Attachment 019 - As-built Production Unit Cost Volume revB.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Mobile Tactical Cannon (MTC) Request for Prototype Proposal
Solicitation number
W912CH26RA017
Issued by

About this file

This is a pricing template for submission of as-built production unit costs in response to the Mobile Tactical Cannon (MTC) Request for Prototype Proposal (RPP) solicitation W912CH26RA017. Offerors must submit production unit cost data in Base Year 2026 U.S. Dollars for three production quantity ranges: 1-24 MTC systems, 25-36 MTC systems, and 37-48 MTC systems. The cost template requires offerors to input pricing information across six cost categories: Direct Labor Cost, Direct Material Cost, Direct Subcontract Cost, Overhead Cost, G&A Cost, and Cost of Money (COM), with a final Total Price calculation. This cost volume will be used for evaluation purposes as defined in the RPP section 4.2.4.

The underlying solicitation is issued by Army Contracting Command - Detroit Arsenal (ACC-DTA) seeking mature and available MTC solutions for prototype manufacturing, network integration, ammunition compatibility testing, safety and characterization testing, and issue to an Army unit for Soldier Evaluation. The Government intends to award a Fixed Price Other Transaction Authority (OTA) Agreement. As of the most recent amendment on March 31, 2026, this attachment (Attachment 019) was updated along with several other key documents including the Request for Prototype Proposal, Prototype Project Agreement, and supporting appendices.

View the file

Other files

File Type Posted
MTC OTA Prototype Project Agreement AMD 02.docx DOCX document
MTC OTA Request for Prototype Proposal AMD 03.docx DOCX document
MTC RPP Questions and Responses (Dist A) revC.xlsx XLSX spreadsheet
Appendix E - Milestone Pricing Summary_20 APR 2026.xlsx XLSX spreadsheet
MTC OTA Request for Prototype Proposal AMD 02.docx DOCX document
MTC OTA Prototype Project Agreement AMD 02.docx DOCX document
MTC RPP Questions and Responses (Dist A) revB.xlsx XLSX spreadsheet
Appendix E - Milestone Pricing Summary_02 APR 2026.xlsx XLSX spreadsheet
Appendix E - Milestone Pricing Summary 31_MAR 2026.xlsx XLSX spreadsheet
MTC OTA Prototype Project Agreement AMD 01.docx DOCX document
Attachment 001 Contract Data Requirements Lists (CDRLs)_31 MAR 2026.pdf PDF
MTC OTA Request for Prototype Proposal AMD 01.docx DOCX document
Appendix A - Project Articles_31 MAR 2026.docx DOCX document
MTC RPP Questions and Responses (Dist A).xlsx XLSX spreadsheet
Attachment 005 - As-Built Configuration Template.xlsx XLSX spreadsheet
Attachment 012 MTC Test Schedule Breakdown.xlsx XLSX spreadsheet
Attachment 007 - MATCE Input Datasheet Wheeled Vehicles.xlsx XLSX spreadsheet
MTC OTA Request for Prototype Proposal.docx DOCX document
Appendix E(1) - Milestone Pricing Sheet - Table F-1.xlsx XLSX spreadsheet
Attachment 016 - MTC Sample Special License Agreement (SLA).docx DOCX document
Appendix C - Representations and Certifications.docx DOCX document
Attachment 001 Contract Data Requirements Lists (CDRLs).pdf PDF
Attachment 003 - Supply Chain Market Checklist.pptx PPTX presentation
Appendix A - Project Articles.docx DOCX document
Attachment 013 ATTLA_Universal_Data_Sheet 9 Mar 26.xlsx XLSX spreadsheet
Attachment 019 - As-built Production Unit Cost Volume.xlsx XLSX spreadsheet
Appendix B - Project Other Terms and Conditions 9 Mar 26.docx DOCX document
Attachment 011 - TDP OPTION WORKSHEET TDP.pdf PDF
Attachment 009 - Proof Gun system Overview Distro A - Embedded video 1.pdf PDF
Attachment 004 - Assertion of Restrictions.xlsx XLSX spreadsheet
Attachment 010 - TDP OPTION WORKSHEET CAD.pdf PDF
Appendix E - Milestone Pricing Summary.xlsx XLSX spreadsheet
Attachment 014 POL Guide v1.2 2024.pdf PDF
Attachment 006 - I-BOM Sample.xlsx XLSX spreadsheet
MTC OTA Prototype Project Agreement 9 Mar 26.docx DOCX document
Appendix E(2) - Milestone Pricing Sheet - Table F-2 Continuation.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

UNCLASSIFIED

Item Description:As-built Production Unit Cost Volume
Cover Page

Distribution Statement A – Approved for Public Release; distribution unlimited

(*Distribution Statement A only applies when form is not filled in. Once filled check the Security Class Guide for proper distribution statement/markings)

As part of the P-BL development, delete this sheet and submit only the "Title Page" and "P-BL" sheets.

1. Introduction

Tab 1. Instructions Nothing to input, informational only.

Tab 2. Production Unit Cost Insert the required information in the blue highlighted cells. The offeror will submit responses in Base Year (BY) 2026 U.S. Dollars (USD) for the given production quantity ranges for the As-built Production Configuration. This cost volume will be used for Evaluation as defined in RPP section 4.2.4

2. Production Unit Cost

Total Cost-Price Summary

Form Instructions: Insert the required information in the blue highlighted cells. The offeror will submit responses in Base Year (BY) 2026 U.S. Dollars (USD) for the given production quantity ranges for the As-built Production Configuration. This cost volume will be used for Evaluation as defined in RPP section 4.2.4

Category Description1-24
MTC systems25-36
MTC systems37-48

MTC systems

Direct Labor Cost
Direct Material Cost
Direct Subcontract Cost
Overhead Cost
G&A Cost
Cost Of Money (COM)
Profit/Fee
Total Price$ -$ -$ -