W912DS23B0004 - Amendment 0002.pdf
PDF 384 KB Posted
- Attached to
- Maintenance Dredging of New York and New Jersey Harbor – Arthur Kill 50’ Reach, Federal Navigation Project
- Solicitation number
- W912DS23B0004
About this file
This document provides details on a proposed federal contract opportunity for maintenance dredging services. The U.S. Army Corps of Engineers, New York District, is soliciting bids to remove approximately 125,000 cubic yards of sediment from the Arthur Kill 50-foot navigation channel to a depth of 50 feet below mean lower low water plus one foot of allowable overdepth. The dredged material, consisting primarily of silt and clay, must be transported from the dredging site to a contractor-provided upland placement site permitted by the state. Bidders must be able to commence work within five calendar days of notice to proceed and maintain a production rate of at least 2,500 cubic yards per day for dredging, transporting, dewatering, and disposing of material. The contract, valued between $10-25 million, will be awarded in June/July 2023 with work expected to occur from August through October 2023. Liquidated damages of $2,540 per day will be assessed for delays in completion.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Respond to bidder inquiries for informational purposes only.
2. Provide the follow ing reports as an attachment: Arthur Kill 50-foot Channel Upland Final Report Tables (PDF, Excel) and AK50 ASI Upland Report.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Apr-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS23B0004
X 9B. DATED (SEE ITEM 11)
07-Apr-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Apr-2023
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS23B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SECTION 00 10 00 - SOLICITATION
AMENDMENT 0002
SUMMARY OF CHANGES
QUESTIONS AND GOVERNMENT REPLY:
(Questions that may be of general interest to all bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the bidders “For Information Only” and do not revise the solicitation, plans or specifications.)
Question 1:
Thank you for uploading the data for the project. Is there by chance an Excel file which summarizes these data sets as is usually provided?
The files you provided contain instrument backup, etc. All of these sets will be needed for an approval. I have attached an example from the Arthur Kill South project performed in 2021. This format summarizes all the information in the 9,000 plus pages in a readily readable report. Upland projects need both the files you have provided and the summary for the placement sites to review. The one attached is in a PDF, however, these summaries are frequently provided in an Excel format with all the columns as the example indicates.
Have you had any success locating the summary report?
The summary report is produced by the laboratory for every USACE project. This document should be in the set of reports Batelle provided. If you contact Carrie Gamber, she can direct you to it or resend it via email. This will not be a large file.
Government Response:
Please see attached report in multiple formats.
Question 2:
Can you please confirm if you require the CD-ROM containing the full Bid Documents as stated in the specifications?
Government Response:
It is not required, but preferred.
(End of Summary of Changes)