This is a Contract Data Requirements List (CDRL) for the Mobile Tactical Cannon project, comprising 43 separate data items (A001-A043) to be delivered by the contractor throughout the contract lifecycle.
The CDRL establishes mandatory deliverables across design, engineering, production, safety, logistics, and compliance domains. Key technical deliverables include: Design Review Information Package (system architecture, subsystems, MBSE tools, modular design approaches); Technical Data Packages (CAD models, TDP documentation); Ammunition Ballistics Data and US Ammunition Interfaces Report; Bill of Materials (indentured and as-built configurations); Product Engineering Design Data; Software Bill of Materials and Software Development Plan; and Lightweight CAD models. Safety and analysis deliverables include Health Hazard Assessment Report, Safety Assessment Report, System Safety Hazard Analysis Report, Failure Modes Effects and Criticality Analysis, Critical Task Analysis Report, and related hazard documentation. Production and logistics deliverables include Production Capability Plan (biweekly status), Logistics Product Data (OMIT), Petroleum/Oils/Lubricants List, Transportability Report, Armor Suitability Report, Power and Mobility Capabilities Report, Engineering Data for Provisioning, Gun Card Records, and Final Inspection Records. Administrative deliverables include Integrated Master Schedule (MS Project format), Field Service Representative Weekly Reports, Contract Field Service Reports, Interface Control Documents, Request for Variance Supporting Data, and Configuration Change Design Reviews. Compliance deliverables include DMSMS Life Cycle Management Data, Cybersecurity Supply Chain Risk Management SBOM, DoD Risk Management Framework artifacts, Cyber RMF packages, OPSEC Awareness Training certification, Antiterrorism Level 1 Training certification, OPSEC Plan, TEMPEST Assessment Report, Systems Security Plan, and Tier 1 Level Suppliers records. Submission dates range from 14 days after contract award through 180 days for various deliverables, with many items required on one-time or as-required bases, while others demand monthly or quarterly updates. All deliverables require marking per DoDI 5200.48 and 5230.24 security classification guidelines.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Design Review Information Package (DRIP)
3. SUBTITLE
System Design Review
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81757A (T)
5. CONTRACT REFERENCE
4.6.2.1
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
NO
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
90 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
90 DAC
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
Block 4: Authority: DI-SESS-81757A is tailored (T) as follows:
1. Format: The information package shall be provided as a presentation in Microsoft PowerPoint or Adobe PDF (searchable), in the English language. The report and attachments shall not be password protected.
2. Contents: Sections 1-12 do not need to be addressed as formatted and are provided as reference. The contactor shall address directly the following contents:
System Design Review A. Introduction - System Summary B. Description of System Architecture
1. Overview of system specifications as they relate to Attachment 015 Key Characteristics Description
2. Trace Primary System Functions to Subsystems (i.e. cannon system, powerpack, fire control system)
3. Configuration Changes from legacy design for systems delivered on this contract
4. Modular Open System Approach – (Reference MOSA Implementation Guidebook –
FEB 2025)
i. Identify system and subsystem designs which employ a modular and open approach
ii. Identify system and subsystem designs which may offer and opportunity for future implementation of a modular and open system approach
5. Digital Engineering/Model Based Systems Engineering
i. What Requirements Management tool is being used – if any
ii. What MBSE Tool is being used to support system design and maturation – if any
iii. Is a working system model available for review?
C. System Capabilities:
1. Mobility
2. Primary Armament System and Ammunition Handling
i. Ammunition Compatibility
ii. Ammunition Capacity (Projectiles/Propellant/Fuses)
iii. Fuse Setting Technology
iv. Ammunition Effective Range(s)
3. Secondary Weapon Systems
i. Systems already integrated
ii. Control Options (remote, direct, etc.)
iii. Inclusion with proposed howitzer system
iv. Designed integration provisions with proposed howitzer system
4. Communications
i. Internal
ii. External
5. System Sustainment
i. Petroleum, Oils, and Lubricants (POLs) for Operation and Maintenance (General
Overview)
ii. Nuclear, Biological, Chemical (Operation and Decontamination)
iii. Environmental (Operation in Hot, Basic, and Cold Environments – Reference AR 70-
38)
iv. Fault Detection and Management
v. Prognostic and Predictive Maintenance
(Continued on next page)
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 48 Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP
Distribution Statement A. Approved for public release: distribution is unlimited.
PEO GCS OPSEC# OPSEC-2026-275
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___ TM ___ OTHER _X_
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A001 (cont’d)
2. TITLE OF DATA ITEM
Design Review Information Package (DRIP)
3. SUBTITLE
System Design Review
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81757A (T)
5. CONTRACT REFERENCE
4.6.2.1
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
NO
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
90 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
90 DAC
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
(Continued from previous page)
6. Survivability and Force Protection
i. Crew Protection
ii. Ammunition Protection
iii. Compartmentalization (separation of crew and ammunition)
iv. Fire Suppression Systems
D. Growth Characteristics – Size, Weight, Power, and Cost impacts to common system enhancements
1. Increased Primary Weapon System Range/Lethality
2. Increased Mobility/Range
3. Increased System Survivability/Force Protection
4. Growth Margins/Limitations with respect to Key Characteristics Description
E. Integration Plan – Discussion Point (Preliminary Designs not Required)
1. US Army Fire Control
2. US Army Ammunition
F. Validation/Verification History
1. System Performance – Mobility/Reliability
2. Test Reports – Summary of Previous System Validation/Verification efforts
G. Test Support
1. FSR Support Plan 2.Ammunition Provision Plan (Foreign Ammunition only)
H. Safety
1. Hazard summary
2. Human Factors Assessments
i. 5th to 95th percentile soldier interaction with key Human – Machine Interfaces
ii. Primary system controls operable with gloved hands
iii. Handholds at climbing points and non-skid material on flat walking surfaces
iv. Emergency egress solutions
I. Cyber
1. Anti-Tamper (physical and radio) Strategy
2. Supply chain risk management (traceability of microelectronic and precious material sources) J. Logistics Support Aspects
1. OEM output for delivering Logistics Product Data (LPD)
2. What life cycle logistics software is used to develop logistics product reports
Block 8: Contractor Shall Submit a draft read-ahead 7 business days ahead of the final submission. The Government will provide comments within 5 business days.
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
PEO GCS CDRL Application 1 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 48 Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Technical Report–Study/Services
3. SUBTITLE
Ammunition Ballistics Data
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B(T)
5. CONTRACT REFERENCE
4.6.3.8
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
LT
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
SEMI A
12. DATE OF 1ST SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Block 4 tailored as follows:
Content shall be provided in contractor format.
The report must include, at a minimum, the information outline below:
- Provide a complete listing of each 155mm artillery shell, fuze, and propellant supported and tested for the platform.
- Provide a complete ammunition combination compatibility list (shell, fuze, propellant)
- Provide a complete list of expected muzzle velocities and Equivalent Full Charge (EFCs) for ammunition combinations and charges.
- Provide a complete listing of the ballistic fire control input data for the platform as agreed to in NATO STANAG 4144 and AOP-65.
- Provide ballistic tests report documenting measured ballistic. Reference DI-MISC-80246 for typical content.
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 3 of 48 Pages
17. PRICE
GROUP
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _X_ TM __ OTHER __
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Diminishing Manufacturing Sources and Material Shortages (DMSMS) Life Cycle Management Data
3. SUBTITLE
Indentured Bill of Material (IBOM)
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-82274(T)
5. CONTRACT REFERENCE
4.6.2.8.5, 4.6.2.8.6, 4.6.6.1
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
LT
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
MTHLY
12. DATE OF 1ST SUBMISSION
60 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
Block 4 Authority: Contractor shall deliver Data Item Description (DID) In Accordance With (IAW) DI-MGMT-82274, the following Data Element Numbers listed in Table 1 shall be excluded from the delivery:
Data Element Number 14 Data Element Number 16 Data Element Number 23 Data Element Number 31 Data Element Number 39 Data Element Number 47 Data Element Number 48 Data Element Number 49
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 4 of 48 Pages
17. PRICE
GROUP
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _X_ TM __ OTHER __
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
As Built Configuration List– Common (ABCL-C)
3. SUBTITLE
ABCL-C Bill of Materials
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81830(T)
5. CONTRACT REFERENCE
3.1, 4.9.1
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
LT
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
ASREQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
Block 4 Authority: Contractor shall deliver Data Item Description (DID) In Accordance With (IAW) DI-SESS-81830, the following Column Numbers listed in Table 1 shall be excluded from the delivery:
Column Number 10 Column Number 11 Column Number 18
This CDRL shall be delivered to the United States Government with every vehicle delivered.
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 5 of 48 Pages
17. PRICE
GROUP
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _X_ TM __ OTHER __
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Product Engineering Design Data and Associated Lists
3. SUBTITLE
Product Level Technical Data Package (TDP)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81000F(T)
5. CONTRACT REFERENCE
4.8.3
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
LT
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
2026Jul01
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
Block 4 Authority: Contractor shall deliver Data Item Description (DID) In Accordance With (IAW) DI-SESS-81000F and Attachment 011 Titled “TDP OPTION WORKSHEET TDP PPA Par 11.1.2”.
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 6 of 48 Pages
17. PRICE
GROUP
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _X_ TM __ OTHER __
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Cybersecurity Supply Chain Risk Management (C-SCRM) Software Bill of Material (SBOM) Requirements
3. SUBTITLE
Software Bill of Materials
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-82433
5. CONTRACT REFERENCE
4.6.4.1
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
NO
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
R/ASR
12. DATE OF 1ST SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft Final
Reg Repro
16. REMARKS
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 7 of 48 Pages
17. PRICE
GROUP
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Software Product Specification
3. SUBTITLE
Software Source Code for Targeted Subsystems
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81441A
5. CONTRACT REFERENCE
4.8.4
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
NO
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
180 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 8 of 48 Pages
17. PRICE
GROUP
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Software Development Plan (SDP)
3. SUBTITLE
Software Development Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81427B
5. CONTRACT REFERENCE
4.6.3.1
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
NO
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
R/ASR
12. DATE OF 1ST SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft Final
Reg Repro
16. REMARKS
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 9 of 48 Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP __ TM __ OTHER X__
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Logistics Product Data
3. SUBTITLE
Operation, Maintenance, Installation, Training (OMIT) Data
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81758A
5. CONTRACT REFERENCE
4.7.2
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
LT
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
MTHLY
12. DATE OF 1ST SUBMISSION
60 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
N/A Draft
Final
Reg Repro
16. REMARKS
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 10 of 48 Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _X_ TM __ OTHER __
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Technical Data Package (TDP)
3. SUBTITLE
Lightweight Computer-aided Design (CAD) Model
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80776B(T)
5. CONTRACT REFERENCE
4.8.2
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
LT
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
2026Jul01
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
Block 4 Authority: Contractor shall deliver Data Item Description (DID) In Accordance With (IAW) DI-SESS-80776B, the following sections shall be excluded from delivery:
3.a.
3.b.
3.c.(1) 3.c.(2) 3.c.(4) 3.c.(6) 3.c.(7) 3.c.(9)-(17) 3.d-j.
Attachment 010 Titled “TDP OPTION WORKSHEET CAD” shall be used to describe the type and format of data delivered
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
Block 10 Frequency: One (1) delivery of this CDRL is required 30 calendar days after contract award.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 11 of 48 Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP __ TM __ OTHER X__
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Contract Field Service Report
3. SUBTITLE
FSR Weekly Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81238A(T)
5. CONTRACT REFERENCE
4.9.7, 4.10.5
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
LT
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
WEKLY
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
O
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft Final
Reg Repro
16. REMARKS
Block 4 Authority: The Contractor shall submit a report of all Field Service Representative (FSR) activity in their own format containing the information required in 3 through 3.15.6.5.
The contractor may add but shall not change or delete data and information submitted by the FSR.
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
Block 12: The Contractor shall submit the first weekly reports within 1 business day of the first full week after arrival at the CONUS or OCONUS location.
Block 13: The FSR shall submit subsequent a weekly summary of their activity within 1 business day of the last business day of the activity report week. The Contractor report shall include damaged or non-repairable equipment. The Contractor shall, for situations that may lead to or resulted in serious injury or loss of life, notify the Government by most expeditious means, and submit a follow-up report within 24 hours.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 12 of 48 Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Critical Task Analysis Report
3. SUBTITLE
Critical Crew Drill Report
4. AUTHORITY (Data Acquisition Document No.)
DI-HFAC-81399B(T)
5. CONTRACT REFERENCE
4.9.10.2
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
LT
9. DIST
STATEMENT
See Block 16
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
2026JUN01
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
Block 4 authority: Tailor DID as follows:
Format: must be PDF Content:
1. Paragraph 3.b For this CDRL, the only tasks required are those associated with:
a. Emplacement
b. First Round Response
c. Displacement
d. Rate of Fire
e. Ammunition Rearm (Resupply of howitzer)
2. The contractor shall specify what the current U.S equivalent Military Occupational Specialty (MOS) is required for each crew member.
3. The Critical Crew Drill Report shall be developed using the notional U.S equivalent MOS for each crew member.
4. The Critical Crew Drill Report shall provide basic dimensions, locations, and human factors requirements (e.g. hand wheel torques) for each of the crew member interfaces.
The contractor may use the Human Engineering Design Approach Document - Operator (HEDAD-O) (DI-HFAC-80746C) as guidance.
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 13 of 48 Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Health Hazard Assessment Report (HHAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80106C(T)
5. CONTRACT REFERENCE
4.6.2.13, 4.9.10.3
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
LT
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
R/ASR
12. DATE OF 1ST SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION Draft
Final
Reg Repro
16. REMARKS
Block 4 Authority: The contractor shall prepare the HHAR in accordance with the DI-SAF -80106C with the following tailored remarks:
• DI-SAFT-80106C Section 4.B shall include up-to-date Safety Data Sheets (SDSs) for all materials used by the system
• DI-SAFT-80106C Section 4.B shall include Noise and Blast Overpressure (BOP) measurements for each of the firing configurations under the following criteria:
- Steady-State Noise data/assessments in accordance with MIL-STD-1474D, Requirement 1.
- Blast Over Pressure and Impulse Noise data/assessments in accordance with MIL-STD- 1474D, Requirement 4.
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
Block 10: The HHAR deliverable will be needed for each test/TiC event and updated to reflect test/TiC specific operations.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 14 of 48 Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Safety Assessment Report (SAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80102D(T)
5. CONTRACT REFERENCE
4.9.10.4
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
LT
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
R/ASR
12. DATE OF 1ST SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
Draft Final
Reg Repro
16. REMARKS
Block 4 Authority: The contractor shall prepare the HHAR in accordance with the DI-SAF -80106C with the following tailored remarks:
• DI-SAFT-80102D Section 5.b shall include up-to-date Safety Data Sheets (SDSs) for all materials used by the system
• DI-SAFT-80102D Section 5.b shall include the applicable Interim Hazard Classifications (IHCs) or Final Hazard Classifications (FHCs) for all Ammunition and Explosive (A&E) items/material used in the system.
o Note: an IHC is required at a minimum, for all A&E provided by the contractor
• DI-SAFT-80102D Section 4 shall include the following additional information:
- A discussion of analyses and tests performed to address software safety risks and Level of Rigor (LoR).
- A summary of Safety-Related (SR), Safety- Critical (SC), and Non-Safety-Significant (NSS) functions identified.
- A summary of Software Criticality Index (SwCI) functional allocations. (i.e. how many functions were SwCI 1, 2, 3, etc.)
- A statement of whether LoR tasks are complete, in progress, or unspecified at the time of the report.
• DI-SAFT-80102D Section 5.b shall include the following information on any system or subsystem that emitts radio frequency (RF) radiation
- RF emitter power output in Watts (W)
- RF emitter antenna gain in isentropic decibels (dBi)
- RF emitter frequencies
Additionally, the contractor shall outline in a safety summary the safety activities conducted on the cannon assembly to be utilized in the proposed howitzer. The safety summary shall include:
a. The safety tests conducted on the cannon (reference appropriate military standards, international test operating procedures [ITOPs], or North Atlantic Treaty Organization Standardization Agreement/Allied Ordnance Publications STANAG/AOP])
b. The ammunition utilized in the safety tests.
c. Provide an engineering report for Safe Service Life testing and/or analysis of the cannon to include the tube, breech, and muzzle brake.
d. Provide an engineering report for wear testing of the cannon tube.
e. Provide an engineering report for reliability of the armament system.
f. The permissible maximum pressure (PMP), the cannon design pressure (CDP), and the proof pressure (PP).
g. Evidence that the cannon has been proofed.
h. The design of the charge used to proof the cannon
i. Provide the maximum rate of fire to include charge and ammunition suite, include the number of rounds that can be fired at this rate.
j. Provide the sustained rate of fire to include charge and ammunition suite
k. Describe the thermal limits for propellant cookoff and for projectile exudation.
l. Describe any automated armament monitoring to include recoil, thermal temperature, and ammunition handling.
(Continued on next page)
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL ---------
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 15 of 48 Pages
17. PRICE
GROUP
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___ TM ___ OTHER _X_
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A014 (cont’d)
2. TITLE OF DATA ITEM
Safety Assessment Report (SAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80102D(T)
5. CONTRACT REFERENCE
4.9.10.4
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
LT
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
R/ASR
12. DATE OF 1ST SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
Draft Final
Reg Repro
16. REMARKS
(Continued from previous page)
m. Describe the impulse and margin that the gun mount and recoil are designed to and what were the design requirements. ((Needed for US developmental ammunition))
n. All cannon condemnation limits and serviceability criteria required for safety inspections.
o. Provide pressure-time curves for interior ballistic environment for relevant charge levels, MIL-STD hot and cold in addition to ambient for each charge zone.
p. Ram velocity profile – velocity-time curve or similar to indicate expected environment imparted on the projectile (including seating event)
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
Block 10/13: Frequency of Delivery Note - The SAR deliverable will be needed for each test/TiC event, and updated to reflect test/TiC specific operations.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 16 of 48 Pages
17. PRICE
GROUP
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
System Safety Hazard Analysis Report (SSHAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80101D(T)
5. CONTRACT REFERENCE
4.9.10.5
6. REQUIRING OFFICE
SFAE-GCS-HM
7. DD 250 REQ
LT
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
90 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
Block 4 Authority: The contractor shall prepare the SSHAR in accordance with the DI-SAFT- 80101D with the following tailored remarks:• DI-SAFT-80101D Section 3 shall include the following additional information:
- A discussion of analyses and tests performed to address software safety risks and Level of Rigor (LoR).
- A summary of Safety-Related (SR), Safety- Critical (SC), and Non-Safety-Significant (NSS) functions identified.
- A summary of Software Criticality Index (SwCI) functional allocations. (i.e. how many functions were SwCI 1, 2, 3, etc.)
- A statement of whether LoR tasks are complete, in progress, or unspecified at the time of the report.
- Identification of safety significant Computer Software Configuration Items (CSCIs), Computer Software Units (CSUs), and Computer Software Components (CSCs).
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
Block 10: The SSHAR deliverable will be needed once, and will be test/TiC agnostic. This report will encompass all safety information for the system.
PEO GCS CDRL Application 1 https://gcscdrl.army.mil/ext
15. TOTAL --------- 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 17 of 48 Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
Failure Analysis Corrective Action Report (FACAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81315B
5. CONTRACT REFERENCE
4.9.11.2, 4.10.6
6. REQUIRING OFFICE
SFAE-GCS-HT
7. DD 250 REQ
NO
9. DIST
STATEMENT
D, See Block
10. FREQUENCY
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
O
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
Draft Final
Reg Repro
16. REMARKS
Block 4 Format: USG requires contractor response digitally and in the English language.
Contractor format is acceptable.
Each Failure Analysis Corrective Action Report (FACAR) shall have a comprehensive analysis of the test incident, the mode of failure, root cause of failure and documentation of the corrective action proposed.
DI-SESS-81315B items C, F, G, H, K, L, T, V and X(2) are not required.
Each FACAR shall also include the following:
Test Title Test Project Number Vehicle/Platform Vehicle Serial Number Test Incident Report (TIR) Number (s) Incident Class Incident Summary Immediate Corrective Action (e.g. what was done to allow testing to continue) Root Cause Corrective Action
Block 9: Mark in accordance with DoDI 5200.48 and DoDI 5230.24, as clarified by the latest PM Howitzer Systems Security Classification Guide.
Blocks 10-13: FACARs shall be provided within the following time frames:
Critical- Interim electronic response within 48 hours of Government TIR notification date and final electronic response within five (5) calendar days after Government TIR notification date.
Major- Final electronic response within thirty (30) calendar days after Government TIR notification date.
Minor- Contractor shall respond to all minor TIRs that have a repetitive or pattern failure mode that impacts operation, as determined by the Government. Individual, one-time minor TIRs, shall be handled on a case-by-case basis. Electronic responses shall be due within thirty (30) calendar days of Government notification date for the final minor TIR for which a pattern has been established.
If the Contractor's FACAR is rejected, the Government will notify the Contractor. The Contractor shall be required to resubmit a response within thirty (30) calendar days of that notification
Block 14: Total Enterprise Asset Management System (TEAMS) https://teams.army.mil/
See Block 16 1 1
15. TOTAL --------- 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 18 of 48 Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP __ TM X__ OTHER __
D. SYSTEM/ITEM
Mobile Tactical Cannon
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A017
2. TITLE OF DATA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .