A.2.11.3 W9128A22R0016 Am-0006 Specifications.pdf
PDF 1 MB Posted
- Solicitation number
- W9128A22R0016
About this file
This announcement constitutes a solicitation notice for a firm-fixed-price construction contract to renovate and repair Building 300 at Helemano Military Reservation for the Multi-Domain Task Force #3. The project includes a new elevator, UPS, emergency generator, utility extensions, communications infrastructure, site work including lighting, grading, parking and fencing. The period of performance is estimated at 912 calendar days. The Army Corps of Engineers, Honolulu District will evaluate proposals based on experience, past performance, technical approach, and price using lowest priced technically acceptable procedures. The project magnitude is between $50-100 million. Offerors must register in the System for Award Management at www.sam.gov which will be the source for any solicitation amendments.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 51 OF 103 PAGES
MDTF #3 Building 300 Helemano Military Reservation
12 21 00 2.1 SIndoor Air Quality for window blinds
2.1 SIndoor Air Quality for window
blinds
SD-08 Manufacturer’s Instructions
2.1 GWindow Blinds
SD-10 Operation and Maintenance
Data
2.1 GWindow Blinds
14 24 23 SD-02 Shop Drawings
2.1 GElevator
1.2.1 GElevator Components
1.2.2 GElevator Components
1.2.1 GElevator Machine
1.2.1 GElevator Controller
1.3.4 GWiring Diagrams
SD-03 Product Data
2.1Elevator
1.2.1Elevator Components
1.2.2Elevator Components
1.2.2Data Sheets
2.5.2Elevator Microprocessor
Controller
SD-05 Design Data
1.2.3.3Emergency Power Systems
1.2.3.2Heat Loads
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 52 OF 103 PAGES
14 24 23 1.2.3.1Reaction Loads
SD-07 Certificates
1.3.2Price Lists
1.4Warranty
1.3.1.1Endorsement Letter
1.2.4Welders' Qualifications
2.5.2.3Elevator Controller Certification
2.1.2 SIndoor Air Quality for Flooring and
Adhesive
SD-10 Operation and Maintenance
Data
2.1Elevator
1.2.5Maintenance Control Program
(MCP)
2.5.2.2Software and Documentation
21 13 13 SD-01 Preconstruction Submittals
1.2.3 GQualified Fire Protection Engineer
(QFPE)
1.4.2.1 GSprinkler System Designer
1.4.2.2 GSprinkler System Installer
SD-02 Shop Drawings
1.2.1.1 GShop Drawing
SD-03 Product Data
2.2.1 GPipe
2.3.1.2 GFittings
2.3.4 GValves
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 53 OF 103 PAGES
21 13 13 2.8.5 GRelief Valves
2.7 GSprinklers
2.3.3 GPipe Hangers and Supports
2.4.1 GSprinkler Alarm Switch
2.4.2 GValve Supervisory (Tamper)
Switch
2.6 GFire Department Connection
2.5 GBackflow Prevention Assembly
2.8.6 GAir Vent
2.5.1 GHose Valve
2.3.3 GSeismic Bracing
2.1.2 GNameplates
SD-05 Design Data
2.3.3 GSeismic Bracing
2.3.3Load calculations for sizing of seismic bracing
1.2.1.2 GHydraulic Calculations
SD-06 Test Reports
3.7.1 GTest Procedures
SD-07 Certificates
3.7.2.1 GVerification of Compliant
Installation
3.7.2.2 GRequest for Government Final
Test
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 54 OF 103 PAGES
21 13 13 3.9 GOperating and Maintenance
(O&M) Instructions
1.6 GSpare Parts
SD-11 Closeout Submittals
3.9 GAs-built drawings
22 00 00 SD-02 Shop Drawings
3.9.1 GPlumbing System
SD-03 Product Data
2.4.3 SWater Sense Label for Water
Closet Flush Valve
2.4.4 SWater Sense Label for Urinal
3.9.1.1 GBackflow Prevention Assemblies
2.6.2Shower Faucets
2.4Fixtures
2.4.3Flush Valve Water Closets
2.4.4Flush Valve Urinals
2.4.6Wall Hung Lavatories
3.1.3 GDielectric Fittings
2.4.7Countertop Lavatories
2.4.8Sinks
2.4.9Service Sinks
2.4.10Drinking-Water Coolers
2.4.10 SEnergy Star Label for Electric
Water Cooler
2.8 GWater Heaters
2.10 GPumps
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 55 OF 103 PAGES
22 00 00 3.4 GVibration-Absorbing Features
3.9.1Plumbing System
SD-06 Test Reports
3.9Tests, Flushing and Disinfection
3.9.1.1Test of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
2.1.1Bolts
SD-10 Operation and Maintenance
Data
3.9.1Plumbing System
23 05 15 SD-01 Preconstruction Submittals
1.2Material, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2 GRecord Drawings
1.2 GConnection Diagrams
1.2 GCoordination Drawings
1.2 GFabrication Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.1 GPipe and Fittings
2.2 GPiping Specialties
2.3 GValves
2.4 GMiscellaneous Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 56 OF 103 PAGES
23 05 15 2.5 GSupporting Elements
1.2 GEquipment Foundation Data
SD-04 Samples
1.2 GManufacturer's Standard Color
Charts
SD-05 Design Data
2.1 GPipe and Fittings
2.2 GPiping Specialties
2.3 GValves
SD-06 Test Reports
3.1 GHydrostatic Tests
3.1 GAir Tests
3.1 GValve-Operating Tests
3.1 GDrainage Tests
3.1 GPneumatic Tests
3.1 GNon-Destructive Electric Tests
3.1 GSystem Operation Tests
SD-07 Certificates
1.4.2 GRecord of Satisfactory Field
Operation
1.4.3 GList of Qualified Permanent
Service Organizations
1.2 GListing of Product Installations
1.2 GRecords of Existing Conditions
3.1 GSurface Resistance
3.1 GShear and Tensile Strengths
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 57 OF 103 PAGES
23 05 15 3.1 GTemperature Ratings
3.1 GBending Tests
3.1 GFlattening Tests
3.1 GTransverse Guided Weld Bend
Tests
SD-10 Operation and Maintenance
Data
3.10 GOperation and Maintenance
Manuals
23 05 48.19 SD-02 Shop Drawings
3.1Coupling and Bracing
3.3Flexible Couplings or Joints
2.2Equipment Restraint
1.2.4 GContractor Designed Bracing
SD-03 Product Data
3.1 GCoupling and Bracing
3.3 GFlexible Couplings Or Joints
2.2 GEquipment Restraint
1.2.4 GContractor Designed Bracing
2.6Snubbers
3.9Anchor Bolts
2.2.2Vibration Isolators
SD-05 Design Data
1.2.4Design Calculations
SD-06 Test Reports
3.9 GAnchor Bolts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 58 OF 103 PAGES
23 05 93 SD-01 Preconstruction Submittals
1.3.3 GRecords of Existing Conditions
1.5.3.1 GTAB Firm
1.2 GTAB Team Assistants
1.2 GTAB Team Engineer
1.5.3.2 GTAB Specialist
1.2 GTAB Team Field Leader
SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.3.4 GTAB Related HVAC Submittals
1.5.2 GTAB Procedures
1.5.2 GCalibration
1.3.3 GSystems Readiness Check
1.5.4 GTAB Execution
1.5.4.3 GTAB Verification
SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
1.5.5.2 GTAB Report for Season 1
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 59 OF 103 PAGES
23 05 93 1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.7.2 GDALT and TAB Submittal and
Work Schedule
1.7.2.3 GTAB Pre-Field Engineering
Report
1.5.3.1 GTAB Firm
1.3.3 GDesign Review Report
1.7.2.2 GPre-field DALT Preliminary
Notification
1.7.2 GAdvanced Notice for TAB Field
Work
1.7.2 GPrerequisite HVAC Work Check
Out List
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
2.3.1 SRecycled content for insulation
materials
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 60 OF 103 PAGES
23 07 00 3.4 GEquipment Insulation Systems
2.3.1 SRecycled Materials
SD-04 Samples
2.2.1.2 GThermal Insulation
3.1.1 GDisplay Samples
SD-07 Certificates
2.2.1 SIndoor air quality for adhesives
and sealants
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
23 09 00 SD-02 Shop Drawings
3.3 GDDC Contractor Design Drawings
3.3 GDraft As-Built Drawings
3.3 GFinal As-Built Drawings
SD-03 Product Data
1.8.3 GProgramming Software
1.8.4 GController Application Programs
1.8.1 GConfiguration Software
1.8.2 GController Configuration Settings
2.2 GManufacturer's Product Data
1.8.5 GNiagara Framework Supervisory
Gateway Backups
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 61 OF 103 PAGES
23 09 00 1.8.6 GNiagara Framework Engineering
Tool
1.5 GNiagara Framework Wizards
SD-05 Design Data
1.9Boiler Or Chiller Plant Gateway
Request
SD-06 Test Reports
3.1.1Existing Conditions Report
3.5.2 GStart-Up Testing Report
3.6.1 GPVT Procedures
3.6.3 GPVT Report
1.10.1 GPre-Construction Quality Control
(QC) Checklist
1.10.2 GPost-Construction Quality Control
(QC) Checklist
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
(O&M) Instructions
3.9.1 GTraining Documentation
SD-11 Closeout Submittals
2.5 GEnclosure Keys
1.10.3 GCloseout Quality Control (QC)
Checklist
23 21 23 SD-02 Shop Drawings
2.1.2 GSystem Coordination
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 62 OF 103 PAGES
23 21 23 SD-03 Product Data
2.2.2 GInstructions
2.2.5 GEquipment Data
3.5.2 GTraining Period
SD-06 Test Reports
2.8Factory Tests
3.3Field Quality Control
SD-07 Certificates
1.3.1Manufacturer's Representative
SD-10 Operation and Maintenance
Data
3.5.1 GOperation and Maintenance
Manuals
3.5.2 GTraining
23 23 00 SD-02 Shop Drawings
2.3 GRefrigerant Piping System
SD-03 Product Data
2.3Refrigerant Piping System
1.5.2Spare Parts
1.3.1Qualifications
3.5Refrigerant Piping Tests
3.1Verification of Dimensions
SD-06 Test Reports
3.5Refrigerant Piping Tests
SD-07 Certificates
2.1Service Organization
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 63 OF 103 PAGES
23 23 00 SD-10 Operation and Maintenance
Data
1.5 GMaintenance
3.4 GOperation and Maintenance
Manuals
3.4 GDemonstrations
23 30 00 SD-02 Shop Drawings
1.4.4 GDetail Drawings
SD-03 Product Data
2.9.1.1Metallic Flexible Duct
2.9.1.2Insulated Nonmetallic Flexible
Duct Runouts
2.9.1.2Duct Connectors
2.9.2 GDuct Access Doors
2.9.3 GManual Balancing Dampers
2.9.6Sound Attenuation Equipment
2.9.7.1Diffusers
2.9.7.2Registers and Grilles
2.9.8Louvers
2.9.9Air Vents, Penthouses, and
Goosenecks
2.10.1.1Centrifugal Fans
2.10.1.2In-Line Centrifugal Fans
2.10.1.3Ceiling Exhaust Fans
2.10.1.3 SPL-109-58 label for ceiling
exhaust fan product
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 64 OF 103 PAGES
23 30 00 2.11 GAir Handling Units
2.12.1 GRoom Fan-Coil Units
2.12.2.1 GVariable Volume, Single Duct
Terminal Units
1.4.5Test Procedures
1.2.1.2 GDiagrams
2.10.3 SAir Filters
2.9.1 SIndoor Air Quality for Duct
Sealants
SD-06 Test Reports
3.12 GPerformance Tests
3.10 GDamper Acceptance Test
SD-07 Certificates
1.4.1Bolts
1.4.3Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.14.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.14.1 GOperation and Maintenance
Manuals
2.9.3 GManual Balancing Dampers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 65 OF 103 PAGES
23 30 00 2.10.1.1 GCentrifugal Fans
2.10.1.2 GIn-Line Centrifugal Fans
2.10.1.3 GCeiling Exhaust Fans
2.11 GAir Handling Units
2.12.1 GRoom Fan-Coil Units
2.12.2.1 GVariable Volume, Single Duct
Terminal Units
SD-11 Closeout Submittals
3.13 SIndoor Air Quality During
Construction
23 64 10 SD-03 Product Data
3.1.3Posted Instructions
1.6.1Verification of Dimensions
2.8Factory Tests
3.6System Performance Tests
3.7Demonstrations
2.5.1Refrigerant
3.5.1Water Chiller - Field Acceptance
Test Plan
SD-06 Test Reports
3.5Field Acceptance Testing
3.5.2Water Chiller - Field Acceptance
Test Report
2.8Factory Tests
3.6System Performance Tests
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 66 OF 103 PAGES
23 64 10 3.1.8 GRefrigeration System
1.3.1Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
3.1 GWater Chiller - Installation
Instructions
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.4 SIndoor Air Quality During
Construction
23 64 26 SD-03 Product Data
2.4.7 GAutomatic Flow Control Valves
2.4.8Pump Discharge Valve
2.4.9Pressure Relief Valve
2.5.8 GExpansion Joints
2.6 GPumps
2.5.2Combination Strainer and Pump
Suction Diffuser
2.7Expansion Tanks
2.8Air Separator Tanks
2.9 GWater Treatment Systems
SD-06 Test Reports
3.1.1.3Piping Welds NDE Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 67 OF 103 PAGES
23 64 26 3.4.2 GPressure Tests Reports
SD-07 Certificates
3.1.1.1Employer's Record Documents
(For Welding)
3.1.1.2Welding Procedures and
Qualifications
SD-08 Manufacturer’s Instructions
3.5 GLesson plan for the Instruction
Course
SD-10 Operation and Maintenance
Data
2.4.6 GCalibrated Balancing Valves
2.4.7 GAutomatic Flow Control Valves
2.4.8 GPump Discharge Valve
2.4.9 GPressure Relief Valve
2.5.8 GExpansion Joints
2.6 GPumps
2.5.2 GCombination Strainer and Pump
Suction Diffuser
2.7 GExpansion Tanks
2.8 GAir Separator Tanks
23 81 00 SD-03 Product Data
3.7.1Spare Parts
3.4Posted Instructions
2.6.1Coil Corrosion Protection
3.6System Performance Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 68 OF 103 PAGES
23 81 00 3.4 GTraining
1.4Inventory
2.1Supplied Products
2.2Manufacturer's Standard Catalog
Data
2.1 SEnergy Star
2.3.2.1.7 SAir Filters
2.2.2.3 SEPA SNAP for Refrigerants
SD-06 Test Reports
3.5 GRefrigerant Tests, Charging, and
Start-Up
3.6 GSystem Performance Tests
SD-07 Certificates
3.7.2Service Organizations
SD-10 Operation and Maintenance
Data
3.4 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
2.2.2.3 SOzone Depleting Substances
23 81 23 SD-03 Product Data
2.1 GComputer Room Air Conditioner
2.5.2 GSpace Temperature Control
System Drawings
2.1.5Filters
1.4 SRefrigerants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 69 OF 103 PAGES
23 81 23 1.4 SEPA SNAP for Refrigerants
SD-07 Certificates
2.3 GCertificate of Specification
Compliance
3.3.3 GCredentials of the Manufacturer's
Field Test Representative
1.5.1Ozone Depleting Substances
Technician Certification
1.6.3Certified List Of Qualified
Permanent Service Organizations
SD-08 Manufacturer’s Instructions
3.1.2Installation Manual for Each Type of CRAC
SD-10 Operation and Maintenance
Data
3.1.3 GComputer Room Air Conditioner
Operation and Maintenance Data
SD-11 Closeout Submittals
3.2 SIndoor Air Quality During
Construction
25 05 11.21 SD-01 Preconstruction Submittals
3.3.2 GDevice Account Lock Exception
Request
1.10.1.6 GContractor Computer
Cybersecurity Compliance
Statements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 70 OF 103 PAGES
25 05 11.21 1.10.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
1.7.2 GCybersecurity Subject Matter
Expert Qualifications
SD-02 Shop Drawings
1.8.1 GNetwork Communication Report
1.8.4 GCybersecurity Riser Diagram
SD-03 Product Data
1.8.5 GControl System Cybersecurity
Documentation
SD-06 Test Reports
3.13.1 GControl System Cybersecurity
Testing Procedures
3.13.3 GControl System Cybersecurity
Testing Report
SD-07 Certificates
1.9 GSoftware Licenses
SD-11 Closeout Submittals
3.4.5.4 GPassword Change Summary
Report
3.3.7 GEnclosure Keys
1.8.3 GSoftware and Configuration
Backups
3.5.3 GAuditing Front End Software
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 71 OF 103 PAGES
25 05 11.21 3.5.4.2 GDevice Audit Record Upload
Software
3.9 GSystem Maintenance Tool
Software
1.8.2 GControl System Inventory Report
3.12.1 GIntegrity Verification Software
25 05 11.23 SD-01 Preconstruction Submittals
3.3.2 GDevice Account Lock Exception
Request
3.2.2.2 GMultiple Ethernet Connection
Device Request
1.10.1.6 GContractor Computer
Cybersecurity Compliance
Statements
1.10.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
1.7.2 GCybersecurity Subject Matter
Expert Qualifications
1.8.1 GProposed STIG and SRG
Applicability Report
SD-02 Shop Drawings
1.8.2 GNetwork Communication Report
1.8.5 GCybersecurity Riser Diagram
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 72 OF 103 PAGES
25 05 11.23 1.8.7 GControl System Cybersecurity
Documentation
SD-06 Test Reports
3.13.1 GControl System Cybersecurity
Testing Procedures
3.13.3 GControl System Cybersecurity
Testing Report
SD-07 Certificates
1.9 GSoftware Licenses
SD-11 Closeout Submittals
3.4.5.4 GPassword Change Summary
Report
3.3.5 GEnclosure Keys
1.8.4 GSoftware and Configuration
Backups
3.5.3 GAuditing Front End Software
3.5.4.1 GDevice Audit Record Upload
Software
3.9 GSystem Maintenance Tool
Software
3.11.1 GControl System Scanning Tools
1.8.6 GSTIG, SRG and Vendor Guide
Compliance Result Report
1.8.3 GControl System Inventory Report
25 05 11.26 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 73 OF 103 PAGES
25 05 11.26 3.3.2 GDevice Account Lock Exception
Request
3.2.2.2 GMultiple Ethernet Connection
Device Request
1.10.1.6 GContractor Computer
Cybersecurity Compliance
Statements
1.10.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
1.7.2 GCybersecurity Subject Matter
Expert Qualifications
SD-02 Shop Drawings
1.8.1 GNetwork Communication Report
1.8.4 GCybersecurity Riser Diagram
SD-03 Product Data
1.8.5 GControl System Cybersecurity
Documentation
SD-06 Test Reports
3.13.1 GControl System Cybersecurity
Testing Procedures
3.13.3 GControl System Cybersecurity
Testing Report
SD-07 Certificates
1.9 GSoftware Licenses
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 74 OF 103 PAGES
25 05 11.26 3.4.5.4 GPassword Change Summary
Report
3.3.5 GEnclosure Keys
1.8.3 GSoftware and Configuration
Backups
3.5.3 GAuditing Front End Software
3.5.4.1 GDevice Audit Record Upload
Software
3.9 GSystem Maintenance Tool
Software
1.8.2 GControl System Inventory Report
25 10 10 SD-02 Shop Drawings
3.3.2UMCS Contractor Design
Drawings
3.3.3Draft As-Built Drawings
3.3.3Final As-Built Drawings
SD-03 Product Data
2.1.5Product Data Sheets
2.4.1Enclosure Keys
SD-05 Design Data
3.3.1UMCS IP Network Bandwidth
Usage Estimate
SD-06 Test Reports
1.7Pre-Construction QC Checklist
1.7Post-Construction QC Checklist
3.1Factory Test Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 75 OF 103 PAGES
25 10 10 3.1Factory Test Report
3.2Existing Conditions Report
3.7 GStart-Up and Start-Up Testing
Report
3.8.1PVT Phase I Procedures
3.8.2 GPVT Phase I Report
3.8.3 GPVT Phase II Report
SD-10 Operation and Maintenance
Data
1.8Operation and Maintenance
(O&M) Instructions
3.9.8.1Preventive Maintenance Work
Plan
3.10.1Basic Training Documentation
3.10.1Advanced Training
Documentation
3.10.1Refresher Training
Documentation
SD-11 Closeout Submittals
1.7Closeout QC Checklist
26 05 19.10 10 SD-03 Product Data
2.1.1 GWire and Cable
2.1.3.1 GConductors
3.1Cable Manufacturing Data
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 76 OF 103 PAGES
26 05 19.10 10 3.2 GTest Report(s), Inspection
Report(s), and Verification
Report(s)
26 05 48.00 10 SD-02 Shop Drawings
3.2Lighting Fixtures in Buildings
1.3Equipment Requirements
SD-03 Product Data
3.2 GLighting Fixtures in Buildings
1.3 GEquipment Requirements
1.2.4 GContractor Designed Bracing
26 08 00 SD-06 Test Reports
3.1 GAcceptance Tests and
Inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance Test and Inspections
Procedure
26 20 00 SD-02 Shop Drawings
2.13 GPanelboards
2.15 GTransformers
2.4 GCable Trays
SD-03 Product Data
3.1.5.1 GSurface Raceways
2.12 GReceptacles
2.13.3 GCircuit Breakers
2.10 GSwitches
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 77 OF 103 PAGES
26 20 00 2.15 GTransformers
2.14 GEnclosed Circuit Breakers
2.17 GMotor Controllers
2.18 GManual Motor Starters
2.27 GMetering
2.21.1 GCATV Outlets
2.22.2 GSecondary Bonding Busbar
2.28 GSurge Protective Devices
SD-06 Test Reports
3.5.2 G600-volt Wiring Test
3.5.6 GGrounding System Test
3.5.3 GTransformer Tests
3.5.4 GGround-fault Receptacle Test
3.5.5 GArc-fault Receptacle Test
SD-07 Certificates
2.11 GFuses
SD-09 Manufacturer’s Field
Reports
2.30.1Transformer Factory Tests
SD-10 Operation and Maintenance
Data
2.27 GMetering
26 24 13 SD-02 Shop Drawings
1.4.2 GSwitchboard Drawings
SD-03 Product Data
2.2 GSwitchboard
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 78 OF 103 PAGES
26 24 13 SD-06 Test Reports
2.5.2 GSwitchboard Design Tests
2.5.3 GSwitchboard Production Tests
3.5.1 GAcceptance Checks and Tests
SD-10 Operation and Maintenance
Data
1.5.1 GSwitchboard Operation and
Maintenance
SD-11 Closeout Submittals
1.5.2 GAssembled Operation and
Maintenance Manuals
2.5.1 GEquipment Test Schedule
3.5 GRequired Settings
2.8 GService Entrance Available Fault
Current Label
26 28 01.00 10 SD-03 Product Data
2.4Fault Current Analysis
2.4Protective Device Coordination
Study
2.1Equipment
1.4.1System Coordinator
3.2Installation
2.4.7ARC Flash Analysis
SD-06 Test Reports
3.3Field Testing
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 79 OF 103 PAGES
26 28 01.00 10 1.6Devices and Equipment
26 29 23 SD-02 Shop Drawings
1.5.1 GSchematic Diagrams
1.5.2 GInterconnecting Diagrams
1.5.3 GInstallation Drawings
1.5.3 GAs-Built Drawings
SD-03 Product Data
2.1 GAdjustable Speed Drives
2.3Wires and Cables
1.5.4Equipment Schedule
SD-06 Test Reports
3.3.1ASD Test
3.3.2Performance Verification Tests
3.3.3Endurance Test
SD-08 Manufacturer’s Instructions
1.5.5Installation instructions
SD-09 Manufacturer’s Field
Reports
2.5.1 GASD Test Plan
1.5.6Standard Products
SD-10 Operation and Maintenance
Data
2.1Adjustable Speed Drives
26 32 15.00 SD-02 Shop Drawings
2.1.1 GEngine-Generator Set and
Auxiliary Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 80 OF 103 PAGES
26 32 15.00 1.3.10 GAuxiliary Systems
1.3.9 GDetailed Drawings
3.15 GAcceptance
SD-03 Product Data
2.1.7 GHarmonic Requirements
2.1.1 GEngine-Generator Set
Efficiencies
2.12 GEmissions
2.7.2 GFilters
2.1.1Engine-Generator Parameter
Schedule
2.8.2Heat Exchanger
2.15Generator
2.5Manufacturer's Catalog
1.3.2Site Welding
1.6.2Spare Parts
3.10Onsite Training
3.14 GPosted Data and Instructions
1.3.7Experience
1.3.8Field Engineer
3.2General Installation
2.16Exciter
SD-05 Design Data
2.15Performance Criteria
2.9 GSound Limitations
2.6.3Integral Main Fuel Storage Tank
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 81 OF 103 PAGES
26 32 15.00 3.4.1.2Power Factor
2.8.2Heat Exchanger
2.19.5Time-Delay on Alarms
2.8Cooling System
2.13.3.2Battery Charger
2.1.1 GCapacity Calculations for
Engine-Generator Set
2.1.1 GBrake Mean Effective Pressure
(BMEP) Calculations
2.1.1 GTorsional Vibration Stress
Analysis Computations
2.1.1 GCapacity Calculations for
Batteries
2.1.1 GTurbocharger Load Calculations
SD-06 Test Reports
3.4.8Performance Tests
2.27Factory Inspection and Tests
2.27.2Factory Tests
3.4 GOnsite Inspection and Tests
3.7.1 GAcceptance Checks and Tests
3.8.2 GFunctional Acceptance Tests
3.10 GMaintenance Procedures
3.10 GOperation and Maintenance
Manuals
3.4.3 GInspections
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 82 OF 103 PAGES
26 32 15.00 3.7.5 GFunctional Acceptance Test
Procedure
SD-07 Certificates
2.8Cooling System
2.27.2Prototype Test
2.1.5Reliability and Durability
1.3.13 GFuel System Certification
3.6 GStart-Up Engineer
3.9.1 GInstructor's Qualification Resume
2.1.2.1 GEngine Emission Limits
2.9Sound Limitations
3.1Site Visit
2.15.1Current Balance
2.4Materials and Equipment
2.27Factory Inspection and Tests
SD-09 Manufacturer’s Field
Reports
3.4.4 GEngine Tests
3.4.5 GGenerator Tests
3.4.6 GAssembled Engine-Generator Set
Tests
SD-10 Operation and Maintenance
Data
3.7.4 GPreliminary Assembled Operation
and Maintenance Manuals
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 83 OF 103 PAGES
26 32 15.00 3.14 GPosted Data and Instructions
3.9.2 GTraining Plan
26 33 53 SD-02 Shop Drawings
1.5.1 GUPS Drawings
SD-03 Product Data
2.5 GUPS Module
2.4Technical Requirements UPS
System
2.4.9 SEnergy Star Label for Battery
Charging Systems and
AC-DC/AC-AC Power Supply
Products
1.4.2 GSpare Parts
SD-06 Test Reports
1.5.3 GWork Plan
1.5.4 GFactory Test Plan
1.5.5 GFactory Test Report
SD-09 Manufacturer’s Field
Reports
3.2.2 GInitial Inspection and Tests
3.2.3 GPerformance Tests
1.5.6 GPerformance Test Plan
1.5.7 GPerformance Test Report
SD-10 Operation and Maintenance
Data
1.4.1 GUPS Operation and Maintenance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 84 OF 103 PAGES
26 33 53 SD-11 Closeout Submittals
3.1Installation
26 36 23 SD-02 Shop Drawings
1.4.2 GAutomatic Transfer Switch
Drawings
SD-03 Product Data
2.1 GAutomatic Transfer Switches
2.2 GBY-PASS/ISOLATION SWITCH
(BP/IS)
2.4 GRemote Annunciator Panel
SD-06 Test Reports
3.3.1 GAcceptance Checks and Tests
3.3.2 GFunctional Acceptance Tests
2.5 GFactory Testing
2.5.2 GFactory Test Reports
SD-07 Certificates
1.4.1 GProof of Listing
SD-10 Operation and Maintenance
Data
1.3 GOperation and Maintenance
Manual
26 41 00 SD-02 Shop Drawings
1.4.1.1 GOverall lightning protection
system
1.4.1.2 GEach major component
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 85 OF 103 PAGES
26 41 00 1.4.3 GLightning Protection and
Grounding System Test Plan
3.4.1 GLightning Protection and
Grounding System Test
SD-07 Certificates
1.2.3 GLightning Protection System
Installers Documentation
1.4.2 GComponent UL Listed and
Labeled
1.4.4 GLightning protection system
inspection certificate
3.1.1 GRoof manufacturer's warranty
26 42 13 SD-01 Preconstruction Submittals
1.8.2Preconstruction Survey
SD-02 Shop Drawings
2.1.2.6 GDrawings
2.4.9Isolation flange kits
2.3.4Anode junction boxes, bonding boxes, and test stations
3.5.3Joint bonds
2.1.2.6 GContractor's Modifications
SD-03 Product Data
1.6.2Qualifications
1.5.1 GEquipment
1.5.1 GAnodes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 86 OF 103 PAGES
26 42 13 2.3.4Anode junction boxes, bonding boxes, and test stations
2.4.11Dielectric unions
2.1.2.2Wires
2.4.3Cable and wire
3.5.4Casings, isolation, and seals
2.3.2Shunts
2.4.6 GPermanent reference electrodes
1.5.1Spare Parts
SD-06 Test Reports
3.6.1 GTests and Measurements
2.1.2.6 GContractor's Modifications
SD-10 Operation and Maintenance
Data
3.6 GCathodic Protection System
3.6 GCathodic Protection System
1.5.1 GTraining Course
SD-11 Closeout Submittals
3.6.1.12 GInitial Cathodic Protection System
Field Testing
3.6.1.14 GOne Year Warranty Period
Cathodic Protection System Field
Test Report
3.6.1.15 GFinal Cathodic Protection System
Field Test Report
26 51 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 87 OF 103 PAGES
26 51 00 1.5.1 GLuminaire Drawings
1.5.9 GOccupancy/Vacancy Sensor
Coverage Layout
SD-03 Product Data
2.2 GLuminaires
2.3 GLight Sources
2.4 GLED Drivers
1.6.1 GLuminaire Warranty
1.6.2 GLighting Controls Warranty
2.5.1.1.1 GLocal Area Controller
2.5.1.2.1 GLighting Relay Panel
2.5.1.2.2 GLighting Contactor
2.5.2.1 GSwitches
2.5.2.2 GDigital Switch Timers
2.5.2.3 GWall Box Dimmers
2.5.2.4 GOccupancy/Vacancy Sensors
2.5.2.5 GPhotosensors
2.5.2.6 GTime Clocks
2.6.1 GExit Signs
2.3.1.1 GLinear LED Lamps
2.2 SEnergy Star
2.2 SDesign Lighting Consortium
SD-05 Design Data
1.5.2 GLuminaire Design Data
1.5.8 GPhotometric Plan
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 88 OF 103 PAGES
26 51 00 1.5.3 GANSI/IES LM-79 Test Report
1.5.4 GANSI/IES LM-80 Test Report
1.5.5 GANSI/IES TM-21 Test Report
1.5.6 GANSI/IES TM-30 Test Report
3.2.1.1 GOccupancy/Vacancy Sensor
Verification Test
3.2.1.1 GPhotosensor Verification Test
SD-07 Certificates
1.5.7 GLED Driver and Dimming Switch
Compatibility Certificate
SD-10 Operation and Maintenance
Data
1.7.1 GLighting System
3.3.2.1 GMaintenance Staff Training Plan
3.3.2.2 GEnd-User Training Plan
26 56 00 SD-02 Shop Drawings
1.5.1.1 GLuminaire Drawings
1.5.1.2 GPole Drawings
1.8.2 GControl System One-Line
Diagram
2.5.1 GSequence of Operation for
Exterior Lighting Control System
SD-03 Product Data
2.2 GLuminaires
2.3 GLight Sources
2.4 GLED Drivers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 89 OF 103 PAGES
26 56 00 1.7.1 GLuminaire Warranty
1.7.2 GLighting Controls Warranty
1.7.3 GPole Warranty
2.5.2.2 GPhotosensors
2.5.2.1 GTime Clock
2.5.2.3 GLighting Contactor
2.6 GPoles
2.6.2Brackets
SD-05 Design Data
1.5.2 GLuminaire Design Data
SD-06 Test Reports
1.5.3 GANSI/IES LM-79 Test Report
1.5.4 GANSI/IES LM-80 Test Report
1.5.5 GANSI/IES TM-21 Test Report
1.5.6 GTests for Fiberglass Poles
SD-08 Manufacturer’s Instructions
2.6Poles
SD-10 Operation and Maintenance
Data
1.8.1 GLighting System
1.8.2 GExterior Lighting Control System
3.3.1.1 GMaintenance Staff Training Plan
3.3.1.2 GEnd-User Training Plan
27 05 13.43 SD-02 Shop Drawings
1.5.1 GWiring Diagrams And Installation
Details
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 90 OF 103 PAGES
27 05 13.43 1.3.4 GSystem Components
SD-03 Product Data
2.2.1 GAttenuators
2.3.1 GAmplifiers
2.3.2 GCables
2.3.4 GTerminators
2.3.5 GSplitters/Combiners
2.3.6 GFiber Optic Couplers
2.3.7 GLine Taps
2.3.8 GCoaxial Outlets
2.3.9 GCoaxial Connectors
2.3.10 GTilt Compensator
2.3.11 GDistribution Hubs
2.3.12 GBaluns
SD-05 Design Data
1.5.2 GTelevision Distribution System
Loss Calculations
SD-06 Test Reports
1.5.3 GOperational Test Plan
1.5.4 GOperational Test Procedures
3.2.1 GSystem Pretest
3.2.2 GAcceptance Tests
SD-08 Manufacturer’s Instructions
1.5.5 GConnector Installation
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 91 OF 103 PAGES
27 05 13.43 3.3 GOperation and Maintenance
Manuals
27 10 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications drawings
1.6.1.2 GTelecommunications Space
Drawings
SD-03 Product Data
2.3 GTelecommunications cabling
2.4.5 GPatch panels
2.5 GTelecommunications
outlet/connector assemblies
2.4.2 GEquipment support frame
SD-06 Test Reports
3.5.1 GTelecommunications cabling
testing
SD-07 Certificates
1.6.2.1 GTelecommunications Contractor
1.6.2.2 GKey Personnel
1.6.2.3 GManufacturer Qualifications
1.6.3 GTest plan
SD-09 Manufacturer’s Field
Reports
2.10.1 GFactory reel tests
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 92 OF 103 PAGES
27 10 00 1.10.1 GTelecommunications cabling and pathway system
SD-11 Closeout Submittals
1.10.2 GRecord Documentation
28 31 76 SD-01 Preconstruction Submittals
1.3.2 GQualified Fire Protection Engineer
(QFPE)
1.8.2.1 GFire alarm system designer
1.8.2.2 GSupervisor
1.8.2.3 GTechnician
1.8.2.4 GInstaller
1.8.2.5 GTest Technician
1.7 GFire Alarm System Site-Specific
Software Acknowledgement
SD-02 Shop Drawings
1.8.1.3 GNameplates
2.2.4 GInstructions
1.8.1.4 GWiring Diagrams
1.8.1.5 GSystem Layout
1.8.1.6 GNotification Appliances
1.8.1.7 GInitiating devices
1.8.1.8 GAmplifiers
1.8.1.9 GBattery Power
1.8.1.10 GVoltage Drop Calculations
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 93 OF 103 PAGES
28 31 76 2.3 GFire Alarm and Mass Notification
Control Unit (FMCU)
1.4.4 GLocal Operating Console (LOC)
1.8.1.8 GAmplifiers
2.5 GTone Generators
2.5 GDigitalized voice generators
2.6.1 GLCD Annunciator
2.7 GManual Stations
2.8 GSmoke Detectors
2.8.2 GDuct Smoke Detectors
2.9 GAddressable Interface Devices
2.10 GAddressable Control Modules
2.11 GIsolation Modules
1.8.1.6 GNotification Appliances
2.12.3 GTextual Display Signs
2.14.1 GBatteries
2.14.2 GBattery Chargers
2.14.1.1 GSupplemental Notification
Appliance Circuit Panels
2.14.1.1 GAuxiliary Power Supply Panels
2.15 GSurge Protective Devices
2.15 GAlarm Wiring
3.3.4 GBack Boxes and Conduit
3.2.8 GCeiling Bridges
3.3.2 GTerminal Cabinets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .