About this file

This document is a set of architectural door schedule and HVAC demolition plans for a manufacturing lab addition and renovation project at Joint Base Lakehurst-MDL in New Jersey. The door schedule details multiple doors for different rooms (Reverse Engineering, Women's/Men's areas, Offices, Admin) with specifications including door type, material, size, glazing, fire rating, and hardware requirements.

The HVAC demolition plans indicate specific removal and modification requirements for existing mechanical systems, including removing an air handling unit that supplies air to Building 332, maintaining the gas meter and existing air compressor, and providing temporary cooling and heating during the renovation. The plans are part of a project by the Department of the Army Corps of Engineers, with a planned implementation date of January 2025, and include provisions for maintaining operational continuity during the renovation process.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment W912DS25BA0040007.pdf PDF
Phase 1 - Spec - Amd 0007.pdf PDF
Phase 2 - Plans - Amd 0007.pdf PDF
Phase 3 - Plans - Amd 0007.pdf PDF
Phase 3 - Specs - Amd 0007.pdf PDF
Phase 1 - Plans - Amd 0007.pdf PDF
Phase 2 - Specs - Amd 0007.pdf PDF
Amendment W912DS25BA0040006.pdf PDF
Appendix H - Bldg 332 - Interior Photos.pdf PDF
Amendment W912DS25BA0040005.pdf PDF
Appendix G - Bldg 331 - Interior Photos.pdf PDF
Appendix J - AMRS Meter Specification 2021.pdf PDF
Appendix I - Transformer and Switchboard.pdf PDF
Amendment W912DS25BA0040004.pdf PDF
W912DS25BA0004 Amendment 03.pdf PDF
Amendment W912DS25BA0040002.pdf PDF
Appendix F - Exterior Site Photos.pdf PDF
Amendment 1 - Spec 01 35 26.pdf PDF
Appendix D - B331-332 Hazmat Survey.pdf PDF
Appendix E - Site Visit Sign-in.pdf PDF
Amendment W912DS25BA0040001.pdf PDF
Phase 2 - Bldg 331 Renovation - Plans.pdf PDF
Phase 1 - Lab Addition - Specifications.pdf PDF
Phase 3 - Bldg 332 Renovation - Plans.pdf PDF
Solicitation - W912DS25BA004.pdf PDF
Phase 1 - Lab Addition - Plans.pdf PDF
Appendix C - Color and Finishes.pdf PDF
Appendix A - MONACO FA.pdf PDF
Phase 2 - Bldg 331 Renovation - SID.pdf PDF
Phase 3 - Bldg 332 Renovation - SID.pdf PDF
Phase 1 - Lab Addition - Exterior Finish.pdf PDF
Phase 3 - Bldg 332 Renovation - Specifications.pdf PDF
Phase 2 - Bldg 331 Renovation - Specifications.pdf PDF
Phase 1 - Lab Addition - SID.pdf PDF
Appendix B - HVAC.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 7

E

AC-2

1 2 3 4

A

B

C

D

E

F

1/8" = 1'-0"C3

HVAC DEMOLITION PLAN

SHEET ID

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R

IN

G C

E N

T E

R

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

R

A D

D

IT

IV

E

L A

B A

D D

IT

IO

N

A u to d e sk

D o c s:

-0

-J

B M

D L B

B

/0

-0

-J

B M

D L -B

B

L a b E x p a n s io n M

.r v t

/1

/2

:2

:1

A

M

MD101C

H V

A C

D E

M O

L

IT

IO

N

P L A

N

J B

M D

L L a k e h u rs t, N

J D

H

E R

N A

N D

E Z

M T

A Y

L O

R

J S

O L A

N O

J A

N U

A R

Y

F

IN

A L

S U

B M

IT

T

A L

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

-0

D C

A V

IN

PLUMBING FIXTURES TO BE

MODIFIED (SEE PLUMBING DRAWINGS)

EXISTING AIR COMPRESSOR - SEE

PLUMBING DRAWINGS

EXISTING AIR

COMPRESSOR

RECEIVER TANK.

REMOVE AND

REINSTALL.

EXISTING GAS

METER

0 4' 8' 16'

PLAN NORTH

e3enmrt3 Polygon

E

AC-2

E

AC-1

1 2 3 4

A

B

C

D

E

F

1/8" = 1'-0"C3

HVAC DEMOLITION PLAN

SHEET ID

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R

IN

G C

E N

T E

R

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

R

A D

D

IT

IV

E

L A

B A

D D

IT

IO

N

A u to d e sk

D o c s:

-0

-J

B M

D L B

B

/0

-0

-J

B M

D L -B

B

L a b E x p a n s io n M

.r v t

/1

/2

:2

:1

A

M

MD101A

H V

A C

D E

M O

L

IT

IO

N

P L A

N

J B

M D

L L a k e h u rs t, N

J D

H

E R

N A

N D

E Z

M T

A Y

L O

R

M A

B

U S

B Y

J A

N U

A R

Y

F

IN

A L

S U

B M

IT

T

A L

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

-0

D C

A V

IN

EXISTING AIR COMPRESSOR - SEE

PLUMBING DRAWINGS

EXISTING AIR HANDLING UNIT THAT

SUPPLIES AIR TO B332 IS TO BE REMOVED

ALONG WITH ALL PIPING, SUPPORTS, AND

ELECTRICAL CONNECTIONS AND WIRING.

EXISTING GAS METER AND GAS LINE TO

BE REMOVED - SEE CIVIL DRAWINGS.BLDG 332 IS TO BE MAINTAINED IN

OPERATION AND WILL REQUIRE THAT

TEMPORARY COOLING AND HEATING

IS PROVIDED BY THE CONTRACTOR TO

MAINTAIN TEMPERATE AND HUMIDITY

CONTROL IN THE SPACE.

CONTRACTOR CAN REUSE EXISTING

DUCTWORK LOCATED IN THE MECHANCAL

ROOM (HATCHED)

IF POSSIBLE AND CONNECT

EXISTING AIR COMPRESSOR TO

REMAIN - SEE PLUMBING

DRAWINGS

EXISTING AIR HANDLING UNIT THAT

SUPPLIES AIR TO B331 TO REMAIN

ALONG WITH ALL PIPING, SUPPORTS, AND

ELECTRICAL CONNECTIONS AND WIRING.

EXISTING AIR

COMPRESSOR

RECEIVER TANK.

0 4' 8' 16'

PLAN NORTH

NEW PLUMBING FIXTURES - SEE

PLUMBING DRAWINGS

DURING PHASE 1 AND 2, ENTIRETY OF

ONLY TO TEMPORARY UNIT IF POSSIBLE.

e3enmrt3 Polygon