AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1) The Bid Opening Date is hereby extended from 06-Aug-2015 at 2:00 P.M. to 10-Aug-2015 at 2:00 P.M. EST
2) Revise the Bid Schedule.
3) Revise Page MTOC-2 to include "02 32 00 Subsurface Drilling, Sampling, and Testing"
4) Include the new spec Section 02 32 00 Subsurface Drilling, Sampling, and Testing. Attached.
5) Replace spec Section 31 62 19.13 Wood Marine Piles w ith the attached spec w ith same name. Attached.
6) Revised Main Table of Contents. Attached.
7) Submittal Register, Attached.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Jul-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-B-0012
X 9B. DATED (SEE ITEM 11)
26-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Jul-2015
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-15-B-0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0006
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Mobilization and Demoblization
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 3,050,000 Cubic
Yard
Hydraulic Beach Fill
(Quantities Are Estimated)
Groin notch 94
FFP
(See Price Sub CLINs 0003AA, 0003AB, 0003AC, 0003AD, 0003AE)
0003AA 1 Job Excavation and Disposal
FFP
of Existing Groin Section
0003AB 380 Ton Bedding Stone
FFP
For Groin Notch Slopes (Quantities Are Estimated)
0003AC 690 Ton Armor Stone
FFP
For Groin Notching (Quantities Are Estimated)
0003AD 4,860 Square
Foot
Stone Filled Marine Mattress
(Quantities Are Estimated)
0003AE 360 Ton Core Stone
FFP
for Groin Notch Slopes (Quantities Are Estimated)
0004 2,701 Ton T-Groin
0005 1 Job Outfall 36B
0006 1 Job Outfall 34
Outfall 33/32 and Outfall 19
FFP
(See Price Sub CLINs 0007AA and 0007AB)
0007AA 1 Job Outfall 33/32
0007AB 1 Job Outfall 19
0008 1 Job Pre-Formed Scour Hole 29
Pre-Formed Scour Hole 28 and
FFP
Splash Pad
0009AA 1 Job Pre-Formed Scour Hole 28
0009AB 1 Job Splash Pad
0010 1 Job Pre-Formed Scour Hole 27A
0011 1 Job Pre-Formed Scour Hole 26A
0012 1 Job Pre-Formed Scour Hole 24A
Subsurface Drilling Sampling and Testing
FFP
(See Price Sub CLINs 0013AA and 0013AB)
0013AA 1 Job Subsurface Drilling Sampling and Testing
FFP
LAND Based Boring
0013AB 1 Job Subsurface Drilling Sampling and Testing
FFP
WATER Based Boring
0014 1 Job Vibration Monitoring
0015 1 Each OPTION Option 1: Additional Pile: 45’
FFP
Class A, Southern Yellow Pine
0016 1 Each OPTION Option 2: Additional Pile: 45’
FFP
0017 1 Each OPTION Option 3: Additional Pile: 45’
FFP
0018 1 Each OPTION Option 4: Additional Pile: 45’
FFP
0019 1 Each OPTION Option 5: Additional Pile: 45’
FFP
0020 1 Each OPTION Option 6: Additional Pile: 45’
FFP
0021 1 Each OPTION Option 7: Additional Pile: 45’
FFP
0022 1 Each OPTION Option 8: Additional Pile: 45’
FFP
0023 1 Each OPTION Option 9: Additional Pile: 45’
FFP
0024 1 Each OPTION Option 10: Additional Pile: 45’
FFP
0025 1 Each OPTION Option 11: Additional Pile: 45’
FFP
0026 1 Each OPTION Option 12: Additional Pile: 45’
FFP
0027 1 Each OPTION Option 13: Additional Pile: 45’
FFP
0028 1 Each OPTION Option 14: Additional Pile: 45’
FFP
0029 1 Each OPTION Option 15: Additional Pile: 45’
FFP
0030 1 Each OPTION Option 16: Additional Pile: 45’
FFP
TOTAL BASE (CLINS 0001 thru 0014) _________________
TOTAL OPTIONS (CLINS 0015 thru 0030)_______________
TOTAL BASE PLUS OPTIONS (CLINS 0001 thu 0030)__________________
NOTE: Bidder must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) by the following method: in the space provided on the SF 1442, by separate letter by signing block 15 below .
FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN
REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR
LATE WITHDRAWAL OF BID (FAR 14.304).