A.2.11.3 W9128A22R0016 Am-0006 Drawings.pdf
PDF 3 MB Posted
- Solicitation number
- W9128A22R0016
About this file
This solicitation notice announces the U.S. Army Corps of Engineers' intent to issue a solicitation for the FY22 OMA Multi-Domain Task Force (MDTF) #3, Building 300 project at Helemano Military Reservation. The project scope includes renovating and repairing Building 300 to accommodate relocation of the 307th ESB and shared occupancy with the new MDTF. Work includes installing a new elevator, UPS, emergency generator, utility extensions, communications, site infrastructure and lighting improvements, grading, parking, fencing and landscaping. The estimated period of performance is 912 calendar days. The acquisition will use Lowest Price Technically Acceptable procedures based on experience, past performance, technical approach, and price. The project magnitude is between $50-100 million. The solicitation will be unrestricted. Offerors must register in SAM and check for any changes to the solicitation.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
Y P
U
O N
10'-0" (MAX) SPACING
M A
X
M A
X
TOP RAILPOST CAP
BRACE RAILS 3/8" DIA TRUSS ROD
LINE POST CHAIN LINK FENCE FABRIC POST CAP
CORNER, END
OR PULL POST
FINISHED
GRADE
TIE WIRES (TYP) ALONG
TOP RAILS AND POSTS
BOTTOM RAIL
BRACE RAILS
TIE WIRES (TYP) ALONG
TOP RAILS AND POSTS
PROVIDE CONCRETE FOOTING.
DIAMETER OF FOOTING MUST BE
4X POST DIAMETER (TYP UON).
3/8" DIA TRUSS ROD
1'-6" DIAMETER FOUNDATION,
TYPICAL
1'-6" DIAMETER
FOUNDATION,
TYPICAL
FITTINGS NOTES:
1. ALL FITTINGS MATERIAL MUST BE AS
SPECIFIED.
ELEVATION ELEVATION - ROUND POST
PLAN
PLAN - ROUND POST
ELEVATION - "H" POST
PLAN - "H" POST
PLAN - "H" POST
ELEVATION - "H" POST
PLAN - ROUND POST
ELEVATION - ROUND POST
ELEVATION TOP OR BRACE
RAIL ATTACHMENT
SELVAGE
T & B
1" TO BOTTOM
OF FABRIC
BOTTOM RAIL OPTION
BOTTOM RAIL
FENCE FABRIC
3/8" DIAMETER
CARRIAGE BOLTS
LINE POST
9-GAGE STEEL
TIE WIRES
2'-0" O.C. (MAX)
FENCE FABRIC
9-GAGE STEEL TIE
WIRE 15" O.C. (MAX)
AND WITHIN 4" FROM
TOP AND BOTTOM OF
FABRIC
FENCE FABRIC
9-GAGE STEEL TIE
WIRE 15" O.C. (MAX)
AND WITHIN 4" FROM
TOP AND BOTTOM OF
FABRIC
5/16" Ø BOLT WITH
HEX NUT
5/16" Ø BOLT WITH
HEX NUT
BRACE RAIL
BOLT AND NUT
CORNER, OR END,
OR GATE POST
TURNBUCKLE
TRUSS ROD
TENSION BAR
TENSION OR
FABRIC BAND
BRACE BAND
RAIL END WITH OFFSET LUG
BRACE OR BOTTOM RAIL
TRUSS ROD
ROUND LINE POST
BRACE BAND
RAIL END WITH OFFSET LUG
BRACE OR BOTTOM RAIL
RAIL END WITH ALTERNATE
TRUSS ROD ATTACHMENT
BRACE OR BOTTOM RAIL
ROUND LINE POST
BRACE BAND
CS502
C H
A I N
L
N
K
F
E N
C E
D
T
A I L
S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
T
O
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
J A
C O
B S
A
H L
J V
B
I S
H O
P
S
T
S
U I T
E
H
O N
O L U
L U
H
I
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I
B
I L D
I N
G
R
O O
M
F
O R
T
S
H A
F T
E R
H
I
W A
D
M A
R C
H
A N
S I
D
W A
F
H E
L E
M A
M
L I T
A R
Y
R
E S
E R
V A
T I O
N
O
A H
U
H
I
F Y
M
D T
F
B
U I L D
I N
G
R Y
J
R T
A
S
U B
M I T
T A
L
US Army Corps of Engineers ®
A
L E
E
K
B
E L T
R A
N
K
K
E N
N E
D Y
CHAIN LINK FENCING NOTES:
1. FABRIC: THE STANDARD FENCE FABRIC MUST BE BLACK PVC-COATED 5179 STEEL WIRE CHAIN LINK WITH MESH
OPENINGS NOT LARGER THAN TWO INCHES PER SIDE AND A TWISTED AT TOP AND BOTTOM IN ACCORDANCE WITH
THE SPECIFICATIONS. UTILIZE 9-GAUGE FOR BASE INTERIOR OR WHEN JOINING AN EXISTING FENCE WHICH IS
ALREADY 9-GAUGE.
2. FABRIC TIES: ONLY 12-GAUGE STEEL TIES MUST BE USED. COATING OR PLATING WILL BE ELECTROLYTICALLY
COMPATIBLE WITH THE FENCE FABRIC TO INHIBIT CORROSION.
3. REINFORCEMENT: TENSION WIRES MUST BE INSTALLED AND INTERWOVEN (OR AFFIXED WITH FABRIC TIES) ALONG
THE TOP & BOTTOM OF THE FENCE FOR STABILIZATION OF THE FENCE FABRIC.
4. FENCE HEIGHT: CHAIN LINK FABRIC MUST BE 8' HIGH . THE TOTAL FENCE HEIGHT MUST BE 8'.
5. GROUND CLEARANCE: BOTTOM OF THE FENCE FABRIC MUST BE WITHIN TWO INCHES OF FIRM SOIL.
6. FENCE POSTS: MUST BE ASTM F1043 OR F1083 ROUND PIPE OR SQUARE TUBE AND MUST BE GALVANIZED IN
ACCORDANCE WITH THE SPECIFICATIONS. FENCE POST SPACING AND SIZE (DIAMETER) MUST BE DETERMINED IN
ACCORDANCE WITH CHAIN LINK FENCE MANUFACTURERS' INSTITUTE (WLG 2445). SPACING MUST NOT EXCEED 10'-0"
OC. SIZE (DIAMETER) MUST NOT BE LESS THAN THAT SPECIFIED.
7. FENCING DESIGN MUST COMPLY WITH UFC 4-022-03.
S
Y
I
P l o t
D a t e
F i l e a t h
C p w w o r k d i r d e n j e g t h o m a s s d
R
Y
J H
M R
B
L D
G
C
S d w g
A
M
NTS
CHAIN LINK FENCE DETAIL
A1
LINE POST DETAILS
CORNER OR END POST DETAILS
TYP. FENCE AND CORNER PANEL ELEVATION
TYP. FENCE AND BRACED PANEL ELEVATION
GENERAL CHAIN LINK FENCE NOTES:
1. SOME LOCATIONS MAY REQUIRE 9' OF FABRIC.
2. FENCE FABRIC TO BE PVC COATED BLACK
STEEL POST SCHEDULE
CORNER, END & FULL POST
USE AND SECTION
TUBULAR - ROUND
LINE POSTS
TUBULAR -ROUND
TOP, BOTTOM & BRACE RAILS
TUBULAR - ROUND
TUBULAR - SQUARE
H - SECTION
C - SECTION (ROLL FORMED)
4.0" O.D.
2.375" O.D.
1.50" O.D.
1.66" O.D.
1.625" X 1.50"
1.625" X 1.25"
MINIMUM OUTSIDE DIMENSIONS (NOMINAL)
E
N D
M E
G
08/17/2022
TREES CODE BOTANICAL / COMMON NAME SIZE QTY REMARKS
CN CASSIA X NEALIAE / RAINBOW SHOWER TREE 25 GAL 8 10' H X 6' W 2 " CALIPER
PT PANDANUS TECTORIUS / HALA / SCREWPINE 12`H X 8`W FIELD DUG 4 12' H X 8'W FIELD DUG
GROUND COVERS CODE BOTANICAL / COMMON NAME CONT SPACING QTY REMARKS
ZE ZOYSIA JAPONICA 'EL TORO' / EL TORO ZOYSIA GRASS SPRIG 6" o.c. 17,855 SF
PLANT SCHEDULE
L A
N D
S C
A P
E
P
L A
N T
I N
G S
C H
E D
U
T
E S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
J A
C O
B S
A
H L
J V
B
I S
H O
P
S
T
S
U I T
E
H
O N
O L U
L U
H
I
R M
Y
C
O R
E
N G
I N
E E
R S
H O
N O
L U
S
T R
I
B
I L D
I N
G
R
O O
M
F
O R
T
S
H A
F T
E R
H
I
W A
D
M A
R C
H
A N
S I
D
W A
F
H E
L E
M A
L I T
A R
Y
R
E S
E R
V A
T I O
N
O
A H
U
H
I
F Y
M
D T
F
B
U I L D
I N
G
R Y
J
R T
A
S
U B
M I T
T A
L
US Army Corps of Engineers ®
L-001
R
M
C N
E I L
F
R E
E M
A N
R
M
C N
E I L
F
R E
E M
A N
K
K
E N
N E
D Y
S
Y
I
GENERAL NOTES
1. VERIFY LOCATION OF UNDERGROUND UTILITIES AND OTHER OBSTRUCTIONS THAT MAY AFFECT
THE WORK. REPORT ANY OBSTRUCTIONS ENCOUNTERED TO THE CONTRACTING OFFICER.
REPAIR ALL DAMAGE TO ANY KNOWN UTILITY LINE OR OTHER UNDERGROUND OBSTRUCTION AT
CONTRACTOR'S EXPENSE. REPORT DAMAGE TO ANY UNKNOWN UTILITIES TO THE CONTRACTING
OFFICER.
2. THE LANDSCAPE ESTABLISHMENT AND GUARANTEE PERIOD WILL COMMENCE ON THE DATE
THAT INSPECTION BY THE CONTRACTING OFFICER SHOWS THE NEW PLANTS FURNISHED UNDER
THIS CONTRACT HAVE BEEN SATISFACTORILY INSTALLED AND MUST CONTINUE FOR A PERIOD
OF 365 DAYS FOR TREES AND 120 DAYS FOR GROUNDCOVER AREAS.
3. BEGIN MAINTENANCE IMMEDIATELY AFTER PLANTS HAVE BEEN INSTALLED. INSPECT EXTERIOR
PLANTS AT LEAST ONCE A WEEK DURING THE INSTALLATION AND ESTABLISHMENT PERIOD AND
PERFORM NEEDED MAINTENANCE PROMPTLY. MAINTENANCE CONSISTS OF, BUT IS NOT LIMITED
TO, THE FOLLOWING:
WATERING, PRUNING, FERTILIZING, ADJUSTING STAKES, WEEDING AND PERFORMING OTHER
OPERATIONS NECESSARY TO PROMOTE PLANT GROWTH AND VIGOR.
4. TURF AREAS, PAVEMENT AND FACILITIES THAT HAVE BEEN DAMAGED FROM THE PLANTING
OPERATION MUST BE RESTORED TO ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
KEEP CLEAN AT ALL TIMES AT LEAST ONE PAVED PEDESTRIAN ACCESS ROUTE AND ONE PAVED
VEHICULAR ACCESS ROUTE TO EACH BUILDING. CLEAN PAVING WHEN WORK IN ADJACENT
AREAS IS COMPLETE.
PLANTING NOTES
1. REFER TO SPECIFICATIONS SECTIONS 32 05 33 LANDSCAPE ESTABLISHMENT, 32 92 26 SPRIGGING
AND 32 93 00 EXTERIOR PLANTS PRIOR TO THE START OF WORK. CONTRACTOR SHALL BE HELD
RESPONSIBLE FOR ALL MATERIALS, SCHEDULING, PRODUCTS, WARRANTIES AND METHODS FOR
EXECUTION OF WORK WHICH MAY NOTE BE INDICATED IN THE DRAWINGS.
2. BACKFILL MIX SHLL CONSIST OF THREE (3) PARTS OF AMENDED IMPORTED PLANTING SOIL TO
ONE (1) PART COMPOSTED DERIVATIVES (SEE SPECIFICATIONS). ADD ONE (1) POUND OF 10-30-10
FERTILIZER TO ONE (1) CUBIC YARD OF BACKFILL MIX. MIX THOROUGHLY ON PROJECT SITE
PRIOR TO ANY PLANTINGS OPERATIONS. NOTE THAT FERTILIZER COMPOSITION AND BACKFILL
MIX STATED IS A BASELINE AND TO BE ADJUSTED ACCORDING TO RECOMMENDATIONS FROM THE
SOIL COMPOSITION TEST RESULTS.
3. PLANTING TABLETS FOR TREES AND SHRUBS SHALL BE AS FOLLOWS:
A. FIELD SPECIMEN 12 TABLETS
B. 25 GALLON 8 TABLETS
C. 15 GALLON 5 TABLETS
D. 5 GALLON 3 TABLETS
E. 3 GALLON 2 TABLETS
F. 1 GALLON 1 TABLET
USE SLOW RELEASE FERTILIZER TABLETS 20-10-5, 21 GRAM SIZE
4. QUANTITIES SHOWN ON PLANT SCHEDULE ARE FOR REFERENCE ONLY. VERIFY ACTUAL
QUANTITIES AS SHOWN ON PLAN TO PROVIDE FULL AND EVEN COVERAGE OF PLANTING AREAS.
5. 120 DAY LANDSCAPE MAINTENANCE PERIOD FOR GROUNDCOVER AND 365 DAYS FOR TREES -
SEE LANDSCAPE ESTABLISHMENT SECTION 32 05 33 FOR REQUIREMENTS.
6. REPAIR ALL AREAS DAMAGED DUE TO CONSTRUCTION PER SECTIONS 32 92 26 SPRIGGING AND 32
93 00 EXTERIOR PLANTS.
7. LOCATE/TONE FOR ALL EXISTING UTILITIES PRIOR TO START OF PLANT INSTALLATION. ANY
EXISTING UTILITES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED.
8. PRIOR TO DELIVERING AND SPREADING AMENDED SOIL AND PLANTING, CONTRACTOR TO CLEAR, GRUB AND REMOVE ALL WEEDS, STUMPS, ROOTS, ROCKS, PAVEMENT DEBRIS AND TRASH.
9. PROVIDE 4 INCHES OF IMPORTED TOPSOIL AND MIX IN 2" OF SOIL CONDITIONER.
10. TEMPORARY AND PERMANENT IRRIGATION SYSTEMS TO BE FUNCTIONAL PRIOR TO PLANTING.
11. CONTRACTOR TO FINE GRADE AMENDED SOIL TO REMOVE DEPRESSIONS, UNEVEN SURFACES, AND TO SURFACE DRAIN WATER.
12. PLACE ROOT BARRIERS ALONG EDGE OF PAVEMENT, STRUCTURES AND UTILITIES THAT ARE
WITHIN 10' OF ANY TREES (MEASURED AWAY FROM THE TREE TRUNK).
13. PLANT MATERIALS SHALL BE CHECKED PRIOR TO DELIVERY TO ENSURE THAT THEY ARE FREE OF
LITTLE FIRE ANTS AND COQUI FROGS.
14. PLANTS TO RECEIVE TEMPORARY IRRIGATION DURING ESTABLISHMENT PERIOD, THEN
IRRIGATION TO BE REMOVED.
15. CONTRACTOR TO PERFORM AERATION MINIMUM 4" DEPTH IN TURF AREAS AS DESCRIBED IN THE
SPECIFICATIONS.
PLANT SCHEDULE MAINTENANCE NOTES
1. ALL DISTURBED AREAS MUST BE RE-VEGETATED OR REPAIRED TO EXISTING PRE-SITE
CONSTRUCTION CONDITIONS OR BETTER. CONTRACTOR MUST RE-VEGETATE THE AREA AND
PROVIDE ESTABLISHMENT IRRIGATION/BMPS UNTIL DISTURBED AREAS ARE STABILZED AND
RE-ESTABLISHED.
2. INSPECTIONS MUST BE MADE ON A REGULAR BASIS, BY THE LANDSCAPE MAINTENANCE
PERSONNEL, TO OBSERVE AND PROVIDE REPAIRS OR REMEDIES TO THE FOLLOWING
COMPONENTS OF STORMWATER MANAGEMENT BMPS AND LID FEATURES:
A. REMOVAL OF SEDIMENT FROM BARRIERS AND SEDIMENTATION DEVICES
B. REPLACEMENT OR REPAIR OF WORN OR DAMAGED SILT FENCE FABRICS
C. REPLACEMENT OR REPAIR OF DAMAGED STRUCTURAL CONTROLS
D. REPAIR OF DAMAGED SOIL STABILIZATION MEASURES (INCLUDING SPRIGGED TURFGRASS
GROUNDCOVER PLANTING AND MULCH), AND
E. OTHER CONTROL MAINTENANCE AS DEFINED IN EACH BMP FACT SHEET.
3. INSPECT SPRIGGED AND HYDRO-MULCHED BMP AREAS PRIOR TO FORECAST RAIN, DAILY DURING
EXTENDED RAIN EVENTS, WEEKLY DURING THE RAINY SEASON, AND AT 2-WEEK INTERVALS
DURING THE NON-RAINY SEASON.
4. REPAIR AREAS WHERE EROSION IS EVIDENT AND BMPS RE-APPLIED AS SOON AS POSSIBLE.
5. WHERE TURFGRASS DIES AND AREA DOES NOT MEET ACCEPTABLE STAND OF TURF COVERAGE
CRITERIA PER SPRIGGING SPECIFICATIONS, RE-SPRIG, FERTILIZE AND APPLY MULCH DURING
OPTIMAL WEATHER CONDITIONS, USING NO LESS THAN HALF THE ORIGINAL APPLICATION RATE.
6. CONTRACTOR SHALL UTILIZE WATER CONSERVATION METHODS DURING PLANT ESTABLISHMENT
AND MAINTENANCE PERIOD INCLUDING BUT NOT LIMITED TO: NO RUNOFF, NO OVER WATERING, WATER USING DAILY ET VALUES & NO PONDING.
7. WATER SHALL BE APPLIED TO PLANTING AREAS IN SHORT INTERVALS TO PROHIBIT ANY SURFACE
PONDING OR RUN-OFF AND AT NO TIME SHALL WATER BE APPLIED TO CAUSE SOIL SATURATION.
8. OVER WATERING CAN RESULT IN DEATH OF PLANTS, POSSIBLE SOIL EXPANSION AND DAMAGE TO
CONCRETE AND ASPHALT PAVING, DAMAGE TO FOUNDATIONS AND POSSIBLE LOSS OF SOIL
COMPACTION.
9. PLANT MATERIALS USED ON THIS PROJECT HAVE VARYING WATER USE REQUIREMENTS THAT ARE
DETERMINED FROM SEASON TO SEASON, WEATHER CONDITIONS, TYPE OF PLANT, AND BY
LOCATION. WATER APPLICATION MUST BE ADJUSTED AS NECESSARY. PLANT MATERIAL, PLANTING
SOIL AND TEMPORARY IRRIGATION SYSTEMS REQUIRE CONTINUOUS, ON-GOING, PROFESSIONAL
MONITORING. IMPROPER MAINTENANCE AND MONITORING CAN LEAD TO SIGNIFICANT DAMAGE.
THE LANDSCAPE ARCHITECT HAS NO CONTROL OVER THE MAINTENANCE OF THE WORK
REPRESENTED ON THESE DRAWINGS AND THEREFORE DISAVOWS ANY RESPONSIBILITY FOR
DAMAGES CAUSED BY PLANT GROWTH AND/OR THE APPLICATION OF IRRIGATION WATER.
10. THE LANDSCAPE MAINTENANCE PERSONNEL FOR THE SITE MUST POSSESS KNOWLEDGE OF THE
WATER NEEDS FOR THE PLANTS. IT WILL BE THE SOLE RESPONSIBILITY OF THE LANDSCAPE
MAINTENANCE PERSONNEL TO DETERMINE THE WATER NEEDS FOR ALL PLANTS.
11. THE LANDSCAPE MAINTENANCE PERSONNEL MUST REMOVE AND REPLACE PLANTS ON A
PERIODIC BASIS. EACH TREE WILL NEED TO RECEIVE INDIVIDUAL CONSIDERATION FOR REMOVAL
BY A CERTIFIED ARBORIST.
12. NOTE: ENSURING THAT THE ABOVE PRECAUTIONS, REPAIRS AND CONTINUING MAINTENANCE ARE
PROPERLY PERFORMED IS THE RESPONSIBILITY OF THE GOVERNMENT AND EVENTUALLY THE
ON-SITE LANDSCAPE MAINTENANCE COMPANY. THE LANDSCAPE ARCHITECT OF RECORD HAS
BEEN RETAINED TO PREPARE THESE PLANS ONLY AND DOES NOT PROVIDE REVIEWS OF ON-SITE
MAINTENANCE. THE LANDSCAPE ARCHITECT DOES NOT ASSUME RESPONSIBILITY, LIABILITY OF
MAINTENANCE, REVIEW OF MAINTENANCE WORK, REPAIRS NOR DAMAGES RESULTING FROM LACK
OF REPAIRS, MAINTENANCE, ADJUSTMENTS, OR IMPROPER INSTALLATION.
LANDSCAPE MAINTENANCE DURING PLANTING ESTABLISHMENT PERIOD AND FUTURE MAINTENANCE &
OPERATIONAL NOTES AFTER ACCEPTANCE OF THE PROJECT BY THE GOVERNMENT AND AFTER THE
COMPLETION OF THE MAINTENANCE PERIOD BY THE CONTRACTOR.
REFER TO SPECIFICATIONS 32 05 33 LANDSCAPE ESTABLISHMENT FOR REQUIRMENTS DURING
PLANTING ESTABLISHMENT AND MAINTENANCE PERIOD.
REQUIREMENTS LISTED BELOW REPRESENT KEY, SITE SPECIFIC PLANTING AND STORM WATER BMP
RECOMMENDATONS. REFER ALSO TO RESOURCE DOCUMENTS LISTED BELOW FOR ADDITIONAL
REQUIREMENTS:
· CITY AND COUNTY OF HONOLULU STORM WATER BEST MANAGEMENT PRACTICE MANUAL
CONSTRUCTION AUGUST 2017.
· HAWAII STATE DEPARTMENT OF TRANSPORTATION (HDOT) HIGHWAYS DIVISION STORM WATER
PERMANANENT BEST PRACTICES MANUAL, APRIL 2015 FOR ONGOING, PERMANENT BMP
MAINTENANCE PRACTICES.
IT IS THE GOVERNMENT'S RESPONSIBILITY TO SUPPLY THESE PLANS WITH THE FOLLOWING NOTES
AND SPECIFICATIONS ALONG WITH CONTRACTOR DRAWN "AS-BUILT" PLANS TO ANY AND ALL FUTURE
MAINTENANCE COMPANIES.
E
N D
M E
G
1. INFILL ALL (E) ABANDONED PENETRATIONS AND OPENINGS IN
CONCRETE FLOORS OR CONCRETE/MASONRY WALLS.
2. AT ALL LOCATIONS WHERE NEW CONCRETE IS PLACED AGAINST
(E) CONCRETE, ROUGHEN THE (E) CONCRETE TO 1/4" AMPLITUDE
AND CLEAN THE SURFACE PRIOR TO PLACING NEW CONCRETE.
3. REFER TO DRAWINGS S-001, S-002 FOR GENERAL NOTES,
ABBREVIATIONS AND SYMBOLS.
4. CONTRACTOR IS RESPONSIBLE FOR ALL SHORING (INCLUDING THE
DESIGN) NEEDED DURING CONSTRUCTION AND DEMOLITION OF
EXISTING STRUCTURAL ELEMENTS.
5. CONTRACTOR MUST VERIFY ALL EXISTING CONDITION AND REPORT
ANY DISCREPANCIES TO CONTRACTING OFFICER AND EOR PRIOR
TO COMMENCEMENT OF WORK.
6. ALL DIMENSION SHOWN ON THE PLANS ARE TO AID THE
CONTRACTOR AND ARE BASED ON THE EXISTING AS-BUILTS.
CONTRACTORE SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO
COMMENCEMENT OF WORK.
7. ELEV 0'-0" = 1139.83' AMSL PER CIVIL.
8. SEE ARCH. PLANS FOR LOCATION OF (E) CMU WALLS TO REMAIN.
RESTRAIN (E) CMU WALLS PER .
9. SEE ARCH. PLANS FOR LOCATION OF NEW CONCRETE CURB.
CONCRETE CURB PER L16/S-502.
10. "CWXXX" DENOTES NEW CONCRETE WALL. SEE CONCRETE WALL
SCHEDULE F1/S-502.
11. WHERE STEEL BEAMS RUN THROUGH (E) CMU WALL, SAWCUT AND
REMOVE PORTION OF THE WALL AS REQUIRED (MAXIMUM 24" WIDE X
12" DEEP, DO NOT OVERCUT ) TO INSERT THE STEEL BEAM. COVER
THE OPENING PER F1/S-507.
12. IDENTIFY DAMAGED CONCRETE AND REPAIR PER SPECIFICATION
03 01 00. QUANTITIES FOR BIDDING PURPOSES ONLY: REPAIR 100LF
OF CONCRETE CRACK; REPAIR 100SF OF CONCRETE SPALL.
/L9 S-506
/L16 S-502
/F1 S-502
/F1 S-507
101112131415C15D
F
MA
MB
MC
MD
ME
MF
MG
P
M10 M9 M8 M7 M6 M5 M4 M3 M2 M1
TYP.
22' - 2" 5' - 4" 9' - 8" 7' - 2" 12' - 9" 12' - 9" 7' - 2" 9' - 8" 5' - 4"
92' - 0"
MATCHLINE
/H1 S-121
7' - 0" 7' - 0"
2 2
1. (E) FOOTING TO REMAIN, TYP.
2. 2'-0"H X 7'-0"W GRILLE OPENING IN (E) CONCRETE GRADE BEAM WALL, TO
REMAIN, TYP.
T R
U E
N
C B A
MW EW
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
PLAN
NORTH
B
IM
/U
S H
I_ D
U
S A
C E
M
D T
F
B u ild in g
/R
Y J H
M R
B
L D
G D
M M
S .r v t
/1
/2
:1
:0
P
M
S-111
S T
R U
C T
U R
A L P
L A
N
M
ID
D L E
W
IN
G
F O
U N
D A
T
IO
N
H E
L E
M A
N O
M
IL
IT
A
R Y
R E
S E
R V
A T
IO
N
O
A H
U H
I
H O
N O
L U
L U
D
IS
T R
IC
T
B L D
G
R
O O
M
F
O R
T S
H A
F T
E R
H
I -5
J A
C O
B S
-A H
L J
V B
IS
H
O P
S T
S U
IT
E
H
O N
O L U
L U
H
I
Z B
A D
R A
L
W .T
S
O N
G
K H
A G
H
IG
H I
K H
A G
H
IG
H I
A U
G U
S T
W A
F
W A
-1 -D
-0
R T
A S
U B
M
IT
T A
L
F Y
M
D T
F
B
U
IL
D
IN
G
R Y
J
GENERAL SHEET NOTES
LEGEND
SHEET KEYNOTESXX
0 4' 8' 16'1/8" = 1'-0"A1
FOUNDATION PLAN - MIDDLE WING
A
M E
N D
M E
N T
/1 /2
101112131415C15D
MA
MB
MC
MD
ME
MF
MG
P
M10 M9 M8 M7 M6 M5 M4 M3 M2 M1
2" 23' - 3" 22' - 9" 22' - 9" 22' - 9" 22' - 9"
22' - 2" 5' - 4" 9' - 8" 7' - 2" 12' - 9" 12' - 9" 16' - 10" 5' - 4"
92' - 0"
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
MATCHLINE
/H1 SD121
TYP.
F2 F1 F5
F10 F10 F5
F14F14
F6
F6 F12 F12
F4
F16
F1
F16
F12 F10 F10 F9
F8F12F12F15 F7
F1
F1
F7
F8
F4
F4
1. SEE GENERAL SHEET NOTES ON S-111.
2. INFILL ALL (E) ABANDONED PENETRATIONS AND OPENINGS IN
CONCRETE FLOORS OR CONCRETE/MASONRY WALLS.
3. AT ALL LOCATIONS WHERE NEW CONCRETE IS PLACED AGAINST
(E) CONCRETE, ROUGHEN THE (E) CONCRETE TO 1/4" AMPLITUDE
AND CLEAN THE SURFACE PRIOR TO PLACING NEW CONCRETE.
4. REFER TO DRAWINGS S-001, S-002 FOR GENERAL NOTES,
ABBREVIATIONS AND SYMBOLS.
5. CONTRACTOR IS RESPONSIBLE FOR ALL SHORING (INCLUDING THE
DESIGN) NEEDED DURING CONSTRUCTION AND DEMOLITION OF
EXISTING STRUCTURAL ELEMENTS.
6. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITION AND REPORT
ANY DISCREPANCIES TO CONTRACTING OFFICER AND EOR PRIOR
TO COMMENCEMENT OF WORK.
7. NO POST INSTALLED ANCHORS ALLOWED WITHIN 1 3/8" OF
MASONRY WALL HEAD JOINT.
1. (E) CONC. FOOTING TO REMAIN, TYP.
2. (E) CONC. BM TO REMAIN, TYP.
3. (E) CONC. GRADE BEAMS TO REMAIN, TYP.
4. (E) CONC. TIE BEAMS TO REMAIN, TYP.
EXISTING FOOTING DIMENSION PER SCHEDULE ON SD111, V.I.F.
F#
WF2.875 PER PLAN PER PLAN 1' - 6"
WF3.0 PER PLAN PER PLAN 1' - 6"
WF3.125 PER PLAN PER PLAN 1' - 6"
T R
U E
N
C B A
MW EW
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
PLAN
NORTH
B
IM
/U
S H
I_ D
U
S A
C E
M
D T
F
B u ild in g
/R
Y J H
M R
B
L D
G D
M M
S .r v t
/1
/2
:1
:0
P
M
SD111
S T
R U
C T
U R
A L D
E M
O P
L A
N
M
ID
D L E
W
IN
G
F O
U N
D A
T
IO
N
H E
L E
M A
N O
M
IL
IT
A
R Y
R E
S E
R V
A T
IO
N
O
A H
U H
I
H O
N O
L U
L U
D
IS
T R
IC
T
B L D
G
R
O O
M
F
O R
T S
H A
F T
E R
H
I -5
J A
C O
B S
-A H
L J
V B
IS
H
O P
S T
S U
IT
E
H
O N
O L U
L U
H
I
Z B
A D
R A
L
W .T
S
O N
G
K H
A G
H
IG
H I
K H
A G
H
IG
H I
A U
G U
S T
W A
F
W A
-1 -D
-0
R T
A S
U B
M
IT
T A
L
F Y
M
D T
F
B
U
IL
D
IN
G
R Y
J
1/8" = 1'-0"A1
FOUNDATION DEMO PLAN - MIDDLE WING
0 4' 8' 16'
GENERAL SHEET NOTES
LEGEND
SHEET KEYNOTESXX
A
M E
N D
M E
N T
/1 /2
A
M E
N D
M E
N T
/1 /2
EXISTING FOOTING SCHEDULE
(VERIFY DIMENSIONS IN FIELD)
Mark LENGTH WIDTH DEPTH
F1 3' - 0" 3' - 0" 1' - 3"
F2 3' - 3" 3' - 3" 1' - 3"
F3 3' - 9" 3' - 9" 1' - 3"
F4 7' - 9" 3' - 0" 1' - 6"
F5 7' - 9" 3' - 6" 1' - 6"
F6 7' - 9" 3' - 9" 1' - 6"
F7 4' - 0" 4' - 0" 1' - 3"
F8 4' - 3" 4' - 3" 1' - 3"
F9 5' - 0" 5' - 0" 1' - 3"
F10 5' - 10" 5' - 10" 1' - 6"
F11 13' - 10" 5' - 9" 1' - 6"
F12 6' - 0" 6' - 0" 1' - 6"
F13 6' - 4" 6' - 4" 1' - 6"
F14 6' - 6" 6' - 6" 1' - 6"
F15 7' - 0" 7' - 0" 1' - 6"
F16 7' - 3" 7' - 3" 1' - 6"
F17 7' - 9" 7' - 9" 1' - 8"
F18 8' - 0" 8' - 0" 1' - 8"
F19 9' - 3" 9' - 3" 2' - 0"
F20 10' - 0" 10' - 0" 2' - 0"
F21 10' - 3" 10' - 3" 2' - 0"
F22 10' - 6" 10' - 6" 2' - 0"
7 6 5 4 3 2 18
E
F
D.7
22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9"
TYP. 2
TYP.
M A
T C
H L
IN
E
H
S
D
MATCHLINE
/A12 SD114
F17 F17 F17 F17 F17 F17
F20 F20 F21 F22 F20 F21
F14F14 F11F13F14
F14
W F
.0
V.I.F.
3' - 0"
V .I .F
89A9B101112131415C15D
D
E
F
Q
D.7
2" 23' - 3" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3" 2" 23' - 3"
TYP.
TYP.
M A
T C
H L
IN
E
A
S
D
M A
T C
H L
IN
E
A
S
D
MATCHLINE
/A1 SD111
F3 F3
W F
.1
F19 F18 F18 F18 F19
F3 F3
W F
.8
F17
F14F17
F21F20F20F20F21
F15 F15 F17 F15
F21
V .I .F
V.I.F.
5' - 9"
V .I .F
/4
V.I.F.
6' - 3"
1. SEE GENERAL SHEET NOTES ON SD111.
1. (E) CONC. FOOTING TO REMAIN, TYP.
2. (E) CONC. GRADE BEAMS TO REMAIN, TYP.
3. (E) CONC. WALL TO REMAIN, TYP.
4. (E) 2'-0"H X 7'-0"W GRILLE OPENING IN (E) CONCRETE GRADE BEAM WALL, TYP.
EXISTING FOOTING DIMENSION PER SCHEDULE ON SD111, V.I.F.
F#
T R
U E
N
C B A
MW EW
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
PLAN
NORTH
B
IM
/U
S H
I_ D
U
S A
C E
M
D T
F
B u ild in g
/R
Y J H
M R
B
L D
G D
M M
S .r v t
/1
/2
:1
:0
P
M
SD121
S T
R U
C T
U R
A L D
E M
O P
L A
N
S E
C T
IO
N
A
B
F O
U N
D A
T
IO
N
H E
L E
M A
N O
M
IL
IT
A
R Y
R E
S E
R V
A T
IO
N
O
A H
U H
I
H O
N O
L U
L U
D
IS
T R
IC
T
B L D
G
R
O O
M
F
O R
T S
H A
F T
E R
H
I -5
J A
C O
B S
-A H
L J
V B
IS
H
O P
S T
S U
IT
E
H
O N
O L U
L U
H
I
Z B
A D
R A
L
W .T
S
O N
G
K H
A G
H
IG
H I
K H
A G
H
IG
H I
A U
G U
S T
W A
F
W A
-1 -D
-0
R T
A S
U B
M
IT
T A
L
F Y
M
D T
F
B
U
IL
D
IN
G
R Y
J
1/8" = 1'-0"A1
FOUNDATION DEMO PLAN - SECTION A
0 4' 8' 16'
GENERAL SHEET NOTES
LEGEND
SHEET KEYNOTESXX
1/8" = 1'-0"H1
FOUNDATION DEMO PLAN - SECTION B
0 4' 8' 16'
A
M E
N D
M E
N T
/1 /2
15C15D16171819202122
E
F
D.7
22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3" 2"
TYP.
TYP.
3 3
M A
T C
H L
IN
E
H
S
D
TYP
F17 F17 F17 F17 F17 F17
F21 F20 F22 F21 F20 F21
F14 F14 F11 F13 F14 F14
V.I.F.
3' - 3"
V .I .F
/2
1. SEE GENERAL SHEET NOTES ON SD111.
1. (E) CONC. FOOTING TO REMAIN, TYP.
2. (E) CONC. GRADE BEAMS TO REMAIN, TYP.
3. (E) CONC. WALL TO REMAIN, TYP.
4. (E) 5" REINF. CONC. SLAB ON GRADE TO BE REPLACED AS NECESSARY.
SAWCUT AND REMOVE PORTION OF (E) SLAB FOR INSTALLATION OF NEW
FOUNDATION/PLUMBING LINES OR REMOVAL OF (E) PLUMBING LINES.
REFER TO S-122 AND PLUMBING PLANS.
EXISTING CONCRETE SLAB TO BE SAWCUT AND REMOVED AS NECESSARY.
EXISTING FOOTING DIMENSION PER SCHEDULE SD111, V.I.F.
F#
T R
U E
N
C B A
MW EW
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
PLAN
NORTH
B
IM
/U
S H
I_ D
U
S A
C E
M
D T
F
B u ild in g
/R
Y J H
M R
B
L D
G D
M M
S .r v t
/1
/2
:1
:0
P
M
SD122
S T
R U
C T
U R
A L D
E M
O P
L A
N
S E
C T
IO
N
C
B A
S E
M E
N T
H E
L E
M A
N O
M
IL
IT
A
R Y
R E
S E
R V
A T
IO
N
O
A H
U H
I
H O
N O
L U
L U
D
IS
T R
IC
T
B L D
G
R
O O
M
F
O R
T S
H A
F T
E R
H
I -5
J A
C O
B S
-A H
L J
V B
IS
H
O P
S T
S U
IT
E
H
O N
O L U
L U
H
I
Z B
A D
R A
L
W .T
S
O N
G
K H
A G
H
IG
H I
K H
A G
H
IG
H I
A U
G U
S T
W A
F
W A
-1 -D
-0
R T
A S
U B
M
IT
T A
L
F Y
M
D T
F
B
U
IL
D
IN
G
R Y
J
1/8" = 1'-0"A1
FOUNDATION AND BASEMENT PLAN - SECTION C
0 4' 8' 16'
GENERAL SHEET NOTES
LEGEND
SHEET KEYNOTESXX
A
M E
N D
M E
N T
/1 /2
DN
FD FD FD
FDFDFD
FD FD
FD
FD
FD
FD
DN
15C15D
F
M4M6M8M9 M2 M1M10
MA
MB
MC
MD
ME
MF
M5 M3M7
3 3
7 7
/H1 AD114
MATCHLINE
22' - 2" 5' - 4" 9' - 8" 7' - 2" 12' - 9" 12' - 9" 7' - 2" 9' - 8" 5' - 4"
1 1 1
7 7 7
7 7
MAIN BUILDING
26 26
26 26 26
262626
6 6
GENERAL SHEET NOTES
1. COORDINATE DEMO WORK/EXTENT WITH NEW WORK.
2. FIELD VERIFY EXST DIMENSIONS AND CONDITIONS TO REMAIN AND PROTECT
FROM INADVERTENT DAMAGE BEFORE COMMENCING WITH DEMO WORK.
3. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATION AND
FIRE PROTECTION DRAWINGS FOR DEMOLITION REQUIREMENTS FOR EACH
DISCIPLINE.
4. HAZARDOUS MATERIALS SURVEYS HAVE BEEN CONDUCTED TO IDENTIFY
POTENTIALLY HAZARDOUS MATERIALS THAT ARE EXPECTED TO BE
DISTURBED DURING CONSTRUCTION. CONTRACTOR MUST
REQUEST/REVIEW THE HAZMAT SURVEY REPORT, CONDUCT THE HAZMAT
INVESTIGATION TO IDENTIFY QUANTITY/LOCATION TO MAKE THE HAZMAT
PLAN AS APPROPRIATE PRIOR TO THE WORK.
5. CONTRACTOR SCOPE OF WORK INCLUDE REMOVAL OF EXISTING CMU
WALLS FOR THE INSTALLATION OF NEW SHEET METAL DUCTWORK – BOTH
RECTANGULAR AND ROUND. CONTRACTOR TO COORDINATE WITH
MECHANICAL DRAWINGS.
6. CONTRACTOR IS TO REMOVE CMU WALLS FROM THE BOTTOM OF THE NEW
DUCTWORK UP TO THE CONCRETE SLAB OR CONCRETE BEAM ABOVE.
7. OPENINGS ARE TO REMAIN CLEAR OF EXISTING DOOR OPENINGS WHERE
NEW DUCTS INCROACH ON EXISTING DOOR LINTEL STRUCTURES.
8. CONTRACTOR SCOPE OF WORK INCLUDES NEW CHILLED WATER SUPPLY
AND RETURN LINES. LOCATIONS ARE TO BE COORDINATED WITH
MECHANICAL DRAWINGS.
9. SEE STRUCTURAL FOR INTERIOR CONCRETE WALL SUPPORT WHERE
EXISTING CMU DEMOLITION OCCURS. SEE A4/A-509
LEGEND
(E) DEMO WALL
(E) DEMO DOOR
(E) WALL TO REMAIN
(E) DEMO WINDOW
DEMO (E) RAISED FLOOR FLUSH WITH CORRIDOR CONCRETE SLAB
VEST
M100
VEST
M101
STORAGE
M102
DISHWASHING
M103
JANITOR
M104
SELF SERVICE
M105
FOOD SERVICE
SERGEANT
M106
ADMIN
M107
POT & PAN WASH
M108
KITCHEN
M109
VEST
M110
DRY STORAGE
M111
VEST
M112
WOMEN
M113
MEN
M114
VEST
M115
MAIN ENTREE
M116
DINING
M117
WALK-IN
FREEZER
M109A
WALK-IN
FREEZER
M109B
WALK-IN
FREEZER
M109C
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
B
IM
/U
S H
I_ D
U
S A
C E
M
D T
F
B u ild in g
/R
Y J H
M R
B
L D
G D
M M
A I.
rv t
/1
/2
:0
:1
A
M
AD111
D E
M O
F L O
O R
P L A
N M
ID
D
L E
W
IN
G
H E
L E
M A
N O
M
IL
IT
A
R Y
R E
S E
R V
A T
IO
N
H O
N O
L U
L U
D
IS
T R
IC
T
B L D
G
R
O O
M
F
O R
T S
H A
F T
E R
H
I -5
J A
C O
B S
-A H
L J
V B
IS
H
O P
S T
S U
IT
E
H
O N
O L U
L U
H
I
J G
A N
O T
IS
I
R B
A L
IN
T O
N A
A H
L
C G
A Y
D O
S H
A U
G U
S T
W A
F
W A
-1 -D
-0
R T
A S
U B
M
IT
T A
L
O A
H U
H
I
R Y
J
1/8" = 1'-0"A6
ENLARGED DEMO PLAN MIDDLE WING
0 4' 8' 16'
1 REMOVE EXST DOOR, DOOR FRAME, DOOR HARDWARE INCLUDING
THRESHOLD, AND WALL MOUNTED SIGNAGE
3 REMOVE EXST WINDOW FRAME AND WINDOW HARDWARE
5 REMOVE EXST PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINALS,
SINKS AND FAUCETS - SEE PLUMBING DRAWINGS
6 REMOVE EXST CASEWORK
7 REMOVE EXST PARTITION AND BASE
8 REMOVE EXST TOILET ACCESSORIES
9 REMOVE EXST RESTROOM TOILET PARTITION
10 REMOVE EXST CERAMIC TILE FLOORING, WAINSCOT, BASE, AND 3" CONC
TOPPING
17 DEMO EXST CMU/CONC WALL
18 REMOVE EXST SHED ROOF
20 REMOVE EXST HANDRAIL, GUARDRAIL, AND BRACKETS
26 REMOVE EXST FLOOR DRAIN/FLOOR SINK
29 DEMO EXST CONC STAIRS AND RAILING
30 DEMO EXST COVERED PATIO. CONC SLAB TO REMAIN
SHEET KEYNOTES
C B A
MW EW
KEY PLAN
MAIN BUILDING
T R
U E
N
PLAN
NORTH
A
M E
N D
M E
N T
J U
L Y
A
M E
N D
M E
N T
A
U G
A
M E
N D
M E
N T
A
U G
/A1 AD116
MATCHLINE
OPENING FOR
BRIDGE
EB
EC
ED
EE
E1E3E4
EA
E2
1 1
1 1
1 1
14' - 8 1/2" 6' - 3" 14' - 8 1/2"
MAIN BUILDING
AD214
H11
17 17 6 6
6 6 17 17
6 6
GENERAL SHEET NOTES
1. COORDINATE DEMO WORK/EXTENT WITH NEW WORK.
2. FIELD VERIFY EXST DIMENSIONS AND CONDITIONS TO REMAIN AND PROTECT
FROM INADVERTENT DAMAGE BEFORE COMMENCING WITH DEMO WORK.
3. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATION AND
FIRE PROTECTION DRAWINGS FOR DEMOLITION REQUIREMENTS FOR EACH
DISCIPLINE.
4. HAZARDOUS MATERIALS SURVEYS HAVE BEEN CONDUCTED TO IDENTIFY
POTENTIALLY HAZARDOUS MATERIALS THAT ARE EXPECTED TO BE
DISTURBED DURING CONSTRUCTION. CONTRACTOR MUST
REQUEST/REVIEW THE HAZMAT SURVEY REPORT, CONDUCT THE HAZMAT
INVESTIGATION TO IDENTIFY QUANTITY/LOCATION TO MAKE THE HAZMAT
PLAN AS APPROPRIATE PRIOR TO THE WORK.
5. CONTRACTOR SCOPE OF WORK INCLUDE REMOVAL OF EXISTING CMU
WALLS FOR THE INSTALLATION OF NEW SHEET METAL DUCTWORK – BOTH
RECTANGULAR AND ROUND. CONTRACTOR TO COORDINATE WITH
MECHANICAL DRAWINGS.
6. CONTRACTOR IS TO REMOVE CMU WALLS FROM THE BOTTOM OF THE NEW
DUCTWORK UP TO THE CONCRETE SLAB OR CONCRETE BEAM ABOVE.
7. OPENINGS ARE TO REMAIN CLEAR OF EXISTING DOOR OPENINGS WHERE
NEW DUCTS INCROACH ON EXISTING DOOR LINTEL STRUCTURES.
8. CONTRACTOR SCOPE OF WORK INCLUDES NEW CHILLED WATER SUPPLY
AND RETURN LINES. LOCATIONS ARE TO BE COORDINATED WITH
MECHANICAL DRAWINGS.
9. SEE STRUCTURAL FOR INTERIOR CONCRETE WALL SUPPORT WHERE
EXISTING CMU DEMOLITION OCCURS. SEE A4/A-509
F
/A1 AD114
MATCHLINE
EB
EC
ED
EE
E1E3E4
EA
E2
5 5
14' - 8 1/2" 6' - 3" 14' - 8 1/2"
1 1
MAIN BUILDING
2' - 8"
3 3
AD214
H1
AD214
H11
17 17
6 6
LEGEND
(E) DEMO WALL
(E) DEMO DOOR
(E) WALL TO REMAIN
(E) DEMO WINDOW
DEMO (E) RAISED FLOOR FLUSH WITH CORRIDOR CONCRETE SLAB
BN LECTURE
A101
VEST
A100
PROJECTION
A102
WOMEN
A103
JAN
A104
MEN
A105
ENTRY
A106
C O
R R
ID
O
R A
STAIR #8
A108
CHAPLAIN STOR
A109
BN CHAPLAIN
A110
VEST
A111
LAUNDRY
A201
BILLET SPACE
A202
ONE MAN NCO
A203
TOILET
A204
TOILET
A205
ONE MAN NCO
A206
NCO
A207
TOILET
A208
TOILET
A209
NCO
A210
TOILET
A211
NCO
A212
STAIR #8
A213
C O
R R
ID
O
R A
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
B
IM
/U
S H
I_ D
U
S A
C E
M
D T
F
B u ild in g
/R
Y J H
M R
B
L D
G D
M M
A I.
rv t
/1
/2
:0
:1
A
M
AD112
D E
M O
F L O
O R
P L A
N E
A S
T W
IN
G
S
T
N
D F
L R
H E
L E
M A
N O
M
IL
IT
A
R Y
R E
S E
R V
A T
IO
N
H O
N O
L U
L U
D
IS
T R
IC
T
B L D
G
R
O O
M
F
O R
T S
H A
F T
E R
H
I -5
J A
C O
B S
-A H
L J
V B
IS
H
O P
S T
S U
IT
E
H
O N
O L U
L U
H
I
J G
A N
O T
IS
I
R B
A L
IN
T O
N A
A H
L
C G
A Y
D O
S H
A U
G U
S T
W A
F
W A
-1 -D
-0
R T
A S
U B
M
IT
T A
L
O A
H U
H
I
R Y
J
1/8" = 1'-0"A6
ENLARGED DEMO PLAN EAST WING - 2ND
FLR
0 4' 8' 16' 0 4' 8' 16' 1/8" = 1'-0"A11
ENLARGED DEMO PLAN EAST WING - 1ST
FLR
C B A
MW EW
KEY PLAN
MAIN BUILDING
T R
U E
N
PLAN
NORTH
1 REMOVE EXST DOOR, DOOR FRAME, DOOR HARDWARE INCLUDING
THRESHOLD, AND WALL MOUNTED SIGNAGE
3 REMOVE EXST WINDOW FRAME AND WINDOW HARDWARE
5 REMOVE EXST PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINALS,
SINKS AND FAUCETS - SEE PLUMBING DRAWINGS
7 REMOVE EXST PARTITION AND BASE
8 REMOVE EXST TOILET ACCESSORIES
9 REMOVE EXST RESTROOM TOILET PARTITION
10 REMOVE EXST CERAMIC TILE FLOORING, WAINSCOT, BASE, AND 3" CONC
TOPPING
17 DEMO EXST CMU/CONC WALL
20 REMOVE EXST HANDRAIL, GUARDRAIL, AND BRACKETS
SHEET KEYNOTESSHEET KEYNOTES
A
M E
N D
M E
N T
J U
L Y
A
M E
N D
M E
N T
A
U G
A
M E
N D
M E
N T
A
U G
UP
GENERAL SHEET NOTES
1. COORDINATE DEMO WORK/EXTENT WITH NEW WORK.
2. FIELD VERIFY EXST DIMENSIONS AND CONDITIONS TO REMAIN AND PROTECT
FROM INADVERTENT DAMAGE BEFORE COMMENCING WITH DEMO WORK.
3. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATION AND
FIRE PROTECTION DRAWINGS FOR DEMOLITION REQUIREMENTS FOR EACH
DISCIPLINE.
4. HAZARDOUS MATERIALS SURVEYS HAVE BEEN CONDUCTED TO IDENTIFY
POTENTIALLY HAZARDOUS MATERIALS THAT ARE EXPECTED TO BE
DISTURBED DURING CONSTRUCTION. CONTRACTOR MUST
REQUEST/REVIEW THE HAZMAT SURVEY REPORT, CONDUCT THE HAZMAT
INVESTIGATION TO IDENTIFY QUANTITY/LOCATION TO MAKE THE HAZMAT
PLAN AS APPROPRIATE PRIOR TO THE WORK.
5. CONTRACTOR SCOPE OF WORK INCLUDE REMOVAL OF EXISTING CMU
WALLS FOR THE INSTALLATION OF NEW SHEET METAL DUCTWORK – BOTH
RECTANGULAR AND ROUND. CONTRACTOR TO COORDINATE WITH
MECHANICAL DRAWINGS.
6. CONTRACTOR IS TO REMOVE CMU WALLS FROM THE BOTTOM OF THE NEW
DUCTWORK UP TO THE CONCRETE SLAB OR CONCRETE BEAM ABOVE.
7. OPENINGS ARE TO REMAIN CLEAR OF EXISTING DOOR OPENINGS WHERE
NEW DUCTS INCROACH ON EXISTING DOOR LINTEL STRUCTURES.
8. CONTRACTOR SCOPE OF WORK INCLUDES NEW CHILLED WATER SUPPLY
AND RETURN LINES. LOCATIONS ARE TO BE COORDINATED WITH
MECHANICAL DRAWINGS.
9. SEE STRUCTURAL FOR INTERIOR CONCRETE WALL SUPPORT WHERE
EXISTING CMU DEMOLITION OCCURS. SEE A4/A-509
15C15D 16171819202122
D
E
F
1 1
D.7
22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3"
333 3 3
14' - 10 1/2"
8 8
5 5
8 8
171717
7 7
11 1
17 17
LEGEND
(E) DEMO WALL
(E) DEMO DOOR
(E) WALL TO REMAIN
(E) DEMO WINDOW
DEMO (E) RAISED FLOOR FLUSH WITH CORRIDOR CONCRETE SLAB
SNACK BAR
DRY STOR
CLEANERS
STOR
OFFICE STOR
JAN
BARBER
MEN
WOMEN
VEST
BN AID
STORAGE
AID TOILET
C O
R R
ID
O
R
EM STOR
EM STOR
EM STOR
EM STOR
CORRIDOR
SUPPLY
SUPPLY
SUPPLY
SUPPLY
1415D
D
4' - 6"
5' - 9"
10 1/2"
"1
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
B
IM
/U
S H
I_ D
U
S A
C E
M
D T
F
B u ild in g
/R
Y J H
M R
B
L D
G D
M M
A I.
rv t
/1
/2
:0
:1
A
M
AD113
D E
M O
F L O
O R
P L A
N B
A S
E M
E N
T
H E
L E
M A
N O
M
IL
IT
A
R Y
R E
S E
R V
A T
IO
N
H O
N O
L U
L U
D
IS
T R
IC
T
B L D
G
R
O O
M
F
O R
T S
H A
F T
E R
H
I -5
J A
C O
B S
-A H
L J
V B
IS
H
O P
S T
S U
IT
E
H
O N
O L U
L U
H
I
J G
A N
O T
IS
I
R B
A L
IN
T O
N A
A H
L
C G
A Y
D O
S H
A U
G U
S T
W A
F
W A
-1 -D
-0
R T
A S
U B
M
IT
T A
L
O A
H U
H
I
R Y
J
0 4' 8' 16'1/8" = 1'-0"A1
ENLARGED DEMO PLAN BASEMENT
C B A
MW EW
KEY PLAN
MAIN BUILDING
T R
U E
N
PLAN
NORTH
1/8" = 1'-0"H1
ENLARGED DEMO PLAN BASEMENT
0 4' 8' 16'
1 REMOVE EXST DOOR, DOOR FRAME, DOOR HARDWARE INCLUDING
THRESHOLD, AND WALL MOUNTED SIGNAGE
3 REMOVE EXST WINDOW FRAME AND WINDOW HARDWARE
5 REMOVE EXST PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINALS,
SINKS AND FAUCETS - SEE PLUMBING DRAWINGS
7 REMOVE EXST PARTITION AND BASE
8 REMOVE EXST TOILET ACCESSORIES
9 REMOVE EXST RESTROOM TOILET PARTITION
10 REMOVE EXST CERAMIC TILE FLOORING, WAINSCOT, BASE, AND 3" CONC
TOPPING
17 DEMO EXST CMU/CONC WALL
28 REMOVE EXST LOUVER. LOUVER FRAME, LOUVER HARDWARE
SHEET KEYNOTES
A
M E
N D
M E
N T
J U
L Y
A
M E
N D
M E
N T
A
U G
A
M E
N D
M E
N T
A
U G
GENERAL SHEET NOTES
1. COORDINATE DEMO WORK/EXTENT WITH NEW WORK.
2. FIELD VERIFY EXST DIMENSIONS AND CONDITIONS TO REMAIN AND PROTECT
FROM INADVERTENT DAMAGE BEFORE COMMENCING WITH DEMO WORK.
3. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATION AND
FIRE PROTECTION DRAWINGS FOR DEMOLITION REQUIREMENTS FOR EACH
DISCIPLINE.
4. HAZARDOUS MATERIALS SURVEYS HAVE BEEN CONDUCTED TO IDENTIFY
POTENTIALLY HAZARDOUS MATERIALS THAT ARE EXPECTED TO BE
DISTURBED DURING CONSTRUCTION. CONTRACTOR MUST
REQUEST/REVIEW THE HAZMAT SURVEY REPORT, CONDUCT THE HAZMAT
INVESTIGATION TO IDENTIFY QUANTITY/LOCATION TO MAKE THE HAZMAT
PLAN AS APPROPRIATE PRIOR TO THE WORK.
5. CONTRACTOR SCOPE OF WORK INCLUDE REMOVAL OF EXISTING CMU
WALLS FOR THE INSTALLATION OF NEW SHEET METAL DUCTWORK – BOTH
RECTANGULAR AND ROUND. CONTRACTOR TO COORDINATE WITH
MECHANICAL DRAWINGS.
6. CONTRACTOR IS TO REMOVE CMU WALLS FROM THE BOTTOM OF THE NEW
DUCTWORK UP TO THE CONCRETE SLAB OR CONCRETE BEAM ABOVE.
7. OPENINGS ARE TO REMAIN CLEAR OF EXISTING DOOR OPENINGS WHERE
NEW DUCTS INCROACH ON EXISTING DOOR LINTEL STRUCTURES.
8. CONTRACTOR SCOPE OF WORK INCLUDES NEW CHILLED WATER SUPPLY
AND RETURN LINES. LOCATIONS ARE TO BE COORDINATED WITH
MECHANICAL DRAWINGS.
9. SEE STRUCTURAL FOR INTERIOR CONCRETE WALL SUPPORT WHERE
EXISTING CMU DEMOLITION OCCURS. SEE A4/A-509
7 6 5 4 3 2 18
D
E
F
1 1
1 1
1 1
3333333
3 3 3 3 3 3
/A11 AD112
MATCHLINE
H
A
D
M A
T C
H L
IN
E
D.7
22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9"
232323
232323
AD213
A1
AD211
A1
4' - 2 1/2"
17 17 17
6' - 2"
1' - 6"
7' - 3"
171717
6 6
89A9B101112131415C15D
D
E
F
1 1
17 17
3 3 3 3 3
A
A
D
M A
T C
H L
IN
E
A
A
D
M A
T C
H L
IN
E
/A6 AD111
MATCHLINE
D.7
23' - 3" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3"
2"
23' - 3"
1 1 1
1 1
1 1
3 3 3
2"
AD213
H1
AD211
H1
17 17
8' - 10" 2' - 10"
8' - 2"
27 27 27 27
1 1
17 17
6 6
6 6
LEGEND
(E) DEMO WALL
(E) DEMO DOOR
(E) WALL TO REMAIN
(E) DEMO WINDOW
DEMO (E) RAISED FLOOR FLUSH WITH CORRIDOR CONCRETE SLAB
LOBBY
1ST SGT
ORDERLY
CO
TOILET
CO
ORDERLY
1ST SGR
TOILET
LOBBY
STAIR #6
CORRIDOR
STAIR #7
SDO
DAY RM
163STAIR
ARMS
ARMS
ARMS
ARMS
MAIL RM
MAILBOXES
169B
MAILBOXES
169A
STAIR
RE-ENLISTMENT
BN CO
CONFERENCE
CORRIDOR
BN XO
TOILET
CLO
CLO
BN XO
STORAGE
DRAFTER
R&U
A&R
MEN
WOMEN
VESTIBULE
179B
S2 SHOP
VENTILATION
JANITOR
CORRIDOR
CLO
CLO
RECEPTION
BN CSM
S3 SHOP
S3
S3
S3 OIC
VAULT
104B
BN COMSEC
104A
S4 SHOP
S4 OIC
S4 STOR
S1
S1 SHOP
S1 OIC
HALL
VESTIBULE
179A
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
B
IM
/U
S H
I_ D
U
S A
C E
M
D T
F
B u ild in g
/R
Y J H
M R
B
L D
G D
M M
A I.
rv t
/1
/2
:0
:2
A
M
AD114
D E
M O
F L O
O R
P L A
N
S T
F L R
S
E C
T
IO
N A
B
H E
L E
M A
N O
M
IL
IT
A
R Y
R E
S E
R V
A T
IO
N
H O
N O
L U
L U
D
IS
T R
IC
T
B L D
G
R
O O
M
F
O R
T S
H A
F T
E R
H
I -5
J A
C O
B S
-A H
L J
V B
IS
H
O P
S T
S U
IT
E
H
O N
O L U
L U
H
I
J G
A N
O T
IS
I
R B
A L
IN
T O
N A
A H
L
C G
A Y
D O
S H
A U
G U
S T
W A
F
W A
-1 -D
-0
R T
A S
U B
M
IT
T A
L
O A
H U
H
I
R Y
J
1/8" = 1'-0"A1
ENLARGED DEMO PLAN 1ST FLR -
SECTION A
1/8" = 1'-0"H1
ENLARGED DEMO PLAN 1ST FLR -
SECTION B
0 4' 8' 16'
0 4' 8' 16'
C B A
MW EW
KEY PLAN
MAIN BUILDING
T R
U E
N
PLAN
NORTH
1 REMOVE EXST DOOR, DOOR FRAME, DOOR HARDWARE INCLUDING
THRESHOLD, AND WALL MOUNTED SIGNAGE
3 REMOVE EXST WINDOW FRAME AND WINDOW HARDWARE
5 REMOVE EXST PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINALS,
SINKS AND FAUCETS - SEE PLUMBING DRAWINGS
7 REMOVE EXST PARTITION AND BASE
8 REMOVE EXST TOILET ACCESSORIES
9 REMOVE EXST RESTROOM TOILET PARTITION
10 REMOVE EXST CERAMIC TILE FLOORING, WAINSCOT, BASE, AND 3" CONC
TOPPING
17 DEMO EXST CMU/CONC WALL
20 REMOVE EXST HANDRAIL, GUARDRAIL, AND BRACKETS
23 REMOVE EXST ACOUSTICAL WALL PANELS
27 REMOVE EXST SERVICE WINDOW, WINDOW FRAME, AND WINDOW
HARDWARE
SHEET KEYNOTES
A
M E
N D
M E
N T
J U
L Y
A
M E
N D
M E
N T
A
U G
A
M E
N D
M E
N T
A
U G
1. COORDINATE DEMO WORK/EXTENT WITH NEW WORK.
2. FIELD VERIFY EXST DIMENSIONS AND CONDITIONS TO REMAIN AND PROTECT
FROM INADVERTENT DAMAGE BEFORE COMMENCING WITH DEMO WORK.
3. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATION AND
FIRE PROTECTION DRAWINGS FOR DEMOLITION REQUIREMENTS FOR EACH
DISCIPLINE.
4. HAZARDOUS MATERIALS SURVEYS HAVE BEEN CONDUCTED TO IDENTIFY
POTENTIALLY HAZARDOUS MATERIALS THAT ARE EXPECTED TO BE
DISTURBED DURING CONSTRUCTION. CONTRACTOR MUST
REQUEST/REVIEW THE HAZMAT SURVEY REPORT, CONDUCT THE HAZMAT
INVESTIGATION TO IDENTIFY QUANTITY/LOCATION TO MAKE THE HAZMAT
PLAN AS APPROPRIATE PRIOR TO THE WORK.
5. CONTRACTOR SCOPE OF WORK INCLUDE REMOVAL OF EXISTING CMU
WALLS FOR THE INSTALLATION OF NEW SHEET METAL DUCTWORK – BOTH
RECTANGULAR AND ROUND. CONTRACTOR TO COORDINATE WITH
MECHANICAL DRAWINGS.
6. CONTRACTOR IS TO REMOVE CMU WALLS FROM THE BOTTOM OF THE NEW
DUCTWORK UP TO THE CONCRETE SLAB OR CONCRETE BEAM ABOVE.
7. OPENINGS ARE TO REMAIN CLEAR OF EXISTING DOOR OPENINGS WHERE
NEW DUCTS INCROACH ON EXISTING DOOR LINTEL STRUCTURES.
8. CONTRACTOR SCOPE OF WORK INCLUDES NEW CHILLED WATER SUPPLY
AND RETURN LINES. LOCATIONS ARE TO BE COORDINATED WITH
MECHANICAL DRAWINGS.
9. SEE STRUCTURAL FOR INTERIOR CONCRETE WALL SUPPORT WHERE
EXISTING CMU DEMOLITION OCCURS. SEE A4/A-509
15C15D16171819202122
D
E
F
3 3 3 3 3 3 3
333333
17 17
H
A
D
M A
T C
H L
IN
E
D.7
22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3"
3' - 3"
6 3/8"
2' - 5 3/4"
4' - 6 1/4"
517177
1 1
2"
AD214
A1
AD212
A1
1 1 1 1 1 1 1 1 1
11111
17 17
6 6
LEGEND
(E) DEMO WALL
(E) DEMO DOOR
(E) WALL TO REMAIN
(E) DEMO WINDOW
DEMO (E) RAISED FLOOR FLUSH WITH CORRIDOR CONCRETE SLAB
NBC
TRAINING
TRAINING
TRAINING
NBC
TRAINING
TRAINING
TRAINING
TRAINING
CO
ORDERLY
1ST SGT
NBC
TRAINING
TRAINING
TRAINING
NBC
TEC
JANITOR
WOMEN
MEN
STORAGE
CO
ORDERLY
1ST SGT
CORRIDOR
CORRIDOR
TOILET
VESTIBULE
153A
VESTIBULE
153B
HALL
VENTILATION
TOILET
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
B
IM
/U
S H
I_ D
U
S A
C E
M
D T
F
B u ild in g
/R
Y J H
M R
B
L D
G D
M M
A I.
rv t
/1
/2
:0
:2
A
M
AD115
D E
M O
F L O
O R
P L A
N
S T
F L R
S
E C
T
IO
N C
H E
L E
M A
N O
M
IL
IT
A
R Y
R E
S E
R V
A T
IO
N
H O
N O
L U
L U
D
IS
T R
IC
T
B L D
G
R
O O
M
F
O R
T S
H A
F T
E R
H
I -5
J A
C O
B S
-A H
L J
V B
IS
H
O P
S T
S U
IT
E
H
O N
O L U
L U
H
I
J G
A N
O T
IS
I
R B
A L
IN
T O
N A
A H
L
C G
A Y
D O
S H
A U
G U
S T
W A
F
W A
-1 -D
-0
R T
A S
U B
M
IT
T A
L
O A
H U
H
I
R Y
J
1/8" = 1'-0"A1
ENLARGED DEMO PLAN 1ST FLR -
SECTION C
0 4' 8' 16'
C B A
MW EW
KEY PLAN
MAIN BUILDING
T R
U E
N
PLAN
NORTH
1 REMOVE EXST DOOR, DOOR FRAME, DOOR HARDWARE INCLUDING
THRESHOLD, AND WALL MOUNTED SIGNAGE
3 REMOVE EXST WINDOW FRAME AND WINDOW HARDWARE
5 REMOVE EXST PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINALS,
SINKS AND FAUCETS - SEE PLUMBING DRAWINGS
7 REMOVE EXST PARTITION AND BASE
8 REMOVE EXST TOILET ACCESSORIES
9 REMOVE EXST RESTROOM TOILET PARTITION
10 REMOVE EXST CERAMIC TILE FLOORING, WAINSCOT, BASE, AND 3" CONC
TOPPING
17 DEMO EXST CMU/CONC WALL
SHEET KEYNOTES
A
M E
N D
M E
N T
J U
L Y
A
M E
N D
M E
N T
A
U G
A
M E
N D
M E
N T
A
U G
GENERAL SHEET NOTES
1. COORDINATE DEMO WORK/EXTENT WITH NEW WORK.
2. FIELD VERIFY EXST DIMENSIONS AND CONDITIONS TO REMAIN AND PROTECT
FROM INADVERTENT DAMAGE BEFORE COMMENCING WITH DEMO WORK.
3. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATION AND
FIRE PROTECTION DRAWINGS FOR DEMOLITION REQUIREMENTS FOR EACH
DISCIPLINE.
4. HAZARDOUS MATERIALS SURVEYS HAVE BEEN CONDUCTED TO IDENTIFY
POTENTIALLY HAZARDOUS MATERIALS THAT ARE EXPECTED TO BE
DISTURBED DURING CONSTRUCTION. CONTRACTOR MUST
REQUEST/REVIEW THE HAZMAT SURVEY REPORT, CONDUCT THE HAZMAT
INVESTIGATION TO IDENTIFY QUANTITY/LOCATION TO MAKE THE HAZMAT
PLAN AS APPROPRIATE PRIOR TO THE WORK.
5. CONTRACTOR SCOPE OF WORK INCLUDE REMOVAL OF EXISTING CMU
WALLS FOR THE INSTALLATION OF NEW SHEET METAL DUCTWORK – BOTH
RECTANGULAR AND ROUND. CONTRACTOR TO COORDINATE WITH
MECHANICAL DRAWINGS.
6. CONTRACTOR IS TO REMOVE CMU WALLS FROM THE BOTTOM OF THE NEW
DUCTWORK UP TO THE CONCRETE SLAB OR CONCRETE BEAM ABOVE.
7. OPENINGS ARE TO REMAIN CLEAR OF EXISTING DOOR OPENINGS WHERE
NEW DUCTS INCROACH ON EXISTING DOOR LINTEL STRUCTURES.
8. CONTRACTOR SCOPE OF WORK INCLUDES NEW CHILLED WATER SUPPLY
AND RETURN LINES. LOCATIONS ARE TO BE COORDINATED WITH
MECHANICAL DRAWINGS.
9. SEE STRUCTURAL FOR INTERIOR CONCRETE WALL SUPPORT WHERE
EXISTING CMU DEMOLITION OCCURS. SEE A4/A-509
7 6 5 4 3 2 18
D
E
F
3 3 3 3 3 3 3
333333
1 1 1 1 1 1 1 1
/A6 AD112
MATCHLINE
H
A
D
M A
T C
H L
IN
E
17 17
17 17 17
7 7 7 7
7 7
D.7
22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9"
5 5 5 5 5 5
12 12
555555
5 5
AD213
A1
AD211
A1
17 1717
5' - 0"3' - 1 1/2" 5' - 0"
1 1
1 1 17 17
17 17 17
6 6
6 6
89A9B101112131415C15D
D
E
F
1 1 1 1
1 1
3333333
3 3 3 3 3 3 3
A
A
D
M A
T C
H L
IN
E
A
A
D
M A
T C
H L
IN
E
17 17 17 17
17 17
7 7
D.7
17 17
23' - 3" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3" 23' - 5"
5 555
55 55
AD213
H1
AD211
H1
1 1 1
1 1
1 1
4' - 1 1/2"
171717171717
17 17 17
17 17
6 6
17 17
6 6
LEGEND
(E) DEMO WALL
(E) DEMO DOOR
(E) WALL TO REMAIN
(E) DEMO WINDOW
DEMO (E) RAISED FLOOR FLUSH WITH CORRIDOR CONCRETE SLAB
STAIR #7
READING
EM
EM
EM
EM
EM
NCO
TOILET
EM
TV RM
STAIR #6
JAN
LAUNDRY
WOMENS
LATRINE
VEST
262A
EM
EM
EM
EM
EM
EM
EM
EM
VEST
262B
EM
EM
EM
EM
EM
EM
DAY RM
EM
EM
EM
EM
EM
EM
EM
EM
NCO
TOILET
EM
EM
EM
EM
EM
EM
VENTILATION
MENS LATRINE
NCO
EM
VEST
271B
JAN
272VEST
271A
TOILET
271C
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
B
IM
/U
S H
I_ D
U
S A
C E
M
D T
F
B u ild in g
/R
Y J H
M R
B
L D
G D
M M
A I.
rv t
/1
/2
:0
:2
A
M
AD116
D E
M O
F L O
O R
P L A
N
N D
F L R
S
E C
T
IO
N A
B
H E
L E
M A
N O
M
IL
IT
A
R Y
R E
S E
R V
A T
IO
N
H O
N O
L U
L U
D
IS
T R
IC
T
B L D
G
R
O O
M
F
O R
T S
H A
F T
E R
H
I -5
J A
C O
B S
-A H
L J
V B
IS
H
O P
S T
S U
IT
E
H
O N
O L U
L U
H
I
J G
A N
O T
IS
I
R B
A L
IN
T O
N A
A H
L
C G
A Y
D O
S H
A U
G U
S T
W A
F
W A
-1 -D
-0
R T
A S
U B
M
IT
T A
L
O A
H U
H
I
R Y
J
1/8" = 1'-0"A1
ENLARGED DEMO PLAN 2ND FLR -
SECTION A
1/8" = 1'-0"H1
ENLARGED DEMO PLAN 2ND FLR -
SECTION B
0 4' 8' 16'
0 4' 8' 16'
C B A
MW EW
KEY PLAN
MAIN BUILDING
T R
U E
N
PLAN
NORTH
1 REMOVE EXST DOOR, DOOR FRAME, DOOR HARDWARE INCLUDING
THRESHOLD, AND WALL MOUNTED SIGNAGE
3 REMOVE EXST WINDOW FRAME AND WINDOW HARDWARE
5 REMOVE EXST PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINALS,
SINKS AND FAUCETS - SEE PLUMBING DRAWINGS
7 REMOVE EXST PARTITION AND BASE
8 REMOVE EXST TOILET ACCESSORIES
9 REMOVE EXST RESTROOM TOILET PARTITION
10 REMOVE EXST CERAMIC TILE FLOORING, WAINSCOT, BASE, AND 3" CONC
TOPPING
12 REMOVE EXST COUNTERTOP, CABINETS, AND FIXTURES
17 DEMO EXST CMU/CONC WALL
20 REMOVE EXST HANDRAIL, GUARDRAIL, AND BRACKETS
SHEET KEYNOTES
A
M E
N D
M E
N T
J U
L Y
A
M E
N D
M E
N T
A
U G
A
M E
N D
M E
N T
A
U G
1. COORDINATE DEMO WORK/EXTENT WITH NEW WORK.
2. FIELD VERIFY EXST DIMENSIONS AND CONDITIONS TO REMAIN AND PROTECT
FROM INADVERTENT DAMAGE BEFORE COMMENCING WITH DEMO WORK.
3. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATION AND
FIRE PROTECTION DRAWINGS FOR DEMOLITION REQUIREMENTS FOR EACH
DISCIPLINE.
4. HAZARDOUS MATERIALS SURVEYS HAVE BEEN CONDUCTED TO IDENTIFY
POTENTIALLY HAZARDOUS MATERIALS THAT ARE EXPECTED TO BE
DISTURBED DURING CONSTRUCTION. CONTRACTOR MUST
REQUEST/REVIEW THE HAZMAT SURVEY REPORT, CONDUCT THE HAZMAT
INVESTIGATION TO IDENTIFY QUANTITY/LOCATION TO MAKE THE HAZMAT
PLAN AS APPROPRIATE PRIOR TO THE WORK.
5. CONTRACTOR SCOPE OF WORK INCLUDE REMOVAL OF EXISTING CMU
WALLS FOR THE INSTALLATION OF NEW SHEET METAL DUCTWORK – BOTH
RECTANGULAR AND ROUND. CONTRACTOR TO COORDINATE WITH
MECHANICAL DRAWINGS.
6. CONTRACTOR IS TO REMOVE CMU WALLS FROM THE BOTTOM OF THE NEW
DUCTWORK UP TO THE CONCRETE SLAB OR CONCRETE BEAM ABOVE.
7. OPENINGS ARE TO REMAIN CLEAR OF EXISTING DOOR OPENINGS WHERE
NEW DUCTS INCROACH ON EXISTING DOOR LINTEL STRUCTURES.
8. CONTRACTOR SCOPE OF WORK INCLUDES NEW CHILLED WATER SUPPLY
AND RETURN LINES. LOCATIONS ARE TO BE COORDINATED WITH
MECHANICAL DRAWINGS.
9. SEE STRUCTURAL FOR INTERIOR CONCRETE WALL SUPPORT WHERE
EXISTING CMU DEMOLITION OCCURS. SEE A4/A-509
15C15D16171819202122
D
E
F
3 3 3 3 3 3 3
33333
7 7 7
H
A
D
M A
T C
H L
IN
E
D.7
2 1/2"
22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3"
555555
12 12
555555
10 10
10 555
AD212
A1
AD214
A1
1 1 1 1 1 1 1 1 1 1 1 1
11111111
17 17
17 17
17 17
6 6
LEGEND
(E) DEMO WALL
(E) DEMO DOOR
(E) WALL TO REMAIN
(E) DEMO WINDOW
DEMO (E) RAISED FLOOR FLUSH WITH CORRIDOR CONCRETE SLAB
EM
EM
EM
EM
EM
EM
VENTILATION
MENS LATRINE
JAN
EM
EM
EM
EM
EM
NCO
TOILET
CORRIDOR
EM
EM
EM
EM
DAY RM
EM
EM
EM
EM
VESTIBULE
248A
VESTIBULE
248B
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
B
IM
/U
S H
I_ D
U
S A
C E
M
D T
F
B u ild in g
/R
Y J H
M R
B
L D
G D
M M
A I.
rv t
/1
/2
:0
:2
A
M
AD117
D E
M O
F L O
O R
P L A
N
N D
F L R
S
E C
T
IO
N C
H E
L E
M A
N O
M
IL
IT
A
R Y
R E
S E
R V
A T
IO
N
H O
N O
L U
L U
D
IS
T R
IC
T
B L D
G
R
O O
M
F
O R
T S
H A
F T
E R
H
I -5
J A
C O
B S
-A H
L J
V B
IS
H
O P
S T
S U
IT
E
H
O N
O L U
L U
H
I
J G
A N
O T
IS
I
R B
A L
IN
T O
N A
A H
L
C G
A Y
D O
S H
A U
G U
S T
W A
F
W A
-1 -D
-0
R T
A S
U B
M
IT
T A
L
O A
H U
H
I
R Y
J
1/8" = 1'-0"A1
ENLARGED DEMO PLAN 2ND FLR -
SECTION C
0 4' 8' 16'
C B A
MW EW
KEY PLAN
MAIN BUILDING
T R
U E
N
PLAN
NORTH
1 REMOVE EXST DOOR, DOOR FRAME, DOOR HARDWARE INCLUDING
THRESHOLD, AND WALL MOUNTED SIGNAGE
3 REMOVE EXST WINDOW FRAME AND WINDOW HARDWARE
5 REMOVE EXST PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINALS,
SINKS AND FAUCETS - SEE PLUMBING DRAWINGS
7 REMOVE EXST PARTITION AND BASE
8 REMOVE EXST TOILET ACCESSORIES
9 REMOVE EXST RESTROOM TOILET PARTITION
10 REMOVE EXST CERAMIC TILE FLOORING, WAINSCOT, BASE, AND 3" CONC
TOPPING
12 REMOVE EXST COUNTERTOP, CABINETS, AND FIXTURES
17 DEMO EXST CMU/CONC WALL
SHEET KEYNOTES
A
M E
N D
M E
N T
J U
L Y
A
M E
N D
M E
N T
A
U G
A
M E
N D
M E
N T
A
U G
2. FIELD VERIFY EXST DIMENSIONS AND CONDITIONS TO REMAIN AND PROTECT
FROM INADVERTENT DAMAGE BEFORE COMMENCING WITH DEMO WORK.
3. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATION AND
FIRE PROTECTION DRAWINGS FOR DEMOLITION REQUIREMENTS FOR EACH
DISCIPLINE.
4. HAZARDOUS MATERIALS SURVEYS HAVE BEEN CONDUCTED TO IDENTIFY
POTENTIALLY HAZARDOUS MATERIALS THAT ARE EXPECTED TO BE
DISTURBED DURING CONSTRUCTION. CONTRACTOR MUST
REQUEST/REVIEW THE HAZMAT SURVEY REPORT, CONDUCT THE HAZMAT
INVESTIGATION TO IDENTIFY QUANTITY/LOCATION TO MAKE THE HAZMAT
PLAN AS APPROPRIATE PRIOR TO THE WORK.
5. CONTRACTOR SCOPE OF WORK INCLUDE REMOVAL OF EXISTING CMU
WALLS FOR THE INSTALLATION OF NEW SHEET METAL DUCTWORK – BOTH
RECTANGULAR AND ROUND. CONTRACTOR TO COORDINATE WITH
MECHANICAL DRAWINGS.
6. CONTRACTOR IS TO REMOVE CMU WALLS FROM THE BOTTOM OF THE NEW
DUCTWORK UP TO THE CONCRETE SLAB OR CONCRETE BEAM ABOVE.
7. OPENINGS ARE TO REMAIN CLEAR OF EXISTING DOOR OPENINGS WHERE
NEW DUCTS INCROACH ON EXISTING DOOR LINTEL STRUCTURES.
8. CONTRACTOR SCOPE OF WORK INCLUDES NEW CHILLED WATER SUPPLY
AND RETURN LINES. LOCATIONS ARE TO BE COORDINATED WITH
MECHANICAL DRAWINGS.
9. SEE STRUCTURAL FOR INTERIOR CONCRETE WALL SUPPORT WHERE
EXISTING CMU DEMOLITION OCCURS. SEE A4/A-509
7 6 5 4 3 2 18
D
E
F
1 1
1 1
3333 3 3 3
3 3 3
17 17
17 17 17
17 17
17 17
17 7
H
A
D
M A
T C
H L
IN
E
D.7
22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9"
5 5 5 5 55
5 5 5 5 55
5 5
AD213
A1
AD211
A1
1 1
1' - 8" 8' - 4"5' - 2"
17 17
17 17
6 6
89A9B101112131415C15D
D
E
F
1 1 1 1
1 1
3333 3 3 3
3 3 3 3 3 3 3
A
A
D
M A
T C
H L
IN
E
A
A
D
M A
T C
H L
IN
E
17 17 17 17
7 7
D.7
"7
1' - 3 5/8" 3' - 3"
2" 23' - 3" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3" 2" 23' - 3"
5 5 5 5
AD213
H1
AD211
H1
1 1 1
1 1
1 1
1 1
1 1
17 17 17 17
171717
17171717
6 6 6 6
6 6 6
17 17
LEGEND
(E) DEMO WALL
(E) DEMO DOOR
(E) WALL TO REMAIN
(E) DEMO WINDOW
DEMO (E) RAISED FLOOR FLUSH WITH CORRIDOR CONCRETE SLAB
STAIR #7
READING
EM
EM
EM
EM
EM
NCO
TOILET
EM
TV RM
STAIR #6
JAN
LAUNDRY
WOMENS
LATRINE
EM
EM
EM
EM
EM
EM
EM
EM
VESTIBULE
326A
VEST
362B
EM
EM
EM
EM
EM
NCO
TOILET
EM
EM
DAY RM
EM
EM
EM
EM
EM
EM
EM
NCO
TOILET
EM
EM
EM
EM
EM
EM
VENTILATION
MENS LATRINE
EM
VEST
371B
JAN
VEST
371A
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
B
IM
/U
S H
I_ D
U
S A
C E
M
D T
F
B u ild in g
/R
Y J H
M R
B
L D
G D
M M
A I.
rv t
/1
/2
:0
:2
A
M
AD118
D E
M O
F L O
O R
P L A
N
R D
F L R
S
E C
T
IO
N A
B
H E
L E
M A
N O
M
IL
IT
A
R Y
R E
S E
R V
A T
IO
N
H O
N O
L U
L U
D
IS
T R
IC
T
B L D
G
R
O O
M
F
O R
T S
H A
F T
E R
H
I -5
J A
C O
B S
-A H
L J
V B
IS
H
O P
S T
S U
IT
E
H
O N
O L U
L U
H
I
J G
A N
O T
IS
I
R B
A L
IN
T O
N A
A H
L
C G
A Y
D O
S H
A U
G U
S T
W A
F
W A
-1 -D
-0
R T
A S
U B
M
IT
T A
L
O A
H U
H
I
R Y
J
1/8" = 1'-0"A1
ENLARGED DEMO PLAN 3RD FLR -
SECTION A
1/8" = 1'-0"H1
ENLARGED DEMO PLAN 3RD FLR -
SECTION B
0 4' 8' 16'
0 4' 8' 16'
C B A
MW EW
KEY PLAN
MAIN BUILDING
T R
U E
N
PLAN
NORTH
1 REMOVE EXST DOOR, DOOR FRAME, DOOR HARDWARE INCLUDING
THRESHOLD, AND WALL MOUNTED SIGNAGE
3 REMOVE EXST WINDOW FRAME AND WINDOW HARDWARE
5 REMOVE EXST PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINALS,
SINKS AND FAUCETS - SEE PLUMBING DRAWINGS
7 REMOVE EXST PARTITION AND BASE
8 REMOVE EXST TOILET ACCESSORIES
9 REMOVE EXST RESTROOM TOILET PARTITION
10 REMOVE EXST CERAMIC TILE FLOORING, WAINSCOT, BASE, AND 3" CONC
TOPPING
12 REMOVE EXST COUNTERTOP, CABINETS, AND FIXTURES
17 DEMO EXST CMU/CONC WALL
20 REMOVE EXST HANDRAIL, GUARDRAIL, AND BRACKETS
SHEET KEYNOTES
A
M E
N D
M E
N T
J U
L Y
A
M E
N D
M E
N T
A
U G
A
M E
N D
M E
N T
A
U G
2. FIELD VERIFY EXST DIMENSIONS AND CONDITIONS TO REMAIN AND PROTECT
FROM INADVERTENT DAMAGE BEFORE COMMENCING WITH DEMO WORK.
3. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATION AND
FIRE PROTECTION DRAWINGS FOR DEMOLITION REQUIREMENTS FOR EACH
DISCIPLINE.
4. HAZARDOUS MATERIALS SURVEYS HAVE BEEN CONDUCTED TO IDENTIFY
POTENTIALLY HAZARDOUS MATERIALS THAT ARE EXPECTED TO BE
DISTURBED DURING CONSTRUCTION. CONTRACTOR MUST
REQUEST/REVIEW THE HAZMAT SURVEY REPORT, CONDUCT THE HAZMAT
INVESTIGATION TO IDENTIFY QUANTITY/LOCATION TO MAKE THE HAZMAT
PLAN AS APPROPRIATE PRIOR TO THE WORK.
5. CONTRACTOR SCOPE OF WORK INCLUDE REMOVAL OF EXISTING CMU
WALLS FOR THE INSTALLATION OF NEW SHEET METAL DUCTWORK – BOTH
RECTANGULAR AND ROUND. CONTRACTOR TO COORDINATE WITH
MECHANICAL DRAWINGS.
6. CONTRACTOR IS TO REMOVE CMU WALLS FROM THE BOTTOM OF THE NEW
DUCTWORK UP TO THE CONCRETE SLAB OR CONCRETE BEAM ABOVE.
7. OPENINGS ARE TO REMAIN CLEAR OF EXISTING DOOR OPENINGS WHERE
NEW DUCTS INCROACH ON EXISTING DOOR LINTEL STRUCTURES.
8. CONTRACTOR SCOPE OF WORK INCLUDES NEW CHILLED WATER SUPPLY
AND RETURN LINES. LOCATIONS ARE TO BE COORDINATED WITH
MECHANICAL DRAWINGS.
9. SEE STRUCTURAL FOR INTERIOR CONCRETE WALL SUPPORT WHERE
EXISTING CMU DEMOLITION OCCURS. SEE A4/A-509
LEGEND
(E) DEMO WALL
(E) DEMO DOOR
(E) WALL TO REMAIN
(E) DEMO WINDOW
DEMO (E) RAISED FLOOR FLUSH WITH CORRIDOR CONCRETE SLAB
15C15D16171819202122
D
E
F
3 3 3 3 3 3 3
33333
17 17
H
A
D
M A
T C
H L
IN
E
D.7
22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3" 2"
2 1/2"5' - 8 1/2"
5' - 8"
5 5 5 5 5 5
5 5 5 5 5 5
17 17 17 17
AD212
A1
AD214
A1
1 1 1 1 1 1 1 1
1111111
17 17
17 17
3 3 6
6 6
EM
EM
EM
EM
EM
EM
EM
EM
DAY RM
EM
EM
VENTILATION
MENS LATRINE
EM
EM
EM
EM
EM
NCO
TOILET
EM
EM
EM
EM
JAN
VEST
348A
VEST
348B
CORRIDOR
US Army Corps of Engineers ®
SHEET ID
U S
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .