W912DS21R0003 Amendment 00004.pdf

PDF 674 KB Posted

Attached to
Cullum Hall Repair Building 605
Solicitation number
W912DS21R0003
Issued by

About this file

This document is an amendment to a solicitation for the Cullum Hall Repair Building 605 project. The Army Corps of Engineers is seeking to renovate Cullum Hall at the United States Military Academy at West Point. The amendment provides responses to contractor questions for informational purposes only. It clarifies details on drawings and specifications, such as fixture types and designations. The amendment also includes site visit sign-in sheets and requires acknowledgement of receipt by offerors. Contractors must address schedule management, material delivery, cost controls, and other best practices for the historic restoration in their proposals.

View the file

Other files

File Type Posted
W912DS21R0003 Amendment 00009.pdf PDF
W912DS21R0003 Amendment 00008.pdf PDF
W912DS21R0003 Amendment 00007.pdf PDF
CULLUM_Amendment 7_Drawings Combined.pdf PDF
CULLUM_Amendment 7_Specifications Combined.pdf PDF
CULLUM_Amendment 6_Specs Combined.pdf PDF
CULLUM_Amendment 6_Drawings Combined.pdf PDF
W912DS21R0003 Amendment 00006.pdf PDF
W912DS21R0003 Amendment 00005.pdf PDF
Cullum Hall Site Visit Sign In Roster 20APR2021.pdf PDF
Cullum Site Visit Sign In Roster 4 May 2021.pdf PDF
Amendment 3_Cullum_C-502.pdf PDF
Amendment 3 Demolition Sheets.pdf PDF
Amendment 3 _ Cullum H-1B2_HAZMAT_PLAN_BASEMENT_LEVEL_2.pdf PDF
W912DS21R0003 Amendment 00003.pdf PDF
CULLUM_Amendment 3_Specifications Combined.pdf PDF
CULLUM_Amendment 3_Drawings Combined.pdf PDF
W912DS21R0003 Amendment 00002.pdf PDF
CULLUM_Amendment 1_Drawings Combined.pdf PDF
W912DS21R0003 Amendment 00001.pdf PDF
CULLUM_Amendment 1_Specifications Combined.pdf PDF
CULLUM RTA SPECS - VOLUME 1.pdf PDF
CULLUM RTA DRAWINGS - VOLUME 1.pdf PDF
CULLUM RTA DRAWINGS - VOLUME 3.pdf PDF
CULLUM RTA DRAWINGS - VOLUME 2.pdf PDF
CULLUM RTA SPECS - VOLUME 2.pdf PDF
JA -Milford Granite.pdf PDF
JA -E Shark 200 Meters.pdf PDF
JA-Distributed Antenna System C Squared systems.pdf PDF
JA- Hirsch Card Access system.pdf PDF
W912DS21R0003.pdf PDF
JA -Monaco Cullum.pdf PDF
JA -Best Hardware Lock Cylinders and Cores.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DS21R0003

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Answ er questions to prospective bidders for informational purposes only

2. Include site visit sign-in sheets.

Off eror must acknow ledge receipt of this amendment by the date specif ied in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS21R0003

X 9B. DATED (SEE ITEM 11)

13-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-May-2021

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

Cullum Hall Building 605 Renovation USMA West Point, New York

Amendment 0004

AMENDMENT 0004 for

Cullum Hall Building 605 Renovation for West Point W912DS21R0003.

TO BIDDERS:

The following changes shall be made to the drawings and specifications.

DRAWINGS:

1. The following DRAWINGS have been REVISED and REISSUED:

2. The following DRAWINGS have been REVISED but NOT REISSUED:

a. None

3. The following DRAWINGS have been ADDED:

4. The following DRAWINGS have been DELETED:

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

OFFEROR’S QUESTIONS AND GOVERNMENT REPLY

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation. This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents. Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted in the FBO.

1. Q. Under notice to bidders, it indicates questions shall be submitted via Bidder Inquiry in ProjNet at least 10 calendar days prior to the RFP for receipt of bids. However, under General Instructions and Proposal Submission Requirements it indicates to submit inquiries only be email to Nicole.Fauntleroy@usace.army.mil within 7 calendars days prior to the date set for receipt of offers. Please clarify.

A. All inquiries should be submitted via ProjNet. This requirement has been removed in amendment 3.

2. Q. Drawing TS101-102 state that only key notes 1,6,9 & 10 pertain to add alternate #10 (item #0015). Are we to assume that the remaining key notes apply to add alternate #11 (item #0016)? Please clarify.

A. Remaining notes apply to base bid with the exception of key note #4, which applies to Add Alternate #11.

3. Q. Drawing T-503 shows all racks associated with low voltage systems. Are racks supposed to be separated by "Options"? Example, option #5 derives from CCTV/ACS rack. Option #6 which is the intrusion system is derived from the same rack CCTV/ACS, unless all racks will fall under the communications option or the base bid?

A. All racks/cabinets fall under base bid.

4. Q. ITEM 0010, Option #5 includes the intrusion detection system. ITEM 0011, Option #6 includes the access control system. What CLIN, Option Number does the CCTV system fall under? There is no option or separate ITEM No. for this system.

A. CCTV is rough-in only, covered under base bid.

5. Q. There are three museum cabinets located in level B2. These cabinets are single-piece, dimensioned 96"x50"x79", and weigh approximately 2000 lbs each. These cannot be walked downstairs and there is no elevator in the building, please advise the route by which these should be brought into level B2.

A. As Keynote 19 on Sheet I-120B2 states, this item does require coordination with other construction work for large components going into the building and it is required of the Contractor to coordinate this scope.

For the Viking Museum Cabinets (XH-6) we discussed the building constraints with the BOD Vender - Spacesaver and they had confirmed that these can be provided in parts and assembled on site as a modified standard to meet the Users mission requirements. The method for install discussed was to bring in the base platform portion as a single piece and then the other components separately and follow up fabrication/welding as needed on site within space identified. The lead time for this item at time of issuance, was approx. 16-18 weeks.

The route plan discussed with the Vender was for the larger pieces to be brought into the North/East B2 Level doorway, Railings of that stair will need to be removed to allow for sufficient clearance into door (refinishing of that stair rail to take place congruently if possible). Items will need to be lifted to height of stair landing. The other entry on Level B2 at the Southeast side of bldg. also has a run of stairs and railing thus will be a similar strategy with need to lift item and have railings removed. Contractor must work with awarded vender to coordinate the best routing plan. While this is a suggestion it is the contractor's responsibility to coordinate the best method.

There will be a new Elevator on the Northwest corner of the building, off the first-floor level terrace and on grade with Cullum Road for transport of regular sized and smaller items.

6. Q. Please advise as to the size of the entrance mat for vestibule CH-104A as no size can be found.

A. On Finish Schedule sheet I-001 Finish WM3 Loose Lay Walk-Off Mats are to be 8'-0" x 4'-0" UNO.

7. Q. Drawing T-603 depicts Option 5 (intrusion) & Option 6 (access). Please clarify as to what is access control versus intrusion system on this drawing as it all looks like an access system. Do these two systems share a data rack, if so how should pricing be separated?

A. IDS/ACS will share a rack. The rack falls under base bid. IDS will consist only of door position sensors (balanced magnets switch type). One double pole double throw BMS can tie in to both ACS and IDS. Two conductors are required per system. All pathways will be shared, hence the single riser diagram. Device cost can be spilt or allocated to first option taken. Cabling can be shared if coordinated between ACS/IDS vendors or separate cables can be pulled for each system.

8. Q. Confirm that all CCTV cameras shown on "T" drawings are fixed cameras. There is no designation on camera types, please confirm there are not PTZ cameras to be required.

A. CCTV is rough-in only.

9. Q. Please confirm which Items or Options should demolition and removal of existing systems indicated in Option #5, Option #6 and Option #7.

A. Demolition of existing systems falls under base bid.

10. Q. Section 2.2.4.1 Raised Characters and Braille - Integral tactile characters, graphics and fully domed braille achieved by UV-Cured, 3D Direct-Print Photopolymerization process on acrylic, shall be raised 1/32" from the first surface processes. ADA compliant graphics must be of the type that has a minimum durometer reading of 90.

Do these signs need to Photopolymer or 3D direct print? Or can we provide our own alternative which will be the most cost effective?

A. Signage is to be provided as Direct Print UV Cured (photopolymerization) for raised characters and braille at dimensions noted. Only equivalent products to the basis of design as specified are acceptable.

11. Q. The quantity of environmental room panels required for this project necessitates the need for a delivery on a full tractor trailer, 53'. Please confirm full tractor trailer deliveries are permitted at this facility.

A. Coordination with the COR and west point to close one lane will be required well in advance and you should not assume approval will granted on a certain day.

12. Q. Specification section 099000 1.4.2 requires the painting subcontractors to have SSPC QP1 certification.

This is an industrial painting certification for industrial painters. Please confirm since there is not industrial painting on this project, this requirement will be waived.

A. SSPC QP1 Certification is not required.

13. Q. Detail A6 shows the designated the elevations for the men's restroom to be E7 and E3 for the East and West walls, respectively. These details do not exist. Please confirm the elevations to reference for the East and West walls are F3 and F7, respectively.

A. See amendment 3 for a revised drawing.

14. Q. Detail D7 only shows TA-01 (Surface mounted toilet dispenser) on the right stall. Please confirm an additional TA-01 is needed in the left toilet compartment (than what is shown).

A. See amendment 3 for a revised drawing A-403,404,405.

15. Q. The first line on the Summary of Shelving Storage Capacity lists the count and cubic feet totals for the unit. Please provide the code and item description.

A. See amendment 3 for a revised drawing I -120.

16. Q. Detail D7 only shows TA-01 (Surface mounted toilet dispenser) on the right stall. Please confirm an additional TA-01 is needed in the left toilet compartment (than what is shown).

A. See amendment 3 for a revised drawing.

17. Q. Please Confirm if there is a current warranty on the roof. If there is please confirm the roofing contractor that holds the warranty.

A. The roof does not have a warranty.

18. Q. Would USACE please consider allowing 10 years back for relevant project experience in lieu of 7? Our firm has several relevant projects at West Point completed just outside of the 7 year window.

A. No, the relevant experience must meet the criteria stated in the solicitation documents.

19. Q. Please clarify the design build and mounting for sign type ES - 1. Can you direct me to some specs and artwork in the bid packet?

A. Per general note #15 on Sheet I-140.1 and on the Legend of the Signage Location Plans, Sign type (ES) is provided by the Government not the Contractor (GFGI). Sign type (ES) is a freestanding Electronic Display Monitor oriented vertically. on Stand that sits on the floor. The Elec power / Data pathways are provided for connectivity as part of Construction scope.

20. Q. It is indicated in various locations that it is assumed that existing foundations bear on bedrock.

Contractor must field verify this presumption. Please confirm for bidding purposes that we are to assume that foundations do bear on bedrock and any rock is not encountered then reinforcement by underpinning would be a change order.

A. Based on the geotechnical investigation the contract documents describe a foundation system bearing on bedrock. In the event the contractor determines through field investigations and construction activities that the actual conditions differ from the contract documents they must bring their findings to the attention of USACE's contracting officer and representative for guidance and direction.

21. Q. Please provide sign details for Sign Type ES-1 as listed on the Signage Schedule.

A. Per general note #15 on Sheet I-140.1 and on the Legend of the Signage Location Plans, Sign type (ES) is provided by the Government not the Contractor (GFGI). Sign type (ES) is a freestanding Electronic Display Monitor oriented vertically. on Stand that sits on the floor. The Elec power / Data pathways are provided for connectivity as part of Construction scope.

22. Q. Factor 3 part i asks the Offeror to describe "schedule management, material/equipment delivery and management, labor management, cost management, site security and personnel assurance. Then Factor 3 part iv.

asks the Offeror to describe "schedule management, material/equipment delivery and management, labor management, cost management, site security and personnel assurance system management". These questions are asked in two different response sections within Factor 3. Please confirm whether Offeror is supposed to address these elements in Factor 3 i or Factor 3 iv.

A: These sections are asking for different information.

Factor 3, Part i asks for a description of the technical construction/installation approach the offeror will use as it relates to schedule management, material/equipment delivery and management, methods of restoring historic craftmanship, structural retrofit and related phasing, labor management, cost management, site security and personnel assurance.

Factor 3, part iv asks for a description of the specific role and interactions of the Offeror’s team during construction, and specifically during the activities of schedule management, material/equipment delivery and management, methods of restoring historic craftmanship, structural retrofit and related phasing, labor management, cost management, site security and personnel assurance. It also asks how the Offeror’s team will interact with the Corp of Engineers during these same activities.

23. Q. Please confirm if there is a current warranty on the wood windows. If there is, please confirm Manufacturer/Installer who holds the warranty.

A. The windows do not have a warranty.

24. Q. Please confirm if there is a current warranty on the Aluminum Windows. If there is, please confirm Manufacturer/Installer who holds the warranty.

A. The windows do not have a warranty.

25. Q. Telecommunications conduit, backboxes, cable tray and all infrastructure is in he base bid and not the telecommunications Option, will the conduit, backboxes, cable try and other infrastructure be included in the security options. Note D on drawing T-603 (a security drawing) states that all infrastructure for telecommunications is in base bid, should we presume the intent to have the security infrastructure in base bid as well, or all in the Option? Please clarify.

A. All conduits, fittings, pull boxes, back boxes, cable tray, and other infrastructure fall under base bid.

Cabling and devices fall under bid option.

26. Q. Does the base bid for ball room CH-200 globe fixtures get new wire and conduit or just wire only?

A. Base-bid scope shall include new conduit and wire.

27. Q. Follow up on question to #9198956-govt response is that the cold storage system requirements include meeting the specs of the "controls to motorize the system". I would like to ask again why is it necessary for a weight load of 3,500 lbs per wheel -as mentioned in the spec-when that is not the requirement for the other 6 mobile systems in the spec.-and there are not items specified in the cold room storage room that require that weight load?

A. Reduction of capacities or change to specified system for the Cold Storage High-Density system must be approved by the Government/USACE.

28. Q. Are groove joints and grooved cast iron couplings/fittings acceptable for Heating HW and Chilled water sizes 2-8". Specifications indicate groove end pipe accessories are acceptable however do not call out groove pipe joints. Please clarify.

A. Grooved joints are not permitted on piping, fittings, or accessories for heating hot water or chilled water systems..

29. Q. Please advise who the security contractor / vendor is for the West Point campus.

A. Question is not relevant to this project specifically. Access to the post will be coordinated with the installation and passes will be provide.

30. Q. Please provide a point of contact familiar with the project at American Water.

A. Kyle Midthassel, Capital Program Manager, American Water Kyle.Midthassel@amwater.com

31. Q. Please provide natural gas service provider and point of contact.

A. Central Hudson Gas and Electric.

32. Q. Note 11S: Memorial Plaques in Casework: Remove, catalogue, store and protect memorial plaques on wall panels for reinstallation (Memorial Room CH-106A Only). Contractor is responsible for protecting the plaques and wall panels until re-install per drawings. Does this scope need to be performed by a third party specialist or can Contractor directly self perform this scope of work?

A. The JV does not mandate the contractor to hire third party specialist if they have the capability of preforming the work. However it is the contractor's responsibility to ensure the plaques and wall panels are protected, catalogued and reinstalled per their original condition as indicated on the drawings. Any damage incurred must be repaired at no cost to the Government. USACE to determine if a third party is necessary.

33. Q. Arktura metal ceiling system supplier reached out to the designer asking if their system is specified.

They were told it is listed in the Interior Finish Schedule but we can't locate where it is called out. Please clarify the ceiling system is specified for the project and if so, where.

A. There are not any metal ceilings in the Cullum Hall project.

34. Q. Can the 3D model for this project be made available for our use in constructability and logistics review?

Please advise.

A. The Revit model will be provided to the selected contractor.

35. Q. Note 11S indicates Memorial Plaques in Casework: Remove, catalogue, store and protect memorial plaques on wall panels for reinstallation (Memorial Room CH-106A Only). Contractor is responsible for protecting the plaques and wall panels until re-install per drawings. What kind of storage requirements are going to be required for these memorial plaques. Can these plaques be stored in the building, will they require storage off site, will storage need to be conditioned, etc.? What method of cataloging will be required?

A. The JV recommends storing items in a similar conditioned environment to the existing. The JV is not mandating to the contractor how to store the items; however, it is the contractor's responsibility to ensure the plaques and wall panels are protected, catalogued and reinstalled per their original condition as indicated on the drawings. Any damage must be repaired at no cost to the government. USACE to confirm if they agree.

36. Q. Note F indicates Existing furniture and furnishes (refer to FFE) to be refurbished for reuse. Remaining items to be stored and protected during construction. Will the Gov. remove and store these items or will it be by Contractor? If by contractor please provide all requirements (storage, direct, third party, cataloging, etc.)

A. The JV has been informed that West Point will remove furniture prior to the start of construction.

USACE please confirm. If there are any remaining items at the start of construction the contractor must notify/coordinate with West Point/USACE for the furniture's removal.

37. Q. Please confirm per specification 013591 the Contractor is responsible for all removal and off-site storage of existing artifacts / archives within the building. Please advise of additional cataloguing, protection, storage, transportation, requirements.

A. It is the contractor's responsibility to ensure the artifacts are protected, catalogued, stored and reinstalled per their original condition as indicated on the drawings/specifications. Any damage to the artifacts must be repaired at no cost to the government.

38. Q. In reference to the new 4" underground Domestic Water pipe servicing Cullum Hall, Ductile Iron is the most commonly used material for underground water service of that size, but your specs are not allowing this as an option. Please advise A. American Water installs the water service from the main to a point 5' from the building. That site piping is to be ductile iron and the American Water specifications are located within the appendix of the project specifications for reference.

39. Q. Please provide method of mounting existing "black" laminate panels with brass engraved plaques to adhered new sold surface surround.

A. Once existing panels are disassembled determine nature of reattachment with mounting to meet or exceed existing method. To be reviewed thru shop submittal process. It will depend on what material is on the back of the existing laminate panels for adherence and if pin mounts had been used or other mounting method, new solid surface to be prepped accordingly.

40. Q. Can a storm riser diagram be provided?

A. Drawing issued in amendment 3 – P-703.

41. Q. First Floor EL-101 – Memorial Room H106A (Colum line 3.5)-3 Fixtures are marked with designation P6 (a new fixture) but the note with leader arrow refers to historical restoration. Please confirm which is correct.

A. Please disregard the note referencing 'existing historical fixture to be refurbished'. The (3) P6 fixtures in question are to be new. See drawing EL-101 reissued in amendment 3.

42. Q. "First Floor EL-101 – Front Entrance (Column line C and D) 2 Fixtures are marked with designation H but the note with leader arrow refers to Type G. Please confirm which is correct."

A. The fixtures in question are to be designation type 'H per the fixture tag. See drawing EL-101 reissued in amendment 3.

(End of Summary of Changes)