About this file

This document package includes structural drawings and details for the Second High Reservoir Maintenance and Improvements project in Washington, DC. The project involves upgrades and improvements to address operational and sanitary issues at the subsurface Second High Reservoir, which has a capacity of 15 million gallons and is a critical component of the water distribution system. Work includes replacement of the brick Sample Building, 24-inch drain line, installation of mechanical mixers and a radio communications antenna, sealing of all interior joints and cracks, and installation of a roof sub-drainage system and perimeter fence replacement. Drawings provide specifications for aluminum ladders, guards, handrails and access doors to be installed at the reservoir. The related federal contract opportunity is a firm-fixed-price construction contract to be awarded by the U.S. Army Corps of Engineers, Baltimore District in accordance with FAR Part 14. The project aims to improve water quality and operation within the distribution system by implementing upgrades during a restricted reservoir outage period.

View the file

Other files

File Type Posted
C.04.01 Abstract of Bids W912DR22B0007 2nd High Reservoir.pdf PDF
2nd High 04222022 Site Visit Sign In Sheet.pdf PDF
PL31_M-02.pdf PDF
B.08.03 Solicitation Amendment W912DR22B0007-0002.pdf PDF
PL40_E-06.pdf PDF
PL11_C-07.pdf PDF
PL33_M-04.pdf PDF
PL05_C-01.pdf PDF
PL20_S-05.pdf PDF
PL21_S-06.pdf PDF
PL24_S-09.pdf PDF
B.08.03 RFI Responses W912DR22B0007.pdf PDF
PL10_C-06.pdf PDF
PL08_C-04.pdf PDF
PL07_C-03.pdf PDF
PL25_S-10.pdf PDF
PL03_G-03.pdf PDF
PL18_S-03.pdf PDF
PL14_C-10.pdf PDF
PL06_C-02.pdf PDF
B.08.03 Solicitation Amendment W912DR22B0007.pdf PDF
B.08.02 Attachment C - DB Wage Determination DC20220002.pdf PDF
B.08.02 Attachment B - Drawings.pdf PDF
B.08.02 Solicitation W912DR22B0007.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTIONSECTION ELEVATION

R U

N G

S

O C

T Y P

4" 8" 2'-4 1/2"

18"

1/4

TYP

1/4

TYP

PROVIDE SELF-CLOSING

GATE AT ALL LADDERS

AND AT ACCESS POINTS

WHERE INDICATED ON

THE CONTRACT DWGS

CAST AL BASE FLANGE,SEE

PLAN VIEW DETAIL S-05-060,

OR 6"x6"x1/4" AL BASE PL

2-5/8" SST ANCHOR BOLTS

AND INSERTS, TYP

BRACKETS EQUALLY

SPACED AT NOT

MORE THAN 5'-0" OC

1 1/2" AL PIPE RAIL

3/4" MIN CLOSED

EXTRUDED AL RUNGS

2 1/2"x3/8" ALUMINUM

BRACKETS W/ 3/4" SST

ANCHOR BOLTS AND INSERTS

OR ADHESIVE ANCHORS

IF CONCRETE IS AVAILABLE FOR BASE

REPLACE BOTTOM BRACKET WITH AL

PLATE AND SST ANCHOR BOLTS AS

SHOWN AT TOP OF LADDER

FLOOR OR

TOP OF WALL

WALL

ALTERNATE

PLAN

PLAN

ELEVATION

SURFACE MOUNTED

TO CONCRETE

SIDE MOUNT

TO CONCRETE

WALL HANDRAIL1

/4

C

L R

P L

M A X

M A X

M A X

4" MAX CLR

GUARD TYPE IIGUARD TYPE I

1 1/2" AL

PIPE RAILING

1/2" AL PIPE,

VERTICAL

TOEBOARD, TYPICAL

ALL GUARDS

NOTE:

UNLESS SHOWN OTHERWISE ON THE

CONTRACT DRAWING, GUARDS SHALL BE TYPE I.

/4

M

A X

/2

M

IN

M

IN

EXTRUDED ALUMINUM

TOEBOARD

EXTRUDED AL

ADAPTER (USED ONLY

WITH AL BASE FLANGE)

1 1/2" ALUMINUM

PIPE POST

1 1/2"x1/8" AL CLAMP

3/8"Ø SST SET SCREWS

CAST AL BASE FLANGE

4-1/2"Ø SST

ADHESIVE ANCHORS

"T Y P

6 1/2"

1 1/2" ALUMINUM

PIPE POST

TOP OF CONCRETE

1/2"Øx5 1/2" SST ADH

ANCHORS, TYP

6 1/2"x2" ALUMINUM SIDE

MOUNT BRACKET, TYP

3/8"Ø SET SCREWS

6 1/2"

3/4" 2 1/2" 2 1/2" 3/4"

3/4" MIN 3 1/2" MIN 3/4" MIN

M

IN

5" MIN

6'-0" MAX 6'-0" MAX

M

IN

M

IN

EDGE OF CONCRETE

4-1/2"Ø SST ADHESIVE ANCHORS

9/16"Ø HOLES

CAST AL BASE PLATE

CLEAR

2 1/4"

/2

C L E A

RBRACKET

HANDRAIL

WALKING SURFACE

SECTION

PLAN

ANGLE FRAME CHANNEL FRAME/WATERTIGHT

NOTE:

OPENINGS LARGER THAN 42 INCHES IN EITHER

DIRECTION SHALL HAVE DOUBLE LEAF DOORS.

S E

E P

L A

N S

O P

E N

IN

G

V A

R

IE

S

SEE PLANS

OPENING VARIES

SST HEAVY DUTY HINGE, TYP

GUIDE ARM, TYP

LIFTING MECHANISM, TYP

REMOVABLE COVER PLUG

REMOVABLE WRENCH

ACCESS DOOR

SST LOCK

AUTOMATIC

HOLD-OPEN ARM

CONTINUOUS GASKET

ALL AROUND

ALUMINUM ANGLE FRAME

FALL THROUGH

PREVENTION SYSTEM

REQUIRED AT ALL OPENINGS

LIFTING MECHANISM

PLATE MEMBER FOR

ATTACHMENT OF

LIFTING MECHANISM

SST HEAVY DUTY HINGE

ALUMINUM CHANNEL

FRAME WITH INTEGRAL

GUTTER AND ANCHORS

DRAIN COUPLING

DRAIN PIPE, BY

CONTRACTOR TO

NEAREST ACCEPTABLE

DISCHARGE POINT

Nova Consulting

REV DATE DESCRIPTION BY

U.S. ARMY ENGINEER DISTRICT, BALTIMORE

WASHINGTON AQUEDUCT

WASHINGTON, DC

SCALE: DATE:

DRAWING NUMBER PLATE

SHEET:

CORPS OF ENGINEERS

BALTIMORE, MARYLAND

SECOND HIGH RESERVOIR

MAINTENANCE AND IMPROVEMENTS

APPROVED:

A/E PRINCIPAL

SEAL:

MARCH 2022

80.2-2.7-.

US Army Corps of Engineers

S-07

STRUCTURAL DETAILS - SHEET 2

STRUCTURAL

AS SHOWN

MAY 22 AMENDMENT 0002 CTP

CHRISTOPHER T. PHILLIPS, PE

1" = 1'-0"S-07

8 DETAIL - ALUMINUM LADDER

1" = 1'-0"S-07

6 DETAIL - ALUMINUM GUARDS AND HANDRAILS

1" = 1'-0"S-07

7 DETAIL - ALUMINUM ACCESS DOOR

File details come from the government source that posted it. Updated .