Amendment 0004.pdf

PDF 592 KB Posted

Attached to
Repair Power Building 4016 (J-Plant) - BMEWS & HEMP Shielding
Solicitation number
W912DS24R0004
Issued by

About this file

This document is an amendment to a solicitation for repair work at Building 4016 at the BMEWS site in Pituffik, Greenland. The amendment provides revisions to drawings and specifications, with no drawings or specifications sections added, deleted, or reissued. It answers four questions from offerors, clarifying that subcontractor bonding is determined between prime and sub, all hazardous waste except asbestos and C&D must be shipped off-island for disposal, there are no fees for on-site storage or shipping but disposal fees apply, and temporary generators may be expected to run for around 250 hours per year on average. The related opportunity is for repair of power systems at Building 4016 to support BMEWS and HEMP shielding, solicited by the Army Corps of Engineers New York District, with no further pricing, award date, or incumbent information included.

View the file

Other files

File Type Posted
W912DS24R0004 0010.pdf PDF
W912DS24R0004 0009.pdf PDF
W912DS24R0004 0008.pdf PDF
W912DS24R0004 0007.pdf PDF
W912DS24R0004 0006.pdf PDF
B.08.03 Amendment 05.pdf PDF
Amendment 0003 - Pituffik SB J-Plant Reno and HEMP - Plans.docx.pdf PDF
Amendment 0003 - Pituffik SB J-Plant Reno and HEMP - Specifications.pdf PDF
Amendment 0003.pdf PDF
Appendix R - Site Photos (J-Plant) - Addendum.pdf PDF
Non-Disclosure Agreement KTR.pdf PDF
Appendix I - Asbestos Management Plan.pdf PDF
Appendix G - Wastewater Slug Prevention Plan.pdf PDF
Appendix C - Hazardous Material Management Program (IHMP).pdf PDF
Package 1 - J-Plant and HEMP - Plans (Redacted)(1).pdf PDF
Appendix Q - Additional As-Build Drawings (J-Plant).pdf PDF
Appendix J - Overseas Hazardous Waste Management Plan.pdf PDF
Appendix F - Storm Water Pollution Prevention Plan.pdf PDF
Appendix R - Site Photos (J-Plant).pdf PDF
Amendment 0002.pdf PDF
Appendix D - Spill Prevention and Response Plan.pdf PDF
Appendix H - Overseas INCRMP.pdf PDF
Appendix P - Pest Management Plan.pdf PDF
Appendix O - Paser Goose Instructions.pdf PDF
W912DS24R0004 0001.pdf PDF
Appendix N - DBAWaiver-Greenland.pdf PDF
Package 4 - J-Plant and HEMP - Appendices (A thru M).pdf PDF
Package 2 - J-Plant and HEMP - Specifications.pdf PDF
Package 3 - J-Plant and HEMP - CID_FFE-1.pdf PDF
Package 5 - J-Plant and HEMP - JA (1 thru 5).pdf PDF
W912DS24R0004.pdf PDF
Package 1 - J-Plant and HEMP - Plans (Redacted).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DS24R0004

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Please see the continuation page for the purpose of this amendment.

NOTE: Offerors must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Dec-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS24R0004

X 9B. DATED (SEE ITEM 11)

20-Oct-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Dec-2023

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

AMENDMENT 0004 to DRAWINGS and SPECIFICATIONS for Repair BMEWS Power, Bldg 4016, Pituffik SB, GL.

TO OFFERORS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

- None

3. The following DRAWINGS have been ADDED:

- None

4. The following DRAWINGS have been DELETED:

- None

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- None

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

- None

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

- None

PROPOSER’S QUESTIONS AND GOVERNMENT REPLY

Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.

1. With reference to Amendment no.3 (Q/A: 1): P&P bonds. Is it correct understood, that your response clarifying no flow down to subcontractor of these bonds, is only for the contract between US Government and Prime - Bonds required for the subcontract between Prime and Subcontractor, is a matter between Prime and Subcontractor?

RESPONSE: The payment bond is used to protect the subcontractor if there are any payment issues between the Prime and subcontractor. The performance bond is between the US Government and the Prime only. Any other bonding will be determined between the Prime and subcontractor and not with the US Government.

2. With reference to Amendment no.3 (Q/A: 19): Hazardous waste. Your response clarifying that all hazardous waste (except asbestos and C&D) is required to be shipped off island and turned into DLA. Please clarify which type of cost offeror shall include within the bid for on-site storage, sea transport to US, handling/disposal fee at DLA…?

RESPONSE: There will not be any fees for storage on site while awaiting shipment off island. When using the PACER GOOSE shipper there would not be any fees for delivery to Norfolk, VA, there would be fees for trucking and disposal of the materials from Norfolk VA to proper disposal site.

3. With reference to document: W912DS24R0004 “Solicitation, offer and Award” – Evaluation Factors Section III –

5.2.1 “Submission requirements” & 5.2.2 “Evaluation Criteria”. (a) 5.2.1: Shall the offeror within the schedule show considered USACE’s review period for submitted materials etc. for approval before procurement or just describe included period within the narrative? (b) 5.2.2: Strength of the schedule is evaluation criteria. Shall offeror include a specific period for USACE’s review period as 1x30 days alternative 2x30 days…or? Allowing sufficient time for reviewing & processing submitted materials etc.

RESPONSE: (a) Please include USACE review period in the schedule. (b) Please include a 30-day review period in the schedule.

4. There are costs associated with the number of hours temporary generators may run. To ensure an appropriate quote, please provide an estimate of hours per year an offeror should assume the J-Plant temporary generators will run as a backup source to M-Plant.

RESPONSE: The temporary generators at J-Plant are to be used as main power source for 12SWS whenever the main base powerplant experiences problems or other issues arise. It is not possible to predict the number of hours or times the temporary generators would need to run, aside from routine testing of the generators, they need to be ready at moment’s notice. Per plans and specifications, temporary generators need to be rated for continual operation. Based on the historical information we’ve seen temporary power runtime of about 250hr per year.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .