About this file

This document is an HVAC plan drawing (sheet M-101B) for a renovation project at Joint Base Lakehurst, New Jersey, specifically focusing on the B331 building. The detailed technical drawing shows a comprehensive HVAC layout with multiple air handling components, including variable air volume (VAV) units, exhaust fans, and ductwork configurations. The plan indicates specific airflow measurements for different zones, with duct sizes ranging from 6" to 24" in diameter, and includes detailed specifications for ductwork requirements such as galvanized steel construction, insulation types, and pressure ratings for different areas (supply, return, and exhaust). The drawing includes general notes on ductwork materials, insulation standards, and specific installation requirements, such as connecting to existing ducts, using flush-mount brick vents, and providing proper ventilation openings. The document is part of the final submittal issued for construction, dated January 2025, with an amendment noted on 28 May 2025.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment W912DS25BA0040007.pdf PDF
Phase 1 - Spec - Amd 0007.pdf PDF
Phase 3 - Plans - Amd 0007.pdf PDF
Phase 3 - Specs - Amd 0007.pdf PDF
Phase 1 - Plans - Amd 0007.pdf PDF
Phase 2 - Specs - Amd 0007.pdf PDF
Amendment W912DS25BA0040006.pdf PDF
Appendix H - Bldg 332 - Interior Photos.pdf PDF
Amendment W912DS25BA0040005.pdf PDF
Appendix G - Bldg 331 - Interior Photos.pdf PDF
Appendix J - AMRS Meter Specification 2021.pdf PDF
Appendix I - Transformer and Switchboard.pdf PDF
Amendment W912DS25BA0040004.pdf PDF
W912DS25BA0004 Amendment 03.pdf PDF
Amendment 2 - Plans.pdf PDF
Amendment W912DS25BA0040002.pdf PDF
Appendix F - Exterior Site Photos.pdf PDF
Amendment 1 - Spec 01 35 26.pdf PDF
Appendix D - B331-332 Hazmat Survey.pdf PDF
Appendix E - Site Visit Sign-in.pdf PDF
Amendment W912DS25BA0040001.pdf PDF
Phase 2 - Bldg 331 Renovation - Plans.pdf PDF
Phase 1 - Lab Addition - Specifications.pdf PDF
Phase 3 - Bldg 332 Renovation - Plans.pdf PDF
Solicitation - W912DS25BA004.pdf PDF
Phase 1 - Lab Addition - Plans.pdf PDF
Appendix C - Color and Finishes.pdf PDF
Appendix A - MONACO FA.pdf PDF
Phase 2 - Bldg 331 Renovation - SID.pdf PDF
Phase 3 - Bldg 332 Renovation - SID.pdf PDF
Phase 1 - Lab Addition - Exterior Finish.pdf PDF
Phase 3 - Bldg 332 Renovation - Specifications.pdf PDF
Phase 2 - Bldg 331 Renovation - Specifications.pdf PDF
Phase 1 - Lab Addition - SID.pdf PDF
Appendix B - HVAC.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SD-3

100 CFM

VAV-11

VAV-10

VAV-9

SD-3

85 CFM

SD-3

90 CFM

(TYP. 2)

T

T

T

B331-EF-1

"ø

E A

"ø

O A

"ø

O A

"ø

S A

"ø

S A

8"ø SA

8"ø SA

10"ø OA

12"ø SA

"ø

R A

12"ø RA

"ø

R A

"ø

S A

"ø

R A

"ø

O A

"ø

O A

"ø

O A

14"ø SA

A

B

C

D

E

F B331

EF-2

COMPRESSOR

ROOM

T

"ø

S A

SD-4

190 CFM

(TYP. 7)

RD-2

400 CFM

SD-5

225 CFM

(TYP. 4)

RD-2

430 CFM

(TYP. 3)

SD-4

230 CFM

TYP. 8

SD-3

190 CFM

(TYP. 2)

RD-1

430 CFM

(TYP. 8)

331-LV-02

SD-3

100 CFM

SHEET ID

A

IR

F O

R C

E C

IV

IL

E N

G

IN

E E

R

IN

G C

E N

T E

R

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

R

B R

E N

O V

A T

IO

N

A u to d e s k D o c s

/0 -0

-J

B M

D L B

B

/0

-0

-J

B M

D L -B

B

L a b E x p a n s io n M

.r v t

/2

/2

:1

:5

P

M

M-101B

H V

A C

P L A

N

J B

M D

L L a k e h u rs t, N

J D

H

E R

N A

N D

E Z

M T

A Y

L O

R

J S

O L A

N O

J A

N U

A R

Y

F

IN

A L

S U

B M

IT

T

A L

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

-0

D C

A V

IN

1/8" = 1'-0"B10

HVAC PLAN

GENERAL NOTES

SHEET KEYNOTES

1. REFER TO M-001B FOR MECHANICAL ABBREVIATION AND

NOTES.

2. DUCTWORK REQUIREMENTS

ROUND AND RECTANGULAR (SUPPLY AND RETURN)

EXPOSED - OCCUPIED AREAS - DOUBLE WALL G90 INNER AND

OUTER, INTERSTITIAL SPACE WITH 1" FIBERGLASS , 0.75 PCF.

MAXIMUM PRESSURE = 6 (IN WC) SEAL CLASS A

ROUND AND RECTANGULAR (SUPPLY AND RETURN)

CONCEALED- OCCUPIED AREAS - G90 GALVANIZED STEEL,

WITH 2" FIBERGLASS DUCT WRAP, 3.0 PCF.

MAXIMUM PRESSURE = 6 (IN WC) SEAL CLASS A

EXHAUST - ROUND AND RECTANGULAR

G90 GALVANIZED STEEL. NO INSULATION.

MAXIMUM PRESSURE = NEGATIVE 2 (IN WC) SEAL CLASS B

1. CONNECT TO EXISTING DUCT IN EXISTING ADDITIVE LAB.

2. UTILIZE FLUSH MOUNT BRICK VENT. TERMINATE AT MIN 10' - 0"

ABOVE ADJACENT GRADE/SIDEWALK.

3. PROVIDE DOOR WITH 3/4" UNDERCUT FOR EXHAUST FAN

VENTILATION. REFER TO ARCHITECTURE DRAWINGS FOR

MORE INFORMATION.

0 4' 8' 16'

PLAN NORTH

EPO

EPO

A

M M

E N

D M

E N

T

M

A Y

Sheets
M-101A - HVAC PLAN
M-101B - HVAC PLAN
M-101C - HVAC PLAN
M-301A - HVAC SECTIONS
M-601A - HVAC SCHEDULES
P-101A - PLUMBING PLAN

File details come from the government source that posted it. Updated .