Amendment 07 - Ad_0007_Drawings_04.01.2025.pdf

PDF 9 MB Posted

Attached to
CANCELED - USDA Dairy Forage Research Center (DFRC)
Solicitation number
W9128F25R0014
Issued by

About this file

These architectural and engineering drawings for the USDA Dairy Forage Research Center (DFRC) provide detailed design specifications for a comprehensive dairy research facility in Prairie du Sac, Wisconsin. The drawings cover multiple building areas including milking parlors, calf barns, support rooms, feed facilities, equipment spaces, and infrastructure elements. Key architectural details include pre-engineered metal building structures, concrete foundations, specialized areas for livestock management, and interconnected systems for research and operational functions.

The design accommodates up to 452 lactating cows, 144 calves, and supports agricultural research across approximately 1300 acres of crop production and 900 acres of pasture. The facility will house 12 permanent researchers and staff, up to 12 operations and maintenance personnel, and 10 student researchers. The complex spans approximately 642,000 gross square feet across 18 buildings, with most structures featuring metal building construction on concrete spread footings, and a unique laminated wood structure for the Lab and Administration Building. The drawings demonstrate intricate planning for specialized research infrastructure, including milking stalls, feed management systems, animal housing, and supporting mechanical and electrical systems.

View the file

Other files

File Type Posted
Am_0015_Dwgs_ARS01.pdf PDF
W9128F25R0014 Amendment 15 - 07.22.2025.pdf PDF
JA_CECT-NWO-25-15_DFRC_Calan Feeding System_Redacted.pdf PDF
W9128F25R0014 Conformed thru Amd 13 - 07.10.2025.pdf PDF
W9128F25R0014 Amendment 13 - 07.10.2025.pdf PDF
Am_0012_Dwgs_ARS01.pdf PDF
Am_0011_Dwgs.pdf PDF
Am_0010_Dwgs.pdf PDF
W9128F25R0014 Amendment 10 - 05.30.2025.pdf PDF
W9128F25R0014 Conformed thru Amd 09 - 05.23.2025.pdf PDF
W9128F25R0014 Amendment 09 - 05.23.2025.pdf PDF
W9128F25R0014 Conformed thru Amd 09 - 05.23.2025.pdf PDF
Site Visit_24 Apr 2025_Sign in Sheet.jpg JPG image
W9128F25R0014 Conformed thru Amd 08 - 05.16.2025.pdf PDF
Amendment 07 - Ad_0010_Drawings_04.01.2025.pdf PDF
Amendment 07 - Ad_0009_Drawings_04.01.2025.pdf PDF
Amendment 07_Specifications_04.01.2025.pdf PDF
Amendment 07 - Ad_0011_Drawings_04.01.2025.pdf PDF
Amendment 07 - Ad_0006_Drawings_04.01.2025.pdf PDF
Amendment 07 - Ad_0003_Drawings_04.01.2025.pdf PDF
W9128F25R0014 - Amendment 0004 - 20241223.pdf PDF
Sheet C-509.pdf PDF
Am_0004_Specs_Div 01.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 3.pdf PDF
Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_7.pdf PDF
Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_3.pdf PDF
Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_2.pdf PDF
Pages from 20241108_USDA_DFRC_RTA_Dwgs_V3_1.pdf PDF
20241108_USDA_DFRC_RTA_Dwgs_V2.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_1_1.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 7.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 4.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 8.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 2.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 9.pdf PDF
Pages from 20241108_USDA_DFRC_RTA_Dwgs_V3_3.pdf PDF
W9128F25R0014 Amd 0003 - 20241210.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_1_3.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 6.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 5.pdf PDF
W9128F25R0014 Amd 0002 - 20241209.pdf PDF
W9128F25R0014 Amd 0001 - 20241204.pdf PDF
20241108_USDA-DRFC_RTA_Specs_V3_23-26.pdf PDF
20241108_USDA-DRFC_RTA_Specs_V2_08-22.pdf PDF
20241108_USDA-DRFC_RTA_Specs_V4_27-43.pdf PDF
USDA_DFRC_SpecsCvrs_RTA_Vol4.pdf PDF
USDA_DFRC_SpecsCvrs_RTA_Vol2.pdf PDF
20241108_USDA-DRFC_RTA_Specs_V1_00-07.pdf PDF
20241108_USDA_DFRC_RTA_ECI.pdf PDF
W9128F25R0014_SPECS_ARS01.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B4.F

B4.1

A-301-B4

A-301-B4

B4.CB4.B

B4.2

B4.3

B4.A B4.G

B4.4

26' - 0" 26' - 0" 12' - 7" 10" 12' - 7 1/8" 26' - 0"

104' - 0"

10' - 5" 9' - 10" 9' - 10" 9' - 10" 9' - 9" 9' - 9"

9' - 4" 14' - 6" 6' - 1" 7' - 10" 21' - 8"

39' - 0"

B4.A B4.A

B4.A B4.A

SHOP

B4-103

UTILITY

ROOM/SUBWAY

ACCESS

B4-104

OFFICE

B4-101

MANAGERS

OFFICE

B4-100

RESTROOM

B4-106

RESTROOM

B4-105

JANITOR

B4-107

HALL

B4-102

C O R R

ID

O R

B4 -1

MILKING PARLOR

B4-109

B4.102

B4.03

B4.01

B4.101

B4.09

B4.11

B4.10B4.08

B4.07

B4.02 B4.12 B4.04 B4.06 B4.05

M

AT

C H

LI

N E

- B

EA

ST

M

AT

C H

LI

N E

- B

W

ES

T

A-203-B4

A-203-B4

A-203-B4

SUBWAY

ACCESS

MILKING STALLS

MILKING STALLS

2' - 5 1/2" 2' - 9 1/2"

4' - 5"

6' - 9 1/2"

9' 2"

9' 5"

5' - 9" 4' - 1" 9' - 10"

5' 0"

0"

5' 0"

5' 0"

3' - 8 1/2"

7' - 2 1/2"

1' - 11" 5' - 6" 5' - 7"

2' - 0"

2' 1/ 2"

9' - 5"

2' - 10"

5' - 8 1/2"

2' - 9 1/2"

A-301-B4

A-301-B4

B4.D B4.E

B4.105

B4.104

B4.103

6'

EYE WASH

SEE DETAIL

/3 A-501-B4

A-302-B4

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 4.

rv t

2/ /2 2:

:0

PM

A-102-B4

AR

C H

IT

EC

TU

R

AL

A R

EA

P

LA

N -W

ES

T

- A

R

EA

B

M

IL

KI

N G P

AR

LO

R

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

A

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B4

3/16" 1'-0"A-102-B4

ARCHITECTURAL AREA PLAN-WEST -

AREA B4 - MILKING PARLOR1

KEYNOTES:

1 OPEN WORK HEIGHT COUNTER. NO CASEWORK

COUNTER 34" HIGH.

2 DRINKING FOUNTAIN WITH WATER BOTTLE

REFILL

GENERAL NOTES:

1. SEE STRUCTURAL PLAN FOR WALL CURB

LOCATIONS

R

TA

/0 8/

AD

D

EN

D U M

/1 1/

AD

D

EN

D U M

/1 8/

RFI 11151670

RFI 11151670

24 GA, RIBBED METAL SKIN

26 GA, RIBBED WALL LINER PANEL

4" SCRIM FACED FIBER REINFORCED INSULATION

8" "ZEE" GIRTS

6" UNFACED BLANKET INSULATION

24 GA, METAL ROOF

8" PURLINS

26 GA, METAL LINER

2" FIBERGLASS INSULATION

WITH VINYL SCRIM FACE

INTERIOR WALL PANEL

INSULATION (SEE WALL DETAIL)

WALL GIRT

INSULATION (SPRAY FOAM)

EXTERIOR WALL PANEL

RIBBED CLOSURE STRIP

CORNER TRIM

INTERIOR WINDOW TRIM (HEAD, SUMB, SILL)

WINDOW

WINDOW

RIBBED CLOSURE STRIP INTERIOR WINDOW TRIM ( HEAD, SAMB, SILL)

INSUALTION (SPRAY FOAM)

SUB SILL (C-FRAMING)

INTERIOR WALL PANEL

INSULATION (SEE WALL DETAIL)

EXTERIOR WALL PANEL

UPPER CURTAIN

CURTAIN WIND GUIDE

HSS 5X4X1/4, SECURE TO METAL

BUILDING FRAMES WITH ANGLE

CLIPS, OUTSIDE FACE TO MATCH

PURLINS

LOWER CURTAIN

CONCRETE FOUNDATION

CURB HEIGHT VARIES

SOFFIT

METAL CEILING LINER

METAL ROOF PANEL

CURTAIN WIND GUIDE

PREENGINEERED METAL

BUILDING FRAME

OVERHANG, SEE

ARCHITECTURAL

ROOF PLAN FOR

DIMENSIONS

POLY BIRD SCREEN,

SECURE TO INSIDE

CURTAIN WIND GUIDE

6" O

PE

N

IN

G

E

AV

E

1/2" FRP FACED PLYWOOD

3 - 5/8" STEEL STUDS @ 16" O.C.

24 GA, RIBBED METAL SKIN

1/2" FRP FACED PLYWOOD

4" SCRIM FACED FIBER REINFORCED INSULATION

8" "ZEE" GIRTS

6" UNFACED BLANKET INSULATION

24 GA, METAL ROOF

8" PURLINS

1/2" FRP FACED PLYWOOD

2" FIBERGLASS INSULATION

WITH VINYL SCRIM FACE

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 7.

rv t

2/ /2 3:

:1

PM

A-310-B7

W

AL

L

SE

C

TI

O N S

- A

R

EA

B

- C

AL

F

BA

R N

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1" 1'-0"1

A-EXTERNAL WALL SECTION (TYPICAL) -

B7

1" 1'-0"2 ROOF SECTION - B7

3" 1'-0"4 WINDOW HEAD DETAIL

3" 1'-0"5 WINDOW DETAIL

1/2" 1'-0"3 WALL SECTION (CURTAIN)

3" 1'-0"6 A-INTERIOR WALL SECTION (TYPICAL) - B7

NORTH

KEY PLAN

B7

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

1" 1'-0"7

EXTERNAL WALL SECTION - SUPPORT

ROOMS

1" 1'-0"8 ROOF SECTION - SUPPORT ROOMS

RFI 11151760

A A

A

B7.HB7.G

B7.1 B7.1

B7.2

B7.3

B7.4 B7.4

A-203-B7 F3 A-203-B7

F9

CALF

WARMING/HOSPITAL

B7-101

CALF BARN

B7-100

25' - 0"

W

AL

K W

AY

W

AL

K W

AY

TRENCH DRAIN

FEED CART

(BY OTHERS)

BOLLARDS

BOLLARD

B7.03B7.02

WS30A

BS

O E

5' - 11" 19' - 1"

W S3

0A W S3

0A W S3

0A W S3

0A

BS18B

BS

B

BS

B

BS

O

EMILK MIXING

B7-102

WH

B7.06

B7.104

16' - 2" 4' - 9 1/2" 4' - 9 1/2"

15' - 4"3' - 3"2' - 0"7' - 0"

5' - 0"

B7.01

1' - 10"

5' - 1"

11' - 3"

A-301-B7

A-301-B7

WASH ROOM

B7-103

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 7.

rv t

2/ /2 3:

:4

PM

A-401-B7

EN

LA

R G

ED

F

LO

O R P

LA

N S

- A

R

EA

B

- C

AL

F

BA

R N

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B7

1/4" 1'-0"1 FLOOR PLAN ENLARGEMENT - CENTER

KEYNOTES:

1 MILK TAXI / PASTEURIZER

2 STORAGE RACKS/SHELVES

3 COUNTER, 30" DEEP

4 3 BAY SCULLERY SINK WITH DRAIN BOARDS

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI# 11151670

B11.1

B11.A

B11.2

B11.B

B11.C

B11.D

B11.E

B11.F

B11.H

B11.G

B11.I

BENCH AND

EQUIPMENT

B11.01

B11.08 B11.07

B11.02B11.108B11.106

B11.107

B11.110

B11.05

B11.109

BENCH AND

EQUIPMENT

6' 9"

TRENCH DRAIN

80' - 0"

DRIVE THRU

DRIVE THRU

SHOP

B11-105

LIQUID STORAGE

CONTAINMENT

AREA

B11-102

UTILITY

B11-104

DRY CHEMICAL

B11-103

MACHINE

STORAGE

(GRAVEL)

B11-101

9' 0"

0"

9'

B11.119

B11.120

B11.13

B11-NORTH

B11-SOUTH

B11.10

B11.09

1'

15' - 2"

3' 2"

6'

9' 6"

3' 1"

21' - 10"

EQ

1' - 1" 3' - 6"EQEQ

EQ

1' - 6"

1' 8"

10' - 6"

9" 1' 8"

2' 3"

1' 3"

9" 9"

10' - 9" 3' - 6" 10' - 5" 3' - 7" 10' - 5" 3' - 7" 10' - 5" 3' - 7" 10' - 5" 3' - 7" 9' - 9"

A-401-B11

K9 K15

A-401-B11

FTS72A30FTS72A30FTS72A30FTS72A30

FTS72A30 FTS72A30

8' - 0"

6' - 0" 3' - 0" 3' - 0" 6' - 0"

EMERGENCY SHOWER/EYE WASH

SEE

/1 A-501-B11

A-301-B11

RESTROOM

B11-106

OFFICE

B11-107

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B .rv t

2/ /2 9:

:1

AM

A-102-B11

AR

C H

IT

EC

TU

R

AL

A R

EA

P

LA

N -N O R

TH

AR

EA

B

M

AC

H

IN

E

ST

O R

AG

E

SH

O P

PE

ST

IC

ID

E

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B11

1/8" 1'-0"A2

ARCHITECTURAL AREA PLAN-NORTH -

AREA B11 - MACHINE STORAGE & SHOP &

PESTICIDE

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

LEVEL 3 B4 EAST ROOF

885' - 4"

LEVEL -1 B4 T.O.

FOOTING

860' - 4"

B4.1 B4.2 B4.3 B4.4

LEVEL 2 B4 T.O.

CURB-EAST

869' - 4"

RIDGE VENTILATOR OR

RIDGE CAP

24 GA. METAL ROOF

6" INSULATION

2" INSULATION

26 GA. METAL LINER

2'-0" METAL

ROOF OVERHANG

W/TRIM AND SOFFIT

26 GA. METAL SKIN

8" STAY IN PLACE

PLASTIC FORM

CONCRETE WALL

2" / 1'-0"2" / 1'-0"

14' - 4" 14' - 4"

EA

VE

H

EI

G H T

9' 0"

6' - 8" 10' - 4"

A-310-B4

5' - 0" 44' - 0"

5' - 0"

54' - 0"

1' 0"

5' 0"

27' - 0" 27' - 0"2' - 0"

5' 1"

S-503-B4

SUBWAY

/6 S-503-B4

TRUSS SEE DETAIL

2L TRUSSES @ 2'-0" O.C.

LEVEL 0 B4 T.O. FLUSH

FLUME

865' - 4"

LEVEL 3 B4 EAST ROOF

885' - 4"

LEVEL -1 B4 T.O.

FOOTING

860' - 4"

B4.2 B4.3

LEVEL 2 B4 T.O.

CURB-EAST

869' - 4"

A-310-B4

LEVEL -1 B4 T.O.

FOOTING

860' - 4"

B4.1 B4.4

LEVEL 1 B4 T.O.

CURB-WEST

865' - 8"

LEVEL 4 B4 WEST ROOF

879' - 8"

SHOP

B4-103

HALL

B4-102

OFFICE

B4-10110

ATTACH CEILING TO BOTTOM

OF ROOF GIRTS

CEILING. SEE FINISH

SCHEDULE FOR MATERIAL

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 4.

rv t

2/ /2 2:

:0

PM

A-301-B4

BU

IL

D

IN

G C R O

SS

S

EC

TI

O N S

- A

R

EA

B

- M

IL

KI

N G

PA

R

LO

R

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

A

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

3/16" 1'-0"A-301-B4

BUILDING CROSS SECTION - AREA B4 -

MILKING PARLOR1

3/16" 1'-0"A-301-B4

BUILDING CROSS SECTION - HOLDING2

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

3/16" 1'-0"A-301-B4

WEST SECTION3

01_LEVEL_FF

864' - 6"

02_LEVEL_ROOF

878' - 6"

00_LEVEL_TOF

860' - 6"

B7.1 B7.2 B7.3 B7.4

01_LEVEL_TOC

866' - 6"

PRE-ENGINEERED METAL

ROOF & WALL SKINS ON

PRE-ENGINEERED METAL

FRAME

METAL FRAME

METAL ROOF

6" INSULATION

2" INSULATION

METAL LINER

2'-0" METAL ROOF

OVERHANG

W/TRIM & SOFFIT

METAL ROOF

CAP

2" / 1'-0"

57' - 0"

2" / 1'-0"

EA

VE

H

EI

G H T

7' - 0"15' - 0"11' - 0"15' - 0"7' - 0"

18 " DEEP PEA GRAVEL 18 " DEEP PEA GRAVEL

PIPE BOLLARDS

(TYP)

VENTILATION TUBE

TRENCH

DRAIN

VENTILATION TUBE

01_LEVEL_FF

864' - 6"

02_LEVEL_ROOF

878' - 6"

00_LEVEL_TOF

860' - 6"

B7.2 B7.3

01_LEVEL_TOC

866' - 6"

34' - 0"

2' - 0"17' - 0"17' - 0"2' - 0"

EA

VE

H

EI

G H T

2' - 9 1/2"8' - 0"10' - 5"8' - 0"2' - 9 1/2"

9'

10" 10"

18 " DEEP PEA GRAVEL 18 " DEEP PEA GRAVEL

VENTILATION

TUBE

TRENCH

DRAIN

A-310-B7

01_LEVEL_FF

864' - 6"

02_LEVEL_ROOF

878' - 6"

00_LEVEL_TOF

860' - 6"

B7.2B7.3

01_LEVEL_TOC

866' - 6"

MILK MIXING

B7-102

CALF BARN

B7-100

WASH ROOM

B7-103

CEILING. SEE FINISH

SCHEDULE FOR MATERIAL

SEE DETAIL:

CEILING. SEE FINISH

SCHEDULE FOR MATERIAL

SEE DETAIL:

CEILING. SEE FINISH

SCHEDULE FOR MATERIAL

SEE DETAIL:

A-310-B7

A-310-B7

/8 A-310-B7

/2 A-310-B7

/8 A-310-B7

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 7.

rv t

2/ /2 3:

:0

PM

A-301-B7

BU

IL

D

IN

G C R O

SS

S

EC

TI

O N S

- A

R

EA

B

- C

AL

F

BA

R N

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B7

1/4" 1'-0"2 EAST CROSS SECTION

1/4" 1'-0"1

WEST CROSS SECTION - AREA B7 - CALF

BARN

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

1/4" 1'-0"3 SUPPORT ROOMS CROSS SECTION

LEVEL 1 B11 TOC

868' - 8"

LEVEL -1 TO FOOTING

863' - 8"

LEVEL 2 B11 ROOF

888' - 8"

B11.1 B11.2

A-302-B11

A-302-B11

2' - 0" 40' - 0" 40' - 0" 2' - 0"

80' - 0"

2" / 1'-0"

2" / 1'-0"

6" CONC FLOOR

OR GRAVEL FLOOR

24 GA. METAL SIDING

8" INSULATION

26 GA. METAL LINER

LEVEL 0 B11 TOFF

868' - 0"

24 GA. METAL ROOF

6" INSULATION

2" INSULATION

26 GA. METAL LINER

2'-0" METAL ROOF

OVERHANG

W/TRIM & SOFFIT

METAL FRAME

PRE-ENGINEERED METAL

ROOF & WALL SKINS ON

PRE-ENGINEERED METAL

FRAME

RIDGE VENTILATOR

7' 2"

5' 0"

1' 0"

A-310-B11

A-310-B11

LEVEL 1 B11 TOC

868' - 8"

B11.E

LEVEL 0 B11 TOFF

868' - 0"

8' 0"

OFFICE

B11-107

RESTROOM

B11-106

CEILING. SEE FINISH

SCHEDULE FOR MATERIAL

6"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B .rv t

2/ /2 9:

:3

AM

A-301-B11

BU

IL

D

IN

G C R O

SS

S

EC

TI

O N

AR

EA

B M

AC

H

IN

E

ST

O R

AG

E

SH

O P

PE

ST

IC

ID

E

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B11

1/4" 1'-0"1 BUILDING CROSS SECTION - AREA B11

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

1/4" 1'-0"2 OFFICE AND RESTROOM CROSS SECTION

LEVEL 3 B4 EAST ROOF

LEVEL -1 B4 T.O.

FOOTING

860' - 4"

B4.F B4.H

A-301-B4

B4.CB4.B B4.I B4.J B4.KB4.A B4.G

PERSONNEL DOOR

DOUBLE 8 RAPID EXIT

PARALLEL MILKING STALLS

STAIRS TO SUBWAY

SUBWAY

CONNECTING

CORRIDOR

ALLEYS

LEVEL 2 B4 T.O.

CURB-EAST

869' - 4"

LEVEL 1 B4 T.O.

CURB-WEST

865' - 8"

5' 4"

1' 0"

3' 8"

26' - 0" 26' - 0" 26' - 0" 26' - 0" 18' - 0" 18' - 0" 20' - 0" 26' - 0"

186' - 0"

SHOP

B4-103

UTILITY

ROOM/SUBWAY

ACCESS

B4-104

MILKING PARLOR

B4-109

HOLDING

B4-110

LEVEL 4 B4 WEST ROOF

879' - 8"

B4.D B4.E

CORRIDOR

B4-108

LEVEL 0 B4 T.O. FLUSH

FLUME

865' - 4"

LEVEL 3 B4 EAST ROOF

885' - 4"

LEVEL -1 B4 T.O.

FOOTING

860' - 4"

B4.CB4.BB4.A

LEVEL 4 B4 WEST ROOF

879' - 8"

B4.D B4.E

OFFICE

B4-101

MANAGERS

OFFICE

B4-100

RESTROOM

B4-106

RESTROOM

B4-105

" CORRIDOR

B4-108

CEILING. SEE FINISH

SCHEDULE FOR MATERIAL

ATTACH CEILING TO

BOTTOM OF ROOF

GIRTS

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 4.

rv t

2/ /2 2:

:4

PM

A-302-B4

BU

IL

D

IN

G L O N G

IT

U D

IN

AL

C R O

SS

S

EC

TI

O N S

AR

EA

B

- M

IL

KI

N G P

AR

LO

R

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

A

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/8" 1'-0"A-302-B4

BUILDING LONGITUDINAL CROSS SECTION

- AREA B4 - MILKING PARLOR1

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

3/16" 1'-0"A-302-B4

SUPPORT ROOMS-EAST/WEST SECTION3

11151670

LEVEL 3 B5 ROOF-WEST

LEVEL -1 B5 T.O.

FOOTING

861' - 4"

B5.B B5.C B5.E B5.F B5.G B5.H B5.I B5.J B5.K B5.L

A-301-B5

A-301-B5

PROCEDURE AREA

HOUSING AREA

B5.MB5.A B5.D

LEVEL 4 B5 ROOF-EAST

885' - 4"

LEVEL 2 B5 T.O. CURB

869' - 4"

288' - 0"

25' - 0" 25' - 0" 26' - 0" 12' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0"

4' 1/ 2"

8' 0"

1' 0"

A-301-B5

A-301-B5

CEILING

STORAGE

B5-101

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 5.

rv t

2/ /2 2:

:2

PM

A-302-B5

BU

IL

D

IN

G L O N G

IT

U D

IN

AL

C R O

SS

S

EC

TI

O N S

AR

EA

B

- S

PE

C

IA

L N

EE

D S

AN

D M

AT

ER

N

IT

Y

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/16" 1'-0"1

BUILDING LONGITUDINAL CROSS SECTION

- AREA B5 - SPECIAL NEEDS AND

MATERNITY

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 11151670

LEVEL 0 B6 TO FLUSH

FLUME

865' - 4"

LEVEL 2 B6 ROOF

884' - 1"

LEVEL -1 B6 TO FOOTING

861' - 4"

LEVEL 1 B6 TO

CONCRETE

868' - 3"

B6.15B6.13B6.12B6.11B6.10B6.8

24 GA METAL ROOF

PRE-ENGINEERED

METAL BUILDING

ROBOT MILKER

B6.14B6.9

10' - 6"29' - 9"16' - 3"21' - 8"16' - 3"29' - 9 1/4"10' - 6"

MECH/ELEC

ROOM

B6-108

WORK ROOM

B6-102

ROBOTIC ROOM

B6-101

WORK ROOM

B6-103

MECH/ELEC

ROOM

B6-109

ROBOTIC ROOM

B6-104

+135" BOTTOM OF CEILING

LEVEL 0 REFERENCE.

+135" BOTTOM OF CEILING

LEVEL 0 REFERENCE.

CEILING. SEE FINISH

SCHEDULE FOR MATERIAL

CEILING. SEE FINISH

SCHEDULE FOR MATERIAL

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 6.

rv t

2/ /2 2:

:3

PM

A-303-B6

BU

IL

D

IN

G C R O

SS

S

EC

TI

O N -C

EN

TE

R

AR

EA

B

R O

BO

TI

C M

IL

KI

N G F R

EE

ST

AL

L

AR

EA

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B6

1/8" 1'-0"1

BUILDING CROSS SECTION-CENTER -

AREA B6

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI# 11151670

RFI# 11151670

B3.1B3.2B3.3B3.6 B3.4B3.5

4" 4"

152' - 0"

FEED DRIVE

16' - 0"

FEED ALLEY

14' - 0"

CROSS OVER

10' - 2 3/4"

COW ALLEY

12' - 0"

CROSS OVER

10' - 2 3/4"

DROVERS LANE

11' - 6 1/2"

DROVERS LANE

11' - 6 1/2"8"8"

CROSS OVER

10' - 2 3/4"

COW ALLEY

12' - 0"

CROSS OVER

10' - 2 3/4"

FEED ALLEY

14' - 0"

FEED DRIVE

16' - 0"8" +34.0"+34.0"

4" 4"

4"

1' 6"

1' 0"

4' 2"

1' 6"

4' 2"3' 0"

4"

6" FLOORS W/ #5 BARS

@ 18" o.c. EACH WAY6" SAND BASE UNDER

ALL CONCRETE

SLABS

4" 4"

2' 1/ 2"

2' 1/ 2"

VA

R

IE

S

1' 1/ 2"

T.O. SLAB

BEYOND T.O. SLAB BEYOND

B3.1B3.2B3.3B3.6 B3.4B3.5

FEED DRIVE

16' - 0" 8"

FEED ALLEY

14' - 0" 8"

FREESTALLS

9' - 0 3/4" 6"

COW ALLEY

12' - 0" 6"

FREESTALLS

9' - 0 3/4" 8"

DROVERS LANE

11' - 6 1/2" 8"

DROVERS LANE

11' - 6 1/2" 8"

FREESTALLS

9' - 0 3/4" 6"

COW ALLEY

12' - 0" 6"

FREESTALLS

9' - 0 3/4" 8"

FEED ALLEY

14' - 0" 8"

FEED DRIVE

16' - 0"

1' 1/ 4"

1' 7"

VA

R

IE

S

6'

1' 0"

1' - 0"

1' 0"

1' 0"

8" 8" 8" 8"

1' 0"

1' 0"

1' 1"

1' 1"

1' 0"

1' 0"

8" 8" 8" 8"

1' 0"

1' 0"

1' 7"

1' 1/ 4"

VA

R

IE

S

6'

1' 0"

1' - 0" 152' - 0"

SCREENINGSSCREENINGS SCREENINGS SCREENINGS6" SAND BASE UNDER

ALL CONCRETE SLABS

6" FLOORS W/ #5 BARS

@ 18" o.c. EACH WAY

B3.1B3.2B3.3B3.6 B3.4B3.5

FEED DRIVE

16' - 0"

FEED SUB KITCHEN

118' - 0"

FEED DRIVE

16' - 0"

SMOOTH TRANSITION SMOOTH TRANSITION

9"

6'

1' 0"

9"

6'

1' 0"

152' - 0"

#5 BARS @ 18" o.c.

EACH WAY

6" SAND BASE UNDER

ALL CONCRETE

SLABS

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 3.

rv t

2/ /2 9:

:2

AM

S-301-B3

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B

C O N

VE

N

TI

O N

AL

F R

EE

ST

AL

L

AR

EA

D R Y C O W

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/8" 1'-0"1

FOUNDATION SECTION - THROUGH

CROSS OVER

1/8" 1'-0"2

FOUNDATION SECTION - THROUGH

FREESTALLS

1/8" 1'-0"3 FEED SUB KITCHEN SECTION

KEYNOTES:

1 FEED MANAGER: 36" X 1/4" TROWELED ON

EPOXY

1 1

GENERAL NOTES:

LEVEL 0' - 0" 865' - 4" (T.O. FLUSH FLUME)

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 111306287

RFI 11130628 7

RFI 11159823

RFI 11159823

RFI 11159823

LEVEL -1 B4 T.O.

FOOTING

860' - 4"

B4.1 B4.4

1' - 0"1' - 0" 52' - 0"

1' - 6"

3" 3"

1' - 6"

3" 3"

6" CONCRETE OVER

6" SAND BASE

LEVEL 1 B4 T.O.

CURB-WEST

865' - 8"

4" 6"

6" CONCRETE FLOOR W/ #5

BARS @ 18" O.C. BOTH WAYS

LEVEL -1 B4 T.O.

FOOTING

860' - 4"

B4.1 B4.4

LEVEL 2 B4 T.O.

CURB-EAST

869' - 4"

1' - 0" 14' - 4" 6' - 8" 10' - 0" 6' - 8" 14' - 4" 1' - 0"

4' - 0" 1' - 0"1' - 8" 1' - 8"1' - 0" 4' - 0"

1' 0"

9' 0"

8" 2' 2"

1' - 6"

3" 3"

1' - 6"

3" 3"

2"2"

VA

R

IE

S

VA

R

IE

S

6"6"

6" CONCRETE FLOOR

6" CONCRETE FLOOR

10" CONCRETE FLOOR

10" CONCRETE FLOOR

1'-0" CONCRETE FLOOR

8" CONCRETE FLOOR

SEE DETAIL 1/S-502-B4 FOR REINFORCEMENT

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 4.

rv t

2/ /2 :0 0:

A M

S-301-B4

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B

- M

IL

KI

N G

PA

R

LO

R

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

A

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/4" 1'-0"S-301-B4

FOUNDATION SECTION THROUGH SHOP

AND OFFICE- AREA B4 - MILKING PARLOR1

1/4" 1'-0"S-301-B4

FOUNDATION SECTION THROUGH

MILKING PARLOR- AREA B4 - MILKING

PARLOR2

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

LEVEL -1 B5 T.O.

861' - 4"

B5.3B5.2

1' - 0"1' - 0"

6" CONCRETE FLOOR OVER

6" SAND FILL

CONCRETE FOUNDATION

CONCRETE

SPREAD FOOTING

VA

R

IE

S

VA

R

IE

S

1' - 6"

3" 3"

1' - 6"

3" 3"

10' - 0" 8" 22' - 8" 8" 8' - 0"

LEVEL 2 B5 T.O. CURB

869' - 4"

2" 2"

6"

6"

6"

6" CONCRETE FLOOR W/ #5

BARS @ 18" O.C. BOTH WAYS

LEVEL -1 B5 T.O.

FOOTING

861' - 4"

B5.1 B5.3B5.2

8"1' - 0" 1' - 0"

SCREENINGS IN PEN AREA - OTHER

AREAS 6" CONCRETE FLOOR

8" 8"

VA

R

IE

S

2' 6"

1' 6"

VA

R

IE

S

6"

6" 6"

1' - 6"

3"3"

1' - 6"

3" 3"

LEVEL 2 B5 T.O. CURB

869' - 4"

16' - 4" 10' - 0" 22' - 8" 8' - 0"

1' 8"

1' 8"

6" CONCRETE FLOOR OVER

6" SAND FILL

6" CONCRETE FLOOR W/ #5

BARS @ 18" O.C. BOTH WAYS

LEVEL -1 B5 T.O.

FOOTING

861' - 4"

B5.3B5.2

1' - 0"

CONCRETE FOUNDATION

CONCRETE SPREAD FOOTING

1' - 6"

3" 3"

VA

R

IE

S

VA

R

IE

S

6"

VA

R

IE

S

VA

R

IE

S

1' - 6"

3"

6"

6"

3"

LEVEL 2 B5 T.O. CURB

869' - 4"

1' - 0" 10' - 0" 8" 22' - 8" 8' - 0"8"

6" CONCRETE FLOOR OVER

6" SAND FILL

6" CONCRETE FLOOR W/ #5

BARS @ 18" O.C. BOTH WAYS

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 5.

rv t

2/ /2 :2 1:

A M

S-301-B5

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B

- S

PE

C

IA

L

N

EE

D S

AN

D M

AT

ER

N

IT

Y

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/4" 1'-0"1

FOUNDATION SECTION THROUGH

PROCEDURE AREA - AREA B5 - SPECIAL

NEEDS AND MATERNITY

1/4" 1'-0"2

FOUNDATION SECTION THROUGH

MATERNITY PENS - AREA B5 - SPECIAL

NEEDS AND MATERNITY

1/4" 1'-0"3

FOUNDATION SECTION THROUGH

MATERNITY PENS - AREA B5 - SPECIAL

NEEDS AND MATERNITY

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 11159823

RFI 11159823

865' - 4"

LEVEL -1 B6 TO FOOTING

861' - 4"

LEVEL 1 B6 TO

CONCRETE

868' - 3"

B6.FB6.E

1' - 0" CURB

1' 0"

1' - 6"

FOUNDATION

8"

FEED ALLEY

14' - 0" 8"

FEED LANE

16' - 1 1/4"

1' 6"

1/ 2"

/4

1' 1/ 2"

3' 0"

1' 6"

1' 2"

1'

VA

R

IE

S

#5 @ 12" EA WAY

#5 @ 12" EA WAY

#5 @ 18" EA WAY

#5 @ 18" EA WAY

6" CONCRETE OVER

6" SAND BASE

6" CONCRETE OVER

6" SAND BASE

FREESTALL

SAND

1/4" THICK BY 36"

TROWELED ON EPOXY

LEVEL 0 B6 TO FLUSH

FLUME

865' - 4"

LEVEL -1 B6 TO FOOTING

861' - 4"

LEVEL 1 B6 TO

CONCRETE

868' - 3"

B6.EB6.D

1' 6"

1' 1/ 2"

1' 6"

8"8"

FREESTALL

9' - 0 3/4" 6"

MANURE SCRAPE ALLEY

12' - 0" 6"

FREESTALL

9' - 0 3/4"

WALKWAY

1/ 2"

1' 0" 8 1/ 2"

1' 1/ 2"

1/ 2"

1' 1/ 2"

SCREENINGS SCREENINGS

#5 @ 12" EA WAY #5 @ 18" EA WAY #5 @ 18" EA WAY #5 @ 12" EA WAY

#5 @ 18" EA WAY 6" CONCRETE OVER

6" SAND BASE

SAND SAND

LEVEL 0 B6 TO FLUSH

FLUME

865' - 4"

LEVEL -1 B6 TO FOOTING

861' - 4"

LEVEL 1 B6 TO

CONCRETE

868' - 3"

B6.FB6.E

VA

R

IE

S

1/2" CROWN

1' 6"

5"

1/ 4"

1/ 4"

CROSS OVER

10' - 2 3/4"

FEED ALLEY

14' - 0" 8"

FEED DRIVE

16' - 1 1/4" 1' - 0"

#5 @ 18" EA WAY

#5 @ 18" EA WAY

#5 @ 18" EA WAY

#5 @ 18" EA WAY1'

5"

6" CONCRETE OVER

6" SAND BASE

1/4" THICK BY 36"

TROWELED ON EPOXY

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 6.

rv t

2/ /2 :4 7:

A M

S-301-B6

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B

- R

O

BO

TI

C

M

IL

KI

N G F R

EE

ST

AL

L

AR

EA

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/2" 1'-0"1 FEED LANE / FEED DRIVE SECTION

1/2" 1'-0"2

FREESTALL / MANURE SCRAPE ALLEY

SECTION

1/2" 1'-0"3 CROSS OVER SECTION

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 11159823

RFI 11159823

RFI 11159823

01_LEVEL_FF

864' - 6"

00_LEVEL_TOF

860' - 6"

01_LEVEL_TOC

866' - 6"

6' - 5 1/2" 6' - 5 1/4"12' - 9 1/4"

34' - 0"

18" PEA GRAVEL

3' - 2" 3' - 2 1/4"

ALL CONC. SLABS 6" W/

#5 BARS @ 18" O.C. EACH WAY

ALL CONC. OVER 6" SAND

BASE THICKEN ALL CONC. EDGES TO 8" X 1'-6"

1' - 0"

2' - 10"

4 1/4"

6' - 5 1/2"

4"

12' - 1"

4"

6' - 5 1/2"

4"

2' - 10"

1' - 0"

18" PEA GRAVEL

1 1

+24"

+4"

+0" +4"

+0"

+4"

+24"

2' 0"

4' 0"

1' 0"

+4"

-3/4" TRENCH DRAIN+0" +0"+0"

+0"

SLOPE DOWN SLOPE DOWN

01_LEVEL_FF

864' - 6"

00_LEVEL_TOF

860' - 6"

B7.1 B7.2 B7.3 B7.4

01_LEVEL_TOC

866' - 6"

14' - 6" 11' - 6" 14' - 6"

57' - 0"

15" DEEP PEA GRAVEL

7' - 3" 7' - 3"

ALL CONC. SLABS 6" W/

#5 BARS @ 18" O.C. EACH WAYALL CONC. OVER 6" SAND BASE

1' - 0" 21' - 9" 6" 10' - 6" 6" 21' - 9" 1' - 0"

15" DEEP PEA GRAVEL

2' 0"

4' 0"

1' 0"

+0" +8"

+0"

+8"

+24" +24"

5' - 3" 5' - 3"

+0" +0" +0"-3/4" TRENCH DRAIN

SLOPE DOWNSLOPE DOWN

+0"

3" LIMESTONE SCREENINGS 3" LIMESTONE SCREENINGS

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 7.

rv t

2/ /2 :0 9:

A M

S-301-B7

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B

- C

AL

F

BA

R N

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B7

3/8" 1'-0"1 WEST CONCRETE CROSS SECTION

3/8" 1'-0"2 EAST CONCRETE CROSS SECTION

KEYNOTES:

1 COORDINATE CURB PLACEMENT WITH CALF

STALL MANUFACTURER

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 11159823

LEVEL -1 B8 TO FOOTING

862' - 1"

B8.1 B8.2

LEVEL 1 B8 TO

CONCRETE

867' - 1"

LEVEL 0 B8 TOFF

866' - 6"

1' - 0" 19' - 0" 20' - 0" 19' - 0" 1' - 0"

6" CONCRETE FLOOR

W/ #4 BARS @18" O.C. EACH

WAY CENTERED IN SLAB

6" THICK SAND BASE

TRENCH DRAIN

5"

LEVEL -1 B8 TO FOOTING

862' - 1"

B8.AB8.BB8.CB8.DB8.E

LEVEL 1 B8 TO

CONCRETE

867' - 1"

LEVEL 0 B8 TOFF

866' - 6"

1' - 0" 87' - 0" 1' - 0"

6" CONCRETE FLOOR

W/ #4 BARS @18" O.C. EACH

WAY CENTERED IN SLAB

6" THICK SAND BASE

2" 11' - 3" 1' - 0" 11' - 3"

5"

LEVEL -1 B8 TO FOOTING

862' - 1"

B8.1 B8.2

LEVEL 1 B8 TO

CONCRETE

867' - 1"

LEVEL 0 B8 TOFF

866' - 6"

1' - 0" 58' - 0" 1' - 0"

6" CONCRETE FLOOR

W/ #4 BARS @18" O.C. EACH

WAY CENTERED IN SLAB

6" THICK SAND BASE

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 8.

rv t

2/ /2 :5 1:

A M

S-301-B8

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B

- A

G R O N O M Y

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B8

1/4" 1'-0"1 TRENCH DRAIN SECTION

1/4" 1'-0"2 LONGITUDINAL SECTION

1/4" 1'-0"3 FLOOR SECTION

GENERAL NOTES:

1. THE SHEET PERTAINS TO BID OPTION 4

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 11159823

RFI 11159823

LEVEL 1 B11 TOC

868' - 8"

LEVEL -1 TO FOOTING

863' - 8"

B11.1 B11.2

1' - 0" 78' - 0" 1' - 0"

5' 0"

1' 0"

1' - 6"

6" T

YP

8"

6" CONC. FLOOR W/ #5 BARS @ 18" O.C.

EACH WAY OVER 6" SAND BASE

LEVEL 1 B11 TOC

868' - 8"

LEVEL -1 TO FOOTING

863' - 8"

B11.1 B11.2

1' - 0" 11' - 2" 8" 66' - 2" 1' - 0"

1' - 6"

1' 0"

5' 0"

6" T

YP

8"

8" X 24"

CURB

6" CONC. FLOOR W/ #5 BARS @ 18" O.C.

EACH WAY OVER 6" SAND BASE

LEVEL 1 B11 TOC

868' - 8"

LEVEL -1 TO FOOTING

863' - 8"

B11.1 B11.2

1' - 0" 78' - 0" 1' - 0"

4' 4"

1' - 6"

1' 0"

TRENCH DRAIN

6" CONC. FLOOR W/ #5 BARS @ 18" O.C.

EACH WAY OVER 6" SAND BASE

LEVEL 1 B11 TOC

868' - 8"

LEVEL -1 TO FOOTING

863' - 8"

B11.1 B11.2

1' - 0" 78' - 0" 1' - 0"

1' 0"

1' - 6"

4' 4"

6" T

YP

. 8" GRAVEL FLOOR

8"

LEVEL 1 B11 TOC

868' - 8"

LEVEL -1 TO FOOTING

863' - 8"

B11.AB11.BB11.CB11.DB11.EB11.FB11.H B11.GB11.I

10' - 6" 23' - 8" 29' - 8" 28' - 5" 11' - 9" 1' - 0" 11' - 3" 27' - 6" 1' - 0"

6" T

YP

TRENCH DRAIN TRENCH DRAIN8" X 36" CONC CURB

W/ #5 BARS @ 12" O.C.

EACH WAY

6" CONC. FLOOR W/ #5 BARS @ 18" O.C.

EACH WAY OVER 6" SAND BASE

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B .rv t

2/ /2 :0 0:

P M

S-301-B11

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B M

AC

H

IN

E

ST

O R

AG

E

SH

O P

PE

ST

IC

ID

E

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/8" 1'-0"1 FLOOR SECTION

1/8" 1'-0"2 CONTAINMENT AREA SECTION

1/8" 1'-0"3 TRENCH DRAIN SECTION

1/8" 1'-0"4 STORAGE SECTION

1/8" 1'-0"5 NORTH LONGITUDINAL SECTION

NORTH

KEY PLAN

B11

R

TA

/0 8/

AD

D

EN

D U M

/0 2/

AD

D

EN

D U M

/1 8/

KEYNOTES:

1 BID OPTION 3: 6" CONCRETE, TROWEL FINISH

RFI 11159823

RFI 11159823

RFI 11159823

LEVEL 0 B12.1 T.O.

FLUSH FLUME

865' - 4"

LEVEL -1 B12.1 T.O.

FOOTING

861' - 4"

B12.1.AB12.1.B

LEVEL 1 B12.1 T.O. CURB

867' - 4"

6" CONCRETE FLOOR W/ #5 BARS

@ 18" O.C. BOTH WAYS CENTERED IN SLAB

CONCRETE FOUNDATION

3"3"

1' - 6"

6" CONCRETE OVER

6" SAND BASE

FLUSH FLUME

LEVEL 0 B12.1 T.O.

FLUSH FLUME

865' - 4"

LEVEL -1 B12.1 T.O.

FOOTING

861' - 4"

B12.1.AB12.1.B

LEVEL 1 B12.1 T.O. CURB

867' - 4"

1' - 6" 1' - 6"

3"3"3" 3"

6" CONCRETE FLOOR W/ #5 BARS

@ 18" O.C. BOTH WAYS CENTERED IN SLAB

CONCRETE FOUNDATION

EXTEND FOUNDATION AND FOOTING CROSS

WALL @ EACH COLUMN LOCATION

1' - 0"12' - 0"1' - 0"

6” CONCRETE OVER

6” SAND BASE

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B .1 .rv t

2/ /2 1:

:3

PM

S-301-B12.1

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B .1

C O N N

EC

TO

R

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B12.1

3/8" 1'-0"1

FOUNDATION SECTION - AREA B12.1 -

CONNECTOR

3/8" 1'-0"2

FOUNDATION SECTION - AREA B12.1 -

CONNECTOR

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 11159823

LEVEL 0 B12.2 T.O.

865' - 4"

LEVEL -1 B12.2 T.O.

FOOTING

861' - 4"

LEVEL 1 B12.2 T.O. CURB

867' - 4"

CONCRETE FOUNDATION

6" CONCRETE FLOOR W/ #5 BARS @ 18"

O.C. BOTH WAYS CENTERED IN SLAB B12.2.AB12.2.B

1' - 0" 1' - 0"

6"

9"2' - 11 1/2"8"8' - 3"

1' - 6"

3" 3"

1' - 6"

3" 3"

11' - 4 1/2"

6" THICK SAND BASE

RFI 11159823

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B .2 .rv t

2/ /2 1:

:0

PM

S-301-B12.2

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B .2

C O N N

EC

TO

R A N D S O R

TI

N G

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B12.2

1/4" 1'-0"1

FOUNDATION SECTION - AREA B12.2 -

CONNECTOR AND SORTING

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

LEVEL -1 B13 T.O.

861' - 4"

B13.A

B12.1.A

FOUNDATION WALL

1' - 0"

3" 1' - 0"

LEVEL 1 B13 T.O. CURB

867' - 4"

B13.C

3" 1' - 0" 3"3"

6" CONCRETE FLOOR W/ #5 BARS

@ 18" O.C. BOTH WAYS

6" CONCRETE FLOOR W/ FLOAT

FINISH OVER 6" SAND BASE

23' - 0" 1' - 0"

PROVIDE CONTROL JOINTS @ 16" O.C. MAXIMUM

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B .rv t

2/ /2 1:

:2

PM

S-301-B13

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B M

IL

K

H O U

SE

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B15

1/4" 1'-0"1

FOUNDATION SECTIONS - AREA B13 - MILK

HOUSE

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

LEVEL 0 B14 FF

868' - 0"

B14.A B14.B B14.C B14.D B14.E B14.F B14.G B14.H B14.I B14.J B14.K

40' - 0"

1' 0"

#4 BARS @ 12" o.c. BOTH WAYS, TWO LAYERS

6" GRANULAR BASE

4"

#4 VERTICAL BARS @ 12" o.c. 2' 0"

8"8"

#4 HOOK BARS

@ 12" o.c.

12"

12"

(2) - #4 HORIZONTAL

BARS CONTINUOUS

4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0"

4' 0"

4' 0"

6"

3' 0"

ROUND CONCRETE AT THE TOP

6" DIAMETER NOMINAL, SCH. 40

GALVANIZED STEEL PIPE

FILL 6" DIAMETER NOMINAL,

SCH. 40 GALVANIZED STEEL

PIPE WITH CONCRETE

SLOPE CONCRETE AWAY

FROM BOLLARD

1' - 6"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B .rv t

2/ /2 1:

:5

PM

S-301-B14

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B

FU

EL

ST

O R

AG

E

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B14

1/2" 1'-0"J2 FOUNDATION CROSS SECTION - B14

1" 1'-0"B12 PIPE BOLLARD DETAIL - B14

1 INSTALL #4 HOOK BARS @ CORNERS

@ 12" o.c. 18" x 18"

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

LEVEL -1 B4 T.O.

860' - 4"

B4.2 B4.3

LEVEL 2 B4 T.O.

CURB-EAST

869' - 4"

1' - 0" 42' - 0" 1' - 0"

1' - 6"

3" 3"

1' - 6"

3"3"

6" CONCRETE OVER

6" SAND BASE

VA

R

IE

S

6"

6" CONCRETE FLOOR W/ #5

BARS @ 18" O.C. BOTH WAYS

8" 8"

VA

R

IE

S

6"

8"

2' - 6" 8" 3' - 4" 8" 27' - 8" 8" 3' - 4" 8" 2' - 6"

8"

LEVEL 0 B4 T.O. FLUSH

FLUME

865' - 4"

LEVEL -1 B4 T.O.

FOOTING

860' - 4"

B4.2 B4.3

1' - 0" 42' - 0" 1' - 0"

1' - 6"

3"3" 1' - 6"

3"3"

6"

6" CONCRETE OVER

6" SAND BASE

6" CONCRETE FLOOR W/ #5

BARS @ 18" O.C. BOTH WAYS

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 4.

rv t

2/ /2 :0 0:

A M

S-302-B4

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B

- M

IL

KI

N G

PA

R

LO

R

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

A

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B4

1/4" 1'-0"S-302-B4

FOUNDATION SECTION THROUGH

HOLDING PEN - AREA B4 - MILKING

PARLOR1

1/4" 1'-0"S-302-B4

FOUNDATION SECTION THROUGH

CONNECTOR- AREA B4 - MILKING PARLOR2

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 11159823

LEVEL -1 B5 T.O.

861' - 4"

B5.B B5.CB5.A

1' - 0" 8"

+11

+21

+19+14

STORAGE PROCEDURE AREA

1' - 6"

LEVEL 2 B5 T.O. CURB

869' - 4"TRENCH DRAIN TRENCH DRAIN

+14 +12.5 +12.5

SLOPE DOWNSLOPE DOWN

[No Slope]

6" CONCRETE FLOOR OVER

6" SAND FILL

6" CONCRETE FLOOR W/ #5

BARS @ 18" O.C. BOTH WAYS

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 5.

rv t

2/ /2 :2 1:

A M

S-302-B5

FO

U N D

AT

IO

N S

EC

TI

O N S-

LO

N G

IT

U D

IN

AL

AR

EA

B5

SP

EC

IA

L N

EE

D S

AN

D M

AT

ER

N

IT

Y

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/4" 1'-0"1

FOUNDATION SECTION-LONGITUDINAL

THROUGH STORAGE AND PROCEDURE

AREA - AREA B5 - SPECIAL NEEDS AND

MATERNITY

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

865' - 4"

LEVEL -1 B6 TO FOOTING

861' - 4"

LEVEL 1 B6 TO

CONCRETE

868' - 3"

B6.22B6.21 8"

SCRAPER DRIVE

10' - 0"

FEED SUB KITCHEN

20' - 0"

FREESTALLS

3' 5"

1' 1"

4"

#5 @ 18" O.C. EACH WAY

6" CONCRETE OVER

6" SAND BASE

#5 @ 12" O.C. EACH WAY

8" X 5'-0"

CONC. WALL

SAND

LEVEL 0 B6 TO FLUSH

FLUME

865' - 4"

LEVEL -1 B6 TO FOOTING

861' - 4"

LEVEL 1 B6 TO

CONCRETE

868' - 3"

B6.22B6.21

FEED SUB KITCHEN

20' - 0"

STALL LANE

#5 @ 18" O.C. EACH WAY 6" CONCRETE OVER

6" SAND BASE

4"

LEVEL 0 B6 TO FLUSH

FLUME

865' - 4"

LEVEL -1 B6 TO FOOTING

861' - 4"

LEVEL 1 B6 TO

CONCRETE

868' - 3"

B6.22B6.21

8"

CROSSOVER

16' - 0" 8"

SCRAPER DRIVE

10' - 0"

FEED SUB KITCHEN

20' - 0"

#5 @ 18" O.C. EACH WAY

6" CONCRETE OVER

6" SAND BASE

#5 @ 12" O.C. EACH WAY

8" X 5'-0"

CONC. WALL

3' 6"

1' 6"

#5 @ 12" O.C. EACH WAY

3' 1/ 4"

1' 3/ 4"

8" X 5'-0"

CONC. WALL

SCREENINGS

SAND

4"

FREESTALLS

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 6.

rv t

2/ /2 :4 7:

A M

S-302-B6

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B

- R

O

BO

TI

C

M

IL

KI

N G F R

EE

ST

AL

L

AR

EA

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/2" 1'-0"1 E LONG FREESTALL SECTION

1/2" 1'-0"2 E STALL LANE LONG SECTION

1/2" 1'-0"3 NE LONG CROWN SECTION

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 11159823

RFI 11159823

LEVEL 0 B12.1 T.O.

865' - 4"

LEVEL -1 B12.1 T.O.

FOOTING

861' - 4"

B12.1.1B12.1.2B12.1.3B12.1.4B12.1.5

LEVEL 1 B12.1 T.O. CURB

867' - 4"

6" CONCRETE FLOOR W/ #5 BARS @ 18"

O.C. BOTH WAYS CENTERED IN SLAB

CONCRETE FOUNDATION

100' - 0"

6" THICK SAND BASE

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B .1 .rv t

2/ /2 1:

:2

PM

S-302-B12.1

FO

U N D

AT

IO

N S

EC

TI

O N S-

LO

N G

IT

U D

IN

AL

AR

EA

B1

2.

- C

O N N

EC

TO

R

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B12.1

1/8" 1'-0"1

FOUNDATION SECTIONS-LONGITUDINAL -

AREA B12.1 - CONNECTOR

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

LEVEL -1 B13 T.O.

861' - 4"

B13.1B13.3

CONCRETE FOUNDATION

LEVEL 1 B13 T.O. CURB

867' - 4"

B13.2

1' - 0" 31' - 0" 1' - 0"

1' - 6" 3" 3"

1' - 6" 3" 3"

6" CONCRETE FLOOR W/ #5 BARS

@ 18" O.C. BOTH WAYS

6" CONCRETE FLOOR W/ FLOAT

FINISH OVER 6" SAND BASE

PROVIDE CONTROL JOINTS @ 16" O.C. MAXIMUM

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B .rv t

2/ /2 1:

:1

PM

S-302-B13

FO

U N D

AT

IO

N S

EC

TI

O N S-

LO

N G

IT

U D

IN

AL

AR

EA

B1

- M

IL

K H O U

SE

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NORTH

KEY PLAN

B15

1/4" 1'-0"1

FOUNDATION SECTIONS-LONGITUDINAL -

AREA B13 - MILK HOUSE

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

LEVEL -2 B4 T.O.

CONCRETE (SUBWAY)

855' - 8"

B4.F B4.C

+31" +36"

+0"

-121" -116"

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

1' - 0" 31' - 2" 8" 19' - 9"

1'-0" CONCRETE FLOOR

8" CONCRETE FLOOR

10" CONCRETE FLOOR

(COW DECK)

6" CONCRETE

FLOOR

6" CONCRETE FLOOR

+29"

[No Slope]

LEVEL 1 B4 T.O.

CURB-WEST

865' - 8"

B4.DB4.E

OPERATOR PIT FLOOR

SUBWAY

MILKING PARLOR

B4-109

CORRIDOR

B4-108

UTILITY

ROOM/SUBWAY

ACCESS

B4-104

CORRIDOR

WALL

4"

SEE PLAN FOR LOCATION

6" CONCRETE CURB AT WALL

-5"

LEVEL -1 B4 T.O.

FOOTING

860' - 4"

B4.C B4.B B4.A

+0"

1' - 0"

1' - 6"

3" 3"

6" CONCRETE FLOOR W/ #5 BARS

@ 18" O.C. BOTH WAYS

LEVEL 1 B4 T.O.

CURB-WEST

865' - 8"

51' - 0"

6"6" CONCRETE OVER

6" SAND BASE

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 4.

rv t

2/ /2 :0 0:

A M

S-303-B4

FO

U N D

AT

IO

N S

EC

TI

O N S-

LO

N G

IT

U D

IN

AL

AR

EA

B4

M

IL

KI

N G P

AR

LO

R

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

A

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/4" 1'-0"S-303-B4

FOUNDATION

SECTIONS-LONGITUDINAL-CENTER - AREA

B4 - MILKING PARLOR2

1/4" 1'-0"S-303-B4

FOUNDATION

SECTIONS-LONGITUDINAL-WEST - AREA

B4 - MILKING PARLOR1

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

LEVEL -1 B6 TO FOOTING

861' - 4"

LEVEL 1 B6 TO

CONCRETE

868' - 3"

B6.E

CROSSOVER / FOOTBATH AREA

10' - 2 3/4"

STALL LANE

12' - 0"

ROBOT CURB

4' - 1 3/4" 6"

ROBOT ROOM

18' - 8 1/2" 6"

ROBOT CURB

4' - 1 3/4"

#5 @ 18" EA WAY

6" CONCRETE OVER

6" SAND BASE

#5 @ 18" EA WAY

#5 @ 18" EA WAY

#5 @ 18" EA WAY

6" CONCRETE OVER

6" SAND BASE

#5 @ 18" EA WAY

#5 @ 18" EA WAY

#5 @ 18" EA WAY

6"

4" 1' 4"

1' 4"

6"

6"

6" [No Slope]

STALL LANE

12' - 0"

CROSSOVER / FOOTBATH AREA

10' - 2 3/4"

LEVEL -1 B6 TO FOOTING

861' - 4"

#5 @ 18" EA WAY6" CONCRETE OVER

6" SAND BASE

6"

#5 @ 18" EA WAY #5 @ 18" EA WAY

#5 @ 18" EA WAY

+20" +20"

LEVEL 0 B6 TO FLUSH

FLUME

865' - 4"

LEVEL 1 B6 TO

CONCRETE

868' - 3"

6"

WORK ROOM

15' - 3" 6"

ROBOT ROOM

31' - 1" 6"

MECH/ELEC ROOM

9' - 8" 6"

#5 @ 18" EA WAY

#5 @ 18" EA WAY

1' 8" 4"

[No Slope]

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

/8

1' 2"

+20" +20" +20"+20"

+6"

+16"CENTER ALLEY

ROBOTIC ROOM

B6-104

WORK ROOM

B6-103

MECH/ELEC

ROOM

B6-109

S-501-B6

FLUSH FLUME

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 6.

rv t

2/ /2 :4 6:

A M

S-303-B6

FO

U N D

AT

IO

N S

EC

TI

O N S

- A

R

EA

B

- R

O

BO

TI

C

M

IL

KI

N G F R

EE

ST

AL

L

AR

EA

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

3/8" 1'-0"1

ROBOT AREA / FOOTBATH CROSS

SECTION

1/2" 1'-0"2 WORK ROOM CROSS SECTION

3/8" 1'-0"3 WORK ROOM LONG SECTION

NORTH

KEY PLAN

B6

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 11159823

RFI 11159823

4' -0

3' -0

4'

18"

SLAB OR GROUND LEVEL

6" DIA. GALV. STEEL PIPE

BOLLARD PAINTED YELLOW AND

FILLED WITH CONCRETE OR GROUT

SLOPE CONC. 1" ABOVE &

FINISH WITH STEEL TROWEL

CROWN CAP W/ CONC.

1" ABOVE TOP OF PIPE

#3 TIES 12" O.C.

4 #6 BARS

4 #6 HOOKS

TWO LAYERS OF

#5 BARS @ 7" O.C.

BOTHWAYS (2 MATTS)

36"

9"

1' 0"

6' 2"

1' - 6"

1' 0"

6"

1' - 0"

#5 HAIR PIN TIES

EXTEND 12'-0" INTO FLOOR SLAB

4 #6 BARS

#3 TIES 12" O.C.

1' - 0"

9"

1 1/2" 1 1/2"

#5 HAIRPIN TIES

EXTEND 12' INTO

FLOOR SLAB

# 5 BARS @ 12" O.C.

BOTHWAYS 2 MATTS

#6 HOOKS

@ 12" 0.C.

TWO LAYERS OF

#5 BARS @ 7" O.C.

BOTHWAYS (2 MATTS)

36"

9"

6' 2"

1' 0"

3"

1' - 6"

1' - 0"

1' 1/ 2"

2" CHAMFER

1' 6"

6" 7"

6"

4"

FEED MANGER

EXPOXY COATING

1/4" THICK X 36" WIDE

#4 BARS @ 18" O.C.

#4 TIES @ 18" O.C.

8" LONG

#4 TIES @ 18" O.C.

8" LONG

#4 BARS @ 12" O.C.

BOTHWAYS

#4 BARS @ 18" O.C.

BOTHWAYS

SLOPE DOWN

UNDISTURBED EARTH OR

COMPACTED FILL

6" GRANULAR FILL

6" GRANULAR FILL

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 2.

rv t

2/ /2 9:

:1

AM

S-501-B2

ST

R U C

TR

U

AL

D

ET

AI

LS

AR

EA

B

- A

D

VA

N C

ED

AN

IM

AL

N U

TR

IT

IO

N

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M .B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/16" 1'-0"H10 PIPE BOLLARD DETAIL

1" 1'-0"H6 COLUMN SECTION

1" 1'-0"H2 COLUMN DETAIL

1" 1'-0"H16 WALL & FOOTING DETAIL

1" 1'-0"1 FEED CURB DETAIL

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 11159823

20"

9"

#3 TIES 9" O.C.

4 #6 BARS

4 #6 HOOKS

#5 BARS @ 7" O.C.

BOTHWAYS 2 MATTS

7' 4"

1' 0"

1' - 6"

1' - 0"

#5 HAIR PIN TIES EXTENDING 16'

INTO FLOOR SLAB

SE

E C

IV

IL

P

LA

N

VA

R

IE

S

4' 0"

GRADE

ANCHOR BOLTS PER

MANUFACTURER

#5 BARS @ 7" O.C.

BOTHWAYS 2 MATTS

#6 HOOKS @ 12" O.C.

#5 BARS @ 12" O.C.

BOTHWAYS 2 MATTS

20"

9"

7' 4"

1' 0"

1' - 6"

1' - 0"

SIX #5 BARS

BOTH WAYS

2 MATTS

3' 6"

3' - 6"

3"

3"

FOUR #6 BARS

TIES @ 9" O.C.

#5 HAIR PIN TIES EXTENDING 16'

INTO FLOOR SLAB

1/ 2"

9" 9"

FLOOR SLAB

#4 X 18" DOWELS

@18" O.C.

6" CONCRETE APRON W/ #4 @ 18 O.C.

EACH WAY CENTERED IN SLAB

#4 @ 12" O.C.

EACH WAY

THICKEN EDGE

ON 3 SIDES

3'

0"12" FOUNDATION

. SLOPE 1/4"/FT

PREENGINEERED

METAL BUILDING

COLUMN

SIX #5 BARS

BOTH WAYS

TWO MATTS

1' 4"

3' - 6"

3"

3"

2' 6"

8"

1' 1/ 2"

6" 1' 1/ 2"

8' - 3"

TOP OF SLAB

TOP OF CATTLE GUARD SLAB

TOP OF SLAB

1' 1/ 2"

6" 1' 1/ 2"

1' 2"

16' - 0" 8"

TOP OF SLAB BEYOND

VA

R

IE

S

1' 1/ 2"

6"

FEED MANGER CURB

FEED ALLEY

TOP OF CATTLE GUARD SLAB

OUTSIDE WALL

FOUNDATION

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 3.

rv t

2/ /2 :2 3:

A M

S-502-B3

ST

R U C

TU

R

AL

D

ET

AI

LS

AR

EA

B

C O N

VE

N

TI

O N

AL

F R

EE

ST

AL

L

AR

EA

D R Y C O W

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1" 1'-0"2 COLUMN SECTION

1" 1'-0"3 WALL & FOOTING DETAIL

1" 1'-0"4 INTERNAL COLUMN FOOTING

1" 1'-0"1 COLUMN DETAIL

3/4" 1'-0"5 APRON & DOOR STOOP SECTION

1" 1'-0"6 INTERNAL COLUMN FOOTING SECTION 1

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

1/2" 1'-0"8 CATTLE GUARD CROSS SECTION 2

1/2" 1'-0"7 CATTLE GUARD CROSS SECTION 1

RFI 11130628

1' - 8" 5' - 0"

2"

8" 9' 0"

1' 0"

#6 HOOKS @ 6" O.C.

2' - 6"

2' 6"

COVER

2 1/2"

4"1' - 0" C O

VE

R 3"

C O

VE

R 1/ 2"

C O

VE

R 1/ 2"

SS SLEEVES SET IN CONCRETE

CURB FOR MILK LINES

SS PRE-FORMED PIT RAIL

6"

COW DECK

MILKER'S PIT

SUBWAY

#5 BARS @ 16" O.C.,

BOTH WAYS

#6 BARS @ 12" O.C.,

BOTH WAYS

#6 BARS @ 12" O.C.,

BOTH WAYS

#6 BARS @ 6" O.C.,

BOTH WAYS

2' 2"

2"

SEE CIVIL DRAWINGS

FOR PIPE SIZE AND

DEPTH

6"

(S

EE

S

IT

E D R

AW

IN

G S)

VA

R

IE

S

1 1/2"

1 1/2"

1/ 2"#3 BARS @ 18" o.c.

BOTH WAYS

#4 HOOK BARS

@ 18" o.c.

12"

12"

#4 VERTICAL

BARS @ 12" o.c.

#4 HORIZONTAL

BARS @ 12" o.c.

4" ROCK BASE

PVC PIPE, SEE

SITE DRAWINGS

L1 1/2 x 1 1/2 x 1/4"

ANGLE WITH 2"

STUDS @ 12" o.c.

GUTTER GRATES - GRATE ROD SPACING @ 2" O.C., 5/8" ⌀ ROD;

CROSS ROD SPACING @ 16" O.C., 3/4" ⌀ ROD.

11"1"

SEE ARCH. DWGS.

SE

E

AR

C H . D

W G S.

CONC. SLAB - SEE PLAN

CONST. JOINT

MTL. EDGE - SEE

ARCH. DWGS.

1 - #4 NOSING

BAR - TYP.

CONC. SLAB - SEE PLAN

1/2" EXP.

JOINT MAT.

#4 @ 16" O.C.

EA.

FACE

#4 @ 18" O.C.

EA.

FACE

EL.- SEE

PLAN

EL.- SEE

PLAN

1' - 0"

COMPACTED

GRANULAR FILL

5"

#4 @ 12" O.C.

EA. WAY

CON. FTG. - SEE

PLAN FOR SIZE &

REINF.

3" COVER

CLEAR

6" 2' - 0" 6"

1' 0"

1' 0"

6"

#4 BARS @ 12" O.C.

TWO LAYERS #6 BARS @

6" O.C. BOTHWAYS

3" X 1-1/2" KEYWAY

6" GRANULAR BASE

OVER COMPACTED FILL

BENTONITE SEAL

THREE #4 BARS @18"

O.C. BOTHWAYS

EL. VARIES - SEE PLAN

8" 1' 8"

8"

6" CONC SLAB- SEE PLAN

POST - SEE EQUIPMENT DWGS

3/4" CHAMFER

6" CONC SLAB- SEE PLAN

6" GRANULAR BASE OVER

COMPACTED FILL OR

UNDISTURBED EARTH

TWO #4 @ 16" O.C.

VERT EA FACE

THREE #4 HORIZ CONT SET TIGHT

TO SLEEVE FOR POSTS

#4 BARS @ 18" O.C.

BOTHWAYS

#5 BARS @ 8" O.C. BOTHWAYS

#4 BARS @ 18" O.C.

BOTHWAYS

16"

16"

#5 HOOK BAR

@ 12" O.C.

#4 BARS @ 12" O.C.

BOTHWAYS

FLOOR

8"

7"

#5 BARS @ 8" O.C. BOTHWAYS

#4 BARS @ 18" O.C.

BOTHWAYS

FLOOR

8"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 4.

rv t

2/ /2 :0 0:

A M

S-502-B4

ST

R U C

TU

R

AL

D

ET

AI

LS

AR

EA

B

- M

IL

KI

N G

PA

R

LO

R

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

A

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/2" 1'-0"S-502-B4

SUBWAY/MILKER'S PIT DETAIL1

3/4" 1'-0"S-502-B4

FLUSH FLUME STRUCTURAL DETAIL3

3/4" 1'-0"S-502-B4

SECTION @ STAIR4

NTS5 SUMP DETAIL

NTS6 CURB DETAIL

NTS2 SUBWAY STAIRS CROSS SECTION

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 11159823

3' 6"

6" 6"

3'

8" 16' - 8"

8"

3' 6"

6" 6"

3'

#5 BARS @ 12" o.c

EACH WAY

#5 BARS @ 18" o.c

EACH WAY

8" SCREENINGS

6" SAND BASE 6" SAND BASE

FREESTALL

DIVIDERS (TYP)

1' 6"

1' 6"

(CROSS OVER) (CROSS OVER)(FREESTALL AREA)

#5 BARS @ 12" o.c

EACH WAY

8" SCREENINGS

#5 BARS @ 18" o.c

EACH WAY

#5 BARS @ 18" o.c

EACH WAY

6" SAND BASE

6" SAND BASE

#5 BARS @ 12" o.c

EACH WAY

8"

6"

2"4"

4" 4" 8"

6" 6"

8" 9' - 0 3/4"

1' 0"

1' 0"

6" 6"

1' 6"

1'

10' - 2 3/4"

CROWN 1/2"

6" 6"

4" 6" 6"

#5 BARS @ 18" o.c

EACH WAY

6" SAND BASE

#5 BARS @ 18" o.c

EACH WAY

PREENGINEERED

METAL BUILDING

COLUMN

SIX #5 BARS

BOTH WAYS

TWO MATTS

1' 4"

3' - 6"

3"

3"

CROSS OVER

FLOOR

TOP OF DIVIDER WALL

(LOCATED BEHIND POST)

6"

TOP OF CURB AT

FREESTALL HEAD

2' 6"

6" 1' 0"

TOP OF ALLEY FLOOR

PREENGINEERED

METAL BUILDING

COLUMN

SIX #5 BARS

BOTH WAYS

TWO MATTS

6" 1' 4"

3' - 6"

3"

3"

CROSS OVER

FLOOR

TOP OF DIVIDER WALL

TOP OF CURB AT FREESTALL HEAD

(LOCATED BEHIND POST)

5' 0"

4"

ALLEY FLOOR

1' 6"

3' 6"

1' 0"

2' 1/ 4"

3' 1/ 4"

COW ALLEY

#5 BARS @ 12" O.C.

#5 HOOKS @ 12" O.C.

24"

24"

1' 0"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 3.

rv t

2/ /2 9:

:3

AM

S-503-B3

ST

R U C

TU

R

AL

D

ET

AI

LS

AR

EA

B

C O N

VE

N

TI

O N

AL

F R

EE

ST

AL

L

AR

EA

D R Y C O W

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/2" 1'-0"1 CONCRETE DIVIDER WALL - B3

1/2" 1'-0"2 FREESTALL CONCRETE DETAIL - B3

1/2" 1'-0"3 CONCRETE DETAIL 3 - B3

1.

NOTES:

PROVIDE CONTROL JOINTS @ 15' MAXIMUM

SPACING.

1" 1'-0"4 INTERNAL COLUMN FOOTING SECTION 2

1" 1'-0"5 INTERNAL COLUMN FOOTING SECTION 3

1" 1'-0"6 WATERER ENDWALL CONCRETE DETAIL

1/2" 1'-0"7 WALL FOUNDATION DETAIL

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 11159823

RFI 11159823

RFI 11159823

RFI 11159823

80 GALLON

SURGE TANK

FROM SERVICE

2" SCH 40 PVC

2" BALL VALVE

WITH UNIONS PRESSURE RELIEF VALVE

SET AT 100 PSI

2" BALL VALVE

WITH UNIONS

P

39 PSI, 30 GPM

BOOSTER PUMP

F.F.

2" FREEZELESS

YARD HYDRANT

WITH 2" FPT OUTLET

2" SCH PVC

PIPE

FLOOR DRAIN WITH

REMOVEABLE DESIMENT

BASKET, THREADED

ADOPTER

P TRAP

TO WASTE LINE

DRAINABLE SLOPE

FLOOR SLAB

NOTE: DO NOT INSTALL P TRAP IN

LIVESTOCK/ ANIMAL AREAS

VALVE HYDRANT

BOX FLANGE

BUILDING

WALL

3/4" HOSE CONNECTION

FROM SUPPLY

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 1.

rv t

2/ /2 1:

:3

PM

P-501-B1

PL

U M

BI

N G D

ET

AI

LS

AR

EA

B

- A

IR

E M

IS

SI

O N S

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NTS1

HIGH VOLUME - LOW PRESSURE

SCHEMATIC

1 1/2" 1'-0"2 LW-1 MOUNTING DETAIL

NTS4 FLOOR DRAIN DETAIL

NTS3 FLUSH MOUNT BOX HYDRANT

R

TA

/0 8/

AD

D

EN

D U M

/1 8/

RFI 11161583

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E

M

AR

K

D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S _M

EP

-B 1.

rv t

2/ /2 1:

:4

PM

P-601-B1

PL

U M

BI

N G S C H

ED

U

LE

S

- A R

EA

B

- A

IR

EM

IS

SI

O N S

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

NOTES:

1.) SUPPLY SOURCES BLUFFVIEW

2.) VALVE ALL FIXTURES ON INLET & OUTLET WITH UNIONS

AHU-2 EXTERIOR AHU -- -- 1" POLY SEE AHU SCHEDULE

AHU-1 EXTERIOR AHU -- -- 1" POLY SEE AHU SCHEDULE

VP-1 LAB SPACE VACUUM PUMP 1" PVC -- -- VACUUM PUMP

WH-1 DIRTY LAB SPACE HYDRANT 3" PVC LW -- -- WALL HYDRANT

WH-1 WASH AREA HYDRANT 2" PVC LW -- -- WALL HYDRANT

WH-1

COW/WORKER

CIRCULATION SPACE HYDRANT 2" PVC LW -- -- WALL HYDRANT

HVLP-1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .