Phase 2 - Bldg 331 Renovation - SID.pdf

PDF 3 MB Posted

Attached to
Manufacturing Lab Addition Between B331 B332 and Renovations, Lakehurst Naval Base, Joint Base-MDL, New Jersey
Solicitation number
W912DS25BA004
Issued by

About this file

This document is a Structural Interior Design (SID) Package for the renovation of Building 331 at Joint Base McGuire-Dix-Lakehurst in Lakehurst, New Jersey. The project involves a single-story renovation of an existing facility, with the primary goal of creating a safe, productive, and comfortable environment for manufacturing personnel and administrative staff. The interior design focuses on a warm, analogous color palette with complementary accents to achieve visual continuity and durability.

The renovation includes specific design details for three main areas: the Machine Shop, Compressor Room, and Restroom. For each space, the design specifies epoxy flooring, painted walls (either CMU or gypsum wallboard), and exposed ceilings painted white. The Machine Shop will have painted CMU walls with stainless steel wall base and corner guards, while the Compressor Room and Restroom will have similar finishes with slight variations. The exterior finishes have been selected to be compatible with surrounding facilities, including Hangar 1, which is part of the Lighter Than Air Historic Preservation District. The project is part of a larger expansion of Buildings 331 and 332, with this document specifically addressing the renovation of Building 331.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment W912DS25BA0040007.pdf PDF
Phase 1 - Spec - Amd 0007.pdf PDF
Phase 2 - Plans - Amd 0007.pdf PDF
Phase 3 - Plans - Amd 0007.pdf PDF
Phase 3 - Specs - Amd 0007.pdf PDF
Phase 1 - Plans - Amd 0007.pdf PDF
Phase 2 - Specs - Amd 0007.pdf PDF
Amendment W912DS25BA0040006.pdf PDF
Appendix H - Bldg 332 - Interior Photos.pdf PDF
Amendment W912DS25BA0040005.pdf PDF
Appendix G - Bldg 331 - Interior Photos.pdf PDF
Appendix J - AMRS Meter Specification 2021.pdf PDF
Appendix I - Transformer and Switchboard.pdf PDF
Amendment W912DS25BA0040004.pdf PDF
W912DS25BA0004 Amendment 03.pdf PDF
Amendment 2 - Plans.pdf PDF
Amendment W912DS25BA0040002.pdf PDF
Appendix F - Exterior Site Photos.pdf PDF
Amendment 1 - Spec 01 35 26.pdf PDF
Appendix D - B331-332 Hazmat Survey.pdf PDF
Appendix E - Site Visit Sign-in.pdf PDF
Amendment W912DS25BA0040001.pdf PDF
Phase 2 - Bldg 331 Renovation - Plans.pdf PDF
Phase 1 - Lab Addition - Specifications.pdf PDF
Phase 3 - Bldg 332 Renovation - Plans.pdf PDF
Solicitation - W912DS25BA004.pdf PDF
Phase 1 - Lab Addition - Plans.pdf PDF
Appendix C - Color and Finishes.pdf PDF
Appendix A - MONACO FA.pdf PDF
Phase 3 - Bldg 332 Renovation - SID.pdf PDF
Phase 1 - Lab Addition - Exterior Finish.pdf PDF
Phase 3 - Bldg 332 Renovation - Specifications.pdf PDF
Phase 2 - Bldg 331 Renovation - Specifications.pdf PDF
Phase 1 - Lab Addition - SID.pdf PDF
Appendix B - HVAC.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

601 NE 63rd Street

Oklahoma City, OK 73105

229 Peachtree Street NE

International Tower, Suite 600

Atlanta, GA 30303

Structural Interior Design Package

Final Submittal

January 2025

Building 331/332 Lab Expansion

MSBL 12-4029

Joint Base McGuire/Dix/Lakehurst

Lakehurst, NJ

B331 Renovation

This page intentionally left blank.

Joint Base McGuire-Dix-Lakehurst, Lakehurst, NJ

Structural Interior Design

TABLE OF CONTENTS TAB

SID NARRATIVE 1

INTERIOR FINISH SAMPLES 2

FINISH MATERIALS LIST 3

FLOOR PATTERN PLANS 4

ROOM FINISH SCHEDULE 5

INTERIOR ELEVATIONS 6

MILLWORK SECTIONS 7

SIGNAGE 8

SID Narrative

Section 1

Joint Base McGuire/Dix/Lakehurst, Lakehurst, NJ

1. Design References:

a UFC 3-120-10, Interior Design

2. General Description:

The B331/332 Lab Expansion at Joint Base McGuire/Dix/Lakehurst (JBMDL) will consist of a single-story addition and the renovation of two existing facilities and will be separated into three projects. This document discusses the Structural Interior Design (SID) for the second project, the renovation of B-331.

The addition was constructed in the first project and B-332 will be renovated in the third. The intent of the interior design is to create a safe, productive, and comfortable environment for all manufacturing personnel and administrative staff of the facility.

Exterior finishes have been selected to be compatible with surrounding facilities, including Hangar 1, that are part of the Lighter Than Air Historic Preservation District.

3. SID Narrative:

The Interior color scheme will include a warm, analogous color palette for the background and complementary accents. The goal is to achieve visual continuity and overall cohesiveness with durability, longevity, and flexibility in mind throughout the facility.

a. Machine Shop: Flooring will be epoxy. The walls will be painted CMU and gypsum wall board with a level 4 finish, eggshell paint, and stainless-steel wall base. The ceiling will be exposed to the structure and painted white. Doors and frames will be painted. All exposed gypsum wallboard corners will receive stainless steel corner guards.

b. Compressor: Flooring will be epoxy. The walls will be gypsum wall board with a level 4 finish, eggshell paint, and stainless-steel wall base. The ceiling will be exposed to the structure and painted white.

Doors and frames will be painted

c. Restroom: Flooring will be epoxy. The walls will receive stainless steel wall base only in this project.

All other finishes have been provided in the first project, the construction of the addition. Doors and frames will be painted

TOC
Section 1 - SID Narrative
Section 2 - Interior Finish Samples
Section 3 - Drawings
AF001B - Finish Materials List
AF101B - Floor Pattern Plan
AF601B - Room Finish Schedule
AI201B - Interior Elevations
IG101B - Signage Floor Plan
IG501B - Sign Types
IG601B - Signage Schedule

File details come from the government source that posted it. Updated .