Amendment_0008_Plan.pdf

PDF 143 KB Posted

Attached to
KC 46A Two Bay General Purpose MX Hangar Federal contract opportunity
Solicitation number
W912DS-19-R-0001
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

Amendment 0008 Plan

View the file

Other files for this federal contract opportunity

Other files attached to KC 46A Two Bay General Purpose MX Hangar, newest first.
File Type Posted
Amendment_0009.pdf PDF
hangar_site_visit_sign_in_12.27.18.pdf PDF
Amendment_0007.pdf PDF
Amendment_0008.pdf PDF
Amendment_0008_Spec.pdf PDF
Amedment_0006.pdf PDF
Amendment_0006_-_2-Bay_MX_Hangar_Plans.docx.pdf PDF
Appendix_Q_-_KC46_2-Bay_Hangar_Soil_Erosion_Plans.pdf PDF
Amendment_0006_-_2-Bay_MX_Hangar_Specs.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Appendix_P_-_Site_Visit_14_NOV_2_Bay_Hanger.pdf PDF
Amendment_0003_-KC46_2-Bay_Hangar_-_Specs.pdf PDF
Amendment_0003.pdf PDF
Amendment_0003_-KC46_2-Bay_Hangar_-_Plans.pdf PDF
W912DS19R0001-0002.pdf PDF
Amendment_0001.pdf PDF
Appendix_G_-_KC46_2-Bay_Hangar_CADD_Files_(Aval_After_Award).pdf PDF
Appendix_B_-_As-Built_Drawings_For_Buildings_1801_and_1823.pdf PDF
Package_2_-_KC46_-_2-Bay_Hangar_-_Specifications.pdf PDF
Package_4_-_KC46_-_2-Bay_Hangar_-_FFE.pdf PDF
Pages_from_Package_1_-_KC46_-_2-Bay_Hangar_-_Plans-1.pdf PDF
Package_3_-_KC46_-_2-Bay_Hangar_-_CID.pdf PDF
Pages_from_Package_1_-_KC46_-_2-Bay_Hangar_-_Plans_2.pdf PDF
Appendix_D_-_Hydrant_Flow_Test.pdf PDF
Appendix_L_-__McGuire_Environmental_Survey_of_B1801_and_B1823_(September_1999).pdf PDF
Appendix_O_-_Hangar_Acceptance_Test_Procedures_AFCEC.pdf PDF
Appendix_F_-_USACE_Joint_Base_MDL_HazMat_Assessment_Report_5-8-18_(KM).pdf PDF
Appendix_I_-_SOO-KC-46A_Beddown.pdf PDF
Appendix_C_-_Sustainability_Checklists_and_References.pdf PDF
W912DS19R0001.pdf PDF
Appendix_N_-_KC-46A_MOB_4_Public_FEIS_ExecSumm_June_2018.pdf PDF
Appendix_M_-_Soil_Contamination_Maps.pdf PDF
Appendix_E_-_McGuire_KC-46A_Two-Bay_MX_Hangar_Geotech_Report.pdf PDF
Appendix_J_-_ATFP_Flightline_Securitypdf.pdf PDF
Appendix_B_-_As-Built_Drawings_For_Buildings_1801_and_1823.pdf PDF
Appendix_K_-_KC46_-_Apron_and_Fuel_Hydrant_Relocation.pdf PDF
Appendix_A_-SOW_Attachment_2_-_AMRS_Meter_Specifications_dated_28_January_2016.pdf PDF
Appendix_H_-_JB_MDL_-_Pavement_Evaluation_Report_North_of_1837.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T1809

300KVA

480/277

T1817

225KVA

208/120

MH-1835B

MH-1835A

4/0

4/0

#2

SW1828

MH-1837

#350 MCM

SW-1712

MH-1712C

MH-1712A

1/0

1/0

T1712

500KVA

480/277

SW1837

1/0

2-BAY

1000KVA

480/277

SW-2 BAY 2

SW-2 BAY 1

#350 MCM

4/0

2-BAY FP

1000KVA

480/277

4/0

US Army Corps of Engineers ®

SHEET

IDENTIFICATION

U S A R M Y C O R P S O F E N G

IN

E E R S

D R A W N B Y

D E S

IG

N E D B Y

S U B M

IT

T E D B Y

S

IZ

E

C H E C K E D B Y

A N S I D

IS

S U E D A T E

C O N T R A C T N O

S O L

IC

IT

A T

IO

N N O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A T E

M A R K

D E S C R

IP

T

IO

N

D E L L E D G E

ES602

E L E C T R

IC

A L S

IT

E O N E -L I N E N E W W O R K

J O

IN

T B A S E M C G U

IR

E /D

IX

/L A K E H U R S T N E W J E R S E Y

F E D E R A L P L A Z A

N E W Y O R K N Y

J O A K E S

J O A K E S

S M A N N

IN

G

S E P T E M B E R

W D S -1 -R -0

RTA SUBMITTAL

K C -4 A T W O B A Y G E N E R A L P U R P O S E M X H A N G A R

B U

IL

D

IN

G

P R O J E C T N U M B E R P T F L

N E W Y O R K D

IS

T R

IC

T

SHEET NOTES:

ALL SWITCHES ARE NORMALLY CLOSED UNLESS NOTED OTHERWISE.

ALL UNDERGROUND CONDUCTORS ARE COPPER UNLESS OTHERWISE NOTED.

SWITCHGEAR AND FUSED SECTIONLIZIING CABINETS HAVE BEEN DRAWN FOR CLARITY.

THE COMPARTMENT LOCATIONS WILL NOT ALWAYS MATCH THE INSTALLED

CONFIGURATION. VERIFY EQUIPMENT PRIOR TO WORKING ON THE SPECIFIC EQUIPMENT.

NOT ALL EQUIPMENT OR CIRCUITS HAVE BEEN SHOWN. ONLY CIRCUITS AND EQUIPMENT

THAT ARE REQUIRED TO BE REMOVED OR MODIFED ARE SHOWN.

POWER TO EXISTING BUILDINGS TO REMAIN SHALL BE UNINTERUPTED DURING

DEMOLITION AND CONSTRUCTION. REROUTING OF PRIMARY FEEDERS AND NEW

INSTALLATION OF NEW EQUIPMENT MUST BE ACCOMPLISHED PRIOR TO DEMOLITION AND

REMOVAL.

COORDINATE REQUIRED POWER OUTAGES FOR CHANGEOVERS WITH BASE.

COORDINATE DEMOLITION OF UTILITES WITH BASE PRIOR TO COMMENCEMENT OF

REQUIRED WORK.

PAD-MOUNTED TRANSFORMERS, PAD-MOUNTED SWITCHES, AND BOLLARDS SHALL BE

BROWN, FEDERAL STANDARD 595 (COLOR #20040).

REFER TO PADMOUNTED SWITCH GEAR GROUNDING PLAN ON SHEET EG502.

1.

2.

3.

4.

5.

6.

7.

8.

9.

SHEET KEYNOTES:

PROVIDE NEW CONDUCTORS AND DUCTBANK AS

INDICATED. REFER TO SITE PLANS FOR MORE

INFORMATION.

PROVIDE NEW TRANSFORMER. REFER TO SITE

PLANS FOR MORE INFORMATION.

PROVIDE NEW 6 WAY SF 6 SWITCH (2 THRU WAYS

AND 4 PROTECTED RADIAL WAYS). REFER TO SITE

PLANS FOR MORE INFORMATION.

N.T.S.B2

ELECTRICAL SITE PRIMARY ONE-LINE DIAGRAM NEW WORK

R E V

IS

E D P E R B

ID

D E R I N Q U

IR

Y

/0 /2

REVISED PER AMENDMENT

joakes Stamp

Sheets
ES602 - ELECTRICAL SITE ONE-LINE NEW WORK

File details come from the government source that posted it.