Phase 1 - Lab Addition - Plans.pdf
PDF 26 MB Posted
- Solicitation number
- W912DS25BA004
About this file
These files comprise detailed architectural, structural, mechanical, electrical, plumbing, fire protection, telecommunications, and security design drawings for a Manufacturing Lab Addition project at Joint Base McGuire-Dix-Lakehurst in Lakehurst, New Jersey. The project involves constructing a new laboratory expansion between existing Buildings 331 and 332, spanning approximately 12,189 square feet and classified with multiple occupancy types including Business (B), Factory - Moderate Hazard (F-1), and High Hazard Group 2 (H-2).
The comprehensive set of drawings covers extensive technical specifications, including architectural layouts, structural framing, site utilities, power distribution, lighting, telecommunications infrastructure, security systems, and fire protection. Key design elements include a non-combustible Type IIB construction with no fire resistance rating, multiple rooftop mechanical units, specialized laboratory equipment power connections, a new electrical service with a 600kW diesel generator, telecommunications infrastructure, and security access control systems. The project includes provisions for specialized laboratory spaces such as an Additive Lab, Optomec Containment area, mechanical rooms, and powder handling spaces, with careful attention to hazardous area classifications and safety requirements.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
IN
G
C
EN
TE
R
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
VOLUME:
M
AR
K D
ES
C
R
IP
TI
O
N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
D C
AV
IN
Au to de sk
D oc s:
//0
9-
-J
BM
D
L B3
B
2/
JB
M
D L
1_
La b
Ex pa ns io n_ A2
3.
rv t 1/
/2
:4
7:
A M
G-000A
C O
VE
R
S H
EE
T
JO
IN
T
BA
SE
M
C G
U
IR
E- D
IX
-L
AK
EH
U R
ST
, L
AK
EH
U R
ST
N
J D
R
EM
Y
G U
EC
KE
R
Q R
EM
Y
JA
N
U
AR
Y
M
SB
L
-4
MSBL 12-4029
JANUARY 2025
JOINT BASE MCGUIRE-DIX-LAKEHURST, LAKEHURST NJ
ADDITIVE LAB ADDITION
FINAL SUBMITTAL - ISSUED FOR CONSTRUCTION
AD
D
IT
IV
E
LA
B
AD
D
IT
IO
N
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
IN
G
C
EN
TE
R
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
D R
EM
Y
Au to de sk
D oc s:
//0
9-
-J
BM
D
L B3
B
2/
JB
M
D L
1_
La b
Ex pa ns io n_ A2
3.
rv t 1/
/2
:4
7:
A M
G-001A
D R
AW
IN
G
IN
D
EX
JO
IN
T
BA
SE
M
C G
U
IR
E- D
IX
-L
AK
EH
U R
ST
, L
AK
EH
U R
ST
N
J D
R
EM
Y
G U
EC
KE
R
Q R
EM
Y
JA
N
U
AR
Y
M
SB
L
-4
FI
N
AL
S
U
BM
IT
TA
L
- I
SS
U
ED
F
O R
C O
N
ST
R U
C
TI
O N
AD
D
IT
IV
E
LA
B
AD
D
IT
IO
N
INDEX OF DRAWINGS
SHEET NO. TITLE
GENERAL
G-000A COVER SHEET
G-001A DRAWING INDEX
GI001A CODE ANALYSIS
GI002A BUILDING CODE SITE PLAN
GI100A LIFE SAFETY PLAN
CIVIL
C-001A CIVIL LEGENDS AND ABBREVIATIONS
C-002A CIVIL GENERAL NOTES
CD101A EXISTING CONDITIONS AND DEMOLITION PLAN
CS101A SITE AND UTILITY PLAN
C-501A SITE DETAILS
C-502A UTILITY DETAILS
CG101A GRADING AND DRAINAGE PLAN
CG102A SOIL EROSION AND SEDIMENT CONTROL PLAN
CG501A SOIL EROSION AND SEDIMENT CONTROL DETAILS
STRUCTURAL
S-001A GENERAL STRUCTURAL NOTES, DESIGN LOADS & ABBREVIATIONS
S-002A GENERAL STRUCTURAL NOTES
S-003A GENERAL STRUCTURAL NOTES
S-004A GENERAL STRUCTURAL NOTES
S-101A FOUNDATION PLAN
S-102A ROOF FRAMING PLAN
S-201A FRAMING ELEVATIONS
S-202A FRAMING ELEVATIONS
S-401A PARTIAL PLANS
S-501A TYPICAL CONCRETE DETAILS
S-502A TYPICAL CONCRETE DETAILS
S-503A TYPICAL CONCRETE DETAILS
S-506A TYPICAL LIGHT GAUGE DETAILS
S-507A TYPICAL STRUCTURAL STEEL DETAILS
S-508A TYPICAL STRUCTURAL STEEL DETAILS
S-510A FOUNDATION DETAILS
S-515A STRUCTURAL STEEL DETAILS
S-601A STRUCTURAL SCHEDULES
S-602A STRUCTURAL SCHEDULES
S-701A DIAGRAMS
ARCHITECTURAL
A-001A LEGENDS ABBREVIATIONS AND GENERAL NOTES
A-002A WALL TYPES
A-101A AREA OF WORK PLAN
A-102A AIR BARRIER PLAN
A-301A AIR BARRIER SECTIONS
AD001A GENERAL DEMOLITION NOTES
AD101A DEMOLITION PLAN
AD120A DEMOLITION ROOF PLAN
AD201A DEMOLITION ELEVATIONS
AE101A OVERALL FLOOR PLAN
AE110A REFLECTED CEILING PLAN
AE120A ROOF PLAN
AE201A BUILDING ELEVATIONS
AE202A BUILDING ELEVATIONS
AE301A BUILDING SECTIONS
AE302A BUILDING SECTIONS
AE303A WALL SECTIONS
AE304A WALL SECTIONS
AE305A WALL SECTIONS
AE401A ENLARGED PLANS
AE402A ENLARGED PLANS
AE501A DOOR DETAILS
AE502A DOOR AND WINDOW DETAILS
AE503A ROOF DETAILS
AE504A ROOF DETAILS
AE505A ROOF DETAILS
AE506A DETAILS
AE507A DETAILS
AE508A DETAILS
AE601A DOOR SCHEDULE
AE602A WINDOW SCHEDULE
AF001A FINISH MATERIALS LIST
AF101A FLOOR PATTERN PLAN
AF601A ROOM FINISH SCHEDULE
AI201A TYPICAL ABA MOUNTING HEIGHTS
AI202A INTERIOR ELEVATIONS
AI203A INTERIOR ELEVATIONS
INTERIORS
IF101A FURNITURE PLAN
IF401A ENLARGED FURNITURE PLAN
IG101A SIGNAGE FLOOR PLAN
IG501A SIGN TYPES
IG601A SIGNAGE SCHEDULE
INDEX OF DRAWINGS
SHEET NO. TITLE
FIRE ALARM
FA001A FIRE ALARM LEGEND
FA101A FIRE ALARM PLAN
FA501A FIRE ALARM CONTROL MATRIX
FA600A FIRE ALARM / MASS NOTIFICATION RISER DIAGRAM
FIRE PROTECTION
FP001A FIRE PROTECTION LEGEND
FP002A FIRE PROTECTION HAZARD CLASSIFICATION
FP101A FIRE PROTECTION PLAN
FP300A FIRE PROTECTION SECTION
FP500A FIRE PROTECTION DETAILS
PLUMBING
P-001A PLUMBING LEGEND
PD101A PLUMBING DEMOLITION PLAN
P-101A PLUMBING PLAN
P-102A PLUMBING ROOF PLAN
P-401A PLUMBING ENLARGED AND ISOMETRIC PLANS
P-402A PLUMBING COMPRESSED AIR, NITROGEN AND ARGON GAS ISOMETRIC
PLAN
P-501A PLUMBING DETAILS
P-601A PLUMBING SCHEDULES
MECHANICAL
M-001A MECHANICAL GENERAL NOTES, ABBREVIATIONS
MD101A HVAC DEMOLITION PLAN
M-101A HVAC PLAN
M-102A HVAC ROOF PLAN
M-301A HVAC SECTIONS
M-501A HVAC DETAILS
M-601A HVAC SCHEDULES
M-700A CONTROL LEGEND & ABBREVIATIONS
M-701A CONTROLS DOAS
M-702A CONTROLS VAV RTU
M-703A CONTROLS TERMINAL UNITS
M-704A CONTROLS FAN
ELECTRICAL
E-001A LEGEND, ABBREVIATIONS AND GENERAL NOTES
ED101A ELECTRICAL DEMOLITION PLAN
ES101A ELECTRICAL SITE PLAN
ES501A SITE DETAILS
ES502A MANHOLE DETAILS
ES503A MANHOLE DETAILS
E-501A SCHEDULES AND DETAILS
E-601A ELECTRICAL ONE-LINE DIAGRAM
E-602A ELECTRICAL FEEDER SCHEDULE
E-603A PANEL SCHEDULES
E-604A PANEL SCHEDULES
EG101A LIGHTNING PROTECTION PLAN
EG501A LIGHTING PROTECTION DETAILS
EL101A LIGHTING PLAN
EP101A POWER PLAN
EP102A ROOF POWER PLAN
EP401A ENLARGED POWER PLAN
TELECOMMUNICATIONS
T-001A TELECOMMUNICATIONS LEGEND
T-101A TELECOMMUNICATION PLAN
T-401A TELECOMMUNICATIONS ENLARGED PLAN & ELEVATIONS
T-501A TELECOMMUNICATION DETAILS
T-502A TELECOMMUNICATION DETAILS
T-601A TELECOMMUNICATION SYSTEM RISER DIAGRAM
TY001A SECURITY SYSTEM LEGEND
TY101A SECURITY PLAN
TY501A SECURITY SYSTEM DETAILS
BUILDING CODE ANALYSIS (IBC 2021)
BUILDING OCCUPANCY (CHAP. 3)
BUSINESS (B), FACTORY - MODERATE HAZARD (F-1), AND HIGH HAZARD GROUP 2 (H-2)
OCCUPANCY SEPARATION (SECTION 508)
OCCUPANCY SEPARATION REQUIREMENTS ARE FOR BUILDINGS WITHOUT AUTOMATIC SPRINKLER PROTECTION
THROUGHOUT.
OCCUPANCY SEPARATION:
H-2 FROM F-1 & B
F-1 FROM B
FIRE RESISTANCE RATING
REQUIRED:
3 HOUR
0 HOUR
FIRE RESISTANCE RATING
PROVIDED:
3 HOUR
0 HOUR
CONSTRUCTION TYPE (CHAP. 6)
THE EXISTING BUILDINGS, BUILDINGS B331 AND B332, ARE BOTH CONSTRUCTED OF NON-COMBUSTIBLE MATERIALS WITH NO FIRE RESISTANCE RATINGS. THE ADDITION WILL ALSO BE CONSTRUCTED OF NON-COMBUSTIBLE MATERIALS.
