This file relates to a federal solicitation for repair work on Building 605 at Cullum Hall. The solicitation number is W912DS21R0003 and was issued by the Department of the Army Corps of Engineers Engineering District New York. The solicitation seeks bids for repair and renovation of Cullum Hall and includes combined drawings to illustrate the scope of work. Specific repairs and renovations required include structural, electrical, and HVAC work. The response due date is not provided in the file.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 0
A M
E N
D M
E N
T
R T
A
S
U B
M I S
S I O
N
J K
D P
K M
G E
N E
R A
L
N
O T
E S
C I V
I L
C-001
CIVIL/SITE CONSTRUCTION GENERAL NOTES:
1. THESE PLANS REFERENCE LOCATION AND TOPOGRAPHIC SURVEY PREPARED BY:
NAME: MJ ENGINEERING AND LAND SURVEYING, P.C.
1533 CRESCENT ROAD
CLIFTON PARK, NY 12065
PHONE: (518) 371-0799
DATED: 01/16/2020
HORIZONTAL DATUM: NORTH AMERICAN DATUM 1983 (NAD83) PROJECTED ON THE NEW YORK STATE PLANE COORDINATE SYSTEM (EAST ZONE)
VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM 1988 (NAVD 88)
REFERENCE CONTROL POINT IS CONTINUOUSLY OPERATING REFERENCE STATION (CORS) NEWBURGH CORS ARP (NYNB)
2. PROVIDE IMPROVEMENTS IN ACCORDANCE WITH UNIFIED FACILITIES GUIDE SPECIFICATIONS LATEST EDITION, WITH AMENDMENTS THERETO AND AS SPECIFIED IN THESE CONTRACT
DRAWINGS AND APPENDICES.
3. PRIOR TO ANY CONSTRUCTION, PROVIDE A PHASING PLAN INCLUSIVE OF A WRITTEN SEQUENCE OF CONSTRUCTION AND PLANS SHOWING PHASED WORK AREAS, STOCKPILE AREAS, WORKER PARKING AREAS, TRAILER LOCATION, MATERIAL STORAGE AREAS, MAINTAINED SITE ENTRANCE LOCATION, PORTABLE SANITARY STATIONS, HAUL ROUTES AND ALL OTHER
NECESSARY CONTRACTOR CONSTRUCTION AREAS. ALL MATERIAL STORAGE AND CONTRACTOR OPERATIONS MUST BE LOCATED WITHIN THE LIMIT OF DISTURBANCE IDENTIFIED ON THE
PLANS. SUBMIT PHASING PLAN TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL. CONTRACTOR MUST FOLLOW THE HAUL ROUTE AS DEPICTED ON SHEET CS102 "TRUCK
ACCESS PLAN".
4. PROVIDE PROPER AND SUFFICIENT CONSTRUCTION PROTECTION TO THE WORKERS AND ALL PERSONNEL ONSITE. OSHA EM 385-1-1, AND OTHER FEDERAL, STATE, AND LOCAL CODES
MUST BE FOLLOWED.
5. WORK AND MATERIAL MUST MEET THE STANDARD DOCUMENTS AND PROCEDURES FOR USMA, INCLUDING REQUIREMENTS OF THE UNITED FACILITIES CRITERIA (UFC), ENGINEERING
PLANNING STANDARDS FOR WEST POINT, WEST POINT INSTALLATION DESIGN GUIDE, LOCAL, STATE, AND FEDERAL LAWS, STATUTES, RULES, AND REGULATIONS, LATEST EDITION.
6. PERFORM WORK IN A SAFE AND CAUTIOUS MANNER IN ACCORDANCE WITH EM 385-1-1.
7. QUANTITIES SHOWN HEREIN ARE APPROXIMATE AND FOR GENERAL INFORMATION ONLY. VERIFY ALL QUANTITIES AND PROVIDE SUPERINTENDENCE, MATERIAL, LABOR, SURVEYING, AND
COORDINATION NECESSARY TO CONSTRUCT THE PROJECT COMPLETE AND AS GENERALLY INTENDED IN THE CONTRACT DOCUMENTS. CONTRACTOR MUST PROVIDE COORDINATION WITH
CONTRACTING OFFICER, USMA AUTHORITIES, AND UTILITIES FOR ALL INTERFACING REQUIRED BY THE PROJECT.
8. AT NO COST TO THE GOVERNMENT, DISTURBED AREAS OUTSIDE THE LIMIT OF DISTURBANCE, MUST BE RESTORED TO EXISTING CONDITIONS .
9. IMPLEMENT AND MAINTAIN ALL SOIL EROSION CONTROL STRUCTURES AND MEASURES THROUGHOUT CONSTRUCTION. FOLLOW NYSDEC SOIL EROSION AND SEDIMENT
CONTROL REQUIREMENTS.A SEQUENCE OF CONSTRUCTION MUST BE SUBMITTED TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL..
10. IN CASE OF DISCREPANCIES BETWEEN THESE PLANS AND THE PROJECT SPECIFICATIONS, THE MORE STRINGENT REQUIREMENT MUST APPLY.
11. SUBMISSIONS REQUIRED FOR DOCUMENTATION OF CONFORMANCE TO THE CONTRACT PLANS, DOCUMENTS, AND SPECIFICATIONS MUST BE PROVIDED TO THE
CONTRACTING OFFICER FOR DISTRIBUTION TO THE APPROPRIATE REVIEWER.
12. INGRESS AND EGRESS TO AND FROM THE CONSTRUCTION SITE MUST BE KEPT READILY ACCESSIBLE AND UNOBSTRUCTED AT ALL TIMES. CONSTRUCTION EQUIPMENT MUST NOT
OBSTRUCT ROADWAYS AND/OR PASSAGEWAYS UNLESS PRE-APPROVAL IS REQUESTED FROM THE COR 14 DAYS PRIOR TO NEED (FOR ITS SUBMISSION TO USMA AN DPW). NO PARKING OR
STOPPING ALONG INGRESS-EGRESS ROUTE WILL BE PERMITTED.
13. MAINTAIN THE CONSTRUCTION SITE AND THE AREAS OF WORK DAILY. CONSTRUCTION DEBRIS MUST BE REMOVED FROM THE CONSTRUCTION SITE ON A DAILY BASIS. NO BURNING OF
DEBRIS OR USE OF EXPLOSIVES WILL BE PERMITTED.
14. PREPARE, LAYOUT, AND INSTALL WORK IN SUCH A MANNER AS NOT TO DELAY OR INTERFERE WITH THE PROGRESS OF OTHER INSTALLATION CONTRACT WORK AND/OR ANY
WORK DESIGNATED TO BE PERFORMED UNDER ANY OTHER CONTRACT ON THE INSTALLATION AND/OR ANY OTHER WORK IN PROGRESS ON THE INSTALLATION.
15. PROVIDE ALL TESTING SERVICES AND SUBMIT, TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL. PROVIDE A LIST OF ALL TESTS TO BE PERFORMED BY EACH TESTING
SERVICE.
16. QUALITY CONTROL INSPECTION AND TESTING MUST BE MADE BY A USACE-APPROVED LABORATORY UNDER CONTRACT TO THE CONTRACTOR. COPIES OF REPORTS AND TESTING
RESULTS ASSOCIATED WITH THE CONTRACTOR'S QUALITY CONTROL PROGRAM MUST BE SUBMITTED TO THE CONTRACTING OFFICER.
17. ILLUMINATE AND PROTECT ALL ELEMENTS COMPLETED OR PARTIALLY COMPLETED AND EXCAVATED TRENCHES AND OPENINGS AT ALL TIMES TO PROTECT AGAINST INJURY TO WORKERS, PEDESTRIANS, WILDLIFE, ETC.
18. DO NOT SCALE DRAWINGS. DETAILS, NOTES, AND THE LIKE ARE TYPICAL AND APPLY IN GENERAL TO SIMILAR CONDITIONS.
19. BY SUBMITTING A PROPOSAL OR AGREEMENT TO PERFORM WORK, THE CONTRACTOR AGREES THAT THEY ARE SKILLED AND EXPERIENCED IN THE USE AND INTERPRETATION
OF PLANS AND SPECIFICATIONS, THEY HAVE CAREFULLY REVIEWED THE PLANS AND SPECIFICATIONS FOR THIS PROJECT AND HAVE FOUND THEM TO BE FREE OF
AMBIGUITIES AND SUFFICIENT FOR BID AND CONSTRUCTION PURPOSES. FURTHER, THEY HAVE CAREFULLY EXAMINED THE SITE OF THE WORK AND FROM THEIR OWN
OBSERVATIONS ARE SATISFIED AS TO THE NATURE AND LOCATION OF THE WORK; THE CHARACTER, QUALITY, AND QUANTITY OF MATERIALS; THE DIFFICULTIES LIKELY TO
BE ENCOUNTERED, AND OTHER ITEMS WHICH MAY AFFECT THE PERFORMANCE OF WORK OTHERWISE, COMPLY WITH NYSDEC AND NYSDOT REQUIREMENTS.
20. WORK MUST BE SCHEDULED AND FULLY COORDINATED IN ADVANCE OF PERFORMANCE WITH THE CONTRACTING OFFICER.
21. ALL CURB/EDGE OF PAVEMENT RADII ARE MINIMUM 3' UNLESS OTHERWISE NOTED.
22. PROVIDE MAINTENANCE OF TRAFFIC PLANS AND TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH THE LATEST MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
REQUIREMENTS. COORDINATE WITH THE CONTRACTING OFFICER.
23. THE CONTRACTOR MUST FOLLOW ALL LIFE SAFETY MEASURES APPLICABLE TO THE PROJECT. FIRETRUCK ACCESS TO CULLUM HALL AND THE SURROUNDING BUILDINGS MUST BE
MAINTAINED AT ALL TIMES. THE CONTRACTOR MUST NOTIFY WEST POINT FIRE DEPARTMENT AND DPW 14-DAYS PRIOR TO ANY ACTIVITY THAT PREVENTS FIRE TRUCK ACCESS TO THE
PROJECT AREA.
24. STRICTLY OBSERVE POLICE AND FIRE PREVENTION CODES AND REGULATIONS AT ALL TIMES.
25. THE CONTRACTOR MUST MAINTAIN OPEN TWO-WAY TRAFFIC ROUTES ALONG CULLUM ROAD FOR VEHICLES AT ALL TIMES. THE CONTRACTOR MUST SUBMIT A TRAFFIC SAFETY PLAN OR
ROADWAY CLOSURE PLAN TO WEST POINT DPW FOR APPROVAL, 14-DAYS PRIOR TO ANY LANE OR ROADWAY CLOSURE.
26. THE CONTRACTOR MUST DESIGNATE A VEHICLE TIRE WASH AREA AND COORDINATE THE LOCATION WITH THE CONTRACTING OFFICER. ALL CONSTRUCTION VEHICLES MUST BE WASHED
PRIOR TO LEAVING THE PROJECT SITE. THE WASH AREA MUST BE SWEPT CLEAN DAILY AND ACCEPTED BY THE CONTRACTING OFFICER.
27. CLEANING/WASHOUT OF CONCRETE DELIVERY VEHICLES MUST BE LIMITED TO CLEANING THE CHUTES WITH AS LITTLE WATER AS POSSIBLE. THE WATER MUST BE DISCHARGED INTO ONE
OF THE FOLLOWING:
FOR CONCRETE DELIVERIES EXCEEDING 30 CY OVER A 1 WEEK PERIOD:
1. PROVIDE A PORTABLE, SELF-CONTAINED AND WATERTIGHT ROLL-OFF METAL BIN/CONTAINER THAT IS DELIVERED AND COLLECTED BY A FIRM THAT SPECIALIZES IN CONCRETE
WASHOUT CONTAINERS AND RECYCLING.
FOR PERIODIC CONCRETE DELIVERIES LESS THAN 30 CY OVER A 1 WEEK PERIOD THE FOLLOWING WASH-OUT CONTAINER IS ACCEPTABLE:
1. A HEAVY-DUTY, WOVEN POLYPROPYLENE OUTER BAG WITH 6-MM CORRUGATED PLASTIC INNER WALLS OR A 6-MM POLYETHYLENE LINER.
2. A WATER RESISTANT CORRUGATED BOX AND A 6-MM POLY LINER.
3. A REINFORCED PVC, UV AND WEATHER RESISTANT FORMED STRUCTURE.
THE WASHOUT STRUCTURE SHALL BE STURDY ENOUGH FOR PICK-UP AND REMOVAL ONCE THE CONCRETE HAS HARDENED. IT SHALL BE PLACED AND SECURED IN A LEVEL AREA AWAY
FROM ANY STORM DRAINS AND WATERCOURSES. ONCE THE CONCRETE HAS HARDENED, ANY REMAINING WATER SHALL BE PUMPED FROM THE WASHOUT AND DISPOSED OF AT A
FACILITY PERMITTED TO RECEIVE LIQUID WASTE. THE SOLID CONCRETE RESIDUE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH LOCAL REGULATIONS.
UNDER NO CIRCUMSTANCES SHALL THE DRUM OF THE TRUCK BE EMPTIED OF EXCESS CONCRETE AND/OR WASHED-OUT ON SITE. SIMILAR PROCEDURES SHALL BE ADHERED TO FOR
WASHOUT OF PORTABLE CEMENT AND CONCRETE MIXERS.
SUBMIT SHOP DRAWINGS OF THE PROPOSED WASHOUT CONTAINER AND LOCATION FOR APPROVAL PRIOR TO ANY CONCRETE DELIVERY.
GRADING NOTES:
1. THE GEOTECHNICAL INVESTIGATION REPORT PREPARED FOR THIS PROJECT IS INCLUDED IN THE PROJECT SPECIFICATIONS AND MUST BE REVIEWED THOROUGHLY PRIOR TO BID
SUBMISSION / CONSTRUCTION. REFER TO GEOTECHNICAL REPORT FOR CLASSIFICATION OF SUBGRADE MATERIALS.
2. DESIGN TEMPORARY CONSTRUCTION STRUCTURES SUCH AS SHEETING & SHORING FOR EXCAVATIONS. PROVIDE DESIGN CALCULATIONS AND DRAWINGS SHOWING LOCATION, EXTENT, AND CONSTRUCTION DETAILS OF SAID TEMPORARY STRUCTURES AND SUPPORTS PROPOSED. DOCUMENTS MUST BE PREPARED AND SEALED BY A NYS LICENSED PROFESSIONAL
ENGINEER. CONTRACTOR MUST SUBMIT A TASK SPECIFIC EXCAVATION AND SHORING PLAN TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL PRIOR TO ANY SITE EXCAVATION.
3. MAXIMUM SLOPE OF RESTORED AREAS MUST BE 3:1 UNLESS OTHERWISE NOTED. ALL EXPOSED EXCAVATIONS MUST BE STABILIZED IN ACCORDANCE WITH NEW YORK STATE STANDARDS
AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL (BLUE BOOK), LATEST EDITION.
4. ALL SUBBASE AND SUBBASES MATERIAL MUST BE PLACED AND COMPACTED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. PROVIDE CERTIFICATION BY A PROFESSIONAL
GEOTECHNICAL ENGINEER LICENSED IN THE STATE OF NEW YORK THAT ALL SUBGRADE, FILL, AND SUBBASE BELOW AND AGAINST IMPROVEMENTS INCLUDING FOUNDATIONS, PAVEMENT, BELOW GRADE STRUCTURES, SIDEWALKS, WALLS, AND OTHER PROJECT COMPONENTS HAVE BEEN COMPACTED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
5. NOTIFY THE CONTRACTING OFFICER OF ANY SUBGRADES NOT MEETING THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS. PROVIDE THE CONTRACTING OFFICER WITH
RECOMMENDATIONS FOR REMOVAL LIMITS.
6. ALL IMPORTED FILL MATERIAL MUST BE OBTAINED FROM AN APPROVED OFF-POST BORROW AREA. ALL EXCAVATED MATERIAL FROM THE PROJECT SITE MUST BE DISPOSED OFF-POST AS
WASTE. REFER TO THE PROJECT SPECIFICATIONS FOR SATISFACTORY MATERIAL REQUIREMENTS.
7. BORROW OR SELECT FILL MUST BE SELECT GRANULAR FILL PURCHASED FROM AN APPROVED SAND AND GRAVEL COMPANY AND BROUGHT TO THE CULLUM HALL SITE. THE SAND AND
GRAVEL COMPANY MUST SUBMIT A CERTIFICATE OF COMPLIANCE WITH CONTRACT SPECIFICATIONS. CONTRACTOR MUST SUBMIT DOCUMENTATION THAT BORROW/SELECT FILL COMPLY
WITH THE CONTRACT DOCUMENTS, FEDERAL, STATE AND LOCAL REQUIREMENTS. CONTRACTOR MUST SUBMIT BORROW SITE AND TESTING DATA PER THE PROJECT SPECIFICATIONS.
8. THE BOTTOM OF ALL EXCAVATIONS OR FOUNDATIONS MUST BE SCARFIED TO A MINIMUM DEPTH OF 6" AND COMPACT AS INDICATED WITHIN THE CONTRACT DOCUMENTS.
9. ALL EXCAVATED MATERIAL MUST BE HAULED OFF-SITE AND DISPOSED OF IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS.
10. PROPOSED SPOT ELEVATIONS AND CONTOURS SHOWN ARE FINISHED GRADE UNLESS OTHERWISE NOTED.
11. ALL EXISTING GRADES MUST BE VERIFIED PRIOR TO CONSTRUCTION.
12. PROVIDE GRADE SHEETS TO THE CONTRACTING OFFICER FOR REVIEW PRIOR TO PAVEMENT/CURBING/SIDEWALK INSTALLATION.
13. THE MAXIMUM GRADE WITHIN ACCESSIBLE PARKING STALLS/ACCESS AISLES MUST BE 2.0%.
14. ACCESSIBLE ACCESS WAYS AND IMPROVEMENTS MUST BE IN ACCORDANCE WITH FEDERAL REQUIREMENTS.
DEMOLITION NOTES:
1. BEFORE THE EXECUTION OF WORK, FOLLOW THE USMA DPW DIG SAFE GUIDELINES WITHIN AND OBTAIN A PROJECT DIG SAFE PERMIT FOR UTILITIES
ON/ADJACENT TO THE SITE. CONTACT " DIG SAFELY NY" AT 811 PRIOR TO CONSTRUCTION. NOTIFY NYS ONE-CALL AND ALL LOCAL UTILITY
COMPANIES/PURVEYORS OWNING OR HAVING JURISDICTION CONCERNING UTILITIES.
2. THE INTENT OF THE DEMOLITION SHOWN ON THE DRAWINGS IS TO GENERALLY OUTLINE THE TYPES OF MATERIALS TO BE REMOVED AND THE LIMITS OF THE
REMOVALS. THE QUANTITY OF ITEMS TO BE REMOVED WITHIN THE LIMIT OF DEMOLITION MAY VARY FROM THOSE DEPICTED ON THE PLANS. THE INTENT AND
REQUIREMENT IS FOR THE CONTRACTOR TO REMOVE THE EXISTING VEGETATION AND IMPROVEMENTS AND REGRADE AS REQUIRED TO CONSTRUCT THE
PROPOSED DEVELOPMENT. ALL MEANS AND METHODS INCLUDING SAFETY REQUIREMENTS ARE THE RESPONSIBILITY OF THE CONTRACTOR.
3. SURFACE AND SUBGRADE DISTURBANCE BELOW THE PAVEMENT DGA MUST NOT EXCEED 0.99 AC. WITHIN THE PROJECT LIMIT OF DISTURBANCE. CONTRACTOR
MUST NOTIFY CONTRACTING OFFICER IF THE DISTURBANCE THRESHOLD WILL BE EXCEEDED PRIOR TO ANY EXCAVATION.
4. REMOVE SIGNS, STRUCTURES, FENCES, AND EXISTING IMPROVEMENTS FROM THE CONSTRUCTION SITE AS REQUIRED. THE SITE MUST BE LEFT IN AN ORDERLY
AND NEAT CONDITION.
5. REMOVE/RELOCATE EXISTING UTILITY SERVICES, WHERE SHOWN ON PLANS AND UNCOVERED BY DEMOLITION, CONSISTENT WITH THE DRAWINGS AND TO THE
EXTENT AND MANNER SATISFACTORY TO THE CONTRACTING OFFICER AND UTILITY COMPANIES INVOLVED.
6. PIPES, CULVERTS, ETC. WITHIN AND NEAR THE AREA OF WORK MUST BE KEPT FREE FROM MATERIAL ENTERING THE DRAINAGE SYSTEMS DURING
CONSTRUCTION. UPON COMPLETION OF CONSTRUCTION, REMOVE ALL ACCUMULATED SEDIMENT. DISPOSE OF ALL UNSUITABLE OR EXCESS EXCAVATED
MATERIALS OFF OF GOVERNMENT PROPERTY.
7. EXERCISE CARE TO PREVENT DAMAGE TO AND PROTECT ANY MATERIALS OR STRUCTURES THAT ARE TO REMAIN IN PLACE. TAKE ALL NECESSARY PRECAUTIONS
IN EXCAVATING AND HAND EXCAVATE AS DEEMED NECESSARY TO PROTECT SUBSURFACE UTILITIES. DAMAGE TO ANY EXISTING UTILITY RESULTING FROM THE
CONTRACTOR’S OPERATIONS MUST BE IMMEDIATELY REPAIRED IN A MANNER AS APPROVED BY THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE
GOVERNMENT. IF THE CONTRACTING OFFICER DEEMS IT IS NECESSARY, THE CONTRACTING OFFICER CAN REQUIRE REPAIR OPERATIONS TO BE PERFORMED
CONTINUOUSLY UNTIL WORKS ARE ACCEPTABLE TO THE CONTRACTING OFFICER AND AT NO ADDITIONAL COST TO THE GOVERNMENT.
8. DESIGN TEMPORARY CLOSURES, BARRICADES, RAILINGS, AND TEMPORARY PROTECTION USED TO PROTECT THE WORK, AND PERSONNEL IN ACCORDANCE WITH
EM 385, CHAPTER 23. IF REQUESTED, PROVIDE DRAWINGS INDICATING THE LOCATIONS, EXTENT, AND CONSTRUCTION DETAILS OF SAME. ALL TEMPORARY
CONSTRUCTION STRUCTURES MUST BE DESIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF NEW YORK.
9. PROTECT ALL AREAS OUTSIDE THE LIMIT OF DISTURBANCE WHICH ARE ADJACENT TO CONSTRUCTION ACTIVITY. ALL AREAS OUTSIDE THE LIMIT OF DISTURBANCE
WHICH ARE DAMAGED BY THE CONTRACTOR, MUST BE RESTORED TO THEIR ORIGINAL CONDITION AND THAT OF THE SURROUNDING AREA. THE RESTORATION
MUST BE DONE AT NO ADDITIONAL COST TO THE GOVERNMENT AND MUST BE APPROVED BY CONTRACTING OFFICER.
10. HAUL EXCAVATED SOIL, DEMOLISHED MATERIAL, RUBBISH AND DEBRIS OFF-SITE AND OFF INSTALLATION EXCEPT ITEMS DIRECTED BY THE CONTRACTING
OFFICER TO BE SALVAGED. DEMOLISHED MATERIAL TO BE MANAGED ACCORDING TO THE PROJECT ENVIRONMENTAL CONTROLS SPECIFICATIONS. ITEMS FROM
THE SITE MUST BE LEGALLY DISPOSED OF WITHOUT DISRUPTING VEHICULAR OR PEDESTRIAN FLOW.
11. RE-USE/PROCESSING OF ASPHALT/CONCRETE WILL NOT BE ALLOWED ON SITE.
12. PREVENT CONTAMINATED WATER, GASOLINE, OR ANY OTHER CONTAMINANTS FROM ENTERING THE PROJECT AREAS. FOLLOW REQUIREMENTS FOR SPILL
RESPONSE.
13. MANAGEMENT OF WASTES GENERATED FROM THIS PROJECT AS WELL AS UNKNOWN CONTAMINATION IS ADDRESSED IN THE CONTRACT DOCUMENTS.
14. CONTROL DUST BY PERIODICALLY SPRAYING WORK AREA WITH WATER, PER NYS STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL, LATEST EDITION.
15. EXISTING INLETS, STORMWATER PIPING AND/OR SWALES IMMEDIATELY BELOW THE DISTURBED AREAS MUST HAVE EROSION CONTROL WORKS INSTALLED TO
PREVENT ENTRY OF SEDIMENT DURING CONSTRUCTION. DISTURBED AREAS MUST BE STABILIZED IN ACCORDANCE WITH THE SOIL EROSION CONTROL PLAN AND
NYS STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL, LATEST EDITION. A SEQUENCE OF CONSTRUCTION SCHEDULE MUST BE
SUBMITTED AND APPROVED BY THE CONTRACTING OFFICER PRIOR TO START OF WORK.
16. UPON COMPLETION OF THE WORK, REMOVE ALL DEBRIS, EQUIPMENT, AND UNUSED MATERIALS FROM GOVERNMENT PROPERTY.
17. THE CONTRACTOR MUST FOLLOW THE GUIDELINES OF THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY FOR SHORT TERM NOISE STANDARDS.
18. THE ABATEMENT OF HAZARDOUS MATERIALS, IF ENCOUNTERED, MUST BE COMPLETED IN ACCORDANCE WITH THE PROJECT DOCUMENTS TO THE SATISFACTION
OF THE GOVERNMENT.
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
C O
N T
R A
C T
N
O
S O
L I C
I T
A T
I O
N
N
O
P R
O J E
SHEET
IDENTIFICATION
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
US Army Corps of Engineers
N E
W
Y
O R
K
D
I S
T R
I C
T
N E
W
Y
O R
K
N
Y
W D
S C
A N
S I
D
W D
S R
U
R M
Y
W E
I N
T
C
U L L U
M
H
A L L
W E
I N
T
N
E W
Y
K
RTA SUBMISSION 2/11/2021
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
1 0
M
E N
D M
E N
T
R T
A
S
U B
M I S
S I O
N
J K
D P
K M
G E
N E
R A
L
N
O T
E S
L E
G E
D
B B
R E
V I A
T I O
N S
C I V
I L
C-002
DRAINAGE & UTILITY NOTES:
1. NOTIFY AND COORDINATE WITH WEST POINT DPW AND/OR UTILITY COMPANIES FOR ALL UTILITY RELATED WORK.
2. REFER TO ALL CONTRACT DRAWINGS FOR LOCATION AND SIZES OF GAS, ELECTRICAL,TELECOMMUNICATIONS, STORM, WATER, AND SANITARY CONNECTIONS TO THE
BUILDING.
3. PRIOR TO CONSTRUCTION, THE CONTRACTOR MUST OBTAIN A USMA DPW DIG SAFE PERMIT FOR THE PROJECT.
4. LOCATION AND SIZES OF UTILITIES ARE APPROXIMATE. CONSTRUCTION MUST COMMENCE BEGINNING AT THE LOWEST INVERT (POINT OF CONNECTION) AND PROGRESS UP
GRADIENT. INTERFACE POINTS (CROSSINGS) WITH EXISTING UNDERGROUND UTILITIES MUST BE FIELD VERIFIED BY TEST PIT(S) PRIOR TO PURCHASING MATERIALS AND
THE COMMENCEMENT OF CONSTRUCTION. DISCREPANCIES MUST BE REPORTED IMMEDIATELY IN WRITING TO THE CONTRACTING OFFICER.
5. THE CONTRACTOR MUST PROTECT ADJACENT UTILITIES DURING CONSTRUCTION TO AVOID DAMAGE AND MUST TAKE ALL NECESSARY PRECAUTIONS IN EXCAVATING.
HAND EXCAVATE AS DEEMED NECESSARY TO PROTECT SUBSURFACE UTILITIES. DAMAGE TO ANY EXISTING UTILITY RESULTING FROM THE CONTRACTOR’S OPERATIONS
MUST BE IMMEDIATELY REPAIRED IN A MANNER AS APPROVED BY THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT. IF THE CONTRACTING
OFFICER DEEMS IT IS NECESSARY, THE CONTRACTING OFFICER CAN REQUIRE REPAIR OPERATIONS TO BE PERFORMED CONTINUOUSLY UNTIL WORKS ARE ACCEPTABLE
TO THE CONTRACTING OFFICER AND AT NO ADDITIONAL COST TO THE GOVERNMENT.
6. UTILITY MANHOLE / VALVE COVERS, RIMS, GRATES, VENTS, AND OTHER COMPONENTS WHICH ARE NOT BEING REMOVED AND ARE WITHIN AREAS OF DISTURBANCE MUST
BE RESET TO GRADE.
7. CONCRETE THRUST BLOCKS MUST BE INSTALLED ON ALL WATER LINE BENDS, TEES, CROSSES, ELBOWS, VALVES, CAPS, ETC. IN ACCORDANCE WITH THE THRUST BLOCK
DETAIL. RESTRAINED JOINTS MAY BE SUBSTITUTED IN LIEU OF THRUST BLOCKS. THE CONTRACTOR MUST SUBMIT SHOP DRAWINGS OF THE JOINT FITTINGS TO THE
CONTRACTING OFFICER FOR REVIEW AND APPROVAL.
8. THE EXISTING WATER SYSTEM WILL BE OPERATIONAL DURING THE RENOVATION OF CULLUM HALL.
9. NEW WATER MAIN SERVICE CONNECTIONS MUST BE DIP AND MUST BE INSTALLED WITH A MINIMUM OF 54" OF COVER FROM FINISHED GRADE TO TOP OF THE PIPE.
DISINFECTION, HYDROSTATIC TESTING, AND BACTERIOLOGICAL TESTING MUST BE PERFORMED IN ACCORDANCE WITH UFC / AWWA / WATER COMPANY SPECIFICATIONS.
10. THE LOCATION, ELEVATION, AND SIZE OF EXISTING UTILITIES SHOWN ON THE CONTRACT DRAWINGS ARE APPROXIMATE. THE FOLLOWING MUST BE
PERFORMED:
A. VERIFY THE LOCATION OF EXISTING UNDERGROUND UTILITIES WITHIN THE WORK AREA PRIOR TO CONSTRUCTION. EXCAVATE TEST PITS AS REQUIRED;
B. EXERCISE EXTREME CAUTION WHEN WORKING ADJACENT TO EXISTING STORM, SANITARY, GAS, STEAM SYSTEMS, POWER, COMMUNICATIONS OR WATER LINES TO
PREVENT DAMAGE. INSTALL SUPPORTS AND BRACES AS REQUIRED. THE DESIGN AND CALCULATIONS, SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED
IN THE STATE OF NEW YORK, MUST BE SUBMITTED TO THE COR FOR REVIEW AND APPROVAL PRIOR TO EXCAVATION.
C. IMMEDIATELY REPAIR ANY DAMAGE TO THE EXISTING UTILITIES RESULTING FROM CONSTRUCTION AT NO ADDITIONAL COST TO THE GOVERNMENT.
D. MAINTAIN UTILITIES IN ACTIVE OPERATION AT ALL TIMES UNLESS THEY ARE TO BE ABANDONED OR REMOVED;
E. NOTIFY AND OBTAIN APPROVALS FROM UTILITY COMPANY/WEST POINT DPW/CONTRACTING OFFICER, PRIOR TO PERFORMING WORK.
F. UTILITIES THAT ARE TO BE ABANDONED/REMOVED MUST BE APPROVED BY THE CONTRACTING OFFICER. SERVICES TO ADJACENT FACILITIES MUST NOT BE
INTERRUPTED.
11. PRE-CAST CONCRETE STRUCTURES AND REINFORCING STEEL WITHIN PRE-CAST STRUCTURES MUST BE DESIGNED BY THE STRUCTURE MANUFACTURER. REINFORCING
STEEL WITHIN POURED-IN-PLACE DRAINAGE STRUCTURES MUST BE DESIGNED BY A NYS LICENSED ENGINEER AND SUBMITTED TO THE CONTRACTING OFFICER FOR
REVIEW.
12. SHOP DRAWINGS FOR ALL STRUCTURES MUST BE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF NEW YORK AND SUBMITTED FOR
REVIEW AND APPROVAL BY CONTRACTING OFFICER.
13. SANITARY SEWER PIPE MUST BE SDR 35 PVC AND MUST BE TESTED FOR COMPLIANCE WITH ASTM STANDARDS FOR INFILTRATION / EXFILTRATION.
14. DEWATER TRENCHES AS REQUIRED FOR INSTALLATION OF THE IMPROVEMENTS. THE CONTRACTOR MUST MAINTAIN THE WATER TABLE 2-FEET BELOW THE BOTTOM OF
TRENCH.
15. ALL STORMWATER INLETS MUST BE EQUIPPED WITH A BICYCLE SAFE ECO GRATE AND CAST WITH "NO DUMPING - DRAINS TO RIVER OR WATERWAY".
16. CURB STORMWATER INLETS MUST HAVE A 6" FACE AND TYPE N CURB BOX.
17. EXISTING STORM PIPING TO REMAIN, MUST BE CLEANED TO THE NEAREST INLET / MANHOLE AND/OR DISCHARGE POINT.
18. ELECTRICAL, FIBER OPTIC, AND COMMUNICATION CONDUIT UNDER AND WITHIN 20' OF VEHICLE TRAVEL WAYS MUST BE ENCASED IN CONCRETE.
19. REFER TO ELECTRIC AND COMMUNICATION PLANS FOR NUMBER AND ARRANGEMENT OF ELECTRICAL AND COMMUNICATION CONDUIT WITHIN DUCT BANKS.
20. PROVIDE TEMPORARY ELECTRIC POWER AS NEEDED FOR ALL CONSTRUCTION OPERATIONS UNTIL ELECTRIC IS EXTENDED TO THE SITE AND SUITABLE FOR USE. REFER TO
ELECTRIC PLANS.
21. ALL OPEN EXCAVATIONS WITHIN VEHICULAR TRAVEL AND PARKING AREAS MUST BE COVERED WITH A STEEL PLATE, RATED FOR HS-25 LOADING.
22. NOTIFY THE CONTRACTING OFFICER, WEST POINT DPW, AND WEST POINT MWR, 14-DAYS PRIOR TO ANY TEMPORARY CLOSURES.
23. THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE CONTRACTING OFFICER OF ANY CONFLICTS WITH UNEXPECTED UTILITIES OR STRUCTURES ENCOUNTERED DURING
CONSTRUCTION.
24. THE CONTRACTOR MUST SUBMIT A DEWATERING PLAN, SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF NEW YORK, TO THE
CONTRACTING OFFICER 14-DAYS PRIOR TO ANY DEWATERING OPERATIONS.
25. ALL UTILITY BEDDING MUST BE WRAPPED IN GEOTEXTILE FABRIC.
26. AMERICAN WATER (AW) IS THE OWNER AND OPERATOR OF ALL SANITARY SEWER AND DOMESTIC/FIRE WATER MAINS AT WEST POINT.
27. ANY SEWER MAIN AND/OR DOMESTIC.FIRE WATER MAIN REPLACEMENT OR MODIFICATION MUST BE COMPLETED BY AW UNLESS DIRECTED OTHERWISE.
28. THE SEWER MAIN WITHIN THE UTILITY TUNNEL MAY ONLY BE MODIFIED AND/OR CONSTRUCTED UPON BY AW.
29. THE CONTRACTOR MUST NOTIFY AND COORDINATE WITH AMERICAN WATER PRIOR TO THE SHUT-OFF OF ANY WATER MAIN OR BUILDING SERVICE.
30. ALL NEW BELOW-GRADE STRUCTURES MUST BE DESIGNED TO SUPPORT HS-25 LOADING. THE CONTRACTOR MUST SUBMIT SHOP DRAWINGS, SIGNED AND SEALED BE A
PROFESSIONAL ENGINEER LICENSED IN THE STATE OF NEW YORK, TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL PRIOR TO THE PURCHASE OF ALL
STRUCTURES.
31. PRIOR TO EXCAVATION, DISCONNECTION, CUTTING, OR REMOVAL OF ANY UTILITY SERVICE, COORDINATE WITH THE CONTRACTING OFFICER, WEST POINT DPW, AND THE
PRIVATE UTILITY PURVEYOR TO ENSURE UNINTERRUPTED SERVICE TO SURROUNDING FACILITIES. SUBMIT TEMPORARY SERVICE PLANS FOR APPROVAL PRIOR TO ANY
UTILITY WORK.
LEGEND
LIST OF ABBREVIATIONS
ABA ARCHITECTURAL BARRIERS ACT
ABC AGGREGATE BASE COURSE
AC ACRES
ADA AMERICAN WITH DISABILITIES ACT
APPROX. APPROXIMATE
ASTM
AMERICAN SOCIETY FOR TESTING AND
MATERIALS
AW AMERICAN WATER
BC BOTTOM OF CURB
BIT. BITUMINOUS
BLDG BUILDING
CB CATCH BASIN
CLF CHAIN LINK FENCE
CO CLEAN OUT
COMM COMMUNICATION
CONC CONCRETE
CORS
CONTINUOUSLY OPERATING REFERENCE
STATION
CW CHILLED WATER
DC DEPRESSED CURB
DGA DENSE GRADED AGGREGATE
DIA. DIAMETER
DIP DUCTILE IRON PIPE
DIM. DIMENSION
DMH DRAINAGE MANHOLE
DPW DIRECTORATE OF PUBLIC WORKS
DWG DRAWING
EA EACH
ELEC. ELECTRIC
EL./ELEV. ELEVATION
EM ENGINEERS MANUAL
EOP EDGE OF PAVEMENT
ETC ET CETERA
EX./EXIST. EXISTING
FF FINISHED FLOOR
GR GRATE
HDPE HIGH DENSITY POLYETHYLENE
HMA HOT MIX ASPHALT
HP HIGH POINT
IN. INCH
INV INVERT
LF LINEAR FEET
LOD LIMIT OF DISTURBANCE
MAX. MAXIMUM
MH MANHOLE
MIN. MINIMUM
MUTCD
MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES
NAD NORTH AMERICAN DATUM
NAVD NORTH AMERICAN VERTICAL DATUM
NYSDEC
NEW YORK STATE DEPARTMENT OF
ENVIRONMENTAL CONSERVATION
NYSDOT
NEW YORK STATE DEPARTMENT OF
TRANSPORTATION
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
PERF. PERFORATED
PIV POST INDICATOR VALVE
PROP. PROPOSED
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
R RADIUS
RCP REINFORCED CONCRETE PIPE
REIN. REINFORCED
REQ'D REQUIRED
SAN SANITARY
SDR STANDARD DIMENSION RATIO
SF SQUARE FEET
SMH SANITARY MANHOLE
STA. STATION
TBR TO BE REMOVED
TC TOP OF CURB
TP TOP OF CONCRETE PAD
TW TOP OF WALL
TYP. TYPICAL
UFC UNIFIED FACILITIES CRITERIA
USMA UNITED STATES MILITARY ACADEMY
W/ WITH
WWF WELDED WIRE FABRIC
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
P R
O J E
SHEET
IDENTIFICATION
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
US Army Corps of Engineers
N E
W
Y
O R
K
D
I S
T R
I C
T
N E
W
Y
O R
K
N
Y
W D
S C
A N
S I
D
W D
S R
M
Y
W E
I N
T
C
U L L U
M
H
A L L
W E
I N
T
N
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
EXISTING PROPOSEDITEM
CATCH BASIN
ROUND CATCH BASIN
COMMUNICATION MANHOLE
SOIL BORING LOCATION
GUY WIRE
POST/ BOLLARD
ROCK/BOULDER
SHRUB
CONIFEROUS TREE
DECIDUOUS TREE
TREE STUMP
SIGN
STORM MANHOLE
ELECTRIC MANHOLE/HANDHOLE
TELE. PED.
WATER VALVE
TREE LINE
FENCE
GUIDE RAIL
UNDERGROUND
COMMUNICATION LINE
UNDERGROUND ELECTRIC (PRIMARY)
STORM LINE
SD
B-4
X X X
CB
D
CB
C
CP
W
SANITARY LINE
SAN
WATER LINE
W W
GAS LINE
G
STEAM LINE
HPS
STEAM MANHOLE
ELECTRICAL JUNCTION BOX
LIGHT POLE
UNKNOWN VENT
GAS VALVE
FIRE HYDRANT
S
SANITARY MANHOLE
M
UNKNOWN MANHOLE
UNKNOWN JUNCTION BOX
EDGE OF PAVEMENT
CURB
SD
X X X
SAN
W W
G
HPS
D
W
S
CONCRETE (POURED IN PLACE)
CHILLED WATER SUPPLY
CHWS CHWS
METAL RAIL
INLET PROTECTION
LIMIT OF DISTURBANCE
E
COMM
E
COMM
CHILLED WATER RETURN
CHWR CHWR
BOLLARD
UNDERGROUND ELECTRIC (SECONDARY)
ES
E E
CO
CLEANOUT
HAND EXCAVATION/EXCAVATE
WITH CAUTION TO FACE OF
WALL/CURB
PAVEMENT SAWCUT
CIVIL CONCRETE AND REINFORCEMENT NOTES:
1. DESIGN IS BASED ON THE FOLLOWING MATERIAL STRENGTHS USING NORMAL WEIGHT CONCRETE:
A. 28-DAY CONCRETE CYLINDER STRENGTH:
SLABS ON GROUND 4,000 PSI
B. DEFORMED BAR REINFORCEMENT 60,000 PSI
C. WELDED WIRE REINFORCEMENT 65,000 PSI
2. PROVIDE THE FOLLOWING MINIMUM COVER FOR REINFORCEMENT:
A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH. 3 IN.
B. CONCRETE EXPOSED TO WEATHER.
NO. 6 THROUGH NO. 18 BARS 2 IN.
NO. 5 BARS AND SMALLER 1 1/2 IN.
3. PROVIDE
" PRE-FORMED EXPANSION JOINTS AGAINST ALL HARD SURFACES INCLUDING BUT NOT LIMITED TO
OTHER CONCRETE STRUCTURES, MASONRY OF ANY KIND, METALS OF ANY KIND, ETC.
SECURITY
CHECKPOINT
S
T
O
L
N
E
S
O
M
S
T
O
L
N
E
S
O
ENTRY TRAVEL
ROUTE
C
U
L
L
CULLUM HALL
BUILDING 605
CONTRACTOR
STAGING /
LAYDOWN AREA
C
U
L
L
S T
O N
Y
L
O N
E S
O M
E
R
D
WASHINGTON RD
T
H
A
Y
EXIT TRAVEL
ROUTE - OPTION 1
(THAYER GATE)
BUFFALO
SOLDIER FIELD
THAYER GATE
S W
I F
T
R
D
EXIT TRAVEL ROUTE -
OPTION 2
(WASHINGTON GATE)
WASHINGTON
GATE
W
A
S
H
I
N
G
T
N
N
A1
TRUCK ACCESS PLAN
SCALE: 1"=500'
1000'0 500'
1 0
A M
E N
D M
E N
T
R T
A
S
U B
M I S
S I O
N
D P
J K
T R
U C
K
A
C C
E S
S
P
L A
N
C I V
I L
CS102
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
P R
O J E
SHEET
IDENTIFICATION
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
US Army Corps of Engineers
N E
W
Y
O R
K
D
I S
T R
I C
T
N E
W
Y
O R
K
N
Y
W D
S C
A N
S I
D
W D
S R
M
Y
W E
I N
T
C
U L L U
M
H
A L L
W E
I N
T
N
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
GENERAL SHEET NOTES
1. GOVERNMENT RESERVES THE ABILITY TO SELECT EITHER
OF THE EXIT ROUTES AT TIME OF CONSTRUCTION.
