W912DS21R0003 Amendment 00006.pdf

PDF 695 KB Posted

Attached to
Cullum Hall Repair Building 605
Solicitation number
W912DS21R0003
Issued by

About this file

This amendment modifies solicitation W912DS21R0003 for repair work at Cullum Hall Building 605 at West Point. The solicitation is for a firm fixed price construction contract to be awarded by the US Army Corps of Engineers, New York District.

The amendment provides responses to bidder questions to clarify the scope of work. It revises several drawings and specifications sections to address wire mesh partitions, plumbing diagrams, and HVAC notes. Pricing is required for a base bid along with optional items including stone cleaning. The response deadline remains unchanged, and award will be based on the printed solicitation documents as amended herein.

View the file

Other files

File Type Posted
W912DS21R0003 Amendment 00009.pdf PDF
W912DS21R0003 Amendment 00008.pdf PDF
W912DS21R0003 Amendment 00007.pdf PDF
CULLUM_Amendment 7_Drawings Combined.pdf PDF
CULLUM_Amendment 7_Specifications Combined.pdf PDF
CULLUM_Amendment 6_Specs Combined.pdf PDF
CULLUM_Amendment 6_Drawings Combined.pdf PDF
W912DS21R0003 Amendment 00005.pdf PDF
Cullum Hall Site Visit Sign In Roster 20APR2021.pdf PDF
Cullum Site Visit Sign In Roster 4 May 2021.pdf PDF
W912DS21R0003 Amendment 00004.pdf PDF
Amendment 3_Cullum_C-502.pdf PDF
Amendment 3 Demolition Sheets.pdf PDF
Amendment 3 _ Cullum H-1B2_HAZMAT_PLAN_BASEMENT_LEVEL_2.pdf PDF
W912DS21R0003 Amendment 00003.pdf PDF
CULLUM_Amendment 3_Specifications Combined.pdf PDF
CULLUM_Amendment 3_Drawings Combined.pdf PDF
W912DS21R0003 Amendment 00002.pdf PDF
CULLUM_Amendment 1_Drawings Combined.pdf PDF
W912DS21R0003 Amendment 00001.pdf PDF
CULLUM_Amendment 1_Specifications Combined.pdf PDF
CULLUM RTA SPECS - VOLUME 1.pdf PDF
CULLUM RTA DRAWINGS - VOLUME 1.pdf PDF
CULLUM RTA DRAWINGS - VOLUME 3.pdf PDF
CULLUM RTA DRAWINGS - VOLUME 2.pdf PDF
CULLUM RTA SPECS - VOLUME 2.pdf PDF
JA -Milford Granite.pdf PDF
JA -E Shark 200 Meters.pdf PDF
JA-Distributed Antenna System C Squared systems.pdf PDF
JA- Hirsch Card Access system.pdf PDF
W912DS21R0003.pdf PDF
JA -Monaco Cullum.pdf PDF
JA -Best Hardware Lock Cylinders and Cores.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DS21R0003

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Answ er questions to prospective bidders for informational purposes only.

Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS21R0003

X 9B. DATED (SEE ITEM 11)

13-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-May-2021

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0006

Cullum Hall Building 605 Renovation USMA West Point, New York

Amendment 0006

AMENDMENT 0006 for

Cullum Hall Building 605 Renovation for West Point W912DS21R0003.

TO BIDDERS:

The following changes shall be made to the drawings and specifications. NOTE the drawings are labeled amendment 5 but actually are associated with this amendment.

DRAWINGS:

1. The following DRAWINGS have been REVISED and REISSUED:

Drawing No. A-109.1 -. Clarified Wire Mesh with a note.

Drawing No. A-109.2 - Clarified Wire Mesh with a note.

Drawing No. A-418 - Revised note about deteriorated plaster around windows in the Ballroom.

Drawing No. I-100.B1 - Epoxy Flooring has been changed to EF4 and clarified note 12 that the other interior finishes for this space are to be provided by the Environmental Room Manufacturer per their available standards as noted in Keynote #12.

Drawing No. P-10B2 - A 2” vent that runs from Sewage Ejector pump and pit at Level B3 and ties into the building vent system was added to the plan and diagram.

Drawing No. P-10B3 - Adjusted the lines for the 5” RWC and the 6” RWC to align.

Drawing No. P-701 - A 2” vent that runs from Sewage Ejector pump and pit at Level B3 and ties into the building vent system was added to the plan and diagram.

Drawing No. E-602 - Per discussion with USACE Note 2 was revised to remove the notation of an "add alt" for the diffusers for Type C fixtures.

2. The following DRAWINGS have been REVISED but NOT REISSUED:

a. None

3. The following DRAWINGS have been ADDED:

4. The following DRAWINGS have been DELETED:

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

02 83 00 – WIRE MESH PARTITIONS

Paragraph 1.3 – Second paragraph describing buildings 1500, 1600 and 1612 was removed.

10 22 13 – WIRE MESH PARTITIONS

Paragraph 2.5.4 – Finish was changed to hot-dipped galvanized.

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

OFFEROR’S QUESTIONS AND GOVERNMENT REPLY

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation. This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents. Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted in the FBO.

1. Q. "Per Specification 08 01 52 Part 3 3.1 ""Perform a complete evaluation survey of the existing conditions of each wood window being preserved to determine the extent of repairs necessary. The evaluation survey may be in the form of a survey data must be incorporated into the window schedule submitted with the Window Repair Plan"". With any restoration that is shown above and beyond in the plans, please include an additional allowance of any items that may become incorporated into the project contract for the Wood Window repair after an evaluation survey has been completed."

A. It is not our intention to include a bidding allowance (line item) for any needed repair materials for the wood windows; any such cost to be covered in the bid. Majority of the wood windows were repaired in 2006.

2. Q. Drawing: P-10B2 vent piping is not shown at S/1, S/2 risers or SP-2 ejector pump on the plan drawing.

Will vent piping be required at these locations?

A. A 2" vent shall be run from Sewage Ejector pump and pit at Level B3 and shall tie into the building vent system. This vent pipe will be added to plan and diagram and reissued.

3. Q. Pump discharge is shown on Basement (B3) level on riser P-701. Pump discharge from SP-2 ejector pump is shown on Basement (B2) level (plan drawing). Please clarify.

A. There is only 1 Sewage Ejector to be installed in facility and it will be installed in the floor of Level B3.

Drainage is collected from level B3. Waste is pumped up the main sanitary line located at ceiling of Level B2. At ceiling of Level B2 drainage will flow via pitched gravity line and tie into main sanitary drain. SP-2 shown on Level B-2 is BIM model visibility issue that will be corrected. Only the pumped discharge piping comes up in this space which turns into a 4" gravity line at ceiling of Level B2. References to SP-2 and SP-2 control panel will be removed from Level B2 drawings.

4. Q. For bidding purposes how much Flat Arch Repair should be included? Since this is an unknown could an allowance be provided for this work?

A. This repair shall apply to 2300 sqft of clay tile arch floor construction repair in base bid. Also provide a unit cost predicated on detail C7/S-504 - for up to 4' wide and 4' in length.

5. Q. During Bradley Barracks renovation it was identified that the Rack Mount Access Control controllers have been discontinued. please confirm that the Wall Mount solution will be acceptable for this project there will be a wall space required of 96" wide by 48" high. along with additional power requirements relocated from the rack to the wall.

A. A wall-mount solution is acceptable. There is sufficient space on the west wall (upper wall on enlarged plans, sheet T-401) of telecom room CH-B116 to accommodate relocated ACS headend equipment and power supplies.

6. Q. Is the gutter demolition price to be included in both base bid and Option #1? Please clarify, it's indicted in both on 2/AD-140 and 2/AD-140.A to be removed.

A. Pricing for Option #1 is in addition to base bid. Pricing for gutter demolition should not be included in pricing for Option #1 as it is already included in the base bid.

7. Q. In the plumbing drawings, it indicates the use of Copper for 4" Rain Water Conductor (RWC). In the specification it indicates other various pipe types to use for Interior RW. Please advise.

A. Provide copper rainwater leaders and copper drains as indicated on the drawings. See Plumbing plans and Architectural Roof Plan A-145.

8. Q. Please provide specification and requirements for the single channel surface mounted metal raceway system indicated by Drawing Note 2 on Sheet EP-102.

A.

See note 2 on EP-102.

PROVIDE NEW SINGLE CHANNEL SURFACE MOUNTED

METAL RACEWAY SYSTEM WITH 20A, 120V RECEPTACLES,

SPACED 6'-0" ON CENTER. RACEWAY MUST MATCH LENGTH

OF DASHED LINES AS INDICATED ON DRAWINGS. RACEWAY

MUST BE MOUNTED JUST ABOVE MOLDING SIMILAR TO

EXISTING INSTALLATION. RACEWAY MUST BE PAINTED TO

MATCH SURROUNDING FINISHES. UTILIZE EXISTING

OPENINGS THROUGH ADJACENT HOLLOW COLUMNS TO

CONNECT RACEWAYS FOR MINIMIAL IMPACT TO EXISTING

HISTORIC SURROUND. PROVIDE ALL END CAPS,

CONNECTORS, ECT. AS REQUIRED FOR A COMPLETE

INSTALLATION.

9. Q. Please provide mounting height for surface mounted raceways indicated on Drawing Note 1 one Sheet

EP-102.

A. Please see General Note 9 on this sheet, which references Drawing A-005 for criteria on running utilities in historic spaces. Heights will vary, and must be coordinated by the contractor to run along existing moldings, door frames, etc. to create the least impact to the existing historic surround. Coordination drawings will be required to show proposed plan and elevation views of all routing for approval prior to installation. Please see referenced drawing A-005 in addition to Drawing Note 1, Sheet EP-102, for full requirements. Please note similar criteria applies to all areas in historic zones.

10. Q. Per the Exterior Door Schedule, Door Type B and C calls out to receive glass, but elevation does not show glass lite. Please confirm Door Type B and C do not receive ATFP Glass.

A. As the door elevations and photos on A-600 clearly show, Upper panels on Door Type B and C are glass and are to receive ATFP Glass.

11. Q. Please confirm American Water will provide all necessary testing of the domestic water, fire water, and sanitary systems installed.

A. American Water will perform all testing.

12. Q. Please confirm American Water will perform excavation (including rock) and backfill of all installed utilities.

A. American Water will excavate and backfill the utilities that are not associated with any other contractor site excavation.

13. Q. Please confirm if fees for utility installed by American Water are part of this contract.

A. Do not understand what fees you are referring to. The Govt will contract direct with AW.

14. Q. Please provide an allowance for damaged brick pavers that are to be salvaged and reused. Considering the age of the materials and scope of work it is likely some replacement will be required.

A. Pavers should not be damaged during salvage because they are set loose and can simply be lifted out.

Pavers were new in 2006. We are actually covering a slightly smaller area than existing with pavers due to the introduction of the perimeter trench drains. Existing supply of pavers is adequate.

15. Q. The Geotechnical report suggests no underpinning of existing structure will be required. If required, please confirm this will be paid additional work.

A. Based on the geotechnical investigation the contract documents describe a foundation system bearing on bedrock. In the event the contractor determines through field investigations and construction activities that the actual conditions differ from the contract documents they must bring their findings to the attention of USACE's contracting officer and representative for guidance and direction.

16. Q. Please confirm American Water will provide any ashpalt patching required for their work.

A. The new pipes will be installed within an area that is to be repaved by the site contractor. American Water will backfill up to the existing pavement elevation. The contractor will provide final pavement over the pipe.

17. Q. Please confirm the contractor is expected to restore the parking lot offered for laydown at the soccer field.

A. If there is damage to the pavement, curbing, or adjacent facilities, the contractor must restore the damage to the original existing conditions and the restoration must be approved by the COR. It is recommended that the contractor take photos or video of the area prior to mobilization of trailers, fencing, and equipment to the area.

18. Q. Please provide inverts and profile drawings of all proposed utilities, including telecom and electrical.

A. The utility information, as shown on the contract documents, is the most current information available.

The contractor must verify existing utility location, size, invert, and depth with test pits and/or GPR prior to excavation.

19. Q. Please confirm no option items are considered within the quantity of 1,034 CY of rock removal.

A. That quantity does not apply to the bid options.

20. Q. Please indicate which if any of the option items require additional rock removal. Should this cost be included with the option item or would the government apply the provided unit cost for rock removal as paid additional work.

A. In the event that rock is discovered that should be brought to the attention of the contracting officer and the representative and the unit cost removal shall apply.

21. Q. On all plumbing drawings from basement level 3 to roof indicates 4" – 5" RWC Risers to be copper. In the spec section it shows options of the use of Copper, steel, Cast and PVC. Can you please confirm that we have the option to use materials indicated in specs and that the drawings do not supersede the specs, please advise?

A. Provide copper rainwater leaders and copper drains as indicated on the drawings. See Plumbing plans and Architectural Roof Plan A-145.

22. Q. Basement Archive Air Barrier notes indicate Ceiling Air Barrier to be "Paint". Is it the intent to paint the entire above finish ceiling for a continuous air barrier? Please clarify

A: Yes, paint the underside of the structural slab above to achieve a continuous air barrier for extents shown on the plans.

23. Q. Please confirm if there is a current warranty on the wood windows. If there is, please confirm Manufacturer/Installer who holds the warranty.

A. The windows do not have a warranty.

24. NOT USED

25. Q. Please clarify the scope of work for intumescent fireproofing shown on Drawing A-004 - Intumescent Paint Floor Plans. The Intumescent Legend indicates which columns are scheduled to receive intumescent fireproofing, however, the Intumescent Paint Exposed Structural Steel Legend references "STRUCTURAL FRAME, INCLUDING COLUMNS". What structural framing is scheduled to receive intumescent fireproofing other than the columns indicated on the Intumescent Paint Floor Plans?

A. The only intumescent painted steel are the columns identified on A004.

26. Q. Please provide a sketch for the "Class of 1964 Plaque" per note 14. Font type, size, etc.

A. CD101 - The existing plaque is to be removed, protected, and salvaged for the Government. The plaque is then to be re-installed in the same location by the contractor at the end of construction.

27. Q. 1. Can PVC in lieu of copper piping be used for storm system piping? 2. Can CPVC in lieu of copper piping be used for domestic water piping?

A. 1. Facility requires installation of copper piping for domestic water, hot cold and hot return services. 2.

Copper is to be installed for storm water drainage piping..

28. Q. Please clarify the extent of masonry cleaning in base bid vs. Add Alternate No. 2 under masonry cleaning notes. It's our interpretation that the base bid is only to include cleaning shown by the shaded "Geneiss Masonry Cleaning" areas. Then Add Alternate No. 2 is to clean the entire building. Please verify.

A. Masonry cleaning and repairs are indicated in the drawings and specifications for each of the two types of stone on the building, the Milford Granite located mostly (but not entirely) on the upper two levels, and the Gneiss, located on the lower levels. 100% of the Milford Granite is to be cleaned as part of base bid. Areas of the Gneiss as indicated on the elevations are also to be cleaned as part of the base bid. Add Alternate No. 2 is to clean all of the additional area (100%) of the Gneiss.

29. Q. Masonry repointing & repair note 1 indicated to repoint 100% of masonry then note 2 indicates to repoint in areas indicated. Please clarify.

A. Masonry cleaning and repairs are indicated in the drawings and specifications for each of the two types of stone on the building, the Milford Granite located mostly (but not entirely) on the upper two levels, and the Gneiss, located on the lower levels. Areas of Milford Granite to be repaired and repointed are as indicated on the elevations. 100% repointing of the Gneiss is included in the base bid.

30. Q. Elevation note indicates to replace damaged lead caps in parapet. Please provide requirements for new lead caps.

A. Lead T caps are to be replaced in-kind; the material and profile is indicated in the masonry specifications.

31. Q. Various notes throughout the drawings indicate to clean and wax existing bronze items. Please provide method and product requirements of cleaning and waxing these items. Due to a lot of these items being aged, proper cleaning and waxing need to be confirmed.

A. Only drawing A-415 of the Vestibule indicates cleaning and waxing of the existing bronze items. The other drawings of the interior spaces call for the bronze items to be protected during work. Cleaning and waxing products are included in specification 05 72 00 Decorative Metal Specialties--2.1.5 Cleaning Materials for Bronze and 2.1.7 Bronze Protective Coating and Patination Products. Cleaning procedures can be found in section 3.4.2 Cleaning and Coating..

32. Q. On sheet M004 - under "HVAC LOGISTICS NOTES AND REQUIREMENTS", it says in Point 4:

" 4. TEMPORARY CHILLED WATER SERVICE (BY OTHERS) MUST BE SUPPLIED TO CULLUM HALL

WHEN NEW CHILLED WATER SYSTEM WITHIN THE BUILDING IS READY TO BE FILLED AND

TESTED. THE

TEMPORARY CHILLED WATER SERVICE MUST BE MAINTAINED UNTIL THE CENTRAL CHILLER

PLANT (B604) SITE DISTRIBUTION IS EXTENDED TO CULLUM HALL UNDER A SEPARATE PROJECT.

TEMPORARY CHILLED WATER SERVICE MUST INCLUDE (FOR INFORMATION ONLY)."

As per the above statement, we understand that the contractor is not responsible for supplying the temporary chilled water system but he/she is responsible for maintaining it. If out understanding is incorrect, please correct it. Please also provide information if contractor is responsible for fill and test of the new chilled water system. Thanks for your time and advice.

A. The operation and maintenance of the temporary chiller is not the responsibility of the Cullum Hall Construction Contractor. It is the responsibility of the organization that is providing the temporary chiller equipment, outside of the scope of the Cullum Hall construction contractor, to operate and maintain the temporary chiller equipment and system.

33. Q. Please confirm that all work shown on ES-102 is to be performed by City Light and Power (CLP). If this is not the case, please provide a specific scope that we will be responsible for.

A. With the exception of the items specifically called out as by contractor, work on sheet ES-102 is to be performed by CLP and was provided for reference.

34. Q. D-120 indicates to "DEMO STAGE FRAMING AND FLOORING. SEE STRUCTURAL AND

MECHANICAL DRAWINGS FOR EXTENTS. SALVAGE FLOORING AND SUBFLOORING FOR

REINSTALLATION". This directive appears to encompass the decorative proscenium arch around the front of the stage. However, the same proscenium profile can be viewed on A-120. Please indicated if the arch is intended to be demolished. And if not, indicate if/how the damage to the arch's decorative plaster and paint is meant to be repaired.

A. No, the "DEMO STAGE FRAMING AND FLOORING" note does not include the decorative proscenium arch around the front of the stage. The full extent of the flooring demolition should be limited to the area identified on AD120.

35. Q. Insulated Floors in the Environmental Rooms: The specification calls for insulated floor panels in the chamber. Drawing A-550 also depicts flooring in the chamber. But it shows a 2" floor in the vestibule into a 4" floor near the low wall shown. Drawing I-502 shows some detail for the recessed concrete for the high density shelving.

Questions:

A. Is only part of the chamber to get an insulated floor? If so, where does the insulated floor end? Please show some details if that is the intent. The Rails for the high density shelving cannot be imbedded in the insulated floor.

B. Would a 2" insulated floor be acceptable for the chamber? A 2" floor would work in a 35F and 35% environment.

C. Can the whole environmental room floor be insulated just as its shown near the high density shelving?

Please clarify and provide additional details of how this should be accomplished.

Answers:

A. The entire floor is insulated. The rails for the high density shelving can be imbedded in the 4" insulated floor. See detail E1/I-502.

B - The temperature and humidity criteria listed in the specification must be maintained. The specifics of the panel thickness, equipment, etc is the responsibility of the environmental room manufacturer.

C- The documents show 4" insulated floor at the main environment room, and 2" insulated floor at the entrance to the vestibule. There is a ramp in the vestibule from the 2" floor thickness to the 4" floor thickness. These thicknesses must be confirmed by the environment room manufacturer.

The environment room configuration (panel thickness, equipment, etc.) are based on discussions with multiple manufacturers and represent a generic approach to room design. At the vestibule the floor is only 2" at the entrance ramp because of space limitations, however since this area is not used for long term material storage this approach was an acceptable solution in this small room. The contractor must confirm the panel thicknesses, design assumptions and necessary equipment to achieve the temperature and humidity criteria listed in the specification for the main environmental room.

36. Q. Due to the lack of overhead space above the environmental room chamber, all of the refrigeration and wiring conduit would have to be mounted to the ceiling of the chamber. Is this going to be acceptable? Please advise.

A. Yes, it is understood that all refrigeration, wiring, devices and lighting will be surface mounted within environmental room. All surface mounted elements should be coordinated with the furniture shown in the interiors drawings.

37. Q. Spec Section 13 21 00 Part 2.3.C says to use fluorescent lighting. Is LED lighting acceptable?

A. Yes, LED lighting is acceptable.

38. Q. Spec for environmental room calls for electrical outlets but none are shown on the drawings. Please confirm no outlets are needed.

A. Electrical convenience outlets should be provided. They should meet the electrical code for number, spacing and installed mounting height. Coordinate the final locations with the environmental room construction and the furniture plans.

39. Q. Spec calls for two different types of humidification and the drawing depict it also. However, at 35F and 35% no additive humidity is required. Please advise why humidifiers are specified..

A. The humidifiers listed in specification section 13 21 00 (by the manufacturer) can be omitted. The HVAC system delivering ventilation air to cold storage is equipped with both a humidifier and de-humidifier.

40. Q. In Spec Section 13 21 00 Part 2.3.F, 3 options of floor covering are listed. Also, drawing I-100.B1 & I- 502 shows epoxy flooring being installed. Please clarify what flooring finish is required? Is the environmental room manufacturer required to install this flooring?

A. Finish flooring contractor should install the epoxy flooring in the environmental room per the specified flooring noted on the Finish Schedule or equivalent. Contractor to coordinate work with installation of motorized High Density Storage with recessed rails.

41. Q. Ballroom elevations on sheet A-418 reference keynote 5: "repaint element to match the original faux-scagliola finish." Please provide an image of what the original faux scagliola finish is to be matched. Alternatively, allow submittal of samples of best practice scagliola consistent with the original intent.

A. The intent for the painted faux-scagliola is to match the real scagliola on the caryatid bases at the south entrance to the ballroom. Finish Schedule under Finish Code (XW6) identifies the locations of that finish work on the Interior Finish Location plan Sheet I-102.

42. Q. Ballroom elevation A1 on sheet A-417 indicates "patch scagliola." However, in the same areas, keynote 6 denotes "replace incompatible patches in marble with new material to match surrounding." Please confirm if this material is marble or scagliola.

A. The material of the caryatid bases at the south end of the Ballroom is scagliola, not marble.

43. Q. Please confirm all metal plaques and cannons are to be protected in place; no bronze cleaning or refinishing of anything outside of the vestibule.

A. Confirmed. With the exception of the bronze in the vestibule, no cleaning or refinishing of the bronze plaques or cannon throughout the building is in scope. However, any dust or construction debris that may accumulate on these materials during the course of the work must be removed.

44. Q. Can the East side Restoration work (Granite Cornice /Chimneys) be access from the road below with a manlift? If so does that road have to remain open to traffic? Can the Terrace/Brick Paver walkway support a manlift/scaffolding to access cornice work around the perimeter of the building.

A. It is the contractor's responsibility to determine the means and methods to perform the work and its impact on the existing structure. However, it is possible to access the east cornice & chimneys with a lift from the road. The contractor must confirm/coordinate with the USACE contracting officer any isolated temporary road closures on the East side of Cullum.

45. Q. Plans indicate an off-sized catch basin of 32"x46". Please clarify if 30"x48" standard size pre-cast catch basins can be utilized.

A. A 30" x 48" standard size pre-cast catch basin is acceptable provided the structure can accommodate the required curb piece.

46. Q. Drawing P-10B3 Top right corner between columns EW1 – EW2 indicates 5" RWC above floor is dead ended by the 5" tee picking up 5" copper Riser to above floor. Does this pipe tie into the 6" RWC that is runs along the hallway ceiling? Please advise

A. A 2" vent shall be run from Sewage Ejector pump and pit at Level B3 and shall tie into the building vent system. This vent pipe will be added to plan and diagram.

47. Q. I-100.B1 shows flooring EF1 in room CH-B108. EF1 is not defined on the flooring page of the finish schedule (I-001). Please provide a definition for EF-1. Additionally, this is the only finish provided for room CH-B108. Please provide completed finish schedule for this room.

A. Epoxy Flooring has been changed to EF4. (Epoxy floor finish EF1 is defined on the Finish Schedule I-001 for Bid - Add Alternate #4 below the General Notes). The other interior finishes for this space are to be provided by the Environmental Room Manufacturer per their available standards as noted in Keynote #12. See the revised dwg attached.

48. NOT USED

49. Q. Solicitation page 38, item 7.4 Tab D, and page 39, item 7.5 Tab E, are listed as "Required Pre-award Information". These items are not listed on page 25 which itemizes each deliverable--organized by volume and tab--offerors are required to submit for the May 28, 2021 submission. Please confirm Tabs D and E are NOT required to be submitted with the May 28, 2021 submission.

A. Page 25 deliverables are to be included in your proposal. Page 38 preaward deliverables are to be submitted by the successful offeror.

50. Q. Can you publish the sign in sheets for both site visits?

A. Posted with amendment 4.

51. Q. Please confirm Specification Volume 2 Appendix 2 titled Hazard Mitigation Plan is complete.

It appears to end the report mid-sentence.

A. Volume 2 Appendix 2 is complete. All Hazardous Materials must be handled and disposed.

52. Q. Please clarify which buildings are being referenced in Spec. Section 02 83 00 1.3 when mentioning building 1500, 1600 & 1612.

A. Text:Section 02 83 00 1.3 buildings 1500, 1600 & 1612 are not to be part of the spec. See updated spec 02 83 00 attached.

53. Q. Spec. Vol. 2 Appendix 2 mentions a Final Project Definition Report (May 2019). Would it be possible to obtain a copy of this report?

A. Vol 2 Appendix 3: Asbestos Containing Materials Survey Report is the HazMat information taken from the referenced PDR (May 2019). The full PDR will not be issued and is not required for bidding.

54. Q. What is the voltage and wattage of the existing marquee perimeter accent lighting?

A. The exact wattage of the existing marquee perimeter lights are unknown; however, they are low voltage fixtures served from a small load panel with (6) 20 A circuits and a 1,000 KVA, single phase 120/240V

– 12/24V transformer.

55. Q. The work described in note 2 for Historic Luminaire Type C says it is an add alternate but there is no corresponding CLIN on the bid form. Should this work be included in the base bid??

A. See updated EL-602 note 2. Work is part of base bid.

56. Q. Does West Point have any preferred, certified, or specific security vendors that work on campus or are permitted to perform the security work on campus? We are receiving feedback from the sub market that many security companies are not certified with the security system in the specifications. Are there any security contractors West Point has worked with in the past that we can be made aware of?

A. Private security is not required by the Contractor.

57. Q. The Government reply for question 11 states to reference the FF&E Specification Package that has been issued separately from the drawing set. This cannot be located on the previous issued documents or amendments. Please reissue FF&E Specification Package.

A. The full FFE package will not be issued. The plans include FFE drawings for information only.

58. Q. Please confirm if an additional site visit would be possible for additional subcontractors to walk the site to become more familiar with the existing conditions A. Another site visit is not currently planned.

59. Q. On drawing A-550, in the Environmental Room, low walls are shown, what is the purpose of this low wall? Please advise

A. The wall is there to delineate an area to park storage carts and to remove a tripping hazard when storage carts are not there. Carts will be stored there while the material on the carts acclimates to the environment conditions in the vestibule.

60. Q. In Spec Section 13 21 00 Part 2.3.F, 3 options of floor covering are listed. Also, drawing I-

100.B1 & I-502 shows epoxy flooring being installed. Please clarify what flooring finish is required? Is the environmental room manufacturer required to install this flooring?

A. Finish flooring contractor should install the epoxy flooring in the environmental room per the specified flooring noted on the Finish Schedule or equivalent. Contractor to coordinate work with installation of motorized High Density Storage with recessed rails.

61. Q. Furniture schedule indicates furnish and installed responsibilities however the Summary of

Shelving Storage does not. Please provide required furnish and installation of these shelving storage units.

A. The schedule on Sheet I-120.1 "Summary of Shelving Storage Capacity" including existing items being reused, is only created to show an estimated tally of cubic feet of available storage for the Archives Dept planning, this is not additional furniture items. All furniture is itemized on the adjacent "Furniture Schedule (GFGI) and Furniture Schedule (CFCI)".

62. Q. Ballroom elevations on sheet A-418 reference keynote 5: "repaint element to match the original faux-scagliola finish." Please provide an image of what the original faux scagliola finish is to be matched.

Alternatively, allow submittal of samples of best practice scagliola consistent with the original intent.

A. The intent for the painted faux-scagliola is to match the real scagliola on the caryatid bases at the south entrance to the ballroom. Finish Schedule under Finish Code (XW6) identifies the locations of that finish work on the Interior Finish Location plan Sheet I-102.

(End of Summary of Changes)