CULLUM_Amendment 3_Drawings Combined.pdf
PDF 6 MB Posted
- Attached to
- Cullum Hall Repair Building 605
- Solicitation number
- W912DS21R0003
About this file
This document outlines the demolition plans for Cullum Hall Building 605 at West Point, New York. The project involves renovations to the basement and first two floors, including removal of walls, ceilings, flooring, casework and other fixtures. Hazardous materials like asbestos and lead paint will be abated. Historic features such as fireplaces and doors will be preserved. The work requires demolition of stage framing, electrical/mechanical systems, and plumbing fixtures. Temporary barriers and safeguards must be installed to protect remaining materials.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLUB/STOR
CH-B206
COAL SHOOT
CH-B208
UNASSIGNED /
UNFINISHED
CH-B212
UNASSIGNED /
UNFINISHED
CH-B214
UNASSIGNED /
UNFINISHED
CH-B218
STOR.
CH-B202
CLUB/STOR
CH-B204D
CLUB/STOR
CH-B204C
CLUB/STOR
CH-B204B
CLUB/STOR
CH-B204A
CORR
CH-B2C2
CLUB/STOR
CH-B200A
CLUB/STOR
CH-B200B
CLUB/STOR
CH-B200C
CLUB/STOR
CH-B200D
CLUB/STOR
CH-B200E
CORR
CH-B2C1
VESTIBULE
CH-B205
CLUB/STOR
CH-B211A
CLUB/STOR
CH-B211B
CLUB/STOR
CH-B211C
CLUB/STOR
CH-B213A
CLUB/STOR
CH-B213B
EXIST. ELEC
CH-B210A
EXIST. MECH
CH-B210B
EX. MECH. STAIR
CH-B210C
CLUB/STOR
CH-B216B
CLUB/STOR
CH-B216C
CLUB/STOR
CH-B216D
CORR
CH-B216A
CLUB/STOR
CH-B203
CLUB/STOR
CH-B217
VEST
CH-B219
TOILET
CH-B201
EW1 EW2 EW3 EW4
NS1
NS2
2.5
CH-B217.1
C H
B
OPEN TO
BELOW
C H
B
C H
B
B
B
42 43 44 45
SOUTHEAST
STAIR
CH-B1S2
12 27 28 47
54 5552 53
12 27 28 54 5552 53 12 27 28 47 54 5552 53 12 27 28 47 54 5552 53
27 28 47 52 5331 51504948
59 6057 581
61 62 63 64
65 66 67
12 27 28 47
54 5552 53
12 27 28 47
54 5552 53
12 27 28 47 54 5552 53
27 28 47
5452 53
27 28
12 27 28 47 54 5552 53
SCALE: 1/8"=1'-0"
0 84
US Army Corps of Engineers ®
SHEET ID
U S
A
R M
Y
C
O R
P
O
F
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
C T
N
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
P R
O J E
PLAN NORTH
H-1B2
H A
Z M
L A
N
B
A S
E M
E N
T
L
E V
E L
W E
I N
T
N
Y
A T
L R
S
K G
W D
S R
W D
S C
RTA SUBMISSION 2/11/2021
U S
M
B
I L D
I N
G
C
U L L U
M
H
A L L
R
E N
O V
A T
I O
N
SCALE: 1/8" = 1'-0"H-1B2
HAZMAT PLAN - BASEMENT LEVEL B2A1
1. NOT ALL OF THE ACMS DEPICTED ON THE DRAWINGS WILL REQUIRE
ABATEMENT. REFER TO THE ARCHITECTURAL, MECHANICAL, PLUMBING,
AND ELECTRICAL DRAWINGS FOR ALL ITEMS THAT WILL REQUIRE REMOVAL.
ASBESTOS NOTES
1. OSHA'S LEAD IN CONSTRUCTION STANDARD APPLIES TO ALL DISTURBANCES OF
LEAD BASED PAINT. IN ADDITION, THE CONTRACTOR SHALL USE METHODS TO
LIMIT THE AMOUNT OF DUST PRODUCED DURING DEMOLITION OF ANY WALL AND
CEILINGS CONTAINING LEAD BASED PAINT. ICRA DUST CONTROLS SHALL BE
UTILIZED AT ALL TIMES.
LEAD BASED PAINT NOTES
LEAD BASED PAINT SAMPLE SYMBOLSASBESTOS SAMPLE SYMBOLS
1.
2.
GENERAL NOTES
THIS DRAWING IS DIAGRAMMATIC AND IS TO BE USED FOR GENERAL
INFORMATION AND SAMPLE LOCATIONS.
SEE THE SPECIFICATIONS DOCUMENT FOR THE HAZARDOUS MITIGATION PLAN,
DIVISION 02 ABATEMENT SPECIFICATIONS 02 82 00, 02 83 00, 02 84 10, AND 02 85 00
AND THE ASBESTOS CONTAINING MATERIALS SURVEY REPORT BY OAK GROUP
FROM THE MASON AND HANGER PDR FOR MORE INFORMATION.
SYMBOL KEY
- DESIGNATION FOR LEAD BASED PAINT CONTAINING MATERIALS
- DESIGNATION FOR ASBESTOS CONTAINING MATERIALS
- EXIST WALLS, DOORS TO REMAIN (SHOWN SCREENED)
- DEMOLITION WALLS, DOORS TO BE DEMOLISHED
(SHOWN DASHED)
3. ACCESSIBLE SPACES WERE SURVEYED FOR SUSPECT ASBESTOS
MATERIALS AND LEAD BASED PAINT. WHERE OBSERVED, THE MATERIALS ARE
NOTED ON THE PLANS.
M
E N
D M
E N
/2 6/
A S
U B
M
IS
S
IO
/1
1/ bkolonauski Snapshot
1 0
M
E N
D M
E N
T
R T
A
S
U B
M I S
S I O
N
J K
D P
K M
C O
N S
T R
U C
T I O
N
D
E T
A I L S
C I V
I L
C-502
D A
T E
M A
R K
D E
S C
R I P
T I O
N
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
P R
O J E
SHEET
IDENTIFICATION
U S
A
R M
Y
C
O R
F
E
N G
I N
E E
R S
US Army Corps of Engineers
N E
W
Y
O R
K
D
I S
T R
I C
T
N E
W
Y
O R
K
N
Y
W D
S C
A N
S I
D
W D
S R
M
Y
W E
I N
T
C
U L L U
M
H
A L L
W E
I N
T
N
E W
Y
K
RTA SUBMISSION 2/11/2021
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D8
8' HIGH TEMPORARY CONSTRUCTION FENCE DETAIL
NOT TO SCALE
NON-PAVED AREAS PAVED AREAS
FINISHED GRADE
4" PLUS 1/2 PIPE O.D. MIN.,
SAWCUT (TYP.)
A2
(WATER SYSTEM, SANITARY SEWER SYSTEM, STORM SYSTEM)
NOT TO SCALE
NOTES:
1. BACKFILL IN EMBEDMENT ZONE MUST BE PLACED BY HAND IN 6-INCH LIFTS
ON BOTH SIDES OF PIPE TO PREVENT DISPLACEMENT. COMPACT TO 95%
MAX. DRY DENSITY IN ACCORDANCE WITH ASTM D-1557.
2. ALL EXCAVATED MATERIAL MUST BE REMOVED FROM GOVERNMENT
PROPERTY IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL FILL
MUST BE IMPORTED AS DIRECTED BY THE PROJECT SPECIFICATIONS.
TYPE "C" BEDDING
BROKEN STONE OR WASHED
GRAVEL MEETING REQUIREMENTS
OF COURSE AGGREGATE SIZE
NUMBER 57 WRAPPED IN
GEOTEXTILE FILTER FABRIC, FOR
360-DEGREES.
12" O.D. 12"
SELECT FILL BACKFILL MATERIAL,
COMPACT TO 90% MODIFIED
PROCTOR DENSITY (ASTM D-1557)
18"
SEE STANDARD
PAVEMENT DETAIL
24"
CLSM BACKFILL MATERIAL
B A
C K
F I L
L
Z
O N
E
E M
B E
D M
E N
T
Z O
N E
N
O T
E
SCARIFY SUBGRADE MIN 6" AND COMPACT TO
95% MODIFIED PROCTOR DENSITY (ASTM D-1557)
4" TOPSOIL, FERTILIZER, AND SEED
EXISTING PAVEMENT
TO BE SAWCUT FULL
DEPTH (BOTH SIDES)
A9
YARD 2 INLET DETAIL (2'X2')
NOT TO SCALE
MAGNETIC DETECTABLE
WARNING TAPE 12"
BELOW GRADE
SAND BAG
(TYP.)
12' WIDE x 8' HIGH ZINC
COATED FENCE PANEL
16"x36" PANEL
BASE STAND
ZINC COATED
STEEL WIRE
MESH
" O.D. PANEL FRAME
" DIAMOND WIDTH
SHUT
" SQ.
BODY
6" DIAMETER
36"
54"
MINIMUM
STANDPIPE BELOW GRADE
(PAINTED BLACK)
STANDPIPE ABOVE GRADE
(PAINTED RED)
STANDPIPE GROUND LINE MARK
GROUND LINE OR
FINISHED GRADE
TAMPER SWITCH (SEE
DETAIL A)
PADLOCK
PADLOCK
TAMPER
SWITCH
DETAIL A
S
H
U
T
D2
POST INDICATOR VALVE
NOT TO SCALE
TYPE "C" BEDDING, BROKEN STONE OR WASHED
GRAVEL MEETING REQUIREMENTS OF COURSE
AGGREGATE SIZE NO. 57 COMPACT TO 95%
MODIFIED PROCTOR DENSITY (ASTM D-1557)
GEOTEXTILE FILTER FABRIC
SCARIFY SUBGRADE MIN 6" AND
COMPACT TO 95% MODIFIED
PROCTOR DENSITY (ASTM D-1557).
GRADE
PVC PIPE
NOTES:
1. CLEANOUTS REQUIRED AT ALL BENDS,
CHANGES IN SLOPE AND AT BUILDING EXIT.
A5
REINFORCED PRECAST CONCRETE TRENCH DRAIN DETAIL
NOT TO SCALE
30"
9" 9"
PVC PIPE
WYE AND 1/8" BEND
EXISTING UNDISTURBED SOIL /
COMPACTED SELECT FILL COMPACT
TO 95% MODIFIED PROCTOR DENSITY
(ASTM D-1557)
PVC PIPE PER PLANS
SELECT FILL MATERIAL COMPACT TO
95% MODIFIED PROCTOR DENSITY
(ASTM D-1557)
3,000 PSI CONCRETE ON
COMPACTED SUBGRADE
BITUMINOUS PAVEMENT
(SEE DETAIL)
CAMPBELL FND. Co. COVER &
CIRCULAR FRAME # 1000 OR
APPROVED EQUAL
BRASS PLUG
UTILITY TRENCH AND BEDDING DETAIL
TYPE "C" BEDDING, BROKEN STONE
OR WASHED GRAVEL MEETING
REQUIREMENTS OF COURSE
AGGREGATE SIZE NO. 57 COMPACT
TO 95% MODIFIED PROCTOR DENSITY
(ASTMD-1557).
6" TOPSOIL6" TOPSOIL
6" OF TYPE "C" BEDDING, BROKEN
STONE OR WASHED GRAVEL
MEETING REQUIREMENTS OF
COURSE AGGREGATE SIZE NO. 57
COMPACT TO 95% MODIFIED
PROCTOR DENSITY (ASTM D-1557)
NOTES:
1. ALL FENCE AND GATE MATERIALS AND ACCESSORIES MUST BE BLACK VINYL COATED.
2. CONFORMS TO THE REQUIREMENTS OF ASTM A-392 UNLESS OTHERWISE SPECIFIED.
3. CONTRACTOR MUST PROVIDE FENCE AND FENCE MATERIAL SHOP DRAWINGS AND WIND/SNOW LOAD CALCULATION
PRIOR TO CONSTRUCTION.
4. ALL FENCE POST AND SYSTEM SUPPORT SIZES/SPACING TO BE FINALIZED BY THE FENCE MANUFACTURER AND
SUBMITTED FOR REVIEW AND APPROVAL.
5. ADVERTISING MUST NOT BE PERMITTED ON TEMPORARY CONSTRUCTION FENCE FABRIC.
6. BLACK VINYL PRIVACY SLATS OR BLACK MESH PRIVACY SCREENING MUST BE INSTALLED.
NOTES:
1. TRENCH DRAIN SHALL ABUT CONCRETE SLAB AND CONCRETE
WALL. PROVIDE AN EXPANSION JOINT SURFACE BETWEEN THE TWO
SURFACES.
2. REFER TO DRAINAGE PLAN FOR TRENCH LENGTH, PIPE SIZE, AND
ORIENTATION.
3. CONCRETE TO BE 5000 PSI MIN. @ 28 DAYS.
4. REINFORCEMENT PER ASTM-615, GR. 60.
5. DESIGNED FOR H-20 LOADING.
6. GRATE SHALL BE EJ, PRODUCT NO. 47304030, 14"X24", HEAVY DUTY,
OR APPROVED EQUAL.
7. GRATES SHALL INDICATE "NO DUMPING, DRAINS TO RIVER OR
WATERWAY".
8. STRUCTURE MUST BE REINFORCED PRECAST CONCRETE.
9. CONTRACTOR MUST SUBMIT SHOP DRAWINGS OF THE STRUCTURE
AND FRAME/GRATE, SIGNED AND SEALED BY A PROFESSIONAL
ENGINEER, LICENSED IN THE STATE OF NEW YORK.
B
B
A A
DUCTILE IRON GRATE
SECTION A-A
SECTION B-B
12" 6"6"
14"
24"
1" DIA. BARS IN 1 1/8"
x 6" DEEP HOLES TO
ALIGN SECTIONS
SLOPED BASE IN FIELD
PLAN VIEW - TRENCH
OPENING IN BOTTOM TO
ACCOMMODATE 10" PVC
DRAIN PIPE
SLOPED BASE IN FIELD
D5
STROM SEWER CLEANOUT DETAIL
NOT TO SCALE
A
SECTION B-BSECTION A-A
B
A
B
GENERAL NOTES:
1. CONCRETE SHALL BE 4,000 PSI MIN.
2. STRUCTURE SHALL BE PRECAST.
3. FRAME & GRATE TO BE EJ CO. V-5324-1
(DRAINS TO WATERWAYS) OR APPROVED
EQUAL.
4. INLET SHALL BE DESIGNED FOR H-25
LOADING BY THE MANUFACTURER OR AN
ENGINEER LICENSED IN THE STATE OF
NEW YORK.
BRICK SHIM
TO GRADE
(TYP.)
6" THICK NYSDOT
SUBBASE TYPE 2
8" PRECAST CONCRETE
V A
R I E
S
6"
2'-0" 2'-0"
8" PRECAST CONCRETE
EXISTING UNDISTURBED SOIL /
COMPACTED SELECT GRANULAR
MATERIAL
EXISTING UNDISTURBED
SOIL / COMPACTED
STRUCTURAL FILL
NYSDOT SUBBASE
TYPE 2,
7"
O
C
POLYPROPYLENE
STEPS (12" O.C.)
STORM
PIPE
STORM
PIPE
BRICK SHIM TO
GRADE (TYP.)
INV. A 137.22 INV. B 137.03INV. C 136.90
.0
S
L O
P E
.0
S
L O
P E
GRATE EL. 138.90
EXISTING UNDISTURBED SOIL / COMPACTED
SELECT FILL COMPACT TO 95% MODIFIED
PROCTOR DENSITY (ASTM D-1557)
GEOTEXTILE FILTER FABRIC
6" THICK NYSDOT
SUBBASE TYPE 2
REMOVE CAP AND WALLS OF
SERVICE TUNNEL, UTILITIES TO
REMAIN. VERIFY POSITION IN FIELD
2 2
A1
AD-300
A1
AD-300
EXIST. MECH. PIT
CH-B30014
A1
AD-301
A1
AD-301
UNFINISHD CRAWL SPACE
HEAD HEIGHT VARIES
UTILITY TUNNEL
DEMOLISH EXTERIOR MASS
MASONRY WALL TO ENLARGE
OPENING, REFER TO ELEVATION
AD-200 AND STRUCT. DWGS.
N
O M
165'-3" NOM
DEMOLISH EXISTING CONCRETE CURB
2" 3'-0" 4'-2"
7'-4" RO
3'-11 1/4" 1'-10 3/4"
5'-10"
5'-10" 15'-10" 8'-4" 2'-3"
7'-7"
ALIGN SILL TO B2
ARCHIVE
ELEVATION
EXISTING ARCHED
OPENING
AD-302
AD-302
" 5
2M
2M
2M
EW1 EW2 EW3 EW4
NS1
NS2
2RAISE
HEADER
EXISTING TUNNEL
BELOW GRADE,
SEE STRUCTURAL
DEMO DRAWINGS
FOR PARTIAL CAP
REMOVAL
TUNNEL TO
LINCOLN
DEMOLISH
EXTERIOR
AREA WAY
ABOVE
EXISTING UTILITY TUNNEL
BELOW TO REMAIN. CAP OF
TUNNEL TO BE DEMOLISHED,
SEE STRUCTURAL DRAWINGS
REMOVE ALL EXISTING WALLS, FLOORS AND
APPENDAGES AND PROJECTIONS IN THE
SHAFT AREA. PROVIDE THE INTERIOR OF THE
SHAFT FLUSH, SMOOTH, STRAIGHT AND TRUE
PRIOR TO INSTALLATION OF ELEVATOR.
DEMOLISH
EXTERIOR
SITE WALL
2M
2M
2M
"6
GENERAL DEMOLITION AND ALTERATION NOTES
A. WALL HUNG PORTRAITS WILL BE REMOVED BY USMA PRIOR TO
CONSTRUCTION. THE CONTRACTOR CANNOT PROCEED WITH ANY WORK
UNTIL THEY ARE REMOVED.
B. ALL FURNITURE, AREA RUGS, AND INTERIOR APPURTENANCES MUST BE
REMOVED BY USMA PRIOR TO CONSTRUCTION. THE CONTRACTOR CANNOT
PROCEED WITH ANY WORK UNTIL THEY ARE REMOVED.
C. PLAQUE PROTECTION: THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING
THE PLAQUES FROM ALL CONSTRUCTION ACTIVITIES INCLUSIVE OF BUT NOT
LIMITED TO DUST, DEBRIS, DAMAGE, CONSTRUCTION ACTIVITY AND THE LIKE
DURING THE ENTIRE CONSTRUCTION PERIOD OF PERFORMANCE. THE
CONTRACTOR MUST REPAIR AND REMEDIATE AT NO COST TO THE
GOVERNMENT ANY PLAQUES AND THE LIKE THAT ARE DAMAGED DURING
CONSTRUCTION OR DUE TO THE INADEQUACY OF THE PROTECTION.
D. CANNON PROTECTION: THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING
THE CANNON FROM ALL CONSTRUCTION ACTIVITIES INCLUSIVE OF BUT NOT
LIMITED TO DUST, DEBRIS, DAMAGE, CONSTRUCTION ACTIVITY AND THE LIKE
DURING THE ENTIRE CONSTRUCTION PERIOD OF PERFORMANCE. THE
CONTRACTOR MUST REPAIR AND REMEDIATE AT NO COST TO THE
GOVERNMENT ANY CANNONS AND THE LIKE THAT ARE DAMAGED DURING
CONSTRUCTION OR DUE TO THE INADEQUACY OF THE PROTECTION.
E. CULLUM HALL EXISTING PIANO: THE EXISTING PIANO WILL BE REMOVED BY
OTHERS PRIOR TO NTP/DEMOLITION.
F. CULLUM HALL EXISTING FURNITURE AND FURNISHINGS: REFER TO FFE
SPECIFICATION PACKAGE FOR THOSE ITEMS THAT ARE TO BE REFURBISHED
FOR REUSE IN CULLUM HALL. THE CONTRACTOR IS REQUIRED TO
COORDINATE WITH THE GOVERNMENT ANY REMAINING
FURNISHINGS/FURNITURE WITHIN CULLUM HALL AND THOSE ITEMS MUST BE
STORED AND PROTECTED DURING THE PERIOD OF PERFORMANCE OF
CONTSTRUCTION AND RETURNED AS INSTRUCTED BY THE GOVERNMENT.
THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT THE EXISTING
FURNISHINGS/FURNITURE IS NOT DAMAGED AND FUNCTIONS PROPERLY
WHEN CULLUM HALL IS TURNED OVER TO THE GOVERNMENT. FAILURE TO
COMPLY WITH THESE REQUIREMENTS HEREIN IN WHOLE OR PART WILL BE
CAUSE FOR THE GOVERNMENT TO MANDATE REPAIR TO ORIGINAL
CONDITION/REPLACEMENT IN KIND AT NO COST TO THE GOVERNMENT.
G. B1 AND B2 BASEMENTS:
1. ALL SUSPENDED ACOUSTICAL CEILING TILES, GRIDS, AND HANGERS
ARE TO BE DEMOLISHED.
2. ALL EXISTING PLUMBING WATER CLOSETS, SINKS, AND SHOWER
FIXTURES TO BE DEMOLISHED
3. ALL EXISTING BATHROOM STALLS TO BE DEMOLISHED
4. SEE PLUMBING DRAWINGS FOR MORE INFORMATION
H. B1 AND B2 BASEMENTS:
1. PRESERVE & PROTECT ALL EXISTING FIREPLACE SURROUNDS,
MANTELS, FIREBOX & HEARTHS TO REMAIN IN PLACE. FLUES TO BE
SEALED.
2. SALVAGE ALL EXISTING WOOD DOORS AS INDICATED ON DEMOLITION
PLANS FOR FUTURE USE.
3. SALVAGE EXISTING METAL SPIRAL STAIRS FROM MECH ROOM. RETURN
TO GOVT.
I. FOR ALL EXTERIOR DEMOLITION INCLUDING WINDOWS, DOORS, RAILINGS,
STAIRS, AND TERRACE, SEE EXTERIOR ENVELOPE SHEETS.
J. SEE RESTORATION DRAWINGS FOR RESTORATION OF PLASTER WALLS AND
CEILINGS IN HISTORIC SPACES.
K. NOT USED
L. ALL EXISTING FINISHED FLOORING MATERIAL TO BE REMOVED ON B1 AND B2
BASEMENTS INCLUDING; TILE, RESILIENT TILE, RUBBER SPORT FLOORING,
CARPET AND OTHER DOWN TO STRUCTURAL FLOOR (INCLUDING PLYWOOD
SHEET UNDERLAYMENT). REFER TO AD-500 FOR FURTHER DETAILS.
M. SEE STRUCTURAL FOR EXCAVATION FOR NEW FOUNDATIONS AND UNDER-
SLAB DRAINAGE.
N. SALVAGE ALL RADIATORS AND RETURN TO GOVERNMENT.
O. SALVAGE & PROTECT EXISTING WOOD FRAME/UPHOLSTERED BENCHES AND
SMALL WOOD TURNED STOOLS FOR REPAIRS/REFINISHING FOR USE IN
RENOVATED SPACES AS DOCUMENTED. REFER TO FURNITURE DRAWINGS
FOR ADDITIONAL INFORMATION.
P. CONTRACTOR MUST NOT CONSIDER DEMOLITION AND ALTERATION NOTES
TO BE ALL INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT
AND ASSESS EACH AREA AND TO FULFILL THE INTENT OF THE WORK
INDICATED BY THE CONTRACT DOCUMENTS. CONTRACTOR MUST VERIFY ALL
CONDITIONS AND DIMENSIONS WITHIN THE CONTRACT LIMITS. DEVIATIONS
FROM THE CONTRACT DOCUMENTS NECESSITATED BY FIELD CONDITIONS
MUST BE BROUGHT TO THE ATTENTION OF THE COR PRIOR TO PROCEEDING
WITH THE WORK.
Q. CONTRACTOR MUST CONSULT WITH THE GOVERNMENT IN ADVANCE OF
DOING WORK TO DETERMINE DISPOSITION OF ALL FIXTURES, CABINETS,
SERVICES, EQUIPMENT AND ITEMS REMOVED DURING THE DEMOLITION.
REMOVE EXISTING FURNISHINGS AND EQUIPMENT LEFT BEHIND TO BE
DISCARDED BY GOVERNMENT.
R. PROVIDE TEMPORARY BARRIERS, BARRICADES, LIGHTING, FIRE PROTECTION,
ETC. TO PROTECT PERSONNEL AND ADJACENT SPACES PER THE
REQUIREMENTS OF DIVISION 01 SECTION “TEMPORARY FACILITIES AND
CONTROLS.”
S. PROVIDE TEMPORARY SAFEGUARDS AS REQUIRED TO PROTECT EXISTING
FINISHES AND EQUIPMENT TO REMAIN DURING DEMOLITION AND
CONSTRUCTION.
T. WHERE EXISTING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO,
PARTITIONS, FLOORS AND BASES, DOOR AND WINDOW FRAMES, CEILINGS,
CASEWORK, EQUIPMENT, ELECTRICAL AND MECHANICAL DEVICES, FIXTURES
AND EQUIPMENT IS REMOVED OR ALTERED, REPAIR ADJACENT SURFACES
DISTURBED BY DEMOLITION OR ALTERATION WORK AND PREPARE THESE
SURFACES TO RECEIVE NEW SCHEDULED FINISHES. REPAIRS TO SURFACES
DEEMED BY THE COR AND GOVERNMENT TO BE UNSATISFACTORY FOR THE
PURPOSE MUST BE REMOVED AND REPLACED IN KIND.
U. WHERE FINISHES ARE NOTED TO BE REMOVED AT COLUMNS OR WALLS,
REMOVAL MUST BE SUCH THAT NEW FINISHES MAY BE INSTALLED TO ALIGN
WITH EXISTING FINISHES.
V. UNLESS NOTED OTHERWISE, REMOVE EXISTING PROJECTIONS, HANGERS,
BOLTS, NAILS, BRACKETS, CURTAIN RODS, VALANCES, ETC. FROM EXISTING
WALLS AND COLUMNS. PATCH ALL HOLES TO MATCH ADJACENT SURFACES
FOR THE INSTALLATION OF NEW FINISHES.
W. AT NEW DOORS, CORRIDOR OPENINGS OR CONNECTIONS AND WHERE
PARTITIONS ARE REMOVED, REMOVE EXISTING FLOORING AND BASES TO
EXTENT REQUIRED FOR NEW UNDERLAYMENT TO PROVIDE A SMOOTH
TRANSITION. THE SUBSURFACE MUST BE PATCHED AND TREATED TO
PRODUCE A SURFACE WHICH WILL ELIMINATE "TELEGRAPHING" OF EXISTING
JOINTS THROUGH THE NEW FLOORING. INSTALL UNDERLAYMENT PER
DIVISION 03 SECTION “GYPSUM CEMENT UNDERLAYMENT.”
X. WHERE NEW WALLS WILL ABUT EXISTING CORNERS, REMOVE CORNER
GUARD AND REPAIR CORNER PRIOR TO INSTALLATION.
Y. ALL MECHANICAL AND ELECTRICAL WORK NOTED ON THE DEMOLITION
DRAWINGS MUST BE REMOVED BY THE APPROPRIATE DIVISION 21, 22, 23, 25,
26, 27 AND 28 SUBCONTRACTORS. REFER TO MECHANICAL AND
ELECTRICAL DEMOLITION DRAWINGS FOR EXTENTS.
Z. MECHANICAL AND ELECTRICAL DEMOLITION IN FINISHED SPACES MUST BE
REMOVED SUCH THAT ALL EXISTING TERMINATIONS WILL BE CONCEALED
BEHIND THE NEW CONSTRUCTION.
GENERAL DEMOLITION AND ALTERATION NOTES (CONTINUED)
AA. HOLES IN UL RATED FLOORS AND WALLS RESULTING FROM DEMOLITION OR
REMOVALS MUST BE REPAIRED IN A MANNER CONSISTENT WITH THE
ADJACENT UL RATED CONSTRUCTION AND BE ACCEPTABLE TO THE
AUTHORITY HAVING JURISDICTION.
BB. REPAIRS TO FIRE, SMOKE OR ACOUSTICALLY RATED WALLS, FLOORS OR
CEILINGS MUST BE MADE WITH MATERIALS APPROPRIATE TO ACHIEVE THE
SAME RATING AS THE EXISTING.
GENERAL DEMOLITION AND ALTERATION NOTES (CONTINUED)
CC. CAREFULLY REMOVE EXISTING DRYWALL PLASTER CEILINGS TO EXTENT
REQUIRED TO ACCOMMODATE NEW MECHANICAL AND ELECTRICAL WORK
BOTH INSIDE AND OUTSIDE THE PROJECT AREA LINE. REINSTALL SUPPORT
STRUCTURE AND INSTALL NEW DRYWALL OR PLASTER AND FINISH TO
MATCH EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE COR
AND GOVERNMENT.
DD. REPORT ALL CRACKED OR DAMAGED EXTERIOR GLAZING TO GOVERNMENT
AND COR.
CERAMIC TILE WALLS: REMOVE WALL TILE AND EXISTING GWB OR CEMENT
BOARD SUBSTRATE AND INSTALL NEW SUBSTRATE APPROPRIATE TO RECEIVE
NEW WALL FINISHED PER DIVISION 09 SECTION “DRYWALL SYSTEMS.”
LAY IN CEILING: REMOVE ALL CEILING TILES. DISCONNECT AND REMOVE ALL
MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT SUPPORTED ON
FRAMING GRID. REMOVE CEILING GRID AND HANGERS IN THEIR ENTIRETY.
PLASTER CEILINGS ADHERED TO TERRACOTTA STRUCTURAL SLAB: REMOVE ALL
LOOSE, CHIPPED, AND DAMAGED PLASTER. WHERE PLASTER IS SOUND AND
ADHERED TO THE SLAB ABOVE, REMOVE FAILING SURFACE FINISHES.
GWB CEILING: REMOVE ALL EXISTING DRYWALL. DISCONNECT AND REMOVE ALL
MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT. REMOVE CEILING
FRAMING AND SUPPORTS IN THEIR ENTIRETY.
PLASTER CEILINGS: REMOVE ALL EXISTING CEILING PLASTER AND ANY SUPPORT
WITHIN EXTENTS DEFINED. REFER TO HISTORICAL RESTORATION DRAWINGS FOR
PLASTER CEILING REPAIR IN HISTORIC SPACES.
FLOOR FINISHES: MECHANICALLY REMOVE EXISTING FLOORING AND
UNDERLAYMENT MATERIALS TO CONCRETE SLAB IN THEIR ENTIRETY. SCARIFY
CONCRETE AS REQUIRED TO REMOVE ALL ADHESIVE RESIDUE. THE USE OF
REMOVAL CHEMICALS IS NOT PERMITTED.
KEYED DEMOLITION NOTES
GWB PARTITION: REMOVE ITEMS ATTACHED TO WALL SURFACE, SUCH AS BASE.
REMOVE EXISTING DRYWALL. DISCONNECT AND REMOVE ALL MECHANICAL AND
ELECTRICAL DEVICES AND EQUIPMENT. REMOVE METAL FRAMING, TRACKS AND
BRACING IN THEIR ENTIRETY.
MASONRY PARTITION: REMOVE ITEMS ATTACHED TO WALL SURFACE, SUCH AS
BASE. REMOVE EXISTING DRYWALL, IF ANY. DISCONNECT AND REMOVE ALL
MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT. REMOVE MASONRY
AND BRACING IN THEIR ENTIRETY.
MASONRY PARTITION (SELECTIVE): NEW MEP UTILITIES TO BE RUN IN EXISTING
PATHWAYS WITHIN MASONRY BEARING WALL: ISOLATED DEMOLITION OF
MASONRY BEARING WALL, DEMOLITION OF EXISTING UTILITES WITHIN MASONRY
BEARING WALL AND PREPARATION OF AREA FOR FUTURE MEP UTILITIES. SEE
MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR DEMOLITION OF
EXISTING UTILITIES. SEE STRUCTURAL DRAWINGS FOR DEMOLITION OF MASONRY
BEARING WALLS. SEE RESTORATION DRAWINGS FOR DEMOLITION OF FINISHES
WITHIN HISTORIC SPACES.
WALL FINISHES: REMOVE EXISTING WALL FINISHES, EXCEPT PAINT, TO
SUBSTRATE, INCLUDING ALL TACK BOARDS, POSTERS, ADHERED FILMS, AND
WALL PAPER. PREPARE SUBSTRATE/PAINTED SURFACES TO RECEIVE NEW
FINISHES PER DIV 02 SECTION “ALTERATION PROJECT PROCEDURES.”
BUILT-UP FLOOR: REMOVE EXISTING SUBBASE TILE, SUPPORTS DOWN TO
STRUCTURAL SLAB BELOW, AND WALL BASE U.N.O. ON FINISH PLANS. PREPARE
FLOORS TO RECEIVE NEW FINISH AS SPECIFIED.
CERAMIC TILE FLOORS: REMOVE EXISTING CERAMIC TILE, MATS AND SETTING
BED TO STRUCTURAL SLAB AND PREPARE FLOORS TO RECEIVE NEW FLOOR
FINISH AS SPECIFIED.
CASEWORK/MILLWORK: DISCONNECT MECHANICAL AND ELECTRICAL SERVICES.
REMOVE CASEWORK CABINETS AND TOPS IN THEIR ENTIRETY.
MEMORIAL PLAQUES IN CASEWORK: CAREFULLY REMOVE, CATALOGUE, STORE
AND PROTECT MEMORIAL PLAQUES ON WALL PANELS FOR REINSTALLATION
(MEMORIAL ROOM CH-106A ONLY). CONTRACTOR IS RESPONSIBLE FOR
PROTECTING THE PLAQUES AND WALL PANELS UNTIL RE-INSTALLATION PER THE
DRAWINGS. CONTRACTOR IS WHOLLY RESPONSIBLE FOR RESTORING MEMORIAL
PLAQUES AND SOLID SURFACE MEMORIAL DISPLAY PANELS TO ORIGINAL
CONDITION. DISCONNECT MECHANICAL AND ELECTRICAL SERVICES. REFER TO
NEW WORK DRAWINGS FOR SCOPE OF NEW WORK. ANY DAMAGE WILL BE
REPAIRED AT NO COST TO THE GOVERNMENT.
DOOR/FRAME/HARDWARE: REMOVE EXISTING DOOR, FRAME AND HARDWARE.
SALVAGE DOOR FRAME, HARDWARE AS INDICATED.
DEMO FOR NEW LINTEL IN MASONRY: DEMOLISH EXISTING MASONRY WALL IN
PREPARATION OF NEW LINTEL INSTALLATION. SEE ARCHITECTURAL AND
STRUCTURAL DETAILS FOR EXTENTS.
11S
FLOOR ASSEMBLY: REMOVE ALL FLOOR ASSEMBLY COMPONENTS INCLUDING
FINISHES, HANDRAILS, SUBFLOORING, SLABS, STRUCTURAL MEMBERS WITHIN
THE EXTENTS DESCRIBED. PROVIDE NECESSARY SCAFFOLDING AND BRACING
TO PREVENT ANY DAMAGE OR COLLAPSE OF BUILDING ELEMENTS. SEE
STRUCTURAL DRAWINGS FOR DETAILS.
WOOD/METAL STAIR: DISCONNECT AND REMOVE ALL MECHANICAL AND
ELECTRICAL DEVICES AND EQUIPMENT. REMOVE EXISTING STAIR, INCLUDING
STRINGERS, TREADS, RISERS, PLATFORMS, SUPPORT FRAMING, AND DEVICES
AND RAILINGS IN THEIR ENTIRETY.
CONCRETE/MASONRY STAIR: REMOVE ALL RAILINGS AND DEMOLISH STAIR IN
ITS ENTIRETY.
PLUMBING FIXTURES: REMOVE ALL PLUMBING FIXTURES, SUPPORT FRAMING,
SUPPORT STRUCTURE, AND FITTINGS. ALL PIPING TO BE REMOVED MUST BE
PROPERLY CAPPED.
INTERIOR STOREFRONT: REMOVE ALL STOREFRONT COMPONENTS
INCLUDING GLAZING, FRAMING, DOORS, DOOR HARDWARE, AND THRESHOLDS.
EXTERIOR WALL: REMOVE ALL PLASTER AND SUBSTRATE LAYERS TO
STRUCTURAL MASONRY AT INTERIOR WALL SURFACES WHERE APPLICABLE IN
BASEMENTS. COORDINATION WITH HISTORIC RESTORATION SCOPE. SEE
SHEET A-650.
FLOOR GRILLE: MECHANICAL FLOOR GRILLE COVER, PROTECT DURING
CONSTRUCTION. SALVAGE AND STORE FOR RE-INSTALLATION.
2M
5 10
149.14
DEMOLITION LEGEND
EXIST WALLS, DOORS TO REMAIN (SHOWN SCREENED)
DEMOLITION WALLS, DOORS TO BE DEMOLISHED
(SHOWN DASHED)
SCALE: 1/8"=1'-0"
0 84
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
PLAN NORTH
AD-1B3
B B
A S
E M
E N
T D
E M
O L
IT
IO
N
P L A
N
W E
S T
P O
IN
T
N
Y L B
Y
D B
B K
R M
/1
/2
W D
S -1
-R
-0
W D
S -1
-C
RTA SUBMISSION 2/11/2021
U S
M A
B U
IL
D
IN
G
C
U L L U
M H
A L L R
E N
O V
A T
IO
N
SCALE: 1/8" = 1'-0"AD-1B3
REF SHEET: A-109.1
B3 BASEMENT DEMOLITION PLANA1
R
T A
S U
B M
IS
S
IO
N
/1
/2
A
M E
N D
M E
N T
/2 /2
ALL PLUMBING FIXTURES AND PARTITIONS
IN BASEMENT FLOORS TO BE REMOVED,
REFER TO PLUMBING FOR DETAILS
5 5 5 5
12 12 12
132 2
1 1 1 1 1 1 1
16 12
12 12
A1
AD-300
A1
AD-300
CLUB/STOR
CH-B206
COAL SHOOT
CH-B208
UNASSIGNED /
UNFINISHED
CH-B212
UNASSIGNED /
UNFINISHED
CH-B214
UNASSIGNED /
UNFINISHED
CH-B218
STOR.
CH-B202
CLUB/STOR
CH-B204D
CLUB/STOR
CH-B204C
CLUB/STOR
CH-B204B
CLUB/STOR
CH-B204A
CORR
CH-B2C2
CLUB/STOR
CH-B200A
CLUB/STOR
CH-B200BCLUB/STOR
CH-B200C
CLUB/STOR
CH-B200D
CLUB/STOR
CH-B200E
CORR
CH-B2C1
VESTIBULE
CH-B205
CLUB/STOR
CH-B211A
CLUB/STOR
CH-B211B
CLUB/STOR
CH-B211C
CLUB/STOR
CH-B213A CLUB/STOR
CH-B213B
EXIST. ELEC
CH-B210A
EXIST. MECH
CH-B210B
EX. MECH. STAIR
CH-B210C
CLUB/STOR
CH-B216B
CLUB/STOR
CH-B216C
CLUB/STOR
CH-B216D
CORR
CH-B216A
11 1
999 59
9.1
9 5
CLUB/STOR
CH-B203 CLUB/STOR
CH-B217
VEST
CH-B219
TOILET
CH-B201
A1
AD-301
A1
AD-301
N
O M
165'-3" NOM
2 2 2 2 2
DEMO EXISTING
AREAWAY,
ENCLOSURE,
WALLS,
SURROUNDS
1919 19 19 19 191919
DEMOLISH INTERIOR PLASTER
REMOVE TERRACOTTA TILE
BELOW PLASTER. SEE PARTITION
DETAILS FOR ADDITIONAL
INFORMATION.
N O
M
ALIGN ALL 5'-0" OPENINGS
IN SEQUENCE AND
BENEATH THOSE AT B1,
SEE SHEET AD-1B1
ALIGN OPENINGS
3'-0 1/2"
3'-0 1/2"
6'-0"
6'-0"
5'-0" 14'-4"
ALIGN JAMB
WITH
OPENING
BELOW
SAME OPENINGS
AS BELOW, SEE
SHEET AD-1B3
N
O M
6'-3"
DEMO WINDOWS
AND EXTERIOR
WALL BETWEEN
THEM, REFER TO
SHEET A-200
AD-302
AD-302
DEMO
EXISTING
RETAINING
WALL
2M
2M
2M
2M
EW1 EW2 EW3 EW4
NS1
NS2
SALVAGE METAL STAIR,
RETURN TO GOVERNMENT
CH-B217.1
C H
-B .1
OPEN TO
BELOW
PROTECT FIREPLACE AND
MANTEL, SEE GENERAL
DEMOLITION NOTE D
ALIGN DEMOLITION EXTENT
WITH WALL ABOVE
REMOVE
DRYWALL AND
FURRING FROM
JAMB OF
MASONRY
BEARING WALL
OPENING
C H
-B .1
C H
-B .2
2M
2M2M
2M
SAME OPENING
AS BELOW, SEE
SHEET AD-1B3
7'-3"
5'-6"
2'-8"
7'-9"2'-9"7'-8"2'-9"7'-7" 3'-8"
7'-7"
GENERAL DEMOLITION AND ALTERATION NOTES
A. WALL HUNG PORTRAITS WILL BE REMOVED BY USMA PRIOR TO
CONSTRUCTION. THE CONTRACTOR CANNOT PROCEED WITH ANY WORK
UNTIL THEY ARE REMOVED.
B. ALL FURNITURE, AREA RUGS, AND INTERIOR APPURTENANCES MUST BE
REMOVED BY USMA PRIOR TO CONSTRUCTION. THE CONTRACTOR CANNOT
PROCEED WITH ANY WORK UNTIL THEY ARE REMOVED.
C. PLAQUE PROTECTION: THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING
THE PLAQUES FROM ALL CONSTRUCTION ACTIVITIES INCLUSIVE OF BUT NOT
LIMITED TO DUST, DEBRIS, DAMAGE, CONSTRUCTION ACTIVITY AND THE LIKE
DURING THE ENTIRE CONSTRUCTION PERIOD OF PERFORMANCE. THE
CONTRACTOR MUST REPAIR AND REMEDIATE AT NO COST TO THE
GOVERNMENT ANY PLAQUES AND THE LIKE THAT ARE DAMAGED DURING
CONSTRUCTION OR DUE TO THE INADEQUACY OF THE PROTECTION.
D. CANNON PROTECTION: THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING
THE CANNON FROM ALL CONSTRUCTION ACTIVITIES INCLUSIVE OF BUT NOT
LIMITED TO DUST, DEBRIS, DAMAGE, CONSTRUCTION ACTIVITY AND THE LIKE
DURING THE ENTIRE CONSTRUCTION PERIOD OF PERFORMANCE. THE
CONTRACTOR MUST REPAIR AND REMEDIATE AT NO COST TO THE
GOVERNMENT ANY CANNONS AND THE LIKE THAT ARE DAMAGED DURING
CONSTRUCTION OR DUE TO THE INADEQUACY OF THE PROTECTION.
E. CULLUM HALL EXISTING PIANO: THE EXISTING PIANO WILL BE REMOVED BY
OTHERS PRIOR TO NTP/DEMOLITION.
F. CULLUM HALL EXISTING FURNITURE AND FURNISHINGS: REFER TO FFE
SPECIFICATION PACKAGE FOR THOSE ITEMS THAT ARE TO BE REFURBISHED
FOR REUSE IN CULLUM HALL. THE CONTRACTOR IS REQUIRED TO
COORDINATE WITH THE GOVERNMENT ANY REMAINING
FURNISHINGS/FURNITURE WITHIN CULLUM HALL AND THOSE ITEMS MUST BE
STORED AND PROTECTED DURING THE PERIOD OF PERFORMANCE OF
CONTSTRUCTION AND RETURNED AS INSTRUCTED BY THE GOVERNMENT.
THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT THE EXISTING
FURNISHINGS/FURNITURE IS NOT DAMAGED AND FUNCTIONS PROPERLY
WHEN CULLUM HALL IS TURNED OVER TO THE GOVERNMENT. FAILURE TO
COMPLY WITH THESE REQUIREMENTS HEREIN IN WHOLE OR PART WILL BE
CAUSE FOR THE GOVERNMENT TO MANDATE REPAIR TO ORIGINAL
CONDITION/REPLACEMENT IN KIND AT NO COST TO THE GOVERNMENT.
G. B1 AND B2 BASEMENTS:
1. ALL SUSPENDED ACOUSTICAL CEILING TILES, GRIDS, AND HANGERS
ARE TO BE DEMOLISHED.
2. ALL EXISTING PLUMBING WATER CLOSETS, SINKS, AND SHOWER
FIXTURES TO BE DEMOLISHED
3. ALL EXISTING BATHROOM STALLS TO BE DEMOLISHED
4. SEE PLUMBING DRAWINGS FOR MORE INFORMATION
H. B1 AND B2 BASEMENTS:
1. PRESERVE & PROTECT ALL EXISTING FIREPLACE SURROUNDS,
MANTELS, FIREBOX & HEARTHS TO REMAIN IN PLACE. FLUES TO BE
SEALED.
2. SALVAGE ALL EXISTING WOOD DOORS AS INDICATED ON DEMOLITION
PLANS FOR FUTURE USE.
3. SALVAGE EXISTING METAL SPIRAL STAIRS FROM MECH ROOM. RETURN
TO GOVT.
I. FOR ALL EXTERIOR DEMOLITION INCLUDING WINDOWS, DOORS, RAILINGS,
STAIRS, AND TERRACE, SEE EXTERIOR ENVELOPE SHEETS.
J. SEE RESTORATION DRAWINGS FOR RESTORATION OF PLASTER WALLS AND
CEILINGS IN HISTORIC SPACES.
K. NOT USED
L. ALL EXISTING FINISHED FLOORING MATERIAL TO BE REMOVED ON B1 AND B2
BASEMENTS INCLUDING; TILE, RESILIENT TILE, RUBBER SPORT FLOORING,
CARPET AND OTHER DOWN TO STRUCTURAL FLOOR (INCLUDING PLYWOOD
SHEET UNDERLAYMENT). REFER TO AD-500 FOR FURTHER DETAILS.
M. SEE STRUCTURAL FOR EXCAVATION FOR NEW FOUNDATIONS AND UNDER-
SLAB DRAINAGE.
N. SALVAGE ALL RADIATORS AND RETURN TO GOVERNMENT.
O. SALVAGE & PROTECT EXISTING WOOD FRAME/UPHOLSTERED BENCHES AND
SMALL WOOD TURNED STOOLS FOR REPAIRS/REFINISHING FOR USE IN
RENOVATED SPACES AS DOCUMENTED. REFER TO FURNITURE DRAWINGS
FOR ADDITIONAL INFORMATION.
P. CONTRACTOR MUST NOT CONSIDER DEMOLITION AND ALTERATION NOTES
TO BE ALL INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT
AND ASSESS EACH AREA AND TO FULFILL THE INTENT OF THE WORK
INDICATED BY THE CONTRACT DOCUMENTS. CONTRACTOR MUST VERIFY ALL
CONDITIONS AND DIMENSIONS WITHIN THE CONTRACT LIMITS. DEVIATIONS
FROM THE CONTRACT DOCUMENTS NECESSITATED BY FIELD CONDITIONS
MUST BE BROUGHT TO THE ATTENTION OF THE COR PRIOR TO PROCEEDING
WITH THE WORK.
Q. CONTRACTOR MUST CONSULT WITH THE GOVERNMENT IN ADVANCE OF
DOING WORK TO DETERMINE DISPOSITION OF ALL FIXTURES, CABINETS,
SERVICES, EQUIPMENT AND ITEMS REMOVED DURING THE DEMOLITION.
REMOVE EXISTING FURNISHINGS AND EQUIPMENT LEFT BEHIND TO BE
DISCARDED BY GOVERNMENT.
R. PROVIDE TEMPORARY BARRIERS, BARRICADES, LIGHTING, FIRE PROTECTION,
ETC. TO PROTECT PERSONNEL AND ADJACENT SPACES PER THE
REQUIREMENTS OF DIVISION 01 SECTION “TEMPORARY FACILITIES AND
CONTROLS.”
S. PROVIDE TEMPORARY SAFEGUARDS AS REQUIRED TO PROTECT EXISTING
FINISHES AND EQUIPMENT TO REMAIN DURING DEMOLITION AND
CONSTRUCTION.
T. WHERE EXISTING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO,
PARTITIONS, FLOORS AND BASES, DOOR AND WINDOW FRAMES, CEILINGS,
CASEWORK, EQUIPMENT, ELECTRICAL AND MECHANICAL DEVICES, FIXTURES
AND EQUIPMENT IS REMOVED OR ALTERED, REPAIR ADJACENT SURFACES
DISTURBED BY DEMOLITION OR ALTERATION WORK AND PREPARE THESE
SURFACES TO RECEIVE NEW SCHEDULED FINISHES. REPAIRS TO SURFACES
DEEMED BY THE COR AND GOVERNMENT TO BE UNSATISFACTORY FOR THE
PURPOSE MUST BE REMOVED AND REPLACED IN KIND.
U. WHERE FINISHES ARE NOTED TO BE REMOVED AT COLUMNS OR WALLS,
REMOVAL MUST BE SUCH THAT NEW FINISHES MAY BE INSTALLED TO ALIGN
WITH EXISTING FINISHES.
V. UNLESS NOTED OTHERWISE, REMOVE EXISTING PROJECTIONS, HANGERS,
BOLTS, NAILS, BRACKETS, CURTAIN RODS, VALANCES, ETC. FROM EXISTING
WALLS AND COLUMNS. PATCH ALL HOLES TO MATCH ADJACENT SURFACES
FOR THE INSTALLATION OF NEW FINISHES.
W. AT NEW DOORS, CORRIDOR OPENINGS OR CONNECTIONS AND WHERE
PARTITIONS ARE REMOVED, REMOVE EXISTING FLOORING AND BASES TO
EXTENT REQUIRED FOR NEW UNDERLAYMENT TO PROVIDE A SMOOTH
TRANSITION. THE SUBSURFACE MUST BE PATCHED AND TREATED TO
PRODUCE A SURFACE WHICH WILL ELIMINATE "TELEGRAPHING" OF EXISTING
JOINTS THROUGH THE NEW FLOORING. INSTALL UNDERLAYMENT PER
DIVISION 03 SECTION “GYPSUM CEMENT UNDERLAYMENT.”
X. WHERE NEW WALLS WILL ABUT EXISTING CORNERS, REMOVE CORNER
GUARD AND REPAIR CORNER PRIOR TO INSTALLATION.
Y. ALL MECHANICAL AND ELECTRICAL WORK NOTED ON THE DEMOLITION
DRAWINGS MUST BE REMOVED BY THE APPROPRIATE DIVISION 21, 22, 23, 25,
26, 27 AND 28 SUBCONTRACTORS. REFER TO MECHANICAL AND
ELECTRICAL DEMOLITION DRAWINGS FOR EXTENTS.
Z. MECHANICAL AND ELECTRICAL DEMOLITION IN FINISHED SPACES MUST BE
REMOVED SUCH THAT ALL EXISTING TERMINATIONS WILL BE CONCEALED
BEHIND THE NEW CONSTRUCTION.
GENERAL DEMOLITION AND ALTERATION NOTES (CONTINUED)
AA. HOLES IN UL RATED FLOORS AND WALLS RESULTING FROM DEMOLITION OR
REMOVALS MUST BE REPAIRED IN A MANNER CONSISTENT WITH THE
ADJACENT UL RATED CONSTRUCTION AND BE ACCEPTABLE TO THE
AUTHORITY HAVING JURISDICTION.
BB. REPAIRS TO FIRE, SMOKE OR ACOUSTICALLY RATED WALLS, FLOORS OR
CEILINGS MUST BE MADE WITH MATERIALS APPROPRIATE TO ACHIEVE THE
SAME RATING AS THE EXISTING.
GENERAL DEMOLITION AND ALTERATION NOTES (CONTINUED)
CC. CAREFULLY REMOVE EXISTING DRYWALL PLASTER CEILINGS TO EXTENT
REQUIRED TO ACCOMMODATE NEW MECHANICAL AND ELECTRICAL WORK
BOTH INSIDE AND OUTSIDE THE PROJECT AREA LINE. REINSTALL SUPPORT
STRUCTURE AND INSTALL NEW DRYWALL OR PLASTER AND FINISH TO
MATCH EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE COR
AND GOVERNMENT.
DD. REPORT ALL CRACKED OR DAMAGED EXTERIOR GLAZING TO GOVERNMENT
AND COR.
CERAMIC TILE WALLS: REMOVE WALL TILE AND EXISTING GWB OR CEMENT
BOARD SUBSTRATE AND INSTALL NEW SUBSTRATE APPROPRIATE TO RECEIVE
NEW WALL FINISHED PER DIVISION 09 SECTION “DRYWALL SYSTEMS.”
LAY IN CEILING: REMOVE ALL CEILING TILES. DISCONNECT AND REMOVE ALL
MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT SUPPORTED ON
FRAMING GRID. REMOVE CEILING GRID AND HANGERS IN THEIR ENTIRETY.
PLASTER CEILINGS ADHERED TO TERRACOTTA STRUCTURAL SLAB: REMOVE ALL
LOOSE, CHIPPED, AND DAMAGED PLASTER. WHERE PLASTER IS SOUND AND
ADHERED TO THE SLAB ABOVE, REMOVE FAILING SURFACE FINISHES.
GWB CEILING: REMOVE ALL EXISTING DRYWALL. DISCONNECT AND REMOVE ALL
MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT. REMOVE CEILING
FRAMING AND SUPPORTS IN THEIR ENTIRETY.
PLASTER CEILINGS: REMOVE ALL EXISTING CEILING PLASTER AND ANY SUPPORT
WITHIN EXTENTS DEFINED. REFER TO HISTORICAL RESTORATION DRAWINGS FOR
PLASTER CEILING REPAIR IN HISTORIC SPACES.
FLOOR FINISHES: MECHANICALLY REMOVE EXISTING FLOORING AND
UNDERLAYMENT MATERIALS TO CONCRETE SLAB IN THEIR ENTIRETY. SCARIFY
CONCRETE AS REQUIRED TO REMOVE ALL ADHESIVE RESIDUE. THE USE OF
REMOVAL CHEMICALS IS NOT PERMITTED.
KEYED DEMOLITION NOTES
GWB PARTITION: REMOVE ITEMS ATTACHED TO WALL SURFACE, SUCH AS BASE.
REMOVE EXISTING DRYWALL. DISCONNECT AND REMOVE ALL MECHANICAL AND
ELECTRICAL DEVICES AND EQUIPMENT. REMOVE METAL FRAMING, TRACKS AND
BRACING IN THEIR ENTIRETY.
MASONRY PARTITION: REMOVE ITEMS ATTACHED TO WALL SURFACE, SUCH AS
BASE. REMOVE EXISTING DRYWALL, IF ANY. DISCONNECT AND REMOVE ALL
MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT. REMOVE MASONRY
AND BRACING IN THEIR ENTIRETY.
MASONRY PARTITION (SELECTIVE): NEW MEP UTILITIES TO BE RUN IN EXISTING
PATHWAYS WITHIN MASONRY BEARING WALL: ISOLATED DEMOLITION OF
MASONRY BEARING WALL, DEMOLITION OF EXISTING UTILITES WITHIN MASONRY
BEARING WALL AND PREPARATION OF AREA FOR FUTURE MEP UTILITIES. SEE
MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR DEMOLITION OF
EXISTING UTILITIES. SEE STRUCTURAL DRAWINGS FOR DEMOLITION OF MASONRY
BEARING WALLS. SEE RESTORATION DRAWINGS FOR DEMOLITION OF FINISHES
WITHIN HISTORIC SPACES.
WALL FINISHES: REMOVE EXISTING WALL FINISHES, EXCEPT PAINT, TO
SUBSTRATE, INCLUDING ALL TACK BOARDS, POSTERS, ADHERED FILMS, AND
WALL PAPER. PREPARE SUBSTRATE/PAINTED SURFACES TO RECEIVE NEW
FINISHES PER DIV 02 SECTION “ALTERATION PROJECT PROCEDURES.”
BUILT-UP FLOOR: REMOVE EXISTING SUBBASE TILE, SUPPORTS DOWN TO
STRUCTURAL SLAB BELOW, AND WALL BASE U.N.O. ON FINISH PLANS. PREPARE
FLOORS TO RECEIVE NEW FINISH AS SPECIFIED.
CERAMIC TILE FLOORS: REMOVE EXISTING CERAMIC TILE, MATS AND SETTING
BED TO STRUCTURAL SLAB AND PREPARE FLOORS TO RECEIVE NEW FLOOR
FINISH AS SPECIFIED.
CASEWORK/MILLWORK: DISCONNECT MECHANICAL AND ELECTRICAL SERVICES.
REMOVE CASEWORK CABINETS AND TOPS IN THEIR ENTIRETY.
MEMORIAL PLAQUES IN CASEWORK: CAREFULLY REMOVE, CATALOGUE, STORE
AND PROTECT MEMORIAL PLAQUES ON WALL PANELS FOR REINSTALLATION
(MEMORIAL ROOM CH-106A ONLY). CONTRACTOR IS RESPONSIBLE FOR
PROTECTING THE PLAQUES AND WALL PANELS UNTIL RE-INSTALLATION PER THE
DRAWINGS. CONTRACTOR IS WHOLLY RESPONSIBLE FOR RESTORING MEMORIAL
PLAQUES AND SOLID SURFACE MEMORIAL DISPLAY PANELS TO ORIGINAL
CONDITION. DISCONNECT MECHANICAL AND ELECTRICAL SERVICES. REFER TO
NEW WORK DRAWINGS FOR SCOPE OF NEW WORK. ANY DAMAGE WILL BE
REPAIRED AT NO COST TO THE GOVERNMENT.
DOOR/FRAME/HARDWARE: REMOVE EXISTING DOOR, FRAME AND HARDWARE.
SALVAGE DOOR FRAME, HARDWARE AS INDICATED.
DEMO FOR NEW LINTEL IN MASONRY: DEMOLISH EXISTING MASONRY WALL IN
PREPARATION OF NEW LINTEL INSTALLATION. SEE ARCHITECTURAL AND
STRUCTURAL DETAILS FOR EXTENTS.
11S
FLOOR ASSEMBLY: REMOVE ALL FLOOR ASSEMBLY COMPONENTS INCLUDING
FINISHES, HANDRAILS, SUBFLOORING, SLABS, STRUCTURAL MEMBERS WITHIN
THE EXTENTS DESCRIBED. PROVIDE NECESSARY SCAFFOLDING AND BRACING
TO PREVENT ANY DAMAGE OR COLLAPSE OF BUILDING ELEMENTS. SEE
STRUCTURAL DRAWINGS FOR DETAILS.
WOOD/METAL STAIR: DISCONNECT AND REMOVE ALL MECHANICAL AND
ELECTRICAL DEVICES AND EQUIPMENT. REMOVE EXISTING STAIR, INCLUDING
STRINGERS, TREADS, RISERS, PLATFORMS, SUPPORT FRAMING, AND DEVICES
AND RAILINGS IN THEIR ENTIRETY.
CONCRETE/MASONRY STAIR: REMOVE ALL RAILINGS AND DEMOLISH STAIR IN
ITS ENTIRETY.
PLUMBING FIXTURES: REMOVE ALL PLUMBING FIXTURES, SUPPORT FRAMING,
SUPPORT STRUCTURE, AND FITTINGS. ALL PIPING TO BE REMOVED MUST BE
PROPERLY CAPPED.
INTERIOR STOREFRONT: REMOVE ALL STOREFRONT COMPONENTS
INCLUDING GLAZING, FRAMING, DOORS, DOOR HARDWARE, AND THRESHOLDS.
EXTERIOR WALL: REMOVE ALL PLASTER AND SUBSTRATE LAYERS TO
STRUCTURAL MASONRY AT INTERIOR WALL SURFACES WHERE APPLICABLE IN
BASEMENTS. COORDINATION WITH HISTORIC RESTORATION SCOPE. SEE
SHEET A-650.
FLOOR GRILLE: MECHANICAL FLOOR GRILLE COVER, PROTECT DURING
CONSTRUCTION. SALVAGE AND STORE FOR RE-INSTALLATION.
2M
5 10
149.14
DEMOLITION LEGEND
EXIST WALLS, DOORS TO REMAIN (SHOWN SCREENED)
DEMOLITION WALLS, DOORS TO BE DEMOLISHED
(SHOWN DASHED)
SCALE: 1/8"=1'-0"
0 84
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
PLAN NORTH
AD-1B2
B B
A S
E M
E N
T D
E M
O L
IT
IO
N
P L A
N
W E
S T
P O
IN
T
N
Y L B
Y
D B
B K
R M
/1
/2
W D
S -1
-R
-0
W D
S -1
-C
RTA SUBMISSION 2/11/2021
U S
M A
B U
IL
D
IN
G
C
U L L U
M H
A L L R
E N
O V
A T
IO
N
SCALE: 1/8" = 1'-0"AD-1B2
REF SHEET: A-109.1
B2 BASEMENT DEMOLITION PLANA1
R
T A
S U
B M
IS
S
IO
N
/1
/2
A
M E
N D
M E
N T
/2 /2
5 5 5 5 5 5
5 5
12 12 12 12 12
1 1
1 12
5 5
D O
W N
DOWN
OPEN
TO BELOW
OPEN
TO BELOW
OPEN
TO BELOW
OPEN
TO BELOW
OPEN
TO BELOW
OPEN
TO BELOW
A1
AD-300
A1
AD-300
CLUB/STOR
CH-B111
VESTIBULE
CH-B100
CORR
CH-B1C2
CLUB/STOR
CH-B106
OPEN
TO BELOW
OPEN
TO BELOW
CLUB/STOR
CH-B114
NORTH STAIR
CH-B1S3
VESIBULE
CH-B122
CLUB/STOR
CH-B102ACLUB/STOR
CH-B102B
CLUB/STOR
CH-B102C
CLUB/STOR
CH-B104A
TOILET
CH-B101
SOUTHEAST STAIR
CH-B1S2
CLUB/STOR
CH-B103
CLUB/STOR
CH-B105A
CLUB/STOR
CH-B105B
CORR
CH-B1C1
CLUB/STOR
CH-B107
CLUB/STOR
CH-B109
CLUB/STOR
CH-B113
CLUB/STOR
CH-B1C3
CLUB/STOR
CH-B1C4
CLUB/STOR
CH-B1C4
CORR
CH-B116A
CLUB/STOR
CH-B116B
PANTRY
CH-B118A
CLUB/STOR
CH-B120A
CLUB/STOR
CH-B120B
TOILET
CH-B118B
STAIR
CH-B1S4
2 2 2 12
99999999
9.1
9.1
6 6 6 6 6 6
A1
AD-301
A1
AD-301
5 96
N O
M
165'-3" NOM
ALL PLUMBING FIXTURES AND PARTITIONS
IN BASEMENTS TO BE REMOVED,
REFER TO PLUMBING FOR DETAILS
19 19 19 19 19 19 19 19 19 19
DEMOLISH INTERIOR PLASTER
REMOVE TERRACOTTA TILE
BELOW PLASTER. SEE PARTITION
DETAILS FOR ADDITIONAL
INFORMATION.
ALIGN ALL 4'-0" OPENINGS IN SEQUENCE,
JUSTIFY EAST JAMB WITH EXISTING OPENING
ALIGN WITH
OPENING
BELOW AT B2 5
N O
M2
5'-0" 14'-8"
8'-2" 5'-0"
5'-6"
AD-302
AD-302
REFER TO
DEMOLITION
ELEVATIONS
FOR EXTENTS
OF STAIR
DEMOLITION
"1
4'-0" 1
N O
M
T Y
P
2M
2M
2M
2M
EW1 EW2 EW3 EW4
NS1
NS2
SEE MECHANICAL, ELECTRICAL, AND
PLUMBING DRAWINGS FOR DEMOLITION
OF SERVICES IN THIS AREA
CH-B122.1
CH-B122.3
C H
-B .2
C H
-B .1
C H
-B .1
C H
-B .1
C H
-B .1
CH-B106.1
CH-B100.1
C H
-B .1
SALVAGE METAL STAIR,
RETURN TO GOVERNMENT
REMOVE
DRYWALL AND
FURRING FROM
JAMB OF
MASONRY
BEARING WALL
OPENING
REMOVE PLASTER ON
INTERIOR FACE OF WALL
10'-9"
REMOVE TRANSOM WINDOW
ABOVE EACH ETR DOOR.
TRANSOM, HEADER, AND
FRAME TO REMAIN. SEE A-560.
2M
2M2M
2M
3'-8"
3'-6"
REMOVE ALL EXISTING WALLS, FLOORS
AND APPENDAGES AND PROJECTIONS
IN THE SHAFT AREA. PROVIDE THE
INTERIOR OF THE SHAFT FLUSH,
SMOOTH, STRAIGHT AND TRUE PRIOR
TO INSTALLATION OF ELEVATOR.
GENERAL DEMOLITION AND ALTERATION NOTES
A. WALL HUNG PORTRAITS WILL BE REMOVED BY USMA PRIOR TO
CONSTRUCTION. THE CONTRACTOR CANNOT PROCEED WITH ANY WORK
UNTIL THEY ARE REMOVED.
B. ALL FURNITURE, AREA RUGS, AND INTERIOR APPURTENANCES MUST BE
REMOVED BY USMA PRIOR TO CONSTRUCTION. THE CONTRACTOR CANNOT
PROCEED WITH ANY WORK UNTIL THEY ARE REMOVED.
C. PLAQUE PROTECTION: THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING
THE PLAQUES FROM ALL CONSTRUCTION ACTIVITIES INCLUSIVE OF BUT NOT
LIMITED TO DUST, DEBRIS, DAMAGE, CONSTRUCTION ACTIVITY AND THE LIKE
DURING THE ENTIRE CONSTRUCTION PERIOD OF PERFORMANCE. THE
CONTRACTOR MUST REPAIR AND REMEDIATE AT NO COST TO THE
GOVERNMENT ANY PLAQUES AND THE LIKE THAT ARE DAMAGED DURING
CONSTRUCTION OR DUE TO THE INADEQUACY OF THE PROTECTION.
D. CANNON PROTECTION: THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING
THE CANNON FROM ALL CONSTRUCTION ACTIVITIES INCLUSIVE OF BUT NOT
LIMITED TO DUST, DEBRIS, DAMAGE, CONSTRUCTION ACTIVITY AND THE LIKE
DURING THE ENTIRE CONSTRUCTION PERIOD OF PERFORMANCE. THE
CONTRACTOR MUST REPAIR AND REMEDIATE AT NO COST TO THE
GOVERNMENT ANY CANNONS AND THE LIKE THAT ARE DAMAGED DURING
CONSTRUCTION OR DUE TO THE INADEQUACY OF THE PROTECTION.
E. CULLUM HALL EXISTING PIANO: THE EXISTING PIANO WILL BE REMOVED BY
OTHERS PRIOR TO NTP/DEMOLITION.
F. CULLUM HALL EXISTING FURNITURE AND FURNISHINGS: REFER TO FFE
SPECIFICATION PACKAGE FOR THOSE ITEMS THAT ARE TO BE REFURBISHED
FOR REUSE IN CULLUM HALL. THE CONTRACTOR IS REQUIRED TO
COORDINATE WITH THE GOVERNMENT ANY REMAINING
FURNISHINGS/FURNITURE WITHIN CULLUM HALL AND THOSE ITEMS MUST BE
STORED AND PROTECTED DURING THE PERIOD OF PERFORMANCE OF
CONTSTRUCTION AND RETURNED AS INSTRUCTED BY THE GOVERNMENT.
THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT THE EXISTING
FURNISHINGS/FURNITURE IS NOT DAMAGED AND FUNCTIONS PROPERLY
WHEN CULLUM HALL IS TURNED OVER TO THE GOVERNMENT. FAILURE TO
COMPLY WITH THESE REQUIREMENTS HEREIN IN WHOLE OR PART WILL BE
CAUSE FOR THE GOVERNMENT TO MANDATE REPAIR TO ORIGINAL
CONDITION/REPLACEMENT IN KIND AT NO COST TO THE GOVERNMENT.
G. B1 AND B2 BASEMENTS:
1. ALL SUSPENDED ACOUSTICAL CEILING TILES, GRIDS, AND HANGERS
ARE TO BE DEMOLISHED.
2. ALL EXISTING PLUMBING WATER CLOSETS, SINKS, AND SHOWER
FIXTURES TO BE DEMOLISHED
3. ALL EXISTING BATHROOM STALLS TO BE DEMOLISHED
4. SEE PLUMBING DRAWINGS FOR MORE INFORMATION
H. B1 AND B2 BASEMENTS:
1. PRESERVE & PROTECT ALL EXISTING FIREPLACE SURROUNDS,
MANTELS, FIREBOX & HEARTHS TO REMAIN IN PLACE. FLUES TO BE
SEALED.
2. SALVAGE ALL EXISTING WOOD DOORS AS INDICATED ON DEMOLITION
PLANS FOR FUTURE USE.
3. SALVAGE EXISTING METAL SPIRAL STAIRS FROM MECH ROOM. RETURN
TO GOVT.
I. FOR ALL EXTERIOR DEMOLITION INCLUDING WINDOWS, DOORS, RAILINGS,
STAIRS, AND TERRACE, SEE EXTERIOR ENVELOPE SHEETS.
J. SEE RESTORATION DRAWINGS FOR RESTORATION OF PLASTER WALLS AND
CEILINGS IN HISTORIC SPACES.
K. NOT USED
L. ALL EXISTING FINISHED FLOORING MATERIAL TO BE REMOVED ON B1 AND B2
BASEMENTS INCLUDING; TILE, RESILIENT TILE, RUBBER SPORT FLOORING,
CARPET AND OTHER DOWN TO STRUCTURAL FLOOR (INCLUDING PLYWOOD
SHEET UNDERLAYMENT). REFER TO AD-500 FOR FURTHER DETAILS.
M. SEE STRUCTURAL FOR EXCAVATION FOR NEW FOUNDATIONS AND UNDER-
SLAB DRAINAGE.
N. SALVAGE ALL RADIATORS AND RETURN TO GOVERNMENT.
O. SALVAGE & PROTECT EXISTING WOOD FRAME/UPHOLSTERED BENCHES AND
SMALL WOOD TURNED STOOLS FOR REPAIRS/REFINISHING FOR USE IN
RENOVATED SPACES AS DOCUMENTED. REFER TO FURNITURE DRAWINGS
FOR ADDITIONAL INFORMATION.
P. CONTRACTOR MUST NOT CONSIDER DEMOLITION AND ALTERATION NOTES
TO BE ALL INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT
AND ASSESS EACH AREA AND TO FULFILL THE INTENT OF THE WORK
INDICATED BY THE CONTRACT DOCUMENTS. CONTRACTOR MUST VERIFY ALL
CONDITIONS AND DIMENSIONS WITHIN THE CONTRACT LIMITS. DEVIATIONS
FROM THE CONTRACT DOCUMENTS NECESSITATED BY FIELD CONDITIONS
MUST BE BROUGHT TO THE ATTENTION OF THE COR PRIOR TO PROCEEDING
WITH THE WORK.
Q. CONTRACTOR MUST CONSULT WITH THE GOVERNMENT IN ADVANCE OF
DOING WORK TO DETERMINE DISPOSITION OF ALL FIXTURES, CABINETS,
SERVICES, EQUIPMENT AND ITEMS REMOVED DURING THE DEMOLITION.
REMOVE EXISTING FURNISHINGS AND EQUIPMENT LEFT BEHIND TO BE
DISCARDED BY GOVERNMENT.
R. PROVIDE TEMPORARY BARRIERS, BARRICADES, LIGHTING, FIRE PROTECTION,
ETC. TO PROTECT PERSONNEL AND ADJACENT SPACES PER THE
REQUIREMENTS OF DIVISION 01 SECTION “TEMPORARY FACILITIES AND
CONTROLS.”
S. PROVIDE TEMPORARY SAFEGUARDS AS REQUIRED TO PROTECT EXISTING
FINISHES AND EQUIPMENT TO REMAIN DURING DEMOLITION AND
CONSTRUCTION.
T. WHERE EXISTING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO,
PARTITIONS, FLOORS AND BASES, DOOR AND WINDOW FRAMES, CEILINGS,
CASEWORK, EQUIPMENT, ELECTRICAL AND MECHANICAL DEVICES, FIXTURES
AND EQUIPMENT IS REMOVED OR ALTERED, REPAIR ADJACENT SURFACES
DISTURBED BY DEMOLITION OR ALTERATION WORK AND PREPARE THESE
SURFACES TO RECEIVE NEW SCHEDULED FINISHES. REPAIRS TO SURFACES
DEEMED BY THE COR AND GOVERNMENT TO BE UNSATISFACTORY FOR THE
PURPOSE MUST BE REMOVED AND REPLACED IN KIND.
U. WHERE FINISHES ARE NOTED TO BE REMOVED AT COLUMNS OR WALLS,
REMOVAL MUST BE SUCH THAT NEW FINISHES MAY BE INSTALLED TO ALIGN
WITH EXISTING FINISHES.
V. UNLESS NOTED OTHERWISE, REMOVE EXISTING PROJECTIONS, HANGERS,
BOLTS, NAILS, BRACKETS, CURTAIN RODS, VALANCES, ETC. FROM EXISTING
WALLS AND COLUMNS. PATCH ALL HOLES TO MATCH ADJACENT SURFACES
FOR THE INSTALLATION OF NEW FINISHES.
W. AT NEW DOORS, CORRIDOR OPENINGS OR CONNECTIONS AND WHERE
PARTITIONS ARE REMOVED, REMOVE EXISTING FLOORING AND BASES TO
EXTENT REQUIRED FOR NEW UNDERLAYMENT TO PROVIDE A SMOOTH
TRANSITION. THE SUBSURFACE MUST BE PATCHED AND TREATED TO
PRODUCE A SURFACE WHICH WILL ELIMINATE "TELEGRAPHING" OF EXISTING
JOINTS THROUGH THE NEW FLOORING. INSTALL UNDERLAYMENT PER
DIVISION 03 SECTION “GYPSUM CEMENT UNDERLAYMENT.”
X. WHERE NEW WALLS WILL ABUT EXISTING CORNERS, REMOVE CORNER
GUARD AND REPAIR CORNER PRIOR TO INSTALLATION.
Y. ALL MECHANICAL AND ELECTRICAL WORK NOTED ON THE DEMOLITION
DRAWINGS MUST BE REMOVED BY THE APPROPRIATE DIVISION 21, 22, 23, 25,
26, 27 AND 28 SUBCONTRACTORS. REFER TO MECHANICAL AND
ELECTRICAL DEMOLITION DRAWINGS FOR EXTENTS.
Z. MECHANICAL AND ELECTRICAL DEMOLITION IN FINISHED SPACES MUST BE
REMOVED SUCH THAT ALL EXISTING TERMINATIONS WILL BE CONCEALED
BEHIND THE NEW CONSTRUCTION.
GENERAL DEMOLITION AND ALTERATION NOTES (CONTINUED)
AA. HOLES IN UL RATED FLOORS AND WALLS RESULTING FROM DEMOLITION OR
REMOVALS MUST BE REPAIRED IN A MANNER CONSISTENT WITH THE
ADJACENT UL RATED CONSTRUCTION AND BE ACCEPTABLE TO THE
AUTHORITY HAVING JURISDICTION.
BB. REPAIRS TO FIRE, SMOKE OR ACOUSTICALLY RATED WALLS, FLOORS OR
CEILINGS MUST BE MADE WITH MATERIALS APPROPRIATE TO ACHIEVE THE
SAME RATING AS THE EXISTING.
GENERAL DEMOLITION AND ALTERATION NOTES (CONTINUED)
CC. CAREFULLY REMOVE EXISTING DRYWALL PLASTER CEILINGS TO EXTENT
REQUIRED TO ACCOMMODATE NEW MECHANICAL AND ELECTRICAL WORK
BOTH INSIDE AND OUTSIDE THE PROJECT AREA LINE. REINSTALL SUPPORT
STRUCTURE AND INSTALL NEW DRYWALL OR PLASTER AND FINISH TO
MATCH EXISTING ADJACENT FINISHES TO THE SATISFACTION OF THE COR
AND GOVERNMENT.
DD. REPORT ALL CRACKED OR DAMAGED EXTERIOR GLAZING TO GOVERNMENT
AND COR.
CERAMIC TILE WALLS: REMOVE WALL TILE AND EXISTING GWB OR CEMENT
BOARD SUBSTRATE AND INSTALL NEW SUBSTRATE APPROPRIATE TO RECEIVE
NEW WALL FINISHED PER DIVISION 09 SECTION “DRYWALL SYSTEMS.”
LAY IN CEILING: REMOVE ALL CEILING TILES. DISCONNECT AND REMOVE ALL
MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT SUPPORTED ON
FRAMING GRID. REMOVE CEILING GRID AND HANGERS IN THEIR ENTIRETY.
PLASTER CEILINGS ADHERED TO TERRACOTTA STRUCTURAL SLAB: REMOVE ALL
LOOSE, CHIPPED, AND DAMAGED PLASTER. WHERE PLASTER IS SOUND AND
ADHERED TO THE SLAB ABOVE, REMOVE FAILING SURFACE FINISHES.
GWB CEILING: REMOVE ALL EXISTING DRYWALL. DISCONNECT AND REMOVE ALL
MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT. REMOVE CEILING
FRAMING AND SUPPORTS IN THEIR ENTIRETY.
PLASTER CEILINGS: REMOVE ALL EXISTING CEILING PLASTER AND ANY SUPPORT
WITHIN EXTENTS DEFINED. REFER TO HISTORICAL RESTORATION DRAWINGS FOR
PLASTER CEILING REPAIR IN HISTORIC SPACES.
FLOOR FINISHES: MECHANICALLY REMOVE EXISTING FLOORING AND
UNDERLAYMENT MATERIALS TO CONCRETE SLAB IN THEIR ENTIRETY. SCARIFY
CONCRETE AS REQUIRED TO REMOVE ALL ADHESIVE RESIDUE. THE USE OF
REMOVAL CHEMICALS IS NOT PERMITTED.
KEYED DEMOLITION NOTES
GWB PARTITION: REMOVE ITEMS ATTACHED TO WALL SURFACE, SUCH AS BASE.
REMOVE EXISTING DRYWALL. DISCONNECT AND REMOVE ALL MECHANICAL AND
ELECTRICAL DEVICES AND EQUIPMENT. REMOVE METAL FRAMING, TRACKS AND
BRACING IN THEIR ENTIRETY.
MASONRY PARTITION: REMOVE ITEMS ATTACHED TO WALL SURFACE, SUCH AS
BASE. REMOVE EXISTING DRYWALL, IF ANY. DISCONNECT AND REMOVE ALL
MECHANICAL AND ELECTRICAL DEVICES AND EQUIPMENT. REMOVE MASONRY
AND BRACING IN THEIR ENTIRETY.
MASONRY PARTITION (SELECTIVE): NEW MEP UTILITIES TO BE RUN IN EXISTING
PATHWAYS WITHIN MASONRY BEARING WALL: ISOLATED DEMOLITION OF
MASONRY BEARING WALL, DEMOLITION OF EXISTING UTILITES WITHIN MASONRY
BEARING WALL AND PREPARATION OF AREA FOR FUTURE MEP UTILITIES. SEE
MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR DEMOLITION OF
EXISTING UTILITIES. SEE STRUCTURAL DRAWINGS FOR DEMOLITION OF MASONRY
BEARING WALLS. SEE RESTORATION DRAWINGS FOR DEMOLITION OF FINISHES
WITHIN HISTORIC SPACES.
WALL FINISHES: REMOVE EXISTING WALL FINISHES, EXCEPT PAINT, TO
SUBSTRATE, INCLUDING ALL TACK BOARDS, POSTERS, ADHERED FILMS, AND
WALL PAPER. PREPARE SUBSTRATE/PAINTED SURFACES TO RECEIVE NEW
FINISHES PER DIV 02 SECTION “ALTERATION PROJECT PROCEDURES.”
BUILT-UP FLOOR: REMOVE EXISTING SUBBASE TILE, SUPPORTS DOWN TO
STRUCTURAL SLAB BELOW, AND WALL BASE U.N.O. ON FINISH PLANS. PREPARE
FLOORS TO RECEIVE NEW FINISH AS SPECIFIED.
CERAMIC TILE FLOORS: REMOVE EXISTING CERAMIC TILE, MATS AND SETTING
BED TO STRUCTURAL SLAB AND PREPARE FLOORS TO RECEIVE NEW FLOOR
FINISH AS SPECIFIED.
CASEWORK/MILLWORK: DISCONNECT MECHANICAL AND ELECTRICAL SERVICES.
REMOVE CASEWORK CABINETS AND TOPS IN THEIR ENTIRETY.
MEMORIAL PLAQUES IN CASEWORK: CAREFULLY REMOVE, CATALOGUE, STORE
AND PROTECT MEMORIAL PLAQUES ON WALL PANELS FOR REINSTALLATION
(MEMORIAL ROOM CH-106A ONLY). CONTRACTOR IS RESPONSIBLE FOR
PROTECTING THE PLAQUES AND WALL PANELS UNTIL RE-INSTALLATION PER THE
DRAWINGS. CONTRACTOR IS WHOLLY RESPONSIBLE FOR RESTORING MEMORIAL
PLAQUES AND SOLID SURFACE MEMORIAL DISPLAY PANELS TO ORIGINAL
CONDITION. DISCONNECT MECHANICAL AND ELECTRICAL SERVICES. REFER TO
NEW WORK DRAWINGS FOR SCOPE OF NEW WORK. ANY DAMAGE WILL BE
REPAIRED AT NO COST TO THE GOVERNMENT.
DOOR/FRAME/HARDWARE: REMOVE EXISTING DOOR, FRAME AND HARDWARE.
SALVAGE DOOR FRAME, HARDWARE AS INDICATED.
DEMO FOR NEW LINTEL IN MASONRY: DEMOLISH EXISTING MASONRY WALL IN
PREPARATION OF NEW LINTEL INSTALLATION. SEE ARCHITECTURAL AND
STRUCTURAL DETAILS FOR EXTENTS.
11S
FLOOR ASSEMBLY: REMOVE ALL FLOOR ASSEMBLY COMPONENTS INCLUDING
FINISHES, HANDRAILS, SUBFLOORING, SLABS, STRUCTURAL MEMBERS WITHIN
THE EXTENTS DESCRIBED. PROVIDE NECESSARY SCAFFOLDING AND BRACING
TO PREVENT ANY DAMAGE OR COLLAPSE OF BUILDING ELEMENTS. SEE
STRUCTURAL DRAWINGS FOR DETAILS.
WOOD/METAL STAIR: DISCONNECT AND REMOVE ALL MECHANICAL AND
ELECTRICAL DEVICES AND EQUIPMENT. REMOVE EXISTING STAIR, INCLUDING
STRINGERS, TREADS, RISERS, PLATFORMS, SUPPORT FRAMING, AND DEVICES
AND RAILINGS IN THEIR ENTIRETY.
CONCRETE/MASONRY STAIR: REMOVE ALL RAILINGS AND DEMOLISH STAIR IN
ITS ENTIRETY.
PLUMBING FIXTURES: REMOVE ALL PLUMBING FIXTURES, SUPPORT FRAMING,
SUPPORT STRUCTURE, AND FITTINGS. ALL PIPING TO BE REMOVED MUST BE
PROPERLY CAPPED.
INTERIOR STOREFRONT: REMOVE ALL STOREFRONT COMPONENTS
INCLUDING GLAZING, FRAMING, DOORS, DOOR HARDWARE, AND THRESHOLDS.
EXTERIOR WALL: REMOVE ALL PLASTER AND SUBSTRATE LAYERS TO
STRUCTURAL MASONRY AT INTERIOR WALL SURFACES WHERE APPLICABLE IN
BASEMENTS. COORDINATION WITH HISTORIC RESTORATION SCOPE. SEE
SHEET A-650.
FLOOR GRILLE: MECHANICAL FLOOR GRILLE COVER, PROTECT DURING
CONSTRUCTION. SALVAGE AND STORE FOR RE-INSTALLATION.
2M
5 10
149.14
DEMOLITION LEGEND
EXIST WALLS, DOORS TO REMAIN (SHOWN SCREENED)
DEMOLITION WALLS, DOORS TO BE DEMOLISHED
(SHOWN DASHED)
SCALE: 1/8"=1'-0"
0 84
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
PLAN NORTH
AD-1B1
B B
A S
E M
E N
T D
E M
O L
IT
IO
N
P L A
N
W E
S T
P O
IN
T
N
Y L B
Y
D B
B K
R M
/1
/2
W D
S -1
-R
-0
W D
S -1
-C
RTA SUBMISSION 2/11/2021
U S
M A
B U
IL
D
IN
G
C
U L L U
M H
A L L R
E N
O V
A T
IO
N
SCALE: 1/8" = 1'-0"AD-1B1
REF SHEET: A-109.2
B1 BASEMENT DEMOLITON PLANA1
R
T A
S U
B M
IS
S
IO
N
/1
/2
A
M E
N D
M E
N T
/2 /2
11S 11S11S
11S 11S11S
11S
11S
11S 11S 11S
11S
11S
A1
AD-300
A1
AD-300 MEMORIAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .