This is a cost submission template for the Mobile Tactical Cannon (MTC) Request for Prototype Proposal (RPP) issued by Army Contracting Command - Detroit Arsenal under solicitation W912CH26RA017. The template is designed to capture as-built production unit costs and total cost-price summaries for the prototype manufacturing phase of the MTC program.
Offerors must submit pricing in Base Year (BY) 2026 U.S. Dollars and provide cost breakdowns across three production quantity ranges: 1-24 MTC systems, 25-36 MTC systems, and 37-48 MTC systems. Cost categories to be populated include Direct Labor Cost, Direct Material Cost, Direct Subcontract Cost, Overhead Cost, General & Administrative (G&A) Cost, and Profit/Fee, with a calculated Total Price for each quantity bracket. The template includes instructional tabs noting that responses will be evaluated per RPP section 4.2.4 and that offerors must delete the cover page upon submission, retaining only the Title Page and Production Unit Cost (P-BL) sheets. This cost volume submission is part of the overall proposal requirements for the Fixed Price Other Transaction Authority (OTA) Agreement the government intends to award for prototype manufacturing, network integration, ammunition compatibility testing, safety and characterization testing, and soldier evaluation.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Page
UNCLASSIFIED
| Item Description: | As-built Production Unit Cost Volume |
| Cover Page |
| DISTRIBUTION STATEMENT A: Approved for Public Release; distribution is unlimited. PEO GSC OPSEC# OPSEC-2026-275 |
| Distribution Statement A – Approved for Public Release; distribution unlimited |
(*Distribution Statement A only applies when form is not filled in. Once filled check the Security Class Guide for proper distribution statement/markings)
As part of the P-BL development, delete this sheet and submit only the "Title Page" and "P-BL" sheets.
1. Introduction
Tab 1. Instructions Nothing to input, informational only.
Tab 2. Production Unit Cost Insert the required information in the blue highlighted cells. The offeror will submit responses in Base Year (BY) 2026 U.S. Dollars (USD) for the given production quantity ranges for the As-built Production Configuration. This cost volume will be used for Evaluation as defined in RPP section 4.2.4
Approved For Public Release
2. Production Unit Cost
Total Cost-Price Summary
Form Instructions: Insert the required information in the blue highlighted cells. The offeror will submit responses in Base Year (BY) 2026 U.S. Dollars (USD) for the given production quantity ranges for the As-built Production Configuration. This cost volume will be used for Evaluation as defined in RPP section 4.2.4
| Category Description | 1-24 | ||
| MTC systems | 25-36 | ||
| MTC systems | 37-48 |
MTC systems
| Direct Labor Cost | |||
| Direct Material Cost | |||
| Direct Subcontract Cost | |||
| Overhead Cost | |||
| G&A Cost | |||
| Profit/Fee | |||
| Total Price | $ - | $ - | $ - |