Am_0008_Dwgs_ARS01.pdf

PDF 19 MB Posted

Attached to
CANCELED - USDA Dairy Forage Research Center (DFRC)
Solicitation number
W9128F25R0014
Issued by

About this file

These architectural drawings (Am_0008_Dwgs_ARS01.pdf) detail the Metabolic Chambers (Building B1) for the new USDA Dairy Forage Research Center in Prairie du Sac, Wisconsin. The drawings provide comprehensive design specifications for a pre-engineered metal building measuring 105' 1-1/2" long by 53' wide, featuring multiple specialized spaces including metabolic chambers, lab spaces, circulation areas, and utility rooms. Key architectural elements include a 2:12 roof slope, mono-slope design, metal siding and roofing, and specific floor elevations at 865' 4" (top of flush flume), with dedicated areas for research functions such as data collection, equipment storage, and cow/worker circulation spaces.

The drawings include detailed plans for four metabolic chambers (B1-107A through B1-107D), each with specific design considerations like individual temperature and humidity controls (5-35°C, 90-35% humidity), specialized wall finishes, and precise dimensional layouts. Structural details highlight concrete foundations, floor slopes, and specific reinforcement requirements, with emphasis on coordinating final chamber dimensions and locations with the equipment manufacturer. The design integrates various technical specifications including electrical, mechanical, and plumbing systems, reflecting a comprehensive approach to creating a specialized research facility for dairy forage studies.

View the file

Other files

File Type Posted
W9128F25R0014 Amendment 15 - 07.22.2025.pdf PDF
Am_0015_Dwgs_ARS01.pdf PDF
JA_CECT-NWO-25-15_DFRC_Calan Feeding System_Redacted.pdf PDF
W9128F25R0014 Amendment 13 - 07.10.2025.pdf PDF
W9128F25R0014 Conformed thru Amd 13 - 07.10.2025.pdf PDF
Am_0012_Dwgs_ARS01.pdf PDF
Am_0011_Dwgs.pdf PDF
W9128F25R0014 Amendment 10 - 05.30.2025.pdf PDF
Am_0010_Dwgs.pdf PDF
W9128F25R0014 Conformed thru Amd 09 - 05.23.2025.pdf PDF
W9128F25R0014 Conformed thru Amd 09 - 05.23.2025.pdf PDF
W9128F25R0014 Amendment 09 - 05.23.2025.pdf PDF
Site Visit_24 Apr 2025_Sign in Sheet.jpg JPG image
W9128F25R0014 Conformed thru Amd 08 - 05.16.2025.pdf PDF
Amendment 07 - Ad_0011_Drawings_04.01.2025.pdf PDF
Amendment 07 - Ad_0007_Drawings_04.01.2025.pdf PDF
Amendment 07 - Ad_0006_Drawings_04.01.2025.pdf PDF
Amendment 07 - Ad_0003_Drawings_04.01.2025.pdf PDF
Amendment 07 - Ad_0010_Drawings_04.01.2025.pdf PDF
Amendment 07 - Ad_0009_Drawings_04.01.2025.pdf PDF
Amendment 07_Specifications_04.01.2025.pdf PDF
W9128F25R0014 - Amendment 0004 - 20241223.pdf PDF
Sheet C-509.pdf PDF
Am_0004_Specs_Div 01.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_1_1.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 7.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 4.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 8.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 2.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 9.pdf PDF
Pages from 20241108_USDA_DFRC_RTA_Dwgs_V3_3.pdf PDF
W9128F25R0014 Amd 0003 - 20241210.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 3.pdf PDF
Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_7.pdf PDF
Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_3.pdf PDF
Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_2.pdf PDF
Pages from 20241108_USDA_DFRC_RTA_Dwgs_V3_1.pdf PDF
20241108_USDA_DFRC_RTA_Dwgs_V2.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_1_3.pdf PDF
Pages from Pages from 20241108_USDA_DFRC_RTA_Dwgs_V1_4_1 6.pdf PDF
W9128F25R0014 Amd 0002 - 20241209.pdf PDF
20241108_USDA-DRFC_RTA_Specs_V2_08-22.pdf PDF
20241108_USDA-DRFC_RTA_Specs_V4_27-43.pdf PDF
W9128F25R0014 Amd 0001 - 20241204.pdf PDF
20241108_USDA-DRFC_RTA_Specs_V3_23-26.pdf PDF
USDA_DFRC_SpecsCvrs_RTA_Vol4.pdf PDF
USDA_DFRC_SpecsCvrs_RTA_Vol2.pdf PDF
20241108_USDA-DRFC_RTA_Specs_V1_00-07.pdf PDF
20241108_USDA_DFRC_RTA_ECI.pdf PDF
W9128F25R0014_SPECS_ARS01.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING ABBREVIATIONS

INDEX OF DRAWINGS

BUILDING SUMMARY

NUMBERING SYSTEM:

XX100

DISCIPLINE:

C - CIVIL

L - LANDSCAPE

A - ARCHITECTURE

M - MECHANICAL

E - ELECTRICAL

P - PLUMBING

S - STRUCTURAL

K - FOOD SERVICE

DISCIPLINE MODIFIER

ANNOTATION CALLOUTS/DRAWING SYMBOLS

GENERAL NOTES

A ---------------------

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ACC ACCESSIBLE

ACS AUTOMATIC CONTROL SYSTEM

ACS DR ACCESS DOOR

ACS PNL ACCESS PANEL

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHU AIR HANDLING UNIT

AIB AIR INFILTRATION BARRIER

ALTALTERNATE

ALUM ALUMINUM

ANOD ANODIZE

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

ASSY ASSEMBLY

ATC ACOUSTICAL TILE CEILING

AVG AVERAGE

AW ARCHITECTURAL WOODWORK

AWT ACOUSTICAL WALL TREATMENT

B ---------------------

B LABEL CLASS B DOOR

BALC BALCONY

BB BASEBOARD

BC BOOKCASE

BD BOARD

BDRY BOUNDARY

BFF BELOW FINISH FLOOR

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BN BULLNOSE

BOS BOTTOM OF STEEL

BOT BOTTOM

BP BUILDING PAPER

BRKT BRACKET

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C ---------------------

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

CAB CABINET

CATW CATWALK

CAV CAVITY

CBB CEMENTITIOUS (BACKER) BOARD

CD CONSTRUCTION DOCUMENTS

CDW CHILLED DRINKING WATER

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR

FURNISHED/CONTRACTOR INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG DIFF CEILING DIFFUSER

CLG HT CEILING HEIGHT

CLLCOLUMN LINE

CLO CLOSET

CLR COLOR

CLRM CLASSROOM

CMU CONCRETE MASONRY UNIT

CNDS CONDENSATE

CDR CARD READER

CO CLEANOUT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONC FLR CONCRETE FLOOR

CONF CONFERENCE

CONT CONTINUE

COORD COORDINATE

CORR CORRIDOR

CP CONCRETE PIPE

CPT CARPET

CR CONTROL ROOM

CRT CURTAIN

CS CAST STONE

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTR CENTER

CU FT CUBIC FEET

CWCASEMENT WINDOW

D ---------------------

D DEPTH

D LABEL CLASS D DOOR

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DGR DIAMOND GROOVE

DIA DIAMETER

DIRDIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

E ---------------------

E LABEL CLASS E DOOR

EA EACH

EF EACH FACE

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

ES EACH SIDE

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPS EXPANDED POLYSTYRENE BOARD

(INSULATION)

EQ EQUAL

EWC ELECTRIC WATER COOLER

EXP EXPOSED

EXT EXTERIOR

EXT EXTINGUISHER

EXT GR EXTERIOR GRADE

F ---------------------

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FAS BD FASCIA BOARD

FC BRK FACE BRICK

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF INSUL FOIL BACKED INSULATION

FGL FIBERGLASS

FH FIRE HOSE

FHP FULL HEIGHT PARTITION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FM FACTORY MUTUAL

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FR FIRE RESISTANT

FRG FIBER REINFORCED GYPSUM

FRMG FRAMING

FRP FIBERGLASS REINFORCED PLASTIC

FRTW FIRE RETARDANT TREATED WOOD

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET

FTG FOOTING

FWC FABRIC WALLCOVERING

G ---------------------

G NATURAL GAS

GALV GALVANIZED

GB GRAB BAR

GFCI GOVERNMENT FURNISHED

CONTRACTOR INSTALLED

GFGI GOVERNMENT INSTALLED

GOVERNMENT INSTALLED

GFRG GLASS-FIBER-REINFORCED GYPSUM

GLZ GLAZING

GR GROOVED

GR FL GROUND FLOOR

GUT GUTTER

GV GRAVEL

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H ---------------------

HB HOSE BIBB

HBRF HEAVY BROOM FINISH

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR

(FILTER)

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HORIZ HORIZONTAL

HT HEIGHT

HYDR HYDRAULIC

I ---------------------

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J ---------------------

JAN JANITOR

K ---------------------

KPD KEYPAD

KIT KITCHEN

KPL KICKPLATE

L ---------------------

LAM LAMINATE

LAV LAVATORY

LBR LUMBER

LBRF LIGHT BROOM FINISH

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIB LIBRARY

LIN LINEAR

LKR LOCKER

LOC LOCATION

LT LIGHT

LVDR LOUVER DOOR

LVR LOUVER

M ---------------------

MACH RM MACHINE ROOM

MATL MATERIAL

MAX MAXIMUM

MC MOISTURE CONTENT

MD METAL DECK

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MEMB MEMBRANE

MF MILL FINISH

MFR MANUFACTURER

MIDMIDDLE

MIL STD MILITARY STANDARD

MINMINIMUM, MINUTE

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOLDING (MOULDING)

MO MASONRY OPENING

MOD MODIFY

MB MOISTURE BARRIER

MTG MOUNTING

MTL METAL

MVBL MOVABLE

MWP MEMBRANE WATERPROOFING

N ---------------------

N NORTH

NANOT APPLICABLE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NICNOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NP NO PAINT

NRC NOISE REDUCTI

O -------------------

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OFF OFFICE

OGL OBSCURE GLASS

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPQ OPAQUE

OWSJ OPEN WEB STEEL JOIST

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P --------------------

PA PUBLIC ADDRESS

PAR PARAPET

PAT PATTERN

PB PULL BOX

PBD PARTICLEBOARD

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PH PHASE

PIL PILASTER

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLBG PLUMBING

PLG PILING

PLYWD PLYWOOD

PNL PANEL

PP PL PUSH/PULL PLATE

PR PAIR

PRCST PRECAST

PRKG PARKING

PS CONC PRESTRESSED CONCRETE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER AND

RECEPTACLE

PTN PARTITION

PWR POWER

Q --------------------

QT QUARRY TILE

QTY QUANTITY

R --------------------

RB RESILIENT BASE

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REINFORCED CONCRETE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RDG INS RIGID INSULATION, SOLID

REC RECESSED

REC ROOM RECREATION ROOM

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

REST RESTROOM

RF RESILIENT FLOORING

RFG ROOFING

RH ROOF HATCH

RHR RIGHT HAND REVERSE

RL ROOF LEADER

RLG RAILING

RM ROOM

RO ROUGH OPENING

RSD ROLLING STEEL DOOR

RV ROOF VENT

RVL REVEAL

REFER TO A/E/C CAD STANDARD FOR

SHEET NUMBERINGSTANDARDS

REVISION

TAG

NORTH ARROW w/

TRUE NORTH

INDICATION

ROOM TAG

ELEVATION NUMBER

SECTION

EXTERIOR ELEVATION

ENLARGEMENT,

DETAIL

SPOT ELEVATION

LEVEL NAME

SHEET NUMBER

SHEET NUMBER

SHEET NUMBER

SHEET KEYNOTE

INTERIOR ELEVATION

SHEET NUMBER

PLAN NORTH

S --------------------

SAN SAND

SB SPLASH BLOCK

SCHED SCHEDULE

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGL SINGLE

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIMSIMILAR

SJ SCORED JOINT

SKLT SKYLIGHT

SLNT SEALANT

SMK SMOKE

SMLS SEAMLESS

SP EL SPOT ELEVATION

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SST STAINLESS STEEL

ST STAIRS

STD STANDARD

STL JST STEEL JOIST

STL RF DK STEEL ROOF DECK

STOR STORAGE

STR STRINGERS

STRB/HRN STROBE/HORN

SUB FL SUBFLOOR

SV SHEET VINYL

SW SIDEWALK

T --------------------

T TREAD

T/S TUB/SHOWER

TC TERRA COTTA

TD TRENCH DRAIN

TELTELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TFFTOP OF FINISH FLOOR

THK THICKNESS

TK BD TACKBOARD

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOPO TOPOGRAPHY

TOS TOP OF SLAB

TRANS TRANSOM

TRTD TREATED

TV TELEVISION

TWL TROWEL

SHEET NUMBER WITHIN SERIES

A201

A204

A301

A401

ROOM

100'

LEVEL 01

100'

A

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 1.

rv t

5/ /2 :3 8:

A M

A-001-B1

G

EN

ER

AL

N O

TE

S, A

BB

R

EV

IA

TI

O N S

- A

R

EA

B

M

ET

AB

O

LI

C C H

AM

BE

R S

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

3/16" 1'-0"1 A1

R

TA

/0 8/

R ev is io n

/1 3/

ADVANCED

ANIMAL

NUTRITION

EQUIPMENT

B1 - 105

METABOLIC

CHAMBER

EQUIPMENT

B1 - 103

LAB SPACE

B1 - 106

HALLWAY TO ADMIN

LABS

(SEE A1 DRAWINGS)

B1.A B1.F

B1.1

B1.2

D6

A-301-B1

METABOLIC

CHAMBER DATA

COLLECTION

B1 - 104

B1.D B1.E

B1.6B1.4B1.3B1.2

UTILITY ROOM

B1 - 108

9' - 0 3/4" 23' - 0" 24' - 0"

/4

8' - 7"

19 19 19 19

B1.5

7'

/2

B1.C

/4

7'

/4

7'

3/

4"

6' - 2 1/2"

(CHAMBER WALL OUT TO OUT)

41' - 11"

20' - 11" 20' - 6" 20' - 6" 17' - 2 1/2" 26' - 0"

3' - 11" 9' - 0" 9' - 0"13' - 11" 10' - 0"

B1.B

2'

6"

B2.1

B2.2

B2.A/B1.F

3'

3/

4"

28' - 11"

A-203-B1

L12

E12 A-203-B1

H12

B12

/4

22' - 0"

B2

AAN

B1

METABOLIC

CHAMBERS

FLUSH FLUME FLUSH FLUME

B1.102

B1.103

B1.8

4'

B1.7

B1.1

B1.104

2'

6"

12' - 0"

5' - 2"

11' - 11"

40' - 1" 5' - 0 1/2"

5'

9"

A-401-B1 E8

1 1 1 1

A-202-B1 E5

A-201-B1 C7

A-201-B1 H7

17' - 3" 10' - 5" 10' - 5" 10' - 5"

19 19 19 19

WASH AREA

B1 - 102

DIRTY LAB SPACE

B1 - 100

METABOLIC

CHAMBER

B1 - 107A

METABOLIC

CHAMBER

B1 - 107B

METABOLIC

CHAMBER

B1 - 107C

METABOLIC

CHAMBER

B1 - 107D

COW/WORKER

CIRCULATION

SPACE

B1 - 101

7 1/2" 8' - 2 3/4" 17' - 1 3/4"

M

AT

C H

LI

N

E

- B

M

AT

C H

LI

N

E

- B

105' - 1 1/2"

1' - 5 3/4"

A-203-B1L6 H6

E6

A-203-B1 B6

8'

0" 5'

4"8' - 0" 6' - 0"

/2

6'

1/

2"

9'

1/

4"

C H

AM

BE

R S

O U

T

TO

O U

T

FLUME FLUME FLUME

A-203-B1 L1

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

Au to de sk

D oc s:

//1

5_

U

SD

A_ D

FR

C

_2

2/

A _S

_M

EP

-B 1.

rv t

5/

/2

:3 8:

A

M

A-101-B1

AR

C

H

IT

EC

TU

R

AL

F

LO

O R

P

LA

N

AR

EA

B

M

ET

AB

O

LI

C C

H

AM

BE

R

S

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D

R

AR

LI

N

G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0

8/

W

F2

0C

W

F2

1C

NORTH

KEY PLAN

B1

1/8" = 1'-0"C7

ARCHITECTURAL FLOOR PLAN - AREA B1 -

METABOLIC CHAMBERS

KEYNOTES:

GENERAL NOTES:

1 FINAL METABOLIC CHAMBER LOCATION AND

DIMENSIONS TO COORDINATE WITH

MANUFACTURER

1.

2.

3.

COORDINATE WITH BUILDING A1 CORRIDOR

CONNECTION

B1 AND B2 ARE A SINGLE BUILDING SEPARATED

BY A NON-LOAD BEARING WALL.

BASELINE DIMENSIONS ARE FROM OUT TO OUT

OF CONCRETE

2 A1 CORRIDOR CONNECTION

R

TA

/0

8/

R ev is io n

/1

3/

B1.A B1.F

B1.1

B1.2

B1.D B1.E

OVERHANG

RIDGELINE

ROOF SLOPE 2:12

ROOF SLOPPE 2:12

2' OVERHANG

2' OVERHANG

B1.CB1.B

B2.1

B2.2

B2.A/B1.F

105' - 1 1/2"

2'

0" O

VE

R

H

AN

G (T

YP

IC

AL

2'

0"

M

AT

C H

LI

N

E

- B

M

AT

C H

LI

N

E

- B

RIDGELINE

2' - 0" 20' - 11" 20' - 6" 20' - 6" 17' - 2 1/2" 26' - 2 1/4"

6'

0"

6' - 0"

DOOR

AWNING

DOOR

AWNING6'

0"

6' - 0"

1MATCHLINE - B1

MATCHLINE - B2

/2

/2

A-203-B1L6 H6

E6

A-203-B1 B6

A-203-B1 L1

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

Au to de sk

D oc s:

//1

5_

U

SD

A_ D

FR

C

_2

2/

A _S

_M

EP

-B 1.

rv t

5/

/2

:3 8:

A

M

A-102-B1

R O

O F

AR

EA

P

LA

N

AR

EA

B

- M

ET

AB

O

LI

C

C H

AM

BE

R S

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D

R

AR

LI

N

G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0

8/

W

F2

0C

W

F2

1C

NORTH

KEY PLAN

B1

1/8" = 1'-0"1

ROOF AREA PLAN - AREA B1 - METABOLIC

CHAMBERS

GENERAL NOTES:

1. AWINGS ARE MONO SLOPE

KEYNOTES:

1 A1 CORRIDOR CONNECTION

R

TA

/0

8/

R ev is io n

/1

3/

B1.A B1.F

B1.1

B1.2

B1.D B1.EB1.C

17' - 2 1/2"61' - 11"

B1.B

B2.1

B2.2

B2.A/B1.F

COW/WORKER

CIRCULATION

SPACE

B1 - 101

0"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

Au to de sk

D oc s:

//1

5_

U

SD

A_ D

FR

C

_2

2/

A _S

_M

EP

-B 1.

rv t

5/

/2

:3 8:

A

M

A-103-B1

R

EF

LE

C

TE

D

C

EI

LI

N

G P

LA

N

AR

EA

B

M

ET

AB

O

LI

C

C H

AM

BE

R S

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D

R

AR

LI

N

G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0

8/

W

F2

0C

W

F2

1C

NORTH

KEY PLAN

B1

1/8" = 1'-0"1

REFLECTED CEILING PLAN - AREA B1 -

METABOLIC CHAMBERS

R

TA

/0

8/

R ev is io n

/1

3/

B1.A B1.FB1.D B1.EB1.CB1.B

B2.A/B1.F

PREENGINEERED BUILDING

METAL SIDING

PREENGINEERED BUILDING

METAL ROOFING

B2

AA

N

B1

M

ET

AB

O

LI

C

C H

AM

BE

R S

5'

8"

1/

2" 2'

1/ 2"

107' - 3 3/4"

20' - 11" 20' - 6" 20' - 6" 17' - 2 1/2" 26' - 0"

LEVEL 2 B1 TO ROOF

44' - 0"

B1.AB1.F B1.DB1.E B1.C B1.B

B2.A/B1.F

T.O. FOUNDATION

28' - 0"

B2

AA

N

B1

M

ET

AB

O

LI

C

C H

AM

BE

R S

1 1 1 1

PREENGINEERED BUILDING

METAL ROOFING

PREENGINEERED BUILDING

METAL SIDING

/4

1'

1/

4"

3/

4" 5'

3/ 4"

107' - 3 3/4"

20' - 11"20' - 6"20' - 6"17' - 2 1/2"26' - 0"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

Au to de sk

D oc s:

//1

5_

U

SD

A_ D

FR

C

_2

2/

A _S

_M

EP

-B 1.

rv t

5/

/2

:3 8:

A

M

A-201-B1

N O

R

TH

A N

D S

O U

TH

E

LE

VA

TI

O

N S

- A R

EA

B

M

ET

AB

O

LI

C

C H

AM

BE

R S

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D

R

AR

LI

N

G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0

8/

W

F2

0C

W

F2

1C

1/8" = 1'-0"C7 SOUTH ELEVATION - AREA B1

1/8" = 1'-0"H7 NORTH ELEVATION - AREA B1

KEYNOTES:

1 WINDOWS CENTERED ON CHAMBERS

2 AHU-1

3 CONNECTOR TO A1

4 3/0X7/0 PERSONNEL DOOR

GENERAL NOTES:

1. LEVEL 0' - 0" = 865' - 4" (T.O. FLUSH FLUME)

R

TA

/0

8/

R ev is io n

/1

3/

LEVEL 2 B2 TO ROOF

20' - 0"

B2.BB2.CB2.DB2.E B2.A/B1.FB2.FB2.GB2.HB2.I

B3.A

LEVEL_OO B2 T.O.

FOUNDATION

4' - 0"

B1 M

ET

AB

O

LI

C C H

AM

BE

R S

B2

AA

N

B2

AA

N

B3 C O N

VE

N

TI

O N

AL

F .S

161' - 8"

19' - 2"20' - 0"20' - 0"20' - 0"20' - 0"20' - 0"20' - 0"21' - 4 1/2"

B2.B B2.C B2.D B2.EB2.A/B1.F B2.F B2.G B2.H B2.I

B3.A

B1 M

ET

AB

O

LI

C C H

AM

BE

R S

B2

AA

N

B2

AA

N

B3 C O N

VE

N

TI

O N

AL

F .S

/2

161' - 8"

19' - 2" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 21' - 4 1/2"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M Y C O R

PS

O F

EN

G

IN

EE

R S

D R

AW

N B Y:

D

ES

IG

N

ED

B Y:

SU

BM

IT

TE

D B Y:

SI

ZE

C H

EC

KE

D B Y:

AN

SI

D

IS

SU

E D

AT

E:

C O N

TR

AC

T N O

SO

LI

C

IT

AT

IO

N N O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K D

ES

C R

IP

TI

O N

Fi le P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E R

ES

EA

R C H C

EN

TE

R

Au to de sk D oc s:

//1 5_ U

SD

A_ D

FR

C _2 2/ A _S

_M

EP

-B 2.

rv t

5/ /2 :2 6:

A M

A-201-B2

N O R

TH

A N D S O U

TH

E

LE

VA

TI

O N S

- A

R

EA

B

AD

VA

N C

ED

A N

IM

AL

N U

TR

IT

IO

N

PR

AI

R

IE

D U S

AC

, W I

O M

AH

A D

IS

TR

IC

T

H D R

AR

LI

N G

TO

N , V

IR

G

IN

IA

J.

W ille

M .B ro w ns te in

R . R in eh ar t

/0 8/

W F2 0C

W F2 1C

1/8" 1'-0"1

NORTH ELEVATION - AREA B2 -

ADVANCED ANIMAL NUTRITION

1/8" 1'-0"2

SOUTH ELEVATION - AREA B2 -

ADVANCED ANIMAL NUTRITION

GENERAL NOTES:

1. LEVEL 0' - 0" 865' - 4" (T.O. FLUSH FLUME)

R

TA

/0 8/

R ev is io n

/1 3/

LEVEL 2 B1 TO ROOF

44' - 0"

B1.1 B1.2

T.O. FOUNDATION

28' - 0"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

Au to de sk

D oc s:

//1

5_

U

SD

A_ D

FR

C

_2

2/

A _S

_M

EP

-B 1.

rv t

5/

/2

:3 8:

A

M

A-202-B1

EA

ST

A N

D W

ES

T

EL

EV

AT

IO

N S

- A R

EA

B

M

ET

AB

O

LI

C

C H

AM

BE

R S

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D

R

AR

LI

N

G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0

8/

W

F2

0C

W

F2

1C

1/4" = 1'-0"E5 WEST ELEVATION - AREA B1

KEYNOTES:

GENERAL NOTES:

1 3/0X7/0 PERSONNEL DOOR

1. EAST ELEVATION NOT SHOWN SINCE THERE IS A

CONTINUATION OF THE BUILDING INTO B2

2 SECTIONAL DOOR

3 BOLLARD

2. LEVEL 0' - 0 = 865' - 4" (T.O. FLUSH FLUME)

R

TA

/0

8/

R ev is io n

/1

3/

17' - 2 1/4"

3'

0" 1'

6"

2'

6"

7'

0"

17' - 10 3/4"

3'

0" 1'

6"

2'

6"

7'

0"

1' - 6" 4' - 8" S1-D

2'

6" 1'

6"

3'

0"

7'

0" 7'

0"

3'

0" 1'

6"

2'

6"

17' - 5 3/4"

7'

0"

1'

6" 3'

0"

2'

6"

17' - 2 3/4"

3'

0"

5' - 4" 8' - 0" 3' - 10 3/4"

BS30BBS30B BSO

KNEE HOLE

3'

0"

2' - 6" 5' - 6" 6' - 0"

2'

6" 1'

6"

3'

0"

FILLER PANEL

7'

0"

3'

0"

5' - 6" 4' - 6" 3' - 0"

13' - 0"

CASEWORK GENERAL NOTE

1. REFER TO VOLUME 1, SHEET Q-001-A FOR

LABORATORY SYMBOLS AND GENERAL NOTES.

2. REFER TO VOLUME 1, SHEET Q-002-A AND Q-003-A

FOR WALL AND BASE CABINETS AND TABLE

NOMENCLATURE.

TC42C TC42C CYLINDER

RACK

2" 7' - 0"

7'

0"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

Au to de sk

D oc s:

//1

5_

U

SD

A_ D

FR

C

_2

2/

A _S

_M

EP

-B 1.

rv t

5/

/2

:3 8:

A

M

A-203-B1

IN

TE

R

IO

R E

LE

VA

TI

O

N S

- A R

EA

B

- M

ET

AB

O

LI

C C

H

AM

BE

R

S

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D

R

AR

LI

N

G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0

8/

W

F2

0C

W

F2

1C

1/4" = 1'-0"E12

B1-103 - METABOLIC CHAMBERS

EQUIPMENT STORAGE - EAST ELEVATION

1/4" = 1'-0"L12

B1-103 METABOLIC CHAMBERS

EQUIPMENT STORAGE - SOUTH

ELEVATION

1/4" = 1'-0"B12 B1-106 LAB SPACE -WEST ELEVATION

1/4" = 1'-0"H12 B1-106 LAB SPACE -SOUTH ELEVATION

1/4" = 1'-0"L6

B1-104 - METABOLIC CHAMBERS DATA

COLLECTION - WEST ELEVATION

1/4" = 1'-0"H6

B1-104 - METABOLIC CHAMBERS DATA

COLLECTION - ISLAND - EAST ELEVATION

1/4" = 1'-0"E6

B1-104 - METABOLIC CHAMBERS DATA

COLLECTION - ISLAND - NORTH

ELEVATION

1/4" = 1'-0"B6

B1-100 - COW/WORKER CIRCULATION

SPACE ELEVATION

BS24B BS30B BS30B BS30B BS30B BS30BBS0E

WC24A WC30A WC30A WC30A WC30A WC30A WC30A

WC30A WC30A WC30A WC30A WC30A WS30A WC12A

BS30B BS30B BS30B BS30B BS27BBS0E

WC30A WC30A WC30A WC30A

BS30B BS30B BS30B

WC30A WC30A WC30A WC30A

WC30AWC30ABS30FBS30BBS30B BS30F

WC12A

WC30A WC30A WC30AWS30A WC12A

BS30B BS30F BS30B BS0E BS30B BS30B

BS36B BS30B BS30B

BS12B

1/4" = 1'-0"L1

B1-104 - METABOLIC CHAMBERS DATA

COLLECTION - EAST ELEVATION

R

TA

/0

8/

R ev is io n

/1

3/

LEVEL 2 B1 TO ROOF

44' - 0"

LEVEL 3 B1 TO FOOTING

21' - 10"

B1.1B1.2

METAL ROOF

6" INSULATION

2" INSULATION

METAL LINER

2'0" METAL ROOF

OVERHANG

W/TRIM & SOFFIT

METAL ROOF CAP

PRE-ENGINEERED METAL

ROOF & WALL SKINS ON

PRE-ENGINEERED METAL

FRAME

2" / 1'-0"

T.O. FOUNDATION

28' - 0"

53' - 0"

METABOLIC CHAMBERS WALLS AND

CEILING PER MANUFACTURER

FLUSH

FLUME

GRATE

METAL SKIN EXTERIOR WITH

4" INSULATION

3-5/8" STEEL STUD 16" O.C.

4" INSULATION

1/2" FRP INTERIOR

(APPLIES TO EXTERIOR

WALLS FOR ROOMS ON

SOUTH SIDE OF BLDG)

AAN EQUIPMENT STORAGE

3-5/8" STEEL STUDS @16"

O.C. WITH 1/2" FRP

FACED PLYWOOD BOTH

SIDES.

SEE DETAIL 1/A-310-B1

CHAMBER

FEED DOOR

CHAMBER COW

ENTRANCE DOOR

TIE STALL

STALL PAD

WITH

MATRESS

WINDOW

3'

0"

SLOPE DOWN[No Slope]

18' - 7 1/4" 5' - 7" 2' - 6" 4' - 9 1/4" 6' - 1" 6" 15' - 2 1/2"

A-310-B1 J13

A-310-B1 E13

4' - 0 1/4"

1/4" / 1'-0" [No Slope]

SLOPE DOWN

EA

VE

H

EI

G H

T

6'

2"

8' -2

" M

IN

C H

AM

BE

R H

EI

G

H T

METABOLIC CHAMBERS EQUIPMENT AREA ABOVE

EACH CHAMBER PER SELECTED MANUFACTURER

(IN

C

LU

D

ES

H

VA

C

E Q

U

IP

M

EN

T)

" M

AX

O

VE

R

AL

L

H

EI

G H

T

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

Au to de sk

D oc s:

//1

5_

U

SD

A_ D

FR

C

_2

2/

A _S

_M

EP

-B 1.

rv t

5/

/2

:3 8:

A

M

A-301-B1

BU

IL

D

IN

G C

R O

SS

S

EC

TI

O N

S

- A

R

EA

B

M

ET

AB

O

LI

C C

H

AM

BE

R

S

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D

R

AR

LI

N

G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0

8/

W

F2

0C

W

F2

1C

1/4" = 1'-0"D6

BUILDING CROSS SECTION - AREA B1 -

METABOLIC CHAMBERS

KEYNOTES:

1 FLUSH FLUME

GENERAL NOTES:

1. LEVEL 0' - 0" = 865' - 4" (T.O. FLUSH FLUME)

R

TA

/0

8/

AD

D

EN

D

U M

/1

1/

R ev is io n

/1

3/

6" UNFACED BLANKET INSULATION

24 GA, METAL ROOF

8" PURLINS

24 GA, METAL LINER

2" FIBERGLASS INSULATION

WITH VINYL SCRIM FACE

24 GA, RIBBED METAL SKIN

24 GA, RIBBED WALL LINER PANEL

4" SCRIM FACED FIBER REINFORCED INSULATION

8" "ZEE" GIRTS

1/2" FRP FACED PLYWOOD

3 - 5/8" STEEL STUDS @ 16" O.C.

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

Au to de sk

D oc s:

//1

5_

U

SD

A_ D

FR

C

_2

2/

A _S

_M

EP

-B 1.

rv t

5/

/2

:3 8:

A

M

A-310-B1

SE

C

TI

O

N D

ET

AI

LS

AR

EA

B

- M

ET

AB

O

LI

C

C H

AM

BE

R S

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D

R

AR

LI

N

G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0

8/

W

F2

0C

W

F2

1C

1" = 1'-0"J13 A-ROOF SECTION - B1

1" = 1'-0"E13

A-EXTERIOR WALL SECTION (TYPICAL) -

B1

3" = 1'-0"1 A-INTERIOR WALL SECTION (TYPICAL) - B1

R

TA

/0

8/

AD

D

EN

D

U M

/1

1/

R ev is io n

/1

3/

D6

A-301-B1

4'

1/

4" 6"

6'

1" 4'

3/ 4"

W

IN

D O

W

7'

3/

4"

W

IN

D O

W

7'

/2

5' - 1" 10' - 5" 10' - 5" 10' - 5" 5' - 1"

4' - 9" 4' - 9" 4' - 9" 4' - 9"

LW-1 LW-1 LW-1 LW-1 1111

METABOLIC

CHAMBER

B1 - 107A

METABOLIC

CHAMBER

B1 - 107D

METABOLIC

CHAMBER

B1 - 107C

METABOLIC

CHAMBER

B1 - 107B

COW/WORKER

CIRCULATION

SPACE

B1 - 101

COW/WORKER

CIRCULATION

SPACE

B1 - 101

5' x 4' WINDOWS

PER MANUFACTURER

(OUT TO OUT OF CHAMBER WALLS)

41' - 11"

10' - 6 1/2" 10' - 5" 10' - 5" 10' - 6 1/2"

2' - 10" 4' - 9" 2' - 10"

5' x 4' WINDOWS

PER MANUFACTURER

5' x 4' WINDOWS

PER MANUFACTURER

5' x 4' WINDOWS

PER MANUFACTURER

FLUSH FLUME FLUSH FLUME

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

Au to de sk

D oc s:

//1

5_

U

SD

A_ D

FR

C

_2

2/

A _S

_M

EP

-B 1.

rv t

5/

/2

:3 8:

A

M

A-401-B1

EN

LA

R G

ED

F

LO

O

R P

LA

N

S

- A

R

EA

B

M

ET

AB

O

LI

C C

H

AM

BE

R

S

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D

R

AR

LI

N

G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0

8/

W

F2

0C

W

F2

1C

NORTH

KEY PLAN

B1

1/4" = 1'-0"E8

METABOLIC CHAMBERS ENLARGED

FLOOR PLAN

KEYNOTES:

GENERAL NOTES:

1. FINAL METABOLIC CHAMBERS DIMENSIONS TO

COORDINATE WITH MANUFACTURER

KEYNOTES:

1 COORDINATE TIE STALLS WITH Q DRAWINGS

AND METABOLIC CHAMBERS MANUFACTURER

R

TA

/0

8/

R ev is io n

/1

3/

BUILDING GIRT

(4) #12 SDS

IN EACH LEG

NUT AND WASHER

ROD END 5/8" X 10"

(4) #12 SDS

[(2) IN WEB,

(1) IN EA FLAGE]

1"

TELESCOPING CEE

NUT AND WASHER

MOUNTING CLIP

[TOP & BOTTOM]

(4) #12 SDS IN EA LEG

PVC SPACER

(TOP AND BOTTOM)

(AS NEEDED)

5/8" NUT AND

FLAT WASHER

OR DECORATIVE PLATE

CANOPY BRACE

ADJUSTMENT

(DOUBLE NUT)

5/8" X 3 1/2"

ROD END

NUT AND WASHER

7/

8"

(CANOPY PROJECTION)

GUTTER ON ALL (4)

SIDES OF CANOPY

WATER FLOW DIRECTION

(STANDING REAR SCUPPER DRAINS SHOWN)

SCUPPERS ARE 1/2" X 2" & LOCATED

3" FROM EACH END OF CANOPY

BU

IL

D

IN

G G

IR

TS

'-0 " O

.C

M

AX

1'

8" (M

IN

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

Au to de sk

D oc s:

//1

5_

U

SD

A_ D

FR

C

_2

2/

A _S

_M

EP

-B 1.

rv t

5/

/2

:3 8:

A

M

A-501-B1

AR

C

H

IT

EC

TU

AL

D

ET

AI

LS

AR

EA

B

- M

ET

AB

O

LI

C

C H

AM

BE

R S

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D

R

AR

LI

N

G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0

8/

W

F2

0C

W

F2

1C

1" = 1'-0"1 CANOPY INSTALLATION DETAIL

R

TA

/0

8/

R ev is io n

/1

3/

SEE SCHEDULE

SE

E

SC

H

ED

U

LE

SE

E

SC

H

ED

U

LE

SEE SCHEDULE

SEE SCHEDULE

SE

E

SC

H

ED

U

LE

SE

E

SC

H

ED

U

LE

SEE SCHEDULE

SEE SCHEDULE

SE

E

SC

H

ED

U

LE

A B Y Z

AA

3'

0" 6"

6" 6"

WINDOW

RIBBED CLOSURE STRIP INTERIOR WINDOW TRIM ( HEAD, SAMB, SILL)

INSUALTION (SPRAY FOAM)

SUB SILL (C-FRAMING)

INTERIOR WALL PANEL

INSULATION (SEE WALL DETAIL)

EXTERIOR WALL PANEL

INTERIOR WALL PANEL

INSULATION (SEE WALL DETAIL)

WALL GIRT

INSULATION (SPRAY FOAM)

EXTERIOR WALL PANEL

RIBBED CLOSURE STRIP

CORNER TRIM

INTERIOR WINDOW TRIM (HEAD, SUMB, SILL)

WINDOW

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

Au to de sk

D oc s:

//1

5_

U

SD

A_ D

FR

C

_2

2/

A _S

_M

EP

-B 1.

rv t

5/

/2

:3 8:

A

M

A-601-B1

D O

O R

S C

H

ED

U

LE

A N

D D

ET

AI

LS

AR

EA

B

M

ET

AB

O

LI

C C

H

AM

BE

R

S

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D

R

AR

LI

N

G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0

8/

W

F2

0C

W

F2

1C

3/8" = 1'-0"B8 A-DOOR FRAMING ELEVATIONS

3" = 1'-0"1 WINDOW DETAIL

3" = 1'-0"2 WINDOW HEAD DETAIL

R

TA

/0

8/

AD

D

EN

D

U M

/1

1/

R ev is io n

/1

3/

B1.8 B1-100 -- -- B HM PAINTED 1 3/4" 3'-0" 7'-0" AA HM PAINTED 6" 1/A-602-B1 1/A-602-B1 3/A-602-B1 1/4" GLASS N/A N/A N/A N/A N/A RHR HW-104 B1.7 B1-105 -- -- A IHM PAINTED 1 3/4" 3'-0" 7'-0" AA HM PAINTED 6" 1/A-602-B1 1/A-602-B1 3/A-602-B1 - N/A N/A N/A N/A N/A RHR HW-108 B1.6 B1-106 90 MIN -- B HM PAINTED 1 3/4" 3'-0" 7'-0" AA HM PAINTED 6" 2/A-602-B1 2/A-602-B1 - 1/4" GLASS N/A N/A N/A N/A N/A LHR HW-200A B1.5 B1-108 90 MIN -- B HM PAINTED 1 3/4" 3'-0" 7'-0" AA HM PAINTED 6" 2/A-602-B1 2/A-602-B1 - 1/4" GLASS N/A N/A N/A N/A N/A LHR HW-200A B1.4 B1-105 90 MIN -- B HM PAINTED 1 3/4" 6'-0" 7'-0" AA HM PAINTED 6" 2/A-602-B1 2/A-602-B1 - 1/4" GLASS N/A N/A N/A N/A N/A LHR/RHR HW-211 B1.3 B1-104 90 MIN -- B HM PAINTED 1 3/4" 3'-0" 7'-0" AA HM PAINTED 6" 2/A-602-B1 2/A-602-B1 - 1/4" GLASS N/A N/A N/A N/A N/A LHR HW-200 B1.2 B1-103 90 MIN -- B HM PAINTED 1 3/4" 6'-0" 7'-0" AA HM PAINTED 6" 2/A-602-B1 2/A-602-B1 - 1/4" GLASS N/A N/A N/A N/A N/A LHR/RHR HW-211 B1.1 B1-101 -- -- A IHM PAINTED 1 3/4" 3'-0" 7'-0" AA HM PAINTED 6" 1/A-602-B1 1/A-602-B1 3/A-602-B1 - N/A N/A N/A N/A N/A LHR HW-108

DOOR ROOM DOOR FRAME TYPE MAT FIN THICKNESS WIDTH HEIGHT ELEV MAT FIN DEPTH HEAD JAMB SILL A-PHONE BARRIER-

FREE

CARD

READER

ELEC. LOCK

HDWR.

MAG

HOLD

NUMBER FIRE RATING DOOR SIZE FRAME DETAILS

GLASS

ACCESS CONTROLS

DOOR

SWING HDWR. SET REMARKS

PERSONNEL DOOR SCHEDULE-B1

2.) ALL DOORS TO HAVE INTERIOR, UNKEYED LATCH

OF DOOR

ARE AS VIEWED FROM INTERIOR/TRACK SIDE

1.) OPERATOR MOUNTING AND HANDLE POSITION

NOTES:

B1.104 ROLL UP 10'-0" 10'-0" 2" Y YES N/A INTERIOR RIGHT N/A MOTOR 3/4 208 RIGHT PUSH BUTTON B1.103 ROLL UP 6'-0" 10'-0" 2" Y YES N/A INTERIOR LEFT N/A MOTOR 3/4 208 LEFT PUSH BUTTON B1.102 ROLL UP 6'-0" 10'-0" 2" Y YES N/A INTERIOR RIGHT N/A MOTOR 3/4 208 RIGHT PUSH BUTTON

WIDTH HEIGHT THICK TYPE INSUL GLAZ. SIDE POSITION LOCKSET TYPE HP VOLTAGE MOUNTING CONTROL

DOOR

# TRACK

DOOR HANDLE OPERATOR

COMMENTS

OVERHEAD DOOR SCHEDULE-B1

19 5'-0" 4'-0" 7'-0" DOUBLE INSULATION 6/B-A 502 7/B-A 502 FIXED PANE

WINDOW NO. WIDTH HEIGHT HEAD HEIGHT GLAZING DETAILS COMMENTS

WINDOW SCHEDULE-B1

METAL TRIM

INSULATED METAL FRAME

CONTIN. SEALANT INSIDE AND OUT,

ALL AROUND FRAME/ (TYP.)

PRE - ENGINEERED METAL BUILDING DOOR HEADER

RIBBED METAL PANEL

BATT INSULATION

PRE-ENGINEERED METAL BUILDING WALL OR STEEL

STUDS

FRP PLYWOOD OR INTERIOR METAL LINER

RIBBED METAL PANEL

BATT INSULATION

PRE-ENGINEERED METAL BUILDING WALL OR STEEL

STUDS

FRP PLYWOOD OR INTERIOR METAL LINER

CONTIN. SEALANT INSIDE AND OUT,

ALL AROUND FRAME/ (TYP.)

INSULATED METAL FRAME

METAL J TRIM

PRE-ENGINEERED METAL

BUILDING SECONDARY

STEEL JAMB

HEAD

JAMB

PRE-ENGINEERED METAL

BUILDING SECONDARY

STEEL JAMB

HEAD

JAMB

SECTIONAL DOOR

OPERATOR AND/OR

TRACK MOUNTING

DOORS

TYP. FOR ALL

SECTIONAL

DOORS

METAL DOOR TRIM

METAL TRIM

INSULATED METAL FRAME CONTIN. SEALANT INSIDE AND OUT,

ALL AROUND FRAME/ (TYP.)

PRE - ENGINEERED METAL BUILDING DOOR HEADER

RIBBED METAL PANEL

BATT INSULATION

PRE-ENGINEERED METAL BUILDING WALL OR STEEL STUDS

FRP, PLYWOOD OR INTERIOR METAL LINER

RIBBED METAL PANEL

BATT INSULATION

PRE-ENGINEERED METAL BUILDING WALL OR STEEL STUDS

FRP PLYWOOD OR INTERIOR METAL LINER

CONTIN. SEALANT INSIDE AND OUT,

ALL AROUND FRAME/ (TYP.)

INSULATED METAL FRAME

METAL J TRIM

PRE-ENGINEERED METAL

BUILDING SECONDARY

STEEL JAMB

HEAD

JAMB

EXTERIOR

DOORS

TYP. FOR ALL

WALK DOORSSEE PLANS FOR WALL

THICKNESS

WEATHER SEAL

ALUMINUM THRESHOLD

THERMAL BREAKTOP OF CONCRETE

SLAB

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

Au to de sk

D oc s:

//1

5_

U

SD

A_ D

FR

C

_2

2/

A _S

_M

EP

-B 1.

rv t

5/

/2

:3 8:

A

M

A-602-B1

D O

O R

D

ET

AI

LS

AR

EA

B

- M

ET

AB

O

LI

C C

H

AM

BE

R

S

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A, D

IS

TR

IC

T

H D

R

AR

LI

N

G

TO

N , V

IR

G

IN

IA

J.

W ille

M . B ro w ns te in

R . R in eh ar t

/0

8/

W

F2

0C

W

F2

1C

1 1/2" = 1'-0"1

INSULATED EXTERIOR DOOR FRAME

DETAIL 1 1/2" = 1'-0"4 TYPICAL SECTIONAL DOOR FRAME DETAIL

1 1/2" = 1'-0"2

UNINSULATED EXTERIOR DOOR FRAME

DETAIL

1 1/2" = 1'-0"3 WALK DOOR SILL DETAIL

R

TA

/0

8/

AD

D

EN

D

U M

/1

1/

R ev is io n

/1

3/

B10.3

A.

B1.

B2.

B3.1.

B3.2.

B4.

B5.

B6.

B7.

B8.

B9.

B10.1.

B10.2.

B10.3.

B11.1.

B11.2.

B13.

B14.

B15.

C1.

C2.

C3.

C4.

E1.

E2.

LAB & ADMIN

METABOLIC CHAMBERS

ADVANCED ANIMAL NUTRITION

CONVENTIONAL FREESTALL

DRY COWS

MILKING PARLOR

SPECIAL NEEDS & MATERNITY

ROBOTIC FREESTALL

CALF BARN

AGRONOMY BUILDING

FEED MIXING

BAG STORAGE (OPEN)

BUNKER STORAGE (OPEN)

HAY STORAGE (GRAVEL PAD)

SHOP

MACHINE STORAGE & PESTICIDE

MILK HOUSE

FUEL STORAGE

COMMODITY

LIQUID WASTE STORAGE FACILITY CELL

SOLID STACK BUILDING

SOLIDS/SAND SEPARATION FACILITY

LEACHATE COLLECTION

SMALL EQUIPMENT BLDG (EXISTING, NIC)

CONSERVATION CLUB (EXISTING, NIC)

2. STRUCTURES

3. SIGN LOCATION LEGEND

LEGEND

SIGN LOCATION NUMBER

SIGN

LOCATION

LOZENGE

SIGN TYPE

SIDE FACE ‘A’

SIGNAGE

SIGN FACE ‘B’

A D

D E

N D

U M

/1 3/

003: EXT4

053: EXT2

001: EXT1

007: EXT4

011: EXT4

031: EXT4

009: EXT4

013: EXT4

019: EXT4

023: EXT4

021: EXT1

025: EXT4

027: EXT4

045: EXT1

041: EXT2

039: BL1

033: EXT4

043: EXT3

047: EXT3

049: EXT3

B

A BA B

A B

A B

A

A

B

B

014: EXT4

008 EXT4

028: EXT4

036: EXT4

037: EXT4

035: EXT4

026: EXT4

A

A B

012: EXT4

SIGNAGE DESIGN NOTES

1. DO NOT SCALE DRAWINGS

2. ORIGINAL ADOBE ILLUSTRATOR ARTWORK SHALL BE PROVIDED TO MANUFACTURERS.

3. MESSAGE TEXT FOR ALL SIGN TYPES SHALL BE COORDINATED WITH THE OWNER PRIOR TO FABRICATION.

4. MESSAGE SCHEDULE (APPENDIX 10 14 00.10a), LOCATION PLANS (AG SERIES), SPECIFICATIONS (SECTION 10 14 00.10) AND DRAWING SHEETS (AG SERIES) SHALL BE COORDINATED FOR COMPLETE INFORMATION.

5. MESSAGE SCHEDULE (APPENDIX 10 14 00.10a), LOCATION PLANS (AG SERIES), SPECIFICATIONS (SECTION 10 14 00.10) AND DRAWING SHEETS (AG SERIES) SHALL BE CONFIRMED TO AS-BUILT CONDITIONS PRIOR TO PRODUCTION.

6. ALL SPECIFIED MATERIALS AND METHODS SHALL BE REVIEWED FOR CONFORMANCE WITH ADA GUIDELINES. NOTIFY ARCHITECT OF ANY ITEMS THAT DO NOT COMPLY PRIOR TO FABRICATION.

7. ELEVATIONS PROVIDED FOR ALL BUILDING SIGNAGE. SEE AG-601 THRU AG-605.

015: EXT1

A B

032: EXT4

024: EXT4

059: EXT4

055: EXT4

057: EXT4

015: EXT1

A B

1. BID OPTION 4

SIGNAGE PLAN GENERAL NOTES

1. DO NOT SCALE DRAWINGS.

2. MESSAGE TEXT FOR ALL SIGN TYPES SHALL BE

COORDINATED WITH THE CLIENT PRIOR TO FABRICATION.

3. MESSAGE SCHEDULE (APPENDIX 10 14 00.20a), LOCATION

PLANS (SERIES AG), AND DRAWING SHEETS (SERIES AG) TO

BE COORDINATED FOR COMPLETE INFORMATION.

4. MESSAGE SCHEDULE (APPENDIX 10 14 00.20a), LOCATION

PLANS (SERIES AG), AND DRAWING SHEETS (SERIES AG) TO

BE CONFIRMED TO AS-BUILT CONDITIONS PRIOR TO

PRODUCTION.

5. REFER TO SPECIFICATIONS FOR COMPLETE MESSAGE

SCHEDULE (APPENDIX 10 14 00.20a).

SIGNAGE PLAN LEGEND

WAYFINDING SIGN#### - XXXX

ROOM/REGULATORY SIGN#### - XXXX

LIFE SAFETY SIGN#### - XXXX

WORK STATION ID #### - XXXX

B1-101.6 - ST12B1-101.5 - ST12 B1-101.6 - ST12

B1-106.2 - RGM

B1-101.2 - RID

B1-101.3 - IPM

B1-103 - RID B1-104 - RID

B1-107A - RID B1-107C - RID

B1-107B - RID B1-107D - RID

B1-105.1 - RID

B1-105.2 - ST8

B1-105.3 - IPM

B1-106.1 - RID

B1-108 - RID

B1-100-ST8

B1-102-ST8B1-107A.1 - RID B1-107B.1 - RID B1-107D.1 - RID

B1-107C.1 - RID

B1-101.1 - FEC

B1-106.3 - FEC

B1-101.4 - FEC

B1-101.7 - FEC

A38.1 - DOM

A38.2 - DOM

M E

TA

B

O

LI

C

A D

D E

N D

U M

/1 3/

CHAMBERS

METABOLIC

METABOLIC

CHAMBER

METABOLIC

METABOLIC

CHAMBER

B1 - 107A

METABOLIC

CHAMBER

B1 - 107B

METABOLIC

CHAMBER

B1 - 107C

METABOLIC

CHAMBER

B1 - 107D

Conventional Freestall

2'-5"

2'-4"

Advanced Animal

Nutrition

2'-4"Metabolic Chambers

2'-5"

2'-4"

Metabolic Chambers

2'-5"

2'-4"

Conventional Freestall

2'-5"

Conventional Freestall

2'-5"

2'-4"

SIGN TYPE: EXT 4

SIGN TYPE: EXT 4

SIGN TYPE: EXT 4

SIGN TYPE: EXT 4

SIGN TYPE: EXT 4

SIGN TYPE: EXT 4

ALIGN

2'- 4"

ALIGN ALIGN

ALIGN

ALIGN

ALIGN

2"

2" 2'-5"2"

SIGNAGE DESIGN NOTES

1. DO NOT SCALE DRAWINGS

2. ORIGINAL ADOBE ILLUSTRATOR ARTWORK SHALL BE PROVIDED TO MANUFACTURERS.

3. MESSAGE TEXT FOR ALL SIGN TYPES SHALL BE COORDINATED WITH THE OWNER PRIOR TO FABRICATION.

4. MESSAGE SCHEDULE (APPENDIX 10 14 00.10a), LOCATION PLANS (AG SERIES), SPECIFICATIONS (SECTION 10 14 00.10) AND DRAWING SHEETS (AG SERIES) SHALL BE COORDINATED FOR COMPLETE INFORMATION.

5. MESSAGE SCHEDULE (APPENDIX 10 14 00.10a), LOCATION PLANS (AG SERIES), SPECIFICATIONS (SECTION 10 14 00.10) AND DRAWING SHEETS (AG SERIES) SHALL BE CONFIRMED TO AS-BUILT CONDITIONS PRIOR TO PRODUCTION.

6. ALL SPECIFIED MATERIALS AND METHODS SHALL BE REVIEWED FOR CONFORMANCE WITH ADA GUIDELINES. NOTIFY ARCHITECT OF ANY ITEMS THAT DO NOT COMPLY PRIOR TO FABRICATION.

7. ELEVATIONS PROVIDED FOR ALL BUILDING SIGNAGE. SEE AG-601 THRU AG-605.

A D

D E

N D

U M

/1 3/

CHAMBERS

METABOLIC

CHAMBERS

METABOLIC

© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS

CP2

CP3

A-1 A-2

A-3

A-4

B1-1 B2-1

B2-2

B2-3

B3.1 -1

B3.1 -2

B3.1 -3

B3.1 -4

B3.1 -5

B3.1-6

B3.2 -1

B3.2 -2

B4-1

B4-2

B4-3

B6-1 B6-2

B6-4 B6-5

B6-6

B7-1

B7-2

B8-1 B8-2

B8-3 B8-4

B9-1

B9-2

B10 .1-

B10 .1-

B10 .2-

B10 .2-

B10 .3-

B10 .3-

B10 .3-

B11.1-1

B11 .2-

B15 -1

BAB-1

BAB-2

BAB-3

BAB-4

BB-1

BB-2

BB-3

BB-4

BB-5

BB-6

BB-7

BB-8

BB-9

BB-10

C1-1 C1-2 C1-3

C1-5

C2-1 C2-2

C3-1

C3-2 C3-3

C3-4

PB-1

PB-2

PB-3

PB-4

PB-5

PB-6

PB-7

PB-8

PB-9

PB-10

PB-11

PB-12

PB-13

PB-14

PB-15

PB-16

PB-17B4-4

B6-3

B8.1 -1

B8.1-2

B8.1-3 B8.1-4

C2.1-1

C1-6

700 701

704 705

706707

708 709

711 712

713714

720721

723 724

727 728

731 732

737 738

742743

745746

748 749

750 751

S

MH

MH

MH MH

MH

MH

MH

MHMH MH

MH MH

MH

MH

MH

B8

C3

C2 B10

B15

B9 B14

B11

B7

B5B4

B6

B13

B3B2B1

A

E1

B1

A

B2 B3

B4 B5

B6

C2

C3

B10

B9

B15

B11

B7

B13

E2

C1-2 C1-1

B14

C4

POINT TABLE

No.

DESCRIPTIONS

B8.1-1

B8.1-2

B8.1-3

B8.1-4

C2.1-1

A-1

A-2

B1-1

B2-1

B3.1-1

B3.1-2

B4-2

B4-1

B4-4

B6-3

B6-2

ELEVATION

866.11

866.12

865.81

865.25

867.77

864.90

862.30

864.60

863.10

860.80

860.80

858.20

860.10

859.00

861.30

858.70

POINT TABLE

No.

DESCRIPTIONS

B6-1

B6-6

C2-2

C2-1

C3-3

C3-2

C1-3

C1-2

C1-1

C1-6

B10.1-1

B10.1-2

B10.3-1

B10.3-2

B15-1

B7-2

ELEVATION

862.60

861.50

862.60

855.50

867.50

867.20

865.20

863.50

864.70

862.77

865.00

867.60

871.00

871.10

867.00

863.70

POINT TABLE

No.

DESCRIPTIONS

B11.2-1

B11.1-1

B8-3

B8-4

B8-2

BB-1

BB-2

BB-3

BB-4

BB-5

BB-6

BB-7

BB-8

BB-9

BB-10

PB-1

ELEVATION

867.90

867.80

865.10

864.50

864.80

863.40

859.90

855.90

846.50

862.70

863.80

861.70

861.70

865.80

862.60

866.80

POINT TABLE

No.

DESCRIPTIONS

PB-2

PB-3

PB-4

PB-5

PB-6

PB-7

PB-8

PB-9

PB-10

PB-11

PB-12

PB-13

PB-14

PB-15

PB-16

PB-17

ELEVATION

867.10

866.50

867.28

866.70

865.70

865.20

862.80

860.80

865.30

866.10

865.00

866.20

863.60

865.30

858.20

865.70

POINT TABLE

No.

DESCRIPTIONS

BAB-1

BAB-2

BAB-3

BAB-4

B2-2

B2-3

B3.1-3

B3.1-4

B3.1-5

B3.1-6

B3.2-1

B3.2-2

B4-3

B7-1

C1-5

B6-4

ELEVATION

869.80

868.80

871.00

870.50

862.15

861.00

860.45

860.12

860.17

858.73

859.66

857.60

858.50

862.50

851.83

862.97

POINT TABLE

No.

DESCRIPTIONS

B6-5

B8-1

B9-1

B9-2

B10.2-1

B10.2-2

B10.3-3

C3-1

C3-4

A-3

A-4

ELEVATION

866.07

865.20

862.70

861.16

867.88

868.41

870.60

860.84

863.40

862.21

862.99

LEGEND

SYMBOL DESCRIPTION

SOIL BORINGS

100' 200'0

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A

D

IS

TR

IC

T

M

AU

R

ER

-S

TU

TZ

, I

N C

T.

F

EL

D

M

AN

N

D . F

EU

C

H T

T.

F

EL

D

M

AN

N

A.

O

R

EB

AU

G

H

/0

8/

W

F2

0C

W

F2

1C

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

R

TA

/0

8/

5/

/2

3:

:1

PM

S:

\2

\2

1\

.0

H D

R -U

SA

C

E- U

SD

A

AR

S

D

FR

C \D ra w in gs

Ag

\B id di ng

R

FI

D ra w in gs \B

-1

S O

IL

B

O R

IN

G

S.

dw g

N . D

R

IE

S

LA

N E, S U

IT

E

PE

O

R

IA

, I L

9-

3-

AD

D

EN

D

U M

/0

2/

AD

D

EN

D

U M

- I N

Q U

IR

Y

/1

1/

AD

D

EN

D

U M

/1

1/

AD

D

EN

D

U M

/1

3/

SO

IL

B O

R

IN

G S

B-100

EXISTING FACILITY DETAILS

SYMBOL FACILITY DESCRIPTION

E1 SMALL EQUIPMENT BUILDING

E2 CONSERVATION CLUB BUILDING

PROPOSED FACILITY DETAILS

SYMBOL FACILITY DESCRIPTION

A VISITOR'S CENTER, ADMIN & LAB

B1 METABOLIC CHAMBERS

B2 ADVANCED ANIMAL NUTRITION

B3 CONVENTIONAL FREESTALL

B4 MILKING PARLOR

B5 SPECIAL NEEDS & MATERNITY

B6 ROBOTIC FREESTALL

B7 CALF BARN

B8 AGRONOMY BUILDING

B9 FEED MIXING

B10 FEED STORAGE

B11 SHOP, PESTICIDE, AND MACHINE

STORAGE

B13 MILK HOUSE

B14 FUEL STORAGE

B15 COMMODITY STORAGE

C1-1 LIQUID WASTE STORAGE FACILITY

CELL 1

C1-2 LIQUID WASTE STORAGE FACILITY

CELL 2

C2 SOLID STACK BUILDING

C3 SOLIDS/SAND SEPARATION FACILITY

C4 LEACHATE RUNOFF COLLECTION

PLAN

NORTH

NOTES:

1. FOR BORING PROFILES, SEE SHEETS B-101 - B-112

2. BORING LOCATIONS WERE TAKEN FROM THE

GEOTECHNICAL EXPLORATION AND ANALYSES REPORT,

DATED 28 NOV. 2022, COMPLETED BY SOILS & ENGINEERING

SERVICES, INC. (SES PROJECT NUMBER: 13460)

B8

B1

A

B2 B3

B4 B5 E1

E2 B6

C1

C1

C2

C3

B10

B9

B15

B11

B7

B13

S

MH

MH

MH MH

MH

MH

MH

MH

MH MH

MH MH

MH

MH

MH

B10

WORKING LIMITS

B8

PROPOSED

STORMWATER

BASIN

C3

C2

B15

B9 B14

B11

B7

B5B4

B6

B13

B3B2B1

A

PROPOSED

STORMWATER

BASIN

PARKING

LOT

E1

A

B2 B3

B4 B5

B6

C2

C3

B10

B9

B15

B11

B7

B13

E2

C1-2

C1-1

B14

DUMPSTER

PAD

C4

DUMPSTER

PAD

B12.1

B12.2

OVEREXCAVATION LEGEND

SYMBOL ITEM

AREAS OF OVEREXCAVATION

100' 200'0

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A

D

IS

TR

IC

T

M

AU

R

ER

-S

TU

TZ

, I

N C

T.

F

EL

D

M

AN

N

D . F

EU

C

H T

T.

F

EL

D

M

AN

N

A.

O

R

EB

AU

G

H

/0

8/

W

F2

0C

W

F2

1C

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

R

TA

/0

8/

5/

/2

4:

:3

PM

S:

\2

\2

1\

.0

H D

R -U

SA

C

E- U

SD

A

AR

S

D

FR

C \D ra w in gs

Ag

\B id di ng

R

FI

D ra w in gs \B

-1

O

VE

R

EX

C

AV

AT

IO

N P

LA

N

.d w g

N . D

R

IE

S

LA

N E, S U

IT

E

PE

O

R

IA

, I L

9-

3-

AD

D

EN

D

U M

/0

2/

AD

D

EN

D

U M

- I N

Q U

IR

Y

/1

1/

AD

D

EN

D

U M

/1

1/

AD

D

EN

D

U M

/1

3/

O

VE

R

EX

C

AV

AT

IO

N P

LA

N

B-113

EXISTING FACILITY DETAILS

SYMBOL FACILITY DESCRIPTION

E1 SMALL EQUIPMENT BUILDING

E2 CONSERVATION CLUB BUILDING

PROPOSED FACILITY DETAILS

SYMBOL FACILITY DESCRIPTION

A VISITOR'S CENTER, ADMIN & LAB

B1 METABOLIC CHAMBERS

B2 ADVANCED ANIMAL NUTRITION

B3 CONVENTIONAL FREESTALL

B4 MILKING PARLOR

B5 SPECIAL NEEDS & MATERNITY

B6 ROBOTIC FREESTALL

B7 CALF BARN

B8 AGRONOMY BUILDING

B9 FEED MIXING

B10 FEED STORAGE

B11 SHOP, PESTICIDE, AND MACHINE

STORAGE

B12.1 CONNECTOR

B12.2 CONNECTOR AND SORTING

B13 MILK HOUSE

B14 FUEL STORAGE

B15 COMMODITY STORAGE

C1-1 LIQUID WASTE STORAGE FACILITY

CELL 1

C1-2 LIQUID WASTE STORAGE FACILITY

CELL 2

C2 SOLID STACK BUILDING

C3 SOLIDS/SAND SEPARATION FACILITY

C4 LEACHATE RUNOFF COLLECTION

PLAN

NORTH

NOTES:

1. CONTRACTOR SHALL REMOVE EXISTING FILL AND

SOILS CONTAINING ORGANIC MATERIAL WITHIN THE

LOCATIONS SHOWN ON THIS SHEET. EXISTING FILL

AND SOILS CONTAINING ORGANIC MATERIAL SHALL BE

REMOVED UNTIL THE UNDERLYING NATIVE SUBGRADE

IS EXPOSED AND VERIFIED BY THE CONTRACTOR'S

GEOTECHNICAL ENGINEER.

2. THE CONTRACTOR'S GEOTECHNICAL ENGINEER SHALL

OBSERVE PROOFROLLING OF THE EXPOSED

SUBGRADE. PROOFROLLING CAN BE ACCOMPLISHED

USING A LOADED TANDEM-AXLE DUMP TRUCK WITH A

GROSS WEIGHT OF AT LEAST 25 TONS OR SIMILARLY

LOADED EQUIPMENT. AREAS THAT DISPLAY

EXCESSIVE DEFLECTION (PUMPING) OR RUTTING

DURING PROOFROLLING OPERATIONS SHOULD BE

IMPROVED BY SCARIFICATION AND COMPACTION OR

BY REMOVAL AND REPLACEMENT WITH APPROVED

COMPACTED FILL.

3. FILL FOR BACKFILLING THE IDENTIFIED AREAS ON THIS

SHEET SHALL CONSIST OF SANDS, GRAVEL, AND

BLENDED SANDY LEAN - CLAY SOILS AS NOTED ON

PLANS COMPACTED IN 8" LIFTS MAXIMUM TO AT LEAST

95% OF THE MAXIMUM DRY DENSITY AS DETERMINED

BY THE MODIFIED PROCTOR PER ASTM D1557.

4. THE HORIZONTAL LIMITS OF THE INITIAL SITE

PREPARATION EXCAVATIONS SHALL CONFORM TO

SAFETY REQUIREMENTS IN ACCORDANCE WITH

CONTRACT SPECIFICATIONS AND EM 385-1-1 BUT IN NO

CASE BE STEEPER THAN 1:1.

CP1

CP3

S

MH

MH

MH MH

MH

MH

MH

MH

MH MH

MH MH

MH

MH

MH

B8

C3

C2 B10

B15

B9 B14

B11

B7

B5B4

B6

B13

B3B2B1

A

E1

B1

A

B2 B3

B4 B5

B6

C3

B9

B15

B11

B7

E2

C1-2

C1-1

B14

C4

SURVEY CONTROL DATA (US

FT)

STATION

BM1

BM2

BM3

BM4

BM5

CP1

CP2

CP3

REBAR1

REBAR2

REBAR3

REBAR4

REBAR5

NORTHING

494,146.49

494,155.95

494,821.87

497,979.08

498,443.49

493,866.54

493,651.83

492,414.39

494,252.55

497,709.78

498,356.89

493,277.07

492,596.35

EASTING

2,032,198.43

2,031,628.68

2,030,726.36

2,030,851.12

2,030,797.66

2,032,633.36

2,034,988.74

2,034,545.32

2,031,134.34

2,030,868.99

2,030,624.09

2,036,566.29

2,036,665.82

ELEV

870.70

871.69

869.31

870.04

870.41

866.51

876.12

859.52

866.77

870.04

869.21

911.82

910.59

DESCRIPTION

BM 1 - CHISELED SQUARE

BM 2 - CHISELED SQUARE

BM 3 - 5/8" IRON PIN

BM 4 - 5/8" IRON PIN

BM 5 - 5/8" IRON PIN

SET FENO MONUMENT

SET FENO MONUMENT

SET FENO MONUMENT

SET 5/8 REBAR W/ CAP

SET 5/8 REBAR W/ CAP

SET 5/8 REBAR W/ CAP

SET 5/8 REBAR W/ CAP

SET 5/8 REBAR W/ CAP

LEGEND

SYMBOL DESCRIPTION

SURVEY CONTROL POINT

100' 200'0

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A

D

IS

TR

IC

T

M

AU

R

ER

-S

TU

TZ

, I

N C

T.

F

EL

D

M

AN

N

D . F

EU

C

H T

T.

F

EL

D

M

AN

N

A.

O

R

EB

AU

G

H

/0

8/

W

F2

0C

W

F2

1C

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

R

TA

/0

8/

5/

/2

4:

:3

PM

S:

\2

\2

1\

.0

H D

R -U

SA

C

E- U

SD

A

AR

S

D

FR

C \D ra w in gs

Ag

\B id di ng

R

FI

D ra w in gs \C

-1

O N

SI

TE

S U

R

VE

Y C

O N

TR

O

L.

dw g

N . D

R

IE

S

LA

N E, S U

IT

E

PE

O

R

IA

, I L

9-

3-

AD

D

EN

D

U M

/0

2/

AD

D

EN

D

U M

- I N

Q U

IR

Y

/1

1/

AD

D

EN

D

U M

/1

1/

AD

D

EN

D

U M

/1

3/

O N

SI

TE

S U

R

VE

Y C

O N

TR

O

L

C-100

EXISTING FACILITY DETAILS

SYMBOL FACILITY DESCRIPTION

E1 SMALL EQUIPMENT BUILDING

E2 CONSERVATION CLUB BUILDING

PROPOSED FACILITY DETAILS

SYMBOL FACILITY DESCRIPTION

A VISITOR'S CENTER, ADMIN & LAB

B1 METABOLIC CHAMBERS

B2 ADVANCED ANIMAL NUTRITION

B3 CONVENTIONAL FREESTALL

B4 MILKING PARLOR

B5 SPECIAL NEEDS & MATERNITY

B6 ROBOTIC FREESTALL

B7 CALF BARN

B8 AGRONOMY BUILDING

B9 FEED MIXING

B10 FEED STORAGE

B11 SHOP, PESTICIDE, AND MACHINE

STORAGE

B13 MILK HOUSE

B14 FUEL STORAGE

B15 COMMODITY STORAGE

C1-1 LIQUID WASTE STORAGE FACILITY

CELL 1

C1-2 LIQUID WASTE STORAGE FACILITY

CELL 2

C2 SOLID STACK BUILDING

C3 SOLIDS/SAND SEPARATION FACILITY

C4 LEACHATE RUNOFF COLLECTION

SURVEY CONTROL DATA REFERENCE

1. SIGNED PLAT OF SURVEY BY DARREN E. FORGY, RLS#

S-2980 AND DATED AUGUST 24, 2021.

SURVEY CONTROL DATA NOTES

1. HORIZONTAL COORDINATES ARE REFERENCED TO THE

WISCONSIN STATE PLANE COORDINATE SYSTEM, SOUTH

ZONE, NAD 83. ALL DISTANCES ARE LISTED AS GRID.

2. ELEVATIONS ARE REFERENCED TO THE NAVD 88 DATUM.

PLAN

NORTH

CP3

WELL

MW

MW

MW

MW

MW

MW

MW

MW

MW

700 701

704 705

706707

708 709

711 712

713714

720721

723 724

727 728

731 732

737 738

742743

745746

748 749

750 751

S

FH

FH

MH

MH

MH MH

MH

MH

MH

MH

MH MH

MH MH

MH

MH

MH

B10

DO NOT

ENTER

SIGN

STOP SIGN

STOP SIGN

STOP SIGN STOP SIGN

16' GATE

16' GATE

16' GATE

WORKING LIMITS

DOUBLE GATE

24' TOTAL WIDTH

DOUBLE GATE

40' TOTAL WIDTH

DOUBLE GATE

40' TOTAL WIDTH

24'-0"

36'-0"

WELL

EXISTING BADGER

WELL 5, SEE NOTES

PROPOSED SECURITY

FENCE

DOUBLE GATE

24' TOTAL WIDTH

DOUBLE GATE

24' TOTAL WIDTH

DOUBLE GATE

24' TOTAL WIDTH

PROPOSED FIRE

PUMP HOUSE

PROPOSED

SCALE

SEE

NOTE

DUMPSTER

PAD

C4

STOP SIGN

B14

STOP SIGN

DOUBLE GATE,

48' TOTAL WIDTH

DUMPSTER

PAD

PROPOSED

STORMWATER

BASIN

C3

C2

B9

B7

B5B4

B6

B13

B3B2B1

A

PROPOSED

STORMWATER

BASIN

PARKING

LOT

E1

B1

A

B2 B3

B4 B5

B6

C3

B9

B7

B13

E2

C1-2

C1-1

B10

B12.1

B15

B12.2

B8

SITE FIRE

DEPARTMENT ACCESS

24'-0"

FIRE DEPARTMENT

CONNECTION

'-0

SITE FIRE

DEPARTMENT

ACCESS

SITE FIRE

DEPARTMENT

ACCESS

SITE FIRE

DEPARTMENT

ACCESS

FIRE

DEPARTMENT

CONNECTION

FIRE DEPARTMENT

CONNECTION

FIRE WATER

STORAGE TANK

SITE FIRE

DEPARTMENT

ACCESS

DOUBLE GATE

24' TOTAL WIDTH

C2

'-0

" DOUBLE GATE

32' TOTAL WIDTH

3'

6'

6'

B11

COORDINATES

No.

NORTHING

493,156.28

493,156.28

493,067.28

493,067.28

492,861.16

492,861.16

492,745.28

492,720.21

492,666.96

492,666.96

492,720.21

492,770.17

492,770.03

492,617.78

492,617.78

EASTING

2,032,958.45

2,033,018.45

2,033,018.45

2,032,958.45

2,033,716.55

2,033,895.72

2,033,686.87

2,033,686.62

2,033,686.62

2,033,951.39

2,033,951.39

2,033,951.39

2,034,423.52

2,034,423.64

2,033,951.39

DESCRIPTION

B8 NW

B8 NE

B8 SE

B8 SW

A NW

A NE

A SW

B1 NW

B1 SW

B2 SE

B2 NE

B3 NW

B3 NE

B3 SE

B3 SW

COORDINATES

No.

NORTHING

492,919.03

492,864.78

492,869.78

492,931.03

493,013.78

493,150.03

493,150.03

493,013.78

493,375.88

493,375.79

493,268.46

493,268.38

493,240.31

493,240.31

493,184.65

EASTING

2,033,977.47

2,033,977.47

2,034,451.72

2,034,451.72

2,034,385.72

2,034,385.72

2,033,903.44

2,033,903.44

2,034,156.64

2,034,462.64

2,034,462.64

2,034,156.64

2,034,503.74

2,034,611.74

2,034,611.74

DESCRIPTION

B4 NW

B4 SW

B5 SE

B5 NE

B6 SE

B6 NE

B6 NW

B6 SW

C3 NW

C3 NE

C3 SE

C3 SW

C2 NW

C2 NE

C2 SE

COORDINATES

No.

NORTHING

493,184.65

493,310.00

493,310.00

493,010.00

493,010.00

492,939.98

492,939.98

493,050.50

493,050.50

493,010.00

492,977.25

492,977.25

492,693.02

492,693.02

492,786.08

EASTING

2,034,503.74

2,034,679.90

2,035,200.90

2,034,724.45

2,034,844.48

2,034,844.48

2,034,724.45

2,034,844.64

2,034,917.48

2,034,917.48

2,035,026.24

2,035,106.51

2,035,106.51

2,035,026.24

2,034,921.83

DESCRIPTION

C2 SW

B10 NW

B10 NE

B9 NW

B9 NE

B9 SE

B9 SW

B15 NW

B15 NE

B15 SE

B11 NW

B11 NE

B11 SE

B11 SW

B11 NE

COORDINATES

No.

NORTHING

492,729.08

492,740.58

492,774.58

493,557.46

493,555.06

493,478.06

493,477.05

493,231.12

493,234.47

EASTING

2,034,921.83

2,034,678.83

2,034,678.83

2,033,320.65

2,033,784.64

2,033,783.70

2,034,007.48

2,034,006.04

2,033,318.04

DESCRIPTION

B11 SE

B11 SW

B11 NW

C1 NW

C1

C1

C1 NE

C1 SE

C1 SW

SURVEY CONTROL DATA (US

FT)

STATION

CP2

CP3

NORTHING

493,651.83

492,414.39

EASTING

2,034,988.74

2,034,545.32

ELEV

876.12

859.52

DESCRIPTION

SET FENO MONUMENT

SET FENO MONUMENT

SITE LAYOUT LEGEND

SYMBOL ITEM

PROPOSED GRAVEL SURFACE

PROPOSED CONCRETE PAVEMENT

PROPOSED 3.5" HMA OR CONCRETE

SURFACE

PROPOSED 4" HMA OR CONCRETE

SURFACE

EXISTING BUILDINGS - STRUCTURES -

ROADS TO REMAIN

BID OPTION 2

BID OPTION 3

BID OPTION 4

BID OPTION 5

BID OPTION 6

BID OPTION 7

100' 200'0

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A

D

IS

TR

IC

T

M

AU

R

ER

-S

TU

TZ

, I

N C

T.

F

EL

D

M

AN

N

D . F

EU

C

H T

T.

F

EL

D

M

AN

N

A.

O

R

EB

AU

G

H

/0

8/

W

F2

0C

W

F2

1C

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

R

TA

/0

8/

5/

/2

4:

:1

PM

S:

\2

\2

1\

.0

H D

R -U

SA

C

E- U

SD

A

AR

S

D

FR

C \D ra w in gs

Ag

\B id di ng

R

FI

D ra w in gs \C

-1

S

IT

E

LA

YO

U

T

PL

AN

.d w g

N . D

R

IE

S

LA

N E, S U

IT

E

PE

O

R

IA

, I L

9-

3-

AD

D

EN

D

U M

/0

2/

AD

D

EN

D

U M

- I N

Q U

IR

Y

/1

1/

AD

D

EN

D

U M

/1

1/

AD

D

EN

D

U M

/1

3/

SI

TE

L

AY

O U

T

PL

AN

C-103

EXISTING FACILITY DETAILS

SYMBOL FACILITY DESCRIPTION

E1 SMALL EQUIPMENT BUILDING

E2 CONSERVATION CLUB BUILDING

PROPOSED FACILITY DETAILS

SYMBOL FACILITY DESCRIPTION

A VISITOR'S CENTER, ADMIN & LAB

B1 METABOLIC CHAMBERS

B2 ADVANCED ANIMAL NUTRITION

B3 CONVENTIONAL FREESTALL

B4 MILKING PARLOR

B5 SPECIAL NEEDS & MATERNITY

B6 ROBOTIC FREESTALL

B7 CALF BARN

B8 AGRONOMY BUILDING

B9 FEED MIXING

B10 FEED STORAGE

B11 SHOP, PESTICIDE, AND MACHINE

STORAGE

B12.1 CONNECTOR

B12.2 CONNECTOR AND SORTING

B13 MILK HOUSE

B14 FUEL STORAGE

B15 COMMODITY STORAGE

C1-1 LIQUID WASTE STORAGE FACILITY

CELL 1

C1-2 LIQUID WASTE STORAGE FACILITY

CELL 2

C2 SOLID STACK BUILDING

C3 SOLIDS/SAND SEPARATION FACILITY

C4 LEACHATE RUNOFF COLLECTION

PLAN

NORTH

NOTES:

1) FENCES SHALL BE 2' MIN. OFF OF DRIVEWAYS AND FEED STORAGE AREA

2) TEMPORARY AND PERMANENT FENCING SHALL MAINTAIN ACCESS TO BUILDINGS

E1, E2 AND BADGER WELL 5. LOCATE TEMPORARY GATES AS NEEDED.

3) FOLLOW PLANS AND SPECIFICATIONS FOR TEMPORARY AND PERMANENT

FENCING. COORDINATE LOCATIONS WITH USACE. DO NOT DISTURB TREES ON

PLAN EAST OF TEMPORARY FENCE DURING PLACEMENT OF FENCING.

PROVIDE

VEHICLE EGRESS

AROUND E1 & E2

5'

B8

E1

E2

B1

A

PROPOSED

STORMWATER

BASIN

M

AT

C H

LI

N

E C

5-

C

R40' R40'

R2 5'

R20'

R17'

'6 PARKING STALLS

(20' X 10')

R25'

R20

43'

R20'

R10'

15'

R25'

R3 5'

R31'

175'

226'

69'

70'20'

23'

464'

430'

PARKING LOT

SEE SHEET

C-109

90'

0'

R25'

R5'

24'

15'

0'

51'

R10.00'

478'

507'

C1-2

WORKING LIMITS R25'

25'

R20'

66'

R25'

7'

STOP SIGN

STOP SIGN

DO NOT ENTER

SIGN

STOP SIGN

STOP

SIGN

STOP SIGN

6' X 6' SIDE WALK STOOP

BY MAN DOOR, TYP.

20'

13'

24'

12' x 9' AIR HANDLING

UNIT SLAB

3'

- T

O E

D G

E O

F R

O

AD

14'

85'

40' 80'0

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A

D

IS

TR

IC

T

M

AU

R

ER

-S

TU

TZ

, I

N C

T.

F

EL

D

M

AN

N

D . F

EU

C

H T

T.

F

EL

D

M

AN

N

A.

O

R

EB

AU

G

H

/0

8/

W

F2

0C

W

F2

1C

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

R

TA

/0

8/

5/

/2

4:

:3

PM

S:

\2

\2

1\

.0

H D

R -U

SA

C

E- U

SD

A

AR

S

D

FR

C \D ra w in gs

Ag

\B id di ng

R

FI

D ra w in gs \C

-1

S

IT

E R

O

AD

P

LA

N

SH

EE

T 1.

dw g

N . D

R

IE

S

LA

N E, S U

IT

E

PE

O

R

IA

, I L

9-

3-

AD

D

EN

D

U M

/0

2/

AD

D

EN

D

U M

- I N

Q U

IR

Y

/1

1/

AD

D

EN

D

U M

/1

1/

AD

D

EN

D

U M

/1

3/

SI

TE

R O

AD

P

LA

N

S H

EE

T

C-105

EXISTING FACILITY DETAILS

SYMBOL FACILITY DESCRIPTION

E1 SMALL EQUIPMENT BUILDING

E2 CONSERVATION CLUB BUILDING

PROPOSED FACILITY DETAILS

SYMBOL FACILITY DESCRIPTION

A VISITOR'S CENTER, ADMIN & LAB

B1 METABOLIC CHAMBERS

B2 ADVANCED ANIMAL NUTRITION

B3 CONVENTIONAL FREESTALL

B4 MILKING PARLOR

B5 SPECIAL NEEDS & MATERNITY

B6 ROBOTIC FREESTALL

B7 CALF BARN

B8 AGRONOMY BUILDING

B9 FEED MIXING

B10 FEED STORAGE

B11 SHOP, PESTICIDE, AND MACHINE

STORAGE

B12.1 CONNECTOR

B12.2 CONNECTOR AND SORTING

B13 MILK HOUSE

B14 FUEL STORAGE

B15 COMMODITY STORAGE

C1-1 LIQUID WASTE STORAGE FACILITY

CELL 1

C1-2 LIQUID WASTE STORAGE FACILITY

CELL 2

C2 SOLID STACK BUILDING

C3 SOLIDS/SAND SEPARATION FACILITY

C4 LEACHATE RUNOFF COLLECTION

PLAN

NORTH

SITE LAYOUT LEGEND

SYMBOL ITEM

PROPOSED GRAVEL SURFACE

PROPOSED CONCRETE PAVEMENT

PROPOSED 3.5" HMA OR CONCRETE

SURFACE

PROPOSED 4" HMA OR CONCRETE

SURFACE

EXISTING BUILDINGS - STRUCTURES -

ROADS TO REMAIN

NOTES:

1) ONLY HANDICAP SPACES SHALL BE

STRIPED. OTHER SPACES SHOWN ON

PLAN TO SHOW NUMBER PROVIDED.

KEY MAP

1" = 600'

20'

C1 - 2 C1-1

C3

C2

B5

B4

B6

B13

B3 B2B1

A

M

AT

C H

LI

N

E C

5-

C

M

AT

C H

LI

N

E C

6-

C

R10 'R10'

12'

20'

40'

20' 35'

6'

54' 131'

19'

17'

7'

61'

5'

7'

99'

' 199'

42'

44'

111'

133'

R1 0'

69'

R10'

R10'

R10'

40' 41' 29' R25'

472'

' 12'

387'

R20'

24'

R15'

R20

R21

20'

68'

207'

97'

R1 8'

R11 'R5

210'

9'80

88'

R5'

191'

25'

341'

12'

52'

12'

45'

90' R10'

R10'

22' 112'

206'

257'

231' 20' 153'

34'

R20'

R20'

R20'

R26'

R20'

R20

R10' R10

2' AGG.

SHOULDER

(TYP.)

R50' R33'

26' 46

52'

62'

R5' R25'

32'

20'

CONCRETE

DUMPSTER PAD

50'

21'

14'

20'

94'

8'

R20'

R10'

12'

C4

B10

47'

B7

20'

R9'

38'

6' X 6' SIDE WALK STOOP

BY MAN DOOR, TYP.

B12.1

B12.2

12' X 9' AIR HANDLING UNIT

CONCRETE SLAB

20'

20'

38'

R25'

R10' 37'

R12'

R15'

R22' R15'

46'

189'

32'

7'

0'

0'

8'

96'

40' 80'0

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

PR

AI

R

IE

D U

S

AC

, W I

O M

AH

A

D

IS

TR

IC

T

M

AU

R

ER

-S

TU

TZ

, I

N C

T.

F

EL

D

M

AN

N

D . F

EU

C

H T

T.

F

EL

D

M

AN

N

A.

O

R

EB

AU

G

H

/0

8/

W

F2

0C

W

F2

1C

N

EW

D

AI

R Y

FO

R

AG

E

R

ES

EA

R

C H

C

EN

TE

R

R

TA

/0

8/

5/

/2

4:

:0

PM

S:

\2

\2

1\

.0

H D

R -U

SA

C

E- U

SD

A

AR

S

D

FR

C \D ra w in gs

Ag

\B id di ng

R

FI

D ra w in gs \C

-1

S

IT

E R

O

AD

P

LA

N

SH

EE

T 2.

dw g

N . D

R

IE

S

LA

N E, S U

IT

E

PE

O

R

IA

, I L

9-

3-

AD

D

EN

D

U M

/0

2/

AD

D

EN

D

U M

- I N

Q U

IR

Y

/1

1/

AD

D

EN

D

U M

/1

1/

AD

D

EN

D

U M

/1

3/

SI

TE

R O

AD

P

LA

N

S H

EE

T

C-106

EXISTING FACILITY DETAILS

SYMBOL FACILITY DESCRIPTION

E1 SMALL EQUIPMENT BUILDING

E2 CONSERVATION CLUB BUILDING

PROPOSED FACILITY DETAILS

SYMBOL FACILITY DESCRIPTION

A VISITOR'S CENTER, ADMIN & LAB

B1 METABOLIC CHAMBERS

B2 ADVANCED ANIMAL NUTRITION

B3 CONVENTIONAL FREESTALL

B4 MILKING PARLOR

B5 SPECIAL NEEDS & MATERNITY

B6 ROBOTIC FREESTALL

B7 CALF BARN

B8 AGRONOMY BUILDING

B9 FEED MIXING

B10 FEED STORAGE

B11 SHOP, PESTICIDE, AND MACHINE

STORAGE

B12.1 CONNECTOR

B12.2 CONNECTOR AND SORTING

B13 MILK HOUSE

B14 FUEL STORAGE

B15 COMMODITY STORAGE

C1-1 LIQUID WASTE STORAGE FACILITY

CELL 1

C1-2 LIQUID WASTE STORAGE FACILITY

CELL 2

C2 SOLID STACK BUILDING

C3 SOLIDS/SAND SEPARATION FACILITY

C4 LEACHATE RUNOFF COLLECTION

PLAN

NORTH

SITE LAYOUT LEGEND

SYMBOL ITEM

PROPOSED GRAVEL SURFACE

PROPOSED CONCRETE PAVEMENT

PROPOSED 3.5" HMA OR CONCRETE

SURFACE

PROPOSED 4" HMA OR CONCRETE

SURFACE

EXISTING BUILDINGS - STRUCTURES -

ROADS TO REMAIN

KEY MAP

CP3

4+97.34

C2

B10

B15

B9

B14

B11

B7

M

AT

C H

LI

N

E C

6-

C

SC

AL

E

119'

37'

54'

12'

36…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .