A.2.11.3 W9128A22R0016 Am-0006 Specifications.pdf

PDF 1 MB Posted

Attached to
FY22 OMA Multi-Domain Task Force (MDTF) #3, Building 300, Helemano Military Reservation
Solicitation number
W9128A22R0016
Issued by

About this file

This announcement constitutes a solicitation notice for a firm-fixed-price construction contract to renovate and repair Building 300 at Helemano Military Reservation for the Multi-Domain Task Force #3. The project includes a new elevator, UPS, emergency generator, utility extensions, communications infrastructure, site work including lighting, grading, parking and fencing. The period of performance is estimated at 912 calendar days. The Army Corps of Engineers, Honolulu District will evaluate proposals based on experience, past performance, technical approach, and price using lowest priced technically acceptable procedures. The project magnitude is between $50-100 million. Offerors must register in the System for Award Management at www.sam.gov which will be the source for any solicitation amendments.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 51 OF 103 PAGES

MDTF #3 Building 300 Helemano Military Reservation

12 21 00 2.1 SIndoor Air Quality for window blinds

2.1 SIndoor Air Quality for window

blinds

SD-08 Manufacturer’s Instructions

2.1 GWindow Blinds

SD-10 Operation and Maintenance

Data

2.1 GWindow Blinds

14 24 23 SD-02 Shop Drawings

2.1 GElevator

1.2.1 GElevator Components

1.2.2 GElevator Components

1.2.1 GElevator Machine

1.2.1 GElevator Controller

1.3.4 GWiring Diagrams

SD-03 Product Data

2.1Elevator

1.2.1Elevator Components

1.2.2Elevator Components

1.2.2Data Sheets

2.5.2Elevator Microprocessor

Controller

SD-05 Design Data

1.2.3.3Emergency Power Systems

1.2.3.2Heat Loads

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 52 OF 103 PAGES

14 24 23 1.2.3.1Reaction Loads

SD-07 Certificates

1.3.2Price Lists

1.4Warranty

1.3.1.1Endorsement Letter

1.2.4Welders' Qualifications

2.5.2.3Elevator Controller Certification

2.1.2 SIndoor Air Quality for Flooring and

Adhesive

SD-10 Operation and Maintenance

Data

2.1Elevator

1.2.5Maintenance Control Program

(MCP)

2.5.2.2Software and Documentation

21 13 13 SD-01 Preconstruction Submittals

1.2.3 GQualified Fire Protection Engineer

(QFPE)

1.4.2.1 GSprinkler System Designer

1.4.2.2 GSprinkler System Installer

SD-02 Shop Drawings

1.2.1.1 GShop Drawing

SD-03 Product Data

2.2.1 GPipe

2.3.1.2 GFittings

2.3.4 GValves

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 53 OF 103 PAGES

21 13 13 2.8.5 GRelief Valves

2.7 GSprinklers

2.3.3 GPipe Hangers and Supports

2.4.1 GSprinkler Alarm Switch

2.4.2 GValve Supervisory (Tamper)

Switch

2.6 GFire Department Connection

2.5 GBackflow Prevention Assembly

2.8.6 GAir Vent

2.5.1 GHose Valve

2.3.3 GSeismic Bracing

2.1.2 GNameplates

SD-05 Design Data

2.3.3 GSeismic Bracing

2.3.3Load calculations for sizing of seismic bracing

1.2.1.2 GHydraulic Calculations

SD-06 Test Reports

3.7.1 GTest Procedures

SD-07 Certificates

3.7.2.1 GVerification of Compliant

Installation

3.7.2.2 GRequest for Government Final

Test

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 54 OF 103 PAGES

21 13 13 3.9 GOperating and Maintenance

(O&M) Instructions

1.6 GSpare Parts

SD-11 Closeout Submittals

3.9 GAs-built drawings

22 00 00 SD-02 Shop Drawings

3.9.1 GPlumbing System

SD-03 Product Data

2.4.3 SWater Sense Label for Water

Closet Flush Valve

2.4.4 SWater Sense Label for Urinal

3.9.1.1 GBackflow Prevention Assemblies

2.6.2Shower Faucets

2.4Fixtures

2.4.3Flush Valve Water Closets

2.4.4Flush Valve Urinals

2.4.6Wall Hung Lavatories

3.1.3 GDielectric Fittings

2.4.7Countertop Lavatories

2.4.8Sinks

2.4.9Service Sinks

2.4.10Drinking-Water Coolers

2.4.10 SEnergy Star Label for Electric

Water Cooler

2.8 GWater Heaters

2.10 GPumps

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 55 OF 103 PAGES

22 00 00 3.4 GVibration-Absorbing Features

3.9.1Plumbing System

SD-06 Test Reports

3.9Tests, Flushing and Disinfection

3.9.1.1Test of Backflow Prevention

Assemblies

SD-07 Certificates

1.3Materials and Equipment

2.1.1Bolts

SD-10 Operation and Maintenance

Data

3.9.1Plumbing System

23 05 15 SD-01 Preconstruction Submittals

1.2Material, Equipment, and Fixture

Lists

SD-02 Shop Drawings

1.2 GRecord Drawings

1.2 GConnection Diagrams

1.2 GCoordination Drawings

1.2 GFabrication Drawings

3.1 GInstallation Drawings

SD-03 Product Data

2.1 GPipe and Fittings

2.2 GPiping Specialties

2.3 GValves

2.4 GMiscellaneous Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 56 OF 103 PAGES

23 05 15 2.5 GSupporting Elements

1.2 GEquipment Foundation Data

SD-04 Samples

1.2 GManufacturer's Standard Color

Charts

SD-05 Design Data

2.1 GPipe and Fittings

2.2 GPiping Specialties

2.3 GValves

SD-06 Test Reports

3.1 GHydrostatic Tests

3.1 GAir Tests

3.1 GValve-Operating Tests

3.1 GDrainage Tests

3.1 GPneumatic Tests

3.1 GNon-Destructive Electric Tests

3.1 GSystem Operation Tests

SD-07 Certificates

1.4.2 GRecord of Satisfactory Field

Operation

1.4.3 GList of Qualified Permanent

Service Organizations

1.2 GListing of Product Installations

1.2 GRecords of Existing Conditions

3.1 GSurface Resistance

3.1 GShear and Tensile Strengths

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 57 OF 103 PAGES

23 05 15 3.1 GTemperature Ratings

3.1 GBending Tests

3.1 GFlattening Tests

3.1 GTransverse Guided Weld Bend

Tests

SD-10 Operation and Maintenance

Data

3.10 GOperation and Maintenance

Manuals

23 05 48.19 SD-02 Shop Drawings

3.1Coupling and Bracing

3.3Flexible Couplings or Joints

2.2Equipment Restraint

1.2.4 GContractor Designed Bracing

SD-03 Product Data

3.1 GCoupling and Bracing

3.3 GFlexible Couplings Or Joints

2.2 GEquipment Restraint

1.2.4 GContractor Designed Bracing

2.6Snubbers

3.9Anchor Bolts

2.2.2Vibration Isolators

SD-05 Design Data

1.2.4Design Calculations

SD-06 Test Reports

3.9 GAnchor Bolts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 58 OF 103 PAGES

23 05 93 SD-01 Preconstruction Submittals

1.3.3 GRecords of Existing Conditions

1.5.3.1 GTAB Firm

1.2 GTAB Team Assistants

1.2 GTAB Team Engineer

1.5.3.2 GTAB Specialist

1.2 GTAB Team Field Leader

SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3 GEquipment and Performance

Data

1.5.3.4 GTAB Related HVAC Submittals

1.5.2 GTAB Procedures

1.5.2 GCalibration

1.3.3 GSystems Readiness Check

1.5.4 GTAB Execution

1.5.4.3 GTAB Verification

SD-06 Test Reports

3.3.5 GCompleted Pre-Final DALT

Report

3.3.8 GCertified Final DALT Report

1.5.5.2 GTAB Report for Season 1

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 59 OF 103 PAGES

23 05 93 1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.7.2 GDALT and TAB Submittal and

Work Schedule

1.7.2.3 GTAB Pre-Field Engineering

Report

1.5.3.1 GTAB Firm

1.3.3 GDesign Review Report

1.7.2.2 GPre-field DALT Preliminary

Notification

1.7.2 GAdvanced Notice for TAB Field

Work

1.7.2 GPrerequisite HVAC Work Check

Out List

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

2.3.1 SRecycled content for insulation

materials

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 60 OF 103 PAGES

23 07 00 3.4 GEquipment Insulation Systems

2.3.1 SRecycled Materials

SD-04 Samples

2.2.1.2 GThermal Insulation

3.1.1 GDisplay Samples

SD-07 Certificates

2.2.1 SIndoor air quality for adhesives

and sealants

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

23 09 00 SD-02 Shop Drawings

3.3 GDDC Contractor Design Drawings

3.3 GDraft As-Built Drawings

3.3 GFinal As-Built Drawings

SD-03 Product Data

1.8.3 GProgramming Software

1.8.4 GController Application Programs

1.8.1 GConfiguration Software

1.8.2 GController Configuration Settings

2.2 GManufacturer's Product Data

1.8.5 GNiagara Framework Supervisory

Gateway Backups

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 61 OF 103 PAGES

23 09 00 1.8.6 GNiagara Framework Engineering

Tool

1.5 GNiagara Framework Wizards

SD-05 Design Data

1.9Boiler Or Chiller Plant Gateway

Request

SD-06 Test Reports

3.1.1Existing Conditions Report

3.5.2 GStart-Up Testing Report

3.6.1 GPVT Procedures

3.6.3 GPVT Report

1.10.1 GPre-Construction Quality Control

(QC) Checklist

1.10.2 GPost-Construction Quality Control

(QC) Checklist

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

(O&M) Instructions

3.9.1 GTraining Documentation

SD-11 Closeout Submittals

2.5 GEnclosure Keys

1.10.3 GCloseout Quality Control (QC)

Checklist

23 21 23 SD-02 Shop Drawings

2.1.2 GSystem Coordination

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 62 OF 103 PAGES

23 21 23 SD-03 Product Data

2.2.2 GInstructions

2.2.5 GEquipment Data

3.5.2 GTraining Period

SD-06 Test Reports

2.8Factory Tests

3.3Field Quality Control

SD-07 Certificates

1.3.1Manufacturer's Representative

SD-10 Operation and Maintenance

Data

3.5.1 GOperation and Maintenance

Manuals

3.5.2 GTraining

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-03 Product Data

2.3Refrigerant Piping System

1.5.2Spare Parts

1.3.1Qualifications

3.5Refrigerant Piping Tests

3.1Verification of Dimensions

SD-06 Test Reports

3.5Refrigerant Piping Tests

SD-07 Certificates

2.1Service Organization

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 63 OF 103 PAGES

23 23 00 SD-10 Operation and Maintenance

Data

1.5 GMaintenance

3.4 GOperation and Maintenance

Manuals

3.4 GDemonstrations

23 30 00 SD-02 Shop Drawings

1.4.4 GDetail Drawings

SD-03 Product Data

2.9.1.1Metallic Flexible Duct

2.9.1.2Insulated Nonmetallic Flexible

Duct Runouts

2.9.1.2Duct Connectors

2.9.2 GDuct Access Doors

2.9.3 GManual Balancing Dampers

2.9.6Sound Attenuation Equipment

2.9.7.1Diffusers

2.9.7.2Registers and Grilles

2.9.8Louvers

2.9.9Air Vents, Penthouses, and

Goosenecks

2.10.1.1Centrifugal Fans

2.10.1.2In-Line Centrifugal Fans

2.10.1.3Ceiling Exhaust Fans

2.10.1.3 SPL-109-58 label for ceiling

exhaust fan product

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 64 OF 103 PAGES

23 30 00 2.11 GAir Handling Units

2.12.1 GRoom Fan-Coil Units

2.12.2.1 GVariable Volume, Single Duct

Terminal Units

1.4.5Test Procedures

1.2.1.2 GDiagrams

2.10.3 SAir Filters

2.9.1 SIndoor Air Quality for Duct

Sealants

SD-06 Test Reports

3.12 GPerformance Tests

3.10 GDamper Acceptance Test

SD-07 Certificates

1.4.1Bolts

1.4.3Ozone Depleting Substances

Technician Certification

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation

Instructions

3.14.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

3.14.1 GOperation and Maintenance

Manuals

2.9.3 GManual Balancing Dampers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 65 OF 103 PAGES

23 30 00 2.10.1.1 GCentrifugal Fans

2.10.1.2 GIn-Line Centrifugal Fans

2.10.1.3 GCeiling Exhaust Fans

2.11 GAir Handling Units

2.12.1 GRoom Fan-Coil Units

2.12.2.1 GVariable Volume, Single Duct

Terminal Units

SD-11 Closeout Submittals

3.13 SIndoor Air Quality During

Construction

23 64 10 SD-03 Product Data

3.1.3Posted Instructions

1.6.1Verification of Dimensions

2.8Factory Tests

3.6System Performance Tests

3.7Demonstrations

2.5.1Refrigerant

3.5.1Water Chiller - Field Acceptance

Test Plan

SD-06 Test Reports

3.5Field Acceptance Testing

3.5.2Water Chiller - Field Acceptance

Test Report

2.8Factory Tests

3.6System Performance Tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 66 OF 103 PAGES

23 64 10 3.1.8 GRefrigeration System

1.3.1Ozone Depleting Substances

Technician Certification

SD-08 Manufacturer’s Instructions

3.1 GWater Chiller - Installation

Instructions

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.4 SIndoor Air Quality During

Construction

23 64 26 SD-03 Product Data

2.4.7 GAutomatic Flow Control Valves

2.4.8Pump Discharge Valve

2.4.9Pressure Relief Valve

2.5.8 GExpansion Joints

2.6 GPumps

2.5.2Combination Strainer and Pump

Suction Diffuser

2.7Expansion Tanks

2.8Air Separator Tanks

2.9 GWater Treatment Systems

SD-06 Test Reports

3.1.1.3Piping Welds NDE Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 67 OF 103 PAGES

23 64 26 3.4.2 GPressure Tests Reports

SD-07 Certificates

3.1.1.1Employer's Record Documents

(For Welding)

3.1.1.2Welding Procedures and

Qualifications

SD-08 Manufacturer’s Instructions

3.5 GLesson plan for the Instruction

Course

SD-10 Operation and Maintenance

Data

2.4.6 GCalibrated Balancing Valves

2.4.7 GAutomatic Flow Control Valves

2.4.8 GPump Discharge Valve

2.4.9 GPressure Relief Valve

2.5.8 GExpansion Joints

2.6 GPumps

2.5.2 GCombination Strainer and Pump

Suction Diffuser

2.7 GExpansion Tanks

2.8 GAir Separator Tanks

23 81 00 SD-03 Product Data

3.7.1Spare Parts

3.4Posted Instructions

2.6.1Coil Corrosion Protection

3.6System Performance Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 68 OF 103 PAGES

23 81 00 3.4 GTraining

1.4Inventory

2.1Supplied Products

2.2Manufacturer's Standard Catalog

Data

2.1 SEnergy Star

2.3.2.1.7 SAir Filters

2.2.2.3 SEPA SNAP for Refrigerants

SD-06 Test Reports

3.5 GRefrigerant Tests, Charging, and

Start-Up

3.6 GSystem Performance Tests

SD-07 Certificates

3.7.2Service Organizations

SD-10 Operation and Maintenance

Data

3.4 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

2.2.2.3 SOzone Depleting Substances

23 81 23 SD-03 Product Data

2.1 GComputer Room Air Conditioner

2.5.2 GSpace Temperature Control

System Drawings

2.1.5Filters

1.4 SRefrigerants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 69 OF 103 PAGES

23 81 23 1.4 SEPA SNAP for Refrigerants

SD-07 Certificates

2.3 GCertificate of Specification

Compliance

3.3.3 GCredentials of the Manufacturer's

Field Test Representative

1.5.1Ozone Depleting Substances

Technician Certification

1.6.3Certified List Of Qualified

Permanent Service Organizations

SD-08 Manufacturer’s Instructions

3.1.2Installation Manual for Each Type of CRAC

SD-10 Operation and Maintenance

Data

3.1.3 GComputer Room Air Conditioner

Operation and Maintenance Data

SD-11 Closeout Submittals

3.2 SIndoor Air Quality During

Construction

25 05 11.21 SD-01 Preconstruction Submittals

3.3.2 GDevice Account Lock Exception

Request

1.10.1.6 GContractor Computer

Cybersecurity Compliance

Statements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 70 OF 103 PAGES

25 05 11.21 1.10.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

1.7.2 GCybersecurity Subject Matter

Expert Qualifications

SD-02 Shop Drawings

1.8.1 GNetwork Communication Report

1.8.4 GCybersecurity Riser Diagram

SD-03 Product Data

1.8.5 GControl System Cybersecurity

Documentation

SD-06 Test Reports

3.13.1 GControl System Cybersecurity

Testing Procedures

3.13.3 GControl System Cybersecurity

Testing Report

SD-07 Certificates

1.9 GSoftware Licenses

SD-11 Closeout Submittals

3.4.5.4 GPassword Change Summary

Report

3.3.7 GEnclosure Keys

1.8.3 GSoftware and Configuration

Backups

3.5.3 GAuditing Front End Software

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 71 OF 103 PAGES

25 05 11.21 3.5.4.2 GDevice Audit Record Upload

Software

3.9 GSystem Maintenance Tool

Software

1.8.2 GControl System Inventory Report

3.12.1 GIntegrity Verification Software

25 05 11.23 SD-01 Preconstruction Submittals

3.3.2 GDevice Account Lock Exception

Request

3.2.2.2 GMultiple Ethernet Connection

Device Request

1.10.1.6 GContractor Computer

Cybersecurity Compliance

Statements

1.10.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

1.7.2 GCybersecurity Subject Matter

Expert Qualifications

1.8.1 GProposed STIG and SRG

Applicability Report

SD-02 Shop Drawings

1.8.2 GNetwork Communication Report

1.8.5 GCybersecurity Riser Diagram

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 72 OF 103 PAGES

25 05 11.23 1.8.7 GControl System Cybersecurity

Documentation

SD-06 Test Reports

3.13.1 GControl System Cybersecurity

Testing Procedures

3.13.3 GControl System Cybersecurity

Testing Report

SD-07 Certificates

1.9 GSoftware Licenses

SD-11 Closeout Submittals

3.4.5.4 GPassword Change Summary

Report

3.3.5 GEnclosure Keys

1.8.4 GSoftware and Configuration

Backups

3.5.3 GAuditing Front End Software

3.5.4.1 GDevice Audit Record Upload

Software

3.9 GSystem Maintenance Tool

Software

3.11.1 GControl System Scanning Tools

1.8.6 GSTIG, SRG and Vendor Guide

Compliance Result Report

1.8.3 GControl System Inventory Report

25 05 11.26 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 73 OF 103 PAGES

25 05 11.26 3.3.2 GDevice Account Lock Exception

Request

3.2.2.2 GMultiple Ethernet Connection

Device Request

1.10.1.6 GContractor Computer

Cybersecurity Compliance

Statements

1.10.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

1.7.2 GCybersecurity Subject Matter

Expert Qualifications

SD-02 Shop Drawings

1.8.1 GNetwork Communication Report

1.8.4 GCybersecurity Riser Diagram

SD-03 Product Data

1.8.5 GControl System Cybersecurity

Documentation

SD-06 Test Reports

3.13.1 GControl System Cybersecurity

Testing Procedures

3.13.3 GControl System Cybersecurity

Testing Report

SD-07 Certificates

1.9 GSoftware Licenses

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 74 OF 103 PAGES

25 05 11.26 3.4.5.4 GPassword Change Summary

Report

3.3.5 GEnclosure Keys

1.8.3 GSoftware and Configuration

Backups

3.5.3 GAuditing Front End Software

3.5.4.1 GDevice Audit Record Upload

Software

3.9 GSystem Maintenance Tool

Software

1.8.2 GControl System Inventory Report

25 10 10 SD-02 Shop Drawings

3.3.2UMCS Contractor Design

Drawings

3.3.3Draft As-Built Drawings

3.3.3Final As-Built Drawings

SD-03 Product Data

2.1.5Product Data Sheets

2.4.1Enclosure Keys

SD-05 Design Data

3.3.1UMCS IP Network Bandwidth

Usage Estimate

SD-06 Test Reports

1.7Pre-Construction QC Checklist

1.7Post-Construction QC Checklist

3.1Factory Test Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 75 OF 103 PAGES

25 10 10 3.1Factory Test Report

3.2Existing Conditions Report

3.7 GStart-Up and Start-Up Testing

Report

3.8.1PVT Phase I Procedures

3.8.2 GPVT Phase I Report

3.8.3 GPVT Phase II Report

SD-10 Operation and Maintenance

Data

1.8Operation and Maintenance

(O&M) Instructions

3.9.8.1Preventive Maintenance Work

Plan

3.10.1Basic Training Documentation

3.10.1Advanced Training

Documentation

3.10.1Refresher Training

Documentation

SD-11 Closeout Submittals

1.7Closeout QC Checklist

26 05 19.10 10 SD-03 Product Data

2.1.1 GWire and Cable

2.1.3.1 GConductors

3.1Cable Manufacturing Data

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 76 OF 103 PAGES

26 05 19.10 10 3.2 GTest Report(s), Inspection

Report(s), and Verification

Report(s)

26 05 48.00 10 SD-02 Shop Drawings

3.2Lighting Fixtures in Buildings

1.3Equipment Requirements

SD-03 Product Data

3.2 GLighting Fixtures in Buildings

1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

26 08 00 SD-06 Test Reports

3.1 GAcceptance Tests and

Inspections

SD-07 Certificates

1.4.1 GQualifications

1.4.3 GAcceptance Test and Inspections

Procedure

26 20 00 SD-02 Shop Drawings

2.13 GPanelboards

2.15 GTransformers

2.4 GCable Trays

SD-03 Product Data

3.1.5.1 GSurface Raceways

2.12 GReceptacles

2.13.3 GCircuit Breakers

2.10 GSwitches

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 77 OF 103 PAGES

26 20 00 2.15 GTransformers

2.14 GEnclosed Circuit Breakers

2.17 GMotor Controllers

2.18 GManual Motor Starters

2.27 GMetering

2.21.1 GCATV Outlets

2.22.2 GSecondary Bonding Busbar

2.28 GSurge Protective Devices

SD-06 Test Reports

3.5.2 G600-volt Wiring Test

3.5.6 GGrounding System Test

3.5.3 GTransformer Tests

3.5.4 GGround-fault Receptacle Test

3.5.5 GArc-fault Receptacle Test

SD-07 Certificates

2.11 GFuses

SD-09 Manufacturer’s Field

Reports

2.30.1Transformer Factory Tests

SD-10 Operation and Maintenance

Data

2.27 GMetering

26 24 13 SD-02 Shop Drawings

1.4.2 GSwitchboard Drawings

SD-03 Product Data

2.2 GSwitchboard

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 78 OF 103 PAGES

26 24 13 SD-06 Test Reports

2.5.2 GSwitchboard Design Tests

2.5.3 GSwitchboard Production Tests

3.5.1 GAcceptance Checks and Tests

SD-10 Operation and Maintenance

Data

1.5.1 GSwitchboard Operation and

Maintenance

SD-11 Closeout Submittals

1.5.2 GAssembled Operation and

Maintenance Manuals

2.5.1 GEquipment Test Schedule

3.5 GRequired Settings

2.8 GService Entrance Available Fault

Current Label

26 28 01.00 10 SD-03 Product Data

2.4Fault Current Analysis

2.4Protective Device Coordination

Study

2.1Equipment

1.4.1System Coordinator

3.2Installation

2.4.7ARC Flash Analysis

SD-06 Test Reports

3.3Field Testing

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 79 OF 103 PAGES

26 28 01.00 10 1.6Devices and Equipment

26 29 23 SD-02 Shop Drawings

1.5.1 GSchematic Diagrams

1.5.2 GInterconnecting Diagrams

1.5.3 GInstallation Drawings

1.5.3 GAs-Built Drawings

SD-03 Product Data

2.1 GAdjustable Speed Drives

2.3Wires and Cables

1.5.4Equipment Schedule

SD-06 Test Reports

3.3.1ASD Test

3.3.2Performance Verification Tests

3.3.3Endurance Test

SD-08 Manufacturer’s Instructions

1.5.5Installation instructions

SD-09 Manufacturer’s Field

Reports

2.5.1 GASD Test Plan

1.5.6Standard Products

SD-10 Operation and Maintenance

Data

2.1Adjustable Speed Drives

26 32 15.00 SD-02 Shop Drawings

2.1.1 GEngine-Generator Set and

Auxiliary Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 80 OF 103 PAGES

26 32 15.00 1.3.10 GAuxiliary Systems

1.3.9 GDetailed Drawings

3.15 GAcceptance

SD-03 Product Data

2.1.7 GHarmonic Requirements

2.1.1 GEngine-Generator Set

Efficiencies

2.12 GEmissions

2.7.2 GFilters

2.1.1Engine-Generator Parameter

Schedule

2.8.2Heat Exchanger

2.15Generator

2.5Manufacturer's Catalog

1.3.2Site Welding

1.6.2Spare Parts

3.10Onsite Training

3.14 GPosted Data and Instructions

1.3.7Experience

1.3.8Field Engineer

3.2General Installation

2.16Exciter

SD-05 Design Data

2.15Performance Criteria

2.9 GSound Limitations

2.6.3Integral Main Fuel Storage Tank

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 81 OF 103 PAGES

26 32 15.00 3.4.1.2Power Factor

2.8.2Heat Exchanger

2.19.5Time-Delay on Alarms

2.8Cooling System

2.13.3.2Battery Charger

2.1.1 GCapacity Calculations for

Engine-Generator Set

2.1.1 GBrake Mean Effective Pressure

(BMEP) Calculations

2.1.1 GTorsional Vibration Stress

Analysis Computations

2.1.1 GCapacity Calculations for

Batteries

2.1.1 GTurbocharger Load Calculations

SD-06 Test Reports

3.4.8Performance Tests

2.27Factory Inspection and Tests

2.27.2Factory Tests

3.4 GOnsite Inspection and Tests

3.7.1 GAcceptance Checks and Tests

3.8.2 GFunctional Acceptance Tests

3.10 GMaintenance Procedures

3.10 GOperation and Maintenance

Manuals

3.4.3 GInspections

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 82 OF 103 PAGES

26 32 15.00 3.7.5 GFunctional Acceptance Test

Procedure

SD-07 Certificates

2.8Cooling System

2.27.2Prototype Test

2.1.5Reliability and Durability

1.3.13 GFuel System Certification

3.6 GStart-Up Engineer

3.9.1 GInstructor's Qualification Resume

2.1.2.1 GEngine Emission Limits

2.9Sound Limitations

3.1Site Visit

2.15.1Current Balance

2.4Materials and Equipment

2.27Factory Inspection and Tests

SD-09 Manufacturer’s Field

Reports

3.4.4 GEngine Tests

3.4.5 GGenerator Tests

3.4.6 GAssembled Engine-Generator Set

Tests

SD-10 Operation and Maintenance

Data

3.7.4 GPreliminary Assembled Operation

and Maintenance Manuals

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 83 OF 103 PAGES

26 32 15.00 3.14 GPosted Data and Instructions

3.9.2 GTraining Plan

26 33 53 SD-02 Shop Drawings

1.5.1 GUPS Drawings

SD-03 Product Data

2.5 GUPS Module

2.4Technical Requirements UPS

System

2.4.9 SEnergy Star Label for Battery

Charging Systems and

AC-DC/AC-AC Power Supply

Products

1.4.2 GSpare Parts

SD-06 Test Reports

1.5.3 GWork Plan

1.5.4 GFactory Test Plan

1.5.5 GFactory Test Report

SD-09 Manufacturer’s Field

Reports

3.2.2 GInitial Inspection and Tests

3.2.3 GPerformance Tests

1.5.6 GPerformance Test Plan

1.5.7 GPerformance Test Report

SD-10 Operation and Maintenance

Data

1.4.1 GUPS Operation and Maintenance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 84 OF 103 PAGES

26 33 53 SD-11 Closeout Submittals

3.1Installation

26 36 23 SD-02 Shop Drawings

1.4.2 GAutomatic Transfer Switch

Drawings

SD-03 Product Data

2.1 GAutomatic Transfer Switches

2.2 GBY-PASS/ISOLATION SWITCH

(BP/IS)

2.4 GRemote Annunciator Panel

SD-06 Test Reports

3.3.1 GAcceptance Checks and Tests

3.3.2 GFunctional Acceptance Tests

2.5 GFactory Testing

2.5.2 GFactory Test Reports

SD-07 Certificates

1.4.1 GProof of Listing

SD-10 Operation and Maintenance

Data

1.3 GOperation and Maintenance

Manual

26 41 00 SD-02 Shop Drawings

1.4.1.1 GOverall lightning protection

system

1.4.1.2 GEach major component

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 85 OF 103 PAGES

26 41 00 1.4.3 GLightning Protection and

Grounding System Test Plan

3.4.1 GLightning Protection and

Grounding System Test

SD-07 Certificates

1.2.3 GLightning Protection System

Installers Documentation

1.4.2 GComponent UL Listed and

Labeled

1.4.4 GLightning protection system

inspection certificate

3.1.1 GRoof manufacturer's warranty

26 42 13 SD-01 Preconstruction Submittals

1.8.2Preconstruction Survey

SD-02 Shop Drawings

2.1.2.6 GDrawings

2.4.9Isolation flange kits

2.3.4Anode junction boxes, bonding boxes, and test stations

3.5.3Joint bonds

2.1.2.6 GContractor's Modifications

SD-03 Product Data

1.6.2Qualifications

1.5.1 GEquipment

1.5.1 GAnodes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 86 OF 103 PAGES

26 42 13 2.3.4Anode junction boxes, bonding boxes, and test stations

2.4.11Dielectric unions

2.1.2.2Wires

2.4.3Cable and wire

3.5.4Casings, isolation, and seals

2.3.2Shunts

2.4.6 GPermanent reference electrodes

1.5.1Spare Parts

SD-06 Test Reports

3.6.1 GTests and Measurements

2.1.2.6 GContractor's Modifications

SD-10 Operation and Maintenance

Data

3.6 GCathodic Protection System

3.6 GCathodic Protection System

1.5.1 GTraining Course

SD-11 Closeout Submittals

3.6.1.12 GInitial Cathodic Protection System

Field Testing

3.6.1.14 GOne Year Warranty Period

Cathodic Protection System Field

Test Report

3.6.1.15 GFinal Cathodic Protection System

Field Test Report

26 51 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 87 OF 103 PAGES

26 51 00 1.5.1 GLuminaire Drawings

1.5.9 GOccupancy/Vacancy Sensor

Coverage Layout

SD-03 Product Data

2.2 GLuminaires

2.3 GLight Sources

2.4 GLED Drivers

1.6.1 GLuminaire Warranty

1.6.2 GLighting Controls Warranty

2.5.1.1.1 GLocal Area Controller

2.5.1.2.1 GLighting Relay Panel

2.5.1.2.2 GLighting Contactor

2.5.2.1 GSwitches

2.5.2.2 GDigital Switch Timers

2.5.2.3 GWall Box Dimmers

2.5.2.4 GOccupancy/Vacancy Sensors

2.5.2.5 GPhotosensors

2.5.2.6 GTime Clocks

2.6.1 GExit Signs

2.3.1.1 GLinear LED Lamps

2.2 SEnergy Star

2.2 SDesign Lighting Consortium

SD-05 Design Data

1.5.2 GLuminaire Design Data

1.5.8 GPhotometric Plan

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 88 OF 103 PAGES

26 51 00 1.5.3 GANSI/IES LM-79 Test Report

1.5.4 GANSI/IES LM-80 Test Report

1.5.5 GANSI/IES TM-21 Test Report

1.5.6 GANSI/IES TM-30 Test Report

3.2.1.1 GOccupancy/Vacancy Sensor

Verification Test

3.2.1.1 GPhotosensor Verification Test

SD-07 Certificates

1.5.7 GLED Driver and Dimming Switch

Compatibility Certificate

SD-10 Operation and Maintenance

Data

1.7.1 GLighting System

3.3.2.1 GMaintenance Staff Training Plan

3.3.2.2 GEnd-User Training Plan

26 56 00 SD-02 Shop Drawings

1.5.1.1 GLuminaire Drawings

1.5.1.2 GPole Drawings

1.8.2 GControl System One-Line

Diagram

2.5.1 GSequence of Operation for

Exterior Lighting Control System

SD-03 Product Data

2.2 GLuminaires

2.3 GLight Sources

2.4 GLED Drivers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 89 OF 103 PAGES

26 56 00 1.7.1 GLuminaire Warranty

1.7.2 GLighting Controls Warranty

1.7.3 GPole Warranty

2.5.2.2 GPhotosensors

2.5.2.1 GTime Clock

2.5.2.3 GLighting Contactor

2.6 GPoles

2.6.2Brackets

SD-05 Design Data

1.5.2 GLuminaire Design Data

SD-06 Test Reports

1.5.3 GANSI/IES LM-79 Test Report

1.5.4 GANSI/IES LM-80 Test Report

1.5.5 GANSI/IES TM-21 Test Report

1.5.6 GTests for Fiberglass Poles

SD-08 Manufacturer’s Instructions

2.6Poles

SD-10 Operation and Maintenance

Data

1.8.1 GLighting System

1.8.2 GExterior Lighting Control System

3.3.1.1 GMaintenance Staff Training Plan

3.3.1.2 GEnd-User Training Plan

27 05 13.43 SD-02 Shop Drawings

1.5.1 GWiring Diagrams And Installation

Details

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 90 OF 103 PAGES

27 05 13.43 1.3.4 GSystem Components

SD-03 Product Data

2.2.1 GAttenuators

2.3.1 GAmplifiers

2.3.2 GCables

2.3.4 GTerminators

2.3.5 GSplitters/Combiners

2.3.6 GFiber Optic Couplers

2.3.7 GLine Taps

2.3.8 GCoaxial Outlets

2.3.9 GCoaxial Connectors

2.3.10 GTilt Compensator

2.3.11 GDistribution Hubs

2.3.12 GBaluns

SD-05 Design Data

1.5.2 GTelevision Distribution System

Loss Calculations

SD-06 Test Reports

1.5.3 GOperational Test Plan

1.5.4 GOperational Test Procedures

3.2.1 GSystem Pretest

3.2.2 GAcceptance Tests

SD-08 Manufacturer’s Instructions

1.5.5 GConnector Installation

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 91 OF 103 PAGES

27 05 13.43 3.3 GOperation and Maintenance

Manuals

27 10 00 SD-02 Shop Drawings

1.6.1.1 GTelecommunications drawings

1.6.1.2 GTelecommunications Space

Drawings

SD-03 Product Data

2.3 GTelecommunications cabling

2.4.5 GPatch panels

2.5 GTelecommunications

outlet/connector assemblies

2.4.2 GEquipment support frame

SD-06 Test Reports

3.5.1 GTelecommunications cabling

testing

SD-07 Certificates

1.6.2.1 GTelecommunications Contractor

1.6.2.2 GKey Personnel

1.6.2.3 GManufacturer Qualifications

1.6.3 GTest plan

SD-09 Manufacturer’s Field

Reports

2.10.1 GFactory reel tests

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 92 OF 103 PAGES

27 10 00 1.10.1 GTelecommunications cabling and pathway system

SD-11 Closeout Submittals

1.10.2 GRecord Documentation

28 31 76 SD-01 Preconstruction Submittals

1.3.2 GQualified Fire Protection Engineer

(QFPE)

1.8.2.1 GFire alarm system designer

1.8.2.2 GSupervisor

1.8.2.3 GTechnician

1.8.2.4 GInstaller

1.8.2.5 GTest Technician

1.7 GFire Alarm System Site-Specific

Software Acknowledgement

SD-02 Shop Drawings

1.8.1.3 GNameplates

2.2.4 GInstructions

1.8.1.4 GWiring Diagrams

1.8.1.5 GSystem Layout

1.8.1.6 GNotification Appliances

1.8.1.7 GInitiating devices

1.8.1.8 GAmplifiers

1.8.1.9 GBattery Power

1.8.1.10 GVoltage Drop Calculations

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 93 OF 103 PAGES

28 31 76 2.3 GFire Alarm and Mass Notification

Control Unit (FMCU)

1.4.4 GLocal Operating Console (LOC)

1.8.1.8 GAmplifiers

2.5 GTone Generators

2.5 GDigitalized voice generators

2.6.1 GLCD Annunciator

2.7 GManual Stations

2.8 GSmoke Detectors

2.8.2 GDuct Smoke Detectors

2.9 GAddressable Interface Devices

2.10 GAddressable Control Modules

2.11 GIsolation Modules

1.8.1.6 GNotification Appliances

2.12.3 GTextual Display Signs

2.14.1 GBatteries

2.14.2 GBattery Chargers

2.14.1.1 GSupplemental Notification

Appliance Circuit Panels

2.14.1.1 GAuxiliary Power Supply Panels

2.15 GSurge Protective Devices

2.15 GAlarm Wiring

3.3.4 GBack Boxes and Conduit

3.2.8 GCeiling Bridges

3.3.2 GTerminal Cabinets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .