Attachment 003 - Supply Chain Market Checklist.pptx

PPTX presentation 63 KB Posted

Attached to
Mobile Tactical Cannon (MTC) Request for Prototype Proposal
Solicitation number
W912CH26RA017
Issued by

About this file

This is a supply chain market checklist presentation that documents parts commonality analysis for military vehicle systems in support of the Mobile Tactical Cannon (MTC) program. The checklist evaluates provisioned parts, procurable parts, and parts assigned National Stock Numbers (NSNs) across vehicle variants such as Stryker, JLTV, and PLS platforms. The analysis measures the percentage of common parts shared between the MTC system and existing U.S. military platforms, with example data showing commonality rates ranging from 20.0% to 40.1% across variants. Additionally, the document assesses the use of Commercial Off-The-Shelf (COTS) components, which in the example represents 21.7% of COTS inventory.

The checklist requires contractors and program managers to identify current integration levels of U.S. and NATO NSN assignments within the supply system, determine total NSNs assigned to integrated vehicle stock supply systems for both U.S. and NATO inventories, and document the percentage utilization of COTS parts for the vehicle system. This market check vehicle analysis supports the PdM MTC-M (Product Manager Mobile Tactical Cannon - Mounted) acquisition strategy by establishing baseline supply chain data and demonstrating interoperability with existing military logistics infrastructure. The document is marked Distribution Statement A, indicating it is approved for public release with unlimited distribution.

View the file

Other files

File Type Posted
MTC OTA Prototype Project Agreement AMD 02.docx DOCX document
MTC OTA Request for Prototype Proposal AMD 03.docx DOCX document
MTC RPP Questions and Responses (Dist A) revC.xlsx XLSX spreadsheet
Appendix E - Milestone Pricing Summary_20 APR 2026.xlsx XLSX spreadsheet
MTC OTA Request for Prototype Proposal AMD 02.docx DOCX document
MTC OTA Prototype Project Agreement AMD 02.docx DOCX document
MTC RPP Questions and Responses (Dist A) revB.xlsx XLSX spreadsheet
Appendix E - Milestone Pricing Summary_02 APR 2026.xlsx XLSX spreadsheet
Appendix E - Milestone Pricing Summary 31_MAR 2026.xlsx XLSX spreadsheet
MTC OTA Prototype Project Agreement AMD 01.docx DOCX document
Attachment 019 - As-built Production Unit Cost Volume revB.xlsx XLSX spreadsheet
Attachment 001 Contract Data Requirements Lists (CDRLs)_31 MAR 2026.pdf PDF
MTC OTA Request for Prototype Proposal AMD 01.docx DOCX document
Appendix A - Project Articles_31 MAR 2026.docx DOCX document
MTC RPP Questions and Responses (Dist A).xlsx XLSX spreadsheet
Attachment 005 - As-Built Configuration Template.xlsx XLSX spreadsheet
Attachment 012 MTC Test Schedule Breakdown.xlsx XLSX spreadsheet
Attachment 007 - MATCE Input Datasheet Wheeled Vehicles.xlsx XLSX spreadsheet
MTC OTA Request for Prototype Proposal.docx DOCX document
Appendix E(1) - Milestone Pricing Sheet - Table F-1.xlsx XLSX spreadsheet
Attachment 016 - MTC Sample Special License Agreement (SLA).docx DOCX document
Appendix C - Representations and Certifications.docx DOCX document
Attachment 001 Contract Data Requirements Lists (CDRLs).pdf PDF
Appendix A - Project Articles.docx DOCX document
Attachment 013 ATTLA_Universal_Data_Sheet 9 Mar 26.xlsx XLSX spreadsheet
Attachment 019 - As-built Production Unit Cost Volume.xlsx XLSX spreadsheet
Appendix B - Project Other Terms and Conditions 9 Mar 26.docx DOCX document
Attachment 011 - TDP OPTION WORKSHEET TDP.pdf PDF
Attachment 009 - Proof Gun system Overview Distro A - Embedded video 1.pdf PDF
Attachment 004 - Assertion of Restrictions.xlsx XLSX spreadsheet
Attachment 010 - TDP OPTION WORKSHEET CAD.pdf PDF
Appendix E - Milestone Pricing Summary.xlsx XLSX spreadsheet
Attachment 014 POL Guide v1.2 2024.pdf PDF
Attachment 006 - I-BOM Sample.xlsx XLSX spreadsheet
MTC OTA Prototype Project Agreement 9 Mar 26.docx DOCX document
Appendix E(2) - Milestone Pricing Sheet - Table F-2 Continuation.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Supply Chain – Market Check

Vehicle Name
PartsCommon Parts% Common
ALLPROVISIONED PARTS (example)3407146142.9%
PROCURABLE PARTS (example)2827139349.3%
PARTS WITH NSN (example)1505132387.9%
Commercial Off The Shelf (COTS)123425621.7%
VARIANT SPECIFIC DATAVARIANTTOTAL PARTSPROCURABLENSN
Common Parts% CommonCommon Parts% CommonCommon Parts% Common
(ex. Stryker, JLTV, PLS, etc..)68320.0%63522.5%60340.1%

PdM MTC-M is requesting additional deliberate information on current supply system provisioned US and NATO NSN assignment and parts available within the stock supply system. Identify how many parts are common with and what current US Military systems are they common with.

Total current Integrated vehicle US and NATO NSNs assigned = XX% Total current Integrated vehicle US Stock Supply NSNs assigned = XX% Total current Integrated vehicle NATO Stock Supply NSNs assigned = XX% Percentage use of Commercial of the Shelf (COTS) parts for vehicle system.

Based on existing provisioning data, this example of supply system parts commonality above was created Distribution Statement A. Approved for public release: distribution is unlimited.

PEO GSC OPSEC# OPSEC-2026-232

File details come from the government source that posted it. Updated .