19 PM

682783_2215AD114.dgn

AD-113

FLOOR PLAN - AREA D DEMOLITION

CVN

3 3

AD114

15 15

17 17

5 5

17 17

20 149

5 5 5

PREPARE FOR NEW, SEE A-114

REMOVE EXISTING WINDOW, FRAME AND TRIM AND 18.

PREPARE AS REQUIRED FOR NEW FINISH

REMOVE EXISTING DOOR, PROTECT FRAME AND 17.

PROTECTED DURING CONSTRUCTION

EXISTING VAULT DOOR TO REMAIN AND BE 16.

CABINET TO OWNER

DEMOLISH AND SALVAGE FIRE EXTINGUISHER AND 15.

REMOVE PORTION OF RAISED ACCESS FLOORING 14.

REMOVE ACOUSTICAL WALL AND CHAIR RAIL IN ITS 13.

RESTROOM WORK, SEE A-114

REMOVE PORTIONS OF CMU AS REQUIRED FOR NEW 12.

PARTITIONS, ACCESSORIES, GRAB BARS ETC.

REMOVE RESTROOM PLUMBING FIXTURES, 11.

NOT USED10.

NOT USED9.

DEMOLISH EXISTING DRINKING FOUNTAIN 8.

FOR NEW DOOR, SEE A-114

REMOVE A PORTION OF CMU WALL AND REQUIRED 7.

WORK

SIDE OF WALL AS INDICATED AND PREPARE FOR NEW

REMOVE GYPSUM BOARD AND WALL COVERING FROM 6.

REMOVE DOOR AND FRAME IN IT'S ENTIRETY5.

REMOVE PORTION OF WALL FOR NEW WORK, SEE 4.

EXTERIOR CMU AS REQUIRED FOR NEW WINDOW, SEE

REMOVE GYPSUM BOARD, FRAME WALL AND 3.

DEMOLISH WALL AS INDICATED2.

RELATED ITEMS

REMOVE EXISTING RAISED FLOOR AREA AND ALL 1.

2019-04-25T09:43:38-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it

-6 e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:53:43 PM

DOOR

" WIDTH

DOOR 2"

DOOR WIDTH2" 2"

FLUSH PANEL

HG

HALF GLASS

PANEL

NG

NARROW LITE

DOOR TYPES:

FRAME TYPES:

FG

FULL GLASS

" WIDTH

DOOR WIDTH2" 2"

FRAME TYPES:

2" 2"

F-1

SINGLE DOOR

F-2

DOUBLE DOOR

F-4

SINGLE DOOR

F-3

F-5

F-6

DOOR 2" 2"

A-601

682783_2215A-601.dgn

SEE SHEET A-602 FOR DOOR AND HARDWARE SCHEDULE CONTINUATION

DOOR AND FRAME TYPES

45 149

SEE SHEET A-602 FOR DOOR AND HARDWARE SCHEDULE CONTINUATION

2019-04-25T09:39:18-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 3:13:19 PM

AD115

F

682783_2215AD115.dgn

RUBBER MAT

VINYL COMPOSITION TILE (VCT)

EXPOSED CONCRETE

CARPET

CERAMIC TILE

WALK-OFF MAT

EXISTING FLOOR FINISH PLAN - FOR REFERENCE ONLY

FLOOR FINISHES, FINISH SCHEDULE ON SHEET A-610

IN THEIR ENTIRETY, PREPARE SURFACES FOR NEW

ALL EXISTING FLOOR COVERINGS ARE TO BE REMOVED B.

PLANS FOR ADDITIONAL INFORMATION.

INDICATE EXISTING FLOOR FINISHES. SEE DEMOLITION

THIS PLAN IS INTENDED FOR REFERENCE ONLY TO A.

NO FLOOR FINISHES

REQUIRED, SEE MECHANICAL AND ELECTRICAL

NO ACCESS TO THIS AREA. NO ARCHITECTURAL 1.

21 149

2019-04-25T09:44:00-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it

-6 e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 2:56:17 PM

A-602

682783_2215A-602.dgn

- CONTINUED, SEE A-601 FOR DOOR AND FRAME TYPES

46 149

2019-04-25T09:39:37-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 3:15:27 PM

AD120

682783_2215AD120.dgn

OVERALL REFLECTED CEILING PLAN - DEMOLITION

ENTIRETY UNLESS NOTED OTHERWISE.

ALL EXISTING CEILINGS ARE TO BE REMOVED IN THEIR B.

PLANS FOR ADDITIONAL INFORMATION.

INDICATE EXISTING CEILING FINISHES. SEE CEILING

THIS PLAN IS INTENDED FOR REFERENCE ONLY TO A.

EXISTING CONCRETE CEILING TO REMAIN4.

EXISTING GYPSUM BOARD CEILING TO REMAIN3.

SELECTIVELY REMOVED IN THIS AREA

25 PERCENT OF EXISTING CEILING TILE TO BE 2.

MECHANICAL AND ELECTRICAL FOR NEW WORK

THIS AREA, NO ARCHITECTURAL WORK REQUIRED. SEE 1.

CONCRETE CEILING

GYPSUM BOARD CEILING

PANEL CEILING SYSTEM

2' x 4' LAY-IN ACOUSTICAL

PANEL CEILING SYSTEM

2' X 2' LAY-IN ACOUSTICAL

OPEN TO STRUCTURE

22 149

2019-04-25T09:44:24-0600

John Reseigh

I am approving this document e c k e d F il je c t s c ri p ti t

S tr e it e c je c t is e I d a h

FILENAME: PLOT DATE: PLOT TIME:2019\04\24 3:17:20 PM

2 4

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .