Amendment 2 - Plans.pdf
PDF 706 KB Posted
- Solicitation number
- W912DS25BA004
About this file
This document is a set of architectural door schedule and HVAC demolition plans for a manufacturing lab addition and renovation project at Joint Base Lakehurst-MDL in New Jersey. The door schedule details multiple doors for different rooms (Reverse Engineering, Women's/Men's areas, Offices, Admin) with specifications including door type, material, size, glazing, fire rating, and hardware requirements.
The HVAC demolition plans indicate specific removal and modification requirements for existing mechanical systems, including removing an air handling unit that supplies air to Building 332, maintaining the gas meter and existing air compressor, and providing temporary cooling and heating during the renovation. The plans are part of a project by the Department of the Army Corps of Engineers, with a planned implementation date of January 2025, and include provisions for maintaining operational continuity during the renovation process.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 7
E
AC-2
1 2 3 4
A
B
C
D
E
F
1/8" = 1'-0"C3
HVAC DEMOLITION PLAN
SHEET ID
A
IR
F O
R C
E C
IV
IL
E N
G
IN
E E
R
IN
G C
E N
T E
R
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
R
A D
D
IT
IV
E
L A
B A
D D
IT
IO
N
A u to d e sk
D o c s:
-0
-J
B M
D L B
B
/0
-0
-J
B M
D L -B
B
L a b E x p a n s io n M
.r v t
/1
/2
:2
:1
A
M
MD101C
H V
A C
D E
M O
L
IT
IO
N
P L A
N
J B
M D
L L a k e h u rs t, N
J D
H
E R
N A
N D
E Z
M T
A Y
L O
R
J S
O L A
N O
J A
N U
A R
Y
F
IN
A L
S U
B M
IT
T
A L
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
-0
D C
A V
IN
PLUMBING FIXTURES TO BE
MODIFIED (SEE PLUMBING DRAWINGS)
EXISTING AIR COMPRESSOR - SEE
PLUMBING DRAWINGS
EXISTING AIR
COMPRESSOR
RECEIVER TANK.
REMOVE AND
REINSTALL.
EXISTING GAS
METER
0 4' 8' 16'
PLAN NORTH
e3enmrt3 Polygon
E
AC-2
E
AC-1
1 2 3 4
A
B
C
D
E
F
1/8" = 1'-0"C3
HVAC DEMOLITION PLAN
SHEET ID
A
IR
F O
R C
E C
IV
IL
E N
G
IN
E E
R
IN
G C
E N
T E
R
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
R
A D
D
IT
IV
E
L A
B A
D D
IT
IO
N
A u to d e sk
D o c s:
-0
-J
B M
D L B
B
/0
-0
-J
B M
D L -B
B
L a b E x p a n s io n M
.r v t
/1
/2
:2
:1
A
M
MD101A
H V
A C
D E
M O
L
IT
IO
N
P L A
N
J B
M D
L L a k e h u rs t, N
J D
H
E R
N A
N D
E Z
M T
A Y
L O
R
M A
B
U S
B Y
J A
N U
A R
Y
F
IN
A L
S U
B M
IT
T
A L
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
-0
D C
A V
IN
EXISTING AIR COMPRESSOR - SEE
PLUMBING DRAWINGS
EXISTING AIR HANDLING UNIT THAT
SUPPLIES AIR TO B332 IS TO BE REMOVED
ALONG WITH ALL PIPING, SUPPORTS, AND
ELECTRICAL CONNECTIONS AND WIRING.
EXISTING GAS METER AND GAS LINE TO
BE REMOVED - SEE CIVIL DRAWINGS.BLDG 332 IS TO BE MAINTAINED IN
OPERATION AND WILL REQUIRE THAT
TEMPORARY COOLING AND HEATING
IS PROVIDED BY THE CONTRACTOR TO
MAINTAIN TEMPERATE AND HUMIDITY
CONTROL IN THE SPACE.
CONTRACTOR CAN REUSE EXISTING
DUCTWORK LOCATED IN THE MECHANCAL
ROOM (HATCHED)
IF POSSIBLE AND CONNECT
EXISTING AIR COMPRESSOR TO
REMAIN - SEE PLUMBING
DRAWINGS
EXISTING AIR HANDLING UNIT THAT
SUPPLIES AIR TO B331 TO REMAIN
ALONG WITH ALL PIPING, SUPPORTS, AND
ELECTRICAL CONNECTIONS AND WIRING.
EXISTING AIR
COMPRESSOR
RECEIVER TANK.
0 4' 8' 16'
PLAN NORTH
NEW PLUMBING FIXTURES - SEE
PLUMBING DRAWINGS
DURING PHASE 1 AND 2, ENTIRETY OF
ONLY TO TEMPORARY UNIT IF POSSIBLE.
e3enmrt3 Polygon
File details come from the government source that posted it. Updated .