This document is a technical specification section (Section 23 30 00) for HVAC Air Distribution systems for the B332 Renovation project at Joint Base McGuire/Dix/Lakehurst in New Jersey. The specification provides detailed technical requirements for mechanical equipment installation, including ductwork, fans, coils, dampers, air handling units, terminal units, and energy recovery devices. It covers critical aspects such as material standards, fabrication methods, installation procedures, testing protocols, and quality assurance requirements, with specific references to ASTM, ASHRAE, SMACNA, and other industry standards. The document includes comprehensive instructions for equipment selection, mounting, painting, identification, leak testing, performance testing, and maintenance, ensuring precise engineering and installation guidelines for the HVAC air distribution systems.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B332 RENOVATION JOINT BASE MCGUIRE/DIX/LAKEHURST, NJ
JBMDL Project Number: MSBL 12-4029
SECTION 09 67 23.13
STANDARD RESINOUS FLOORING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A990/A990M (2018) Standard Specification for Castings, Iron-Nickel-Chromium and Nickel Alloys, Specially Controlled for Pressure-Retaining Parts for Corrosive Service
ASTM C881/C881M (2020) Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete
ASTM D445 (2019a) Standard Test Method for Kinematic Viscosity of Transparent and Opaque Liquids (and Calculation of Dynamic Viscosity)
ASTM D523 (2014; R 2018) Standard Test Method for Specular Gloss
ASTM D570 (1998; E 2010; R 2010) Standard Test Method for Water Absorption of Plastics
ASTM D638 (2014) Standard Test Method for Tensile Properties of Plastics
ASTM D696 (2016) Standard Test Method for Coefficient of Linear Thermal Expansion of Plastics Between -30 degrees C and 30 degrees C With a Vitreous Silica Dilatometer
ASTM D1475 (2013) Standard Test Method for Density of Liquid Coatings, Inks, and Related Products
ASTM D1544 (2004; R 2010) Standard Test Method for Color of Transparent Liquids (Gardner Color Scale)
ASTM D1652 (2011; E 2012) Standard Test Method for Epoxy Content of Epoxy Resins
ASTM D2240 (2015; E 2017) Standard Test Method for Rubber Property - Durometer Hardness
SECTION 09 67 23.13 Page 1
ASTM D2471 (1999) Standard Test Method for Gel Time and Peak Exothermic Temperature of Reacting Thermosetting Resins
ASTM D4259 (2018) Standard Practice for Preparation of Concrete by Abrasion Prior to Coating Application
ASTM F1869 (2016) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
ASTM F2170 (2019a) Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning
1.2 ADMINISTRATIVE REQUIREMENTS
1.2.1 Pre-Installation Meetings
Pre-installation Conference: Conduct conference at Project site.
1.2.2 Product Data
Within 30 days of contract award, submit manufacturer's catalog data for the following items:
a. Epoxy-Resin Binder/Matrix
b. Cured Epoxy Binder
c. Aggregate
d. Surface Sealing Coat
1.2.3 Design Mix Data
Within 30 days of contract award, submit design mix data for the following items, including a complete list of ingredients and admixtures:
a. Epoxy-Resin Binder/Matrix
b. Cured Epoxy Binder
c. Surface Sealing Coat
Ensure applicable test reports verify the mix has been successfully tested and meets design requirements.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that reviews the submittal for the Government.
SECTION 09 67 23.13 Page 2
Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Installation Drawings ; G, AE
SD-03 Product Data
Manufacturer's Catalog Data ; G, AE
Stainless Steel Wall Base ; G, AE
SD-04 Samples
Hardboard Mounted Epoxy Flooring ; G, RO
Floor Topping ; G, RO
Mockups ; G, RO
SD-05 Design Data
Design Mix Data ; G, AE
SD-07 Certificates
Listing of Product Installations
Referenced Standards Certificates
SD-11 Closeout Submittals
Warranty ; G, AE
1.4 DELIVERY, STORAGE, AND HANDLING
Protect materials from weather, soil, and damage during delivery, storage, and construction. Deliver materials in original packages, containers, or bundles bearing brand name and name of material.
Maintain materials used in the installation of floor topping at a temperature between 65 and 85 degrees F .
1.5 QUALITY CONTROL
Prior to commencement of work, submit referenced standards certificates for the following, showing conformance with the referenced standards contained in this section:
a. Epoxy-Resin Binder/Matrix
b. Cured Epoxy Binder
c. Aggregate
d. Surface Sealing Coat
SECTION 09 67 23.13 Page 3
1.5.1 Mockups
Build mockups to verify selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution. Apply full-thickness mockups on 96 inch square floor area selected by Contracting Officer. Simulate finished lighting conditions for the review of mockups.
1.5.2 Qualifications
Submit a listing of product installations for heavy duty epoxy flooring including identification of at least 5 units, similar to those proposed for use, that have been in successful service for a minimum period of 5 years. Identify purchaser, address of installation, service organization, and date of installation.
Ensure floor system applicators are experienced in the application of troweled aggregate thin-set floor topping.
1.5.3 Sampling
Submit hardboard mounted epoxy flooring samples not less than 12 inch square for each required color.
Provide panels showing nominal thickness of finished toppings, color, and texture of finished surfaces. Finished floor toppings and the approved samples are to match in color and texture.
1.6 WARRANTY
Submit a 2 year written warranty for all materials and installation work.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Submit installation drawings for heavy duty epoxy flooring systems clearly designating the areas of application and the installation plan. Include in the installation plan, methods to control sand and dust if sand blasting is required.
2.2 MATERIALS
2.2.1 Mixes
2.2.1.1 Epoxy-Resin Binder/Matrix
Provide a clear, high gloss, two-component, 100% solids, epoxy, high performance, high build protection for concrete that is chemical and abrasion resistant.
2.2.1.2 Cured Epoxy Binder
Provide a cured epoxy binder with the following properties.
SECTION 09 67 23.13 Page 4
PROPERTY TEST METHOD REQUIREMENT
Tensile strength, psi* at test temperature:
77 degrees F
ASTM D638 4000 to 6000
Tensile elongation, percent* at test temperature: 77 degrees F
ASTM D638 15 to 30
Water absorption, percent 24 hours at 77 degrees F, maximum
ASTM D570 0.15
Hardness, Shore D ASTM D2240 85 to 90
Gel time/peak exotherm at 77 degrees F, 200 gm mass in 4 ounce metal container
ASTM D2471 35 to 45 minutes at 300 degrees F, maximum
*1/8 inch thick castings **1/8 by 1 by 3 inch castings, aged in forced draft oven
***** AMENDMENT 0007 , 28 MAY 2025 ***** 2.2.1.3 Aggregate
Provide colorized quartz aggregate or vinyl-chip as recommended by the resinous flooring manufacturer and approved by the Contracting Officer.
***** END AMENDMENT 0007, 28 MAY 2025 ***** 2.2.1.4 Surface Sealing Coat
Provide nonambering aliphatic UV resistant surface sealer.
2.3 Stainless Steel Wall Base
Provide 6-1/2" (+/- 1/8") brushed, stainless steel, commercial, coved wall base with vinyl or rubber sealing lip. Base shall have 5 year warranty.
Provide inside and outside corners. Provide manufacturer's recommended adhesive.
SECTION 09 67 23.13 Page 5
PART 3 EXECUTION
3.1 PREPARATION
Prior to applying resinous flooring material, inspect substrate and immediately report any unsatisfactory conditions that exist and repair.
Verify that the concrete substrates are dry and the moisture-vapor emissions are within acceptable levels according to the manufacturer's written instructions.
Relative Humidity Test: Use in situ probes, ASTM F2170. Proceed with installation only after substrates have a maximum 75 percent relative humidity level measurement.
3.1.1 Safety Precautions
Prior to application in confined spaces of toppings and coatings containing flammable or toxic properties, institute safety precautions recommended by the manufacturer of the product.
Erect "NO SMOKING" signs, and prohibit smoking or use of spark- or flame-producing devices within 50 feet of any mixing or placing operation involving flammable materials.
Provide the personnel required to handle, mix, or apply toppings containing toxic or flammable properties with such items of personal protective equipment and apparel for eye, skin, and respiratory protection as are recommended by the manufacturer of the product. Ensure all personnel are trained in the appropriate use and wearing of personal protection equipment.
3.1.2 Protection of Adjacent Surfaces
In addition to the protection of adjacent surfaces during installation, provide areas used to store and mix materials with a protective covering under the materials. After application of the sealer coats, protect finished flooring during the remainder of the construction period. In areas of expected minimum or moderate traffic, cover floors with a 30-30-30 waterproof kraft paper, with strips taped together and edges secured to prevent roll-up. Place vegetable fiberboard, plywood, or other suitable material that does not mar the flooring over the paper to protect areas used as passages by workmen and areas subject to floor damage because of subsequent building operations. Upon completion of construction, remove the protection, clean flooring and, where necessary, repair, reseal, or both, at no additional cost to the Government.
3.1.3 Concrete Subfloor
3.1.3.1 New Concrete Floors
Do not commence installation of the floor topping until the concrete has cured a minimum of 28 calendar days. Verify that the concrete floor is straight, properly sloped, and has broom type finish. Ensure that the concrete is moist cured with burlap or polyethylene. Before applying the prime coat, clean the concrete surface by an approved method.
SECTION 09 67 23.13 Page 6
3.1.3.2 Existing Concrete Floors
Clean existing concrete floors, with hard troweled or contaminated areas in conformance with ASTM D4259. Ensure the concrete is free of all paint, sealers, curing agents, oil, grease, moisture, dirt or any other contaminants. Remove any loose or corroded segments of existing concrete. Patch with a grouting compound as recommended by the resinous flooring manufacturer. Fill all cracks with an elastomeric jointing compound compatible with the resinous flooring system used.
3.1.4 Mixing Of Materials
Select the job mix proportions on the trial batch proportions used to prepare the floor topping samples as submitted and approved.
Use mechanical equipment for mixing of materials in accordance with the manufacturer's instructions.
Use rotating paddle-type masonry mortar mixers for preblending the three sizes and color pigment, if any, of the walnut shell aggregate and addition of the mixed epoxy resin binder. Ensure mixing times are as recommended by the materials supplier(s), provided mixing times result in homogeneous mixtures. Limit quantity of material mixed at one time to that which can be applied and finished within the working life of the mixtures. Verify that the temperature of materials at the time of mixing are between 65 and 85 degrees F .
3.2 APPLICATION
3.2.1 Areas of Application
Anchor plates set with the top surface at or above the finished epoxy floor level do not require coverage with this flooring material. Extend flooring under equipment, except when the equipment base is indicated to be flush against the structural floor. Cover and/or mask surfaces not to receive the epoxy floor topping, such as equipment or cabinets installed prior to surface-preparation efforts and adjacent to the flooring installation.
3.2.2 Application of Prime Coat and Troweling
Combine the epoxy binder components A and B in the proportions specified by the manufacturer to form a clear compatible system immediately on mixing. Cure combined components to a clear film possessing a glossy, non-greasy surface at relative humidities less than 80 percent, having the following properties after curing 24 hours at 77 degrees F , followed by 24 hours at 125 degrees F :
Ensure that the prepared subfloor surface is dry and at a temperature of not less than 60 degrees F when application of the floor topping is initiated. Immediately before application of the prime/scratch coat on the prepared surface, remove dust or other loose particles by blowing with compressed air or vacuum cleaned. Use only an air compressor equipped with an efficient oil-water trap to prevent oil contamination or wetting of surface.
Apply a thin roller coat of the epoxy binder specified to the prepared subfloor as a prime coat. As an aid to placing, compacting, and finishing the floor topping, form a scratch coat by sprinkling a minimum quantity of
SECTION 09 67 23.13 Page 7 the walnut shell aggregate on the prime coat surface immediately following the prime coat application. Prior to application of the prime/scratch coat, fill cracks in the concrete per manufacturer's instructions, and make provisions to keep control or expansion joints open.
***** AMENDMENT 0007 , 28 MAY 2025 *****
Place the floor topping prior to final gelling of the prime/scratch coat.
Immediately after the materials are mixed as specified, dump the mixture in the placement area and spread to prolong troweling life. Screed or rough trowel placed materials to the specified thickness and then compact by the use of a smooth roller prior to finish troweling to a nominal thickness of 3/16 inch plus or minus 1/16 inch 25 mils plus or minus 10 mils .
Ensure all finished surfaces are free of ridges, hollows (bird-baths), trowel marks, and smoothness varies no more than 1/8 inch when tested with an 8 foot straightedge. Make provisions to maintain the work areas in a relatively dust-free environment during curing of the topping.
***** END AMENDMENT 0007, 28 MAY 2025 *****
3.2.3 Sealer Coat
After the floor topping has set firmly (approximately 6 to 16 hours depending on subfloor temperature) in a relatively dust-free environment, apply two thin coats of the sealer coat, by means of brush, roller, squeegee, or notched trowel to provide a pore-free, easy-to-clean surface. At the time of sealer application, ensure that the surface is dust-free. Depending on relative humidity, allow the applied sealer to cure to a tack-free condition in 2 to 4 hours. Do not apply second coat until after the initial coat has cured to a tack-free, hard film.
Maintain topping areas in a relatively dust-free environment during curing of the sealer coats.
3.3 Stainless Steel Wall Base
Provide a 6-1/2 (+/-1/8") inch high cove base with sealing lip and inside/outside corner pieces to all wall surfaces as indicated on the drawings. Install using manufacturer recommended adhesive
3.4 FIELD QUALITY CONTROL
3.4.1 Repairing
Remove and replace damaged or unacceptable portions of completed work with new work to match adjacent surfaces at no additional cost to the Government.
3.5 ADJUSTING AND CLEANING
Clean surfaces of the new work, and adjacent surfaces soiled as a result of the work. Remove all equipment, surplus materials, and rubbish associated with the work from the site.
-- End of Section --
SECTION 09 67 23.13 Page 8
SECTION 12 24 13
ROLLER WINDOW SHADES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI/WCMA A100.1 (2018) American National Standard for Safety of Window Covering Products
ASTM INTERNATIONAL (ASTM)
ASTM G21 (2015; R 2021; E 2021) Standard Practice for Determining Resistance of Synthetic Polymeric Materials to Fungi
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA ICS 6 (1993; R 2016) Industrial Control and Systems: Enclosures
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 701 (2019) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
UNDERWRITERS LABORATORIES (UL)
UL 325 (2017; Reprint Feb 2020) UL Standard for Safety Door, Drapery, Gate, Louver, and Window Operators and Systems
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES
SECTION 12 24 13 Page 1
SD-02 Shop Drawings
Detailed Drawings ; G, AE
SD-03 Product Data
Window Shades ; G, AE
Recycled Content for various fiber components ; S
SD-04 Samples
Window Shades ; G, RO
SD-06 Test Reports
Flammability Requirements ; G, AE
SD-07 Certificates
Indoor Air Quality for roller window shades ; S
Qualifications
SD-10 Operation and Maintenance Data
Window Shades , Data Package 1; G, RO
SD-11 Closeout Submittals
Submit Data Package 1 for roller window shades, and Data Package 2 for electrical operators, in accordance with Section 01 78 23
OPERATIONS AND MAINTENANCE DATA.
1.3 CERTIFICATES
1.3.1 Indoor Air Quality Certifications
1.3.1.1 Roller Window Shades
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard), SCS Global Services Indoor Advantage Gold or provide validation by other third-party program that products meet the requirements of this paragraph. Provide current product certification documentation from certification body.
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
1.4.1.1 Installer's Qualifications
Installer trained and certified by the manufacturer with a minimum of ten years of experience in installing products comparable to those specified in this section.
1.4.2 Flammability Requirements
Passes in accordance with NFPA 701 small and large-scale vertical burn.
SECTION 12 24 13 Page 2
Materials tested are identical to products proposed for use.
1.4.3 Anti-Microbial Requirements
'No Growth' per ASTM G21 results for fungi ATCC9642, ATCC 9644, ATCC9645.
1.5 DELIVERY, STORAGE, AND HANDLING
Deliver components to the jobsite in the manufacturer's original packaging with the brand or company name, item identification, and project reference clearly marked. Store components in a dry location that is adequately ventilated and free from dust, water, or other contaminants and has easy access for inspection and handling. Store materials flat in a clean dry area with temperature maintained above 50 degrees F . Do not open containers until needed for installation unless verification inspection is required. Handle and store shades in accordance with manufacturer's recommendations.
1.6 WARRANTY
Provide manufacturer's warranty to repair or replace defective materials and workmanship for a period of 10 years from date of final acceptance of the work.
PART 2 PRODUCTS
2.1 WINDOW SHADES
Submit drawings showing plans, elevations, sections, product details, installation details, operational clearances, wiring diagrams and relationship to work. Submit a location schedule showing location, size and quantity of shades. Include the use of same room designations as indicated on the drawings.
Provide product data composed of catalog cuts, brochures, and operating and maintenance instructions on each product to be used. Include styles, profiles and features.
Furnish samples of each type and color of roller shade fabric and roller shade channel. Provide shade material minimum 6 by 6 inches in size.
Mark face of material to indicate interior faces.
Submit fire resistance data, flame spread and smoke contribution data.
Provide roller tube that operates smoothly and of sufficient diameter and thickness to prevent excessive deflection. Provide brackets that are appropriate for inside mount. Provide shade cloth meeting the performance described in NFPA 701 , small scale test. Treat steel features for corrosion resistance.
Provide Various Fiber Components with a minimum of 60 percent recycled content. Provide data identifying percentage of recycled content for various fiber components .
Provide certification of indoor air quality for roller window shades .
***** AMENDMENT 0007 , 28 MAY 2025 *****
SECTION 12 24 13 Page 3
2.1.1 Manufacturer's Qualifications
Obtain roller shades through one source from a single manufacturer with a minimum of twenty years of experience and minimum of three projects of similar scope and size in manufacturing products comparable to those specified in this section. Furnish shades produced by the same manufacturer to provide matching appearance.
***** END AMENDMENT 0007, 28 MAY 2025 *****
2.1.1 Manually Operated Shades with Single Rollers
2.1.1.1 Chain-and-Clutch Operating Mechanisms
Provide continuous-loop bead chain and clutch that stops shade movement when bead chain is released; shade to be permanently adjusted and lubricated.
2.1.1.2 Bead Chains
Provide bead chain from #10 stainless steel rated to 90 lb. minimum breaking strength with pull chain tensioning device complying with
ANSI/WCMA A100.1
a. Loop Length: Full length of roller shade.
b. Limit Stops: Allows shade to stop when chain is released. Provide limit stops to prevent shade from being raised or lowered too far.
c. Chain-Retainer Type: Chain tensioner, jamb mounted.
2.1.1.3 Rollers
Provide corrosion-resistant steel or extruded-aluminum tubes of diameters and wall thicknesses required to accommodate operating mechanisms and weights and widths of shade bands indicated without deflection. Provide with permanently lubricated drive-end assemblies and idle-end assemblies designed to facilitate removal of shade cloth for service.
a. Roller Drive-End Location: Right side of interior face of shade.
b. Direction of Shade cloth Roll: Regular, from back (exterior face) of roller.
c. Shade cloth-to-Roller Attachment: Removable spline fitting into integral channel in tube. Adhesive attachment is not acceptable.
2.1.1.4 Mounting Hardware
Provide corrosion resistant brackets or endcaps compatible with roller assembly, operating mechanism, installation accessories, and mounting location and conditions indicated. Provide hardware that allows for field adjustment or removal of shade roller tube and other operable hardware component without removal of brackets and end or center supports.
2.1.1.5 Shade Cloth
a. Shade Material: Light-filtering fabric: Openness 3 percent.
b. Shade Cloth Bottom (Hem) Bar: Steel or extruded aluminum. Provide
SECTION 12 24 13 Page 4 shade bar enclosed in sealed pocket of shade band material.
2.1.1.6 Installation Accessories
a. Front Fascia: L-shaped aluminum extrusion to conceal shade roller and hardware that snaps onto end caps without requiring exposed fasteners of any kind. Fascia can be mounted continuously across two or more shade bands. Provide manufacturers standard height fascia as required to conceal roller and shade band assembly when shade is fully open.
b. Endcaps: Extruded aluminum with universal design suitable for mounting to window mullions. Provide size compatible with roller size. Provide end cap covers matching fascia/headbox finish.
2.1.1.7 Room Darkening Shades
Provide room darkening (black-out) window shades designed to eliminate all visible light gaps when shades are fully closed and conform with the following:
a. Provide roller tube made of aluminum. Provide shop fabricated light traps consisting of a head box to house the roller shade, and U-shaped channels to serve as guides for the shade along the sides and to receive the bottom edge of the shade along the sill.
b. Provide light trap made of sheet steel having a minimum thickness of 22 gauge or anodized, extruded, aluminum. Provide legs of the channels not less than 1-3/4 inches long and separated by the minimum distance that permits free operation of the shade. Edges of light trap coming into contact with the shade cloth are smooth pile light seal. The exposed face of the head box is hinged or removable for access to the shade roller. The interior or unexposed surfaces of the light trap have a finish coat of flat black enamel. The exposed portions of the light trap have a factory-applied priming coat of gray paint.
c. Provide type of cloth for blackout purposes. Provide shade from a single piece of PVC free material.
d. Fit the bottom edge of the shade with a steel operating bar. Shades to engage positively with bottom rail through operating bar or chain pull. Paint bars with flat black enamel. Make pull cords of No. 4 braided nylon or beaded chain having not less than 175 pounds breaking strength.
2.2 COLOR
Provide color, pattern and texture for metal trim and shade fabric as indicated; colors listed are not intended to limit the selection of equal colors from other manufacturers.
PART 3 EXECUTION
3.1 FIELD MEASUREMENTS
After becoming familiar with details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.
SECTION 12 24 13 Page 5
3.2 ROLLER WINDOW SHADE PLACEMENT SCHEDULE
All exterior windows include. Provide window covering as follows:
Room Number/Name Roller Window Shade Covering Type
Window Type/Size Window Quantity
103 Womens Light Filtering Fixed/60"x32" 1
105 Break Light Filtering Fixed/60"x32" 1
107 CT Room Darkening Fixed/60"x32" 1
110 Admin Light Filtering Fixed/60"x32" 2
3.3 INSTALLATION
Do not install building construction materials that show visual evidence of biological growth.
Provide roller window shades, complete with necessary brackets, fittings, and hardware in accordance with paragraph ROLLER WINDOW SHADE PLACEMENT
SCHEDULE.
Perform installation in accordance with the approved detailed drawings and manufacturer's installation instructions. Install units level, plumb, secure, and at proper height and location relative to window units.
Provide and install supplementary or miscellaneous items in total, including clips, brackets, or anchorages incidental to or necessary for a sound, secure, and complete installation. Do not start installation until completion of room painting and finishing operations.
3.4 CLEAN-UP
Upon completion of the installation, clean window treatments and exposed components as recommended by manufacturer. Adjust window treatment for form and appearance and proper operating condition. Repair or replace damaged units as directed by the Contracting Officer. Isolate metal parts from direct contact with concrete, mortar, or dissimilar metals. Ensure shades installed in recessed pockets can be removed without disturbing the pocket. The entire shade, when retracted, is contained inside the pocket. For shades installed outside the jambs and mullions, overlap each jamb and mullion 0.75 inch or more when the jamb and mullion sizes permit. Include all hardware, brackets, anchors, fasteners, and accessories necessary for a complete, finished installation.
-- End of Section --
SECTION 12 24 13 Page 6
SECTION 23 30 00
HVAC AIR DISTRIBUTION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ACOUSTICAL SOCIETY OF AMERICA (ASA)
ASA S12.51 (2012; R 2017) American National Standard Acoustics - Determination of Sound Power Levels and Sound Energy Levels of Noise Sources using Sound Pressure - Precision Methods for Reverberation Test Rooms
AIR CONDITIONING CONTRACTORS OF AMERICA (ACCA)
ACCA Manual 4 (2001) Installation Techniques for Perimeter Heating and Cooling; 11th Edition
AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL, INC. (AMCA)
AMCA 201 (2002; R 2011) Fans and Systems
AMCA 210 (2016) Laboratory Methods of Testing Fans for Aerodynamic Performance Rating
AMCA 220 (2005;R 2012) Test Methods for Air Curtain Units
AMCA 300 (2014) Reverberant Room Method for Sound Testing of Fans
AMCA 301 (2014) Methods for Calculating Fan Sound Ratings from Laboratory Test Data
AMCA 500-D (2018) Laboratory Methods of Testing Dampers for Rating
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI 260 I-P (2012) Sound Rating of Ducted Air Moving and Conditioning Equipment
AHRI 350 (2015) Sound Rating of Non-Ducted Indoor Air-Conditioning Equipment
AHRI 410 (2001; Addendum 1 2002; Addendum 2 2005;
Addendum 3 2011) Forced-Circulation Air-Cooling and Air-Heating Coils
SECTION 23 30 00 Page 1
AHRI 430 (2009) Central-Station Air-Handling Units
AHRI 440 (2008) Performance Rating of Room Fan-Coils
AHRI 880 I-P (2011) Performance Rating of Air Terminals
AHRI 885 (2008; Addendum 2011) Procedure for Estimating Occupied Space Sound Levels in the Application of Air Terminals and Air Outlets
AHRI DCAACP (Online) Directory of Certified Applied Air-Conditioning Products
AHRI Guideline D (1996) Application and Installation of Central Station Air-Handling Units
AMERICAN BEARING MANUFACTURERS ASSOCIATION (ABMA)
ABMA 9 (2015) Load Ratings and Fatigue Life for Ball Bearings
ABMA 11 (2014) Load Ratings and Fatigue Life for Roller Bearings
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 15 & 34 (2013) ASHRAE Standard 34-2016 Safety Standard for Refrigeration Systems/ASHRAE Standard 34-2016 Designation and Safety Classification of Refrigerants-ASHRAE Standard 34-2016
ASHRAE 52.2 (2012) Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size
ASHRAE 62.1 (2010) Ventilation for Acceptable Indoor Air Quality
ASHRAE 68 (1997) Laboratory Method of Testing to Determine the Sound Power In a Duct
ASHRAE 70 (2006; R 2011) Method of Testing for Rating the Performance of Air Outlets and Inlets
ASHRAE 84 (2020) Method of Testing Air-to-Air Heat Exchangers
ASHRAE 90.1 - IP (2013) Energy Standard for Buildings Except Low-Rise Residential Buildings
ASHRAE 90.1 - SI (2013) Energy Standard for Buildings Except Low-Rise Residential Buildings
SECTION 23 30 00 Page 2
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME A13.1 (2020) Scheme for the Identification of Piping Systems
ASTM INTERNATIONAL (ASTM)
ASTM A53/A53M (2020) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A167 (2011) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip
ASTM A924/A924M (2020) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM B75/B75M (2020) Standard Specification for Seamless Copper Tube
ASTM B117 (2019) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM B152/B152M (2019) Standard Specification for Copper Sheet, Strip, Plate, and Rolled Bar
ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B209M (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate (Metric)
ASTM B280 (2020) Standard Specification for Seamless Copper Tube for Air Conditioning and Refrigeration Field Service
ASTM B766 (1986; R 2015) Standard Specification for Electrodeposited Coatings of Cadmium
ASTM C553 (2013; R 2019) Standard Specification for Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications
ASTM C916 (2020) Standard Specification for Adhesives for Duct Thermal Insulation
ASTM C1071 (2019) Standard Specification for Fibrous Glass Duct Lining Insulation (Thermal and Sound Absorbing Material)
ASTM D520 (2000; R 2011) Zinc Dust Pigment
SECTION 23 30 00 Page 3
ASTM D1654 (2008; R 2016; E 2017) Standard Test Method for Evaluation of Painted or Coated Specimens Subjected to Corrosive Environments
ASTM D1785 (2015; E 2018) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120
ASTM D2466 (2017) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40
ASTM D2564 (2012) Standard Specification for Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems
ASTM D2855 (2015) Standard Practice for Making Solvent-Cemented Joints with Poly(Vinyl Chloride) (PVC) Pipe and Fittings
ASTM D3359 (2017) Standard Test Methods for Rating Adhesion by Tape Test
ASTM E84 (2020) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E2016 (2020) Standard Specification for Industrial Woven Wire Cloth
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
GERMAN INSTITUTE FOR STANDARDIZATION (DIN)
DIN EN 14037 (2016) Free Hanging Heating and Cooling Surfaces for Water with a Temperature Below 120 Degrees C - Part 1:
Pre-Fabricated Ceiling Mounted Radiant Panels for Space Heating
DIN EN 14240 (2004) Ventilation for Buildings
INSTITUTE OF ENVIRONMENTAL SCIENCES AND TECHNOLOGY (IEST)
IEST RP-CC-001 (2016; Rev 6) HEPA and ULPA Filters
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA ICS 6 (1993; R 2016) Industrial Control and Systems: Enclosures
NEMA MG 1 (2018) Motors and Generators
SECTION 23 30 00 Page 4
NEMA MG 10 (2017) Energy Management Guide for Selection and Use of Fixed Frequency Medium AC Squirrel-Cage Polyphase Induction Motors
NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA
20-1; TIA 20-2; TIA 20-3; TIA 20-4)
National Electrical Code
NFPA 90A (2018) Standard for the Installation of Air Conditioning and Ventilating Systems
NFPA 96 (2017; TIA 17-1) Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations
NFPA 701 (2019) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1403 (2008) Accepted Industry Practice for Industrial Duct Construction, 2nd Edition
SMACNA 1819 (2002) Fire, Smoke and Radiation Damper Installation Guide for HVAC Systems, 5th Edition
SMACNA 1884 (2003) Fibrous Glass Duct Construction Standards, 7th Edition
SMACNA 1966 (2005) HVAC Duct Construction Standards Metal and Flexible, 3rd Edition
SMACNA 1972 CD (2012) HVAC Air Duct Leakage Test Manual - 2nd Edition
SMACNA 1981 (2008) Seismic Restraint Manual Guidelines for Mechanical Systems, 3rd Edition
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-STD-101 (2014; Rev C) Color Code for Pipelines and for Compressed Gas Cylinders
U.S. DEPARTMENT OF ENERGY FEDERAL ENERGY MANAGEMENT PROGRAM (FEMP)
PL-109-58 (1992; R 2005) Energy Efiicient Procument Requirements
SECTION 23 30 00 Page 5
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 82 Protection of Stratospheric Ozone
UNDERWRITERS LABORATORIES (UL)
UL 6 (2007; Reprint Sep 2019) UL Standard for Safety Electrical Rigid Metal Conduit-Steel
UL 94 (2013; Reprint Jun 2020) UL Standard for Safety Tests for Flammability of Plastic Materials for Parts in Devices and Appliances
UL 181 (2013; Reprint Apr 2017) UL Standard for Safety Factory-Made Air Ducts and Air Connectors
UL 555 (2006; Reprint Aug 2016) UL Standard for Safety Fire Dampers
UL 555S (2014; Reprint Aug 2016) UL Standard for Safety Smoke Dampers
UL 586 (2009; Reprint Dec 2017) UL Standard for Safety High-Efficiency Particulate, Air Filter Units
UL 705 (2017; Reprint Oct 2018) UL Standard for Safety Power Ventilators
UL 723 (2018) UL Standard for Safety Test for Surface Burning Characteristics of Building Materials
UL 900 (2015) Standard for Air Filter Units
UL 1995 (2015) UL Standard for Safety Heating and Cooling Equipment
UL 2021 (2015; Reprint Dec 2016) UL Standard for Safety Fixed and Location-Dedicated Electric Room Heaters
UL Bld Mat Dir (updated continuously online) Building Materials Directory
UL Electrical Construction (2012) Electrical Construction Equipment Directory
UL Fire Resistance (2014) Fire Resistance Directory
1.2 SYSTEM DESCRIPTION
Furnish ductwork, piping offsets, fittings, and accessories as required to provide a complete installation. Coordinate the work of the different trades to avoid interference between piping, equipment, structural, and electrical work. Provide complete, in place, all necessary offsets in
SECTION 23 30 00 Page 6 piping and ductwork, and all fittings, and other components, required to install the work as indicated and specified.
1.2.1 Mechanical Equipment Identification
The number of charts and diagrams must be equal to or greater than the number of mechanical equipment rooms. Where more than one chart or diagram per space is required, mount these in edge pivoted, swinging leaf, extruded aluminum frame holders which open to 170 degrees.
1.2.1.1 Charts
Provide chart listing of equipment by designation numbers and capacities such as flow rates, pressure and temperature differences, heating and cooling capacities, horsepower, pipe sizes, and voltage and current characteristics.
1.2.1.2 Diagrams
Submit proposed diagrams, at least 2 weeks prior to start of related testing. provide neat mechanical drawings provided with extruded aluminum frame under 1/8-inch glass or laminated plastic, system diagrams that show the layout of equipment, piping, and ductwork, and typed condensed operation manuals explaining preventative maintenance procedures, methods of checking the system for normal, safe operation, and procedures for safely starting and stopping the system. After approval, post these items where directed.
1.2.2 Service Labeling
Label equipment, including fans, air handlers, terminal units, etc. with labels made of self-sticking, plastic film designed for permanent installation. Provide labels in accordance with the typical examples below:
SERVICE LABEL AND TAG DESIGNATION
Air handling unit Number AHU - 1
Dedicated Outside air system DOAS-1
Exhaust Fan Number EF - 1
VAV Box Number VAV - 1 thru 8
Identify similar services with different temperatures or pressures. Where pressures could exceed 125 pounds per square inch, gage , include the maximum system pressure in the label. Label and arrow piping in accordance with the following:
a. Each point of entry and exit of pipe passing through walls.
b. Each change in direction, i.e., elbows, tees.
c. In congested or hidden areas and at all access panels at each point required to clarify service or indicated hazard.
SECTION 23 30 00 Page 7
d. In long straight runs, locate labels at distances within eyesight of each other not to exceed 75 feet . All labels must be visible and legible from the primary service and operating area.
For Bare or Insulated Pipes for Outside Diameters of Lettering
1/2 thru 1-3/8 inch 1/2 inch
1-1/2 thru 2-3/8 inch 3/4 inch
2-1/2 inch and larger 1-1/4 inch
1.2.3 Color Coding
Color coding of all piping systems must be in accordance with MIL-STD-101 .
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Detail Drawings ; G
SD-03 Product Data
Metallic Flexible Duct
Insulated Nonmetallic Flexible Duct Runouts
Duct Connectors
Duct Access Doors ; G
Fire Dampers
Manual Balancing Dampers ; G
Sound Attenuation Equipment
Diffusers
Registers and Grilles
Louvers
Air Vents, Penthouses, and Goosenecks
Panel Type Power Wall Ventilators
SECTION 23 30 00 Page 8
Air Handling Units ; G
Variable Volume, Single Duct Terminal Units ; G
Variable Volume, Single Duct, Fan-Powered Terminal Units ; GEnergy Recovery Devices ; G
Test Procedures
Diagrams ; G
SD-06 Test Reports
Performance Tests ; G
Damper Acceptance Test ; G
SD-07 Certificates
Bolts
Ozone Depleting Substances Technician Certification
SD-08 Manufacturer's Instructions
Manufacturer's Installation Instructions
Operation and Maintenance Training
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals ; G
Fire Dampers ; G
Manual Balancing Dampers ; G
Panel Type Power Wall Ventilators ; G
Air Handling Units ; G
Variable Volume, Single Duct Terminal Units ; GVariable Volume, Single Duct, Fan-Powered Terminal Units ; G
Energy Recovery Devices ; G
1.4 QUALITY ASSURANCE
Except as otherwise specified, approval of materials and equipment is based on manufacturer's published data.
a. Where materials and equipment are specified to conform to the standards of the Underwriters Laboratories, the label of or listing with reexamination in UL Bld Mat Dir , and UL 6 is acceptable as sufficient evidence that the items conform to Underwriters Laboratories requirements. In lieu of such label or listing, submit a written certificate from any nationally recognized testing agency, adequately equipped and competent to perform such services, stating
SECTION 23 30 00 Page 9 that the items have been tested and that the units conform to the specified requirements. Outline methods of testing used by the specified agencies.
b. Where materials or equipment are specified to be constructed or tested, or both, in accordance with the standards of the ASTM International (ASTM), the ASME International (ASME), or other standards, a manufacturer's certificate of compliance of each item is acceptable as proof of compliance.
c. Conformance to such agency requirements does not relieve the item from compliance with other requirements of these specifications.
d. Where products are specified to meet or exceed the specified energy efficiency requirement of FEMP-designated or ENERGY STAR covered product categories, equipment selected must have as a minimum the efficiency rating identified under "Energy-Efficient Products" at http://femp.energy.gov/procurement . Equipment having a lower efficiency may be specified if the designer determines such equipment to be more life-cycle cost effective.
1.4.1 Prevention of Corrosion
Protect metallic materials against corrosion. Provide rust-inhibiting treatment and standard finish for the equipment enclosures. Do not use aluminum in contact with earth, and where connected to dissimilar metal.
Protect aluminum by approved fittings, barrier material, or treatment.
Provide hot-dip galvanized ferrous parts such as anchors, bolts, braces, boxes, bodies, clamps, fittings, guards, nuts, pins, rods, shims, thimbles, washers, and miscellaneous parts not of corrosion-resistant steel or nonferrous materials in accordance with ASTM A123/A123M for exterior locations and cadmium-plated in conformance with ASTM B766 for interior locations. Provide written certification from the bolt manufacturer that the bolts furnished comply with the requirements of this specification. Include illustrations of product markings, and the number of each type of bolt to be furnished in the certification.
1.4.2 Asbestos Prohibition
Do not use asbestos and asbestos-containing products.
1.4.3 Ozone Depleting Substances Technician Certification
All technicians working on equipment that contain ozone depleting refrigerants must be certified as a Section 608 Technician to meet requirements in 40 CFR 82 , Subpart F. Provide copies of technician certifications to the Contracting Officer at least 14 calendar days prior to work on any equipment containing these refrigerants.
1.4.4 Detail Drawings
Submit detail drawings showing equipment layout, including assembly and installation details and electrical connection diagrams; ductwork layout showing the location of all supports and hangers, typical hanger details, gauge reinforcement, reinforcement spacing rigidity classification, and static pressure and seal classifications. Include any information required to demonstrate that the system has been coordinated and functions properly as a unit on the drawings and show equipment relationship to other parts of the work, including clearances required for operation and
SECTION 23 30 00 Page 10 maintenance. Submit drawings showing bolt-setting information, and foundation bolts prior to concrete foundation construction for all equipment indicated or required to have concrete foundations. Submit function designation of the equipment and any other requirements specified throughout this Section with the shop drawings.
1.4.5 Test Procedures
Conduct performance tests as required in Section 23 05 93 Testing, Adjusting and Balancing for HVAC and Section 23 09 00 Instrumentation and Control for HVAC.
1.5 DELIVERY, STORAGE, AND HANDLING
Protect stored equipment at the jobsite from the weather, humidity and temperature variations, dirt and dust, or other contaminants.
Additionally, cap or plug all pipes until installed.
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
Provide components and equipment that are "standard products" of a manufacturer regularly engaged in the manufacturing of products that are of a similar material, design and workmanship. "Standard products" is defined as being in satisfactory commercial or industrial use for 2 years before bid opening, including applications of components and equipment under similar circumstances and of similar size, satisfactorily completed by a product that is sold on the commercial market through advertisements, manufacturers' catalogs, or brochures. Products having less than a 2-year field service record are acceptable if a certified record of satisfactory field operation, for not less than 6000 hours exclusive of the manufacturer's factory tests, can be shown. Provide equipment items that are supported by a service organization. In product categories covered by ENERGY STAR or the Federal Energy Management Program, provide equipment that is listed on the ENERGY STAR Qualified Products List or that meets or exceeds the FEMP-designated Efficiency Requirements.
2.2 IDENTIFICATION PLATES
In addition to standard manufacturer's identification plates, provide engraved laminated phenolic identification plates for each piece of mechanical equipment. Identification plates are to designate the function of the equipment. Submit designation with the shop drawings. Provide identification plates that are layers, black-white-black, engraved to show white letters on black background. Letters must be upper case.
Identification plates that are 1-1/2-inches high and smaller must be 1/16-inch thick, with engraved lettering 1/8-inch high; identification plates larger than 1-1/2-inches high must be 1/8-inch thick, with engraved lettering of suitable height. Identification plates 1-1/2-inches high and larger must have beveled edges. Install identification plates using a compatible adhesive.
2.3 EQUIPMENT GUARDS AND ACCESS
Fully enclose or guard belts, pulleys, chains, gears, couplings, projecting setscrews, keys, and other rotating parts exposed to personnel contact according to OSHA requirements. Properly guard or cover with insulation of a type specified, high temperature equipment and piping
SECTION 23 30 00 Page 11 exposed to contact by personnel or where it creates a potential fire hazard. The requirements for catwalks, operating platforms, ladders, and guardrails are specified in Section 08 31 00 ACCESS DOORS AND PANELS.
2.4 ELECTRICAL WORK
a. Provide motors, controllers, integral disconnects, contactors, and controls with their respective pieces of equipment, except controllers indicated as part of motor control centers. Provide electrical equipment, including motors and wiring, as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Provide manual or automatic control and protective or signal devices required for the operation specified and control wiring required for controls and devices specified, but not shown. For packaged equipment, include manufacturer provided controllers with the required monitors and timed restart.
b. For single-phase motors, provide high-efficiency type, fractional-horsepower alternating-current motors, including motors that are part of a system, in accordance with NEMA MG 11. Provide premium efficiency type integral size motors in accordance with
NEMA MG 1.
c. For polyphase motors, provide squirrel-cage medium induction motors, including motors that are part of a system , and that meet the efficiency ratings for premium efficiency motors in accordance with NEMA MG 1. Select premium efficiency polyphase motors in accordance with NEMA MG 10.
d. Provide motors in accordance with NEMA MG 1 and of sufficient size to drive the load at the specified capacity without exceeding the nameplate rating of the motor. Provide motors rated for continuous duty with the enclosure specified. Provide motor duty that allows for maximum frequency start-stop operation and minimum encountered interval between start and stop. Provide motor torque capable of accelerating the connected load within 20 seconds with 80 percent of the rated voltage maintained at motor terminals during one starting period. Provide motor starters complete with thermal overload protection and other necessary appurtenances. Fit motor bearings with grease supply fittings and grease relief to outside of the enclosure.
e. Where two-speed or variable-speed motors are indicated, solid-state variable-speed controllers are allowed to accomplish the same function. Use solid-state variable-speed controllers for motors rated 10 hp or less and adjustable frequency drives for larger motors.
Provide variable frequency drives for motors.
2.5 ANCHOR BOLTS
Provide anchor bolts for equipment placed on concrete equipment pads or on concrete slabs. Bolts to be of the size and number recommended by the equipment manufacturer and located by means of suitable templates.
Installation of anchor bolts must not degrade the surrounding concrete.
2.6 SEISMIC ANCHORAGE
Anchor equipment in accordance with applicable seismic criteria for the area and as defined in SMACNA 1981
SECTION 23 30 00 Page 12
2.7 PAINTING
Paint equipment units in accordance with approved equipment manufacturer's standards unless specified otherwise. Field retouch only if approved.
Otherwise, return equipment to the factory for refinishing.
2.8 INDOOR AIR QUALITY
Provide equipment and…