This amendment modifies an existing federal solicitation for maintenance dredging services. The solicitation seeks dredging of approximately 125,000 cubic yards of material from the Arthur Kill 50-foot Reach of the New York and New Jersey Harbor Federal Navigation Project. The amendment revises the plans and specifications, provides a new quality control system section, and replaces the bid schedule. Bidders must acknowledge the amendment by the date specified. The dredged material will be processed and transported to contractor-furnished upland placement sites permitted by the state. The apparent low bidder must submit permit and approval evidence within 35 days of notification. Bids are due in June 2023, with award anticipated in June/July and work from August to October. Liquidated damages of $2,540 per day will be assessed for delays.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise the original plans and technical specifications and replace them in their entirety, to reflect concentrating w ork efforts on a recently prioritized area of shoaling and its respective quantity of material.
2. Section 01 45 00.10 10 Quality Control System (QCS) of the technical specifications has been replaced w ith Section 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM).
3. Provide a revised Bid Schedule.
NOTE: Bidders must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the following methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below. FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS23B0004
X 9B. DATED (SEE ITEM 11)
07-Apr-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-May-2023
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
AMENDMENT 0005
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Mobilization and Demobilization
FFP
FOB: Destination
PSC CD: Y1KZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 108,450 Cubic
Yard Basic Work - Dredging Area 1
FFP
Dredging (to -50 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheet 3-6 of 6 of the contract drawings). Removal of material (108,450 CY) except ledge rock lying above the plane of 50 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Arthur Kill 50-foot Reach, NY & NJ Harbor, Federal Navigation Project with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s).
ESTIMATED QUANTITIES.
FOB: Destination
PSC CD: Y1KZ
NET AMT
W912DS23B0004
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Job
Black Box Monitoring Unit
FFP
See specifications section 35 20 29.
FOB: Destination
PSC CD: Y1KZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 24,010 Cubic
Yard OPTION Option 1 - Extension 0-20ft.
FFP
Dredging (to -50 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheets 3-6 of 6 of the contract drawings). Removal of material (24,010 CY) except ledge rock lying above the plane of 50 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Arthur Kill 50-foot Reach, NY & NJ Harbor, Federal Navigation Project with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s).
ESTIMATED QUANTITIES.
FOB: Destination
PSC CD: Y1KZ
NET AMT
W912DS23B0004
0005 12,580 Cubic
Yard OPTION Option 2 - Extension 20-30ft.
FFP
Dredging (to -50 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheets 3-6 of 6 of the contract drawings). Removal of material (12,580 CY) except ledge rock lying above the plane of 50 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Arthur Kill 50-foot Reach, NY & NJ Harbor, Federal Navigation Project with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s).
ESTIMATED QUANTITIES.
FOB: Destination
PSC CD: Y1KZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006 12,935 Cubic
Yard OPTION Option 3 - Extension 30-40ft.
FFP
Dredging (to -50 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheets 3-6 of 6 of the contract drawings). Removal of material (12,935 CY) except ledge rock lying above the plane of 50 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Arthur Kill 50-foot Reach, NY & NJ Harbor, Federal Navigation Project with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s).
ESTIMATED QUANTITIES.
FOB: Destination
PSC CD: Y1KZ
NET AMT
W912DS23B0004
0007 13,205 Cubic
Yard OPTION Option 4 - Extension 40-50ft.
FFP
Dredging (to -50 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheets 3-6 of 6 of the contract drawings). Removal of material (13,205 CY) except ledge rock lying above the plane of 50 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Arthur Kill 50-foot Reach, NY & NJ Harbor, Federal Navigation Project with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s).
ESTIMATED QUANTITIES.
FOB: Destination
PSC CD: Y1KZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0008 4,320 Cubic
Yard OPTION Option 5 - H.H. Bend
FFP
Dredging (to -50 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheets 3-6 of 6 of the contract drawings). Removal of material (4,320 CY) except ledge rock lying above the plane of 50 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Arthur Kill 50-foot Reach, NY & NJ Harbor, Federal Navigation Project with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s).
ESTIMATED QUANTITIES.
FOB: Destination
PSC CD: Y1KZ
NET AMT
W912DS23B0004
NOTES TO BIDDERS:
TOTAL BASE BID (CLINs 0001 thru 0003)
TOTAL OPTIONAL BID (CLINs 0004 thru 0008)
TOTAL BID (CLINs 0001 thru 0008) __________________________
NOTE 01:
NOTE 02:
NOTE 03:
NOTE 04:
NOTE 05:
NOTE 06:
NOTE 07:
NOTE 08:
NOTE 09:
Bidders must bid on all items. Failure to bid on all work will be cause for rejection of the bid as nonresponsive.
Award of contract will be based on the responsible and responsive bidder with the lowest total price for the total of the CLINs 0001 through 0008.
The unit prices for CLINs 0002, 0004, 0005, 0006, 0007, and 0008 represent the cost per cubic yard for the removal of the estimated quantities of dredged material (all material except ledge rock lying above the planes of -50 feet mean lower low water (MLLW), plus 1 foot allowable overdepth), in the Basic Work and Option areas of Arthur Kill. The dredged material from CLINs 0002, 0004, 0005, 0006, 0007, and 0008 must subsequently be transported, processed, and placed at a contractor furnished, state permitted, Government approved upland placement site(s).
All bidders are hereby advised that the execution of Options is subject to the availability of funds.
Execution of an Option is at the discretion of the Government. If exercised, Option(s) 1 through 4 (CLINS 0004, 0005, 0006 and 0007) must be awarded in numerical order and can be exercised within five (5) calendar days of receipt by the contractor of the Notice to Proceed. If exercised, Option 5 (CLIN 0008) can be awarded independent of Options 1 through 4 (CLINS 0004, 0005, 0006 and 0007) and can be exercised within thirty-six (36) calendar days of receipt by the contractor of the Notice to Proceed.
If an option(s) is exercised, its performance period will be consecutive to that of the Basic Work. If exercised, the time for contract completion of the option(s) will be based on the rate of one (1) additional calendar day for each 2,500 cubic yards in the option(s).
Options 1 through 4 (CLINS 0004, 0005, 0006, and 0007) represent the stated additional and incremental extension of the dredging area from the Basic Work limit line or preceeding option limit line as shown on the contract drawings. Estimated quantities for CLINS 0004, 0005, 0006, and 0007 account for the removal of slope material from the preceeding option(s) or Basic Work area.
All bidders are hereby advised that the estimated dredge quantities for placement in the price schedule are estimated and based on the survey data collected on 17, 21-22 November 2022.
The Government may reject a bid as non–responsive if the prices bid are materially unbalanced between line items and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low bid.
W912DS23B0004
NOTE 10: Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself may render the proposal non-responsive and may be cause for its rejection.
NOTE 11: The apparent low bidder shall submit the documents specified in Section 01 30 00, Administrative Requirements, paragraph 1.4, Contractor-Identified Offloading, Processing and Disposal Site Compliance.
If the apparent low bidder does not submit the required information within 35 calendar days from the date the apparent low bidder is notified of being the low bidder, the bidder may be considered non-responsible and his bid will no longer be considered. Information provided by the apparent low bidder regarding the 35 day submittal will be the final version. If the apparent low bidder requests to make changes to the 35 day submittal, they can only be made with approval from the Government.
NOTE 12:
NOTE 13:
It is the contractor’s responsibility to comply with all conditions and requirements of the contractor furnished placement site(s).
All bidders are hereby advised that the contractor is to complete the entire work ready for use, not later than 56 calendar days after the date the Contractor receives the notice to proceed. Should any option(s) be exercised, an additional one (1) calendar day for each 2,500 cubic yards to be removed under the option(s) will be allowed. The time stated for completion shall include final cleanup of the premises.
W912DS23B0004
SECTION 00 10 00 - SOLICITATION
The contractor period of performance end date has increased by 13 days from 43 days to 56 days.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 56 calendar days from the notice to proceed.
(End of clause)
(End of Summary of Changes)