CONSTRUCTION TYPE PROVIDED: TYPE IIB (NON-COMBUSTIBLE, NO FIRE RESISTANCE RATING)
FIRE RESISTANCE RATING
REQUIRED:
0 HOUR
0 HOUR
0 HOUR
0 HOUR
0 HOUR
0 HOUR
0 HOUR
FIRE RESISTANCE RATING
PROVIDED:
0 HOUR
0 HOUR
0 HOUR
0 HOUR
0 HOUR
0 HOUR
0 HOUR
PER TYPE IIB CONSTRUCTION:
PRIMARY STRUCTURAL FRAME:
BEARING WALLS
EXTERIOR:
INTERIOR:
NONBEARING WALLS & PARTITIONS
EXTERIOR:
INTERIOR:
FLOOR CONSTRUCTION:
ROOF CONSTRUCTION:
PER SITE PLAN GI002 THERE IS A MINIMUM FIRE SEPARATION DISTANCE OF 30 FT AT ALL NEW EXTERIOR WALLS.
EXTERIOR WALLS DO NOT REQUIRE A FIRE RESISTANCE RATING AT THIS DISTANCE IN ACCORDANCE WITH TABLE
705.5. EXISTING EXTERIOR WALLS ON THE WEST SIDE OF BUILDING 332 HAS A FIRE SEPARATION DISTANCE OF 5 FEET.
PER IEBC 2021, SINCE THE WALL IS EXISTING AND THE OCCUPANCY IS NOT CHANGING TO A HIGHER HAZARD CATEGORY, THE EXISTING WALL FIRE RESISTANCE RATING, INCLUDING OPENINGS SHALL BE ACCEPTED.
MAXIMUM AREA OF EXTERIOR WALL
OPENINGS (TABLE 705.8):
OPENINGS ALLOWABLE:
NO LIMIT
OPENINGS PROVIDED:
30% MAXIMUM
BUILDING HEIGHT & AREA
BUILDING HEIGHT AND AREA REQUIREMENTS ARE FOR TYPE IIB CONSTRUCTION BUILDINGS WITHOUT AUTOMATIC
SPRINKLER PROTECTION THROUGHOUT.
ALLOWABLE
55 FT
SEE BELOW
PROVIDED:
22 FT
12,189 FT2
BUILDING HEIGHT (504.3):
NUMBER OF STORIES (504.4):
BUILDING AREA (506.2):
ALLOWABLE BUILDING AREA CALCULATION: THE SUM OF RATIOS OF ACTUAL AREAS AND ALLOWABLE AREA PER
OCCUPANCY MUST NOT BE MORE THAN 1 (508.4.2). TABLE VALUES
FOR NON-SPRINKLERED AREAS IN TYPE IIB CONSTRUCTIONS:
OCCUPANCY
BUSINESS (B):
FACTORY (F-1):
HIGH HAZARD (H-2):
TABLE VALUE
23,000 FT2
15,500 FT2
7,000 FT2
ALLOWABLE AREA
34,500 FT2
23,250 FT2
10,500 FT2
ACTUAL AREA
3,823 FT2
3,818 FT2
4,859 FT2
NOTE: AT LEAST 50% OF THE BUILDING PERIMETER HAS A FRONTAGE DISTANCE OF 30 FT OR GREATER. A
FRONTAGE INCREASE OF 0.5 IS APPLIED TO DETERMINE THE ALLOWABLE AREA.
(3,823 FT2 / 34,500 FT2) + (3,818 FT2 / 23,250 FT2) + (4,859 FT2 / 10,500 FT2) = 0.74 < 1
REFERENCES
INTERNATIONAL BUILDING CODE, FOR CONSTRUCTION TYPE AND BUILDING OCCUPANCY
SEPARATION, ALLOWABLE FLOOR AREA, BUILDING HEIGHT LIMITATIONS AND FIRE
SEPARATIONS DISTANCE REQUIREMENTS, EXCEPT AS MODIFIED BY UFC 3-600-01 AND UFC
4-211-01.
INTERNATIONAL EXISTING BUILDING CODE
FIRE CODE
STANDARD FOR PORTABLE FIRE EXTINGUISHERS
STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR
APPURTENANCES
NATIONAL ELECTRICAL CODE
NATIONAL FIRE ALARM AND SIGNALING CODE
STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES
STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS
LIFE SAFETY CODE, FOR SEPARATION FROM HAZARDS, BUILDING EGRESS AND LIFE SAFETY
AND APPLICABLE CRITERIA IN UFC 3-600-01
HAZARDOUS MATERIALS CODE
DOD BUILDING CODE, CHANGE 1 (SEPTEMBER 2022)
IBC 2021:
IEBC, 2021
NFPA 1, 2021
NFPA 10, 2022
NFPA 13, 2022
NFPA 24, 2022
NFPA 70, 2020
NFPA 72, 2022
NFPA 80, 2022
NFPA 90A, 2021
NFPA 101, 2021
NFPA 400, 2022
UFC 1-200-01
LIFE SAFETY ANALYSIS (NFPA 101)
BUILDING OCCUPANCY (CHAP. 3)
BUSINESS, INDUSTRIAL - GENERAL, AND INDUSTRIAL - HIGH HAZARD (PROTECTION LEVEL 2)
CONSTRUCTION TYPE (NFPA 220, CHAP. 4)
TYPE II (000)
CAPACITY OF MEANS OF EGRESS (7.3.3.1)
EGRESS COMPONENTS:
LEVEL COMPONENTS:
DOORS:
NUMBER OF MEANS OF
EGRESS (7.4.1.1):
0.2 IN. / PERSON, FOR HIGH HAZARD AREAS 0.4 IN. / PERSON
32 INCHES MIN. CLEAR WIDTH (7.2.1.2.3.2)
NOT LESS THAN TWO MEANS OF EGRESS SHALL BE PROVIDED FROM EVERY STORY
OR SECTION.
EXITS REQUIRED
EXITS PROVIDED
EXIT DISCHARGE (7.7.1): EXITS SHALL TERMINATE DIRECTLY AT A PUBLIC WAY OR AT AN EXTERIOR EXIT
DISCHARGE
TRAVEL DISTANCE
TRAVEL DISTANCE TO AN EXIT IN OCCUPANCIES WITHOUT SPRINKLER PROTECTION THROUGHOUT SHALL NOT EXCEED:
BUSINESS (38.2.6.2):
INDUSTRIAL - GENERAL
(40.2.6.1):
INDUSTRIAL HIGH HAZARD
(7.11.1, 40.2.5.1 & NFPA 400,
6.2.1.4.1 ):
ALLOWABLE
200 FT
200 FT
75 FT TO EXIT HIGH HAZARD AREA
100 FT EXIT
PROVIDED
85 FT 6 IN.
84 FT
73 FT
96 FT
DEAD-END CORRIDORS
DEAD-END CORRIDORS IN OCCUPANCIES WITHOUT SPRINKLER PROTECTION THROUGHOUT SHALL NOT EXCEED:
BUSINESS (38.2.5.3.2):
INDUSTRIAL - GENERAL
(40.2.5.1):
INDUSTRIAL HIGH HAZARD
(40.2.5.1):
ALLOWABLE
20 FT
50 FT
NOT
PERMITTED
PROVIDED
0 FT
0 FT
0 FT
COMMON PATH OF TRAVEL
COMMON PATH OF TRAVEL IN OCCUPANCIES WITHOUT SPRINKLER PROTECTION THROUGHOUT SHALL NOT EXCEED:
BUSINESS (38.2.5.2.3):
INDUSTRIAL - GENERAL
(40.2.5.1):
INDUSTRIAL HIGH HAZARD
(40.2.5.1):
ALLOWABLE
75 FT
50 FT
NOT
PERMITTED1
PROVIDED
31 FT
26 FT
0 FT
NOTE: HIGH HAZARD AREAS ARE REQUIRED TO BE PROTECTED WITH AUTOMATIC SPRINKLERS.
NOTE: HIGH HAZARD AREAS ARE REQUIRED TO BE PROTECTED WITH AUTOMATIC SPRINKLERS.
NOTE: HIGH HAZARD AREAS ARE REQUIRED TO BE PROTECTED WITH AUTOMATIC SPRINKLERS.
1. A SINGLE MEANS OF EGRESS IS PERMITTED IN A HAZARDOUS AREA IF THE AREA DOES NOT EXCEED 200 FT2, CALCULATED OCCUPANT LOAD DOES NOT EXCEED 3 PERSONS AND THE COMMON PATH DOES NOT EXCEED 25
FT. (7.11.4)
OCCUPANT LOAD FACTOR (7.3.1.2)
USE
BUSINESS
ASSEMBLY, LESS CONCENTRATED
INDUSTRIAL, GENERAL
MECHANICAL, ELECTRICAL & BUILDING EQUIPMENT
SPACES (UFC 3-600-01, TABLE 10-1)
IT/COMM EQUIPMENT (UFC 3-600-01, TABLE 10-1)
LOAD FACTOR (FT2 / PERSON)
150 GROSS
15 NET
100 GROSS
500 GROSS
300 GROSS
INTERIOR FINISHES
FIRE PROTECTION ENGINEERING FOR FACILITIES, 8 AUGUST 2016, CHANGE 6 (MAY 2021)
DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, 12 DECEMBER 2018, CHANGE 2
(JULY 2022)
DESIGN AND O&M: MASS NOTIFICATION SYSTEMS, 9 APRIL 2008, CHANGE 1 (JANUARY 2010)
UFC 3-600-01
UFC 4-010-01
UFC 4-021-01
REFERENCES CONTINUED
FIRE DOORS: THE MINIMUM FIRE RATING OF OPENING PROTECTIVES IN FIRE BARRIERS, FIRE RATED
SMOKE BARRIERS AND FIRE RATED SMOKE PARTITIONS SHALL BE IN ACCORDANCE
WITH NFPA 101 TABLE 8.3.3.2.2
ALLOWABLE
3 HOUR
PROVIDED
3 HOUR
COMPONENT
3 HOUR FIRE BARRIER
-DOOR
FIRE SEPARATIONS
SPECIAL HAZARDS (8.7): AREAS HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL TO THE GENERAL
OCCUPANCY OF THE BUILDING SHALL BE SEPARATED FROM OTHER PARTS OF THE
BUILDING WITH A FIRE BARRIER HAVING A RESISTANCE RATING NOT LESS THAN 1
HOUR AND WITHOUT WINDOWS.
CORRIDORS: EXIT ACCESS CORRIDORS DO NOT REQUIRE 1 HOUR FIRE RESISTANCE RATING PER
NFPA 101 38.3.6.1 AND 40.3.6.
USE
OTHER SPACES
ALLOWABLE
A, B OR C
PROVIDED
A
HIGH HAZARD PROTECTION LEVEL 2 REQUIREMENTS
CHAPTER 4 OF UFC 3-600-01 SUPERCEDES IBC CHAPTER 4 IN ITS ENTIRETY. FOR UNIQUE HAZARDS NOT ADDRESS
WITHIN CHAPTER 4 OF UFC 3-600-01, COMPLY WITH NFPA 101.
HAZARDOUS MATERIALS USED AND STORED IN THE BUILDING INCLUDE COMBUSTIBLE AND WATER REACTIVE
METALS.
HIGH HAZARD AREA SHALL BE SEPARATED FROM OTHER PARTS OF THE BUILDING WITH NOT LESS THAN 2 HOUR FIRE SEPARATION AND HAVE EXPLOSION VENTING THROUGH AN EXTERIOR WALL PER UFC 3-600-01, 4-2.2. ALSO, REFER TO
THE DEFLAGRATION VENTING SECTION BELOW.
AUTOMATIC SPRINKLERS SHALL BE PROVIDED WITH INDICATING VALVE TO ISOLATE SPRINKLER SYSTEM WITHIN
HAZARDOUS AREA PER UFC 3-600-01, 4-20.2.4.
FIRE EXTINGUISHER REQUIREMENTS
ORDINARY HAZARD
2-A, 10-B, C
1500 FT2
11,250 FT2
30 FT WITH 10-B,
50 FT WITH 20-B
EXTRA HAZARD
4-A, 40-B, C
1000 FT2
11,250 FT2
30 FT WITH 40-B,
50 FT WITH 80-B,
75 FT FOR TYPE D
EXTINGUISHERS
LIGHT HAZARD
2-A, C
3000 FT2
11,250 FT2
75 FT
DRY CHEMICAL TYPE ABC FIRE EXTINGUISHERS SHALL BE PROVIDED THROUGHOUT THE BUILDING. ADDITIONALLY, TYPE D FIRE EXTINGUISHERS WILL BE PROVIDED IN THE HIGH HAZARD OCCUPANCY AREA.
FIRE EXTINGUISHERS MUST BE PROVIDED TO MEET THE CRITERIA OF NFPA 10 FOR THE RESPECTIVE OCCUPANCY HAZARDS. THE ADMINISTRATIVE WING IS CLASSIFIED AS LIGHT HAZARD AND POTENTIAL FIRES ARE EXPECTED TO BE TYPE A OR C. THE HIGH HAZARD AREA IS CLASSIFIED AS EXTRA HAZARD AND POTENTIAL FIRES ARE EXPECTED TO BE TYPE A, B, C, OR D. THE MACHINE SHOP WING IS CLASSIFIED AS ORDINARY HAZARD AND POTENTIAL FIRES ARE
EXPECTED TO BE TYPE A, B, OR C.
COMPONENT
MINIMUM RATING
MAXIMUM FLOOR AREA PER
UNIT OF A
MAXIMUM FLOOR AREA PER
EXTINGUISHER
MAXIMUM TRAVEL DISTANCE
TO EXTINGUISHER
DEFLAGRATION VENTING
UFC 3-600-01, 4-2.2, EXPLOSION VENTING IS REQUIRED ON AN EXTERIOR WALL. A DUST HAZARD ANALYSIS DETERMINED THAT THE MAXIMUM KST = 27 (BAR*M / S) AND THE MAXIMUM PMAX = 6.1 BAR-G. THE YIELD STRENGTH OF
THE STRUCTURE IS 33 KSI (2,275 BAR).
PER NFPA 68, THE REDUCED PRESSURE FROM VENTING SHALL NOT EXCEED 2/3 THE YIELD STRENGTH OF THE ENCLOSURE OR THE YIELD STRENGTH INCLUDING A DYNAMIC LOAD FACTOR (DLF). WITH A WORSE CASE DLF OF 1.5, THE MAXIMUM ALLOWABLE REDUCED PRESSURE IS 1,516 BAR. 1,516 BAR EXCEEDS THE 6.1 BAR THE HAZARDOUS
MATERIAL IS CAPABLE OF PRODUCING. THUS DEFLAGRATION VENTING IS NOT REQUIRED.
SHEET ID
A
IR
F O
R C
E C
IV
IL
E N
G
IN
E E
R
IN
G C
E N
T E
R
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
D R
E M
Y
A u to d e s k D o c s /0
-0
-J
B M
D L B
B
/J
B M
D L
L a b E x p a n s io n A
.r v t
/1
/2
:0
:4
P
M
GI001A
C O
D E
A N
A L Y
S
IS
J O
IN
T
B A
S E
M C
G U
IR
E
-D
IX
-L A
K E
H U
R S
T L A
K E
H U
R S
T N
J R
Y
E S
T E
R
C S
P E
N C
E R
J A
N U
A R
Y
M S
B L
-4
F
IN
A L
S U
B M
IT
T
A L
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
A D
D
IT
IV
E
L A
B A
D D
IT
IO
N
ADDITIVE LAB101
ADDITIVE LAB
(PARTICULATE
CONTAINMENT)102
OPTOMEC
CONTAINMENT103
MECH
ELECT
COMM
POWDERHANDLING
W V
W V
W V
B U
IL
D
IN
G
B U
IL
D
IN
G
T
B U
IL
D
IN
G
B U
IL
D
IN
G
T E
N T
T E
N T
H U
T
B U
IL
D
IN
G
CONCRETE
CONCRETE
C O
N C
R E
T E
C O
N C
R E
T E
S
LA
B
C O
N C
R E
T E
S
LA
B
CONCRETE
CONCRETE
M E
T A
L P
L A
T F O
R M
G A
T E
GATE
C O
N C
R E
T E
P A
T H
E L E
C T R
IC
C
O N
C R
E T E
P A
D
C O
N C
R E
T E
R A
M P
STORAGE
CONTAINER
STORAGE
CONTAINER
STORAGE
CONTAINER
STORAGE
CONTAINER
STORAGE
CONTAINER
SHIPPING
CONTAINER
S H
IP
P
IN
G
C O
N T A
IN
E
R
S H
IP
P
IN
G
C O
N T A
IN
E
R
S H
IP
P
IN
G
C O
N T A
IN
E
R
S H
IP
P
IN
G C
O N
T A
IN
E R
SHIPPING
CONTAINER
S H
IP
P
IN
G
C O
N T A
IN
E
R
S H
IP
P
IN
G
C O
N T A
IN
E
R
S H
IP
P
IN
G
C O
N T A
IN
E
R
S H
IP
P
IN
G
C O
N T A
IN
E
R
P A
V E
D P
A R
K
IN
G L
O T
S H
E L V
E S
PLANTER
W O
O D
E N
R A
M P
S T A
IR
C
A S
E
TRENCH DRAIN
C
O N
C R
E T E
B A
R R
IE
R
S
C O
N C
R E
T E
B A
R R
IE
R
S
P A
V E
M E
N T
P A
V E
M E
N T
P A
V E
M E
N T
HOUGHTON ROAD
A C
U N
IT
O
N R
A
IS
E D
C O
N C
R E
T E
A C
U N
IT
S
A C
U N
IT
O
N R
A
IS
E D
C O
N C
R E
T E
A C
U N
IT
A C
U N
IT
A C
U N
IT
A C
U N
IT
V E
N T S
VENTS
S T O
N E
S
S T O
N E
S
V A
U L T
F
IR
E D
E P
A R
TM
E
N T
C O
N N
E C
T
IO
N
E Q
U
IP
M E
N T
E Q
U
IP
M E
N T
E Q
U
IP
M E
N T
R O
O F T
U R
B
IN
E S
F
IR
E P
H O
N E
F
IR
E P
H O
N E
F
IR
E P
H O
N E
F
IR
E P
H O
N E
R A
IL
A B
A N
D O
N E
D E
X P
O S
E D
R A
IL
R
O A
D
T R
A C
K S
C O
V E
R E
D W
IT
H
A S
P H
A L T
G E
N E
R A
T O
R
F
IR
E E
X T
IN
G U
IS
H
E R
C O
M P
R E
S S
E D
A
IR
P
IP
E
P
IP
E
F
IR
E P
H O
N E
F
IR
E P
H O
N E
S T
R I P
E
S T
R I P
E
S T
R I P
E
R A
IL
S
E D
G E
P A
V E
P A
V E
C O
M P
E N
S A
T E
D
A
IR
D
IS
C H
A R
G E
H O
IS
T
P
IV
P
IV
S T E
E L P
L A
T E
(R E
M O
V A
B L E
C O
V E
R E
D
C O
N N
E C
T
IO
N
VENT
VENT
R
O O
F D
R A
IN
C O
N C
R E
T E
W
M
IS
C E
Q U
IP
M
E N
T
R O
O F D
R A
IN
R O
O F D
R A
IN
R O
O F D
R A
IN
R O
O F D
R A
IN
H
IG
H V
O L T A
G E
E L E
C T R
IC
E
Q U
IP
M
E N
T
R O
O F D
R A
IN
R O
O F D
R A
IN
R O
O F D
R A
IN
R O
O F D
R A
IN
P
IN
E R
O W
P
IN
E R
O W
A C
U N
IT
CLENDENING STREET
R O
O F D
R A
IN
R O
O F D
R A
IN
R O
O F D
R A
IN
S H
IP
P
IN
G
C O
N T A
IN
E
R
S H
IP
P
IN
G
C O
N T A
IN
E
R
R O
O F D
R A
IN
PLANTER
S E
V E
R Y
N S
R O
A D
G
T
41'-6"
'-6
FIRE WATER MAIN
PIV
FIRE HYDRANT
FIRE HYDRANT
'-6
26'-0"
5'-0"
'-6
FIRE DEPARTMENT
CONNECTION
199 LINEAR FEET
335 LINEAR FEET
143 LINEAR FEET
TO THE FDC
SHEET ID
A
IR
F O
R C
E C
IV
IL
E N
G
IN
E E
R
IN
G C
E N
T E
R
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
D R
E M
Y
A u to d e s k D o c s /0
-0
-J
B M
D L B
B
/J
B M
D L
L a b E x p a n s io n A
.r v t
/1
/2
:0
:4
P
M
GI002A
B U
IL
D
IN
G
C O
D E
S
IT
E P
L A
N
J O
IN
T
B A
S E
M C
G U
IR
E
-D
IX
-L A
K E
H U
R S
T L A
K E
H U
R S
T N
J R
Y
E S
T E
R
C S
P E
N C
E R
J A
N U
A R
Y
M S
B L
-4
F
IN
A L
S U
B M
IT
T
A L
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
A D
D
IT
IV
E
L A
B A
D D
IT
IO
N
1" = 30'-0" A1
BUILDING CODE SITE PLAN
PLAN NORTH
30 15 0 30 60
FIRE DEPARTMENT
MAIN ENTRANCE
GENERAL NOTES
1. FIRE SEPARATION DISTANCES ARE SHOWN ON THE BUILDING
CODE SITE PLAN. THERE IS A MININIMUM FIRE SEPARATION
DISTANCE OF 30 FT FROM ALL NEW EXTERIOR WALLS.
EXTERIOR WALLS DO NOT REQUIRE A FIRE RESISTANCE RATING
AT THIS DISTANCE IN ACCORDANCE WITH IBC TABLE 705.5.
EXISTING EXTERIOR WALL ON THE WEST SIDE OF THE BUILDING
HAS A FIRE SEPARATION DISTANCE OF 5 FT. PER IEBC 2021,
SINCE THE WALL IS EXISTING AND THE OCCUPANCY IS NOT
CHANGING TO A HIGHER HAZARD CATEGORY, THE EXISTING
WALL FIRE RESISTANCE RATING, INCLUDING OPENINGS SHALL
BE ACCEPTED.
