About this file

This solicitation package describes a federal construction contract opportunity for the Second High Reservoir Maintenance and Improvements project at the Washington Aqueduct in Washington, DC. The U.S. Army Corps of Engineers, Baltimore District is seeking a firm-fixed price contract to replace the brick Sample Building, replace the 24-inch drain line, install mechanical mixers, seal interior joints and cracks, install a spread spectrum radio communications antenna, install a roof sub-drainage system, and replace the perimeter fence at the Second High Reservoir. The reservoir is a critical component of the water distribution system serving approximately one million people. The work is required to address operational and sanitary issues previously identified in order to improve water quality within the system. The solicitation will be conducted in accordance with FAR Part 14 and awarded via an invitation for bid with the reservoir outage period restricted due to its importance to the water system.

View the file

Other files

File Type Posted
C.04.01 Abstract of Bids W912DR22B0007 2nd High Reservoir.pdf PDF
2nd High 04222022 Site Visit Sign In Sheet.pdf PDF
PL31_M-02.pdf PDF
B.08.03 Solicitation Amendment W912DR22B0007-0002.pdf PDF
PL40_E-06.pdf PDF
PL11_C-07.pdf PDF
PL33_M-04.pdf PDF
PL05_C-01.pdf PDF
PL20_S-05.pdf PDF
PL21_S-06.pdf PDF
PL24_S-09.pdf PDF
B.08.03 RFI Responses W912DR22B0007.pdf PDF
PL10_C-06.pdf PDF
PL08_C-04.pdf PDF
PL07_C-03.pdf PDF
PL25_S-10.pdf PDF
PL03_G-03.pdf PDF
PL14_C-10.pdf PDF
PL22_S-07.pdf PDF
PL06_C-02.pdf PDF
B.08.03 Solicitation Amendment W912DR22B0007.pdf PDF
B.08.02 Attachment C - DB Wage Determination DC20220002.pdf PDF
B.08.02 Attachment B - Drawings.pdf PDF
B.08.02 Solicitation W912DR22B0007.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VAN NESS ST NW

th S

T N

W th S

T N

W

WARREN ST NW

GENERAL SHEET NOTES

1.

2.

3.

4.

SEE NOTES G-5 AND G-6 ON S-01 FOR CONSTRUCTION LOADING RESTRICTIONS.

ARCHITECTURAL WALLS NOT SHOWN FOR CLARITY. SEE ARCHITECTURAL DRAWINGS.

NEW COLUMNS MUST BE CENTERED ABOVE EXISTING RESERVOIR COLUMNS. SEE

DETAIL 2/S-05 FOR REINFORCEMENT DETAILS.

ANTENNA POST SHALL BE MOUNTED TO MASONRY INSIDE OF SAMPLE BUILDING AND

PENETRATE THROUGH ROOF. PROVIDE A MINIMUM OF 3 MOUNTS AT 4'-0" MAX

SPACING IN GROUTED MASONRY CELLS PER DETAIL 4/S-05. SEE ARCHITECTURAL AND

ELECTRICAL DRAWINGS FOR EXACT POSITIONING.

EXISTING RESERVOIR ROOF

TOP OF CONC 340.58 ±

N O

S-04

S-04

S-04

S-04

TYP

9' - 7" 16' - 0"

T Y

P

EXISTING CONC CURB

ø 3' - 0" ±

/2 S-05

RESERVOIR ROOF HPT 338.50 ±

RESERVOIR ROOF HPT 338.50 ±

RESERVOIR ROOF HPT 338.50 ±

CONC STUB COL, SEE

DET , TYP

S L O

P E

S L O

P E

SLOPESLOPE

S L O

P E

S L O

P E

SLOPESLOPE

S L O

P E

S L O

P E

SLOPESLOPE

S L O

P E

S L O

P E

SLOPESLOPE

S L O

P E

S L O

P E

SLOPESLOPE

S L O

P E

S L O

P E

SLOPESLOPE

EXCAVATION EXTENTS

B -1

B -1

B-2

B-2

B-2

B -1

B -1

N O

S-04

S-04

S-04

S-04

T Y

P

4' - 1" CL MANHOLE

C L B

E A

M C

L B

E A

M C

L B

E A

M

INSTALL NEW SAMPLE

ENCLOSURE OVER EXIST

MANHOLE COVER W/ 2 BLIND

FLANGE PEN, SEE DET

C L M

A N

H O

L E

EXISTING RESERVOIR ROOF

RESERVOIR ROOF HPT 338.50 ±

RESERVOIR ROOF HPT 338.50 ±

RESERVOIR ROOF HPT 338.50 ±

7" 16' - 0" 7"

17' - 2"

B -3

B -3

CL BEAM

S L O

P E

S L O

P E

SLOPESLOPE

S L O

P E

S L O

P E

SLOPE

S L O

P E

S L O

P E

SLOPESLOPE

S L O

P E

S L O

P E

SLOPESLOPE

S L O

P E

S L O

P E

SLOPESLOPE

S L O

P E

S L O

P E

SLOPESLOPE

S L O

P E

SLOPE

LPT 342.67

HPT 342.75 , TYP

x EL 342.75

/3 S-05

MASONRY WALLS,

SEE NOTE 2

4' - 5" 11' - 7" 7"

ANTENNA POST MOUNT,

SEE DET 4/S-05 AND NOTE 4

KEY PLAN

Nova Consulting

N

REV DATE DESCRIPTION BY

U.S. ARMY ENGINEER DISTRICT, BALTIMORE

WASHINGTON AQUEDUCT

WASHINGTON, DC

SCALE: DATE:

DRAWING NUMBER PLATE

SHEET:

CORPS OF ENGINEERS

BALTIMORE, MARYLAND

SECOND HIGH RESERVOIR

MAINTENANCE AND IMPROVEMENTS

APPROVED:

A/E PRINCIPAL

SEAL:

MARCH 2022

80.2-2.7-.

US Army Corps of Engineers

S-03

SAMPLE BUILDING PLANS

STRUCTURAL

AS SHOWN

MAY 22 AMENDMENT 0002 CTP

CHRISTOPHER T. PHILLIPS, PE

3/8" = 1'-0"

4'21012"

3/8" = 1'-0"S-03

1 FOUNDATION PLAN - SAMPLE BUILDING R-2

3/8" = 1'-0"S-03

2 BOTTOM PLAN - SAMPLE BUILDING R-2 (EL 342.75)