Main_Table_of_Contents.pdf

PDF 16 KB Posted

Attached to
Elberon to Loch Arbor Reach, Contract 2 Deal to Elberon, New Jersey
Solicitation number
W912DS-15-B-0012
Issued by

About this file

Main Table of Contents

View the file

Other files

File Type Posted
BBN_Laurel_Hill_Plans_Post-100__20150710_Bid_doc.pdf PDF
W912DS-14-B-0014.pdf PDF
BBN_Stonehedge_Plans_Post-100__20150710_Bid_doc.pdf PDF
Bartlett_Brook_Specs_100_Kim_01_57_20.00_10_Edit_.pdf PDF
Bid_Abstract.pdf PDF
W912DS-15-B-0012-0009.pdf PDF
W912DS-15-B-0012-0008.pdf PDF
W912DS-15-B-0012-0007.pdf PDF
02_32_00.pdf PDF
Amendment_0006.pdf PDF
31_62_19.13_Wood_Marine_Piles-Final.pdf PDF
Submittal_Register.pdf PDF
W912DS-15-B-0012-0005.pdf PDF
W912DS-15-B-0012-0004.pdf PDF
W912DS-15-B-0012-0003.pdf PDF
C-106.pdf PDF
C-107.pdf PDF
DTM_07-2014_ELBERON_TO_LOCH_ARBOUR_NAVD88.xyz XYZ file
W912DS-15-B-0012-0002.pdf PDF
90-PDFSW912DS-15B-0012-0015-C-309.pdf PDF
G-102.pdf PDF
W912DS-15B-0012-0015-C-104.pdf PDF
amend2_G-001.pdf PDF
W912DS-15-B-0012-0001.pdf PDF
Pages_11-20_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
Pages_21-40_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
04_00_90_05_Geotechnical_ReportL_AppendixVolume_144DPI.pdf PDF
01_00_90_05_Geotechnical_Report_DEAL_MainReport.pdf PDF
02_00_90_05_Geotechnical_Report_DEAL_QuadrantsReport_1and2.pdf PDF
W912DS-15-B-0012.pdf PDF
03_00_90_05_Geotechnical_Report_QuadrantsReport_3and4.pdf PDF
Pages_1-10_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
W912DS-15-B-0012_Deal_Final_Specs_-CT_2-june_25_red.pdf PDF
Pages_41-51_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Beach Erosion Control Project Elberon to Loch Arbour Reach, Contract 2, Deal to Elberon, NJ

MTOC - 1

MAIN TABLE OF CONTENTS

SECTION TITLE

00 10 00 SF 1442 AND BIDDING SCHEDULE

00 21 13 INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 CONTRACT CLAUSES

00 73 00 SPECIAL CONTRACT REQUIREMENTS

LIST OF DOCUMENTS, EXHIBITS & OTHER ATTACHMENTS

00 90 00 WAGE RATES

00 90 01 REPORT OF OPERATIONS FORM and others

00 90 02 BORROW AREA INFORMATION

00 90 03 WATER QUALITY CERTIFICATE

00 90 04 SUPPLEMENTAL SURVEY DATA

00 90 05 GEOTECHNICAL REPORT (SEE FBO WEB SITE)

TECHNICAL PROVISIONS

DIVISION 01 – GENERAL REQUIREMENTS

01 11 35 AIR EMISSIONS REQUIREMENTS

01 12 00.00 18 DESIGN AND RECORD DRAWING REQUIREMENTS

01 32 01.00 18 PROJECT SCHEDULE

01 33 00.00 18 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 02.00 18 QUALITY CONTROL SYSTEM (QCS)

01 45 04.00 18 CONTRACTOR QUALITY CONTROL

01 54 00.00 18 MOBILIZATION AND DEMOBILIZATION

01 56 10.00 ENDANGERED SPECIES MONITORING: EQUIPMENT,

PROCEDURES AND ENDANGERED SPECIES OBSERVER

PROTOCOLS

01 57 20.00 18 ENVIRONMENTAL PROTECTION FOR CIVIL WORKS

APPENDIX A MONITORING SPECIFICATIONS FOR HOPPER DREDGES

APPENDIX B MONITORING SPECIFICATIONS FOR MECHANICAL DREDGES

APPENDIX C ENDANGERED SPECIES OBSERVER DREDGE CYCLE REPORT

APPENDIX D DREDGE OBSERVER FORM HDP

APPENDIX E INCIDENT REPORT OF SEA TURTLE TAKE

APPENDIX F INCIDENT REPORT OF ATLANTIC STURGEON TAKE

APPENDIX G ENDANGERD SPECIES OBSERVER PROGRAM LARGE WHALE

OBSERVATION DATA

Beach Erosion Control Project Elberon to Loch Arbour Reach, Contract 2, Deal to Elberon, NJ

MTOC - 2

01 78 00.00 18 CLOSEOUT SUBMITTALS

DIVISION 02 – EXISTING CONDITIONS

02 01 51 VIBRATION MONITORING OF STRUCTURES

02 32 00 SUBSURFACE DRILLING, SAMPLING, AND TESTING

02 41 00 DEMOLITION

DIVISION 03 – CONCRETE

03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS

DIVISION 05 – METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

06 13 33 PIER TIMBERWORK

DIVISION 09 – FINISHES

09 97 13.26 COATING OF STEEL WATERFRONT STRUCTURES

DIVISION 31 – EARTHWORK

31 05 22 GEOTEXTILES USED AS FILTERS

31 24 00.00 18 BEACH FILL PLACEMENT

31 34 10 STONE-FILLED (SF) MARINE MATTRESSES

31 62 19.13 WOOD MARINE PILES

DIVISION 33 – UTILITIES

33 21 00.00 18 WELL POINTS

33 40 00 STORM DRAINAGE UTILITIES

DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION

35 20 23.23 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM

HOPPER DREDGE

35 31 19 STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR

STRUCTURES

35 31 29.00 18 STONE CONSTRUCTION - GROIN NOTCHING

MAIN TABLE OF CONTENTS
LIST OF DOCUMENTS, EXHIBITS & OTHER ATTACHMENTS
TECHNICAL PROVISIONS

File details come from the government source that posted it. Updated .