2. EMERGENCY VEHICLE (FIRE DEPARTMENT) ACCESS IS VIA
EXISTING ADJACENT ROADS AND EXISTING PARKING AREAS.
3. THIS FACILITY IS WITHIN A SECURED FACILITY, ANTITERRORISM
SECURE ACCESS REQUIREMENTS DO NOT APPLY.
4. ACCESS TO THE BUILDING INTERIOR IS WITHIN 50 FT FROM FIRE
DEPARTMENT ACCESS ROOM. EXTERIOR ACCESS TO THE FIRE
SPRINKLER RISER ROOM IS LOCATED ON THE SOUTH SIDE OF
THE BUILDING.
5. THE BUILDING FDC IS LOCATED ON THE SOUTHSIDE OF THE
BUILDING AND IS WITHIN 150 FT OF A FIRE HYDRANT. FINAL FDC
LOCATION TO BE APPROVED BY BASE FIRE DEPARTMENT.
6. FIRE HYDRANTS, PIV'S AND NEW AND EXISTING FIRE WATER
LINES ARE SHOWN ON THE BUILDING CODE SITE PLAN.
7. A FIRE PUMP IS NOT REQUIRED OR PROVIDED.
8. A WATER STORAGE TANK IS NOT REQUIRED OR PROVIDED.
9. THERE ARE NO HAZADOUS SPILL CONTAINMENT
REQUIREMENTS FOR THIS FACILITY.
10. THE FIRE SUPPRESSION SYSTEM BACKFLOW PREVENT IS
LOCATED IN THE MECH/EQUIP. ROOM AND IS ACCESSIBLE FROM
THE BUILDING EXTERIOR.
S S S S
1 4
G
F
E
D
C
B
A
32"
33"
32"
33"
2,305 SF
IND.
H-2
100 GSF
442 SF
EQUIP.
H-2
500 GSF
56'-0" 0'-0"
EQUIP.
IND.
1,994 SF
IND.
H-2
100 GSF
67'-0" 0'-0"
K B
48'-0" 0'-0"
73'-0" 0'-0"
48'-0" 0'-0"
3 HOUR FIRE RATED
COLUMN
32"
33"
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
63'-6" 0'-0"
ADDITIVE
LAB
ADDITIVE
LAB
(PARTICULATE
CONTAINMENT)
OPTOMEC
CONTAINMENT
MECHANICAL
ELECTRICAL
COMM
POWDER
HANDLING
RESTROOM
32"
52"
1-HR RATED FIRE BARRIER
2-HR RATED FIRE BARRIER
3-HR RATED FIRE BARRIER
SMOKE PARTITION
EXIT PATH
COMMON PATH OF TRAVEL
COMMON PATH OF TRAVEL
TOTAL TRAVEL DISTANCE
DOOR EGRESS TAGS:
NUMBER OF OCCUPANTS USING EXIT
EGRESS MAXIMUM CAPACITY
CLEAR WIDTH PROVIDED
COMPONENT MINIMUM WIDTH REQUIRED
CALCULATED OCCUPANT LOAD
USE GROUP AREA
OCCUPANCY USE GROUP
OCCUPANT LOAD FACTOR
BUILDING OCCUPANCY CLASSIFICATION
USE GROUP AND FUNCTION OF SPACE TAG:
LIFE SAFETY LEGEND
000 SF
IND.
F-1
150 GSF
130' 55'
EMERGENCY KEY BOX
32"
34"
KB
FIRE EXTINGUISHER - TYPE ABC
FIRE EXTINGUISHER - TYPE D
ILLUMINATED EXIT SIGN - SINGLE FACE
(ARROWS INDICATE EXIT DIRECTION)
ILLUMINATED EXIT SIGN - DOUBLE FACE
(ARROWS INDICATE EXIT DIRECTION)
SHEET ID
A
IR
F O
R C
E C
IV
IL
E N
G
IN
E E
R
IN
G C
E N
T E
R
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
D R
E M
Y
A u to d e s k D o c s /0
-0
-J
B M
D L B
B
/J
B M
D L
L a b E x p a n s io n A
.r v t
/1
/2
:0
:4
P
M
GI100A
L
IF
E S
A F
E T
Y P
L A
N
J O
IN
T
B A
S E
M C
G U
IR
E
-D
IX
-L A
K E
H U
R S
T L A
K E
H U
R S
T N
J R
Y
E S
T E
R
C S
P E
N C
E R
J A
N U
A R
Y
M S
B L
-4
F
IN
A L
S U
B M
IT
T
A L
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
A D
D
IT
IV
E
L A
B A
D D
IT
IO
N
1/8" = 1'-0" A1
LIFE SAFETY PLAN
PLAN NORTH
0' 2' 4' 8' 16'
GENERAL NOTESOCCUPANCY USE LEGEND
MECH/ELECT. EQUIPMENT (UFC 3-600-01)
GENERAL INDUSTRIAL (NFPA 101)
1. IN HIGH HAZARD AREA TRAVEL PATHS ARE BROKEN INTO
TWO. FIRST SEGMENT IS SHOWING TRAVEL DISTANCE OUT
OF HIGH HAZARD AREA. SECOND SEGMENT IS SHOWING
REMAINING DISTANCE TO AN EXIT.
NAME AREA
BLDG.
OCCUPANCY
USE
GROUP
LOAD FACTOR
(SQFT/OCC.)
OCCUPANT
LOAD
ADD. MANF. 1994 SF H-2 IND. 100 20
BREAK 206 SF B LS
CONC.
15 14
BUSINESS 3518 SF B B 150 24
CLEAN
ROOM
2305 SF H-2 IND. 100 23
EQUIPMENT 442 SF H-2 EQUIP. 500 1
SHOP 3724 SF F-1 IND. 100 38
TOTALS: 12189 SF 120
OCCUPANT LOAD - BUILDING TOTAL
SHEET KEYNOTES
1. 3 HOUR FIRE BARRIER EXTENDS WITH ROOF OVERHANG.
THE FIRE BARRIER SHALL BE SUPPORTED BY 3 HOUR
RATED CONSTRUCTION.
OCCUPANT LOAD - PROJECT 1
NAME AREA
BLDG.
OCCUPANCY
USE
GROUP
LOAD FACTOR
(SQFT/OCC.)
OCCUPANT
LOAD
ADD. MANF. 1994 SF H-2 IND. 100 20
CLEAN
ROOM
2305 SF H-2 IND. 100 23
EQUIPMENT 442 SF H-2 EQUIP. 500 1
TOTALS: 4741 SF 44
CONCRETE PAVEMENT
ASPHALT PAVEMENT
G
T
SAN
W W
CO
SANITARY SEWER SERVICE
WATER SERVICE
SEWER CLEAN OUT
FO FIBER OPTIC LINE
E UNDERGROUND ELECTRIC
TRANSFORMER
GENERATOR
F FIRE WATER
COMMUNICATIONS MANHOLEC
GATE VALVE
REMOVE AND DEMOLISH PAVEMENT
REMOVE AND DEMOLISH UTILITY
UNDERGROUND ELECTRICE
COMMUNICATIONSC
NATURAL GASG
T
GV
FIRE WATERF
CO
S
DOMESTIC WATERW
SANITARY SEWERS
COMMUNICATIONS MANHOLE
NATURAL GAS VALVE
LIGHT POLE
CLEAN OUT
SANITARY SEWER MANHOLE
STORM DRAIN MANHOLE
STORM DRAIN PIPE
BENCHMARK LOCATION
FIRE HYDRANT
5 FT CONTOUR
1 FT CONTOUR
STREET SIGN
1' CONTOUR
5' CONTOUR90
SF SILT FENCE
INLET PROTECTION
* THE LIST OF ABBREVIATIONS AND THE LEGENDS MAY
CONTAIN ITEMS THAT ARE NOT SHOWN WITHIN THE
DRAWINGS AND DO NOT OCCUR IN THE PROJECT.
AC AIR CONDITIONING
ASPH ASPHALT CEMENT
ASSY ASSEMBLY
BOC BACK OF CURB
BFP BACKFLOW PREVENTER
BITUM BITUMINOUS
BLDG BUILDING
BM BENCHMARK
BW BACK OF WALL
CB CATCH BASIN
CES CIVIL ENGINEERING SQUADRON
CF CUBIC FEET
C&G CURB & GUTTER
CI CURB INLET
CL CENTERLINE
CLR CLEAR
CMH COMMUNICATIONS MANHOLE
CMP CORRUGATED METAL PIPE
CO CLEANOUT
CMU CONCRETE MASONRY UNIT
COL COLUMN LINE
COM COMMUNICATIONS
CONC CONCRETE
CONN CONNECTION
COR CONTRACTING OFFICER'S REPRESENTATIVE
CY CUBIC YARDS
DIA DIAMETER
DIP DUCTILE IRON PIPE
DW DOMESTIC WATER
DWG DRAWING
E EAST
EL ELEVATION
ELEV ELEVATION
EMH ELECTRICAL MANHOLE
EOP EDGE OF PAVEMENT
ESMT EASEMENT
EW EACH WAY
EX EXISTING
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FES FLARED END SECTION
FF FINISHED FLOOR ELEVATION
FH FIRE HYDRANT
FL FLOW LINE
FM FORCE MAIN
FP FIRE PROTECTION
FT FEET or FOOT
FW FIRE WATER
GAL GALLON
GALV GALVANIZED
GE GUTTER ELEVATION
GP GUARD POST
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
GV GATE VALVE
HDPE HIGH-DENSITY POLYETHYLENE PIPE
HG HYDROGEN GAS
HP HIGH POINT
IAW IN ACCORDANCE WITH
ID INSIDE DIAMETER
INV INVERT ELEVATION
JB JUNCTION BOX
JBMDL JOINT BASE McGUIRE-DIX-LAKEHURST
L LENGTH
LF LINEAR FEET or LINEAR FOOT
LP LOW POINT
MAX MAXIMUM
M.E. MATCH EXISTING
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MON MONUMENT
MTR METER
MW MONITORING WELL
N NORTH
N/A NOT APPLICABLE
NG NATURAL GAS
NJDOT NEW JERSEY DEPARTMENT OF TRANSPORTATION
NO. NUMBER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
PC POINT OF CURVE
PD POSITIVE DISPLACEMENT
PE POLYETHYLENE
PG PRESSURE GAUGE
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PL PROPERTY LINE
PS POINT OF SWITCH
PSF POUNDS PER SQUARE FOOT (or FEET)
PSI POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PVC POINT OF VERTICAL CURVATURE or
POLYVINYLCHLORIDE PIPE
PVMT PAVEMENT
R RADIUS
RCP REINFORCED CONCRETE PIPE
ROW RIGHT OF WAY
ABBREVIATIONS*
SITE AND UTILITY LEGEND
DEMOLITION LEGEND
LA
KE
H U
R
ST
, N J
FA
D
AU
G
U
ST
JO
IN
T-
BA
SE
M C
G U
IR
E-
D
IX
-L
AK
EH
U
R
ST
, L
AK
EH
U
R
ST
N J
AD
D
IT
IT
VE
L
AB
A
D D
IT
IO
N
FA
D
FI
N
AL
S
U
BM
IT
TA
L
- I
SS
U
ED
F
O R
C O
N
ST
R U
C
TI
O N
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
IN
G
C
EN
TE
R
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Au to de sk
D oc s:
//0
9-
-J
BM
D
L B3
B
2/
-0 3C
-0
.d w g
A.
S
EA
L
A.
Y
AR
N
EL
L
N . L
EA
G
U E
D . C
AV
IN
C
IV
IL
L
EG
EN
D S
AN
D
A
BB
R
EV
IA
TI
O N
S
C-001A
S SOUTH
SD STORM DRAIN or STORM SEWER
SHT SHEET
SS SANITARY SEWER
SSMH SANITARY SEWER MANHOLE
ST STORM SEWER
STA STATION
STD STANDARD
STMH STORM SEWER MANHOLE
TBM TEMPORARY BENCHMARK
TOC TOP OF CURB ELEVATION
TD TRENCH DRAIN
TG TOP OF GRATE ELEVATION
TOP TOP OF PAVEMENT ELEVATION
TOW TOP OF WALL ELEVATION
TYP TYPICAL
UC UNDERGROUND COMMUNICATIONS
UE UNDERGROUND ELECTRICAL
UNO UNLESS NOTED OTHERWISE ON DRAWINGS
VC VERTICAL CURVE
VCP VITRIFIED CLAY PIPE
W WATER or WEST
W/ WITH
WWF WELDED WIRE FABRIC
ABBREVIATIONS* EXISTING CONDITIONS LEGEND
PLAN NORTH
TRUE NORTH
PLAN
NORTH 8/
1/
1:
A
M
GRADING LEGEND
M
AY
IS
SU
E
D A
JU
N
E
08/01/202324 JUNE 2024
JA
N
U
AR
Y
LA
KE
H U
R
ST
, N J
FA
D
AU
G
U
ST
JO
IN
T-
BA
SE
M C
G U
IR
E-
D
IX
-L
AK
EH
U
R
ST
, L
AK
EH
U
R
ST
N J
AD
D
IT
IT
VE
L
AB
A
D D
IT
IO
N
FA
D
FI
N
AL
S
U
BM
IT
TA
L
- I
SS
U
ED
F
O R
C O
N
ST
R U
C
TI
O N
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
IN
G
C
EN
TE
R
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Au to de sk
D oc s:
//0
9-
-J
BM
D
L B3
B
2/
-0 3C
-0
.d w g
A.
S
EA
L
A.
Y
AR
N
EL
L
N . L
EA
G
U E
D . C
AV
IN
C
IV
IL
G
EN
ER
AL
N
O
TE
S
C-002A
GENERAL CIVIL NOTES
1. EXISTING CONDITIONS INFORMATION IS BASED ON A TOPOGRAPHICAL AND PHYSICAL DESIGN SURVEY
PROVIDED BY: BORBAS SURVEYING AND MAPPING, LLC. BOONTON, NJ (PROJECT NO. 980724 DATED 8/2/22)
2. EXISTING SURFACE INFORMATION, IMPROVEMENTS, APPURTENANCES, AND ABOVE-GRADE
CONSTRUCTION AS SHOWN ON THESE PLANS IS BASED ON THE FIELD SURVEY REFERENCED ABOVE. ALL UNDERGROUND UTILITY LINEWORK SHOWN IS AS PROVIDED BY JBMDL IN GIS AND CAD FORMAT. UTILITY MARKINGS, AND SURVEY SHOTS ON UTILITY MARKINGS, WERE NOT CONDUCTED FOR THIS PROJECT. DUE TO THIS, DISCREPANCIES MAY EXIST BETWEEN FIELD-SURVEYED SURFACE UTILITY STRUCTURES AND THE UNDERLYING UTILITY LINEWORK . CONTRACTOR SHALL FIELD-VERIFY ALL EXISTING CONDITIONS PRIOR TO
CONSTRUCTION.
3. CONTRACTOR SHALL RETAIN A SURVEYOR LICENSED IN THE STATE OF NEW JERSEY TO SURVEY PROJECT
IMPROVEMENTS. IF BENCHMARKS SHOWN ARE IN AREAS THAT REQUIRE DEMOLITION, OTHER
BENCHMARKS SHALL BE ESTABLISHED BEFORE DEMOLITION AND CONSTRUCTION WORK BEGINS.
CONTRACTOR SHALL SUPPLY CERTIFIED CONTROL POINT DATA TO CONTRACTING OFFICER'S
REPRESENTATIVE PRIOR TO DEMOLITION ACTIVITIES AND AFTER COMPLETION OF CONSTRUCTION.
4. TOTAL DISTURBED ACREAGE = ±0.36 AC
5. THE CONTRACTOR SHALL COMPLETE AND FILE AF 103 DIG PERMIT AS REFERENCED IN THE
SPECIFICATIONS. THE CONTRACTOR SHALL ALSO CONTACT NEW JERSEY 811 CALL BEFORE YOU DIG.
6. THE GEOTECHNICAL INVESTIGATION REPORT WAS PREPARED BY ACER ASSOCIATES, LLC DATED 9/30/22.
7. THERE ARE NO KNOWN WETLANDS OR STREAMS WITHIN 200 FT OF THE PROJECT SITE.
8. CONTRACTOR SHALL PROVIDE DESIGN AND IMPLEMENTATION OF DEWATERING METHODS, IF NECESSARY, AND INCLUDE IN BASE BID FOR APPROVAL. COORDINATE WITH GEOTECHNICAL REPORT
RECOMMENDATIONS.
9. ALL PAVEMENTS USED BY THE CONTRACTOR DURING CONSTRUCTION SHALL BE MAINTAINED AND REPLACED AS NEEDED TO THE SATISFACTION OF THE GOVERNMENT AT NO ADDITIONAL COST. PAVEMENT INSPECTION WITH THE GOVERNMENT IS REQUIRED PRIOR TO AND AT THE END OF EACH PHASE OF
CONSTRUCTION. PERIODIC PAVEMENT INSPECTIONS SHALL BE DONE ON A WEEKLY BASIS.
10. ALL AREAS NOTED FOR PAVEMENT REPLACEMENT SHALL HAVE BASE MATERIAL REMOVED AND REPLACED
AND SUBGRADE COMPACTED AND TESTED IN THE PRESENCE OF THE CONTRACTING OFFICER'S
REPRESENTATIVE PRIOR TO PLACEMENT OF NEW MATERIAL.
11. CONTRACTOR ACCESS TO THE BASE IS RESTRICTED TO THE COMMERCIAL VEHICLE GATE.
12. DISPOSAL AREAS FOR RUBBLE, UNSUITABLE OR EXCESS SOIL MATERIALS, OR OTHER CONSTRUCTION
DEBRIS ARE NOT AVAILABLE ON THE BASE FOR THE CONTRACTOR'S USE. DISPOSAL MUST BE PROVIDED BY THE CONTRACTOR AT LAWFUL CONTRACTOR-PROVIDED SITES OFF GOVERNMENT-CONTROLLED LANDS.
13. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF WORK TO AVOID DAMAGE TO EXISTING UTILITIES AND/OR SITE FEATURES. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND SITE FEATURES DESIGNATED TO REMAIN THROUGHOUT CONSTRUCTION. ANY DAMAGE TO EXISTING
UTILITIES AND/OR SITE FEATURES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED BY THE
CONTRACTOR TO THE SATISFACTION OF THE CONTRACTING OFFICER'S REPRESENTATIVE AT NO COST TO THE GOVERNMENT. ANY DAMAGE BY CONTRACTOR SHALL BE REPORTED IMMEDIATELY AND SENT TO THE
CONTRACTING OFFICER REPRESENTATIVE. AS DETERMINED BY THE CONTRACTING OFFICER
REPRESENTATIVE, THE CONTRACTOR CAN BE ORDERED TO IMMEDIATELY REPAIR DAMAGE CAUSED BY THE CONTRACTOR TO THE SATISFACTION OF THE CONTRACTING OFFICER'S REPRESENTATIVE AT NO COST
TO THE GOVERNMENT.
14. ALL CONTRACTOR TRAFFIC MUST STAY ON DESIGNATED HAUL ROUTE ROADWAYS AT ALL TIMES WHILE TRAVELING TO AND FROM THE PROJECT SITE. AT NO TIME SHALL THE HAUL ROUTE BECOME A PARKING /
STANDING AREA FOR ANY CONTRACTOR VEHICLES OR EQUIPMENT.
15. AREAS FOR CONTRACTOR USE ARE RESTRICTED TO THOSE LOCATIONS SHOWN. CONTRACTOR SHALL BE RESPONSIBLE FOR FENCING, SECURITY, FIELD OFFICE AND OTHER REQUIREMENTS AS PROVIDED IN SPECIFICATION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS. AREAS SHALL BE
RESTORED TO PRE-EXISTING CONDITION UPON COMPLETION OF THE PROJECT.
16. CONTRACTOR SHALL PROTECT ALL PAVEMENTS AND EXISTING UTILITIES DESIGNATED TO REMAIN FROM ALL HEAVY EQUIPMENT. PROVIDE TRAFFIC CONTROL MEASURES PER PROJECT SPECIFICATIONS.
17. ANY ITEMS WHICH ARE DAMAGED AND NEED TO BE REPLACED SHALL MEET THE PROJECT SPECIFICATION
REQUIREMENTS FOR THE APPLICABLE MATERIALS OR SYSTEM AT NO ADDITIONAL COST TO THE
GOVERNMENT. REQUIRED TESTING SHALL BE PERFORMED IN ACCORDANCE WITH PROJECT
SPECIFICATIONS FOR MATERIALS UTILIZED. PROVIDE 48 HOUR ADVANCE NOTICE TO THE CONTRACTING
OFFICER FOR TESTING ACTIVITIES.
GENERAL CIVIL DEMOLITION NOTES
1. CONTRACTOR SHALL COMPLETE A WORK CLEARANCE REQUEST PRIOR TO CONSTRUCTION PER PROJECT
SPECIFICATIONS. PROCEED WITH EXTREME CAUTION WHEN EXCAVATING.
2. BEFORE DEMOLISHING ANY UTILITY, THE CONTRACTOR SHALL ENSURE THAT THERE IS AN ACTIVE LINE TO
REPLACE THE FUNCTION OF THE UTILITY BEING REMOVED IF SERVICE IS FOR OCCUPIED FACILITIES.
3. CONTRACTOR SHALL STOP WORK AND NOTIFY CONTRACTING OFFICER OF ANY UNFORESEEN UTILITY
CONFLICTS AS SOON AS DISCOVERED.
4. CONTRACTOR SHALL COORDINATE LIMITS OF SAWCUT AND PAVEMENT REMOVAL WITH PROPOSED WORK
TO BE PERFORMED. PAVEMENT DESIGNATED FOR SAWCUT SHALL BE SAWCUT PER PROJECT
SPECIFICATIONS AND DETAILS PROVIDED IN THESE PLANS.
5. WELL CAPPING METHODS, IF REQUIRED, SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS AND NEW JERSEY DEPARTMENT OF HEALTH REQUIREMENTS. ALL CAPPING, IF REQUIRED, SHALL BE INSPECTED AND
APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
GENERAL CIVIL SITE NOTES
1. CONTRACTOR SHALL FURNISH AND MAINTAIN ANY AND ALL NECESSARY BARRICADES AROUND THE WORK
AND PROVIDE PROTECTION AGAINST WATER DAMAGE, DUST MIGRATION, AND SOIL EROSION PER PROJECT
CONTRACT DOCUMENTS AND JBMDL REQUIREMENTS.
2. ALL BUILDING DIMENSIONS SHALL BE CHECKED AND COORDINATED WITH THE ARCHITECTURAL PLANS.
GENERAL CIVIL GRADING AND DRAINAGE NOTES
1. ALL GRADING AND SITE PREPARATION SHALL CONFORM TO THE PROJECT SPECIFICATIONS
2. CONTRACTOR SHALL MARK, AND PROTECT WITH FENCE, ALL BENCHMARKS DESIGNATED TO REMAIN.
3. ALL CUT AND FILL SLOPES SHALL BE 3:1 OR FLATTER (SEE PLANS).
4. ALL SPOT ELEVATIONS SHOWN ARE FINISHED GRADE, UNLESS NOTED OTHERWISE.
5. SITE GRADING SHALL NOT PROCEED UNTIL EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND
PERMITS OBTAINED PER PROJECT CONTRACT DOCUMENTS AND JBMDL REQUIREMENTS.
6. CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE OF ALL SURFACE RUNOFF DURING CONSTRUCTION PER
PROJECT CONTRACT DOCUMENTS.
GENERAL CIVIL UTILITY NOTES
1. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES PRIOR TO
CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL UTILITY COMPANIES THAT POTENTIALLY HAVE EXISTING UTILITIES ON-SITE AND DETERMINE APPLICABLE
REQUIREMENTS.
2. ALL CONNECTIONS TO EXISTING UTILITIES AND ALL UTILITY INSTALLATIONS SHALL BE IN COMPLIANCE
WITH PROJECT CONTRACT DOCUMENTS AND JBMDL REQUIREMENTS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING CIVIL SITE WORKS ACROSS ALL DISCIPLINES ASSOCIATED WITH THE PERFORMANCE OF THIS PROJECT. REFER TO THE ELECTRICAL SITE
PLANS FOR EXTERIOR POWER DISTRIBUTION AND COMMUNICATIONS WORK.
4. ANY EXISTING UTILITY STRUCTURES AND/OR APPURTENANCES WHICH ARE IN THE AREA OF
CONSTRUCTION AND WHICH WILL REMAIN SHALL BE ADJUSTED TO FINAL GRADE.
GENERAL CIVIL EROSION CONTROL NOTES
1. EROSION CONTROL FACILITIES SHALL BE INSTALLED PRIOR TO ANY OTHER CONSTRUCTION.
2. CONTRACTOR SHALL BE RESPONSIBLE DURING CONSTRUCTION FOR CONTINUAL MAINTENANCE OF
EROSION CONTROL MEASURES PER PROJECT CONTRACT DOCUMENTS, OCEAN COUNTY SOIL
CONSERVATION DISTRICT AND JBMDL REQUIREMENTS.
3. THE CONTRACTOR SHALL INSTALL AND MAINTAIN SILT BARRIERS AROUND ALL DRAINAGE STRUCTURES
UNTIL ALL CONSTRUCTION HAS BEEN COMPLETED.
4. SILT FENCES SHALL BE LOCATED ON-SITE TO PREVENT SEDIMENT AND EROSION FROM LEAVING THE
PROPERTY LIMITS.
5. THERE ARE NO CURRENT APPARENT EROSION CONTROL PROBLEMS ON-SITE. CONTRACTOR SHALL
TAKE PRECAUTIONS AS NECESSARY TO PREVENT EROSION AND SEDIMENT TRANSPORT DURING
CONSTRUCTION PER PROJECT CONTRACT DOCUMENTS.
6. ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL BE CLEANED AND MAINTAINED PER THE
CONTRACT DOCUMENTS.
7. ALL CUT AND FILL SLOPES MUST BE SURFACE ROUGHENED AND VEGETATED PER PROJECT CONTRACT
DOCUMENTS.
8. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES, IF NECESSARY, SHALL BE IMPLEMENTED AS
DIRECTED BY THE CONTRACTING OFFICER.
9. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION
CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, ANY LAND DISTURBING
ACTIVITY IN ACCORDANCE WITH PROJECT CONTRACT DOCUMENTS.
10. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES UNTIL PERMANENT
VEGETATION OR PAVEMENTS HAVE BEEN ESTABLISHED. THE CONTRACTOR SHALL CLEAN ALL
SEDIMENT TRAPS AS REQUIRED BY THE PROJECT CONTRACT DOCUMENTS.
11. FAILURE TO INSTALL, OPERATE, AND MAINTAIN ALL EROSION CONTROL MEASURES SHALL RESULT IN ALL WORK ON THE CONSTRUCTION SITE BEING STOPPED UNTIL PROPER CORRECTIVE MEASURES HAVE
BEEN MET, AS REQUIRED AND / OR DIRECTED.
12. THE CONTRACTOR SHALL KEEP AND MAINTAIN AN ON-SITE LOG NOTING THE DATE OF ALL RAINFALL EVENTS, THE AMOUNT OF RAINFALL RECEIVED, DURATION OF RAINFALL EVENT, INSPECTION NOTES, AND ANY REPAIRS OR CLEANING OF EROSION CONTROL DEVICES. LOG RECORDS SHALL BE SUPPLIED
TO THE CONTRACTING OFFICER'S REPRESENTATIVE ON A MONTHLY BASIS.
13. EROSION CONTROL MEASURES SHALL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF
MEASURES DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND
SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO EFFECTIVELY CONTROL OR TREAT THE
SEDIMENT SOURCE.
14. ALL CONSTRUCTION SITES ARE SUBJECT TO INSPECTIONS BY STATE, FEDERAL, AND JBMDL AGENCIES.
15. ANY FAILURE OF EROSION CONTROL MEASURES SHALL BE REPAIRED OR REPLACED BY CONTRACTOR
WITHIN 24 HOURS.
8/ 1/
1:
A
M
AU
G
U
ST
M
AY
AU
G
U
ST
M
AY
IS
SU
E D
A
JU
N E
08/01/202324 JUNE 2024
JA
N
U
AR
Y
10 11
C O
N C
R
ETE
BUILDING 332
C O
N C
R
ETE
BUILDING 332T
BUILDING 331
X
X X
X
XXX
X X
X
X
ELECTRIC
CONCRETE
PAD
PAVED
PARKING LOT
PLAN
TER
WOODEN RAMP
GV
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G
G
G
G
G
G
G
G
G
G
GGGGGG
G
G G
G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
TR
EN
C H
D R
AIN
CONCRETE
BARRIERS
H O
U G
H
TO
N R
O
AD
CO
CO
AC UNIT
ON RAISED
CONCRETE
AC UNITS
AC UNIT
ON RAISED
CONCRETE
AC UNIT
AC UNIT
T
T
VENTS
GAS METER
GAS METER
EQUIPMENT
FIRE PHONE
FIRE PHONE
FIRE PHONE
FIRE PHONE
4" PVC
15" R
C P
15" RCP
SILL90.14
SILL90.15
SILL90.12
SILL90.18
FF90.16
AC UNIT
COMPENSATED
AIR DISCHARGE
ROOF DRAIN
ROOF DRAIN
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
W W
W W
W W
W W
W W
W W
W W
W W
F F
F
F F F F F F F F
C C C C C C C
C
C C C C C C C C C C C C
W
W W
W W
W W
W W
W W
W
S
S S
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E E E E E E E E
E
E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E E E E
E E E E E E E
E E
E E
E
E
E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E E
E E
E E
E
E E
E E
E E
E
C C
C C
C C
C C C C C C C
C
C C
C C
C
C C C C C
C C
C C
C C
C C
C C
C C
C C
C C
C
E E
E E
G
C
LEN
D
EN
IN
G
STR
EET
INLET GRT 89.22
IN 4" INV 87.1
OUT 15" INV 86.4
MH RIM 89.85
INV 84.7
INLET TRENCH 89.75
INV 89.1
BSM-3
SPIKE & TAG ON CURB
N:434652.21 E:543861.89
ELEV:85.94'
ROOF DRAIN
ROOF DRAIN ROOF DRAIN
ROOF DRAIN
PLAN
TER
87 88 89
17 17
20 20
GV
G G
E E
E
E
E
E
E
E
E
E
E
G
G
G
GV
W
W
W
W
PLAN
NORTH
LA
KE
H U
R
ST
, N J
FA
D
AU
G
U
ST
JO
IN
T-
BA
SE
M C
G U
IR
E-
D
IX
-L
AK
EH
U
R
ST
, L
AK
EH
U
R
ST
N J
AD
D
IT
IT
VE
L
AB
A
D D
IT
IO
N
FA
D
FI
N
AL
S
U
BM
IT
TA
L
- I
SS
U
ED
F
O R
C O
N
ST
R U
C
TI
O N
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
IN
G
C
EN
TE
R
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Au to de sk
D oc s:
//0
9-
-J
BM
D
L B3
B
2/
-0 3C
D
1.
dw g
A1 EXISTING CONDITIONS AND DEMOLITION PLAN
SCALE: 1" = 10'
GENERAL SHEET NOTES
1. ALL EXISTING INFORMATION SHOWN HEREON IS BASED ON THE CAD FILE
PROVIDED BY BORBAS SURVEYING & MAPPING, LLC. THIS IS NOT A BOUNDARY
OR TOPOGRAPHIC SURVEY. THE CERTIFICATION ON THIS SHEET IS INTENDED
ONLY TO CERTIFY THE DEMOLITION SHOWN, NOT THE EXISTING CONDITIONS.
2. THE HORIZONTAL DATUM IS THE NEW JERSEY STATE PLANE COORDINATE
SYSTEM NAD83 (2011) DETERMINED BY DIFFERENTIAL GPS ON JULY 11, 2022
USING THE NGS CORS SYSTEM, REFERENCE STATION NJOC.
3. THE VERTICAL DATUM IS THE NORTH AMERICAN VERTICAL DATUM OF 1988
(NAVD88) GEOID12A VERIFIED BY DIFFERENTIAL GPS OBSERVATIONS FROM THE
NGS CORS NETWORK ON JULY 11, 2022. BENCHMARK: REFERENCE STATION
NJOC (ORTHOMETRIC HEIGHT=81.4629').
4. THIS BASE MAP DEPICTS LIMITED PHYSICAL IMPROVEMENTS AS THEY EXISTED
ON JULY 11, 2022. NO ATTEMPT HAS BEEN MADE TO DETERMINE THE LOCATION
OF PROPERTY LINES, EASEMENTS OR RIGHT-OF-WAY LINES.
5. ALL COORDINATES AND ELEVATIONS SHOWN HEREON ARE IN U.S. SURVEY FEET
IN THE HORIZONTAL AND VERTICAL DATUMS LISTED ABOVE.
6. THE UTILITIES SHOWN HAVE BEEN LOCATED FROM EVIDENCE OBSERVED ON
THE SURFACE ONLY. THE SURVEYOR MAKES NO GUARANTEES THAT THE
UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER
IN-SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT
THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION
INDICATED. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE
UNDERGROUND UTILITIES.
7. COMMUNICATIONS, ELECTRICAL POWER, WATER, FIRE WATER, SANITARY
SEWER, AND NATURAL GAS UNDERGROUND UTILITIES HAVE BEEN SHOWN ON
THESE PLANS BASED ON GIS INFORMATION PROVIDED BY THE BASE.
CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES PRIOR TO
DEMOLITION AND CONSTRUCTION.
SHEET KEYNOTES
1. REMOVE BUILDING DOWNSPOUTS
2. REMOVE AC UNIT AND CONCRETE PAD, RE: MECHANICAL
3. REMOVE METAL PLATFORM AND GAS TANKS ALONG WITH CONCRETE PAD
4. SAWCUT ASPHALT
5. REMOVE ASPHALT
6. REMOVE LIGHT POLE, RE: ELECTRICAL
7. REMOVE LIGHTING FEEDS BACK TO NEAREST HANDHOLE OR LIGHT POLE
8. REMOVE VAULT
9. REMOVE SHELTER STRUCTURE
10. REMOVE STEEL PLATE
11. REMOVE PLANTERS
12. REMOVE ELECTRICAL EQUIPMENT AND CONCRETE PADS, RE: ELECTRICAL
13. REMOVE NATURAL GAS METER AND SERVICE LINE BACK TO MAIN, CUT AND CAP
SERVICE, RE: PLUMBING
14. REMOVE WATER LINE, CUT AND CAP
15. REMOVE SANITARY SEWER CLEANOUT AND SERVICE LINE, CUT AND CAP AT
MAIN
16. CUT AND CAP STEAM PIPES (APPROXIMATE LOCATION), RE: PLUMBING
17. REMOVE EXTERNAL ELECTRICAL CONDUIT, RE: ELECTRICAL
18. REMOVE EXISTING COMPRESSED AIR, STEAM, AND CONDENSATE PIPES
19. RELOCATE CONCRETE BARRICADE
20. REMOVE MISCELLANEOUS UTILITY EQUIPMENT
21. SAWCUT, DEMOLISH AND REMOVE CURB
A.
S
EA
L
A.
Y
AR
N
EL
L
N . L
EA
G
U E
D . C
AV
IN
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
AN
D D
EM
O
LI
TI
O N
P
LA
N
CD101A10' 20'0
8/ 1/
:3
PM
MATCHLINE, SEE DETAIL A17 THIS SHEET
MATCHLINE SEE PLAN THIS SHEET
A16 FIRE SERVICE DETAIL
SCALE: 1"=10' 10' 20'0
AU
G
AU
G
U
ST
M
AY
IS
SU
E D
A
JU
N E
08/01/202324 JUNE 2024
JA
N
U
AR
Y
F F
F F
F F
GV
G
E
E E
E
E
E
E
E
E
E
G
G
G
GV
W
W
W
W
N: 434658.44 E: 543894.82
E
CO
W
SAN
W
W W
CO SAN
F F
F F
F F
F F
F F
F F
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
FO
FO
FO
C
C
E E
E E
E E
ARGON TANK
S
G
C O
N C
R
ETE
BUILDING 332
C O
N C
R
ETE
BUILDING 332T
BUILDING 331
X
X X
X
XXX
X X
X
X
ELECTRIC
CONCRETE
PAD
PAVED
PARKING LOT
PLAN
TER
WOODEN RAMP
GV
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G
G G
G G
G G
G G
G
G
G
G
G
G
G
G
G
G
GGGGGG
G
G G
G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
TR
EN
C H
D R
AIN
CONCRETE
BARRIERS
H O
U G
H
TO
N R
O
AD
CO
AC UNIT
ON RAISED
CONCRETE
AC UNITS
AC UNIT
ON RAISED
CONCRETE
AC UNIT
AC UNIT
T
T
VENTS
GAS METER
GAS METER
EQUIPMENT
FIRE PHONE
FIRE PHONE
FIRE PHONE
FIRE PHONE
4" PVC
15" R
C P
15" RCP
SILL90.14
SILL90.15
SILL90.12
SILL90.18
FF90.16
AC UNIT
COMPENSATED
AIR DISCHARGE
ROOF DRAIN
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
W W
W W
W W
W W
W W
W W
W W
W W
F F
F
F F F F F F F F
C C C C C C C
C
C C C C C C C C C C C C
W W
W W
W
S
S S
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E
E E E E E E E E
E
E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E E
E E
E E
E E
E E
E E E
E E
E E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E E E E
E
E
E
E
E E
E E
E E
E
E E
E E
E E
C C
C C
C C
C C C C C C C
C
C C
C C
C
C C C C C
C C
C C
C C
C C
C C
C C
C C
C C
C
E E
E E
G G
C
LEN
D
EN
IN
G
STR
EET
INLET GRT 89.22
IN 4" INV 87.1
OUT 15" INV 86.4
MH RIM 89.85
INV 84.7
INLET TRENCH 89.75
INV 89.1
BSM-3
SPIKE & TAG ON CURB
N:434652.21 E:543861.89
ELEV:85.94'
ROOF DRAIN ROOF DRAIN
ROOF DRAIN
PLAN
TER
ROOF
DRAIN
ROOF
DRAIN
BUILDING
ADDITION
EX FF = ±90.15
EX FF = ±90.15
FF = 90.15
6'
RE: ELECTRICAL
FOR CONTINUATION
6'
6'
6'
20'
26 (10)
26 (10)
PLAN
NORTH
LA
KE
H U
R
ST
, N J
FA
D
M
AY
JO
IN
T-
BA
SE
M C
G U
IR
E-
D
IX
-L
AK
EH
U
R
ST
, L
AK
EH
U
R
ST
N J
AD
D
IT
IT
VE
L
AB
A
D D
IT
IO
N
FA
D
FI
N
AL
S
U
BM
IT
TA
L
- I
SS
U
ED
F
O R
C O
N
ST
R U
C
TI
O N
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
IN
G
C
EN
TE
R
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Au to de sk
D oc s:
//0
9-
-J
BM
D
L B3
B
2/
-0 3C
S1
.d w g
A1 SITE AND UTILITY PLAN
SCALE: 1" = 10'
GENERAL SHEET NOTES
1. ALL EXISTING INFORMATION SHOWN HEREON IS BASED ON THE CAD FILE
PROVIDED BY BORBAS SURVEYING & MAPPING, LLC. THIS IS NOT A BOUNDARY
OR TOPOGRAPHIC SURVEY.
2. ALL COORDINATES AND ELEVATIONS SHOWN HEREON ARE IN U.S. SURVEY FEET.
3. BEFORE INSTALLATION OF THE CONCRETE GENERATOR PAD AND ASSOCIATED
BOLLARDS, CONTRACTOR MUST INVESTIGATE LOCATION OF BURIED POWER
CONDUIT LINE TO AVOID CONFLICT WITH, OR DAMAGE TO THE LINE. IF NEEDED,
A FIELD ADJUSTMENT WILL NEED TO BE MADE TO ACCOMMODATE NEW PAD AND
BOLLARD LOCATIONS.
SHEET KEYNOTES
A.
S
EA
L
A.
Y
AR
N
EL
L
N . L
EA
G
U E
D . C
AV
IN
SI
TE
A N
D U
TI
LI
TY
P
LA
N
CS101A
1. CURB RAMP, SEE DETAIL H1 ON SHEET C-501A
2. CONCRETE STOOP, RE: STRUCTURAL
3. PRECAST SPLASH BLOCK
4. COMM MANHOLE, RE: ELECTRICAL
5. AUTOMATIC TRANSFER SWITCH CONCRETE PAD, RE: STRUCTURAL DETAIL K1 ON
S-503A
6. GENERATOR CONCRETE PAD, RE: STRUCTURAL DETAIL K1 ON S-503A AND SEE
GENERAL NOTE 3 ABOVE
7. 6" FIRE WATER SPRINKLER SERVICE
8. CONNECT TO EX FIRE SERVICE MAIN WITH GATE VALVES
9. CONCRETE SIDEWALK, SEE DETAIL A1 ON SHEET C-501A
10. ASPHALT PAVEMENT, RE: NJDOT HOT MIX ASPHALT PATCH REQUIREMENTS
11. SANITARY SEWER CLEANOUT, SEE DETAIL A15 ON SHEET C-502A
12. 4" SANITARY SEWER SERVICE
13. CONNECT TO EX SANITARY SEWER MAIN
14. 1-1/2" WATER SERVICE
15. CONNECT TO EX WATER MAIN
16. CONNECTION AT EX COMM MANHOLE, RE: ELECTRICAL
17. ELECTRICAL CONDUIT, RE: ELECTRICAL
18. CONCRETE PAD FOR METAL SHAVINGS BIN INSTALLED IN SAME MANNER AS
SIDEWALK, SEE DETAIL A1 ON SHEET C-501A
19. STRUCTURAL CONCRETE SLAB, RE: STRUCTURAL
20. CONCRETE HEADER CURB, SEE DETAIL D1 ON SHEET C-501A
21. CONCRETE PAVEMENT INSTALLED IN SAME MANNER AS SIDEWALK, SEE DETAIL
A1 ON SHEET C-501A
22. MECHANICAL EQUIPMENT CONCRETE PAD, RE: STRUCTURAL
23. 2" WATER SERVICE
24. POST INDICATOR VALVE (PIV), SEE DETAIL F9 ON SHEET C-502A
25. HANDRAIL, RE: ARCHITECTURAL FOR HANDRAIL DETAIL
26. BOLLARD, RE: STRUCTURAL DETAIL K1 ON S-508A
27. ARGON TANK CONCRETE PAD/FOUNDATION
MATCHLINE, SEE DETAIL C17 THIS SHEET
MATCHLINE SEE PLAN THIS SHEET
C17 FIRE SERVICE DETAIL
SCALE: 1"=10'
10' 20'0
10' 20'0
C-501 D8
6/ 7/
:1
PM
AU
G
U
ST
AU
G
AU
G U
ST
M
AY
JU
N E
08/01/202324 JUNE 2024
JA
N
U
AR
Y
8"
6"
ROADWAY SURFACE
4"
1"
1/8"
8" R
CONTRACTION JOINT
1/2"
JOINT SEALER CONFORMING TO
PROJECT SPECIFICATIONS
PREMOLDED EXPANSION JOINT
FILLER CONFORMING TO
PROJECT SPECIFICATIONS EXPANSION JOINT
COMPACTED NATIVE
MATERIAL PER PROJECT
SPECIFICATIONS
WALK WIDTH PER PLANS
4" PER FOOT MAX
D1 CONCRETE HEADER CURB
SCALE: NTS
A11 TYPICAL CONCRETE WALK JOINTS
SCALE: NTS
1" R
SIDEWALK 1/2"
ABOVE ADJACENT
LANDSCAPE AREAS
18"
7"
1/4"
LA
KE
H U
R
ST
, N J
FA
D
AU
G
U
ST
JO
IN
T-
BA
SE
M C
G U
IR
E-
D
IX
-L
AK
EH
U
R
ST
, L
AK
EH
U
R
ST
N J
AD
D
IT
IT
VE
L
AB
A
D D
IT
IO
N
FA
D
FI
N
AL
S
U
BM
IT
TA
L
- I
SS
U
ED
F
O R
C O
N
ST
R U
C
TI
O N
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
IN
G
C
EN
TE
R
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Au to de sk
D oc s:
//0
9-
-J
BM
D
L B3
B
2/
-0 3C
-5
.d w g
A1 SIDEWALK SECTION
SCALE: NTS
6" COMPACTED
STRUCTURAL FILL
6'-0" CURB BEYOND
SLOPE TO MEET
GUTTER LINE
3/8" x 3/4"
JOINT SEALANT
COMPACTED NATIVE
MATERIAL PER PROJECT
SPECIFICATIONS
6" COMPACTED
STRUCTURAL FILL
SECTION A-A
12:1 MAX.
A
6' -0
SEE SITE PLAN
EXISTING CURB FACE
BACK OF
CURB
SL
O
PE
A
CONCRETE
SIDEWALK
PLAN
H1 SIDEWALK RAMP
SCALE: NTS
R6"R6"
D8 THICKENED EDGE
SCALE: NTS
NOTE:
BASE AND SUBBASE COURSES SHALL
REMAIN THE SAME DEPTH AS THE PAVEMENT
SECTIONS BUT SHALL BE SHAPED TO
INCORPORATE THE THICKENED EDGE.
EXISTING ASPHALT
TACK COAT
SEALANT CONCRETE SLAB,
RE: STRUCTURAL
ASPHALT PATCH
8/ 1/
:3
PM
A.
S
EA
L
A.
Y
AR
N
EL
L
N . L
EA
G
U E
D . C
AV
IN
SI
TE
D
ET
AI
LS
C-501A
AU
G
AU
G
U
ST
AU
G
AU
G U
ST
M
AY
JU
N E
08/01/202324 JUNE 2024
JA
N
U
AR
Y
A9 GATE VALVE AND BOX
SCALE: NTS
LA
KE
H U
R
ST
, N J
FA
D
AU
G
U
ST
JO
IN
T-
BA
SE
M C
G U
IR
E-
D
IX
-L
AK
EH
U
R
ST
, L
AK
EH
U
R
ST
N J
AD
D
IT
IT
VE
L
AB
A
D D
IT
IO
N
FA
D
FI
N
AL
S
U
BM
IT
TA
L
- I
SS
U
ED
F
O R
C O
N
ST
R U
C
TI
O N
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
IN
G
C
EN
TE
R
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Au to de sk
D oc s:
//0
9-
-J
BM
D
L B3
B
2/
-0 3C
-5
.d w g
A1 UTILITY TRENCH SECTION
SCALE: NTS
VARIES MINIMUM WIDTH REQUIRED
FOR SAFE UTILITY
INSTALLATION PER OSHA
REQUIREMENTS
PIPE OD + 12" MINIMUM
TO 24" MAXIMUM
NATIVE BACKFILL MATERIAL
UTILITY MARKING TAPE
OVER CENTERLINE OF
PIPE BELOW
PIPE
OD + 1'
VARIES
INITIAL BACKFILL
CLEAN BEDDING TO 6"
ABOVE TOP OF PIPE
PIPE
6" MINIMUM
CLEAN BEDDING
UNDISTURBED
EARTH
DETECTION WIRE OVER
NON-METALLIC PIPE TYP.
NOTES:
1. COMPACT BACKFILL TO SPECIFICATION
REQUIREMENTS.
2. NEW PAVEMENT THICKNESS SHALL MATCH
OR EXCEED EXISTING CONDITIONS.
3. MAINTAIN A MINIMUM OF 18" VERTICAL
SEPARATION BETWEEN GAS LINE AND
OTHER UTILITIES.
FINISH GRADE
NEW HOT MIX
SURFACE
COURSEEXISTING BITUMINOUS
PAVEMENT TACK COAT
6" MIN.
(TYP.)
EXISTING
UNDERLYING
MATERIAL
PRIME COAT
FLEXIBLE PAVEMENT EXISTING EARTH GRADE
FULL-DEPTH SAW CUT
EXISTING ASPHALT
2"
9"
6"
7"
#4 BAR 20" LONG EACH WAY
12"
WATER
COVER
FINISHED GRADE
CAST IRON COVER
NOTES:
1. SET VALVE AND BOX PLUMB, W/BOX CENTERED ON VALVE.
2. EXTENSION ROD AND 2" OPERATING NUT IS REQUIRED WHERE VALVE IS MORE THAN
2'-6" BELOW GRADE.
CONCRETE COLLAR IN ALL
AREAS
ADJUSTABLE
VALVE BOX
REMOVABLE PLUG
15" SQUARE CONCRETE
SLAB, 6" THICK
FINISH PAVEMENT
DUCTILE
IRON WYE
FLOW
DUCTILE
IRON PIPE
DUCTILE
IRON BEND
PLUG AT
END OF LINE
A15 SINGLE SANITARY CLEANOUT
SCALE: NTS
2"
SEE SPECS
(TYP.)
A.
S
EA
L
A.
Y
AR
N
EL
L
N . L
EA
G
U E
D . C
AV
IN
U
TI
LI
TY
D
ET
AI
LS
C-502A
8/ 1/
:3
PM
OPEN
POST
INDICATOR
NO. 3 BAR ALL AROUND
(WITH 6" OVERLAP)
1'-4" MIN SQ.
CONCRETE BLOCK
FINISHED
GRADE
0"
T O
T O
P 3'
-0
M
IN
F9 POST INDICATOR VALVE (PIV)
SCALE: NTS
FINISHED
GRADE
OPERATING WRENCH,
PADLOCK, AND LOCKING
STAPLE
WATER MAIN
AU
G
AU
G
U
ST
AU
G
AU
G U
ST
M
AY
JU
N E
08/01/202324 JUNE 2024
JA
N
U
AR
Y
POINT TABLE
No.
NORTHING
434,821.08
434,819.02
434,711.60
434,702.07
434,804.34
434,807.51
434,798.58
434,796.56
434,792.85
434,721.04
434,698.38
434,707.03
434,701.85
434,699.15
434,695.58
434,698.28
434,674.90
434,684.27
434,672.33
434,662.96
434,735.23
434,728.08
434,725.39
434,715.41
434,711.55
434,722.69
434,712.89
434,716.75
434,833.00
434,837.49
434,844.64
434,840.15
434,693.42
434,696.93
EASTING
543,828.52
543,827.49
543,796.63
543,815.56
543,856.63
543,858.23
543,875.95
543,872.13
543,870.26
543,777.90
543,822.87
543,827.22
543,797.70
543,803.06
543,801.26
543,795.90
543,829.30
543,834.03
543,857.69
543,852.95
543,771.61
543,768.01
543,773.37
543,783.52
543,791.19
543,778.73
543,791.86
543,784.20
543,780.11
543,771.18
543,774.76
543,783.71
543,776.31
543,769.13
ELEV
89.85
89.93
89.57
89.57
89.93
89.82
89.72
89.87
90.07
89.85
89.65
89.65
89.40
89.40
89.00
89.00
87.00
87.60
87.60
87.00
89.63
89.46
90.00
89.52
89.52
90.00
89.55
89.55
90.23
90.23
90.18
90.18
85.86
85.94
DESC
ASPH M.E.
ASPH
PAD COR
PAD COR
ASPH/CONC
ASPH/CONC
ASPH M.E.
CONC
BLDG COR
BLDG COR
BLDG COR
BLDG COR
PAD COR
PAD COR
PAD COR
PAD COR
PAD COR
PAD COR
PAD COR
PAD COR
PAD COR
PAD COR
WALK
PAD COR
PAD COR
WALK
PAD COR
PAD COR
PAD COR
PAD COR
PAD COR
PAD COR
RAMP M.E.
RAMP M.E.
POINT TABLE
No.
NORTHING
434,701.27
434,698.57
434,703.93
434,707.08
434,720.57
434,715.22
434,717.92
434,723.27
434,728.63
434,733.99
434,731.29
434,725.93
434,716.93
434,721.84
434,713.78
434,719.14
434,708.03
434,698.49
434,819.86
434,849.13
434,847.32
434,818.04
434,806.86
434,808.86
434,803.64
434,808.84
434,805.53
434,810.68
434,807.69
434,796.53
434,680.17
434,695.34
434,688.58
434,673.41
EASTING
543,772.42
543,777.78
543,780.48
543,774.23
543,747.43
543,744.73
543,739.38
543,742.08
543,744.77
543,747.47
543,752.83
543,750.13
543,767.99
543,771.59
543,774.25
543,776.95
543,794.83
543,813.76
543,830.95
543,845.81
543,849.38
543,834.55
543,856.75
543,857.76
543,868.12
543,870.69
543,877.10
543,879.70
543,885.64
543,880.02
543,861.64
543,869.31
543,882.70
543,875.03
ELEV
86.26
86.26
86.26
86.26
88.06
88.06
88.06
88.06
88.48
88.48
88.48
88.48
89.68
89.68
89.68
89.68
89.49
89.49
89.83
90.24
90.21
89.76
89.70
89.71
89.67
89.68
89.71
89.69
89.68
89.75
88.98
89.15
88.92
88.75
DESC
RAMP
RAMP
WALK
WALK
WALK
WALK
WALK
WALK
WALK
WALK
WALK
WALK
WALK
WALK
WALK
WALK
PAD COR
PAD COR
ASPH M.E.
ASPH M.E.
ASPH M.E.
ASPH M.E.
ASPH M.E.
ASPH M.E.
ASPH M.E.
ASPH M.E.
ASPH M.E.
ASPH M.E.
ASPH M.E.
ASPH M.E.
PAD COR
PAD COR
PAD COR
PAD COR
E
CO
W
SAN
W
W W
CO SAN
F F
F F
F F
F F
F F
F F
F F
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
C
E E
E E
E E
ARGON TANK
S
G
BUILDING
ADDITION
EX FF = ±90.15
EX FF = ±90.15
FF = 90.15
C O
N C
R
ETE
BUILDING 332
C O
N C
R
ETE
BUILDING 332T
BUILDING 331
X
X X
X
XXX
X X
X
X
ELECTRIC
CONCRETE
PAD
PLAN
TER
WOODEN RAMP
GV
GV
G G
G
G
G
G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G
G G
G G
G
G
G
G
G
G
G
G
G
G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G
TR
EN
C H
D R
AIN
H O
U G
H
TO
N R
O
AD
AC UNIT
ON RAISED
CONCRETE
AC UNITS
AC UNIT
T
T
GAS METER
EQUIPMENT
FIRE PHONE
FIRE PHONE
FIRE PHONE
FIRE PHONE
4" PVC
15" R
C P
15" RCP
SILL90.14
SILL90.15
SILL90.12
SILL90.18
FF90.16
AC UNIT
COMPENSATED
AIR DISCHARGE
ROOF DRAIN
S S
S S
S S
S S
S S
S S
S S
S S
S S
W W
W W
W W
W W
W W
W W
W W
F F
F F F F F F F F
C C C C C C C
C
C C C C C C C C C C C C
W W
W W
S
S S
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .