A.2.11.3 W9128A22R0016 Am-0003.pdf
PDF 2 MB Posted
- Solicitation number
- W9128A22R0016
About this file
This document provides details of a federal solicitation for construction services. The U.S. Army Corps of Engineers, Honolulu District is seeking proposals for the renovation and repair of Building 300 at Helemano Military Reservation to accommodate the Multi-Domain Task Force #3 and the 307th Expeditionary Sustainment Brigade. Renovations include installation of a new elevator, UPS, emergency generator, utility extensions, communications infrastructure, site work, lighting, grading, parking, fencing and landscaping. The period of performance is 912 calendar days with an estimated value between $50-100 million. The acquisition will use lowest priced technically acceptable procedures and evaluate offerors on experience, past performance, technical approach, and price. The submission deadline for any requests for information is August 8, 2022. Proposals are due by the date specified in the solicitation, which is to be issued following this announcement. The NAICS code for this requirement is 236220 and it is unrestricted with a $39.5 million size standard.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY22 Multi-Domain Task Force #3, Building 300, Helemano Military Reservation, Oahu, Haw aii
See Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128A22R0016
X 9B. DATED (SEE ITEM 11)
07-Jul-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
Am-0003
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
CODE
CONTRACTING DIVISION
BLDG 230 OTAKE ST.
FORT SHAFTER HI 96858
W9128A 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
02-Aug-2022
W9128A22R0016 Am-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0003)” is shown on each revised page.
a. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are marked in “*” asterisks.
Section 00 10 00 – Page 2
b. NEW SECTIONS. The following are new pages to the solicitation.
Section 00 60 00, Attachment A – Requests for Information (#6-9)
c. REPLACED SECTIONS. The following section from the solicitation has been deleted in its entirety and replaced with the section attached to this amendment.
Specifications Volume 1 of 2 – Cover Page Section 01 32 00, Attachment – Scheduling Section 01 91 00.15 10, Appendix B – Commissioning Plan Specifications Volume 2 of 2 – Cover Page
2. CHANGES TO DRAWINGS
a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued herewith:
Sheet ID Description Mark
G-001 COVER SHEET 3
G-002 SHEET INDEX 3
G-003 SHEET INDEX 3
G-004 ABBREVIATIONS, SYMBOLS, LOCATION & VICINITY MAP, GENERAL NOTES 3
GS101 OVERALL BUILDING PHASING PLAN 3
GS102 CONTROLLED AND SECURE AREA BOUNDARY - BASEMENT AND 1ST FLOOR
PLAN
GS103 CONTROLLED AND SECURE AREA BOUNDARY - 2ND AND 3RD FLOOR PLAN 3
AD101 OVERALL BASEMENT & 1ST FLR DEMO PLAN 3
AD102 OVERALL 2ND & 3RD FLR DEMO PLAN 3
AD103 OVERALL ROOF DEMO PLAN 3
AD111 DEMO FLOOR PLAN MIDDLE WING 3
AD112 DEMO FLOOR PLAN EAST WING - 1ST & 2ND FLR 3
AD113 DEMO FLOOR PLAN BASEMENT 3
AD114 DEMO FLOOR PLAN 1ST FLR - SECTION A&B 3
AD115 DEMO FLOOR PLAN 1ST FLR - SECTION C 3
AD116 DEMO FLOOR PLAN 2ND FLR - SECTION A&B 3
AD117 DEMO FLOOR PLAN 2ND FLR - SECTION C 3
AD118 DEMO FLOOR PLAN 3RD FLR - SECTION A&B 3
AD119 DEMO FLOOR PLAN 3RD FLR - SECTION C 3
AD120 DEMO FLOOR PLAN ROOF - SECTION B 3
AD121 DEMO REFLECTED CEILING PLAN MIDDLE WING 3
AD122 DEMO REFLECTED CEILING PLAN EAST WING - 1ST & 2ND FLR 3
AD123 DEMO REFLECTED CEILING PLAN BASEMENT 3
AD124 DEMO REFLECTED CEILING PLAN 1ST FLR - SECTION A&B 3
AD125 DEMO REFLECTED CEILING PLAN 1ST FLR - SECTION C 3
AD126 DEMO REFLECTED CEILING PLAN 2ND FLR - SECTION A&B 3
AD127 DEMO REFLECTED CEILING PLAN 2ND FLR - SECTION C 3
AD128 DEMO REFLECTED CEILING PLAN 3RD FLR - SECTION A&B 3
AD129 DEMO REFLECTED CEILING PLAN 3RD FLR - SECTION C 3
AD211 DEMO EXTERIOR ELEVATIONS 3
AD212 DEMO EXTERIOR ELEVATIONS 3
AD213 DEMO EXTERIOR ELEVATIONS 3
AD214 DEMO EXTERIOR ELEVATIONS 3
A-101 OVERALL BASEMENT & 1ST FLR PLAN 3
A-102 OVERALL 2ND & 3RD FLR PLAN 3
A-105 OVERALL ROOF PLAN 3
A-111 FLOOR PLAN MIDDLE WING 3
A-112 FLOOR PLAN EAST WING - 1ST & 2ND FLR 3
A-113 FLOOR PLAN BASEMENT - SECTION B&C 3
A-114 FLOOR PLAN 1ST FLR - SECTION A&B 3
A-115 FLOOR PLAN 1ST FLR - SECTION C 3
A-116 FLOOR PLAN 2ND FLR - SECTION A&B 3
A-117 FLOOR PLAN 2ND FLR - SECTION C 3
A-118 FLOOR PLAN 3RD FLR - SECTION A&B 3
A-119 FLOOR PLAN 3RD FLR - SECTION C 3
A-120 FLOOR PLAN ROOF - SECTION B 3
A-121 REFLECTED CEILING PLAN MIDDLE WING 3
A-122 REFLECTED CEILING PLAN EAST WING - 1ST& 2ND FLR 3
A-123 REFLECTED CEILING PLAN BASEMENT 3
A-124 REFLECTED CEILING PLAN 1ST FLR - SECTION A&B 3
A-125 REFLECTED CEILING PLAN 1ST FLR - SECTION C 3
A-126 REFLECTED CEILING PLAN 2ND FLR - SECTION A&B 3
A-127 REFLECTED CEILING PLAN 2ND FLR - SECTION C 3
A-128 REFLECTED CEILING PLAN 3RD FLR - SECTION A&B 3
A-129 REFLECTED CEILING PLAN 3RD FLR - SECTION C 3
A-201 OVERALL EXTERIOR ELEVATIONS 3
A-211 EXTERIOR ELEVATIONS MIDDLE WING 3
A-212 EXTERIOR ELEVATIONS EAST WING 3
A-213 EXTERIOR ELEVATIONS 3
A-214 EXTERIOR ELEVATIONS 3
A-215 EXTERIOR ELEVATIONS 3
A-216 EXTERIOR ELEVATIONS 3
A-301 BUILDING SECTIONS EAST WING 3
A-302 BUILDING SECTIONS MIDDLE WING 3
A-303 BUILDING SECTIONS 3
A-304 BUILDING SECTIONS 3
A-310 WALL SECTIONS 3
A-311 WALL SECTIONS 3
A-401 DETAILED PLANS MIDDLE WING & EAST WING 3
A-402 DETAILED RESTROOM PLANS 3
A-403 DETAILED RESTROOM, CONFERENCE RM, BREAK RM. AND WELLNESS RM.
