Submittal_Register.pdf

PDF 101 KB Posted

Attached to
Elberon to Loch Arbor Reach, Contract 2 Deal to Elberon, New Jersey
Solicitation number
W912DS-15-B-0012
Issued by

About this file

Submittal Register

View the file

Other files

File Type Posted
BBN_Laurel_Hill_Plans_Post-100__20150710_Bid_doc.pdf PDF
W912DS-14-B-0014.pdf PDF
BBN_Stonehedge_Plans_Post-100__20150710_Bid_doc.pdf PDF
Bartlett_Brook_Specs_100_Kim_01_57_20.00_10_Edit_.pdf PDF
Bid_Abstract.pdf PDF
W912DS-15-B-0012-0009.pdf PDF
W912DS-15-B-0012-0008.pdf PDF
W912DS-15-B-0012-0007.pdf PDF
02_32_00.pdf PDF
Amendment_0006.pdf PDF
31_62_19.13_Wood_Marine_Piles-Final.pdf PDF
Main_Table_of_Contents.pdf PDF
W912DS-15-B-0012-0005.pdf PDF
W912DS-15-B-0012-0004.pdf PDF
W912DS-15-B-0012-0003.pdf PDF
C-106.pdf PDF
C-107.pdf PDF
DTM_07-2014_ELBERON_TO_LOCH_ARBOUR_NAVD88.xyz XYZ file
W912DS-15-B-0012-0002.pdf PDF
90-PDFSW912DS-15B-0012-0015-C-309.pdf PDF
G-102.pdf PDF
W912DS-15B-0012-0015-C-104.pdf PDF
amend2_G-001.pdf PDF
W912DS-15-B-0012-0001.pdf PDF
Pages_11-20_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
Pages_21-40_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
04_00_90_05_Geotechnical_ReportL_AppendixVolume_144DPI.pdf PDF
01_00_90_05_Geotechnical_Report_DEAL_MainReport.pdf PDF
02_00_90_05_Geotechnical_Report_DEAL_QuadrantsReport_1and2.pdf PDF
W912DS-15-B-0012.pdf PDF
03_00_90_05_Geotechnical_Report_QuadrantsReport_3and4.pdf PDF
Pages_1-10_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
W912DS-15-B-0012_Deal_Final_Specs_-CT_2-june_25_red.pdf PDF
Pages_41-51_W912DS-15-B-0012_Deal_Final_Plans-CT_2-june_25.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 8 PAGES

Elberon to Loch Arbour Reach Contract 2, NJ

01 11 35 SD-07 Certificates

1.2 G ROProject Air Emissions Calculator

1.3.1 G ROMonthly Air Emissions Calculator

1.3.1 G RONarrative

1.3.2 G ROCertification

3.3.3.3 G ROInitial Project Schedule

3.4.1 G ROPreliminary Project Schedule

3.4.3 G ROPeriodic Project Schedule

3.5.2 G RONarrative Report

01 32 01.00 18 SD-07 Certificates

1.3Qualifications Statement

01 35 26 SD-01 Preconstruction Submittals

1.6 G ROAccident Prevention Plan (APP)

1.7 G ROActivity Hazard Analysis (AHA)

1.6.1 G ROCrane Critical Lift Plan

1.5.1.4 G ROCrane Operators

SD-06 Test Reports

1.11Reports

1.11.2Accident Reports

1.11.3Crane Reports

SD-07 Certificates

1.8Confined Space Entry Permit

1.11.4Certificate of Compliance

1.8Hot work permit

01 45 04.00 18 SD-01 Preconstruction Submittals

G ROContractor Quality Plan (CQC)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 8 PAGES

01 57 20.00 18 SD-01 Preconstruction Submittals

1.4.1 G ROEnvironmental Protection Plan

3.1.3.1 G ROShorebird Monitor

01 78 00.00 18 SD-01 Preconstruction Submittals

1.3.1 G ROWarranty Management Plan

SD-11 Closeout Submittals

1.2.1 G RORecord Drawings

02 01 51 SD-01 Preconstruction Submittals

1.1 G ROVibration Monitoring Plan

3.1 G ROVibration Monitoring Plan

1.2 G ROPre-construction structural

condition survey

1.2 G ROPost-construction structural

condition survey

1.3 G ROSeismic Specialist

SD-06 Test Reports

3.1Written and Telephone Report

1.2Weekly Reports

02 32 00 SD-02 Shop Drawings

3.8 G AEDrilling Log

SD-03 Product Data

1.6Permits, Certifications, and

Licenses

G AEDrilling, Sampling, Testing and

Safety Plan

02 41 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 8 PAGES

02 41 00 1.9 G ROExisting Conditions

SD-07 Certificates

G RODemolition Plan

1.7 GNotification

03 31 01.00 10 SD-01 Preconstruction Submittals

3.1 G AEField Verification of Pipes

SD-02 Shop Drawings

2.1.5 G AEReinforcing Steel

SD-03 Product Data

1.2 G AEConcrete Mix Designs

3.3.4 G ROConstruction Joint Treatment

3.4.1 GCold-Weather Requirements

3.4.2 GHot-Weather Requirements

1.5.2 G AECementitious Materials, Admixtures, and Curing

Compound

SD-06 Test Reports

2.1.2 G ROAggregates

2.1 G ROMill Test Reports

3.5 G ROTests and Inspections

3.5.2.3 G ROQuality of Aggregates

2.1.4 G ROWater

SD-07 Certificates

1.5 G ROConcrete Field Testing

Technicians

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 8 PAGES

03 31 01.00 10 1.5 G ROConcrete Construction Inspector

(CCI)

2.1.1 G ROCementitious Materials

SD-08 Manufacturer’s Instructions

1.5.2 G AECuring Compound

05 50 13 SD-02 Shop Drawings

G ROGratings

2.4 G ROangles and plates

SD-03 Product Data

G ROGratings

06 13 33 SD-02 Shop Drawings

2.1.2.4 G AEShop Drawings

SD-03 Product Data

2.1.1.1 G AESolid Sawn

2.1.2 G AEHardware, Straps, and Caps

2.1.3 G ROSynthetic Mastic

SD-06 Test Reports

1.5.2 G AETimber Preservative Inspection

1.5.3 G RODelivery Inspection List

3.5 G ROField Approvals

SD-07 Certificates

1.5.1 G ROMSDS and CIS

09 97 13.26 SD-07 Certificates

2.1.1.1 G AECoal tar epoxy-polyamide

31 05 22 SD-04 Samples

G ROGeotextiles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 8 PAGES

31 05 22 SD-06 Test Reports

2.2.1.1 G ROConformance Testing

2.2.2 G ROSite Verification and Testing

SD-07 Certificates

G ROGeotextiles

31 24 00.00 18 SD-01 Preconstruction Submittals

1.10.3 G DOMEC Safety and Work Plan

SD-04 Samples

G RODischarge End Screening Device

31 34 10 SD-02 Shop Drawings

G DOSF Marine Mattress

G DOLayout Plan

SD-04 Samples

G DOStructural Geogrid

G DOStone for Filling SF Marine

Mattresses

G DOConnectors

SD-07 Certificates

G DOEvaluation Testing of Stone

G DOSF Marine Mattresses Fabrication

Work Plan

G DOSF Marine Mattresses

G DOSieve Curve

31 62 19.13 SD-03 Product Data

2.1.1 G AEPiles

3.1.1 G AEPile driving equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 8 PAGES

31 62 19.13 G AEPile caps

2.1.4 G AEPile shoes

G AEJetting

3.1.4.2 G AESpudding

3.1.4.3 G AEPredrilling

SD-04 Samples

3.1.2.2 G AETest piles

SD-06 Test Reports

G AETest Pile Plan

3.1.2.3 G AELoad tests

1.4.1 G AEPreservative treated piles

SD-07 Certificates

1.4.2 G AEMSDS and CIS

1.4.3 G AEBest Management Practices

(BMPs)

SD-11 Closeout Submittals

G AErecords

33 21 00.00 18 SD-01 Preconstruction Submittals

1.4 G AEWell Point Expert Requirements

3.4 G AETemporary Intake Operation Plan

SD-05 Design Data

1.3 G AEWell Point Inspection

Post-Removal

1.3 G AEWell Point Inspection

Pre-Reinstallation

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 8 PAGES

33 21 00.00 18 3.3 G AEStatement of Completion

33 40 00 SD-01 Preconstruction Submittals

1.5.2.2 GQuality Control Procedures

1.8 G AEDiversion/Dewatering Plan for

Outfall #36B

3.1 G AEField Verification of Pipes

SD-02 Shop Drawings

1.6.1 G AECustom-Made Precast Units

SD-03 Product Data

2.1 G ROPipe for Outfalls and Intakes

3.3 G ROPlacing Pipe

2.2.6 G RONon-shrink Grout

SD-04 Samples

2.1 G ROPipe for Outfalls and Intakes

SD-05 Design Data

1.6.1 G AEDesign Calculations

1.6.2.1 G AEConcrete Mix Proportions

SD-06 Test Reports

1.5.2.4 G ROTest Reports

SD-07 Certificates

2.2.4 G ROManhole Frame and Cover

1.5.2.2 GQuality Control Procedures

2.1.3Resin Certification

G: RO

3.9 G AEPost-Installation Inspection

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 8 PAGES

35 20 23.23 SD-01 Preconstruction Submittals

G RODredge Plant Instrumentation

Plan Revisions or Addendum

G ROContract Quality Control Plan

SD-06 Test Reports

G ROData Appropriately Archived e-mail (section 3.2.11)

SD-07 Certificates

G ROLetter of National Dredging

Quality Management Program

Certification;

35 31 19 SD-01 Preconstruction Submittals

1.5.3 G AESources

SD-04 Samples

1.6 G ROStone Samples

SD-05 Design Data

3.3 G ROCheck Surveys

SD-06 Test Reports

1.7.1 G AEEvaluation Testing of Stone

1.7.1 G ROLaboratory Validation Documents

1.7.2 G ROGradation Test

SD-07 Certificates

1.7.2 G ROGradation Test

1.5.5 GWeigh Scale Certification

1.5.5 GCertified Weight Scale Tickets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .