CULLUM_Amendment 6_Drawings Combined.pdf
PDF 9 MB Posted
- Attached to
- Cullum Hall Repair Building 605
- Solicitation number
- W912DS21R0003
About this file
This document package includes architectural drawings and specifications for repair and renovation work at Cullum Hall at the United States Military Academy in West Point, New York. The work includes repairs to historic finishes and structures, upgrades to mechanical and electrical systems, and interior renovations. Key project elements involve repairing deteriorated plaster, replacing damaged marble and repairing floors and stairs, upgrading fire protection systems, and refinishing wood surfaces. Interior renovations comprise refinishing existing wood floors, installing new wall finishes and flooring, and replacing casework and millwork. The solicitation seeks bids for general construction, electrical, plumbing and HVAC work. The contracting agency is the Department of the Army Corps of Engineers Engineering District New York. The solicitation number is W912DS21R0003 and bids are due on February 11, 2021.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
/T
D
4.9
K LK.6
2.5
B9
A-109.2
B7
A-109.2
6'-2 1/2"
3'-1" 3'-1"
/2
/2
/2
/2
/2
3'-10" 3'-10" 3'-10" 3'-0" 2'-8 1/2" 2'-8 1/2"
5'-5 1/2" 17'-8"11'-7"
3'-6" 3'-6" 3'-6" 3'-6" 3'-6"
/2
/2
/2
/2
/2
/2
2'-11 1/2"2'-11 1/2"6'-4"2'-1 1/2"2'-8 1/2"2'-8 1/2"3'-2"3'-9 1/2"3'-9 1/2"3'-9 1/2"
11'-5 1/2" 5'-5 1/2" 5'-11 1/2"
/2
3'-1"
22'-0" 18'-6"
3'-1"
2'-1 1/2"
4'-3 1/2"
A-109.1 F1
A-109.1 F2
A-109.1 F4
A-109.1 F8
A-109.1 C2
A-109.1 A1
A-109.1 A3
6.4
NOTE:
SEE SPEC SECTION
10 22 13 - WIRE MESH PARTITIONS
FOR ATFP SCREEN. FINISH HOT-DIPPED
GALVANIZED.
BASIS OF DESIGN PRODUCT:
WIRE MESH PRODUCT, 1 1/2" NO 10. GA
SURE GUARD™ - STANDARD DUTY, THE G-
S COMPANY, 7920 STANSBURY ROAD
BALTIMORE, MD 21222. PHONE:
410.284.9549 FAX: 410.282.6499. FINISH
HOT-DIPPED GALVANIZED.
LEVEL B2
139' - 10 3/4"
LEVEL B3
134' - 7 3/4"
K
3'-1" 3'-1"
A-109.2
A5
SIM
LEVEL B2
139' - 10 3/4"
LEVEL B3
134' - 7 3/4"
76.4
4'-0" 4'-0"
A-109.2
A5
SIM
LEVEL B2
139' - 10 3/4"
LEVEL B3
134' - 7 3/4"
K LK.6
3'-9 1/2" 3'-9 1/2" 3'-9 1/2" 3'-2" 2'-8 1/2"2'-8 1/2" 2'-1 1/2" 2'-1 1/2" 3'-1 1/2" 3'-1 1/2" 2'-11 1/2" 2'-11 1/2"
A-109.2
A5
SIM
A-109.2
A2
SIM
A-109.2
A2
SIM
LEVEL B2
139' - 10 3/4"
LEVEL B3
134' - 7 3/4"
7 4.9 4'-0" 4'-0"
/2
/2
/2
3'-5 1/2" 3'-5 1/2" 3'-5 1/2" 3'-5 1/2"
A-109.2
A5
SIM
LEVEL B2
139' - 10 3/4"
KL K.6
3'-6" 3'-6" 3'-6" 3'-6" 3'-6" 2'-8 1/2" 2'-8 1/2" 3'-10" 3'-10" 3'-10"
A-109.2
A5
SIM
A-109.2
A2
SIM
LEVEL B2
139' - 10 3/4"
4.9 2.5
3'-10 1/2" 3'-10 1/2" 3'-10 1/2" 3'-10 1/2"
A-109.2
A5
SIM
LEVEL B2
139' - 10 3/4"
K
3'-1" 3'-1"
A-109.2
A5
SIM
SCALE: 1/4"=1'-0"
0 42
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
PLAN NORTH
A-109.1
A T
F P
S C
R E
E N
P L A
N A
N D
E L E
V A
T
IO
N S
W E
S T
P O
IN
T
N
Y L B
Y
D B
B K
R M
/1
/2
W D
S -1
-R
-0
W D
S -1
-C
U S
M A
B U
IL
D
IN
G
C
U L L U
M H
A L L R
E N
O V
A T
IO
N
SCALE: 1/4" = 1'-0"A-109.1
SERVICE YARD LOWER LEVEL PLAN - ATFP SCREENA6
R
T A
S U
B M
IS
S
IO
N
/1
/2
A
M E
N D
M E
N T
/1 /2
SCALE: 1/4" = 1'-0"A-109.1
REF SHEET: A-109.1
ATFP SCREEN
ELEVATION 1F1
SCALE: 1/4" = 1'-0"A-109.1
REF SHEET: A-109.1
ATFP SCREEN
ELEVATION 2F2
SCALE: 1/4" = 1'-0"A-109.1
REF SHEET: A-109.1
ATFP SCREEN ELEVATION 3F4
SCALE: 1/4" = 1'-0"A-109.1
REF SHEET: A-109.1
ATFP SCREEN ELEVATION 4F8
SCALE: 1/4" = 1'-0"A-109.1
REF SHEET: A-109.1
ATFP SCREEN ELEVATION 5C2
SCALE: 1/4" = 1'-0"A-109.1
REF SHEET: A-109.1
ATFP SCREEN ELEVATION 6A1
SCALE: 1/4" = 1'-0"A-109.1
REF SHEET: A-109.1
ATFP SCREEN
ELEVATION 7A3
MECHANICAL YARD CLIN
INCLUDES ALL
ARCHITECTURAL AND
STRUCTURAL IN
NORTH SERVICE YARD
bkolonauski Snapshot
LEVEL B1
150' - 0 3/4"
LEVEL B2
139' - 10 3/4"
LEVEL B3
134' - 7 3/4"
A-109.2
E1
HEAVY DUTY SELF-CLOSING
BARREL HINGE.
B.O.D. = SHUT IT CI3950
LEVEL B1
150' - 0 3/4"
LEVEL B2
139' - 10 3/4"
LEVEL B3
134' - 7 3/4"
A-109.2
E5
SEE ELEVATIONS
VARIES
S E
E E
L E
V A
T
IO
N S
V A
R
IE
S
HOLES TAPPED IN FRAME AS
REQUIRED TO BOLT TO
CONTINUOUS STEEL ANGLE
STEEL CHANNEL FRAME
ELEVATIONSECTION
NOTE:
SEE SPEC SECTION
10 22 13 - WIRE MESH PARTITIONS
FOR ATFP SCREEN. FINISH HOT-DIPPED
GALVANIZED.
BASIS OF DESIGN PRODUCT:
WIRE MESH PRODUCT, 1 1/2" NO 10. GA
SURE GUARD™ - STANDARD DUTY, THE G-
S COMPANY, 7920 STANSBURY ROAD
BALTIMORE, MD 21222. PHONE:
410.284.9549 FAX: 410.282.6499. FINISH
HOT-DIPPED GALVANIZED.
10 GAGE WIRE, 1-1/2 INCH MESH
WELDED L6x4x5/16 (LLH), SEE STRUCTURAL
HSS GIRT,
SEE STRUCTURAL
WIDE FLANGE
COLUMN BEYOND,
SEE STRUCTURAL
SCREEN PANEL
FRAME
THROUGH-BOLT TO
ANGLE IN FIELD
SLOTTED HOLES
FOR 3/8" BOLTS
HEAVY DUTY SELF-CLOSING BARREL HINGE.
B.O.D. = SHUT IT CI3950
FRONT ELEVATION SIDE ELEVATION
PLAN
HSS POST, SEE
STRUCTURAL
+/- 2 1/2"
+/- 2 1/2"
GATE FRAME
GATE FRAME
HSS POST, SEE
STRUCTURAL
SEE ELEVATIONS
VARIES
S E
E E
L E
V A
T
IO
N S
V A
R
IE
S
STEEL CHANNEL FRAME
ELEVATIONSECTION
E
Q E
Q
A-109.2
E1
A-109.2
E3
NOTE:
SEE SPEC SECTION
10 22 13 - WIRE MESH PARTITIONS
FOR ATFP SCREEN. FINISH HOT-DIPPED
GALVANIZED.
BASIS OF DESIGN PRODUCT:
WIRE MESH PRODUCT, 1 1/2" NO 10. GA
SURE GUARD™ - STANDARD DUTY, THE G-
S COMPANY, 7920 STANSBURY ROAD
BALTIMORE, MD 21222. PHONE:
410.284.9549 FAX: 410.282.6499. FINISH
HOT-DIPPED GALVANIZED.
10 GAGE WIRE, 1-1/2 INCH MESH
BOLT, SPAN TO
HSS STRUCTURE
FRONT ELEVATION SIDE ELEVATION
PLAN
HSS POST, SEE
STRUCTURAL
GATE FRAME
MAX
1"
LOCKABLE
GRAVITY LATCH
GATE FRAME
HSS POST, SEE
STRUCTURAL
BOLT, SPAN TO
HSS STRUCTURE
LOCKABLE
GRAVITY LATCH
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
A-109.2
A T
F P
S C
R E
E N
D E
T A
IL
S
W E
S T
P O
IN
T
N
Y L B
Y
D B
B K
R M
/1
/2
W D
S -1
-R
-0
W D
S -1
-C
U S
M A
B U
IL
D
IN
G
C
U L L U
M H
A L L R
E N
O V
A T
IO
N
SCALE: 3/4" = 1'-0"
1 0
SCALE: 3/4" = 1'-0"A-109.2
REF SHEET: A-109.1
ATFP SCREEN SECTION 1B9
SCALE: 3/4" = 1'-0"A-109.2
REF SHEET: A-109.1
ATFP SCREEN SECTION 2B7
SCALE: 1" = 1'-0"A-109.2
REF SHEET: A-109.1
ATFP SCREEN STANDARD PANELA5
1/2 1 21
SCALE: 1" = 1'-0"
R
T A
S U
B M
IS
S
IO
N
/1
/2
A
M E
N D
M E
N T
/1 /2
SCALE: 1 1/2" = 1'-0"A-109.2
REF SHEET: A-109.2
SCREEN PANEL FASTENING
CONNECTIONE5
SCALE: 1 1/2" = 1'-0"
SCALE: 3" = 1'-0"A-109.2
REF SHEET: A-109.2
GATE HINGE DETAILSE1
SCALE: 1" = 1'-0"A-109.2
REF SHEET: A-109.1
ATFP SCREEN GATE PANELA2
SCALE: 3" = 1'-0"
1/21/4
SCALE: 3" = 1'-0"A-109.2
REF SHEET: A-109.2
GATE LATCH DETAILSE3
MECHANICAL YARD CLIN
INCLUDES ALL
ARCHITECTURAL AND
STRUCTURAL IN
NORTH SERVICE YARD
bkolonauski Snapshot
EW3
LEVEL 2
177' - 2 3/4"
177.24'
LEVEL 3
191' - 0 3/4"
191.07'
STAGE LEVEL
180' - 9 1/4"
180.78'
MISSING DENTIL
5 5 5 5 5 5
PROTECT ALL BRONZE
PLAQUES AND CANNON
DURING WORK, TYP.
A-541
F2
A-541
C2 A2A4
A-541
A-130
NEW WORK
A-541
REPAIR ALL DETERIORATED PLASTER AROUND
WINDOW. THIS REPAIR APPLIES TO 25% OF ALL
WINDOWS WITHIN THE ROOM
LEVEL 2
177' - 2 3/4"
177.24'
LEVEL 3
191' - 0 3/4"
191.07'
STAGE LEVEL
180' - 9 1/4"
180.78'
EW3
PATCH HOLE
5 5 5 5 5 5 5
PROTECT ALL BRONZE
PLAQUES AND CANNON
DURING WORK, TYP.
F2C2 F2
A-541A-541
C2
A-541
F2
A-541
C2
A-310
NEW WORK
A-130
A-541A-541
P:\West Point--Cullum And Lincoln Halls Ewing Cole\Cullum Hall\Architects Drawings Large\JBC REPAIR DRAWINGS_RTA\CULLUM_JBC 100% SUBMISSION 12.22.2020_2.8.21.dwg
5/12/2021 4:20:03 PM
A-418
W E
S T
P
O I N
T
N
Y
U S
M
B
U I L D
I N
G
C
U L L U
M
H
A L L
R
E N
O V
A T
I O
N
B A
L L
R O
M
E
L E
V A
T I O
N S
H I S
T O
R I C
R
S
T O
R A
T I O
N
H T
H
T A
H T
H
B K
W D
S R
W D
S C
US Army Corps of Engineers ®
SHEET ID
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
N
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R I P
T I O
N
P R
O J E
R
B
M I S
S I O
N
A
M E
N D
M E
PLAN NORTH
SCALE: 3/16"=1'-0"
024 4 8 12
FEET
B1
E1
SCALE: 3/16" = 1'-0"
BALLROOM EAST ELEVATIONE1
A-418
SCALE: 3/16" = 1'-0"
BALLROOM WEST ELEVATIONB1
A-418
RTA SUBMISSION 2/11/2021
GENERAL NOTES
REPAIR NOTES
REPAIR KEY
STONE REPAIR, SEE DRAWING A-540 FOR REPAIR DETAILS
PLASTER REPAIR, SEE DRAWING A-541 FOR REPAIR DETAILS
METAL REPAIR
LOCATION OF INTERNAL LEADER
TYPICAL REPAIR NOTE
TYP.
- NOT ALL REPAIR NOTES USED ON ALL SHEETS.
1. REMOVE DAMAGED LIME PLASTER, PATCH, AND REPAINT TO MATCH
EXISTING. SEE REPAIR DETAILS C2 & F2/A-541.
2. DEMOLISH BEAM SOFFIT FOR INSTALLATION OF NEW FIRE
PROTECTION SYSTEM. SEE DETAIL A1/A-564.
REINSTALL NEW PLASTER AND PAINT TO MATCH ORIGINAL. SEE
REPAIR DETAILS D7 & F7/A-541.
3. REPLACE MISSING LIME PLASTER ELEMENT AND REPAINT TO MATCH
EXISTING. SEE REPAIR DETAILS A2 & A4/A-541.
4. REMOVE FAILING PAINT AND REPAINT TO MATCH EXISTING.
5. REPAINT ELEMENT TO MATCH THE ORIGINAL FAUX-SCAGLIOLA
FINISH.
6. REPLACE INCOMPATIBLE PATCHES IN MARBLE WITH NEW MATERIAL
TO MATCH SURROUNDING. SEE REPAIR DETAIL A1/A-540.
7. CLEAN AND RE-GROUT ALL MARBLE FLOORS AND STAIRS, TYP.
8. REPLACE DAMAGED MARBLE UNIT WITH NEW TO MATCH ORIGINAL.
SEE REPAIR DETAILS D1 & F1/A-540.
9. RESET LOOSE MARBLE FLAGSTONE. SEE REPAIR DETAILS C5 &
E5/A-540
10. FILL CRACKS IN MARBLE. SEE REPAIR DETAIL A5/A-540.
11. PATCH SPALLS IN MARBLE. SEE REPAIR DETAIL A1/A-540.
12. CLEAN MARBLE WALLS, INCLUDING COPPER STAINS. CLEAN AND
WAX BRONZE.
13. REMOVE LIME PLASTER AND STRUCTURAL CLAY TILE TO ACCESS
INTERNAL LEADER AND MEP UTILITY. REINSTALL NEW STRUCTURAL
CLAY TILE AND PLASTER, AND REPAINT TO MATCH EXISTING. SEE
DRAWING A-542 FOR TYPICAL REPAIR DETAILS.
REMOVE AND REPLACE LIME PLASTER AND STRUCTURAL CLAY
TILE TO ACCESS INTERNAL LEADER AND MEP UTILITY
- IN-PAINT ALL MINOR CHIPS AND LOSSES IN LIME PLASTER TO MATCH
EXISTING.
- REPAIR ALL HISTORIC FINISHES AFFECTED BY THE ELECTRICAL,
STRUCTURAL, MECHANICAL AND PLUMBING SCOPES OF WORK.
SEE DRAWING A-540 FOR MARBLE REPAIR DETAILS.
SEE DRAWING A-541 FOR PLASTER REPAIR DETAILS.
- REMOVE SURFACE MOUNTED CONDUIT. PATCH AND PAINT UNUSED
PENETRATIONS AND RESTORE AFFECTED FINISHES TO MATCH
SURROUNDING. SEE MECHANICAL, ELECTRICAL, PLUMBING,
TELECOM, SECURITY, FIRE PROTECTION AND FIRE ALARM DRAWINGS
FOR EXTENTS.
SEE REPAIR DETAILS C2 & F2/A-541.
- REFER TO SHEET A-005 FOR GENERAL NOTES ON RUNNING UTILITIES
IN HISTORIC SPACES. CONTRACTOR IS RESPONSIBLE FOR
SUBMITTING COORDINATED DRAWINGS OF THE VARIOUS TRADES
SHOWING THE SIZES, LOCATIONS, AND PATHWAYS OF ALL
MECHANICAL AND ELECTRICAL WORK.
- REPAIR OPERATION OF HISTORIC DOORS AS NEEDED, REPAIR
HISTORIC HARDWARE AND REPLACE HISTORICALLY INCOMPATIBLE
HARDWARE, REPAIR DOORS AND TRIM.
SEE DRAWING A-600 FOR EXTERIOR DOOR SCHEDULE.
SEE DRAWING A-660 FOR INTERIOR DOOR SCHEDULE.
- SEE DRAWINGS I-001 TO I-103 FOR FINISH SCHEDULE AND FINISH
LOCATION PLANS.
KEY PLAN
PF
FEC
F E
FE
F E
F E
F E
-C O
F E
-C O
FE-CO2
F E
C
F E
C
SC1
RB2
P3
CP2
SC1
RB2
P3
CP2
EF4, -
RF4
RB2
P3
CP2
RF1
P7, WB2
BG1, P3
A1
RF1
RB1
P3, P5
CP2
WM1, WM2
P7, WB2
BG1, P3, P4
A1
SC
P3
SC1
P3
WM1
P7, WB2
BG1, P3
A1
RF1, RF2
P7, WB2
BG1, P3, P4
A1
RF1, EX
P8, WB2
P1
CP1
TF4, 5, 7
TB2
TW5, 6, 7
A1
TF4, 5, 7
TB2
TW5, 6, 7
A1
C1
WB4
P3, P4, XW4
CP2
C1
WB4
P3, P4, XW4
CP2
C1
WB4
P3, P4, XW4
CP2
C1
WB4
P3, P4, XW4
CP2
C1
WB4
P3, P4, XW4
CP2
SC1, WM2
P7, WB2
P3
CP2
SC1
RB2
P3
CP2
CORR
CH-B1C4
ELEC. EM.
CH-B120
TELE/DATA
CH-B116
ELEV
CH-B1E1
CORR
CH-B1C1
HIGH-DENSITY
STORAGE
CH-B112A
HIGH-DENSITY
STORAGE
CH-B112B
ENVIRONMENTAL
ROOM
CH-B108
OPEN
BOOKSHELVES
CH-B110
MECHANICAL
SERVICE
CH-B106
MECH SERVICE
DBL HEIGHT
01CC
MECHANICAL
SERVICE
CH-B114
NORTH STAIR
CH-B1S3
VESTIBULE
CH-B122
VESTIBULE
CH-B100
OPEN SHELVING
CH-B102A
MEN
CH-B101
SOUTHEAST
STAIR
CH-B1S2
WOMEN
CH-B103
SUPERVISOR'S
OFFICE
CH-B105
OFFICE
CH-B107
OFFICE
CH-B109
OFFICE
CH-B111
OFFICE
CH-B113
RF4
RB2
P3
CP2
CORR
CH-B1C2
CORRIDOR
CH-B1C3
RF1, RF2
P7, WB2
BG1, P3
A1
RF1
RB1
BG2, P3
CP2
RF3
RB3
P3, P6
CP2
RF3
RB3
P6
CP3
TECH. CAMERA
CH-B104A
TECH. AUDIO
CH-B104B
SUPPLIES
CH-B102B
RF1
P7, WB2
BG1, P3
A1
EF4
IB1
P3, WP1
CP2
JC
CH-B115
WD1/XW1 WD1/XW1 WD1/XW1 WD1/XW1 WD1/XW1
ELEC. MAIN
CH-B118
RF4
RB2
P3
CP2
8 8 8 8 8
HR1
TP2
TP2
RF1RF3
RF1WM2
SC1RF1
EF4RF1
RF1EX-ST
RF1TF7
RF1RF4
RF1RF4
RF1RF4
RF1
C1
RF1
C1
RF1
C1
RF1
C1
RF1
C1
SC1
RF1
RF1
TF4, TF5
SC1
RF1
WM2WM1
RF1EF4
WM1
RF1
WM1WM2
WM2SC1
TP2
I-400
A1
I-401
A1
P4 P4
CG1 CG1
CG1 CG1
GF1GF1
GF1
GF1
P6
P5
P4
HR2
INDICATES WALL PROTECTION EXTENT
INDICATES CORNERGUARD
INDICATES TWO WALL FINISHES, REFER TO
ELEVATIONS FOR ADDITIONAL INFORMATION
INDICATES CHANGE OF MATERIALS,
SEE TRANSITION DETAILS
INDICATES CASEWORK TREATMENT
INDICATES COUNTERTOP TREATMENT
INDICATES MILLWORK TREATMENT
INDICATES ACCENT TREATMENT
XXX INDICATES OVERALL FLOOR TREATMENT
INDICATES OVERALL WALL TREATMENT
INDICATES OVERALL BASE TREATMENT
INDICATES OVERALL CEILING TREATMENT
FINISH LEGEND
XX
XX/XX
XX
XX XX
INDICATES WOOD GRAIN DIRECTION
LEGEND KEY
XXX
XXX
XXX
CG
MATERIAL CODES
AF ACCESS (RAISED) FLOORING
A ACOUSTICAL TILE
BG BUMPER GUARD
C CARPET
CG CORNER GUARD
D DRAPERY / CURTAIN
DP DEMOUNTABLE PARTITION
EF EPOXY FLOORING
EP EPOXY PAINT
EX EXISTING TO REMAIN
FR FOOT RAIL
GF GLASS FILM
GM GLAZED MASONRY
HR HAND RAIL
IB INTEGRAL BASE
L PLASTIC LAMINATE
MB METAL BASE
P PAINT
PF PREFABRICATED PANELS
RB RESILIENT BASE
RF RESILIENT FLOOR
ST STONE TILE
SC SEALED CONCRETE
SF STRETCHED FABRIC SYSTEM
SPG SPECIALTY GLASS
SS SOLID SURFACE
SST STAINLESS STEEL
TB TILE BASE
TF TILE FLOOR
TP TOILET PARTITION
TS TACK SURFACE
TW TILE WALL
TZ TERRAZZO
U UPHOLSTERY
W WALL COVERING
WB WOOD BASE
WD WOOD
WF WOOD FLOORING
WM WALKOFF MAT
WP WALL PROTECTION
WT WINDOW TREATMENT
XB SPECIALTY BASE
XC SPECIALTY CEILING
XF SPECIALTY FLOOR
XW SPECIALTY WALL
INTERIOR KEYNOTES (REFER TO PLAN FOR APPLICABLE INFORMATION)
REFER TO SHEETS (A-700 SERIES) FOR DETAILS OF ELEVATOR. REFER TO WRITTEN
SPECIFICATIONS: DIVISION 14. PRE-ENGINEERED INTERIOR FINISH SYSTEM SHALL
MATCH THE FOLLOWING BASIS OF DESIGN:
MANUFACTURER: FORMS + SURFACES /STYLE: CAB FORM LEVELe - 105 WITH
CERAMILOC
CEILING: FUSED GRAPHITE / FINISH: SEASTONE WITH (6) LED DOWNLIGHTS AND
CONTINUOUS PERIMETER LIGHTS
UPPER WALLS: FUSED WHITE GOLD / FINISH: LINEN
FRAME, RAIL & BASE: FUSED GRAPHITE / FINISH: SEASTONE
LOWER WALLS: BONDED BRONZE / PATTERN: AUSTIN / PATINA: DARK
HANDRAIL STYLE: COMPASS SERIES - DOUBLE RING / RAIL FINISH: STIPPLED OIL -
RUBBED BRONZE, STANDOFF: OIL-RUBBED BRONZE
FLOOR: PORCELAIN TILE (TF8) 12 X 24
NOTE: PROVIDE ALL SST WALL FINISHES WITH CERAMILOC TREATMENT FOR
SMUDGE-PROOF SURFACE. PAINT EXPOSED SURFACES ABOVE CEILING PANELS
INTUMESCENT "MATTE BLACK".
THIS ROOM/AREA TO BE REFINISHED/REPAIRED TO EXTENT NOTED IN HISTORICAL
RENOVATION DRAWINGS AND TO EXTENT REQUIRED DUE TO OTHER WORK. FINISHES
MUST MATCH ADJACENT SURFACE OF SAME KIND IN MATERIAL, COLOR, FINISH AND
TECHNIQUE OF APPLICATIONS, U.N.O. ROOMS ON LEVEL 1 ONLY WITH EXISITNG
WOOD PLANK FLOORING MUST BE REFINISHED (WF1). REFER TO HISTORICAL
PRESERVATION REPORT, FINISH SCHEDULE AND EXISTING CONDITIONS FOR
REPLICATION OF DECORATIVE TRIM PAINT FINISHES/COLORS; HR1, P8, P9, P10 & XW6.
GROUP TOILET ROOMS TO INCLUDE FLOOR MOUNTED/OVERHEAD BRACED SOLID
HDPE - TOILET PARTITIONS. SOLID SURFACE (ACRYLIC) UNDER MOUNT SINK WITH
SOLID QUARTZ COMPOSITE COUNTERTOPS ON FIRST FLOOR. DECORATIVE GLAZED
PRIVACY FILM ON WINDOWS (GFI).
EXPOSED STRUCTURAL MEMBERS PAINTED TO MATCH COLOR (P1). REFER TO
ARCHITECTURAL DRAWINGS FOR LOCATIONS REQUIRING INTUMESCENT PAINT.
PROVIDE SURFACE MOUNTED 3/4" THICK, UNFINISHED FIRE-RATED PLYWOOD. (RATING
LABEL TO BE INSTALLED ON VISIBLE SIDE). REFER TO ARCHITECTURAL DRAWINGS FOR
EXTENT.
THIS ROOM / AREA TO REMAIN UNFINISHED.
PROVIDE CONCRETE SEALANT TO MATCH SPECIFICATION (SC1) TO EXISTING CONCRETE
FLOORING, INCLUDING STEPS AND LANDINGS.
THIS ROOM TO HAVE BUILT-IN ADJUSTABLE WOOD SHELVING WITH TACKABLE COLORED
WALL COVERING ON BACK WALL AND CONTINUOUS SOLID WOOD PICTURE RAIL.
(20) TWO-TIER BUILT-IN GUEST/CADET LOCKERS (12" W x 18" D).
EXISTING SOLID SURFACE MEMORIAL DISPLAY PANELS MODIFIED TO EXTENT REQUIRED
FOR MECHANICAL DISTRIBUTION. SALVAGED PANELS & PLAQUES MODIFIED AT THE TOP
AND SIDES WITH MATERIALS TO MATCH ORIGINAL SPECIFICATIONS. REFER TO
ELEVATIONS FOR EXTENT OF WORK AND MECH/ELEC DWGS FOR FURTHER
COORDINATION.
ONE SIDE TO HAVE COAT ROD AND SHELF @ ADA HT. OPP. SIDE TO HAVE (4) SHELVES.
REFER TO DETAILS ON SHEET A-580.
INTERIOR FINISHES OF ENVIRONMENTAL ROOM MUST BE COORDINATED WITH
MANUFACTURER FROM AVAILABLE STANDARDS. FLOOR FINISH TO BE AS NOTED.
COORDINATE INSTALLATION OF RECESSED HIGH DENSITY STORAGE RAIL SYSTEM WITH
THERMAL INSULATION SYSTEM PRIOR TO FINISHING FLOORS. REFER TO DETAIL ON SHEET
I-502.
INSTALL 1/4" BRASS DIVIDER INLAY FOR CHANGE OF MATERIAL. REFER TO ENLARGED
PATTERN PLANS ON I-500 SERIES FOR FURTHER DETAILS.
REFER TO FURNITURE DRAWINGS & FURNITURE SPECIFICATION PACKAGE FOR FURTHER
DETAILS ON NEW AREA RUGS.
GENERAL NOTES
1. REFER TO SHEETS (I-001) & (I-002) FOR COMPLETE LIST
OF GENERAL NOTES & SCHEDULES. REFER TO SHEET
(I-500) SERIES FOR FINISH DETAILS.
2. REFER TO (I-400) SERIES FOR TYP FLOOR PATTERN
PLANS.
3. REFER TO (A-400) SERIES FOR INTERIOR ELEVATIONS &
WALL TILE PATTERNS. REFER TO (A-580) SERIES FOR
MILLWORK DETAILS.
4. REFER TO (A-410) SERIES DRAWINGS FOR FURTHER
DETAILS ON EXTENTS OF HISTORIC PRESERVATION
PATCHING, REPAIRS AND REFINISHING OF KEY
INTERIOR SPACES.
5. REFER TO ARCHITECTURAL SHEET A-004 FOR AREAS
REQUIRING INTUMESCENT PAINT.
6. IN AREAS WITH EXISTING WALL BASE, BUMPER
GUARDS AND OTHER TRIMWORK THAT IS DISTURBED
BY NEW WORK, MOULDING PROFILE IS TO BE
REPLICATED AND FILLED FOR CONTINUITY. PRIMED
FOR PAINT FINISH AS SPECIFIED. ALL JOINTS TO BE
INCONSCIPUOUS AND CORNERS MITERED.
SCALE: 1/8"=1'-0"
0 84
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
PLAN NORTH
I-100.B1
IN
T
E R
IO
R
F
IN
IS
H
L O
C A
T
IO
N P
L A
N
B A
S E
M E
N T
B
W E
S T
P O
IN
T
N
Y L B
Y
V B
/H M
/C D
G D
/K C
/1
/2
W D
S -1
-R
-0
W D
S -1
-C
U S
M A
B U
IL
D
IN
G
C
U L L U
M H
A L L R
E N
O V
A T
IO
N
SCALE: 1/8" = 1'-0"I-100.B1
REF SHEET: A-109.2
INTERIOR FINISH LOCATION PLAN - BASEMENT B1C1
R
T A
S U
B M
IS
S
IO
N
/1
/2
A
M E
N D
M E
N T
/1 /2
F
P F
MECH SERV
02XX
MECH SERV
02XX
MECH SERV
02XX
MECHANICAL SERVICE
CH-B206
MECHANICAL SERVICE
CH-B208
MECHANICAL SERVICE
CH-B212
MECHANICAL SERVICE
CH-B214
SUPPLIES
CH-B200B
WORK ROOM
CH-B200A
MEN
CH-B201
JAN/STOR.
CH-B203
VESTIBULE
CH-B205
WOMEN
CH-B207
CORR
CH-B2C1
CABINET STORAGE
CH-B204
CABINET STORAGE
CH-B204
HIGH-DENSITY
STORAGE
CH-B210A
HIGH-DENSITY
STORAGE
CH-B210B
VEST
CH-B217
REFUSE COLLECTION
CH-B215
MACHINE ROOM
CH-B219
MECHANICAL
CH-B216
STAIR B2-A
CH-B210B.S
STORAGE
CH-B202
CORR
CH-B2C2
WC-A
MR-A
EWC-A
WC-A
LAV-B (TYP)
LAV-B
CTS-A
ELEV LOBBY
CH-B2L1
3" FD-A
3" FD-A
3" FD-A
4" FD-B
4" S DN
3" V RISE
NEW 5"
COPPER
RWL
NEW 5" COPPER
RWL
NEW 5" COPPER
RWL UP & DN
NEW 5" COPPER
RWL UP & DN
PROVIDE ELEVATOR SUMP PUMP
IN PIT DISCHARGE TO MECH ROOM
SEE DETAIL E2/P-602
NEW 4" COPPER
RWL
UNPROCESSED
STORAGE BAY 2
CH-B211
UNPROCESSED
STORAGE BAY 1
CH-B213
1 1/2" W DN
1 1/2" V RISE
2"
2"
S
4" S STACK
3" V STACK
W/CO ON
RISE
4" S DN
2" V RISE
2" W DN
1 1/2" V RISE
1 1/2" W
DROP
4" S DN
2" V RISE
4" S DN
2" V RISE
3"
CO
CO
3" W DN
1 1/2" V RISE
3" W DN
1 1/2" V RISE
UR-A
3"
CO
3" FD-A
DHU-1
AHU-1
BOILER-1
HUMDIFIER 2-2
HUMDIFIER 1-1
HUMDIFIER 2-1
4" W DN
PUMPED
DISCH. FROM
BELOW. 2" V
FROM BELOW 4" W DROP
S
S
3" UP TO MR
3" UP TO FD
4"
BEL FLR.
(E) 3" VENT
LEAK DETECTION
CONTROL PANEL
WIRE BACK TO BAS
S L O
P E
CO3" AVB CLG
2" W UP
2"
4" 4"
ABV FLR
4"
4"
4"
BEL FLR.
S
4" SAN UP/DN
4"
CO
CO
S A
N S
A
N SAN
4" FD-B
4" FD-B
4" FD-B
EW1 EW2
A B C D E F
G
EW3
H J
EW4
2.5
3.8
4.9
5.5
6.4
K
NS2
NS1
1.1
3.5
SLOPE .01
4" DRAIN TO TIE INTO
S/3 SAN STACK
4" SAN RUN
@ .01 AT CLG.
2"V UP
2"V OFFSET
AT CLG.
SCALE: 1/8"=1'-0"
0 84
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
PLAN NORTH
P-10B2
B A
S E
M E
N T
B F
L O
O R
P L A
N
D R
A
IN
A G
E
W E
S T
P O
IN
T
N
Y R
F
E C
E C
B F
/1
/2
W D
S -1
-R
-0
W D
S -1
-C
RTA SUBMISSION 2/11/2021
U S
M A
B U
IL
D
IN
G
C
U L L U
M H
A L L R
E N
O V
A T
IO
N
SCALE: 1/8" = 1'-0"P-10B2
BASEMENT B2 FLOOR PLAN DRAINAGEA1
R
T A
S U
B M
IS
S
IO
N
/1
/2
A
M E
N D
M E
N T
/1 /2
DRAWING NOTES:
1. COORDINATE ALL RWC LOCATIONS WITH ARCHITECTURAL DRAWINGS.
NEW 4" COPPER RWC
NEW 4" COPPER
RWC UP
NEW 5" COPPER
RWC UP
4" FD-B
4" FD-B
4" FD-B
4" SAN DN
W/VERTICAL
CELANOUIT
4"
4" SAN UP & DN
W/ CO ON RISE
4" FD-C
PROVIDE ELEVATOR SUMP PUMP
IN PIT DISCHARGE TO MECH ROOM
SEE DETAIL E2/P-602
P-1 P-2
HUM1-1
AHU-1DHU-1
4"
4"
4" 4"
2" SUMP PUMP
DISCHARGE TO
4" FD-B
2" DROP
S
SP-2
CONT.
PANEL
CONNECT TO 10" PVC STORM
DRAIN SEE CIVIL DWG'S.
CONNECT TO SANITARY
SEWER SEE CIVIL DWG'S.
4" S STACK
S
S
4" W DROP
4" FD-B
8"
ABV FLR
ABV FLR
5'-0"
6"
5'-0"8"
B-1
INV. EL. = 128.83 INV. EL. 128.67
5"
ABV FLR
6"
CO
CO
CO
5"
5" ABV FLR
RWC
R
W C
RWC
R W
C
RWC
R W
C
S A
N
SAN
RWC
R W
C
EW1 EW2
A B C D E F
G
EW3
H J
EW4
2.5
3.8
4.9
5.5
6.4
K
NS2
NS1
1.1
3.5
CO
5" COPPER
RWL UP
4" COPPER RAIN
LEADER UP & DN
5" COPPER
RWL UP
CO
CO
3" PD UP
2"V UP
SP-2
DUPLEX
SUMP
PUMP
SCALE: 1/8"=1'-0"
0 84
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
PLAN NORTH
P-10B3
B A
S E
M E
N T
B F
L O
O R
P L A
N
D R
A
IN
A G
E
W E
S T
P O
IN
T
N
Y R
F
E C
E C
B F
/1
/2
W D
S -1
-R
-0
W D
S -1
-C
RTA SUBMISSION 2/11/2021
U S
M A
B U
IL
D
IN
G
C
U L L U
M H
A L L R
E N
O V
A T
IO
N
SCALE: 1/8" = 1'-0"P-10B3
BASEMENT B3 FLOOR PLAN DRAINAGEA1
R
T A
S U
B M
IS
S
IO
N
/1
/2
A
M E
N D
M E
N T
/1 /2
DRAWING NOTES:
1. COORDINATE ALL RWL LOCATIONS WITH ARCHITECTURAL DRAWINGS.
LEVEL 1
LEVEL B1
ROOF
LEVEL B2
LEVEL B3
LEVEL 1
LEVEL B1
LEVEL 2
ROOF
LEVEL B2
LEVEL B3
CTS
MR
3"
MR
3"
3" FD
PANTRY
CH-100
JC
CH-102D
WC
LAV LAV
3" FD
LAV LAV
WCO
WC
UR
WC
WOMEN
CH-103A
WC WC
MEN
CH-105
WC
3" FD3" FD
LAV LAV LAV UR
LAV LAV
UR
WC WC WC
3" FD
LAV LAV
WOMEN
CH-B103
MEN
CH-B101
LAV LAV
UR
WC
LAV
WC
4' FD
FLOOR
SINK
MR
3"
3" FD
JC
CH-B115
MECHANICAL
CH-B216
EWC-A
4' FD 4' FD
4' FD
4' FD
S
S
S
S
WOMEN
CH-B207
MEN
CH-B101
1-1/2"
1-1/2"
3"
(E) 3"
(E) 3" VTR
(E) 3"
(E) 3" VTR
2"
1-1/2"
2"
1-1/2"
1 1/2"
2"
1-1/2"
3"
2"2"2"
2"
4"
4"
2"
4"
4"
2"
2"
2"
3"
4" PVC DRAIN IN 8"
PVC CONTAINMENT
PIPE3/4" PVC CONTAINMENT DRAIN TO MR
EWC
3"
1-1/2"
3"
4" PVC DRAIN IN 8"
PVC CONTAINMENT
PIPE
3" PVC DRAIN IN 6"
PVC CONTAINMENT
PIPE
CO
2" 2"
2"
2"
2"
1-1/2"
2" 2"
2"3" 7 (DFU'S)4" (82 DFU'S
4"
3" (14 DFU'S)
3" FD3" FD
CTS
2" 4" (4 DFU)
3" FD
3"
3" FD
EWC
3" FD
3"
3"
4"
2" 1 1/2"
2" 1-1/2" 1-1/2"
1 1/2"
CO CO
3"
1-1/2"
(E) 3"
(E) 3" VTR
CO 4"
2"
CO
4"
CO
2" SUMP PUMP
DISCHARGE
SUMP PUMP
DISCHARGE
TO FS
2'X 2' X 2'
SUMP PIT
4" (86
DFU'S
100(DFU'S)
16 (DFU'S)
40 (DFU'S)
10 (DFU'S)
50 (DFU'S)
10 (DFU'S)
120 (DFU'S)
8 (DFU'S)
14 (DFU'S)
12 (DFU'S)
38 (DFU'S) 50 (DFU'S)
3' DIA.X 6' DEEP
BASIN WITH PUMPS
4"4"
4"
2"
4"
2"
3"
3"
3"
3"
1 1/2"
3"
4"
4"
19 (DFU'S)
6" 139 (DFU'S)
JAN./STOR.
CH-B207
4"
3"
3"
2"
2" 2"
2"
CO
2"
2"
2"
4" (17 DFU'S)
2"
4" FD
PANTRY
CH-100
ELEV LOBBY
2"
2"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
PLAN NORTH
P-701
D R
A
IN
A G
E R
IS
E
R D
IA
G
R A
M
W E
S T
P O
IN
T
N
Y R
F
A u th o r
B F
/1
/2
W D
S -1
-R
-0
W D
S -1
-C
RTA SUBMISSION 2/11/2021
U S
M A
B U
IL
D
IN
G
C
U L L U
M H
A L L R
E N
O V
A T
IO
N
R
T A
S U
B M
IS
S
IO
N
/1
/2
A
M E
N D
M E
N T
/1 /2
FIXTURE DFU VALUE
WC
UR
LAV
CTS
EWC
3"FD
4" FD
WATER CLOSET
URINAL
LAVATORY
COUNTER TOP SINK
ELECTRICAL WATER COOLER (DUAL)
FLOOR DRAIN (TOILET ROOM)
FLOOR DRAIN (MECH. ROOM)
SCALE: 12" = 1'-0"P-701
SANITARY RISERA1
(17 DFU'S)
| A-109.1 AFTP SCREEN PLAN AND ELEVATIONS |
| A-109.2 ATFP SCREEN DETAILS |
| A-418 BALLROOM ELEVATIONS-2 HISTORIC RESTORATION |
| I-100.B1 INTERIOR FINISH LOCATION PLAN - BASEMENT B1 |
| P-10B2 BASEMENT B2 PLAN - DRAINAGE |
| P-10B3 BASEMENT B3 FLOOR PLAN - DRAINAGE |
| P-701 DRAINAGE |
| EL-602 LUMINAIRE SCHEDULE AND DETAILS |
File details come from the government source that posted it. Updated .