Appendix_D_-_Hydrant_Flow_Test.pdf

PDF 126 KB Posted

Attached to
KC 46A Two Bay General Purpose MX Hangar Federal contract opportunity
Solicitation number
W912DS-19-R-0001
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

Appendix D

View the file

Other files for this federal contract opportunity

Other files attached to KC 46A Two Bay General Purpose MX Hangar, newest first.
File Type Posted
Amendment_0009.pdf PDF
Amendment_0007.pdf PDF
Amendment_0008_Plan.pdf PDF
Amendment_0008_Spec.pdf PDF
hangar_site_visit_sign_in_12.27.18.pdf PDF
Amendment_0008.pdf PDF
Amendment_0006_-_2-Bay_MX_Hangar_Plans.docx.pdf PDF
Appendix_Q_-_KC46_2-Bay_Hangar_Soil_Erosion_Plans.pdf PDF
Amedment_0006.pdf PDF
Amendment_0006_-_2-Bay_MX_Hangar_Specs.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003_-KC46_2-Bay_Hangar_-_Specs.pdf PDF
Amendment_0003.pdf PDF
Amendment_0003_-KC46_2-Bay_Hangar_-_Plans.pdf PDF
Appendix_P_-_Site_Visit_14_NOV_2_Bay_Hanger.pdf PDF
W912DS19R0001-0002.pdf PDF
Amendment_0001.pdf PDF
Appendix_G_-_KC46_2-Bay_Hangar_CADD_Files_(Aval_After_Award).pdf PDF
Appendix_B_-_As-Built_Drawings_For_Buildings_1801_and_1823.pdf PDF
Package_2_-_KC46_-_2-Bay_Hangar_-_Specifications.pdf PDF
Package_4_-_KC46_-_2-Bay_Hangar_-_FFE.pdf PDF
Pages_from_Package_1_-_KC46_-_2-Bay_Hangar_-_Plans_2.pdf PDF
Pages_from_Package_1_-_KC46_-_2-Bay_Hangar_-_Plans-1.pdf PDF
Package_3_-_KC46_-_2-Bay_Hangar_-_CID.pdf PDF
Appendix_O_-_Hangar_Acceptance_Test_Procedures_AFCEC.pdf PDF
Appendix_F_-_USACE_Joint_Base_MDL_HazMat_Assessment_Report_5-8-18_(KM).pdf PDF
Appendix_I_-_SOO-KC-46A_Beddown.pdf PDF
Appendix_C_-_Sustainability_Checklists_and_References.pdf PDF
Appendix_J_-_ATFP_Flightline_Securitypdf.pdf PDF
Appendix_B_-_As-Built_Drawings_For_Buildings_1801_and_1823.pdf PDF
Appendix_K_-_KC46_-_Apron_and_Fuel_Hydrant_Relocation.pdf PDF
Appendix_A_-SOW_Attachment_2_-_AMRS_Meter_Specifications_dated_28_January_2016.pdf PDF
Appendix_H_-_JB_MDL_-_Pavement_Evaluation_Report_North_of_1837.pdf PDF
Appendix_L_-__McGuire_Environmental_Survey_of_B1801_and_B1823_(September_1999).pdf PDF
W912DS19R0001.pdf PDF
Appendix_N_-_KC-46A_MOB_4_Public_FEIS_ExecSumm_June_2018.pdf PDF
Appendix_M_-_Soil_Contamination_Maps.pdf PDF
Appendix_E_-_McGuire_KC-46A_Two-Bay_MX_Hangar_Geotech_Report.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE: 10/31/2017

TEST BY: Day of Week: Tuesday TIME OF DAY: 10:45am MIN. OF FLOW: 5

WATER SUPPLIED BY:

PURPOSE OF TEST:

DATA

FLOW HYDRANT(S) A1 A2 A3

SIZE OPENING: 2.5

COEFFICIENT: 0.91

PITOT READING: 37

GPM: 1030

TOTAL FLOW DURING TEST: 1030 GPM

STATIC READING: 65 PSI RESIDUAL: 56 PSI

RESULTS: AT 20 PSI RESIDUAL 2456 GPM AT 0 PSI 2996 GPM

ESTIMATED CONSUMPTION: 5150 GAL.

REMARKS: Flow test performed using a 2.5 inch hosemonster

McGuire Air Force Base

KC46A Hangar Design

FIRE HYDRANT FLOW TEST

HYDRANT # & LOCATION:

Jeremy W. John, PE

Along Hangar Road: Test Hydrant #1828, Flow Hydrant #1823

0 500 1000

Pr es su re

, p sig

Flow, gpm

Data