B.08.02 Attachment B - Drawings.pdf
PDF 39 MB Posted
- Solicitation number
- W912DR22B0007
About this file
This document provides details for a federal solicitation seeking construction services for reservoir maintenance and improvements. The U.S. Army Corps of Engineers, Baltimore District is soliciting competitive, firm-fixed-price bids via an invitation for bid to implement upgrades and repairs at the Second High Reservoir in Washington D.C. The work includes replacing a sample building, drain line, and perimeter fence, installing mechanical mixers, sealing joints and cracks, adding a radio antenna and roof drainage system. The reservoir is a critical part of the water distribution system serving over one million people, so the outage period for work is restricted. Bids are due by the date specified in the solicitation issued under number W912DR22B0007.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
VERTICAL REINFORCEMENT IN
FULLY GROUTED CELLS AT WALL
CORNERS AND AT OPENINGS
LINTEL EXTEND 8" MIN,
BEYOND OPENING EACH SIDE
HORIZONTAL REINFORCEMENT IN
FIRST AND SECOND BED JOINTS,
IMMEDIATELY ABOVE AND BELOW
WALL OPENING, EXTEND 24"
BEYOND OPENING
HORIZONTAL REINFORCEMENT
@ 16" O.C., CONTINUOUS
OPENING
GROUT FILL FIRST TWO COURSES
1' - 4"
"1
2' - 0"
2-#5/#6 VERTICAL BARS
ADJACENT TO THE
OPENING (SAME SIZE AS
MAIN REINF)
3-#5/#6 VERTICAL
BARS AT CORNER
(SAME SIZE AS MAIN
REINF)
PLAN
MORTAR FACE SHELL
ONLY. DO NOT
MORTAR TONGUE OF
CONTROL JOINT BLOCK
ELEVATION
CONTROL JOINT
JOINT REINF STOPS
AT CONTROL JOINT
HORIZ REINF SPACED
16" OC VERTICALLY
NOTE: WIDE FLANGED PREFORMED CONTROL JOINT
FILLER MAY BE USED IN LIEU OF DETAIL SHOWN
PREFORMED CONTROL JOINT FILLER
RAKE MORTAR 3/4", CAULK EXPOSED
FACES WITH JOINT SEALANT
NOTE: CONTROL JOINTS MAY BE OFFSET A MAXIMUM
DISTANCE OF 8" FROM BRICK EXPANSION JOINT.
EXTERIOR FACE OF MASONRY
COMPRESSIBLE BACK-UP ROD
MASONRY JOINT SEALANT
1/2" MAX
3/8" MIN
MASONRY BACKUP
MASONRY VENEER
CAVITY DRAINAGE SYSTEM
RIGID INSULATION
HORIZONTAL REINFORCEMENT
DISCONTINUOUS AT BOTH JOINTS
PREFORMED CONTROL JOINT (CJ) FILLER
EXPANSION JOINT (EJ) WITH
COMPRESSIBLE FILLER AND SEALANT
MORTAR FACE SHELL ONLY. DO
NOT MORTAR TONGUE OF
CONTROL JOINT BLOCK.
RAKE MORTAR 3/4", CAULK EXPOSED
FACES WITH JOINT SEALANT
NOTE: WIDE FLANGED PREFORMED
CONTROL JOINT FILLER MAY BE
USED IN LIEU OF DETAIL SHOWN
VERTICAL REINFORCEMENT IN
FULLY GROUTED CELL AT CORNER
BRICK EXPANSION JOINT (EJ) WITH
COMPRESSIBLE FILLER AND SEALANT
UNDERLAYMENT WRAPPED OVER HIP
ASPHALT SHINGLES
HIP SHINGLE
CUT ALONG DASHED LINE,
TAPER TOP SLIGHTLY
CUT COVERINGS FOR HIPS USING A
SELF-SEALING THREE-TAB SHINGLE
SEALING STRIPS
FASTENERS SHOULD BE LONG ENOUGH
TO PENETRATE THROUGH ALL LAYERS OF
ROOFING MATERIAL-- SEE NOTE 2
1. FASTENERS SHOULD EXTEND A
MINIMUM 1/8 INCH THROUGH
UNDERSIDE OF ROOF DECKS LESS
THAN 3/4 INCH THICK AND
PENETRATE AT LEAST 3/4 INCH
INTO ROOF DECKS GREATER THAN
3/4 INCH THICK.
2. MOST MANUFACTURERS SUPPLY HIP
SHINGLES. FOLLOW MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
NOTES:
SEALING STRIPS
SOFT METAL FLASHING SLEEVE, ROLL
INTO PIPE APPROX. 1"
SEALANT UNDER SHINGLES
ASPHALT SHINGLES
Nova Consulting
REV DATE DESCRIPTION BY
U.S. ARMY ENGINEER DISTRICT, BALTIMORE
WASHINGTON AQUEDUCT
WASHINGTON, DC
SCALE: DATE:
DRAWING NUMBER PLATE
SHEET:
CORPS OF ENGINEERS
BALTIMORE, MARYLAND
SECOND HIGH RESERVOIR
MAINTENANCE AND IMPROVEMENTS
APPROVED:
A/E PRINCIPAL
SEAL:
MARCH 2022
80.2-2.7-.
US Army Corps of Engineers
A-04
SAMPLE BUILDING R-2 DETAILS
ARCHITECTURAL
AS SHOWN
DEAN A. WALDROP, RA
1/4" = 1'-0"A-04
MASONRY REINFORCEMENT
AT OPENINGS AND CORNERS
1 1/2" = 1'-0"A-04
CMU BACKUP WYTHE
VERTICAL REINFORCEMENT
NTSA-04
CMU
BRICK
EXPANSION JOINT
1 1/2" = 1'-0"A-04
CAVITY WALL REINFORCEMENT
CONTINUOUS AT CORNER WITH CJ & EJ
1 1/2" = 1'-0"
1'04"
1/4" = 1'-0"
1 1 3 7'0 2
HIP
ASPHALT SHINGLE ROOF
VENT PIPE PENETRATION
ASPHALT SHINGLE ROOF
Sheets
A-01 - SAMPLE BUILDING DEMOLITION
A-02 - SAMPLE BUILDING R-2
A-03 - SAMPLE BUILDING R-2 SCHEDULES AND DETAILS
A-04 - SAMPLE BUILDING R-2 DETAILS
2022-03-21T11:52:39-0400
DEAN AVERY WALDROP
VAN NESS ST NW
th S
T N
W
WARREN ST NW
KEY PLAN
FLOOR DRAIN, SEE DET 5/M-01
4" PVC DRAIN PIPE, SEE
CIVIL FOR CONTINUATION
EMBEDDED BRONZE SURVEY MONUMENT
DETAIL 7/M-01
INSTALL NEW
SAMPLE ENCLOSURE ATOP
EX. COVER
R2-EF-2
R2-EF-1
DSW-R2-UH-1
SAMPLE ENCLOSURE
W/PUMP, SEE DET 2 THRU 4
THIS SHT
MX-1 CONTROLLER
MX-2 CONTROLLER
MX-3 CONTROLLER
R2-UH-2
R2-UH-1
R2-LP
SAMPLE PUMP STARTER
RELOCATED NETWORK
PANEL WITH VERIZON
MODEM
RELOCATED
SCADA ANTENA BOX
BACKDRAFT DAMPER
BACKDRAFT DAMPER
SECURITY
SYSTEM
PANEL
LE/LIT,
SEE NOTE 9, E-03
ACCESS PORT,
SEE DET 4/S-05, TYP
x FFE - 342.75
SAMPLE PUMP
ROOM
76 SF
ELECTRICAL ROOM
78 SF
FINISH FLOOR-FORM 2'-0"∅
DISH WHERE REQUIRED
FLOOR DRAIN
"P" TRAP
NOTE: INTERIOR FLOOR DRAIN AND CLEANOUTS TO HAVE 316 STAINLESS
STEEL TOPS. EXTERIOR FLOOR DRAINS AND CLEANOUTS TO HAVE
LACQUERED CAST IRON TOPS.
INV. ELEV.
3' BELOW FIN. FLR.
COUNTERSINK DISK
FLUSH WITH SURFACE
DRILL 1" DIA. HOLE
EPOXY GROUT
1" SCH 40 PVC DRAIN PIPE, SEE
DETAIL 2 IN THIS SHEET FOR
CONNECTION TO FLOOR DRAIN
EXISTING
MANHOLE COVER
2"x1" REDUCER
PIPE BRACKET,
TYP OF 2
FRONT ACCESS
DOOR
PADLOCK HASP
1/2" (MIN) 316 SS BOLTS TO BE
INSTALLED BY DRILLING AND
TAPPING EXISTING MANHOLE COVER,
SEE NOTE 2
DOUBLE PIPE CLAMP,
TYP OF 2
6"x7" ALUMINUM
SAMPLE ENCLOSURE
TOP ACCESS DOOR
1. ENCLOSURE SHALL BE KUPFERLE
MAINGUARD #66, OR EQUAL.
2. PROVIDE DIELECTRIC INSULATING
WASHERS FOR BOLTED CONNECTIONS.
PADLOCK EYE
0' - 7"
FLOOR MOUNTED
BRACKET, TYP OF 4
PLAN VIEW
1/2" PVC PIPE
1/2" THREADED
PVC UNION
SECTION VIEW
EXISTING PVC UNION
EXISTING LINE FROM
SUBMERSIBLE PUMP
6" MIN AIR GAP
SEE DETAIL 3,
THIS SHEET
1/2" PVC FROM PUMP
1. CONTRACTOR TO INSTALL NEW SAMPLE ENCLOSURE ATOP EX. COVER IN NEW
SAMPLE BUILDING. SEAL PER DETAIL 4 THIS SHEET.
2. INSTALL ALL FITTINGS AND PIPING IN SAMPLE ENCLOSURE AS SHOWN IN THIS
SCHEMATIC.
FLOOR DRAIN PER
DETAIL 5/M-01
END 1" PIPE ABOVE DRAIN
4" PVC DRAIN, SEE CIVIL
FOR CONTINUATION
4" DRAIN PASSES BELOW
NEW BUILDING BEAM
1/2" PVC
THREADED UNION
EXISTING PVC UNION
1" PVC TANK ADAPTER
1/2" PVC NEEDLE VALVE
EXISTING STAINLESS
STEEL PUMP CHAIN
EXISTING SPLIT FLANGE
EXISTING MANWAY
FRAME AND COVER
EXISTING 6" PVC PIPE
EXISTING SUBMERSIBLE
WELL PUMP
NEW SAMPLE ENCLOSURE
SAMPLE BUILDING
RESERVOIR BOTTOM
SLAB FF EL 318.00 +/-
FF EL 342.75
NOTE:
EXISTING CONDITION FOR SUBMERSIBLE PUMP MAY VARY FROM WHAT IS
SHOWN IN DETAIL, CONTRACTOR SHALL FIELD VERIFY SUBMERSIBLE PUMP
AND NOTIFY ENGINEER ANY DISCREPANCY WITH THE DETAIL.
1/2" PVC SAMPLE LINE
EXISTING PUMP
POWER CABLE
A
F
EXISTING PVC PIPE
WITH UNION
AARON W. DUKE, PE
M-01
SAMPLE BUILDING
MECHANICAL
3/8" = 1'-0"
4'21012"
1/2" = 1'-0"M-01
1 PLAN - SAMPLE BUILDING
SCALE: NOT TO SCALEM-01
5 DETAIL - FLOOR DRAIN
12" = 1'-0"M-01
7 BRASS SURVEY DISK
4 DETAIL - SAMPLE ENCLOSURE
2 SCHEMATIC - SAMPLE ENCLOSURE AND DRAIN
3 DETAIL - SAMPLE PUMP AND SLEEVE
2022-03-18T21:26:18-0400
Aaron Duke
EXISTING GRADE
EXISTING RESERVOIR DRAIN
PIPE TO REMAIN
RESERVOIR WALL
RESERVOIR SUMP
EXISTING 24" CI DRAIN PIPE
TO REMAIN
EXISTING STEM GUIDE
TO BE DEMOLISHED
EXISTING STEM GUIDE
CORE DRILL ON EXISTING
RESERVOIR WALL (PIPE
DIAMETER + 10")
APPROXIMATE 53' OF 24 INCH TERRACOTTA PIPE TO BE DEMOLISHED
P
IP
E O
.D
M-02
EXISTING OVERFLOW
COVER PLATE TO REMAIN
EXISTING 24" CI DRAIN
PIPE TO REMAIN
APPROXIMATE 53' OF 24 INCH TERRACOTTA PIPE TO BE DEMOLISHED
GENERAL SHEET NOTES
1. ALL ELEVATIONS SHOWN IN THIS DRAWING ARE BASED ON WA VERTICAL DATUM.
2. CONTRACTOR SHALL PROTECT EXISTING RESERVOIR DURING EXCAVATION WORK.
3. CONTRACTOR SHALL PROVIDE ADEQUATE SHEETING AND BRACING TO PROTECT
EXISTING STRUCTURE AND TO PREVENT UNDERMINING OF THE RESERVOIR.
4. REMOVE EXISTING BOLTS AND 24" FLEXIBLE IN-LINE CHECK VALVE AND PLACE A 24" DI
BLIND FLANGE WITH NEW ANCHOR BOLTS.
SHEET KEYNOTES
1. EXISTING FLOOR STAND ACTUATOR TO BE SALVAGED AND RETURNED TO THE
OWNER.
2. EXISTING BUTTERFLY VALVE, VALVE STEM TO BE SALVAGED AND RETURNED TO
THE OWNER.
3. EXISTING 24" BUTTERFLY VALVE TO BE SALVAGED AND RETURNED TO THE
OWNER.
4. EXISTING 24" FLEXIBLE IN-LINE CHECK VALVE TO BE SALVAGED AND RETURNED
THE OWNER (SEE DEMOLITION AND SALVAGE ITEMS NOTES ON SHEET C-02).
LEGEND
DENOTES TO BE DEMOLISHED OR REMOVED
STEVEN S. EAGLE, PE
M-02
DEMOLITION PLAN AND SECTION
31313/8" = 1'-0"M-02
2 CHAMBER WEST SECTION DEMOLITION
3/8" = 1'-0"M-02
1 DRAIN DEMOLITION PLAN
0 3
SCALE: 3/8" = 1'-0"
1 2 4 5
OrlandoAlfonso
Polygon
Sheets
M-02 - DEMOLITION PLAN AND SECTION
M-03 - OVERFLOW/DRAIN CHAMBER PLAN AND SECTIONS
M-04 - MECHANICAL DETAILS AND SECTIONS
2022-03-18T18:43:07-0400
Steven S. Eagle, P.E. #43684
M-03
M-04
24" DIP DRAIN PIPE
24" HDPE
OVERFLOW PIPE
6 6
8' PVC STORM PIPE
16 17
17 16
CONNECT TO EXISTING
24" CI CITY STORM
SEWER LINE
8' - 0"
M
IN
18"
5 3
2 4
CONNECT TO EXISTING
24" CI DRAIN PIPE
24" (DI) DIA FLG X PE WALL PIPE
PENETRATION WITH SST FLANGE
BOLTS AND DOUBLE LINK SEAL IN
CORE DRILLED WITH SST HARDWARE
8" PVC RESERVOIR
ROOF DRAIN
EXISTING 24" CI CITY
STORM SEWER LINE
24" BLIND
FLANGE
(SEE NOTE 5)
EXISTING 24" CI
DRAIN PIPE
24" CI OVERFLOW PIPE
SST STEM GUIDE WITH SST
ANCHOR BOLTS (TYP OF 2)
28' - 4"
24'' OUTLET WITH STAINLESS STEEL #24
MESH, SEE NOTE 7 ON THIS SHEET.
5' - 9" CORE DRILL
12"
GROUT
1. 24" Ø CIRCULAR FLAP GATE TO BE RODNEY HUNT SERIES FV-SPR OR EQUAL
MOUNTED ON STANDARD DUCTILE IRON PIPE FLANGE WITH SST FLANGE BOLTS
2. 24" BUTTERFLY VALVE
3. MANUAL FLOOR STAND ACTUATOR WITH VERTICAL HANDWHEEL (TYP OF 2)
4. 24" Ø FLG X PE WALL PIPE (TYP OF 2)
5. 36" X 36" BILCO TYPE J HATCH (SEE SHEET M-04, DETAIL 5 AND STRUCTURAL
SHEET S-07)
6. 24" MJ 11.25 BEND (TYP OF 2)
7. 24" MJ HDPE 45 BEND (TYP OF 4)
8. 24" MJ HDPE 22.5 BEND (TYP OF 2)
9. 24" FLG X PE DI SPOOL PIECE WITH SST FLANGE BOLTS
10. 24" MEGALUG FLANGE ADAPTER SERIES 1100 (TYP OF 3) WITH SST BOLTS
11. 24" FLG BUTTERFLY VALVE WITH EXTENDED BONNET (SEE NOTE 4)
12. BUTTERFLY VALVE EXTENDED BONNET WITH SST FLANGE BOLTS
13. 8''x8''x8'' DOUBLE WYE W\ CLEANOUT (REFER TO CIVIL SHEET C-08)
14. MANHOLE STEPS AT 16'' OC (SEE SHEET NOTE 6 AND STRUCTURAL SHEET S-07)
15. 8" PVC 90 BEND
16. 8" PVC 45 BEND (TYP OF 4)
17. 8" PVC 22.5 BEND (TYP OF 2)
18. 24" MJ SOLID SLEEVE
19. ALUMINUM GUARDRAIL (SEE STRUCTURAL SHEET S-07)
20. 24" DOUBLE LINK SEAL
3. CONTRACTOR SHALL PROVIDE ADEQUATE SHEETING AND BRACING TO PROTECT
EXISTING STRUCTURE AND TO PREVENT UNDERMINING OF THE RESERVOIR.
4. BUTTERFLY SHALL BE PROVIDED WITH EXTENDED BONNET. THE BONNET IS TO EXTEND
6 INCHES ABOUT THE OVERFLOW ELEVATION.
5. A 24 INCH BLIND FLANGE WITH A STOPCOCK FOR AIR BLEEDING SHALL BE PLACED
TEMPORARILY UNTIL PIPE PRESSURE TESTING IS COMPLETED. FOLLOWING TESTING, A
PERMANENT 24 INCH BLIND FLANGE WITH SST FLANGE BOLTS AND GASKET SHALL BE
PLACED OVER EXISTING DRAIN.
6. CONTRACTOR SHALL PROVIDE SAFETY EXTENDABLE POST THAT EXTEND 42 INCHES
MINIMUM ABOVE THE TOP OF THE CHAMBER STRUCTURE.
7. FOR SEAL PIPE OPENING SEE DETAIL 8 ON CIVIL SHEET C-10.
M-03
OVERFLOW/DRAIN CHAMBER PLAN
AND SECTIONS
3/8" = 1'-0"M-03
1 CHAMBER FOUNDATION PLAN
3/8" = 1'-0"M-03
2 CHAMBER SECTION SOUTH
0 3
SCALE: 3/8" = 1'-0"
1 2 4 5
Sheets
M-02 - DEMOLITION PLAN AND SECTION
M-03 - OVERFLOW/DRAIN CHAMBER PLAN AND SECTIONS
M-04 - MECHANICAL DETAILS AND SECTIONS
2022-03-18T18:43:38-0400
Steven S. Eagle, P.E. #43684
SCALE: DATE: SHEET:
SUBMITTED:
CHIEF, ENGINEERING & PLANNING BRANCH
CHIEF, WASHINGTON AQUEDUCT DIVISION
RECOMMENDED:
COLONEL, C. OF E. DISTRICT ENGINEER
APPROVED FOR:
DATE:
VICINITY MAP
LOCATION MAP
SECOND HIGH RESERVOIR MAINTENANCE AND
IMPROVEMENTS
4420 WARREN STREET, NW WASHINGTON, DC 20016
CONTACT INFORMATION:
HANIF K. DRZAL, P.E.
5900 MACARTHUR BLVD. NW
WASHINGTON , DC 20016
PHONE: (202) 587-9366
SQUARES: 1594 AND 1595
LOTS: LOT 0800, LOT 0801 AND LOT 0807
SECOND HIGH
RESERVOIR
NE
BR
AS
KA
VE
VERPLANCK PL NW
MASSACHUSETTS AVE NW
ST N
WINDOM PL NW
YUMA ST NW
rd
ALBEMARLE ST NW
UN
IV
ER
SI
TY
VE
BUTTERWORTH PL NW
MASSACHUSETTS AVE NW
BRANDYWINE ST NW
nd
NO SCALE
80.2-2.7-01 01
G-01
GENERAL
COVER SHEET
VICINITY MAP
4420 WARREN STREET, N.W.
Washington, D.C. 20016
INDEX OF DRAWINGS
PLATE
NO TITLE DRAWING NO SHEET
NO
01 COVER SHEET 80.2-2.7-01 G-01
02 ABBREVIATIONS AND LEGEND 80.2-2.7-02 G-02
03 GENERAL NOTES 80.2-2.7-03 G-03
CIVIL
04 SITE SURVEY PLAN 80.2-2.7-04 SV-01
05 OVERALL SITE PLAN 80.2-2.7-05 C-01
06 EXISTING CONDITIONS AND DEMOLITION PLAN 80.2-2.7-6 C-02
07 ROOF DRAINAGE PLAN 80.2-2.7-07 C-03
08 RESTORATION PLAN 80.2-2.7-08 C-04
09 EROSION AND SEDIMENT CONTROL NOTES 80.2-2.7-09 C-05
10 EROSION AND SEDIMENT CONTROL PLAN 80.2-2.7-10 C-06
11 EROSION AND SEDIMENT CONTROL STANDARD DETAILS 80.2-2.7-11 C-07
12 24 INCH DRAIN PIPE PLAN AND PROFILE 80.2-2.7-12 C-08
13 4 INCH EFFLUENT DRAIN LINE PLAN AND PROFILE 80.2-2.7-13 C-09
14 CIVIL DETAILS 1 80.2-2.7-14 C-10
15 CIVIL DETAILS 2 80.2-2.7-15 C-11
STRUCTURAL
16 GENERAL STRUCTURAL NOTES 80.2-2.7-16 S-01
17 SAMPLE BUILDING DEMO PLAN AND SECTION 80.2-2.7-17 S-02
18 SAMPLE BUILDING PLAN 80.2-2.7-18 S-03
19 SAMPLE BUILDING SECTIONS 80.2-2.7-19 S-04
20 SAMPLE BUILDING BEAM SCHEDULE AND DETAILS 80.2-2.7-20 S-05
21 STRUCTURAL DETAILS - SHEET 1 80.2-2.7-21 S-06
22 STRUCTURAL DETAILS - SHEET 2 80.2-2.7-22 S-07
23 OVERFLOW/DRAIN CHAMBER PLAN AND SECTIONS 80.2-2.7-23 S-08
24 CONCRETE AND JOINTS REPAIR DETAILS I 80.2-2.7-24 S-09
25 CONCRETE AND JOINTS REPAIR DETAILS II 80.2-2.7-25 S-10
26 SAMPLE BUILDING DEMO 80.2-2.7-26 A-01
27 SAMPLE BUILDING 80.2-2.7-27 A-02
28 SAMPLE BUILDING SCHEDULES AND DETAILS 80.2-2.7-28 A-03
29 SAMPLE BUILDING DETAILS 80.2-2.7-29 A-04
30 SAMPLE BUILDING 80.2-2.7-30 M-01
31 DEMOLITION PLAN AND SECTION 80.2-2.7-31 M-02
32 OVERFLOW/DRAIN CHAMBER PLAN AND SECTIONS 80.2-2.7-32 M-03
33 MECHANICAL DETAILS AND SECTIONS 80.2-2.7-33 M-04
34 RESERVOIR MIXERS PLAN 80.2-2.7-34 M-05
ELECTRICAL
35 LEGEND AND GENERAL NOTES 80.2-2.7-35 E-01
36 OVERALL SITE PLAN 80.2-2.7-36 E-02
37 SAMPLE BUILDING DEMOLITION PLANS 80.2-2.7-37 E-03
38 SAMPLE BUILDING PLANS 80.2-2.7-38 E-04
39 RESERVOIR PLANS 80.2-2.7-39 E-05
40 ELECTRICAL SCHEDULES AND DETAILS 80.2-2.7-40 E-06
HVAC
41 SAMPLE BUILDING PLAN, SECTION AND SCHEDULES 80.2-2.7-41 H-01
4420 WARREN STREET, NW
Washington, DC 20016
WASHINGTON DC
AutoCAD SHX Text
REV
DATE
DESCRIPTION
BY
EXIT 9
EXIT 12
V I R G I N I A
FAIRFAX CO, VA
ARLINGTON CO, VA
MONTGOMERY CO, MD
WESTERN AVE
SOUTHERN AVE.
PRINCE GEORGES CO, MD
POTOMAC
RIVER
MD
VA
EXIT 40
EXIT 38
EXIT 35
EXIT 41
A R L I N G T O N
W A S H I N G T O N D. C.
OTOMAC
ANACOSTIA
EASTERN AVE
REAGAN WASH. NAT. AIRPORT
PENTAGON
US CAPITOL
WHITE HOUSE
M A R Y L A N D
MONTGOMERY CO, MD
EXIT 14
TO DULLES AIRPORT
DULLES AIRPORT
ACCESS ROAD
DALECARLIA RESERVOIR
MACARTHUR
BLVD.
LOU
GHB
ORO
RD
GOLDSBORO RD
MASS
AVE
MACARTHUR
BLVD.
CABIN
JOHN
PKWY
CLARA
BARTON
AM. LEG.
MEM. BR
GEO.
WASH
MEM.
CANAL.
WARD CIRCLE
NEBRASKA AVE
KEY BR
WHITEHURST
MASS
INDEP AVE
14TH ST.
NORTH TO BALTIMORE
EXIT 27
TO BALT. WASH. INTL. AIRPORT
ROOSEVELT
MEM. BR
ARL. MEM.
BRIDGE
ROSSLYN
14TH ST.
G. W.
P.
M.
PENN. AVE
ANACOSTIA FRWY
KENILWORTH AVE
TO RICHMOND, VA
SOUSA
BR.
SCALE IN MILES
1/4
1/2
TO RICHMOND, VA
CAPITAL
BELTWAY
CHAIN
CAP
BELTWAY
CONST AVE
THOMAS CIRCLE
1ST ST.
7TH ST.
GEORGIA AVE
R. I. AVE
COL. RD
MICH AVE
HRVD ST
ARIZ.
ESVILLE
EXIT 30
EXIT 31
ITAL
GEORGIA
16TH ST.
McMILLAN RESERVOIR
SCOTT CIRCLE
U.S. ARMY CORPS OF ENGINEERS 5900 MACARTHUR BLVD., N.W. WASHINGTON, D.C. 20016-2514 PHONE: 202-764-2753
B.W.
COL
Sheets and Views
G-01
2022-03-18T18:24:27-0400
Steven S. Eagle, P.E. #43684
8" PVC
STORM PIPE
24" DRAIN PIPE
24" OVERFLOW PIPE
EL 318' - 6"
EL 316' - 10"
EL 319' - 3"
ALUMINUM GUARD RAIL
EL 323' - 0"
0' - 8"
EXISTING RESERVOIR
SUMP, SEE NOTE 5
EXISTING END FLANGE
PROJECTION OF VALVE DISC
IN OPEN POSITION
EXISTING STEM CASING
TO BE FIELD VERIFIED
AND REUSED
EXISTING RESERVOIR
ROOF PENETRATION
3. IF THE NEW BUTTERFLY VALVE DISK TOUCHES CONCRETE WHEN OPEN, CUT AWAY
CONCRETE TO ACCOMMODATE SMOOTH DISK OPERATION.
4. CONTRACTOR SHALL USE ADJUSTABLE PIPE STAND TO SUPPORT BUTTERFLY
ASSEMBLY DURING INSTALLATION. PIPE STAND IS TO REMAIN SUPPORTING VALVE
AFTER INSTALLATION.
5. FOR STRUCTURAL DETAILS REFER SHEET S-07.
1. DRAIN RESERVOIR MANUAL STAND ACTUATOR
2. BUTTERFLY VALVE EXTENDED BONNET
3. 24" DI FLANGE WITH SPOOL PIECE (LENGTH AS REQUIRED)
4. 24" MEGALUG FLANGE ADAPTER SERIES 1100
5. 24" DRAIN BUTTERFLY VALVE (RESERVOIR) ORIENTED WITH VALVE SHAFT IN
VERTICAL POSITION
6. 24" BUTTERFLY VALVE (OVERFLOW CHAMBER) ORIENTED WITH VALVE SHAFT IN
VERTICAL POSITION
7. 24" Ø CIRCULAR FLAP GATE TO BE RODNEY HUNT SERIES FV-SPR OR EQUAL
8. 36" X 36" BILCO TYPE J HATCH
9. CHAMBER MANUAL FLOOR STAND ACTUATOR
10. GATE OR VALVE ACTUATOR FLOOR STAND
11. TYPE 316 SS GATE OR VALVE STEM
12. SHIMS AND NON-SHRINK GROUT
13. MINIMUM FOUR SS ANCHOR BOLTS WITH SS NUTS AND WASHERS, SEE NOTE 3 ON
DETAIL.
14. FOUR ADDITIONAL #5 BARS, EXTEND 6'' PAST ANCHOR BOLTS
15. SS BAR, TACK WELD TO BOLT, SEE NOTE 3 ON DETAIL
FACE WALL
24'' WALL PIPE
MINIMUM 3/8'' DIA. 3'' EMBEDMENT
SST CONCRETE ANCHOR BOLT HEX
NUT AND SST FENDER WASHER
(12 HOLES)
STAINLESS STEEL #24 MESH
R
G
ID
H
FRAME OPENING LENGTH +6''
PLAN VIEW
GUIDE ARM
REMOVABLE COVER PLUG
REMOVABLE SQUARE
KEY WRENCH
1/4'' ALUMINUM DIAMOND
PATTERN PLATE COVER
BILCO HEAVY DUTY FORGED
STAINLESS STEEL HINGES
W/ STAINLESS STEEL PINS
1/4'' SUPPORT PLATE
WELDED TO FRAME
STAINLESS STEEL SPRING
LIFTING MECHANISM
SLAM LOCK
BILCO AUTOMATIC
HOLD OPEN ARM
STAINLESS STEEL
LOCK STRIKE
TO DISPOSAL OR DRY WELL
1/8'' DIA. NEOPRENE CONTINUOUS
BUMPER ALL AROUND
BILCO 1/4'' ALUMINUM CHANNEL
FRAME W\ RECESSED ANCHORS
SECTION
3"
36"
42"
42"
24" DIP WALL PIPE
CORE DRILL TO INSTALL NEW 24" DI
WALL PIPE AND FILL WITH GROUT
AFTER WALL PIPE IS INSTALLED
5' - 9" CORE DRILL
EXISTING RESERVOIR WALL
24" MEGALUG FLANGE
ADAPTER SERIES 1100
24" DOUBLE LINK SEAL
12"
WALL
6" MIN
FLANGE OR END TO SUIT
MECHANICAL COUPLING
DUCTILE IRON OR CAST IRON
WALL PIPE WITH INTEGRALLY
CAST SEEP RING. LINING AND
COATING THE SAME AS PIPE
ANCHOR BOLT PEDESTAL BASE CONNECTION DETAIL
NTS
EXISTING STEM CASING
TO BE FIELD VERIFIED
AND REUSED
1. FLOOR STAND IS REPRESENTATIVE ONLY.
2. DETAIL APPLICABLE FOR FLOOR SLAB OR CURB INSTALLATION.
3. IF USED ON ELEVATED SLABS LESS THAN 12" THICK, BOLT THROUGH SLAB USING 4" SS
ANCHOR BOLTS WITH SS NUTS AND WASHERS. SEE DRAWINGS FOR ADDITIONAL ANCHOR
PLATE DETAILS, IF REQUIRED. SEE SPECIFICATIONS FOR ANCHOR BOLT AND ANCHORAGE
REQUIREMENTS.
4. IF USED ON ELEVATED SLAB GREATER THAN 12" THICK, USE EPOXY -GROUTED ANCHORS.
CORE DRILL, REMOVE, AND REPLACE ANCHOR BOLTS WITH EPOXY- GROUTED ANCHORS
WHEN INSTALLATION IS TO TAKE PLACE IN THE LOCATION OF THE EXISTING ANCHOR BOLTS.
5. SEE SPECIFICATION FOR ANCHOR BOLT PATTERN REQUIREMENTS.
6. ADDITIONAL SUPPORTS AND BRACING, AS RECOMMENDED BY MANUFACTURER.
IN9
/2
B L Y
Y
-1
J
C
IO
FLOOR STAND
AS REQUIRED BY
MECHANICAL DETAILS AND SECTIONS
1/2" = 1'-0"M-03
3 CHAMBER SECTION WEST
1" = 1'-0"M-03
2 BUTTERFLY VALVE CONNECTION DETAIL
1" = 1'-0"M-03
1 ACTUATOR CONNECTION DETAIL
1 1/2" = 1'-0"M-03
5 SS MESH AND ANCHOR BOLTS
1" = 1'-0"M-04
6 36''x36'' HATCH DETAIL
4 OVERFLOW PIPE PENETRATION DETAIL
7 WALL PIPE DETAIL
Sheets
M-02 - DEMOLITION PLAN AND SECTION
M-03 - OVERFLOW/DRAIN CHAMBER PLAN AND SECTIONS
M-04 - MECHANICAL DETAILS AND SECTIONS
2022-03-18T18:44:50-0400
Steven S. Eagle, P.E. #43684
AWG AMERICAN WIRE GAUGE
DEPTH, DEEP, DEGREE OF CURVATURE, DRAIN
BITUMINOUS COATED CORRUGATED METAL PIPE
(NON REINFORCED) CONCRETE PIPECP
COUNTER SUNK
COLD WATER
CONTRACT SPECIALIST
CAPILLARY WATER BARRIER
CERAMIC TILE, CURRENT TRANSFORMER
DRILL HOLE
DISCHARGE
DOWNSPOUT
DEAD LOAD
DISTRIBUTION PANEL
DRINKING WATER DISPENSER
DRY BULB, DECIBEL, DIRECT BURIAL
D PNL
DWD
DWG
DS
DO
DISCH
DN
DL
DIA
DH
DITTO
DRAWING
DIAMETER
DOWN
CWB
CW
D
DB
DET
CT
CTR
C-S
CSK
DETAIL
CENTER
CIP CAST IRON PIPE
CIRCULATING
CENTERLINE, CLEAR, CLEARANCE
CLEANOUT
CONCRETE
CONDUCTOR
CONNECTION
CONSTRUCTION
CONTINUED, CONTINUOUS
CONTRACTION
CONVERTER
CORRUGATED METAL PIPE
CORRUGATED METAL PIPE ARCH
CONCRETE MASONRY UNITS
CO
CONC
COND
CONN
CONST
CONT
CONTR
CONV
COP, CU
COL
COPPER
COLUMN
CMP
CMPA
CL
CLG
CKT
CIR
CJ
CEILING
CIRCUIT
BOTTOM OF CURB
BITUMINOUS
BASE LINE
BEAM, BENCHMARK
BASEMENT
CAPACITY
BRITISH THERMAL UNIT
CENTER TO CENTER
CUBIC FEET PER MINUTE
CAST IRON
BM
BSMT
C, CND
CAP
CFM
CI
CC
CEM
BTU
CEMENT
CONDUIT
BCCMP
BLDG
BLK
BD
BIT
BC
BOARD
BUILDING
BLOCK
BOTTOM
TC
POST INDICATOR VALVEPIV
HEATING HOT WATER
HEATING HOT WATER RETURN
INLET, MOMENT OF INERTIA
INSIDE DIAMETER, INSIDE DIMENSION
INSULATION, INSULATED
JANITOR CLOSET
INVERTINV
JT
JB
JC
JCT
JST
JOINT
JUNCTION BOX
JUNCTION
JOIST
I
ID
INT
INSUL
HVY
HHW
HZ
HHWR
INTERIOR
INCH
HERTZ
HEAVY
PRESS
PT
PVC
PSF
PSI
PRIM
PS
PLNJ
POV
PRELIM
PLYWD
PNL
PLAS
PL
PJF
PL
PRIVATELY OWNED VEHICLE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POINT, POINT OF TANGENT
PAPER AND LEAD NEOPRENE JACKET
POINT OF VERTICAL CURVE, POLYVINYL CHLORIDE
PRESSURE
PULL SWITCH
PRIMARY
PROPERTY LINE
PREFORMED JOINT FILLER
PRELIMINARY
PLYWOOD
PANEL
PLATE
PLASTER
THRU
TP
TS
TW
TYP
3/C
TH
3/P
3 WAY
THRSLD
TF
TEL
TEMP
TERM
OVHD, OH
GALLONS PER MINUTE
GLAZED STRUCTURAL UNIT
GROUND WATER
HORN GAP SWITCH
HORSEPOWER, HIGH POINT
HIGH STRENGTH
GYPSUMGYP
HGSW
HORIZ
HP
HR
HS
HDW
HD
H, HGT
HORIZONTAL
HOUR
HARD DRAWN
HARDWARE
HEIGHT
GPM
GRD
GSU
GW
GR
GA
GALV
GL
GOVT
GROUND
GRADE
GALVANIZED
GOVERNMENT
GLASS
GAUGE
PI
PF
PB
PC
OPP
OPNG
OD
OA
OCB
OC
NTS
NIC
NOM
NO
NDC
NEUT
FIRE ALARM BOX
FAHRENHEIT, FIRE, FLUSH
FLOOR, FLASHING
FEET PER MINUTE
FIRE HOSE CABINET
FINISHFIN
FPM
FS
FT
FR
FJ
FL
FLUOR
4 WAY
FULL SIZE
FOOT, FEET
FRAME
FELT JOINT
FLUORESCENT
FOUR WAY
FDR
FF, FFL
FH
FIG
FHC
FD
FDN
FABX
FEEDER
FIRE HYDRANT
FINISHED FLOOR
FIGURE
FLOOR DRAIN
FOUNDATION
NC
MWP
MTG
MP
MPH
MTD
MISC
MO
MET
MIN
MH
MECH
MEP
MATL
MAX
MBH
MACH
MAS
SP
OVERHEAD
OUTSIDE DIAMETER
PULL BOX
POINT OF CURVE
POINT OF INTERSECTION
PIPE
PROFILE
OPPOSITE
NOSE DOWN CURB
NOT TO SCALE
OUTSIDE AIR
ON CENTER
NOT IN CONTRACT
OIL CIRCUIT BREAKER
NEUTRAL
NUMBER, NORMALLY OPEN
NOMINAL
STL
SWBD
SWGR
T & B
SUPT
SW
SUSP
SUP
SQ
SST
ST
STD
STA
SPC
SPST
SPDT
SPEC
THOUSAND BTU PER HOUR
MILITARY EQUIPMENT PARKING
MEMBRANE WATERPROOFING
MISCELLANEOUS
MILES PER HOUR
NON CORROSIVE, NORMALLY CLOSED
MOUNTING
MASONRY OPENING
MEDIUM PRESSURE
NORTH
MOUNTED
METAL
MANHOLE
MINIMUM
MACHINE
MASONRY
MATERIAL
MAXIMUM
SATC
SH
SL
1 PH
SKCP
SMH
SCH
SECT
SERV
SD
RPM
R/W
SAN
RF
RI
RL
RM
ALUMINUM CONDUCTOR STEEL REINFORCED
AIRBRAKE SWITCH
ACOUSTIC
AREA DRAIN
ADJUSTABLE
ANCHOR BOLT, AUGER BOLT
ASBESTOS CEMENT, ASPHALTIC CONCRETE
AIR CIRCUIT BREAKER
ALTERNATE
ACCESS PANEL
APPROXIMATE
ARRESTOR
ALUMINUM
ACST
ARCH
ARR
APPROX
ASPH
AP
AL
ALT
AD
ADJ
ASPHALT
A, AMP
ACB
ACSR
ABS
AB
AC
AMPERE
ELECTRICAL METALLIC TUBING
ELECTRIC WATER COOLER
EXPANSION, EXPOSED
EXPANSION JOINT
EMERGENCYEMER
EWC
EXIST
EXP
EJ, EXP JT
EXT
EMT
EW
EQUIP
EQ
EXTERIOR
EQUAL
EQUIPMENT
EACH WAY
EA
EF
EL
EC
ELEC
EACH
EMPTY CONDUIT
EACH FACE
ELEVATION
ELECTRIC
EAST
LC
LLV
LT
LLH
LL
LAV
LBS
LA
KCP
KVA
KW
KO
KV
K
ABBREVIATIONS
KEENE'S CEMENT PLASTER
LOUVER, LENGTH, LENGTH OF CURVE
LEAD COVERED
LIVE LOAD
LIGHTNING ARRESTOR
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LIGHT
LAVATORY
POUNDS
KNOCK OUT
KILOVOLT-AMPERE
KIPS (1000 LBS)
KILOVOLT
KILOWATT
RAD
REG
REL
REM
REINF
REQD
RCP
RED
RECIRC
PVT
QT
PVI
WITH
REVISION
W/
METAL IN SECTION
PLAS CEM & GROUT
CONCRETE
GSU & CT
WOOD FINISH
WOOD IN SECTION
TOP OF CURB
TOP OF STEEL, TOP OF STONE, TOP OF SLAB
THROUGH
TEST PIT
TYPICAL
TOP OF WALL
TOP OF FOOTING
THREE CONDUCTOR
TOTAL HEAD (PUMPS)
THREE POLE
THREE WAY
THRESHOLD
TELEPHONE
TEMPORARY
TERMINAL
WITHOUT
WET BULB
WATER CLOSET
WEIGHT
WIDTH, WINDOW DIMENSION
WATER LEVEL
WELDED WIRE MESH
TRANSFORMER
EXTRA STRENGTH
DEFLECTION ANGLE
WATERPROOF, WEATHERPROOF
WASTE STACK, WATER SURFACE, WATERSTOP
2 HORIZONTAL TO 1 VERTICAL
1 VERTICAL ON 2 HORIZONTAL
SINGLE POLE
STREAM, SINGLE THROW, STREET
STEEL
TILE, TOP, TANGENT
TOP AND BOTTOM
SWITCHBOARD
SWITCHGEAR
SUPPORT
SUPPLY
SUSPENDED
SWITCH
SUSPENDED PLASTER CEILING
SINGLE POLE, SINGLE THROW
STAINLESS STEEL
SINGLE POLE DOUBLE THROW
SQUARE
STATION
STANDARD
SPECIFICATION
SUSPENDED ACOUSTICAL TILE CEILING
SUSPENDED KEENE'S CEMENT PLASTER
SANITARY MANHOLE
SHEET
SINGLE PHASE
SLOPE
SECTION
SERVICE
SCHEDULE
STORM DRAIN
RUBBER INSULATED
SOUTH, SECTION MODULUS
SANITARY SEWER
REVOLUTIONS PER MINUTE
RIGHT OF WAY
RAIN LEADER
ROOM
ROOF
XFMR
X-STR
1 ON 2
SLOPE
2:1 SLOPE
YR YEAR
WWM
WL
WT
WP
WS
WC
WD
W/O
WB
ROCK
EARTH
INSULATION
PLYWOOD
BRICK
MATERIALS
VACUUM
UNDERGROUND
UNLESS NOTED OTHERWISE
VINYL ASBESTOS
VAPOR BARRIER
VEHICLE
VOLUME
VITRIFIED CLAY PIPE
VERTICAL
VESTIBULE
VENT, VOLT, VALVE, VELOCITY
VARNISH CAMBRIC, VITRIFIED CLAY
VERTICAL WALL REINFORCING
WIDTH, WASTE, WATER, WATT, WEST
RADIUS, RISER, RUBBER SHEATH
POINT OF VERTICAL INTERSECTION
RADIUS
REINFORCED CONCRETE PIPE
ROOF DRAIN, ROAD
REGULATOR, REGISTER
REINFORCEMENT
RELOCATED
REMOVED
REQUIRED
REDUCING
RECIRCULATION
POINT OF VERTICAL TANGENT
QUARRY TILE
VB
VERT
VEST
VOL
VWR
VEH
VC
VCP
V ASB
UNO
VAC
V
UG
SECTION / DETAIL SYMBOLS
DETAIL OR SECTION
IDENTIFICATION NUMBER
CONDITION IS DRAWN
OR SECTION OF THE
SHEET ON WHICH DETAIL
IDENTIFICATION NUMBER
DETAIL OR SECTION
FRP FIBERGLASS REINFORCED PLASTIC
SIM SIMILAR
WINDOW TAG
DOOR TAG
GLAZING TAG
TITLE
3" = 1'-0"
FLEXIBLEFLEX
OPTIONAL ITEM
OP OPTIONAL ITEM
LG LONG
SV
SVA
SURGE VALVE
SURGE VALVE ACTUATOR
VARIABLE FREQUENCY DRIVEVFD
BFV BUTTERFLY VALVE
VERIFY IN FIELDVIF
ABOVE FINISHED FLOORAFF
HEATING HOT WATER SUPPLYHHWS
SPD SUMP PUMP DISCHARGE
WATER HEATERWH
RET RETURN
STR, STRU STRUCTURAL
DRAINDR
RECP RECEPTACLE
HOT WATER, HEADWALL
HIGH WATER LEVEL
HW
HWL
HOT WATER RETURN / RECIRCULATEHWR
HOT WATER SUPPLYHWS
PPD PACKAGED PUMP DISCHARGE
LINETYPE LEGEND
CONTOURS - EXISTING - INDEX
CONTOURS - EXISTING - INTERVAL
CONTOURS - NEW - INDEX
CONTOURS - NEW - INTERVAL
SANITARY SEWER - EXISTINGSS
SANITARY SEWER - NEWSS
PBO PROPOSED BY OTHERS
DIMENSIONDIM
GAL GALLON
FORCE MAIN - NEWFM FM
INSTALLED BY OTHERSIBO
TWR
TWS
TEPID WATER RETURN
TEPID WATER SUPPLY SSF SSF SUPER SILT FENCE
LIMITS OF DISTURBANCE
PIPE SUPPORT
PIPE SUPPORT ATTACHMENT
(NUMBER DESIGNATOR)
(LETTER DESIGNATOR)
FCA FLEXIBLE COUPLING ADAPTER
CENTRIFUGALLY CAST, GLASS FIBER REINFORCEDCCGFR
TE TEMPERATURE SENSOR (ELEMENT)
TEMPERATURE ELEMENT
TREE PROTECTION FENCETPF TPF
MS MOTION (SENSOR) SWITCH
MOTION SENSOR ELEMENT
DEMOLITIONDEMO
HDPE HIGH DENSITY POLYETHYLENE
MFR MANUFACTURER
MJ MECHANICAL JOINT
PE PLAIN END
GATE VALVE
FLANGED JOINT
WALL PENETRATION
MECHANICAL JOINT
BUTTERFLY VALVE
NEEDLE VALVE
SYMBOLSDMH DRAINAGE MANHOLE
FES FLARED END SECTION
UNDERGROUND WATERUGW
CA CIRCA
SILT FENCE
SF SILT FENCE
SSF SUPER SILT FENCE
TPF TREE PROTECTION FENCE
WOOD CELLULOSE FIBER MULCHWCFM
STORM SEWER - EXISTINGSD
FENCE - EXISTINGX
WATER LINE- EXISTINGW
ELECTRICAL LINE-EXISTINGELEC
ELECTRICAL LINE-NEWELEC
SOIL TYPE LINE
NPS NATIONAL PARK SERVICE
FLANGEFLG
DUCTILE IRONDI
DUCTILE IRON PIPEDIP
80.2-2.7-02 02
G-02
ABBREVIATIONS AND LEGEND
HIGH POINTHPT
LPT LOW POINT
PEN PENETRATION
CEMENT BOARDCB
CANT CANTILEVERED
HG HALF GLASS
INSULATED GLASSIG
LE LEVEL
MR MOISTURE RESISTANT
MX MIXER
EXPOSED STRUCTUREEXP STR
ROD OVERFLOW ROOF DRAIN
TOS
TOC
TOM
TOP OF STRUCTURE
TOP OF CONCRETE
TOP OF MASONRY
ARCHITECT-ENGINEERA\E
COR CONTRACTING OFFICER REPRESENTATIVE
COLD-ROLLED STEELCRS
DESIGN MANAGERDM
OTI OPERATIONS TECHNOLOGY AND INSTRUMENTATION
PM PROJECT MANAGER
POB PLANT OPERATION BRANCH
POC POINT OF CONTACT
U.S. ARMY CORPS OF ENGINEERSUSAGE
WASHINGTON AQUEDUCTWA
ESC EROSION AND SEDIMENT CONTROL
PERF PERFORATED
WELDED WIRE FABRICWWF
X
OP
LOD
TE
ME
XXX.X
Sheets and Views
G-02
2022-03-18T18:25:48-0400
Steven S. Eagle, P.E. #43684
A B C D E F G H I J K L M N O P Q
MECHANICAL MIXER
(MX-1), SEE NOTE 1
MECHANCAL MIXER
(MX-2), SEE NOTE 1
(MX-3), SEE NOTE 1
BAFFLE WALL
56' - 0" 8' - 0"
56' - 0" 8' - 0"
8' - 0" 72' - 0"
REFERENCE E-04 AND E-05 FOR INFORMATION ON ELECTRICAL INSTALLATION
1.
AARON W. DUKE, PE
M-05
RESERVOIR MIXERS PLAN
1" = 20'-0"M-05
1 OVERALL RESERVOIR PLAN (EL 338.50)
2022-03-21T07:40:13-0400
Aaron Duke
80.2-2.7-03 03
G-03
GENERAL NOTES
1. REFER TO CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL GENERAL NOTES, ABBREVIATION AND SYMBOLS.
2. MATERIALS AND SYSTEMS NOTES ARE TYPICAL IN NATURE AND APPLY TO
MULTIPLE DRAWINGS. NOTES ON ANY DRAWING ARE TO BE APPLIED TO ALL
SIMILAR MATERIALS AND SYSTEMS UNLESS NOTED OTHERWISE.
3. ACTUAL SITE CONDITIONS MAY DIFFER FROM THOSE SHOWN ON THE DRAWINGS.
CONTACT THE GOVERNMENT IF A DISCREPANCY IS FOUND.
4. EXISTING UTILITY LOCATIONS AND PROPOSED EASEMENT AND RIGHT-OF-WAY
BOUNDARIES ARE APPROXIMATE ONLY AND ARE BASED ON BEST AVAILABLE
DATA. CONTRACTOR SHALL FIELD VERIFY THESE LOCATIONS AND ELEVATIONS,
AND IDENTIFY ANY UTILITIES NOT SHOWN IN THE DRAWINGS BEFORE
COMMENCING THE WORK. CONTACT MISS UTILITY AT 1-800-257-7777 AND
WASHINGTON AQUEDUCT FOR FIELD LOCATION OF EXISTING UTILITIES. THE
CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO THE BEGINNING OF ANY
CONSTRUCTION.
5. ALL DIMENSIONS AND ELEVATIONS SHOWN AND ALL EXISTING CONDITIONS ARE
APPROXIMATE AND SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO
STARTING WORK. THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE
HIMSELF WITH ALL EXISTING CONDITIONS PRIOR TO BIDDING WORK.
6. IN CASE OF DISCREPANCIES BETWEEN DIMENSIONS AND SCALE, DIMENSIONS
GOVERN. DO NOT SCALE DRAWINGS.
7. THE CONTRACTOR SHALL PROTECT EXISTING TREES AS NECESSARY AND ONLY
REMOVE MARKED TREES OR AS DIRECTED BY THE GOVERNMENT. CONTRACTOR
SHALL NOT REMOVE ANY TREES UNTIL SPECIFIC APPROVAL FROM THE
GOVERNMENT HAS BEEN RECEIVED. CONTRACTOR SHALL BE RESPONSIBLE FOR
APPLYING AND OBTAINING ANY REQUIRED PERMIT.
8. WORK SHALL BE PERFORMED IN AN EXPEDITED MANNER SO AS TO MINIMIZE THE
TIME THE RESERVOIR IS OUT OF SERVICE.THE CONTRACTOR SHALL PLAN ALL
WORK TO BE COMPLETED DURING RESERVOIR OUTAGE, INCLUDING BUT NOT
LIMITED TO WORK ASSOCIATED WITH SAMPLE BUILDING, DRAINING, INSPECTIONS,
REPAIRS, OPERATIONAL TESTING UNDER WET CONDITIONS AND PUNCH LIST
ITEMS TO BE COMPLETED IN THE LOW DEMAND PERIOD (BETWEEN NOVEMBER
1ST TO MARCH 31ST, BOTH INCLUSIVE) SO THAT THE RESERVOIR IS OUT OF
SERVICE FOR NO MORE THAN NINETY (90) CALENDAR DAYS. THERE CAN ONLY BE
ONE RESERVOIR OUTAGE AND THE CONTRACTOR SHALL ENSURE THAT ALL WORK
INSIDE THE RESERVOIR INCLUDING PREFINAL AND FINAL INSPECTION BY THE
GOVERNMENT IS PERFORMED DURING THIS SINGLE OUTAGE
9. CONTRACTOR SHALL REQUEST CONTRACTING OFFICER REPRESENTATIVE TO
CONTACT DC WATER AT LEAST THIRTY (30) CALENDAR DAYS IN ADVANCE IN
ORDER TO REMOVE ANTENNA PRIOR TO THE DEMOLITION OF THE SAMPLE
BUILDING.
10. PRIOR TO COMMENCING WORK TO DEMOLISH THE SAMPLE BUILDING, THE
CONTRACTOR SHALL PROVIDE THE GOVERNMENT SIXTY (60) CALENDAR DAYS
NOTICE.
11. CONTRACTOR SHALL PAY ALL COSTS INCURRED IN CONNECTING, CONVERTING,
AND TRANSFERRING THE UTILITIES TO THE WORK, INCLUDING BUT NOT LIMITED
TO PROVIDING BACKFLOW-PREVENTING DEVICES ON CONNECTIONS TO
DOMESTIC WATER LINES; PROVIDING METERS; AND PROVIDING TRANSFORMERS;
AND MAKING DISCONNECTIONS. CONTRACTOR SHALL NOT TAP TO CITY FIRE
HYDRANTS FOR OBTAINING DOMESTIC WATER AND IS RESPONSIBLE FOR HIS OWN
WATER SUPPLY IF NEEDED. THE CONTRACTOR IS RESPONSIBLE PROCURING DC
WATER HYDRANT USE AND TRAFFIC USE PERMITS TO RUN HOSES TO THE
NEAREST HYDRANT.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING WATER DISCHARGE
PERMIT FOR CONSTRUCTION WASH WATER FROM DCWATER. IN CASE RESERVOIR
DRAIN WATER HAS TO BE DISCHARGED INTO THE STORM SEWER, CONTRACTOR
SHALL ENSURE THAT IT MEETS THE WA GENERAL NPDES REQUIREMENTS.
CONTRACTOR IS RESPONSIBLE FOR SAMPLING AND TESTING REQUIREMENTS AS
DESCRIBED IN SPECIFICATION 01 57 19.
13. CONTRACTOR SHALL COORDINATE THE DRAINING AND THE SUPPLY OF FINISHED
WATER NECESSARY FOR FILLING, TESTING AND START-UP OF THE RESERVOIR
WITH THE WASHINGTON AQUEDUCT, AT LEAST THIRTY (30) CALENDAR DAYS IN
ADVANCE.
14. CONTRACTOR SHALL PROVIDE PERIMETER SITE SECURITY THROUGHOUT
CONSTRUCTION. AT A MINIMUM, CONTRACTOR SHALL INSTALL TEMPORARY
FENCING AND SIGNS ALONG LIMITS OF DISTURBANCE, WHERE EXISTING FENCE
HAS BEEN REMOVED FOR CONSTRUCTION ACTIVITIES OR AS DIRECTED BY THE
GOVERNMENT. TEMPORARY FENCING SHALL BE A SPECIFIC COMPONENT OF THE
CONTRACTOR'S WORK PLAN SUBMITTAL.
15. THE PROPOSED STAGING AREA AS SHOWN ON SHEET C-01 HAS TREES THAT
SHALL BE PROTECTED AT ALL TIMES. IF ADDITIONAL AREA IS REQUIRED, THE
CONTRACTOR MAY UTILIZE AREAS WITHIN THE PROPERTY LIMITS WITH PRIOR
APPROVAL FROM THE WASHINGTON AQUEDUCT. IF OFF-SITE STAGING AREA IS
REQUIRED FOR THE CONTRACTOR’S STAGING NEEDS, THEN THE CONTRACTOR
SHALL MAKE ALL NECESSARY ARRANGEMENTS AT NO ADDITIONAL COST TO THE
WASHINGTON AQUEDUCT.
16. CONTRACTOR SHALL CONFIRM THE BOUNDARY OF PROPERTY OWNERSHIP BY
THE WASHINGTON AQUEDUCT AND MAINTAIN ALL CONSTRUCTION ACTIVITIES
WITHIN THAT BOUNDARY.
17. IF EXISTING FACILITIES OR ANY PRIVATE OR GOVERNMENT PROPERTY IS
DAMAGED DURING THE COURSE OF THE WORK, THE CONTRACTOR SHALL REPAIR
TO THE SATISFACTION OF THE OWNER AT NO EXTRA COST TO THE GOVERNMENT.
18. ALL WORK SHALL CONFORM TO ALL APPLICABLE CODES, STANDARDS, AND
GOVERNING AUTHORITIES.
19. ALL CONCRETE REPAIR MATERIALS AND OTHER PRODUCTS USED FOR WORK
WITHIN THE RESERVOIR SHALL CONFORM TO NSF/ANSI 61 FOR CONTACT WITH
POTABLE WATER SUPPLIES.
20. THE ARCHITECT'S SELECTION OF FENCE MATERIALS AND DETAILS DOES NOT
RELIEVE THE CONTRACTOR FROM VERIFYING WITH THE FENCE MATERIAL
SUPPLIERS THAT THE PROPOSED FENCE MATERIALS ARE CORRECT AND PROPER
FOR THE INTENDED APPLICATION AND USE. PRIOR COORDINATION SHALL BE
MADE WITH THE WASHINGTON AQUEDUCT CHIEF OF SECURITY AND LAW
ENFORCEMENT ABOUT THE LATEST REQUIREMENTS FOR FENCE, CAMERA
SYSTEM AND RELATED WORK.
21. PROVIDE ACCESS PANELS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING,
AND FIRE PROTECTION EQUIPMENT.
22. CONTRACTOR SHALL KEEP THE ROADWAYS CLEAR AND CLEAN OF
CONSTRUCTION DEBRIS AND EQUIPMENT.
23. CONTRACTOR SHALL NOT STORE UNNECESSARY MATERIALS OR EQUIPMENT ON
THE JOB SITE AND SHALL TAKE CARE TO PREVENT ANY STRUCTURE FROM BEING
LOADED WITH A WEIGHT WHICH WILL ENDANGER ITS SECURITY OR THE SAFETY
OF PERSONS.
24. THE CONTRACTOR WORK SHALL COMPLY WITH LIMITS SPECIFIED IN THE DC NOISE
ORDINANCE.
25. UPON COMPLETION OF THE WORK, THE CONTRACTOR IS RESPONSIBLE FOR
REMOVING ALL MATERIAL, EQUIPMENT AND DEBRIS, AND RESTORING THE SITE TO
ITS ORIGINAL CONDITION.
26. THE CONTRACTOR SHALL PLAN FOR LEAKAGE THROUGH VALVES, JOINT LEAKS IN
MAINS, ROOF AND WALLS, AND SHALL HAVE THE NECESSARY PUMPS AND LINES
AVAILABLE SO AS NOT TO ALLOW ANY LEAKAGE TO IMPEDE PROJECT PROGRESS.
27. IT HAS BEEN DETERMINED THAT THE RESERVOIR HAS INFILTRATION WHEN IT IS
EMPTY. THE CONTRACTOR SHALL ASSUME WET WORKING CONDITIONS INSIDE
THE RESERVOIR.
28. THE CONTRACTOR SHALL PROCURE ALL NECESSARY PERMITS FOR STREET
OPENINGS, TRAFFIC CONTROL, AND SEDIMENT AND EROSION CONTROL RELATED
TO PERFORMING EXCAVATION IN THE VICINITY OF THE RESERVOIR FOR WORK
UNDER THIS CONTRACT. THE CONTRACTOR SHALL COMPLY WITH THE
PROVISIONS OF THESE PERMITS.
29. THE ACQUISITION OF A DDOT/URBAN FORESTRY DIVISION SPECIAL TREE
REMOVAL PERMIT MAY BE REQUIRED FOR ANY TREE REMOVAL. THE REMOVAL OF
TREES GREATER OR EQUAL TO 100 INCHES IN CIRCUMFERENCE IS PROHIBITED.
30. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED IMMEDIATELY
FOLLOWING INITIAL INSTALLATION, WEEKLY THEREAFTER, AND WITHIN 24 HOURS
AFTER A RAINFALL EVENT PRODUCING 1/2 INCH OR GREATER OF RAIN. MEASURES
SHALL BE REPAIRED OR REPLACED AS NECESSARY.
PROJECT DESCRIPTION
THE PROJECT INVOLVES MAINTENANCE AND IMPROVEMENTS WORK TO THE SECOND
HIGH RESERVOIR. THE CONTRACTOR SHALL PROCURE ALL NECESSARY PERMITS FOR
STREET OPENINGS, TRAFFIC CONTROL, EROSION AND SEDIMENT CONTROL AND ANY
OTHER WORK RELATED TO PERFORMING WORK UNDER THIS CONTRACT. THE
CONTRACTOR SHALL COMPLY WITH THE PROVISIONS OF THESE PERMITS AT ALL
TIMES. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR INSTALLING
TEMPORARY CONSTRUCTION ENTRANCE, TREE PROTECTION FENCE, ALL PERIMETER
SOIL EROSION AND SEDIMENT CONTROL DEVICES, AND SILT FENCE AS SHOWN ON
PLAN PRIOR TO ANY SITE DISTURBANCE OR CONSTRUCTION. THE MAJOR FEATURES
OF THIS PROJECT INCLUDE THE FOLLOWING:
1. SITE WORK INCLUDING BUT NOT LIMITED TO INSTALLATION OF SUB-DRAINAGE
SYSTEM ON TOP OF THE ROOF WITH DRAIN INTO AIR-GAP CHAMBER,
CONNECTION OF SUBDRAIN SYSTEM TO 8-INCH PVC DRAIN AND ELECTRICAL SITE
WORK.
2. DEMOLITION OF EXISTING AND INSTALLATION OF NEW 24-INCH TERRA COTTA
DRAIN LINE, VALVE, STEM AND ACTUATOR AND ADDITION OF A REDUNDANT
DRAIN VALVE ON NEW 24-INCH DRAIN LINE OUTSIDE RESERVOIR.
3. DEMOLITION OF EXISTING AND CONSTRUCTION OF NEW SAMPLE BUILDING
CONSISTING OF TWO COMPARTMENTS. ONE COMPARTMENT SHALL BE
MECHANICALLY VENTILATED AND DESIGNED TO BE FREE OF CHLORINE FUMES
AND HOUSE THE SCADA, ELECTRICAL AND SECURITY EQUIPMENT, AND THE
OTHER COMPARTMENT SHALL CONTAIN THE ACCESS HATCHES AND HOUSE
SAMPLING EQUIPMENT. THE NEW SAMPLE BUILDING SHALL HAVE NO
ATTACHMENTS AND ALL PENETRATIONS SHALL BE SUBSURFACE.
4. REPAIR WORK ASSOCIATED WITH EXISTING AREA ON THE WEST SIDE OF THE
RESERVOIR INCLUDING BUT NOT LIMITED TO FILLING WITH SUITABLE MATERIAL
TO MATCH PROPOSED GRADE AND PLACING SOD.
5. JOINT STRUCTURAL INSPECTION OF THE INTERIOR OF THE RESERVOIR WITH THE
WASHINGTON AQUEDUCT AND THEIR A/E FIRM.CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL SECURITY AND SAFETY PROTOCOLS FOR WORK WITHIN A
CONFINED SPACE. ENTRY SPACE INCLUDING BUT NOT LIMITED TO AIR
MONITORING, CSE, BLOWERS, ETC, NEEDED TO PERFORM THIS INSPECTION. THIS
INSPECTION SHALL BE COORDINATED WITH THE GOVERNMENT AT LEAST FIFTEEN
(15) CALENDAR DAYS IN ADVANCE AND SHALL TAKE PLACE AS SOON AS THE
RESERVOIR IS TAKEN OUT OF SERVICE. THE OBJECTIVE OF THIS INSPECTION IS
TO VERIFY AND CONFIRM TYPES AND QUANTITIES OF CONCRETE REPAIRS
NEEDED.
6. CONTRACTOR WILL BE RESPONSIBLE FOR DRAINING THE RESERVOIR IN
COORDINATION WITH THE WASHINGTON AQUEDUCT. CONTRACTOR SHALL
SUBMIT A RESERVOIR DRAINING AND DECHLORINATION PLAN DESCRIBING
DECHLORINATION, DRAINAGE AND DISCHARGE PROTOCOLS NO LATER THAN
FIFTEEN (15) CALENDAR DAYS AFTER NTP AND OBTAIN APPROVAL FROM THE
WASHINGTON AQUEDUCT PRIOR TO RESERVOIR OUTAGE COORDINATION.
DECHLORINATION AND DISCHARGE ACTIVITIES SHALL BE IN COMPLIANCE WITH
NPDES PERMITTING REQUIREMENTS, (REFER TO SPECIFICATION 01 57 19 FOR
PERMITTING REQUIREMENTS).
7. CONCRETE REPAIRS ALONG CEILING, FLOOR, WALLS, COLUMNS AND JOINTS
INSIDE THE RESERVOIR INCLUDING TAPING OF FLOOR JOINTS. THIS WORK
INCLUDES HANDLING AND DISPOSAL OF CONSTRUCTION JOINT MATERIAL THAT
HAS BEEN DETERMINED TO CONTAIN ASBESTOS.
8. MECHANICAL UPGRADES INSIDE THE RESERVOIR, INCLUDING BUT NOT LIMITED
TO, INSTALLATION AND TESTING OF NEW BUTTERFLY VALVE, MIXERS,
SUBMERSIBLE LEVEL TRANSDUCERS AND PIPES.
9. DISINFECTING AND REFILLING OF THE RESERVOIR IN ACCORDANCE WITH AWWA
C652-11, SEC 4.3. THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL FROM
WASHINGTON AQUEDUCT NO LATER THAN FIFTEEN (15) CALENDAR DAYS FROM
NTP FOR THE METHOD TO BE APPLIED. THE CONTRACTOR SHALL ENSURE THAT
ALL AREAS OF THE RESERVOIR WHERE WORK WAS CONDUCTED AND WHERE
POSSIBLY WERE CONTAMINATED BY THE WORK INSIDE THE RESERVOIR ARE
DISINFECTED, INCLUDING BUT NOT LIMITED TO CONTROL VALVES, WALL PIPES,
DRAIN LINES, AND INFLUENT AND EFFLUENT MAINS, AS APPLICABLE.
10. CLEANING OF THE FLOOR INSIDE THE RESERVOIR AND ANY OTHER AREAS THAT
ARE AFFECTED BY CONTRACTOR'S ACTIVITIES USING POTABLE WATER IN
ACCORDANCE WITH AWWA C-652-11, SEC 4.1. THE CONTRACTOR SHALL
PRESSURE WASH WITH PRESSURE NOT EXCEEDING 2,500 PSI AND SHALL
DECREASE THE PRESSURE AS NEEDED SO AS NOT TO CAUSE DAMAGE TO THE
RESERVOIR. WASH WATER DISPOSAL SHALL FOLLOW SPECIFICATION 01 57 19
AND SHALL BE IN ACCORDANCE WITH NPDES PERMIT REQUIREMENTS.
11. DECHLORINATION AND MAINTAINING COMPLIANCE WITH NPDES (PERMIT NUMBER
DC0000019), INCLUDING SAMPLING AND TESTING PRIOR TO DISCHARGE DURING
DRAINING OF THE RESERVOIR.
12. INSTALLATION OF A NEW BUG/RODENT SCREEN ON THE DIP DISCHARGE LINE
INSIDE THE AIR-GAP CHAMBER.
13. WATERPROOFING MEMBRANE REPAIRS TO AREAS BENEATH THE NEW SAMPLE
14. INSTALLATION OF A 4-INCH DISCHARGE LINE FROM SAMPLE WATER DISCHARGE
TO AN EXISTING SANITARY SEWER MANHOLE LOCATED AT WARREN STREET NW.
15. INSTALLATION OF UTILITY POLE AND YAGI POLE TYPE ANTENNA.
16. DEMOLITION OF THE EXISTING CHAIN LINK FENCE AND GATES AND INSTALLATION
OF THE NEW 8-FOOT HIGH PICKET FENCE AND GATES IN A MANNER SO THAT
SECOND HIGH RESERVOIR IS NEVER WITHOUT A SECURE FENCE, AND THAT THE
SECURITY CAMERA SYSTEM (LOCATED ON INDEPENDENT POLES JUST INSIDE
THE EXISTING FENCE LINE) ARE NOT DISTURBED, IMPACTED OR DAMAGED.
CONTRACTOR SHALL ENSURE THAT NO GAP IN FENCING SHALL BE LEFT
UNATTENDED AT ANY TIME AND THE CONTRACTOR SHALL VERIFY AT THE END OF
EACH WORK DAY THAT NO GAP EXISTS THAT COMPROMISES THE SECURITY OF
THE RESERVOIR. TEMPORARY FENCING SHALL BE INSTALLED, REPAIRED AND
UTILIZED AS REQUIRED AT NO ADDITIONAL COST TO THE OWNER.
17. SALVAGED SECURITY EQUIPMENT MUST BE REINSTALLED BY THE
GOVERNMENT'S SECURITY CONTRACTOR AND SHALL BE COMPLETED AND
TESTED PRIOR TO THE END OF THE WORK ON THIS CONTRACT. THE
CONTRACTOR SHALL ENSURE THAT THERE IS NO LAPSE IN SITE SECURITY
COVERAGE AT ANY TIME DURING THIS CONTRACT. THE CONTRACTOR SHALL
COORDINATE THE REQUIRED REINSTALLATION AND RETESTING WITH A MINIMUM
OF THIRTY (30) CALENDAR DAYS NOTICE AND PRIOR TO COMPLETION OF THE
WORK IN THIS CONTRACT.
18. RESTORATION OF DISTURBED AREAS TO ORIGINAL OR BETTER CONDITIONS,
INCLUDING BUT NOT LIMITED TO SODDING, SIDEWALK AND PAVEMENT REPAIRS,
PEDESTRIAN WALKWAYS, ETC.
19. CLOSE-OUT ACTIVITIES INCLUDING BUT NOT LIMITED TO REMOVAL OF EROSION
AND SEDIMENT CONTROL, TESTING AND COMMISSIONING TO THE SATISFACTION
OF THE GOVERNMENT, PRE-FINAL INSPECTION, CORRECTIVE WORK IF
APPLICABLE BASED ON GOVERNMENT INSPECTION, AS-BUILT SUBMITTAL,
PREPARATION OF PUNCH LIST, SUBMISSION OF INSTALLED EQUIPMENT AND
DEMOBILIZATION.
20. ANY INCIDENTAL WORK ASSOCIATED WITH THE PROJECT DESCRIPTION
DESCRIBED ABOVE.
CONSTRUCTION SEQUENCE
THE FOLLOWING CONSTRUCTION SEQUENCE IS SUGGESTED FOR THIS PROJECT.
THIS IS NOT ALL-INCLUSIVE AS MAY NOT INCLUDE ALL CONSTRUCTION ACTIVITIES
ASSOCIATED WITH THIS PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR
DEVELOPING A CONSTRUCTION SEQUENCING AND SCHEDULE BASED ON EXISTING
CONDITIONS ENCOUNTERED.
PHASE I – MOBILIZATION
1. INSTALL TEMPORARY CONSTRUCTION ENTRANCE, TREE PROTECTION FENCE, ALL
PERIMETER SOIL EROSION AND SEDIMENT CONTROL DEVICES, AND SILT FENCE AS
SHOWN ON PLAN, PRIOR TO ANY SITE DISTURBANCE OR CONSTRUCTION.
2. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED IMMEDIATELY
FOLLOWING INITIAL INSTALLATION, WEEKLY THEREAFTER, AND WITHIN 24 HOURS
AFTER EACH RAINFALL EVENT PRODUCING 1/2 INCH OR GREATER OF RAIN.
MEASURES SHALL BE REPAIRED OR REPLACED AS NECESSARY.
3. CONTRACTOR TO ENSURE THAT THE EXISTING SAMPLE BUILDING, CONTROL
SYSTEM AND RELATED DEVICES, SECURITY SYSTEM AND RELATED DEVICES,
ACCESS CONTROLS AND ALL SITE UTILITIES REMAIN IN SERVICE AT ALL TIMES THAT
THE SECOND HIGH RESERVOIR IS IN SERVICE. THIS IS AN ABSOLUTE REQUIREMENT
AND SUPERSEDES ANY OTHER PROVISION OF THESE CONTRACT DOCUMENTS
RELATED TO ALLOWABLE OUTAGES. COORDINATION WITH THE GOVERNMENT
SHALL BE PERFORMED TO SUFFICIENTLY PLAN FOR REQUIRED OUTAGES AND TO
ENSURE THAT THE ASSOCIATED WORK IS COMPLETED WHILE THE SECOND HIGH
RESERVOIR IS OUT OF SERVICE.
PHASE II – WORK PRIOR TO RESERVOIR OUTAGE
1. ONCE PERIMETER AND INLET PROTECTION MEASURES HAVE BEEN INSTALLED,
CONTRACTOR SHALL BEGIN SUBDRAINAGE TRENCH EXCAVATION
2. THE CONTRACTOR SHALL PERFORM SITE WORK PRIOR TO TAKING THE RESERVOIR
OUT OF SERVICE, INCLUDING BUT NOT LIMITED TO, INSTALLATION OF
SUB-DRAINAGE SYSTEM WITH DRAIN INTO AIR-GAP CHAMBER, CONNECTION OF
SUBDRAIN SYSTEM TO 8-INCH PVC DRAIN, AND ELECTRICAL SITE WORK.
3. PLUGGING EXISTING DRAIN, AIRGAP SHEETING/SHORING, CONSTRUCTION OF NEW
AIRGAP STRUCTURE AND INSTALLATION OF NEW 24-INCH DIP, 24-INCH HDPE
OVERFLOW PIPE, PVC PIPING AND 24-INCH BUTTERFLY VALVE.
4. CONTRACTOR SHALL PERFORM REPAIR WORK ASSOCIATED WITH APPROXIMATELY
70 SY OF EXISTING AREA ON THE WEST SIDE OF THE RESERVOIR INCLUDING BUT
NOT LIMITED TO FILLING WITH SUITABLE MATERIAL TO MATCH PROPOSED GRADE
AND PLACING SOD.
5. SURPLUS SOIL FROM SUB-DRAIN INSTALLATION SHALL BE HAULED AWAY AS
NECESSARY.
6. THE CONTRACTOR SHALL INFORM THE GOVERNMENT AT LEAST SIXTY (60)
CALENDAR DAYS IN ADVANCE AND OBTAIN PRIOR APPROVAL FROM THE
GOVERNMENT, PRIOR TO COMMENCING WORK INSIDE THE RESERVOIR.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DECHLORINATION AND
MAINTAINING COMPLIANCE WITH NPDES (PERMIT NUMBER DC0000019), INCLUDING
SAMPLING AND TESTING PRIOR TO DISCHARGE DURING DRAINING OF THE
RESERVOIR.
PHASE III – WORK INSIDE THE RESERVOIR DURING OUTAGE (TO BE PERFORMED
BETWEEN NOVEMBER 1 AND MARCH 31 WHILE NOT EXCEEDING A TOTAL OF 90
CALENDAR DAYS)
1. CONTRACTOR SHALL BE RESPONSIBLE FOR DRAINING OF THE RESERVOIR IN
COORDINATION WITH THE WASHINGTON AQUEDUCT, AT LEAST THIRTY (30)
CALENDAR DAYS IN ADVANCE.
2. THE CONTRACTOR SHALL FACILITATE A JOINT STRUCTURAL INSPECTION WITH THE
WASHINGTON AQUEDUCT AND THEIR A/E FIRM. CONTRACTOR WILL BE
RESPONSIBLE FOR ALL SECURITY AND SAFETY PROTOCOLS (I.E., AIR MONITORING,
CSE, BLOWERS, ETC) NEEDED TO UNDERTAKE THIS INSPECTION. STRUCTURAL
INSPECTION WILL TAKE PLACE AS SOON AS THE RESERVOIR IS TAKEN OUT OF
SERVICE AND IS AIMED AT VERIFYING ACTUAL TYPES AND QUANTITIES OF REPAIRS
NEEDED.
3. THE CONTRACTOR SHALL PERFORM CONCRETE REPAIRS ALONG CEILING, FLOOR,
WALLS, COLUMNS AND JOINTS INSIDE THE RESERVOIR.
4. THE CONTRACTOR SHALL PERFORM MECHANICAL UPGRADES INSIDE THE
RESERVOIR, INCLUDING BUT NOT LIMITED TO, INSTALLATION AND TESTING OF NEW
BUTTERFLY VALVE, MIXERS AND PIPES.
5. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR CLEANING THE FLOOR
INSIDE THE RESERVOIR AND ANY OTHER AREAS THAT ARE AFFECTED BY THEIR
ACTIVITIES USING POTABLE WATER IN ACCORDANCE WITH AWWA C-652-11, SEC 4.1.
THE CONTRACTOR SHALL PRESSURE WASH WITH PRESSURE NOT EXCEEDING 2,500
PSI AT ANY TIME AND SHALL DECREASE THE PRESSURE AS NEEDED SO AS NOT TO
CAUSE DAMAGE TO THE RESERVOIR. THE WATER USED FOR CLEANING NEEDS TO
BE REMOVED FROM THE RESERVOIR IN ACCORDANCE WITH SECTION 01 57 19
TEMPORARY ENVIRONMENTAL CONTROLS, AND ANY OTHER APPLICABLE PERMIT
CONDITIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR DISINFECTING AND REFILLING OF THE
RESERVOIR IN ACCORDANCE WITH C-652-11, SEC 4.3. THE CONTRACTOR SHALL
ADHERE TO METHOD 1 AND ANY DEVIATION FROM THIS SHALL BE SUBMITTED BY
THE CONTRACTOR AS A REQUEST FOR APPROVAL BY THE GOVERNMENT. THE
CONTRACTOR SHALL OBTAIN PRIOR APPROVAL FROM WASHINGTON AQUEDUCT NO
LATER THAN FIFTEEN (15) CALENDAR DAYS FROM NTP FOR THE METHOD TO BE
APPLIED. THE CONTRACTOR SHALL ENSURE THAT ALL COMPONENTS OF THE
RESERVOIR POSSIBLY CONTAMINATED BY THE WORK INSIDE THE RESERVOIR NEED
TO BE DISINFECTED, INCLUDING BUT NOT LIMITED TO CONTROL VALVES, WALL
PIPES, DRAIN LINES, AND INFLUENT AND EFFLUENT MAINS, AS APPLICABLE.
7. THE CONTRACTOR SHALL COMPLETE WORK ASSOCIATED WITH NEW SAMPLE
BUILDING, INCLUDING BUT NOT LIMITED TO BRICKWORK, ELECTRICAL, HVAC AND
PAINTING.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION OF UTILITY POLE AND
YAGI POLE TYPE ANTENNA.
9. REMOVE EXISTING SIDEWALK AND REPLACE IT WITH A NEW SIDEWALK
CONNECTING TO THE EXISTING SAMPLE BUILDING AND STAIRS.
10. CONTRACTOR SHALL REPAIR THE WATERPROOFING MEMBRANE BENEATH THE
NEW SAMPLE BUILDING AS SHOWN IN THE DRAWINGS.IN THE EVENT OF ANY OTHER
DAMAGE TO THE WATERPROOFING MEMBRANE AS A RESULT OF CONSTRUCTION
ACTIVITIES, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE
REPAIRS AT NO ADDITIONAL COST TO THE GOVERNMENT.
11. THE CONTRACTOR SHALL PLAN ALL WORK INSIDE THE RESERVOIR INCLUDING
DRAINING, INSPECTIONS, REPAIRS, OPERATIONAL TESTING UNDER WET
CONDITIONS, POTENTIAL CORRECTIVE WORK AFTER PRELIMINARY WALKTHROUGH,
FINAL WALKTHROUGH, PUNCH LIST ITEMS FILLING OF RESERVOIR, CHLORINATION
AND DEMOBILIZATION TO BE COMPLETED IN THE LOW DEMAND PERIOD (BETWEEN
NOVEMBER 1ST TO MARCH 31ST, BOTH INCLUSIVE) SO THAT THE RESERVOIR IS
OUT OF SERVICE FOR NO MORE THAN NINETY (90) CALENDAR DAYS. THE
CONTRACTOR MAY BE REQUIRED TO CONDUCT 16-HOUR DAYS, EITHER THROUGH
DOUBLE SHIFTS OR THROUGH MULTIPLE CREWS, AS APPLICABLE AND APPROVED
BY WASHINGTON AQUEDUCT WHILE BEING COMPLIANT WITH LOADING LIMITS ON
THE RESERVOIR. THE CONTRACTOR SHALL INFORM AND OBTAIN PRIOR APPROVAL
FROM WASHINGTON AQUEDUCT AND THEIR A/E AT LEAST SIXTY (60) CALENDAR
DAYS IN ADVANCE BEFORE SCHEDULING WORK INSIDE THE RESERVOIR.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE SUPPLY OF
FINISHED WATER NECESSARY FOR FILLING, TESTING AND START-UP OF THE
RESERVOIR WITH THE WASHINGTON AQUEDUCT, AT LEAST THIRTY (30) CALENDAR
DAYS IN ADVANCE.
31. CONTRACTOR TO ENSURE THAT THE EXISTING SAMPLE BUILDING, CONTROL
SYSTEM AND RELATED DEVICES, SECURITY SYSTEM AND RELATED DEVICES,
ACCESS CONTROLS AND ALL SITE UTILITIES REMAIN IN SERVICE AT ALL TIMES
THAT THE SECOND HIGH RESERVOIR IS IN SERVICE. THIS IS AN ABSOLUTE
REQUIREMENT AND SUPERSEDES ANY OTHER PROVISION OF THESE CONTRACT
DOCUMENTS RELATED TO ALLOWABLE OUTAGES. COORDINATION WITH THE
GOVERNMENT SHALL BE PERFORMED TO SUFFICIENTLY PLAN FOR REQUIRED
OUTAGES AND TO ENSURE THAT THE ASSOCIATED WORK IS COMPLETED WHILE
THE SECOND HIGH RESERVOIR IS OUT OF SERVICE.
32. CONTRACTOR SHALL RESTORE DISTURBED AREAS TO ORIGINAL OR BETTER
CONDITION .
33. SANDBLASTING CANNOT BE PERFORMED INSIDE THE RESERVOIR UNDER ANY
CIRCUMSTANCES.
34. NO WORK TO BE PERFORMED DURING FEDERAL HOLIDAYS AS ESTABLISHED BY
THE FEDERAL LAW (5 U.S.C. 6103). THE LIST OF FEDERAL HOLIDAYS CAN BE
ACCESSED FROM THE U.S. OFFICE OF PERSONNEL MANAGEMENT (OPM)
WEBSITE THROUGH THE FOLLOWING LINK -
(https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/). THE
CONTRACTOR SHALL NOTIFY WASHINGTON AQUEDUCT AT LEAST 15 CALENDAR
DAYS PRIOR TO THE HOLIDAY AND RECEIVE APPROVAL IF THEY NEED TO
PERFORM WORK ON THE FEDERAL HOLIDAYS
35. THE OWNER SHALL HAVE THE AUTHORITY TO ORDER WORK STOPPED OR
PROHIBITED THAT WOULD IN HIS OPINION, UNREASONABLY RESULT IN
INTERRUPTING THE NECESSARY FUNCTIONS OF THE PLANT OPERATIONS.
36. PARKING FOR PERSONAL VEHICLES OF CONSTRUCTION PERSONNEL SHALL NOT
BE ALLOWED ALONG VAN NESS ST NW. THE GENERAL CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING ACCESS TO AND FOR PREPARING AND
MAINTAINING/APPROVED PARKING AREAS.
SAFETY REQUIREMENTS
1. ALL WORK IN THE INTERIOR OF THE RESERVOIR IS CONSIDERED WORK WITHIN
PERMIT REQUIRED CONFINED SPACE AND THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL PERMIT ACQUISITION, COMPLIANCE AND SAFETY
REQUIREMENTS, AS WELL AS ARRANGING SUITABLE LIGHTING, VENTILATION,
MOISTURE CONTROL, ETC, TO COMPLETE THE WORK. REFER TO USACE'S EM
385-1-1, SECTION 34 (AND OSHA GENERAL INDUSTRY 1910.146) FOR SPECIFIC
DETAILS.
2. WHEN PREPARING FOR CONFINED SPACE WORK, CONTRACTOR SHALL TEST FOR
SIGNIFICANTLY HIGH LEVELS OF CHLORINE AS PART OF THE REQUIRED
MULTI-GAS METER TESTING.
3. AS PART OF EM 385-1-1, CONTRACTOR SHALL COMPLETE AND SUBMIT FORM A-02
ACCIDENT PREVENTION PLAN CHECKLIST AT OR BEFORE THE
PRE-CONSTRUCTION MEETING.
SECURITY INSTRUCTION NOTES
1. THE WASHINGTON AQUEDUCT AND ASSOCIATED PROPERTIES ARE CONSIDERED
SECURE SITES. THE CONTRACTOR SHALL PROVIDE PERSONNEL INFORMATION,
COMPLY WITH SECURITY POLICIES, AND MAINTAIN SECURE ACCESS TO THE SITE
AT ALL TIMES.
2. THE CONTRACTOR SHALL ACCESS THE SITE THROUGH THE CARD READER
SLIDING GATE AND KEEP THE GATE LOCKED, IF NOT IN USE, AT ALL TIMES.
3. ALL CONTRACTORS AND SUBCONTRACTORS ARE REQUIRED TO BE US CITIZENS.
FOREMAN IS REQUIRED TO COMPLETE FORM DA 1999 WITH IDENTITY OF ALL
INDIVIDUALS ENTERING AND EXITING THE SITE. THESE FORMS ARE TO BE
SUBMITTED TO WASHINGTON AQUEDUCT'S CHIEF OF SECURITY AND LAW
ENFORCEMENT ON A WEEKLY BASIS.
4. THE CONTRACTOR SHALL COORDINATE THE DEMOLITION AND REPLACEMENT OF
THE EXISTING FENCE AND GATES IN A MATTER THAT AT NO TIME THE SECOND
HIGH RESERVOIR IS WITHOUT A SECURE FENCE. NO GAP SHALL BE LEFT
UNATTENDED AT ANY TIME AND THE CONTRACTOR SHALL VERIFY AT THE END OF
THE WORK DAY THAT NO GAP EXISTS THAT COMPROMISES THE SECURITY OF
THE RESERVOIR. TEMPORARY FENCING SHALL BE INSTALLED AND UTILIZED AS
REQUIRED AT NO ADDITIONAL COSTS TO THE GOVERNMENT.
TEMPORARY POWER
1. CONTRACTOR TO COORDINATE AND REQUEST APPROVAL FROM WASHINGTON
AQUEDUCT AT LEAST FIFTEEN (15) CALENDAR DAYS IN ADVANCE BEFORE
DISCONNECTING POWER, NETWORK AND PHONE SERVICES TO THE SAMPLE
2. IF TEMPORARY POWER WILL BE REQUIRED ON THE PROJECT SITE, PROVIDE A
TEMPORARY POWER PLAN AND SKETCH REQUIREMENT FOR GOVERNMENT
REVIEW AND ACCEPTANCE AT LEAST THIRTY (30) CALENDAR DAYS IN ADVANCE.
SEALANT NOTES
1. SEAL EXTERIOR JOINTS AROUND DOORS, WINDOWS AND LOUVER FRAMES AND
PENETRATIONS OF MECHANICAL, ELECTRICAL, AND PLUMBING ELEMENTS TO
PREVENT AIR INFILTRATION AND WATER LEAKAGE.
2. ALL SEALANT JOINTS SHALL BE SIZED AS RECOMMENDED BY MANUFACTURER IN
THEIR INSTALLED POSITION.
3. ALL SEALANT JOINTS SHALL MAINTAIN CONTACT WITH THE ADJOINING PARTS
WITHIN ALLOWABLE DIMENSIONED CHANGES IN THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .