W912DS-15-B-0012-0004.pdf

PDF 77 KB Posted

Attached to
Elberon to Loch Arbor Reach, Contract 2 Deal to Elberon, New Jersey
Solicitation number
W912DS-15-B-0012
Issued by

About this file

Amendment 0004

View the file

Other files

File Type Posted
BBN_Laurel_Hill_Plans_Post-100__20150710_Bid_doc.pdf PDF
W912DS-14-B-0014.pdf PDF
BBN_Stonehedge_Plans_Post-100__20150710_Bid_doc.pdf PDF
Bartlett_Brook_Specs_100_Kim_01_57_20.00_10_Edit_.pdf PDF
Bid_Abstract.pdf PDF
W912DS-15-B-0012-0009.pdf PDF
W912DS-15-B-0012-0008.pdf PDF
W912DS-15-B-0012-0007.pdf PDF
02_32_00.pdf PDF
Amendment_0006.pdf PDF
31_62_19.13_Wood_Marine_Piles-Final.pdf PDF
Main_Table_of_Contents.pdf PDF
Submittal_Register.pdf PDF
W912DS-15-B-0012-0005.pdf PDF
W912DS-15-B-0012-0003.pdf PDF
C-106.pdf PDF
C-107.pdf PDF
DTM_07-2014_ELBERON_TO_LOCH_ARBOUR_NAVD88.xyz XYZ file
W912DS-15-B-0012-0002.pdf PDF
90-PDFSW912DS-15B-0012-0015-C-309.pdf PDF
G-102.pdf PDF
W912DS-15B-0012-0015-C-104.pdf PDF
amend2_G-001.pdf PDF
W912DS-15-B-0012-0001.pdf PDF
Pages_11-20_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
Pages_21-40_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
04_00_90_05_Geotechnical_ReportL_AppendixVolume_144DPI.pdf PDF
01_00_90_05_Geotechnical_Report_DEAL_MainReport.pdf PDF
02_00_90_05_Geotechnical_Report_DEAL_QuadrantsReport_1and2.pdf PDF
W912DS-15-B-0012.pdf PDF
03_00_90_05_Geotechnical_Report_QuadrantsReport_3and4.pdf PDF
Pages_1-10_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
W912DS-15-B-0012_Deal_Final_Specs_-CT_2-june_25_red.pdf PDF
Pages_41-51_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

Revise and Reissue Bid Schedule Answ er question to prospective bidders for informational purposes only and does not revise the issued plans and specifications.

Bid opening date remains 04-August-2015 2:00 P.M.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 18

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-B-0012

X 9B. DATED (SEE ITEM 11)

26-Jun-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Jul-2015

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-15-B-0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0004

SECTION 00 10 00 - SOLICITATION/CONTRACT FORM

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Mobilization and Demoblization

FFP

FOB: Destination

NET AMT

0002 3,050,000 Cubic

Yard

Hydraulic Beach Fill

(Quantities Are Estimated)

Groin notch 94

0003AA 1 Job Excavation and Disposal

FFP

of Existing Groin Section

0003AB 380 Ton Bedding Stone

FFP

For Groin Notch Slopes (Quantities Are Estimated)

0003AC 690 Ton Armor Stone

FFP

For Groin Notching (Quantities Are Estimated)

0003AD 4,860 Square

Foot

Stone Filled Marine Mattress

(Quantities Are Estimated)

0003AE 360 Ton Core Stone

FFP

for Groin Notch Slopes (Quantities Are Estimated)

0004 1 Job T-Groin

FFP

Excavation/Disposal

0005 1 Job Outfall 36B

0006 1 Job Outfall 34

0007 1 Job Outfall 33/32

0008 1 Job Pre-Formed Scour Hole 29

0009 1 Job Pre-Formed Scour Hole 28

0010 1 Job Pre-Formed Scour Hole 27A

0011 1 Job Pre-Formed Scour Hole 26A

0012 1 Job Pre-Formed Scour Hole 24A

0013 1 Job Outfall 19

0014 1 Job Vibration Monitoring

0015 1 Job Splash Pad

0016 1 Each OPTION Option 1: Additional Pile: 45’

FFP

Class A, Southern Yellow Pine

0017 1 Each OPTION Option 2: Additional Pile: 45’

FFP

0018 1 Each OPTION Option 3: Additional Pile: 45’

FFP

0019 1 Each OPTION Option 4: Additional Pile: 45’

FFP

0020 1 Each OPTION Option 5: Additional Pile: 45’

FFP

0021 1 Each OPTION Option 6: Additional Pile: 45’

FFP

0022 1 Each OPTION Option 7: Additional Pile: 45’

FFP

0023 1 Each OPTION Option 8: Additional Pile: 45’

FFP

0024 1 Each OPTION Option 9: Additional Pile: 45’

FFP

0025 1 Each OPTION Option 10: Additional Pile: 45’

FFP

0026 1 Each OPTION Option 11: Additional Pile: 45’

FFP

0027 1 Each OPTION Option 12: Additional Pile: 45’

FFP

0028 1 Each OPTION Option 13: Additional Pile: 45’

FFP

0029 1 Each OPTION Option 14: Additional Pile: 45’

FFP

0030 1 Each OPTION Option 15: Additional Pile: 45’

FFP

0031 1 Each OPTION Option 16: Additional Pile: 45’

FFP

TOTALS

BASE CLINS 0001‐0015 ____________

OPTIONAL CLINS 0016‐0031______________

BASE PLUS OPTIONS 0001‐0031__________________

Question and Answers

Question 1: In order to bid the project responsibly, the Contractor needs clarification for specifications section 35 31 29.00 paragraph 3.2.4. Can the Contractor assume that alternative land based location be used for the disposal of unused stone from the groin notch, providing that Contractor disposes of the stone / other materials in accordance with all local, state, federal requirements regarding disposal of these materials? This would lead to significant savings for the Government. Contract language in this specification section would need to change in order to make it Contractor’s decision, not the Contracting Officer or the cost savings to the Government will not be realized.

Response 1: Language in the specification will remain as-is. Disposal location shall be directed/approved by Contracting Officer.

Question 2: Section 35 31 29.00 Paragraph 3.2.4: Where is the on site designated area for disposing excess stone?

Response 2: The on site area will be directed by Contracting Officer after contract is awarded.

Questions 3. Can additional sand be placed and left in place at Phillips Ave to assist in the construction of the groin notch?

Response 3: Additional sand material from the borrow source may be placed in a graded stockpile, above the existing beach, to the south of the Phillips Avenue groin to assist in the construction of the Phillips Avenue groin notch. Stockpile location, dimensions and quantity will be approved by the COR. Stockpile material will be paid at the unit price of beachfill, bid item 0002. A maximum stockpile quantity of 4000 cy will be allowed. After completion of the groin notch, any remaining stockpiled material will be graded to elevations below the elevations of the groin notch as shown on Sheets C-105 and C-501.

Question 4: Under the Beach Fill spec Section 31 24 00.00 18 Beach fill Placement Part 2.2.4 and Part 3.1.9 screening of 0.75” is required on the beach discharge end of the pipeline. These specs also allow for relief widows on the opposite side of the inflow. Historically, these baskets have been configured with such windows and with open tops that allow some material to flow onto the beach without being screened. On the present project, due to the discovery of a new MEC, 100% of the discharge is being required to be screened with the baskets being completely enclosed with no relief ports or openings. Since this new type of MEC will likely be encountered on the instant project will the requirement for 100% screening, as on the present project, be required from the beginning or will the relief ports and open baskets be allowed regardless of MEC encountered. If the latter is true, then will the elimination of the relief ports and closure of baskets be considered a Differing Site Condition?

Response 4: Approved basket designs, including the designs that may or may not include relief windows, for this Contract will be determined based upon the Contractor’s required submittal as described in SECTION 31 24 00.00 18; BEACH FILL PLACEMENT; 1.7 SUBMITTALS and the Contractor’s ability to demonstrate that discharged and screening devices operate as designed and preclude the passage of any material greater than three-quarter inches in any dimension (i.e.

screen shall be 0.75'" x 0.75").

-References: 1. SECTION 31 24 00.00 18; BEACH FILL PLACEMENT 1.7 SUBMITTALS “ Discharge End Screening Device; G, RO. Prior to commencement of any beachfill work, provide working demonstration that discharge end screening device operates as designed, subject to approval by Contracting Officer.”

2. SECTION 31 24 00.00 18 BEACH FILL PLACEMENT 2.2.4 Ordnance; paragraph c.

Question 5: Are the 4x10 timber bracing shown on sheet S-309 alternating as shown on plan (9/C-104) or connected to both sides of all piles as shown in Section (A/S-309)?

Response 5: The Plan view (9/C-104) shows the braces correctly. The section should be considered to be revised to show braces on the outboard sides of the piles only, where outboard is defined as the side furthest from the axis. See attached marked-up drawing.

Question 6: Can the USACE consider having a pre-bid teleconference with potential bidders to clarify the response to our above question?

Response 6: There will not be a pre-bid conference.

Question 7: Can the USACE please postpone the bid receipt date by two weeks?

Response 7: The bid opening date has been rescheduled to 4 August 2015.

Question 8: Two borrow areas are permitted to be used on this contract. However only 3 geotechnical boring logs were provided within these two borrow sites. We do not feel that the geotechnical samples provided demonstrate enough clarity on what Contractors should expect to dredge within the borrow site to properly evaluate the cost to complete this project.

Response 8: Bidders are entitled to collect additional information that they feel may be required to properly evaluate the cost to complete the project.

Reference Specifications SECTION 31 24 00.00 18; 1.5 SITE CONDITIONS

“Bidders are expected to examine the site of the work, including the placement areas and decide for themselves the conditions affecting their operations prior to submitting their bids. See Contract Clause entitled: "SITE INVESTIGATION AND CONDITIONS AFFECTING THE

WORK" (FAR 52.236-3).”

Question 9: What are the dimensions of the neoprene pad as shown on detail H/S-504?

Response 9: The pad is 1/8 inch thick and unreinforced. The pad should be slightly larger (1/2 inch) than the dimensions of the smaller of the two surfaces that sandwich the pad. The size depends on the specific location of the pad (steel strap on steel, steel strap on timber, under the retaining straps) and should be determined by the contractor.

Question 10: Can the USACE collect more borings within the permitted borrow sites to provide bidders with a better understanding of the dredge ability of these sites?

Response 10: USACE will not collect more borings within the permitted borrow sites, however Bidders are entitled to collect additional information that they feel may be required to better understand the conditions that may affect operations.

Reference Specifications SECTION 31 24 00.00 18; 1.5 SITE CONDITIONS

“Bidders are expected to examine the site of the work, including the placement areas and decide for themselves the conditions affecting their operations prior to submitting their bids. See Contract Clause entitled: "SITE INVESTIGATION AND CONDITIONS AFFECTING THE

WORK" (FAR 52.236-3).”

Question 11: Of the three borings provided there is a wide range of materials within the samples demonstrating that the 3,000,000 CY to be dredged could be course gravel to fine sand. If a better analysis of the material to be dredged was performed it would allow contractors to refine their dredging cycles and lower costs.

No response requested.

Question 12: Section 00 73 00 Special Contract Requirements, Paragraph 1. Requires a contractor to commence placing sand on the beach within 60 days of NTP. Since the beach fill portion of this project is likely to take only about one half of the contractually allowed time, we ask that this artificial restriction to competition be removed and contractors be allowed to schedule their work to give the government the most competitive price as long as they complete within the noted contractual timeframe.

Response 12: Section 00 73 00 Special Contract Requirements, Paragraph 1 will remain as stated.

Question 13: Line Item No 0004 on the bid list is not being used. Can the government please remove Line Item No 0004 in order to avoid any confusion amongst potential bidders?

Response 13: Line Item No 0004 was modified in Amendment #2; this RFI is no longer applicable to the solicitation.

Question 14: In regards to the T-Groin excavation and disposal, is there any requirements how the stone shall be dumped/placed/set?

Response 14: There are no specific requirements for method of T-groin stone disposal; stone may be dumped over reef.

Question 15: In regards to the T-Groin excavation and disposal, How will quantity of tons excavated and disposed be measured for payment?

Response 15: This will be 1 Job as per amendment.

AMENDMENT REVISION: Revise the following for item no. 0004 T-Groin Excavation/Disposal: Estimated quantity is "1", Unit is "JOB, Remove "2700" and "ton".

Question 16: Are there any construction requirements for disposing stone at Axel Carlson Reef?

Response 16: There are no specific requirements for method of T-groin stone disposal; stone may be dumped over reef.

Question 17: How will CLIN 0004 T-Groin Excavation/Disposal be measured for payment?

Response 17: This will be 1 Job as per amendment.

AMENDMENT REVISION: (see above)

Question 18: Are there as-builts for T-Groin? What is the largest stone size?

Response 18: There aren't any as-builts for the T-Groin. The largest stone size is not known.

Question 19: Section 31 62 19.13 Paragraph 3.1.4 states "The Contractor is solely responsible for the costs associated with drilling-through or relocating a pile when an obstruction is encountered." Should these costs be included with the outfall items or in the unit prices for "Southern Yellow Pine Pile, Class A, 45'Long"?

Response 19: These costs should be included in the Unit Prices for Southern Yellow Pine Piles.