Phase 3 - Bldg 332 Renovation - SID.pdf

PDF 8 MB Posted

Attached to
Manufacturing Lab Addition Between B331 B332 and Renovations, Lakehurst Naval Base, Joint Base-MDL, New Jersey
Solicitation number
W912DS25BA004
Issued by

About this file

This document is a Structural Interior Design (SID) Package for the B332 Renovation project at Joint Base McGuire/Dix/Lakehurst in Lakehurst, New Jersey. The design package, prepared by Blair Remy Architects and Merrick & Company in January 2025, details the interior design specifications for Building 332, which is part of a larger lab expansion project. The interior design focuses on creating a safe, productive, and comfortable environment for manufacturing personnel and administrative staff, with a warm, analogous color palette and complementary accents.

The design package specifies detailed finishes for various rooms, including the Reverse Engineering area, CT Room, admin offices, break room, restrooms, and janitor's closet. Consistent design elements include epoxy flooring, painted CMU and gypsum walls with eggshell finish, stainless steel wall base, and various ceiling treatments such as exposed structure painted white or lay-in acoustic ceiling tiles. Wood and metal doors will be stained or painted, and all exposed gypsum wallboard corners will receive stainless steel corner guards. The design also considers exterior finishes to be compatible with surrounding facilities, including Hangar 1, which is part of the Lighter Than Air Historic Preservation District.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment W912DS25BA0040007.pdf PDF
Phase 1 - Spec - Amd 0007.pdf PDF
Phase 2 - Plans - Amd 0007.pdf PDF
Phase 3 - Plans - Amd 0007.pdf PDF
Phase 3 - Specs - Amd 0007.pdf PDF
Phase 1 - Plans - Amd 0007.pdf PDF
Phase 2 - Specs - Amd 0007.pdf PDF
Amendment W912DS25BA0040006.pdf PDF
Appendix H - Bldg 332 - Interior Photos.pdf PDF
Amendment W912DS25BA0040005.pdf PDF
Appendix G - Bldg 331 - Interior Photos.pdf PDF
Appendix J - AMRS Meter Specification 2021.pdf PDF
Appendix I - Transformer and Switchboard.pdf PDF
Amendment W912DS25BA0040004.pdf PDF
W912DS25BA0004 Amendment 03.pdf PDF
Amendment 2 - Plans.pdf PDF
Amendment W912DS25BA0040002.pdf PDF
Appendix F - Exterior Site Photos.pdf PDF
Amendment 1 - Spec 01 35 26.pdf PDF
Appendix D - B331-332 Hazmat Survey.pdf PDF
Appendix E - Site Visit Sign-in.pdf PDF
Amendment W912DS25BA0040001.pdf PDF
Phase 2 - Bldg 331 Renovation - Plans.pdf PDF
Phase 1 - Lab Addition - Specifications.pdf PDF
Phase 3 - Bldg 332 Renovation - Plans.pdf PDF
Solicitation - W912DS25BA004.pdf PDF
Phase 1 - Lab Addition - Plans.pdf PDF
Appendix C - Color and Finishes.pdf PDF
Appendix A - MONACO FA.pdf PDF
Phase 2 - Bldg 331 Renovation - SID.pdf PDF
Phase 1 - Lab Addition - Exterior Finish.pdf PDF
Phase 3 - Bldg 332 Renovation - Specifications.pdf PDF
Phase 2 - Bldg 331 Renovation - Specifications.pdf PDF
Phase 1 - Lab Addition - SID.pdf PDF
Appendix B - HVAC.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

601 NE 63rd Street

Oklahoma City, OK 73105

229 Peachtree Street NE

International Tower, Suite 600

Atlanta, GA 30303

Structural Interior Design Package

Final Submittal

January 2025

Building 331/332 Lab Expansion

MSBL 12-4029

Joint Base McGuire/Dix/Lakehurst

Lakehurst, NJ

B332 Renovation

This page intentionally left blank.

B332 Renovation Joint Base McGuire-Dix-Lakehurst, Lakehurst, NJ

Structural Interior Design

TABLE OF CONTENTS TAB

SID NARRATIVE 1

INTERIOR FINISH SAMPLES 2

FINISH MATERIALS LIST 3

FLOOR PATTERN PLANS 4

ROOM FINISH SCHEDULE 5

INTERIOR ELEVATIONS 6

MILLWORK SECTIONS 7

SIGNAGE 8

SID Narrative

Section 1

B-332 Renovation

Joint Base McGuire/Dix/Lakehurst, Lakehurst, NJ

1. Design References:

a UFC 3-120-10, Interior Design

2. General Description:

The B331/332 Lab Expansion at Joint Base McGuire/Dix/Lakehurst (JBMDL) will consist of a single-story addition and the renovation of two existing facilities and will be separated into three projects. This document discusses the Structural Interior Design (SID) for the third project, the renovation of B-332. The addition was constructed in the first project and B-331 was renovated in the second. The intent of the interior design is to create a safe, productive, and comfortable environment for all manufacturing personnel and administrative staff of the facility.

Exterior finishes have been selected to be compatible with surrounding facilities, including Hangar 1, that are part of the Lighter Than Air Historic Preservation District.

3. SID Narrative:

The Interior color scheme will include a warm, analogous color palette for the background and complementary accents. The goal is to achieve visual continuity and overall cohesiveness with durability, longevity, and flexibility in mind throughout the facility.

a. Reverse Engineering: Flooring will be epoxy. The walls will be CMU and gypsum wall board with a level 4 finish, eggshell paint, and stainless-steel wall base. The ceiling will be exposed to the structure above and painted white. Wood doors will be stained and door frames will be painted. Metal doors and frames will be painted. All exposed gypsum wallboard corners will receive stainless steel corner guards.

b. CT Room and Closet: Flooring will be epoxy. The walls will be painted gypsum wall board with a level 4 finish, eggshell paint, and stainless-steel wall base. The ceiling will be exposed to the structure above and painted white. Metal doors and door frames will be painted. All exposed gypsum wallboard corners will receive stainless steel corner guards.

c. Admin and Offices: Flooring will be epoxy. The walls will be painted CMU and gypsum wall board with a level 4 finish, eggshell paint, and stainless-steel wall base. The ceiling will be lay-in acoustical ceiling tile (ACT) in a 2’-0” x 2’-0” grid. Wood doors will be stained wood and door frames will be painted. All exposed gypsum wallboard corners will receive stainless steel corner guards.

d. Break Room: Flooring will be epoxy. The walls will be gypsum wall board with a level 4 finish, eggshell paint, and stainless-steel wall base. The ceiling will be lay-in ACT in a 2’-0” x 2’-0” grid. The upper and lower cabinets will be finished with plastic laminate. The countertop will be a solid surface material with integral four-inch-high backsplash and a ceramic tile backsplash above. Wood doors will be stained and door frames will be painted.

e. Restrooms: Flooring will be epoxy. Both rooms will have full-height ceramic wall tile at wet walls; the remaining walls will be gypsum wall board with a level 4 finish and eggshell paint. All walls will receive stainless-steel wall base. The ceiling will be moisture-resistant gypsum board with a level 4 finish and eggshell paint. Knee guards and closure panels will be finished with plastic laminate. The countertop will be a solid surface material with integral four-inch-high backsplash and apron. Wood doors will be stained and door frames will be painted.

f. Janitor: Flooring will be sealed concrete. Fiberglass reinforced plastic (FRP) panels will be wall-mounted around the floor sink. The walls will be painted CMU and gypsum wall board with a level 3 finish, eggshell paint, and stainless-steel wall base. The ceiling will be exposed to the structure and painted white. Metal doors and door frames will be painted.

TOC
Section 1 - SID Narrative
Section 2 - Interior Finish Samples
Section 3 - Drawings
AF001C - Finish Materials List
AF101C - Floor Pattern Plan
AF601C - Room Finish Schedule
AI201C - Typical ABA Mounting Heights
AI202C - Interior Elevations
AI501C - Millwork Details
AI502C - Millwork Details
IG101C - Signage Floor Plan
IG501C - Sign Types
IG601C - Signage Schedule