SD
6"
BEECH
161.5
161.5
161.3
161.0
161.1
161.0
161.1
160.8
160.8
160.7
160.6
160.3
160.3
160.2
CB
W
W
W
160.5
S
S
130.2
130.2
129.7
CB
BM
133.7
132.3
131.3
E
130.1
129.0
128.5
CB
M
130.1
134.4
134.3
133.8
132.9
131.6
130.8
130.6
130.6
W
W
W
W
W W
W W
W W
W
W
W
W
S
C
W
C
W
158.7
162.0 FFE
E
EE
W
CB
E
E
C
132.7
D
CB
133.9
133.7
139.9 FFE
BM
W
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
28"
MAPLE
CULLUM HALL
BUILDING 605
4 STORY STONE
MASONRY
BUILDING
LINCOLN HALL
BUILDING 607
4 STORY STONE
MASONRY
BUILDING
30"
MAPLE
WEST POINT
CLUB BUILDING
4 STORY STONE
MASONRY
BUILDING
NO PARKING
NO PARKING
BENCHMARK:
X-CUT NORTH BOLT
ELEV:161.58'
BENCHMARK:
BOX CUT
ELEV:129.39'
24"
OAK
12"
APPLE
M
161.7 FFE
163.1 FFE
150.1 FFE
LINCOLN HALL
BUILDING 607
5 STORY STONE
MASONRY
BUILDING
160.5
160.3 160.4
160.3
160.4
161.9 FFE
138.3 FFE
161.3 FFE
CB
CB
CB
CB
C
B
SD SD
SD
SD SD
SD
S A
N
S A
N
S A
N
P
V C
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S D
RIM:160.70'
(S) INV.OUT=155.03'
(W) INV. IN=157.95'
(N) INV. IN=156.58'
(NE) INV. IN=155.45'
SD
SD
SD
SD
SD
RIM:159.56'
(S) INV.OUT=154.98'
(N) INV. IN=154.96'
SD
SD
S D
RIM:158.76'
(S) INV.OUT=153.66'
(W) INV. IN=156.71'
(N) INV. IN=153.26'
SD
SD
SD
SD
SD
RIM:158.56'
(S) INV.OUT=152.86'
(N) INV. IN= NO ACCESS
(SE) INV. IN=156.11
SD
SD
SD
RIM:157.76'
(S) INV.OUT=151.56'
(N) INV. IN=151.61'
RIM:158.36'
COVER INSIDE
MANHOLE
SD
SD
RIM:159.05'
(N) INV.OUT=152.10'
(S) INV. IN=152.21'
(NW) INV. IN=155.90'
RIM:158.94'
INV.OUT=156.74'
RIM:158.96'
SUMP:156.61'
PVC SLEEVE
THROUGH
STRUCTURE
S D
S D
S D
RIM:159.19'
(E) INV.OUT=154.34'
(N) INV. IN=154.79'
(S) INV. IN=154.69'
S
A
N
E
E
L
E
E
L
RIM:129.61'
NO VISIBLE PIPES
S D
RIM:127.95'
INV. OUT=125.10'
RIM:130.31'
6" VERT. PIPE
INV.=127.31'
RIM:134.03'
(E) INV.OUT=131.95'
(E) INV. OUT=131.95'
RIM:133.50'
CAR PARKED
ON TOP
S
D
RIM:133.04'
INV.=130.24'
S D
RIM:133.10'
INV. OUT=131.10'
(VERTICAL 4" HDPE)
INV. IN=132.05'
RIM:134.31
CAR PARKED ON TOP
COMM
COMM
COMM
COMM
COMM
C O
M M
C O
M M
C O
M M
COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM
COMM
COMM
C O
M
M
C O
M
M
C O
M
M
C O
M
M
C O
M
M
COMM
COMM
COMM
COMM
COMM
COMM
E E
E E
E E
E E
E E
E E E E
E E E E E
E E E E
E E E
E E
E E
E E E
E E
E E
E E
E E
E E
E E
E E
W
W
W
W
W
W W
W
W
W
W
W W W W
W
W W W
W
WWWW
RAILING
"RESERVED CPA PASS"
STEEL PLATE OVER
COMMUNICATION MANHOLE
TRASH
COMPACTOR
PLANTING BED
"WEST POINT CLUB
BUILDING 603"
"LINCOLN HALL
BUILDING 607"
COOLER
CONC. GUTTER
CONC. PAD
WITH UNK.
UTILITIES
OLD SIGN
BASE
CLASS OF
1927 PLAQUE
CLASS OF
1936 PLAQUE
KOSCIUSZKO'S
GARDEN SIGN
STAIRS
STAIRS W/
RAILING
CHAIN LINK FENCE
START 4 FT
METAL
HANDRAIL
4 FT METAL
HANDRAIL
4 FT HIGH METAL
HANDRAIL
END 4 FT METAL
HANDRAIL
STONE AREA W/
METAL GRATES
RAILING
CANNON
STATUE
FIRE HYDRANT / POST
INDICATOR VALVE
LOADING DOCK
DUMPSTER
COVERED WALK
METAL
COVER
RAILING
TRASH
RECEPTACLE
2009 OFFICER
PLAQUE
G
G
G
G
W
W
W W
W
W
W
W
W
G
G G
G
G
G G
G
G G
G
G G
G
G G
G G
G G
15" RCP
12" VCP
P
V C
10" VCP
8" VCP
15" RCP
15" RCP
15" RCP
H
D P
E
15" RCP
V
C
12" PVC
12" PVC
C M
P
H
P
E
P
E
H
D
P
E
H
D P
E
160.37
160.30
160.22
160.29
160.24
160.09
160.14
160.09
160.09
160.27
160.31
160.34
160.17
160.12
160.27
160.26
160.05
R
E
L
L
S
T
O
N
E
STAIRS
W/ HANDRAIL
CONC. CURB
GRASS
GRASS
GRASS
GRASS
GRASS
LOADING
DOCK
CONC. CURB
CONC. CURB
STAIRS
CONC. WALK
CONC. WALK
CONC. WALK
ASPH.
DRIVE
RAMP
S T
A I R
S
R A
M P
C O
N C
W
A L K
R
E
T A
I N
I
G
L L
R E
T A
IN
IN
G W
A L L
C
O
N
L
K
ASPHALT
ASPHALT
ASPHALT
RETAINING WALL
P
A
V
E
M
E
G
E
CULLUM ROAD
STAIRS
RET. WALL
B-1
B-3
B-4
WINDOW WELL
S T
A I R
S
CONC.
A C
A C
B-2
CONC
PAD
BUILDING OVERHANG
CONC. CURB
S T
A I R
S
DOOR
SALLY PORT
FIRE HYDRANT
W W
W W
W W
W W
W W
HPS
HPS
ASPHALT
ASPHALT
C L A
Y
10" CLAY
S
A
N
S
A
N
W
W
W
S
A
W W W W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W W
W W
W W
W W
W
W
W
W W
W
APPROXIMATE LOCATION
OF EXISTING 10" WATER
MAIN PER WEST POINT
DPW DRAWINGS
APPROXIMATE LOCATION OF
EXISTING UTILITIES PER
WEST POINT DPW DRAWINGS
APPROXIMATE LOCATION OF
EXISTING SANITARY SERVICE
PER WEST POINT DPW
DRAWINGS
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
APPROXIMATE LOCATION OF
EXISTING ELECTRIC SERVICE
PER WEST POINT DPW
DRAWINGS
G
G
G G
G G
G
G
APPROXIMATE LOCATION OF
AIR VENTILATION TUNNEL
(PER AS-BUILT DRAWINGS)
CONCRETE
RETAINING WALL
3 FT CHAIN LINK
FENCE ATOP
CONCRETE WALL
EXISTING RAISED
BRICK MANHOLE
CONCRETE
CURB
CONCRETE
CURB
APPROXIMATE LOCATION OF
EXISTING UNDERGROUND
UTILITY TUNNEL
H
P
S
S D
S
D
S
D
(2) 6" DIP
INV. 130.06±
(PER FIELD
INVESTIGATION)
6" CLAY PIPE
INV. 129.87±
(PER FIELD
INVESTIGATION)
6" DIP
INV. 127.83±
(PER FIELD
INVESTIGATION)
METAL
RAILING
28" MAPLE
2" PCR
3" MPS
2" LPC
APPROXIMATE LOCATION OF
EXISTING COMMUNICATION
SERVICE PER WEST POINT
DPW DRAWINGS
C
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
FF
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E S
E S
E S
E S
E S
E
S
A
N
S
A
N
A
B
A
SD
SD
C
B
D
CAP END OF
10" PVC
INV. 153.50
161 LF
10" PERF. PVC
FOUNDATION
DRAIN @ 0.00 %
INLET #1
TYPE YARD
GR. 159.60
INV. 157.10
89 LF
15" HDPE
@ 0.50 %
INLET #2
TYPE YARD
GR. 159.50
INV. A 156.65
INV. B 153.50
INV. C 153.40
11 LF
15" HDPE
@ 6.80 %
INLET #3
TYPE R
GR. 158.80
INV. A 152.75
INV. B 152.65
1 LF
10" PERF. PVC
@ 0.00 %
CAP END OF 10"
PVC INV. 153.50
STM MH #1
RIM 159.00
INV. A 151.89
INV. B 150.90
13 LF
15" HDPE
@ 1.00 %
10" PVC INV. 136.90
VERTICAL DROP INTO15" HDPE
WITH 10"X15"X15" TEE
CORE DRILL THROUGH
EXISTING WALL
INV. 128.50±
INLET #4
TYPE R
GR. 159.00
INV. A 152.14
INV. B 154.79 (EX)
INV. C 152.04
A
C
A
B
STM MH #2
RIM 153.00
INV. A 150.00
INV. B 136.77
9 LF
15" HDPE
@ 10.0 %
F
F
F F
W
D
D
S D
S D
S D
S
D
E
E
S
E
S
B
A
A
STM MH #3
RIM 139.52
INV. A 136.64
INV. B 134.95
INV. C 128.95
26 LF
15" HDPE
@ 0.50 %
E
X
X
X
X
X
159.67
TC 158.95
BC 158.45
BW 133.80
FLUSH CURB
133.00
DOOR THRESHOLD
EL. 133.08+/- (SEE
STRUCTURAL AND
ARCHITECTURAL
DRAWINGS FOR
DOOR WIDENING)
X
X
FLUSH CURB
158.90
G 159.60
X
G 159.40
W
UNDERSLAB DRAIN
INV. 128.67
(SEE STRUCTURAL
FOR CONTINUATION
INSIDE BUILDING)
13 LF
10" PVC DRAIN
@ 1.00 %
10" PVC
INV. 128.31
(CORE DRILL AND
DAYLIGHT THROUGH
RETAINING WALL)
5 LF
10" PVC DRAIN
@ 1.00 %
16 LF
10" PVC DRAIN
@ 1.00 %
10" PVC
INV. 128.54
(CORE DRILL AND
DAYLIGHT THROUGH
RETAINING WALL)
F F
F F
F F
W W
W W
W W
W
B
RESET INLET TO GRADE
EL. 133.00
X X
X X
S
A
N
S
A
N
H
P
S
H
P
S G: 134.96
TP: 135.46
E
E S
E S
ES
RESET GRATE TO GRADE
GRT 132.65±
D
RESET MH
TO GRADE
RESET INLET
TO GRADE
EL. 133.05
XX
X
X
X
X
X
G: 134.74
G: 134.74
G: 134.96
TP: 135.46
TP: 135.46
G: 134.82
TP: 135.46
G: 134.08
G: 134.33
G: 159.00
EE
COMM
G G
G
D
ROOF DRAIN
INV. 128.70
(SEE PLUMBING
FOR CONTINUATION
INSIDE BUILDING)
STM MH #4
RIM 133.50
INV. A 128.62
INV. B 128.62
INV. C 128.52
7 LF
10" PVC DRAIN
@ 1.00 %
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C
STM MH #5
RIM 133.50
INV. A 128.78
INV. B 128.80
INV. C 128.70
UNDERSLAB DRAIN
INV. 128.83
(SEE STRUCTURAL
FOR CONTINUATION
INSIDE BUILDING)
SD
COCO
3 LF
10" PVC DRAIN
@ 1.00 %
CLEANOUT
INV. 128.83
CLEANOUT
INV. 128.83
10" PVC
UNDERSLAB
DRAINAGE
PIPE @0.00%
COMM
COMM
F F
F F
F
A
B
C
5 LF
10" PVC DRAIN
@ 1.00 %
5 LF
15" HDPE
@ 0.50 %
INLET #5
TYPE YARD
GR. 133.10
INV. A 128.39
INV. B 128.34
A
B
TC 133.80
BC 133.30
X
X
X
TC 133.50
BC 133.20
S
D
A
B
C
SD
30 LF 6" PERFORATED PVC
FOOTING DRAIN @ 0.00% SL
(SEE STRUCTURAL DRAWINGS)
CONNECT PERFORATED PVC
FOOTING DRAIN INTO 6" SOLD
WALL PVC PIPE
CAP END OF 6" PVC
SLEEVE 6" PVC PIPE THROUGH
RETAINING WALL (SEE
STRUCTURAL DRAWINGS)
12 LF 6" SOLID WALL
PVC PIPE @ 1.0%
77 LF
15" HDPE
@ 0.50 %
46 LF TRENCH DRAIN
GR. 138.90
INV. A 137.22
INV. B 137.03
INV. C 136.90
C
B
NO PARKING
NO PARKING
51 LF
15" HDPE
@ 1.00 %
MECHANICAL YARD CLIN INCLUDES ALL NEW
STRUCTURAL FOUNDATION, CONCRETE, AND
STEEL WORK IN NORTH SERVICE YARD
REPAIR TO EXISTING SITE RETAINING WALLS
AND STAIRS IS NOT INCLUDED
X
G 159.80
X
G 159.80
X
G 160.23
X
TC 159.65
BC 159.15
X
TC 159.40
BC 158.80
X
TC 159.59
BC 159.09
X
TC 159.51
BC 159.01
X
G 159.60
X
G 160.00
X
G 159.65
X
G 159.55
X
G 159.05
X
G 159.70
X
TC 159.50
BC 159.00
TC 159.58
BC 158.16
X
TC 159.60
BC 159.10
TC 134.06
BC 133.95
X
TC 133.90
BC 133.40
X
BW 133.10
X
BW 133.20
X
X
G: 133.90
TC 133.90
BC 133.40
X
TC 133.86
BC 133.70
X
X
G: 133.86
BW 133.40
X
C E
E
A
BC
6"± VERTICAL DRAIN
BELOW METAL
COVER. MAINTAIN
EXISTING INVERT
AND REPAIR AS
NECESSARY
CO
CLEANOUT
INV. 153.50
MAINTAIN EXISTING
INVERTS AND
REPAIR AS
NECESSARY
N
COORDINATE TABLE
STRUCTURE NAME
INLET #1
INLET #2
INLET #3
INLET #4
INLET #5
STM MH #1
STM MH #2
STM MH #3
TRENCH DRAIN
STM MH #4
STM MH #5
NORTHING
932519.8897
932594.0257
932601.5098
932645.8049
932555.7693
932636.2273
932629.7149
932634.3289
932610.1869
932564.0281
932443.2706
EASTING
641898.6592
641950.9503
641939.9812
641971.3669
642066.4935
641985.5922
641996.6558
642025.5756
642042.9749
642055.1466
641967.1715
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
P R
O J E
SHEET
IDENTIFICATION
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
US Army Corps of Engineers
N E
W
Y
O R
K
D
I S
T R
I C
T
N E
W
Y
O R
K
N
Y
W D
S C
A N
S I
D
W D
S R
M
Y
W E
I N
T
C
U L L U
M
H
A L L
W E
I N
T
N
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
20' 40'0
N
A1
GRADING AND DRAINAGE PLAN
SCALE: 1"=20'
1 0
A M
E N
D M
E N
T
R T
A
S
U B
M I S
S I O
N
D P
J K
G R
A D
I N
G
A
A
I N
A G
E
P
L A
N
C I V
I L
CG101
6"
BEECH
161.5
161.5
161.3
161.0
161.1
161.0
161.1
160.8
160.8
160.7
160.6
160.3
160.3
160.2
CB
W
W
W
160.5
S
S
130.2
130.2
129.7
CB
BM
133.7
132.3
131.3
E
130.1
129.0
128.5
CB
M
130.1
134.4
134.3
133.8
132.9
131.6
130.8
130.6
130.6
W
W
W
W
W W
W W
W W
W
W
W
W
S
C
W
C
W
158.7
162.0 FFE
E
EE
W
CB
E
E
C
132.7
D
CB
133.9
133.7
139.9 FFE
BM
W
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
28"
MAPLE
CULLUM HALL
BUILDING 605
4 STORY STONE
MASONRY
BUILDING
LINCOLN HALL
BUILDING 607
4 STORY STONE
MASONRY
BUILDING
30"
MAPLE
WEST POINT
CLUB BUILDING
4 STORY STONE
MASONRY
BUILDING
NO PARKING
NO PARKING
BENCHMARK:
X-CUT NORTH BOLT
ELEV:161.58'
BENCHMARK:
BOX CUT
ELEV:129.39'
24"
OAK
12"
APPLE
M
161.7 FFE
163.1 FFE
150.1 FFE
LINCOLN HALL
BUILDING 607
5 STORY STONE
MASONRY
BUILDING
160.5
160.3 160.4
160.3
160.4
161.9 FFE
138.3 FFE
161.3 FFE
CB
CB
CB
CB
C
B
SD SD
SD
SD
SD SD
S A
N
S A
N
S A
N
P
V C
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S D
RIM:160.70'
(S) INV.OUT=155.03'
(W) INV. IN=157.95'
(N) INV. IN=156.58'
(NE) INV. IN=155.45'
SD
SD
SD
SD
SD
RIM:159.56'
(S) INV.OUT=154.98'
(N) INV. IN=154.96'
SD
SD
S D
RIM:158.76'
(S) INV.OUT=153.66'
(W) INV. IN=156.71'
(N) INV. IN=153.26'
SD
SD
SD
SD
SD
RIM:158.56'
(S) INV.OUT=152.86'
(N) INV. IN= NO ACCESS
(SE) INV. IN=156.11
SD
SD
SD
RIM:157.76'
(S) INV.OUT=151.56'
(N) INV. IN=151.61'
RIM:158.36'
COVER INSIDE
MANHOLE
SD
SD
RIM:159.05'
(N) INV.OUT=152.10'
(S) INV. IN=152.21'
(NW) INV. IN=155.90'
RIM:158.94'
INV.OUT=156.74'
RIM:158.96'
SUMP:156.61'
PVC SLEEVE
THROUGH
STRUCTURE
S D
S D
S D
RIM:159.19'
(E) INV.OUT=154.34'
(N) INV. IN=154.79'
(S) INV. IN=154.69'
S
A
N
E
E
L
E
E
L
RIM:129.61'
NO VISIBLE PIPES
S D
RIM:127.95'
INV. OUT=125.10'
RIM:130.31'
6" VERT. PIPE
INV.=127.31'
RIM:134.03'
(E) INV.OUT=131.95'
(E) INV. OUT=131.95'
RIM:133.50'
CAR PARKED
ON TOP
S
D
RIM:133.04'
INV.=130.24'
S D
RIM:133.10'
INV. OUT=131.10'
(VERTICAL 4" HDPE)
INV. IN=132.05'
RIM:134.31
CAR PARKED ON TOP
COMM
COMM
COMM
COMM
COMM
C O
M M
C O
M M
C O
M M
COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM
COMM
COMM
C O
M
M
C O
M
M
C O
M
M
C O
M
M
C O
M
M
COMM
COMM
COMM
COMM
COMM
COMM
E E
E E
E E
E E
E E
E E
E E E E E
E E E E
E E E E
E E
E E
E E E
E E
E E
E E
E E
E E
E E
E E
E
W
W
W
W
W
W W
W
W
W
W
W W W W
W
W W W
W
WWWW
RAILING
"RESERVED CPA PASS"
STEEL PLATE OVER
COMMUNICATION MANHOLE
TRASH
COMPACTOR
PLANTING BED
"WEST POINT CLUB
BUILDING 603"
"LINCOLN HALL
BUILDING 607"
COOLER
CONC. GUTTER
CONC. PAD
WITH UNK.
UTILITIES
OLD SIGN
BASE
CLASS OF
1927 PLAQUE
CLASS OF
1936 PLAQUE
KOSCIUSZKO'S
GARDEN SIGN
STAIRS
STAIRS W/
RAILING
CHAIN LINK FENCE
START 4 FT
METAL
HANDRAIL
4 FT METAL
HANDRAIL
4 FT HIGH METAL
HANDRAIL
END 4 FT METAL
HANDRAIL
STONE AREA W/
METAL GRATES
RAILING
CANNON
STATUE
FIRE HYDRANT / POST
INDICATOR VALVE
LOADING DOCK
DUMPSTER
COVERED WALK
METAL
COVER
RAILING
TRASH
RECEPTACLE
2009 OFFICER
PLAQUE
G
G
G
G
W
W
W W
W
W
W
W
W
G
G G
G
G G
G
G G
G
G G
G
G
G G
G G
G G
15" RCP
12" VCP
P
V C
10" VCP
8" VCP
15" RCP
15" RCP
15" RCP
H
D P
E
15" RCP
C
12" PVC
12" PVC
C M
P
P
E
P
E
H
D
P
E
H
D P
E
160.37
160.30
160.22
160.29
160.24
160.09
160.14
160.09
160.09
160.27
160.31
160.34
160.17
160.12
160.27
160.26
160.05
R
E
L
L
S
T
O
N
E
STAIRS
W/ HANDRAIL
CONC. CURB
GRASS
GRASS
GRASS
GRASS
GRASS
LOADING
DOCK
CONC. CURB
CONC. CURB
STAIRS
CONC. WALK
CONC. WALK
CONC. WALK
ASPH.
DRIVE
RAMP
S T
A I R
S
R A
M P
C O
N C
W
A L K
R
E
T A
I N
I
G
L L
R E
T A
IN
IN
G W
A L L
C
O
N
L
K
ASPHALT
ASPHALT
ASPHALT
RETAINING WALL
P
A
V
E
M
E
G
E
CULLUM ROAD
STAIRS
RET. WALL
B-1
B-3
B-4
WINDOW WELL
S T
A I R
S
CONC.
A C
A C
B-2
CONC
PAD
BUILDING OVERHANG
CONC. CURB
S T
A I R
S
DOOR
SALLY PORT
FIRE HYDRANT
W W
W W
W W
W W
W W
HPS
HPS
ASPHALT
ASPHALT
C L A
Y
10" CLAY
S
A
N
S
A
N
W
W
W
S
A
W W W W
W
W
W
W W
W
W
W
W
W
W
W
W
W W W W W W W W W W W
W W
W W
W W
W W
W
W
W W
W
APPROXIMATE LOCATION
OF EXISTING 10" WATER
MAIN PER WEST POINT
DPW DRAWINGS
APPROXIMATE LOCATION OF
EXISTING UTILITIES PER
WEST POINT DPW DRAWINGS
APPROXIMATE LOCATION OF
EXISTING SANITARY SERVICE
PER WEST POINT DPW
DRAWINGS
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
APPROXIMATE LOCATION OF
EXISTING ELECTRIC SERVICE
PER WEST POINT DPW
DRAWINGS
G
G
G G
G G
G
G
APPROXIMATE LOCATION OF
AIR VENTILATION TUNNEL
(PER AS-BUILT DRAWINGS)
CONCRETE
RETAINING WALL
3 FT CHAIN LINK
FENCE ATOP
CONCRETE WALL
EXISTING RAISED
BRICK MANHOLE
CONCRETE
CURB
CONCRETE
CURB
APPROXIMATE LOCATION OF
EXISTING UNDERGROUND
UTILITY TUNNEL
H
P
S
S D
S
D
S
D
(2) 6" DIP
INV. 130.06±
(PER FIELD
INVESTIGATION)
6" CLAY PIPE
INV. 129.87±
(PER FIELD
INVESTIGATION)
6" DIP
INV. 127.83±
(PER FIELD
INVESTIGATION)
METAL
RAILING
28" MAPLE
2" PCR
3" MPS
2" LPC
APPROXIMATE LOCATION OF
EXISTING COMMUNICATION
SERVICE PER WEST POINT
DPW DRAWINGS
C
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
INLET PROTECTION
(TYP.)
INLET PROTECTION
(TYP.)
FF
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E S
E S
E S
E S
E S
E
S
A
N
S
A
N
SD
SD
D
F
F
F F
W
D
D
S D
S D
S D
S
D
E
E
S
E
S
E
X X X X X X X X X X X X X
X
X
X
X
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
FILTER SOCK
(TYP.)
FILTER SOCK
(TYP.)
W
F F
F F
F F
W W
W W
W W
W
LIMIT OF DISTURBANCE
(TYP.)
LIMIT OF DISTURBANCE
(TYP.)
S
A
N
S
A
N
H
P
S
H
P
S
E
E S
E S
ES
D
EE
COMM
G G
G
D
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C
SD
COCO
COMM
COMM
F F
F F
F
S
D
SD
NO PARKING
NO PARKING
C E
E
CO
N
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
P R
O J E
SHEET
IDENTIFICATION
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
US Army Corps of Engineers
N E
W
Y
O R
K
D
I S
T R
I C
T
N E
W
Y
O R
K
N
Y
W D
S C
A N
S I
D
W D
S R
M
Y
W E
I N
T
C
U L L U
M
H
A L L
W E
I N
T
N
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
20' 40'0
N
A1
SOIL EROSION PLAN
SCALE: 1"=20'
1 0
A M
E N
D M
E N
T
R T
A
S
U B
M I S
S I O
N
D P
J K
S O
I L
E
R O
S I O
N
P
L A
N
C I V
I L
CG102
6"
BEECH
161.5
161.5
161.3
161.0
161.1
161.0
161.1
160.8
160.8
160.7
160.6
160.3
160.3
160.2
CB
W
W
W
160.5
S
S
130.2
130.2
129.7
CB
BM
133.7
132.3
131.3
E
130.1
129.0
128.5
CB
M
130.1
134.4
134.3
133.8
132.9
131.6
130.8
130.6
130.6
W
W
W
W
W W
W W
W W
W
W
W
W
S
C
W
C
W
158.7
162.0 FFE
E
EE
W
CB
132.7
CB
133.9
133.7
139.9 FFE
BM
W
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
28"
MAPLE
CULLUM HALL
BUILDING 605
4 STORY STONE
MASONRY
BUILDING
LINCOLN HALL
BUILDING 607
4 STORY STONE
MASONRY
BUILDING
30"
MAPLE
WEST POINT
CLUB BUILDING
4 STORY STONE
MASONRY
BUILDING
NO PARKING
NO PARKING
BENCHMARK:
X-CUT NORTH BOLT
ELEV:161.58'
BENCHMARK:
BOX CUT
ELEV:129.39'
24"
OAK
12"
APPLE
M
161.7 FFE
163.1 FFE
150.1 FFE
LINCOLN HALL
BUILDING 607
5 STORY STONE
MASONRY
BUILDING
160.5
160.3 160.4
160.3
160.4
161.9 FFE
138.3 FFE
161.3 FFE
CB
CB
CB
CB
C
B
SD
SD SD
SD
SD SD
S A
N
S A
N
S A
N
P
V C
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S D
RIM:160.70'
(S) INV.OUT=155.03'
(W) INV. IN=157.95'
(N) INV. IN=156.58'
(NE) INV. IN=155.45'
SD
SD
SD
SD
SD
RIM:159.56'
(S) INV.OUT=154.98'
(N) INV. IN=154.96'
SD
SD
S D
RIM:158.76'
(S) INV.OUT=153.66'
(W) INV. IN=156.71'
(N) INV. IN=153.26'
SD
SD
SD
SD
SD
RIM:158.56'
(S) INV.OUT=152.86'
(N) INV. IN= NO ACCESS
(SE) INV. IN=156.11
SD
SD
SD
RIM:157.76'
(S) INV.OUT=151.56'
(N) INV. IN=151.61'
RIM:158.36'
COVER INSIDE
MANHOLE
SD
SD
RIM:159.05'
(N) INV.OUT=152.10'
(S) INV. IN=152.21'
(NW) INV. IN=155.90'
RIM:158.94'
INV.OUT=156.74'
RIM:158.96'
SUMP:156.61'
PVC SLEEVE
THROUGH
STRUCTURE
S D
S D
S D
RIM:159.19'
(E) INV.OUT=154.34'
(N) INV. IN=154.79'
(S) INV. IN=154.69'
S
A
N
E
E
L
E
E
L
RIM:129.61'
NO VISIBLE PIPES
S D
RIM:127.95'
INV. OUT=125.10'
RIM:130.31'
6" VERT. PIPE
INV.=127.31'
RIM:134.03'
(E) INV.OUT=131.95'
(E) INV. OUT=131.95'
RIM:133.50'
CAR PARKED
ON TOP
S
D
RIM:133.04'
INV.=130.24'
S D
RIM:133.10'
INV. OUT=131.10'
(VERTICAL 4" HDPE)
INV. IN=132.05'
RIM:134.31
CAR PARKED ON TOP
COMM
COMM
COMM
COMM
COMM
C O
M M
C O
M M
C O
M M
COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM
COMM
COMM
C O
M
M
C O
M
M
C O
M
M
C O
M
M
C O
M
M
COMM
COMM
COMM
COMM
COMM
COMM
E E
E E
E E
E E
E E
E E
E E E E E
E E E E E
E E E
E E
E E
E E E
E E
E E
E E
E E
E E
E E
E E
E
W
W
W
W
W
W W
W
W
W
W
W W W W
W
W W W
W
WWWW
G
G
G
G
W
W
W W
W
W
W
W
W
G G
G
G
G G
G
G G
G
G G
G
G
G G
G G
G G
15" RCP
12" VCP
P
V C
10" VCP
8" VCP
15" RCP
15" RCP
15" RCP
H
D P
E
15" RCP
C
12" PVC
12" PVC
C M
P
P
E
P
E
H
D
P
E
160.37
160.30
160.22
160.29
160.24
160.09
160.14
160.09
160.09
160.27
160.31
160.34
160.17
160.12
160.27
160.26
160.05
W W
W W
W W
W W
W W
HPS
HPS
C L A
Y
10" CLAY
S
A
N
S
A
N
W
W
W
S
A
W W W W
W
W
W
W W
W
W
W
W
W
W
W
W
W W W W W W W W W W W
W W
W W
W W
W W
W
W
W W
W
APPROXIMATE LOCATION
OF EXISTING 10" WATER
MAIN PER WEST POINT
DPW DRAWINGS
APPROXIMATE LOCATION OF
EXISTING UTILITIES PER
WEST POINT DPW DRAWINGS
APPROXIMATE LOCATION OF
EXISTING SANITARY SERVICE
PER WEST POINT DPW
DRAWINGS
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
APPROXIMATE LOCATION OF
EXISTING ELECTRIC SERVICE
PER WEST POINT DPW
DRAWINGS
G
G
G G
G G
G
G
APPROXIMATE LOCATION OF
AIR VENTILATION TUNNEL
(PER AS-BUILT DRAWINGS)
EXISTING RAISED
BRICK MANHOLE
APPROXIMATE LOCATION OF
EXISTING UNDERGROUND
UTILITY TUNNEL
S D
S
D
S
D
(2) 6" DIP
INV. 130.06±
(PER FIELD
INVESTIGATION)
6" CLAY PIPE
INV. 129.87±
(PER FIELD
INVESTIGATION)
6" DIP
INV. 127.83±
(PER FIELD
INVESTIGATION)
28" MAPLE
APPROXIMATE LOCATION OF
EXISTING COMMUNICATION
SERVICE PER WEST POINT
DPW DRAWINGS
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
FF
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E S
E S
E S
E S
E S
E
S
A
N
S
A
N
SD
SD
D
MECHANICAL YARD/DUNNAGE AREA ABOVE
(SEE MECHANICAL, PLUMBING, FIRE
PROTECTION AND ELECTRICAL DRAWINGS)
COMM. SERVICE
CONNECT TO NEW SANITARY
SEWER SERVICE WITHIN
UTILITY TUNNEL BELOW
CULLUM HALL. SEE
PLUMBING PLAN FOR
CONTINUATION
PVC SANITARY SERVICE
(MATCH EXISTING SIZE,
INVERTS AND SLOPE)
CONNECT NEW PRIMARY ELECTRIC
SERVICE INTO EXISTING ELECTRIC
MANHOLE (SEE ELECTRICAL DRAWINGS)
EXTEND NEW SANITARY AND STEAM, FROM
CULLUM HALL TO LINCOLN HALL, WITHIN UTILITY
TUNNEL FOR LINCOLN HALL CONNECTION (SEE
MECHANICAL AND PLUMBING DRAWINGS)
F
F
F F
W
D
D
S D
S D
S D
S
D
E
E
S
E
S
8" DIP FIRE
WATER
SERVICE
MH-1
SECONDARY ELECTRIC MANHOLE TO
SERVE CULLUM HALL
SECONDARY ELECTRIC SERVICE
CONDUITS (SPARE FOR LINCOLN HALL)
MH-2
SECONDARY ELECTRIC MANHOLE TO
SERVICE LINCOLN HALL
PRIMARY ELECTRIC
SERVICE
MH-3
PRIMARY ELECTRIC
MANHOLE
E
CONNECT TO EXISTING
GAS SERVICE
3" GAS VALVE
NEW 3" POLYETHYLENE
GAS SERVICE
8" PIV
SEE PLUMBING DRAWINGS
FOR CONTINUATION
WITHIN BUILDING
SEE TELCOMM DRAWINGS
FOR CONTINUATION WITHIN
BUILDING
8" WATER SERVICE
CONNECTION FOR FIRE
PUMP HOUSE
COMM. SERVICE (SEE
TELCOMM DRAWINGS FOR
CONNECTION)
SEE TELCOMM DRAWINGS FOR
CONTINUATION WITHIN BUILDING
CONNECT COMM. SERVICE INTO
EXISTING COMMUNICATION MANHOLE
(SEE TELCOMM DRAWINGS)
W
4" VALVE
4" DIP WATER
SERVICE
EXISTING 6" DIP STUB FROM 10" MAIN
COORDINATE WITH WEST POINT DPW
FOR WATER SHUT-OFF
6"x6"x8" TEE
4"x6" REDUCER
LOCATE EAST
OF 8" FIRE
CONNECTION.
F F
F F
F F
W W
W W
W W
W
8" DIP FIRE
WATER
SERVICE
INSTALL PIPE THROUGH
EXISTING CONCRETE
RETAINING WALL
CONNECT INTO EXISTING
BRICK MANHOLE
MATCH INVERT
S
A
N
S
A
N
H
P
S
H
P
S
E
E S
E S
ES
6" DIP FIRE SERVICE TO
CULLUM HALL (SEE FIRE
PROTECTION PLAN)
STEAM SERVICE
SEE MECHANICAL
DRAWINGS FOR
CONTINUATION
WITHIN BUILDING
D
EE
COMM
FIRE PUMP HOUSE
ELECTRICAL AND
COMMUNICATION SERVICE
FIRE PUMP HOUSE (SEE
FIRE PROTECTION PLAN)
G G
G
SEE PLUMBING DRAWINGS
FOR CONTINUATION
WITHIN BUILDING
D
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C
SD
COCO
EX. COMM MH-1021
CONNECT COMM. SERVICE
INTO EXISTING
COMMUNICATION MANHOLE
(SEE TELCOMM DRAWINGS)
COMM. SERVICE
COMM
COMM
SEE TELCOMM
DRAWINGS FOR
CONTINUATION TO
DAVIS BARRACKS
EX. COMM MH-25
EX. COMM MH-25B
8" CHILLED WATER SUPPLY AND
RETURN INSTALLED UNDER
SEPARATE CONTRACT (SEE
MECHANICAL DRAWINGS FOR TAPS
AND CONTINUATION WITHIN BUILDING)
F F
F F
F
FIRE DEPARTMENT
CONNECTION (SEE
FIRE PROTECTION
PLAN)
4" DIP FIRE
WATER SERVICE
4" DIP FIRE SERVICE
WITHIN UTILITY TUNNEL
TO CULLUM HALL (SEE
FIRE PROTECTION PLAN)
S
D
SD
SANITARY MH #1
RIM. 134.00
INVERTS AND SIZE OF PIPE
TO BE VERIFIED IN FIELD
NO PARKING
NO PARKING
MECHANICAL YARD CLIN INCLUDES ALL NEW
STRUCTURAL FOUNDATION, CONCRETE, AND
STEEL WORK IN NORTH SERVICE YARD
REPAIR TO EXISTING SITE RETAINING WALLS
AND STAIRS IS NOT INCLUDED
C E
E
CO
GENERATOR ELECTRIC
CONDUIT (SEE ELECTRICAL
DRAWINGS FOR CONTINUATION)
GENERATOR, GENERATOR PAD,
AND ASSOCIATED EQUIPMENT
(SEE ELECTRICAL DRAWINGS
FOR COORDINATION)
RELOCATED TRASH
COMPACTOR (SEE ELECTRICAL
DRAWINGS FOR COORDINATION)
GENERATOR FENCING AND GATE
LAYOUT MUST BE COORDINATED WITH
THE FINAL GENERATOR MANUFACTURER
SELECTED TO PROVIDE THE REQUIRED
OFFSET FROM THE GENERATOR TO THE
FENCE FOR SAFE ACCESS AND TO
ACCESS THE DOOR SWING AREA
N
COORDINATE TABLE
STRUCTURE NAME
ELEC MH-1
ELEC MH-2
ELEC-MH-3
EX. COMM MH-1021
EX. COMM MH-25
EX. COMM MH-25B
SANITARY MH #1
NORTHING
932609.3191
932606.4149
932588.5762
932469.6150
932477.5050
932556.4260
932442.7054
EASTING
642024.3578
642077.4624
642066.4643
641843.4470
641839.6870
642048.9300
641962.6737
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
P R
O J E
SHEET
IDENTIFICATION
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
US Army Corps of Engineers
N E
W
Y
O R
K
D
I S
T R
I C
T
N E
W
Y
O R
K
N
Y
W D
S C
A N
S I
D
W D
S R
M
Y
W E
I N
T
C
U L L U
M
H
A L L
W E
I N
T
N
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
20' 40'0
N
A1
UTILITY PLAN
SCALE: 1"=20'
1 0
A M
E N
D M
E N
T
R T
A
S
U B
M I S
S I O
N
D P
J K
U T
I L I T
Y
P
L A
N
C I V
I L
CU101
GENERAL SHEET NOTES
1. NEW STEAM AND SANITARY SERVICE TO BE INSTALLED
WITHIN UTILITY TUNNEL BELOW CULLUM HALL. (SEE
MECHANICAL AND PLUMBING DRAWINGS)
2. THE NEW STEAM AND SANITARY SERVICE MUST BE
EXTENDED WITHIN THE UTILITY TUNNEL NORTH FROM THE
NORTH CULLUM WALL AND CONNECT INTO THE EXISTING
STEAM AND SANITARY SERVICE FOR LINCOLN HALL AT THE
SOUTH LINCOLN HALL WALL.
3. REFER TO ARCHITECTURAL, STRUCTURAL, ELECTRICAL,
AND FIRE PROTECTION DRAWINGS FOR MECHANICAL YARD
LAYOUT AND EQUIPMENT LOCATIONS.
4. REFER TO ELECTRICAL DRAWINGS FOR GENERATOR
LAYOUT.
5. AMERICAN WATER (AW) IS THE OWNER AND OPERATOR OF
ALL SANITARY SEWER AND DOMESTIC/FIRE WATER MAINS
THROUGHOUT USMA WEST POINT. THE MAINS MUST ONLY
BE MODIFIED AND/OR CONSTRUCTED UPON BY AW.
6. CITY LIGHT AND POWER (CLP) IS THE OWNER AND
OPERATOR OF ALL ELECTRICAL TRANSMISSION,
DISTRIBUTION, AND SERVICE THROUGHOUT USMA WEST
POINT. THE SYSTEM MUST ONLY BE MODIFIED AND/OR
CONSTRUCTED UPON BY CLP.
7. USAG WEST POINT HAS PRIVATIZED WATER, WASTEWATER,
AND ELECTRICAL SERVICE. ALL UTILITY WORK ON THESE
SYSTEMS SHALL BE COORDINATED WITH THE UTILITY
SYSTEMS OWNERS:
ELECTRIC - CITY LIGHT AND POWER
WATER - AMERICAN WATER FEDERAL SERVICES
WASTEWATER - AMERICAN WATER FEDERAL SERVICES
PRIMARY POINT OF CONTACT FOR COORDINATION IS RANGI
MATHEW, RANGI.K.MATHEW2.CIV@MAIL.MIL
8. GENERATOR PAD MUST BE SIZED ACCORDINGLY BASED ON
SELECTED GENERATOR MANUFACTURER REQUIREMENTS.
9. GENERATOR FENCING AND GATE LAYOUT MUST BE
COORDINATED WITH THE FINAL GENERATOR
MANUFACTURER SELECTED TO PROVIDE THE REQUIRED
OFFSET FROM THE GENERATOR TO THE FENCE FOR SAFE
ACCESS AND TO ACCESS THE DOOR SWING AREA.
CB
COMM
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
FFFFFFFFF
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E S
E S
E S
E S
E S
E S
E S
E S
E S
E S
E S
E S
E S
E S
E S
E S
E S
E S
E S
E S
E S
E S
E
DN
F
F
F
F
F
F
F
F
F
F
F
F F
F F
F F
F F
F
F
F
F
D
D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S
D
S
D
S
D
S
D
S
D
E
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
C O
M M
S D
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
E S
E S
E S
E S
E S
E S
E S
E
S
ESESESESES
E
E
EEEEEEEE
COMMCOMMCOMMCOMM
G G
G
G
D
S
D
F F
F F
F F
F F
F F
F F
F F
F F
F
F
F
SD
SD
SD
SD
SD
C
EXTEND NEW SANITARY AND STEAM SERVICE
FROM CULLUM HALL TO LINCOLN HALL, WITHIN
UTILITY TUNNEL FOR LINCOLN HALL CONNECTION
(SEE MECHANICAL AND PLUMBING DRAWINGS)
8" DIP FIRE
WATER
SERVICE
MH-1
SECONDARY ELECTRIC
MANHOLE TO SERVE
CULLUM HALL (SEE
ELECTRICAL DRAWINGS)
SECONDARY ELECTRIC
SERVICE CONDUITS (SPARE
FOR LINCOLN HALL)
MH-2
SECONDARY ELECTRIC
MANHOLE TO SERVICE
LINCOLN HALLPRIMARY ELECTRIC
SERVICE (TYP.)
MH-3
PRIMARY ELECTRIC
MANHOLE
8" WATER SERVICE
CONNECTION FOR FIRE
PUMP HOUSE
6" DIP FIRE SERVICE TO
CULLUM HALL (SEE FIRE
PROTECTION
DRAWINGS)
FIRE PUMP HOUSE
ELECTRICAL AND
COMMUNICATION SERVICE
(SEE ELECTRICAL AND
COMMUNICATION DRAWINGS)
FIRE PUMP HOUSE
(SEE FIRE PROTECTION PLAN)
3" GAS SERVICE
(SEE PLUMBING
DRAWINGS)
EX. COMM MH-25B
4" DIP FIRE
WATER SERVICE
4" DIP FIRE SERVICE
WITHIN UTILITY TUNNEL
TO CULLUM HALL (SEE
FIRE PROTECTION
DRAWINGS)
CULLUM HALL
BUILDING 605
4 STORY
STONE
MASONRY
BUILDING
S T
A I R
S
APPROXIMATE LOCATION
OF EXISTING
UNDERGROUND UTILITY
TUNNEL
LINCOLN HALL
BUILDING 607
4 STORY
STONE
MASONRY
BUILDING
R A
M P
MECHANI…