This document contains a federal contract opportunity solicitation for reservoir maintenance and improvements. The U.S. Army Corps of Engineers, Baltimore District is soliciting competitive, firm-fixed-price bids to implement upgrades and improvements to the Second High Reservoir in Washington D.C. as part of the Washington Aqueduct water treatment and distribution system. The project consists of replacing infrastructure such as a sample building, 24-inch drain line, and perimeter fence. Additional work includes installing mechanical mixers to seal interior joints and cracks, spreading spectrum radio communications equipment, and a roof sub-drainage system. The reservoir outage period for work is restricted. The solicitation number is W912DR22B0007 and the bid response deadline has not been specified.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASIC DEVELOPMENT LENGTH AND SPLICE LENGTH
BASIC
1'-0"
1'-0"
1'-2"
1'-5"
2'-3"
2'-10"
3'-6"
4'-3"
5'-1"
TOP *
1'-0"
1'-2"
1'-6"
1'-9"
2'-11"
3'-8"
4'-6"
5'-6"
6'-7"
1'-0"
1'-6"
2'-2"
2'-11"
4'-7"
5'-8"
6'-4"
7'-2"
7'-11"
1'-3"
2'-0"
2'-10"
3'-9"
6'-0"
7'-4"
8'-3"
9'-3"
10'-3"
SIZE
# 3
# 4
# 5
# 6
# 7
# 8
# 9
# 10
# 11
BAR
1'-0"
1'-2"
1'-6"
1'-9"
2'-11"
3'-8"
4'-6"
5'-6"
6'-7"
1'-2"
1'-7"
1'-11"
2'-4"
3'-9"
4'-9"
5'-10"
7'-2"
8'-7"
1'-3"
2'-0"
2'-10"
3'-9"
6'-0"
7'-4"
8'-3"
9'-3"
10'-3"
1'-7"
2'-7"
3'-8"
4'-11"
7'-9"
9'-6"
10'-8"
12'-0"
13'-4"
BASIC DEVELOPMENT LENGTH CLASS B SPLICE LENGTH
d 1.3 x
* TOP REINFORCEMENT IS ANY HORIZONTAL REINFORCEMENT SO PLACED THAT MORE THAN
12 INCHES OF FRESH CONCRETE IS CAST IN THE MEMBER BELOW THE REINFORCEMENT.
FOR UNCOATED BARS IN TENSION
fy = 60,000 psi fc' = 4500 psi OR GREATER
FOR MATERIALS OR CONDITIONS DIFFERENT FROM THOSE STATED, LENGTHS SHOWN IN**
CHART SHALL BE MODIFIED TO CONFORM TO THE PROVISIONS OF ACI 318, SECTION 12.2.
CLEAR SPACING≥ 3" CLEAR SPACING <3"
BASIC TOP *
CLEAR SPACING <3"CLEAR SPACING≥ 3"
BASIC TOP * BASIC TOP *
NORMAL WEIGHT CONCRETE
** BASED ON MATERIALS AND CONDITIONS AS FOLLOWS:
CLEAR COVER≥ 1.5 INCHES
d
DEVELOPMENT LENGTH OF STANDARD HOOKS
HOOK AT LEAST 2".
END COVER BEYOND OUTSIDE END OF
AT LEAST 2 1/2"; AND FOR 90° HOOK,
SIDE COVER NORMAL TO PLANE OF HOOK*
FOR UNCOATED BARS IN TENSION
fc' = 4500 psi OR GREATERfy = 60,000 psi
DEVELOPMENT LENGTH, dh
#11
#10
#9
#8
#7
#6
#5
#4
#3 dh dh
W/ CONC COVER *
6"
7"
8"
10"
11"
1'-1"
1'-3"
1'-4"
1'-6"
BASIC
7"
9"
1'-0"
1'-2"
1'-4"
1'-6"
1'-9"
1'-11"
2'-2"
BAR SIZE
OPNG
NOTES:
1. THIS DETAIL APPLIES FOR OPENINGS 8"∅ AND LARGER. FOR SMALLER
OPENINGS, BEND BARS OR ADJUST SPACING OF REINFORCEMENT TO
AVOID OPENING.
2. PLACE EXTRA BARS OF THE SAME SIZE AS THE INTERRUPTED BARS AT
EACH SIDE OF OPENING. QUANTITY OF EXTRA BARS AT EACH SIDE
SHALL EQUAL HALF THE QUANTITY OF INTERRUPTED BARS EXCEPT
WHERE NOTED OTHERWISE.
3. PROVIDE ONE DIAGONAL BAR EACH SIDE OF OPENING WITH SIZE EQUAL
TO MAIN REINFORCEMENT, TYPICAL EACH FACE.
4. WHERE INVERT OF OPENING IN WALL IS LESS THAN 44 BAR DIAMETERS
FROM TOP OF SLAB, EXTRA REINFORCEMENT ON EACH SIDE SHALL
INCLUDE DOWELS EMBEDDED INTO SLAB WITH STANDARD 90 DEGREE
HOOKS TO SPLICE WITH EXTRA VERTICAL REINFORCEMENT. DOWELS
SHALL ALSO STILL BE PROVIDED BELOW OPENING.
5. WHERE INVERT OF OPENING IN WALL OR SLAB IS CLOSER THAN 44 BAR
DIAMETERS TO EDGE OF SLAB OR BOTTOM OF WALL, EXTRA DIAGONAL
BARS MAY BE TERMINATED TWO INCHES FROM EDGE OF SLAB OR
BOTTOM OF WALL. DOWELS DO NOT HAVE TO BE PROVIDED TO SPLICE
WITH DIAGONAL BARS.
TY
P44
D
2"
3"
TYP
44D
T
SPLICE +2"
CLASS "B"
FOR SLAB OR WALL THICKNESS AND
REINFORCING, SEE DESIGN DRAWINGS
FOR TYPICAL KEYWAY,
SEE DETAIL 1
WATERSTOP WHERE REQUIRED,
SEE SPECIFICATIONS AND
GENERAL CONCRETE NOTES
1/3" 1/3" 1/3" WATERSTOP
FOR EQUIPMENT
PLAN DIMENSION AS REQUIRED
EDGE DISTANCE SEE NOTE 3
0" OR 2" MIN
SEE NOTE 3
2" MIN EDGE DISTANCE
BOLT DESIGN
CONFIRM BY ANCHOR
REQUIRED COVER
+1" MAX
LEVELING CHANNEL,
SEE NOTES 2 AND 3
#5 DOWELS @12" ALL
AROUND, SEE NOTE 1
DOWEL ADHESIVE
LEVELING CHANNEL
ANCHORS, SEE NOTE 2
8" MIN, SEE NOTE 1
4" MIN, SEE NOTE 6
PUMP OR EQUIP BASE
CONC FLOOR
#4@12 EW
#5 DOWELS @12" ALL
AROUND, SEE NOTE 1
1" MIN GROUT,
SEE NOTES 2 & 3
CONC PAD
CL ANCHOR RODS
NOTES:
1. DOWELS MAY BE CAST IN WITH 90° HOOK OR ANCHORED WITH DOWEL ADHESIVE AT CONTRACTORS
OPTION. WHERE FLOOR IS 8" THICK OR LESS, USE #4 DOWELS EMBEDDED TO WITHIN 2" OF BOTTOM OF
FLOOR SLAB.
2. THE CONTRACTOR SHALL PROVIDE LEVELING CHANNELS AND LEVELING CHANNEL ANCHORS FOR
SWITCHGEAR, SWITCHBOARDS, MOTOR CONTROL CENTERS, AND SIMILAR EQUIPMENT WHEN
REQUIRED TO MEET EQUIPMENT MANUFACTURER'S LEVELING TOLERANCES. THE CONTRACTOR SHALL PROVIDE 1" MINIMUM NON-SHRINK GROUT FOR PUMPS AND SIMILAR EQUIPMENT WHEN REQUIRED TO
MEET EQUIPMENT MANUFACTURER'S UNIFORM BEARING AND LEVELING REQUIREMENTS.
3. PRIOR TO PLACING CONCRETE PAD, LEVELING CHANNEL SIZE AND MEANS OF INSTALLATION, ANCHORAGE, GROUT, CONCRETE EDGE DISTANCE, AND CONCRETE BLOCKOUTS REQUIREMENTS
SHALL BE COORDINATED WITH EQUIPMENT MANUFACTURER.
4. COAT DISSIMILAR MATERIALS PER THE CONTRACT DOCUMENTS.
5. STAGGER CHANNEL ANCHORS AND PAD DOWELS.
6. FOR PADS 24" OR GREATER IN DEPTH, PROVIDE #4@8" HORIZONTAL SKIN REINFORCING AROUND
PERIMETER OF PAD.
BASIC DEVELOPMENT LENGTH AND SPLICE LENGTH
BASIC
1'-0"
1'-0"
1'-3"
1'-6"
2'-5"
3'-0"
3'-8"
4'-6"
5'-5"
TOP *
1'-0"
1'-3"
1'-7"
1'-11"
3'-1"
3'-11"
4'-9"
5'-10"
7'-0"
1'-0"
1'-7"
2'-4"
3'-1"
4'-11"
6'-0"
6'-9"
7'-7"
8'-5"
1'-4"
2'-1"
3'-0"
4'-0"
6'-4"
7'-9"
8'-9"
9'-10"
10'-11"
SIZE
# 3
# 4
# 5
# 6
# 7
# 8
# 9
# 10
# 11
BAR
1'-0"
1'-3"
1'-7"
1'-11"
3'-1"
3'-11"
4'-9"
5'-10"
7'-0"
1'-3"
1'-8"
2'-0"
2'-5"
4'-0"
5'-1"
6'-3"
7'-7"
9'-1"
1'-4"
2'-1"
3'-0"
4'-0"
6'-4"
7'-9"
8'-9"
9'-10"
10'-11"
1'-8"
2'-9"
3'-11"
5'-2"
8'-3"
10'-1"
11'-4"
12'-9"
14'-2"
BASIC DEVELOPMENT LENGTH CLASS B SPLICE LENGTH
d 1.3 x
FOR UNCOATED BARS IN TENSION
fy = 60,000 psi fc' = 4000 psi OR GREATER
CLEAR SPACING≥ 3" CLEAR SPACING <3"
BASIC TOP *
CLEAR SPACING <3"CLEAR SPACING≥ 3"
BASIC TOP * BASIC TOP *
NORMAL WEIGHT CONCRETE
** BASED ON MATERIALS AND CONDITIONS AS FOLLOWS:
CLEAR COVER≥ 1.5 INCHES
TOP REINFORCEMENT IS ANY HORIZONTAL REINFORCEMENT SO PLACED THAT MORE THAN 12
INCHES OF FRESH CONCRETE IS CAST IN THE MEMBER BELOW THE REINFORCEMENT.
FOR MATERIALS OR CONDITIONS DIFFERENT FROM THOSE STATED, LENGTHS SHOWN IN
CHART SHALL BE MODIFIED TO CONFORM TO THE PROVISIONS OF ACI 318-14, SECTION 25.3.
d
/4
C
L R
2" CLR 0.25L1
GREATER
0.3L1 OR L2
GREATER
0.3L1 OR L2
L1 L2
/4
C
L
R6" MIN 6" MIN
S E E P
L A N
S
SYM
ABOUT
CL
TOP BARS
TEMP STEEL
BOT BARS
SEE BEAM SCHEDULE
FOR TYP REINF AND
BEAM DEPTH
NOTE:
SEE PLAN FOR BAR SIZE AND SPACING.
Nova Consulting
REV DATE DESCRIPTION BY
U.S. ARMY ENGINEER DISTRICT, BALTIMORE
WASHINGTON AQUEDUCT
WASHINGTON, DC
SCALE: DATE:
DRAWING NUMBER PLATE
SHEET:
CORPS OF ENGINEERS
BALTIMORE, MARYLAND
SECOND HIGH RESERVOIR
MAINTENANCE AND IMPROVEMENTS
APPROVED:
A/E PRINCIPAL
SEAL:
MARCH 2022
80.2-2.7-.
US Army Corps of Engineers
S-06
STRUCTURAL DETAILS - SHEET 1
STRUCTURAL
AS SHOWN
MAY 22 AMENDMENT 0002 CTP
CHRISTOPHER T. PHILLIPS, PE
NTSS-06
5 DETAIL - TYPICAL REINFORCING AT OPENINGS
NTSS-06
2 DETAIL - CONSTRUCTION JOINT
NTSS-06
1 DETAIL - KEYWAY
NTSS-06
3 DETAIL - TYPICAL PUMP OR EQUIPMENT PAD
NTSS-06
4 DETAIL - TYPICAL SLAB SECTION
File details come from the government source that posted it. Updated .