Elberon to Loch Arbor Reach, Contract 2 Deal to Elberon, New Jersey
Solicitation number
W912DS-15-B-0012
Issued by

About this file

Amendment 0005

View the file

Other files

File Type Posted
BBN_Laurel_Hill_Plans_Post-100__20150710_Bid_doc.pdf PDF
W912DS-14-B-0014.pdf PDF
BBN_Stonehedge_Plans_Post-100__20150710_Bid_doc.pdf PDF
Bartlett_Brook_Specs_100_Kim_01_57_20.00_10_Edit_.pdf PDF
Bid_Abstract.pdf PDF
W912DS-15-B-0012-0009.pdf PDF
W912DS-15-B-0012-0008.pdf PDF
W912DS-15-B-0012-0007.pdf PDF
02_32_00.pdf PDF
Amendment_0006.pdf PDF
31_62_19.13_Wood_Marine_Piles-Final.pdf PDF
Main_Table_of_Contents.pdf PDF
Submittal_Register.pdf PDF
W912DS-15-B-0012-0004.pdf PDF
W912DS-15-B-0012-0003.pdf PDF
C-106.pdf PDF
C-107.pdf PDF
DTM_07-2014_ELBERON_TO_LOCH_ARBOUR_NAVD88.xyz XYZ file
W912DS-15-B-0012-0002.pdf PDF
90-PDFSW912DS-15B-0012-0015-C-309.pdf PDF
G-102.pdf PDF
W912DS-15B-0012-0015-C-104.pdf PDF
amend2_G-001.pdf PDF
W912DS-15-B-0012-0001.pdf PDF
Pages_11-20_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
Pages_21-40_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
04_00_90_05_Geotechnical_ReportL_AppendixVolume_144DPI.pdf PDF
01_00_90_05_Geotechnical_Report_DEAL_MainReport.pdf PDF
02_00_90_05_Geotechnical_Report_DEAL_QuadrantsReport_1and2.pdf PDF
W912DS-15-B-0012.pdf PDF
03_00_90_05_Geotechnical_Report_QuadrantsReport_3and4.pdf PDF
Pages_1-10_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
W912DS-15-B-0012_Deal_Final_Specs_-CT_2-june_25_red.pdf PDF
Pages_41-51_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

Revise section 00 73 00 Paragraph 1.a., and 4.a.

Answ er question to prospective bidders for informational purposes

The Bid Opening Date is hereby extended from 04-Aug-2015 at 2:00 P.M. to 06-Aug-2015 at 2:00 P.M. EST NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-B-0012

X 9B. DATED (SEE ITEM 11)

26-Jun-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jul-2015

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-15-B-0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0005

NOTE: In the FBO headings Solicitation 1 is the original solicitation Solicitation 2 is Amendment 0001 Amendment 1 is Amendment 0002 Amendment 2 is Amendment 0003 Amendment 3 is Amendment 0004 Amendment 4 is Amendment 0005

Please ensure to acknowledge all amendment 0001 thru 0005 and any possible subsequent amendments.

Specification Revisions directly below:

Section 00 73 00

Delete Paragraph 1.a.

Replace with the following paragraphs:

1.a. The contractor shall be required to commence work under this contract within 5 calendar days after the date the contractor receives the Notice to Proceed, complete Hydraulic Beach Fill work by 1 August 2016, complete all other work, including optional bid items (if awarded) and remove all of his equipment from the contract area by 1 March 2017.

The contractor shall prosecute the work diligently, using one or more dredges and appurtenant equipment of which one dredge will be dedicated to work on this contract until completion (with the exception for weather delays or equipment breakdown). The time stated for completion shall include the final cleanup of the premises.

Section 00 73 00

4. Liquidated Damages ‐ Construction

Delete Paragraph 4.a.

Replace with new Paragraph 4.a.:

If the Contractor fails to complete the work within the time specified in the Contract, or any extension, the Contractor shall pay to the Government as liquidated damages, the sum of $5,400.00 for each day of delay for the Hydraulic Beach Fill after 1 August 2016 and $5,400 for each day of delay for all other work after 1 March 2017.

W912DS-15-B-0012

Question and Answer

Question 1: After receiving feedback from potential subcontractors for the upland construction bid items, it appears that the outfall scope of work will be difficult to complete by the current contract completion date. Given the number of submittals, material procurement, and magnitude of construction required associated with the outfall work, can an additional 365 days be added to the contract completion date?”

Response 1: The specifications have been revised to reflect a longer duration for all other work besides Hydraulic Beachfill.

Question 2: Will the government please reconsider removing the language in section 00 73 00 Special Contract Requirements, Paragraph 1, which requires the contractor to commence placing sand on the beach within 60 days of NTP. Since the beach fill portion of this project is likely to take only about one half of the contractually allowed time, we ask that this artificial restriction to competition be removed and contractors be allowed to schedule their work to give the government the most competitive price as long as they complete within the noted contractual timeframe.

Response 2: The specifications have been revised to remove the requirement of commencement of beachfill within 60 days.

Question 3: Please consider extending the project duration at least 6 months to account for the amount of outfall construction, submissions & approvals, and procurement of materials and coordination with replenishment and other contracts.

Response 3: The specifications have been revised to reflect a longer duration for all other work besides Hydraulic Beach Fill.