PLANS
A-411 DETAILED PLANS, ELEVATIONS - ELEVATOR 3
A-412 DETAILED PLANS, SECTIONS, AND DETAILS - EXTERIOR RAMP 3
A-413 DETAILED PLANS, SECTIONS, AND DETAILS - STAIRS 3
A-414 DETAILED PLANS, SECTIONS, AND DETAILS - STAIRS 3
A-415 DETAILED PLANS, SECTIONS, AND DETAILS - STAIRS 3
A-416 DETAILED PLANS, SECTIONS, AND DETAILS - STAIRS 3
A-420 AIR BARRIER DIAGRAMS 3
A-421 AIR BARRIER DIAGRAMS 3
A-422 AIR BARRIER DIAGRAMS 3
A-501 PARTITION TYPES 3
A-502 DETAILS - DOOR 3
A-503 DETAILS - DOOR 3
A-504 DETAILS - DOOR 3
A-505 DETAILS - WINDOW 3
A-506 DETAILS 3
A-507 DETAILS 3
A-508 DETAILS 3
A-509 DETAILS 3
A-510 DETAILS - COLUMNS 3
A-511 DETAILS - COLUMNS 3
A-512 DETAILS - COLUMNS 3
A-513 DETAILS - RAILINGS AND ELEVATOR 3
A-514 DETAILS - RAILINGS AND STAIRS 3
A-515 DETAILS - RAILINGS AND STAIRS 3
A-516 DETAILS - ROOF 3
A-517 DETAILS - BRIDGE 3
A-518 DETAILS - TOILET & BATHROOM 3
A-601 DOOR SCHEDULE 3
A-602 DOOR SCHEDULE 3
A-603 DOOR SCHEDULE 3
A-604 WINDOW SCHEDULE, DOOR AND WINDOW TYPES 3
AI201 INTERIOR ELEVATIONS - MIDDLE WING 3
AI202 INTERIOR ELEVATIONS - MIDDLE WING 3
AI203 INTERIOR ELEVATIONS - EAST WING 3
AI204 INTERIOR ELEVATIONS - EAST WING 3
AI205 INTERIOR ELEVATIONS 3
AI206 INTERIOR ELEVATIONS 3
AI207 INTERIOR ELEVATIONS 3
AI208 INTERIOR ELEVATIONS 3
AI209 INTERIOR ELEVATIONS 3
AI210 INTERIOR ELEVATIONS 3
AI211 INTERIOR ELEVATIONS 3
AI212 INTERIOR ELEVATIONS 3
AI213 INTERIOR ELEVATIONS 3
AF111 FLOOR FINISH PLAN MIDDLE WING 3
AF112 FLOOR FINISH PLAN EAST WING - 1ST & 2ND FLR 3
AF113 FLOOR FINISH PLAN BASEMENT 3
AF114 FLOOR FINISH PLAN 1ST FLR - SECTION A&B 3
AF115 FLOOR FINISH PLAN 1ST FLR - SECTION C 3
AF116 FLOOR FINISH PLAN 2ND FLR - SECTION A&B 3
AF117 FLOOR FINISH PLAN 2ND FLR - SECTION C 3
AF118 FLOOR FINISH PLAN 3RD FLR - SECTION A&B 3
AF119 FLOOR FINISH PLAN 3RD FLR - SECTION C 3
AF121 SIGNAGE PLAN MIDDLE WING 3
AF122 SIGNAGE PLAN EAST WING - 1ST & 2ND FLR 3
AF123 SIGNAGE PLAN BASEMENT 3
AF124 SIGNAGE PLAN 1ST FLR - SECTION A&B 3
AF125 SIGNAGE PLAN 1ST FLR - SECTION C 3
AF126 SIGNAGE PLAN 2ND FLR - SECTION A&B 3
AF127 SIGNAGE PLAN 2ND FLR - SECTION C 3
AF128 SIGNAGE PLAN 3RD FLR - SECTION A&B 3
AF129 SIGNAGE PLAN 3RD FLR - SECTION C 3
AF501 SIGNAGE TYPE DETAILS 3
AF502 SIGNAGE TYPE DETAILS 3
AF503 SIGNAGE TYPE DETAILS 3
AF504 TYPICAL SIGNAGE MOUNTING HEIGHTS 3
AF506 TYPICAL MOUNTING HEIGHTS 3
AF601 COLOR & MATERIAL SCHEDULE 3
AF602 ROOM FINISH SCHEDULE 3
AF603 ROOM FINISH SCHEDULE 3
AF604 ROOM FINISH SCHEDULE 3
AF605 SIGNAGE SCHEDULE 3
AF606 SIGNAGE SCHEDULE 3
AF607 SIGNAGE SCHEDULE 3
IF101 OVERALL BASEMENT & 1ST FLR FF&E PLAN 3
IF103 OVERALL 2ND & 3RD FLR FF&E PLAN 3
IF111 FF&E PLAN MIDDLE WING 3
IF112 FF&E PLAN EAST WING - 1ST & 2ND FLOOR 3
IF113 FF&E PLAN BASEMENT - SECTION C 3
IF114 FF&E PLAN 1ST FLR - SECTION A&B 3
IF115 FF&E PLAN 1ST FLR - SECTION C 3
IF116 FF&E PLAN 2ND FLR - SECTION A&B 3
IF117 FF&E PLAN 2ND FLR - SECTION C 3
IF118 FF&E PLAN 3RD FLR - SECTION A&B 3
IF119 FF&E PLAN 3RD FLR - SECTION C 3
IF601 FURNITURE, FIXTURES & EQUIPMENT (FF&E) LEGEND 3
3. The proposal due date and time remains unchanged.
Section 00 10 00 – Page 2
c. Section 00 45 00, Representations and Certifications
d. Section 00 45 00, Representations and Certifications, Appendix A – SF LLL Disclosure of
Lobbying Activities
e. Volumes 1 and 2 in response to Section 00 22 16
7. The magnitude of this construction project is $50,000,000 - $100,000,000.
8. Requests for Information (RFIs) must be submitted no later than August 8, 2022, 2:00 PM Hawaii Standard Time. The Government Points of Contact for RFIs are as follows:
Mr. Colin Waki Mr. Kent Tamai E-mail: colin.k.waki@usace.army.mil E-mail: kent.a.tamai@usace.army.mil
(Am-0003)
FY22 Multi-Domain Task Force #3 Building 300 Helemano Military Reservation, Oahu, Hawaii
RFI # Reference Question Government Response
6 Specification Section 01 90 00 Includes clause S-28.14 Workers Compensation Insurance (Defense Base Act). Is it truly the intent of the Government to have the Contractor provide DBA Insurance for all its workers and those of all its subcontractors at every tier through CNA at $6/$100 of compensation, even though all subcontractors (at any tier) are required to provide Workers Compensation Insurance in accordance to the Dept of Labor and the State of Hawaii?
See revised Section 01 90 00, per Am-0002. S-28.14 is deleted from this solicitation.
7 Currently the documents have been made available through SAM.GOV and not DOD SAFE. In the RFP section 00 72 00 -6, the Government inserts the FAR Clause 52.204-21- Basic Safeguarding of Covered Contractor Information Systems. Specifications Volume’s 1 & 2 Title Pages and Drawings Part 1 of 4 , Title Sheet G-001 indicate a C..U..I..
designation referencing CEPOH and all the G series sheets are marked C..U..I.. Are the documents for this solicitation intended to be C..U..I.. and treated as such?
See Revised Drawings and Specifications provided in Am-0003. All CUI markings have been removed from the solicitation.
8 Per the RFP, “Volume 1, Tab 4: Technical Approach c. Describe how it will coordinate with the security monitoring contractor also present at the site.”
Please provide the security monitoring contractors SOW that details the following if applicable, so we can provide our coordination details as stated above.
• Roles and Responsibilities
• Construction Site Access Control Measures – for the project site and if any are required internal building access controls for SCIF areas
• Personnel inspections/monitoring & badging – procedures and timelines for requesting personnel access to the reservation, what type of background check if any required , vetting requirements for workers
• Use of Construction Security Technicians/Escorts and Ratios of Escorts to Tradespeople
• Secure Storage Area requirements for delivering materials, receiving materials timelines from the SSA to be installed, material inspection requirements
Refer to Section 01 90 00 attachments issued per Am-0002.
9 Factor 1: Relevant Contractor Experience- Item 4- Relevant Projects are defined as having at least 2 of the below. Would it be possible to allow projects that have 1 of the items a, b or c, in lieu of 2 items as currently requested, as long as our overall project experience meets all 3 items?
The contractor will be responsible for complying with the requirements in this section, per the original solicitation.
Section 00 60 00, Attachment A (Am-0003)
| 22-R-0016 Am-0003 |
| 22-R-0016 - 00 10 00, Page 2 |
| 22-R-0016 - 00 60 00, Att. A - RFI (#6-9) |
File details come from the government source that posted it. Updated .