About this file

This solicitation package outlines requirements for a firm-fixed-price construction contract to perform reservoir maintenance and improvements for the Second High Reservoir in Washington, DC. The U.S. Army Corps of Engineers, Baltimore District will award a contract to replace the brick Sample Building, replace the 24-inch drain line, install mechanical mixers, seal all interior joints and cracks, install a spread spectrum radio communications antenna, install a roof sub-drainage system, and replace the perimeter fence. The project aims to address operational and sanitary issues previously identified at the reservoir to improve water quality and distribution system operation. The Second High Reservoir is a critical component of the water treatment and supply system serving approximately one million people in the District of Columbia and Northern Virginia.

View the file

Other files

File Type Posted
C.04.01 Abstract of Bids W912DR22B0007 2nd High Reservoir.pdf PDF
2nd High 04222022 Site Visit Sign In Sheet.pdf PDF
PL31_M-02.pdf PDF
B.08.03 Solicitation Amendment W912DR22B0007-0002.pdf PDF
PL40_E-06.pdf PDF
PL11_C-07.pdf PDF
PL05_C-01.pdf PDF
PL20_S-05.pdf PDF
PL21_S-06.pdf PDF
PL24_S-09.pdf PDF
B.08.03 RFI Responses W912DR22B0007.pdf PDF
PL10_C-06.pdf PDF
PL08_C-04.pdf PDF
PL07_C-03.pdf PDF
PL25_S-10.pdf PDF
PL03_G-03.pdf PDF
PL18_S-03.pdf PDF
PL14_C-10.pdf PDF
PL22_S-07.pdf PDF
PL06_C-02.pdf PDF
B.08.03 Solicitation Amendment W912DR22B0007.pdf PDF
B.08.02 Attachment C - DB Wage Determination DC20220002.pdf PDF
B.08.02 Attachment B - Drawings.pdf PDF
B.08.02 Solicitation W912DR22B0007.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8" PVC STORM PIPE

24" DRAIN PIPE

24" OVERFLOW PIPE

EL 318' - 6"

EL 316' - 10"

EL 319' - 3"

ALUMINUM GUARD RAIL

EL 323' - 0"

0' - 8"

EXISTING RESERVOIR

SUMP, SEE NOTE 5

EXISTING END FLANGE

TO REMAIN

0' - 8"

0' - 8"

PROJECTION OF VALVE DISC

IN OPEN POSITION

EXISTING STEM CASING

TO BE FIELD VERIFIED

AND REUSED

EXISTING RESERVOIR

ROOF PENETRATION

GENERAL SHEET NOTES

1. ALL ELEVATIONS SHOWN IN THIS DRAWING ARE BASED ON WA VERTICAL DATUM.

2. CONTRACTOR SHALL PROTECT EXISTING RESERVOIR DURING EXCAVATION WORK.

3. IF THE NEW BUTTERFLY VALVE DISK TOUCHES CONCRETE WHEN OPEN, CUT AWAY

CONCRETE TO ACCOMMODATE SMOOTH DISK OPERATION.

4. CONTRACTOR SHALL USE ADJUSTABLE PIPE STAND TO SUPPORT BUTTERFLY

ASSEMBLY DURING INSTALLATION. PIPE STAND IS TO REMAIN SUPPORTING VALVE

AFTER INSTALLATION.

5. FOR STRUCTURAL DETAILS REFER SHEET S-07.

SHEET KEYNOTES

1. DRAIN RESERVOIR MANUAL STAND ACTUATOR

2. BUTTERFLY VALVE EXTENDED BONNET

3. 24" DI FLANGE WITH SPOOL PIECE (LENGTH AS REQUIRED)

4. 24" MEGALUG FLANGE ADAPTER SERIES 1100

5. 24" DRAIN BUTTERFLY VALVE (RESERVOIR) ORIENTED WITH VALVE SHAFT IN

VERTICAL POSITION

6. 24" BUTTERFLY VALVE (OVERFLOW CHAMBER) ORIENTED WITH VALVE SHAFT IN

VERTICAL POSITION

7. 24" Ø CIRCULAR FLAP GATE TO BE RODNEY HUNT SERIES FV-SPR OR EQUAL

8. 36" X 36" BILCO TYPE J HATCH

9. CHAMBER MANUAL FLOOR STAND ACTUATOR

10. GATE OR VALVE ACTUATOR FLOOR STAND

11. TYPE 316 SS GATE OR VALVE STEM

12. SHIMS AND NON-SHRINK GROUT

13. MINIMUM FOUR SS ANCHOR BOLTS WITH SS NUTS AND WASHERS, SEE NOTE 3 ON

DETAIL.

14. FOUR ADDITIONAL #5 BARS, EXTEND 6'' PAST ANCHOR BOLTS

15. SS BAR, TACK WELD TO BOLT, SEE NOTE 3 ON DETAIL

FACE WALL

24'' WALL PIPE

MINIMUM 3/8'' DIA. 3'' EMBEDMENT

SST CONCRETE ANCHOR BOLT HEX

NUT AND SST FENDER WASHER

(12 HOLES)

STAINLESS STEEL #24 MESH

F R

A M

E O

P E

N

IN

G W

ID

T

H

FRAME OPENING LENGTH +6''

PLAN VIEW

GUIDE ARM

REMOVABLE COVER PLUG

REMOVABLE SQUARE

KEY WRENCH

1/4'' ALUMINUM DIAMOND

PATTERN PLATE COVER

BILCO HEAVY DUTY FORGED

STAINLESS STEEL HINGES

W/ STAINLESS STEEL PINS

1/4'' SUPPORT PLATE

WELDED TO FRAME

STAINLESS STEEL SPRING

LIFTING MECHANISM

SLAM LOCK

BILCO AUTOMATIC

HOLD OPEN ARM

STAINLESS STEEL

LOCK STRIKE

TO DISPOSAL OR DRY WELL

1/8'' DIA. NEOPRENE CONTINUOUS

BUMPER ALL AROUND

BILCO 1/4'' ALUMINUM CHANNEL

FRAME W\ RECESSED ANCHORS

SECTION

3"

36"

42"

42"

24" DIP WALL PIPE

CORE DRILL TO INSTALL NEW 24" DI

WALL PIPE AND FILL WITH GROUT

AFTER WALL PIPE IS INSTALLED

5' - 9" CORE DRILL

EXISTING RESERVOIR WALL

24" MEGALUG FLANGE

ADAPTER SERIES 1100

24" DOUBLE LINK SEAL

12"

WALL

6" MIN

FLANGE OR END TO SUIT

MECHANICAL COUPLING

DUCTILE IRON OR CAST IRON

WALL PIPE WITH INTEGRALLY

CAST SEEP RING. LINING AND

COATING THE SAME AS PIPE

ANCHOR BOLT PEDESTAL BASE CONNECTION DETAIL

NTS

EXISTING STEM CASING

TO BE FIELD VERIFIED

AND REUSED

1. FLOOR STAND IS REPRESENTATIVE ONLY.

2. DETAIL APPLICABLE FOR FLOOR SLAB OR CURB INSTALLATION.

3. IF USED ON ELEVATED SLABS LESS THAN 12" THICK, BOLT THROUGH SLAB USING 4" SS

ANCHOR BOLTS WITH SS NUTS AND WASHERS. SEE DRAWINGS FOR ADDITIONAL ANCHOR

PLATE DETAILS, IF REQUIRED. SEE SPECIFICATIONS FOR ANCHOR BOLT AND ANCHORAGE

REQUIREMENTS.

4. IF USED ON ELEVATED SLAB GREATER THAN 12" THICK, USE EPOXY -GROUTED ANCHORS.

CORE DRILL, REMOVE, AND REPLACE ANCHOR BOLTS WITH EPOXY- GROUTED ANCHORS

WHEN INSTALLATION IS TO TAKE PLACE IN THE LOCATION OF THE EXISTING ANCHOR BOLTS.

5. SEE SPECIFICATION FOR ANCHOR BOLT PATTERN REQUIREMENTS.

6. ADDITIONAL SUPPORTS AND BRACING, AS RECOMMENDED BY MANUFACTURER.

M

IN9

/2

A F

T E

R A

S S

E M

B L Y

T

Y P

-1

P

R O

J E

C T

IO

N

FLOOR STAND

AS REQUIRED BY

Nova Consulting

REV DATE DESCRIPTION BY

U.S. ARMY ENGINEER DISTRICT, BALTIMORE

WASHINGTON AQUEDUCT

WASHINGTON, DC

SCALE: DATE:

DRAWING NUMBER PLATE

SHEET:

CORPS OF ENGINEERS

BALTIMORE, MARYLAND

SECOND HIGH RESERVOIR

MAINTENANCE AND IMPROVEMENTS

APPROVED:

A/E PRINCIPAL

SEAL:

MARCH 2022

80.2-2.7-.

US Army Corps of Engineers

STEVEN S. EAGLE, PE

M-04

MECHANICAL DETAILS AND SECTIONS

MECHANICAL

AS SHOWN

5/2022 AMENDMENT 0002 SSE

1/2" = 1'-0"M-03

3 CHAMBER SECTION WEST

1" = 1'-0"M-03

2 BUTTERFLY VALVE CONNECTION DETAIL

1" = 1'-0"M-03

1 ACTUATOR CONNECTION DETAIL

1 1/2" = 1'-0"M-03

5 SS MESH AND ANCHOR BOLTS

1" = 1'-0"M-04

6 36''x36'' HATCH DETAIL 1" = 1'-0"M-03

4 OVERFLOW PIPE PENETRATION DETAIL

1" = 1'-0"M-04

7 WALL PIPE DETAIL

OrlandoAlfonso Polygon

Sheets
M-02 - DEMOLITION PLAN AND SECTION
M-04 - MECHANICAL DETAILS AND SECTIONS
2022-05-04T14:53:52-0400
Steven S. Eagle, P.E. #43684

File details come from the government source that posted it. Updated .