Attachment 019 - As-built Production Unit Cost Volume.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Mobile Tactical Cannon (MTC) Request for Prototype Proposal
Solicitation number
W912CH26RA017
Issued by

About this file

This is a cost submission template for the Mobile Tactical Cannon (MTC) Request for Prototype Proposal (RPP) issued by Army Contracting Command - Detroit Arsenal under solicitation W912CH26RA017. The template is designed to capture as-built production unit costs and total cost-price summaries for the prototype manufacturing phase of the MTC program.

Offerors must submit pricing in Base Year (BY) 2026 U.S. Dollars and provide cost breakdowns across three production quantity ranges: 1-24 MTC systems, 25-36 MTC systems, and 37-48 MTC systems. Cost categories to be populated include Direct Labor Cost, Direct Material Cost, Direct Subcontract Cost, Overhead Cost, General & Administrative (G&A) Cost, and Profit/Fee, with a calculated Total Price for each quantity bracket. The template includes instructional tabs noting that responses will be evaluated per RPP section 4.2.4 and that offerors must delete the cover page upon submission, retaining only the Title Page and Production Unit Cost (P-BL) sheets. This cost volume submission is part of the overall proposal requirements for the Fixed Price Other Transaction Authority (OTA) Agreement the government intends to award for prototype manufacturing, network integration, ammunition compatibility testing, safety and characterization testing, and soldier evaluation.

View the file

Other files

File Type Posted
MTC OTA Request for Prototype Proposal AMD 03.docx DOCX document
MTC OTA Prototype Project Agreement AMD 02.docx DOCX document
MTC RPP Questions and Responses (Dist A) revC.xlsx XLSX spreadsheet
Appendix E - Milestone Pricing Summary_20 APR 2026.xlsx XLSX spreadsheet
MTC OTA Request for Prototype Proposal AMD 02.docx DOCX document
MTC OTA Prototype Project Agreement AMD 02.docx DOCX document
MTC RPP Questions and Responses (Dist A) revB.xlsx XLSX spreadsheet
Appendix E - Milestone Pricing Summary_02 APR 2026.xlsx XLSX spreadsheet
MTC OTA Request for Prototype Proposal AMD 01.docx DOCX document
MTC OTA Prototype Project Agreement AMD 01.docx DOCX document
Attachment 019 - As-built Production Unit Cost Volume revB.xlsx XLSX spreadsheet
Appendix A - Project Articles_31 MAR 2026.docx DOCX document
Appendix E - Milestone Pricing Summary 31_MAR 2026.xlsx XLSX spreadsheet
Attachment 001 Contract Data Requirements Lists (CDRLs)_31 MAR 2026.pdf PDF
MTC RPP Questions and Responses (Dist A).xlsx XLSX spreadsheet
Attachment 003 - Supply Chain Market Checklist.pptx PPTX presentation
Attachment 004 - Assertion of Restrictions.xlsx XLSX spreadsheet
Attachment 009 - Proof Gun system Overview Distro A - Embedded video 1.pdf PDF
Attachment 016 - MTC Sample Special License Agreement (SLA).docx DOCX document
MTC OTA Request for Prototype Proposal.docx DOCX document
Appendix A - Project Articles.docx DOCX document
Appendix B - Project Other Terms and Conditions 9 Mar 26.docx DOCX document
Attachment 001 Contract Data Requirements Lists (CDRLs).pdf PDF
Attachment 011 - TDP OPTION WORKSHEET TDP.pdf PDF
Attachment 013 ATTLA_Universal_Data_Sheet 9 Mar 26.xlsx XLSX spreadsheet
Attachment 014 POL Guide v1.2 2024.pdf PDF
MTC OTA Prototype Project Agreement 9 Mar 26.docx DOCX document
Appendix E(2) - Milestone Pricing Sheet - Table F-2 Continuation.xlsx XLSX spreadsheet
Attachment 005 - As-Built Configuration Template.xlsx XLSX spreadsheet
Attachment 006 - I-BOM Sample.xlsx XLSX spreadsheet
Appendix C - Representations and Certifications.docx DOCX document
Appendix E - Milestone Pricing Summary.xlsx XLSX spreadsheet
Appendix E(1) - Milestone Pricing Sheet - Table F-1.xlsx XLSX spreadsheet
Attachment 007 - MATCE Input Datasheet Wheeled Vehicles.xlsx XLSX spreadsheet
Attachment 010 - TDP OPTION WORKSHEET CAD.pdf PDF
Attachment 012 MTC Test Schedule Breakdown.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

UNCLASSIFIED

Item Description:As-built Production Unit Cost Volume
Cover Page
DISTRIBUTION STATEMENT A: Approved for Public Release; distribution is unlimited. PEO GSC OPSEC# OPSEC-2026-275
Distribution Statement A – Approved for Public Release; distribution unlimited

(*Distribution Statement A only applies when form is not filled in. Once filled check the Security Class Guide for proper distribution statement/markings)

As part of the P-BL development, delete this sheet and submit only the "Title Page" and "P-BL" sheets.

1. Introduction

Tab 1. Instructions Nothing to input, informational only.

Tab 2. Production Unit Cost Insert the required information in the blue highlighted cells. The offeror will submit responses in Base Year (BY) 2026 U.S. Dollars (USD) for the given production quantity ranges for the As-built Production Configuration. This cost volume will be used for Evaluation as defined in RPP section 4.2.4

Approved For Public Release

2. Production Unit Cost

Total Cost-Price Summary

Form Instructions: Insert the required information in the blue highlighted cells. The offeror will submit responses in Base Year (BY) 2026 U.S. Dollars (USD) for the given production quantity ranges for the As-built Production Configuration. This cost volume will be used for Evaluation as defined in RPP section 4.2.4

Category Description1-24
MTC systems25-36
MTC systems37-48

MTC systems

Direct Labor Cost
Direct Material Cost
Direct Subcontract Cost
Overhead Cost
G&A Cost
Profit/Fee
Total Price$ -$ -$ -
Approved For Public Release

File details come from the government source that posted it. Updated .