Appendix E - Milestone Pricing Summary_20 APR 2026.xlsx
XLSX spreadsheet 34 KB Posted
- Solicitation number
- W912CH26RA017
- Issued by
-
Department of the Army
About this file
This is a milestone pricing summary template for the Mobile Tactical Cannon (MTC) Request for Prototype Proposal (RPP) W912CH-26-R-A017, Revision 002, dated 26 March 2026. The document provides a structured framework for offerors to propose milestone-based pricing across multiple deliverables and work breakdown structure (WBS) elements aligned with the Statement of Work (SOW). The template includes highlighted cells for vendors to fill in proposed milestone prices, with columns for milestone number, description, SOW reference, proposed price, percentage of total price, cost share, and USG share amounts.
The milestone pricing template encompasses four primary delivery categories: Prototype MTC system deliveries (quantities 1-3 at various completion intervals ranging from 60 to 450 days post-award), Cannon/Breech Assemblies for the Proof Gun Stand (3 milestones between 120-300 days), Ammunition storage cells for Sequential Environment Testing (2 milestones at 300 days), and Training Systems (2 milestones at 270 and 420 days). Additional milestones cover Test Ammunition across three increments (HE projectiles, training projectiles, primers, and propelling charges), Service Payment Schedule items including technical deliverables and monthly integration support, System Engineering CDRLs, Fire Control and Network Integration tasks, Supply Chain documentation, Test and Soldier Evaluation support services, training completion events, and prototype production capabilities. The template also includes unfunded option milestones for technical data packages (modular system interfaces, lightweight CAD models, and targeted subsystems) and computer software packages for various subsystems. All milestone prices are currently populated at 0.00%, indicating this is a blank template awaiting vendor completion. The Army Contracting Command - Detroit Arsenal (ACC-DTA) intends to award a Fixed Price Other Transaction Authority (OTA) Agreement.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover
| Appendix E |
| Milestone Pricing Summary |
| RPP No. W912CH-26-R-A017 |
| Revision Number: 002 |
| Date: 26 Mar 2026 |
DISTRIBUTION STATEMENT A: Approved for Public Release; distribution unlimited.
Instructions
Please see the instructions at the top of each tab in this workbook.
Approved For Public Release
Summary 4. Milestone Schedule
Summary 4. Milestone Schedule
Form Instructions: Fill in cells highlighted yellow
Milestone Number
| (WBS) | Milestone |
| Description | SOW |
| Reference | Proposed |
| Milestone Price | Percent of |
Total Proposed
| Price | Cost |
| Share ($) | USG |
Share ($)
| Table A: Prototype MTC system delivery | Qty 1 - 60 days after award | 0.00% | $ - | Base | ||
| Table A: Prototype MTC system delivery | Qty 2 - 360 days after award | 0.00% | $ - | Option | ||
| Table A: Prototype MTC system delivery | Qty 2 - 390 days after award | 0.00% | $ - | |||
| Table A: Prototype MTC system delivery | Qty 1 - 420 days after award | 0.00% | $ - | |||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | 0.00% | $ - | |||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | 0.00% | $ - | |||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | 0.00% | $ - | |||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | 0.00% | $ - | |||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 1 - 120 days after award | 0.00% | $ - | |||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 1 - 150 days after award | 0.00% | $ - | |||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 3 - 300 days after award | 0.00% | $ - | |||
| Table C: Ammunition storage cells for Sequential Environment Testing | Howitzer Projectile - 300 days after award | 0.00% | $ - | |||
| Table C: Ammunition storage cells for Sequential Environment Testing | Howitzer Propellant - 300 days after award | 0.00% | $ - | |||
| Table D: Training System | Qty 2 - 420 days after award - Base | 0.00% | $ - | |||
| Table D: Training System | Qty 2 - 270 days after award - UM | 0.00% | $ - | |||
| Table E: Test Ammunition | Increment 1 HE Projectiles | 0.00% | $ - | |||
| Table E: Test Ammunition | Increment 2 HE Projectiles | 0.00% | $ - | |||
| Table E: Test Ammunition | Increment 3 HE Projectiles | 0.00% | $ - | |||
| Table E: Test Ammunition | Increment 1 Training Projectiles | 0.00% | $ - | |||
| Table E: Test Ammunition | Increment 1 Primers | 0.00% | $ - | |||
| Table E: Test Ammunition | Increment 2 Primers | 0.00% | $ - | |||
| Table E: Test Ammunition | Increment 3 Primers | 0.00% | $ - | |||
| Table E: Test Ammunition | Increment 1 Propelling Charges | 0.00% | $ - | |||
| Table E: Test Ammunition | Increment 2 Propelling Charges | 0.00% | $ - | |||
| Table E: Test Ammunition | Increment 3 Propelling Charges | 0.00% | $ - | |||
| Table F: Service Payment Schedule | Completion of Start of Work Meeting, Deliver Program Integrted Master Schedule (CDRL A019) | 0.00% | $ - | Base | ||
| Table F: Service Payment Schedule | Ammunition Ballistics Data (CDRL A002) | 0.00% | $ - | Option | ||
| Table F: Service Payment Schedule | Complete PMR (8 of 8 available) at $Vendor Fill In each - provide total in column E | 0.00% | $ - | |||
| Table F: Service Payment Schedule | Integration & Technical Support (monthly) | 0.00% | $ - | |||
| Table F - System Engineering | Delivery of Cyber Risk Management Framework Artifacts (CDRL A031), Final Inspection Record - Template (A035) | 0.00% | $ - | |||
| Table F - System Engineering | Delivery of System Overview (A001), Indentured Bill of Materials (CDRL A003) | 0.00% | $ - | |||
| Table F - System Engineering | Armor Suitability Report (CDRL A026) | 0.00% | $ - | |||
| Table F - Fire Control and Network Integration | (a) Completion of Tactical Radio Integration | 0.00% | $ - | |||
| Table F - Fire Control and Network Integration | (b) Completion of Position/Navigation/Timing Device | 0.00% | $ - | |||
| Table F - Fire Control and Network Integration | (c ) Fire Mission Data Processing integration | 0.00% | $ - | |||
| Table F - Fire Control and Network Integration | (d) Completion of Command and Control Applications Integration | 0.00% | $ - | |||
| Table F - Fire Control and Network Integration | (e )Development of Vehicle Fire Control Emulator | 0.00% | $ - | |||
| Table F - Fire Control and Network Integration | (f) Submit Graphical Human Machine Interface | 0.00% | $ - | |||
| Table F - Supply Chain | Delivery of EDFP (CDRL A029) & OMIT Data (CDRL A009) | 0.00% | $ - | |||
| Table F - Supply Chain | Delivery of Availability Assessment (CDRL A032) & Supply Chain Market Checklist (CDRL A034) | 0.00% | $ - | |||
| Table F - Test & Soldier Evaluation | Deliver Critical Crew Drill Report (CDRL A012), Health Hazard Assessment Report (CDRL A013), Safety Assessment Report (CDRL A014) | 0.00% | $ - | |||
| Table F - Test & Soldier Evaluation | US Ammunition Interfaces Report (CDRL A028) | 0.00% | $ - | |||
| Table F - Test & Soldier Evaluation | Deliver System Safety Hazard Analysis Report (CDRL A015), Failure Mode Effects and Critical Analysis (CDRL A023), Transportability Report (CDRL A024) | 0.00% | $ - | |||
| Table F - Test & Soldier Evaluation | Petroleum Oils and Lubricant List (CDRL A025) | 0.00% | $ - | |||
| Table F - Test & Soldier Evaluation | Test Support Services (est. 18 Months) | 0.00% | $ - | |||
| Table F - Test & Soldier Evaluation | MTC Soldier Evaluation Support (est. 12 Months) | 0.00% | $ - | |||
| Table F - Training | Complete 1st Operation and Crew Level training | 0.00% | $ - | |||
| Table F - Training | Complete 2nd Operation and Crew Level training | 0.00% | $ - | |||
| Table F - Training | Complete 3rd Operation and Crew Level training | 0.00% | $ - | |||
| Table F - Training | Complete 4th Operation and Crew Level Training | 0.00% | $ - | |||
| Table F - Training | Completion of 1st Cannon/Breech/Muzzle Brake Assembly training | 0.00% | $ - | |||
| Table F - Training | Completion of 2nd Cannon/Breech/Muzzle Brake Assembly training | 0.00% | $ - | |||
| Table F - Training | Completion of 1st Operator and Field Maintainer training | 0.00% | $ - | Base | ||
| Table F - Training | Completion of 2nd Operator and Field Maintainer training | 0.00% | $ - | Option | ||
| Table F - Training | Completion of 3rd Operator and Field Maintainer training | 0.00% | $ - | |||
| Table F - Training | Complete 1st vehicle familiarization training event | 0.00% | $ - | |||
| Table F - Training | Complete 2nd vehicle familiarization training event | 0.00% | $ - | |||
| Table F - Prototype Production | Deliver Production Capability Plan (CDRL A018) | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 1: Technical Data -Modular System Interfaces | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 2: Technical Data - Lightweight CAD Model | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (a) Fire Control System | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (b) Cannon Assembly | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (c) Human-Machine Interfaces | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (d) Electrical Power Generation, Storage and Distribution System | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (e ) Ammunition Handling System | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (f) Cannon Mount and Reoil System | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (g) Cannon Pointing System | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (h) Wheel and Tire Assembly | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (i) Armor | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (j) Integrated Fire Suppression System | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (k) Climate Control Systems | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (a) Fire Control System | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (b) Human-Machine Interfaces | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (c) Electrical Power Generation, Storage, and Distribution System | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (d) Ammunition Handling System | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (e) Cannon Pointing System | 0.00% | $ - | |||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (f) Climate Control Systems | 0.00% | $ - | |||
| Total Proposed Price | $ - | 0.00% | $ - | $ - | ||