AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of This Amendment is to:
1. Revise and Reissue Bid Schedule.
2. Revise Plans and Specs.
3. Answ er questions to prospective bidders for informational purposes.
Bid opening remains 28 Jul 2015 at 2:00 P.M. EST.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 18
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jul-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-B-0012
X 9B. DATED (SEE ITEM 11)
26-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jul-2015
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-15-B-0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SECTION 00 10 00 - SOLICITATION/CONTRACT FORM
AMENDMENT 0003
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Mobilization and Demoblization
FFP
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 3,050,000 Cubic
Yard
Hydraulic Beach Fill
(Quantities Are Estimated)
Groin notch 94
0003AA 1 Job Excavation and Disposal
FFP
of Existing Groin Section
0003AB 380 Ton Bedding Stone
FFP
For Groin Notch Slopes (Quantities Are Estimated)
0003AC 690 Ton Armor Stone
FFP
For Groin Notching (Quantities Are Estimated)
0003AD 4,860 Square
Foot
Stone Filled Marine Mattress
(Quantities Are Estimated)
0003AE 360 Ton Core Stone
FFP
for Groin Notch Slopes (Quantities Are Estimated)
0004 2,700 Ton T-Groin
FFP
Excavation/Disposal
0005 1 Job Outfall 36B
0006 1 Job Outfall 34
0007 1 Job Outfall 33/32
0008 1 Job Pre-Formed Scour Hole 29
0009 1 Job Pre-Formed Scour Hole 28
0010 1 Job Pre-Formed Scour Hole 27A
0011 1 Job Pre-Formed Scour Hole 26A
0012 1 Job Pre-Formed Scour Hole 24A
0013 1 Job Outfall 19
0014 1 Job Vibration Monitoring
0015 1 Job Splash Pad
0016 1 Each OPTION Option 1: Additional Pile: 45’
FFP
Class A, Southern Yellow Pine
0017 1 Each OPTION Option 2: Additional Pile: 45’
FFP
0018 1 Each OPTION Option 3: Additional Pile: 45’
FFP
0019 1 Each OPTION Option 4: Additional Pile: 45’
FFP
0020 1 Each OPTION Option 5: Additional Pile: 45’
FFP
0021 1 Each OPTION Option 6: Additional Pile: 45’
FFP
0022 1 Each OPTION Option 7: Additional Pile: 45’
FFP
0023 1 Each OPTION Option 8: Additional Pile: 45’
FFP
0024 1 Each OPTION Option 9: Additional Pile: 45’
FFP
0025 1 Each OPTION Option 10: Additional Pile: 45’
FFP
0026 1 Each OPTION Option 11: Additional Pile: 45’
FFP
0027 1 Each OPTION Option 12: Additional Pile: 45’
FFP
0028 1 Each OPTION Option 13: Additional Pile: 45’
FFP
0029 1 Each OPTION Option 14: Additional Pile: 45’
FFP
0030 1 Each OPTION Option 15: Additional Pile: 45’
FFP
0031 1 Each OPTION Option 16: Additional Pile: 45’
FFP
TOTALS
BASE CLINS 0001‐0015 ____________
OPTIONAL CLINS 0016‐0031______________
BASE PLUS OPTIONS 0001‐0031__________________
NOTES:
1. Tapering for hydraulic beach fill is included in the items and exact locations are on the plan sheets
2. Low bidder for the purpose of award will be the conforming bidder offering the lowest amount for the total base bid and optional bid items.
3. Any bid which is materially unbalanced may be rejected. An unbalanced bid is one, which is based on the prices significantly less than cost for some work and prices, which are significantly overstated for other work.
4. Bidders are required to bid on all items or their bids will be rejected.
5. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions, or attachments made by the bidder himself thereto may render the bid non‐responsive and may be caused for its rejection.
6. Optional Items CLINS 0016 - 0031 will be awarded as needed during the duration of the contract. These items at the discretion of the Contracting Officer are reserve for a pile damaged during proper installation by buried obstructions and at the direction and approval of the Contracting Officer needs to be replaced in accordance with the specifications. Price includes removal and proper disposal of damaged pile, treatment of new pile as per specification, and installation of new pile in place with steel shoe as per specification. No additional time will be added to the duration of the contract.
The Following Plans and Specs have been Revised
a. Specifications, SECTION 35 31 29.00 18, Pg. 1. Remove "Item No. 0032 - T-Groin Excavation and Disposal"
b. Specifications, SECTION 35 31 29.00 18, Pg. 1. Add "Item No. 0004 - T- Groin Excavation and Disposal"
c. Specifications, SECTION 35 31 29.00 18, Part 3.2.4, Pg. 10. Revise "(Option 18)" to "(Bid Item 0004)".
d. Plans: Sheet C-106 has been included for the T- Groin Excavation and Disposal
e. Plans: Sheet C-107 has been included for the splash pad
Questions and Answers Questions 1. Can the USACE please clarify where bidders should list cost associated with the work for the optional T-Groin Excavation and Disposal?
Answer 1. The T-Groin Excavation and Disposal is now Item 0004. It is not an Optional Item.
The Bid Schedule has been revised to reflect this revision.
Question 2. Is the bidder to include any cost in Item No. 0003, if so what is the quantity and unit of measure?
Answer 2. NO CLIN 0003 is for informational purposes only Question 3. Specifications provide information on 4 borings taken for the two borrow sites H1 and J3 and one of the four borings being outside of the respective borrow limits. Would the Corps have any additional geotechnical data for the specified borrow sites?
Answer 3. The Corps' expanded H1 borrow limit H1-1, H1-2, and H1-3 coordinates are revised as follows in NAD NJ State Plane ft. in Point ID, Northing, Easting format:
H1-1, 573667.7, 648400.0 H1-2, 576150.0, 648400.0 H1-3, 576150.0, 651808.8
Remaining coordinates H1-4, H1-5, and H1-6 remain unchanged.
Question 4. Request a revised bid schedule be provided with the missing 0032 T-Groin Excavation and Disposal item to be included.
Answer 4. Specifications, SECTION 35 31 29.00 18, Pg. 1. Remove "Item No. 0032 - T-Groin Excavation and Disposal"
Question 5. There also appears to be a skip in the sequence of numbers for the bid items i.e., no bid item 0031? Please clarify whether it is missing or there is no item.
Answer 5. The T-Groin Excavation and Disposal is now Item 0004. It is not an Optional Item.
The Bid Schedule has been revised to reflect this revision.
Question 6. Page 34 and 35 of the plans for contract W912DS-15-B-0012 shows a hydrographic survey of the Offshore Borrow Areas.
Can the USACE please provide the XYZ data for that survey?
Answer 6. XYZ data provided per this amendment.
Question 7. Section 31 62 19.13 Paragraph 1.4.3 references certification of Best Management Practices as published by the Western Wood Preservers Institute.
This is not the standard on the eastern half of the United States. Is it the intention of the COE to only receive materials from the west coast?
Answer 7. The stated reference does not exclude material from any geographical source; it only requires BMPs from WWPI to be followed.
Question 8. Is there a specified class of RCP required for the outfall pipes?
Answer 8. For RCP elliptical (Outfalls #19 & #34), there is no specified class, only a minimum specified thickness that is industry standard across manufacturer’s catalog cuts. This minimum thickness is specified in ASTM C507.
For RCP circular (Outfall #36B), if the requirements for paragraph 2.1.4 Precast Reinforced Concrete Pipe, subpart ‘e’ are followed, the Contractor would arrive at Wall Type C.
Question 9. What is a 16" class A pile (see table 3-7 http://www.timberpilingcouncil.org/manual/timber_manual/timber03.pdf )?
Answer 9. The 16” refers to the pile butt diameter (this is a standard callout). Class A is an industry standard referring to the general integrity/quality of the timber and physical dimensions of the pile.
Note: Class A designation is defined as having a specified required minimum circumference of 50 in. at 3 feet from the butt or greater as the case may be. The 50-inch circumference corresponds to a diameter of 16 inches achieved at 3 feet from the butt. The natural taper of Southern Yellow Pine is approximately 0.1 in/ft throughout the length so the butt diameter works out to 16 + 3 x 0.1 = 16.3 inches for a pile of exact size.
Question 10. How is pile length defined?
Answer 10. Pile length is specified in the first paragraph of Specification 31 62 19.13 paragraph
2.1.1 and Table 1 per Outfall.
Question 11. Is there a maximum allowance for cutoff length?
Answer 11. We did not specify a max allowance for cutoff length because as per Specification 31 62 19.13 paragraph 3.1.2.4 Lengths of Job Piles, the Contractor is responsible to determine the actual lengths of piles required to be driven below the cutoff elevation. Because of this requirement, our best professional judgement was that it would have been too prescriptive for us to specify a max allowance for the cutoff length. If we were to specify this quantity, we would recommend a 5-foot max. If the District would like us to add this to Specification 31 62 19.13, we can do so.
Question 12. What is the procedure for piles which achieve minimum pile length before reaching bearing capacity? What is the procedure for piles which achieve bearing capacity before reaching minimum pile length?
Answer 12. The pile must be driven to a minimum length as well as achieve the minimum bearing capacity. If refusal is reached prior to the specified embedment being obtained, the pile will not be accepted. It will be presumed that an obstruction has been encountered and suitable measures shall be taken to ensure that both criteria are met.
Question 13. Why are the outlet invert of the outfall pipes so deep? They are below low tide elevations. How will the pipes drain or be maintained?
Answer 13. "Hydraulic flow analyses were performed to determine appropriate size pipes and inverts to allow drainage from the specific drainage areas for each new outfall extension."