Appendix E - Milestone Pricing Summary.xlsx
XLSX spreadsheet 52 KB Posted
- Solicitation number
- W912CH26RA017
- Issued by
-
Department of the Army
About this file
This is a Milestone Pricing Summary template for the Mobile Tactical Cannon (MTC) Request for Prototype Proposal (RPP W912CH-26-R-A017), issued by Army Contracting Command - Detroit Arsenal. The document is a blank pricing worksheet designed to capture milestone-based pricing for prototype deliverables across multiple work breakdown structure (WBS) elements. The template includes fields for milestone number, description, SOW reference, proposed milestone price, percentage of total proposed price, due date, contract type (Base or Option), cost share amounts, and USG share amounts. The template is structured across multiple tabs to accommodate up to 75+ milestones organized by delivery category.
The document outlines pricing for key deliverable categories including: Table A (Prototype MTC system deliveries in multiple quantities at various completion dates from 60 to 450 days after award); Table B (Cannon/Breech Assemblies for Proof Gun Stand at 120, 150, and 300 days); Table C (Ammunition storage cells for Sequential Environment Testing); Table D (Training Systems); Table E (Test Ammunition components including HE projectiles, training projectiles, primers, and propelling charges across three increments); Table F (Service Payment Schedule items including program management, system engineering, fire control and network integration, supply chain documentation, test and soldier evaluation support, training completion milestones, production capability planning, and optional technical data and software packages). The template is currently unpopulated with actual pricing data and contains error indicators, indicating it awaits contractor input for a fixed-price Other Transaction Authority (OTA) Agreement.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover
| Appendix E |
| Milestone Pricing Summary |
| RPP No. W912CH-26-R-A017 |
| Revision Number: 001 |
| Date: 19 Feb 2026 |
DISTRIBUTION STATEMENT A: Approved for Public Release; distribution is unlimited. PEO GSC OPSEC# OPSEC-2026-275
Instructions
Please see the instructions at the top of each tab in this workbook.
Approved For Public Release
Summary 4. Milestone Schedule
Summary 4. Milestone Schedule
Form Instructions: No Input Required. Sheet is linked to Tab 4. Milestone Schedule - File 1, 2, 3, and 4.
Milestone Number
| (WBS) | Milestone |
| Description | SOW |
| Reference | Proposed |
| Milestone Price | Percent of |
Total Proposed
| Price | Due Date | Contract | ||||||||||
| Type | Cost | |||||||||||
| Share ($) | USG | |||||||||||
| Share ($) | Identify if Milestome is Base or Option | |||||||||||
| Table A: Prototype MTC system delivery | Qty 1 - 60 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | Base | ||
| Table A: Prototype MTC system delivery | Qty 2 - 360 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | Option | ||
| Table A: Prototype MTC system delivery | Qty 2 - 390 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table A: Prototype MTC system delivery | Qty 1 - 420 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 1 - 120 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 1 - 150 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 3 - 300 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table C: Ammunition storage cells for Sequential Environment Testing | Howitzer Projectile - 300 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table C: Ammunition storage cells for Sequential Environment Testing | Howitzer Projectile - 300 days after award | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table D: Training System | Qty 2 - 420 days after award - Base | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table D: Training System | Qty 2 - 270 days after award - UM | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 1 HE Projectiles | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 2 HE Projectiles | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 3 HE Projectiles | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 1 Training Projectiles | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 1 Primers | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 2 Primers | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 3 Primers | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 1 Propelling Charges | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 2 Propelling Charges | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table E: Test Ammunition | Increment 3 Propelling Charges | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F: Service Payment Schedule | Completion of Start of Work Meeting, Deliver Program Integrted Master Schedule (CDRL A019) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | Base | ||
| Table F: Service Payment Schedule | Ammunition Ballistics Data (CDRL A002) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | Option | ||
| Table F: Service Payment Schedule | Complete PMR (0 of 8 available) at $ each - provide total in column E and add each pricing in column C after first $ | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F: Service Payment Schedule | Integration & Technical Support (monthly) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - System Engineering | Delivery of Cyber Risk Management Framework Artifacts (CDRL A031) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - System Engineering | Delivery of System Overview (A001), Final Inspection Record - Template (A035), Indentured Bill of Materials (CDRL A003), Armor Suitability Report (CDRL A026) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Fire Control and Network Integration | (a) Completion of Tactical Radio Integration | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Fire Control and Network Integration | (b) Completion of Position/Navigation/Timing Device | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Fire Control and Network Integration | (c ) Fire Mission Data Processing integration | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Fire Control and Network Integration | (d) Completion of Command and Control Applications Integration | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Fire Control and Network Integration | (e )Development of Vehicle Fire Control Emulator | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Fire Control and Network Integration | (f) Submit Graphical Human Machine Interface | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Supply Chain | Delivery of EDFP & OMIT Data (CDRL A009) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Supply Chain | Delivery of Availability Assessment (CDRL A032) & Supply Chain Market Checklist (CDRL A034) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Test & Soldier Evaluation | Deliver Critical Crew Drill Report (CDRL A012), Health Hazard Assessment Report (CDRL A013), Safety Assessment Report (CDRL A014) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Test & Soldier Evaluation | US Ammunition Interfaces Report (CDRL A028) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Test & Soldier Evaluation | Deliver System Safety Hazard Analysis Report (CDRL A015), Failure Mode Effects and Critical Analysis (CDRL A023), Transportability Report (CDRL A024), Petroleum Oils and Lubricant List (CDRL A025) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Test & Soldier Evaluation | Test Support Services (est. 18 Months) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Test & Soldier Evaluation | MTC Soldier Evaluation Support (est. 12 Months) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Complete 1st Operation and Crew Level training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Complete 2nd Operation and Crew Level training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Complete 3rd Operation and Crew Level training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Complete 4th Operation and Crew Level Training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Completion of 1st Cannon/Breech/Muzzle Brake Assembly training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Completion of 2nd Cannon/Breech/Muzzle Brake Assembly training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Completion of 1st Operator and Field Maintainer training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | Base | ||
| Table F - Training | Completion of 2nd Operator and Field Maintainer training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | Option | ||
| Table F - Training | Completion of 3rd Operator and Field Maintainer training | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Complete 1st vehicle familiarization training event | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Training | Complete 2nd vehicle familiarization training event | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Prototype Production | Deliver Production Capability Plan (CDRL A018) | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 1: Technical Data -Modular System Interfaces | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 2: Technical Data - Lightweight CAD Model | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (a) Fire Control System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (b) Cannon Assembly | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (c) Human-Machine Interfaces | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (d) Electrical Power Generation, Storage and Distribution System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (e ) Ammunition Handling System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (f) Canon Mount and Reoil System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (g) Cannon Pointing System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (h) Wheel and Tire Assembly | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (i) Armor | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (j) Integrated Fire Suppression System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (k) Climate Control Systems | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (a) Fire Control System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (b) Human-Machine Interfaces | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (c) Electrical Power Generation, Storage, and Distribution System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (d) Ammunition Handling System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (e) Cannon Pointing System | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (f) Climate Control Systems | 0 | $ - | ERROR:#DIV/0! | 0 | 0 | $ - | $ - | 0 | |||
| Total Proposed Price | $ - | ERROR:#DIV/0! | $ - | $ - | ||||||||
| check | check |
Approved For Public Release
4. Milestone Schedule-File 1
Milestone Schedule
Form Instructions: Insert the required information in the blue highlighted cells. Copied from Tab 4. Milestone Schedule from the individual Milestone Pricing Excel file proposal spreadsheet for Milestones 1 -25, as needed.
Milestone Number
| (WBS) | Milestone |
| Description | SOW |
| Reference | Proposed |
| Milestone Price | Percent of |
Total Proposed
| Price | Due Date | Contract | |||||||
| Type | Cost | ||||||||
| Share ($) | USG | ||||||||
| Share ($) | Identify if Milestome is Base or Option | ||||||||
| Table A: Prototype MTC system delivery | Qty 1 - 60 days after award | $ - | 0.00% | $ - | $ - | Base | |||
| Table A: Prototype MTC system delivery | Qty 2 - 360 days after award | $ - | 0.00% | $ - | $ - | Option | |||
| Table A: Prototype MTC system delivery | Qty 2 - 390 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table A: Prototype MTC system delivery | Qty 1 - 420 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table A: Prototype MTC system delivery | Qty 3 - 450 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 1 - 120 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 1 - 150 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS) | Qty 3 - 300 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table C: Ammunition storage cells for Sequential Environment Testing | Howitzer Projectile - 300 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table C: Ammunition storage cells for Sequential Environment Testing | Howitzer Projectile - 300 days after award | $ - | 0.00% | $ - | $ - | ||||
| Table D: Training System | Qty 2 - 420 days after award - Base | $ - | 0.00% | $ - | $ - | ||||
| Table D: Training System | Qty 2 - 270 days after award - UM | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 1 HE Projectiles | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 2 HE Projectiles | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 3 HE Projectiles | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 1 Training Projectiles | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 1 Primers | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 2 Primers | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 3 Primers | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 1 Propelling Charges | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 2 Propelling Charges | $ - | 0.00% | $ - | $ - | ||||
| Table E: Test Ammunition | Increment 3 Propelling Charges | $ - | 0.00% | $ - | $ - | ||||
| Total Proposed Price | $ - | 0.00% | $ - | $ - | |||||
| check | check |
Approved For Public Release
4. Milestone Schedule-File 2
Milestone Schedule
Form Instructions: Insert the required information in the blue highlighted cells. Copied from Tab 4. Milestone Schedule from the individual Milestone Pricing Excel file proposal spreadsheet for Milestones 26 -50, as needed.
Milestone Number
| (WBS) | Milestone |
| Description | SOW |
| Reference | Proposed |
| Milestone Price | Percent of |
Total Proposed
| Price | Due Date | Contract | |||||||
| Type | Cost | ||||||||
| Share ($) | USG | ||||||||
| Share ($) | Identify if Milestome is Base or Option | ||||||||
| Table F: Service Payment Schedule | Completion of Start of Work Meeting, Deliver Program Integrted Master Schedule (CDRL A019) | $ - | 0.00% | $ - | $ - | Base | |||
| Table F: Service Payment Schedule | Ammunition Ballistics Data (CDRL A002) | $ - | 0.00% | $ - | $ - | Option | |||
| Table F: Service Payment Schedule | Complete PMR (0 of 8 available) at $ each - provide total in column E and add each pricing in column C after first $ | $ - | 0.00% | $ - | $ - | ||||
| Table F: Service Payment Schedule | Integration & Technical Support (monthly) | $ - | 0.00% | $ - | $ - | ||||
| Table F - System Engineering | Delivery of Cyber Risk Management Framework Artifacts (CDRL A031) | $ - | 0.00% | $ - | $ - | ||||
| Table F - System Engineering | Delivery of System Overview (A001), Final Inspection Record - Template (A035), Indentured Bill of Materials (CDRL A003), Armor Suitability Report (CDRL A026) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Fire Control and Network Integration | (a) Completion of Tactical Radio Integration | $ - | 0.00% | $ - | $ - | ||||
| Table F - Fire Control and Network Integration | (b) Completion of Position/Navigation/Timing Device | $ - | 0.00% | $ - | $ - | ||||
| Table F - Fire Control and Network Integration | (c ) Fire Mission Data Processing integration | $ - | 0.00% | $ - | $ - | ||||
| Table F - Fire Control and Network Integration | (d) Completion of Command and Control Applications Integration | $ - | 0.00% | $ - | $ - | ||||
| Table F - Fire Control and Network Integration | (e )Development of Vehicle Fire Control Emulator | $ - | 0.00% | $ - | $ - | ||||
| Table F - Fire Control and Network Integration | (f) Submit Graphical Human Machine Interface | $ - | 0.00% | $ - | $ - | ||||
| Table F - Supply Chain | Delivery of EDFP & OMIT Data (CDRL A009) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Supply Chain | Delivery of Availability Assessment (CDRL A032) & Supply Chain Market Checklist (CDRL A034) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Test & Soldier Evaluation | Deliver Critical Crew Drill Report (CDRL A012), Health Hazard Assessment Report (CDRL A013), Safety Assessment Report (CDRL A014) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Test & Soldier Evaluation | US Ammunition Interfaces Report (CDRL A028) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Test & Soldier Evaluation | Deliver System Safety Hazard Analysis Report (CDRL A015), Failure Mode Effects and Critical Analysis (CDRL A023), Transportability Report (CDRL A024), Petroleum Oils and Lubricant List (CDRL A025) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Test & Soldier Evaluation | Test Support Services (est. 18 Months) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Test & Soldier Evaluation | MTC Soldier Evaluation Support (est. 12 Months) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Complete 1st Operation and Crew Level training | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Complete 2nd Operation and Crew Level training | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Complete 3rd Operation and Crew Level training | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Complete 4th Operation and Crew Level Training | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Completion of 1st Cannon/Breech/Muzzle Brake Assembly training | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Completion of 2nd Cannon/Breech/Muzzle Brake Assembly training | $ - | 0.00% | $ - | $ - | ||||
| Total Proposed Price | $ - | 0.00% | $ - | $ - | |||||
| check | check |
Approved For Public Release
4. Milestone Schedule-File 3
Milestone Schedule
Form Instructions: Insert the required information in the blue highlighted cells. Copied from Tab 4. Milestone Schedule from the individual Milestone Pricing Excel file proposal spreadsheet for Milestones 51 -75, as needed.
Milestone Number
| (WBS) | Milestone |
| Description | SOW |
| Reference | Proposed |
| Milestone Price | Percent of |
Total Proposed
| Price | Due Date | Contract | |||||||
| Type | Cost | ||||||||
| Share ($) | USG | ||||||||
| Share ($) | Identify if Milestome is Base or Option | ||||||||
| Table F - Training | Completion of 1st Operator and Field Maintainer training | $ - | 0.00% | $ - | $ - | Base | |||
| Table F - Training | Completion of 2nd Operator and Field Maintainer training | $ - | 0.00% | $ - | $ - | Option | |||
| Table F - Training | Completion of 3rd Operator and Field Maintainer training | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Complete 1st vehicle familiarization training event | $ - | 0.00% | $ - | $ - | ||||
| Table F - Training | Complete 2nd vehicle familiarization training event | $ - | 0.00% | $ - | $ - | ||||
| Table F - Prototype Production | Deliver Production Capability Plan (CDRL A018) | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 1: Technical Data -Modular System Interfaces | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 2: Technical Data - Lightweight CAD Model | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (a) Fire Control System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (b) Cannon Assembly | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (c) Human-Machine Interfaces | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (d) Electrical Power Generation, Storage and Distribution System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (e ) Ammunition Handling System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (f) Canon Mount and Reoil System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (g) Cannon Pointing System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (h) Wheel and Tire Assembly | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (i) Armor | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (j) Integrated Fire Suppression System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 3: Technical Data - Targeted Subsystems - (k) Climate Control Systems | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (a) Fire Control System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (b) Human-Machine Interfaces | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (c) Electrical Power Generation, Storage, and Distribution System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (d) Ammunition Handling System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (e) Cannon Pointing System | $ - | 0.00% | $ - | $ - | ||||
| Table F - Options (Unfunded Milestones) | Option 4: Computer Software Package - Targeted Subsystems - (f) Climate Control Systems | $ - | 0.00% | $ - | $ - | ||||
| Total Proposed Price | $ - | 0.00% | $ - | $ - | |||||
| check | check |