A.2.11.3 W9128A22R0016 Am-0003 Drawings.pdf

PDF 32 MB Posted

Attached to
FY22 OMA Multi-Domain Task Force (MDTF) #3, Building 300, Helemano Military Reservation
Solicitation number
W9128A22R0016
Issued by

About this file

This announcement constitutes a solicitation for the U.S. Army Corps of Engineers, Honolulu District to renovate and repair Building 300 for the Multi-Domain Task Force #3 at Helemano Military Reservation. The project scope includes a new elevator, UPS, emergency generator, utility extensions, communications infrastructure, site improvements, lighting, parking, fencing and landscaping. The estimated period of performance is 912 calendar days. The acquisition will use lowest priced technically acceptable evaluation criteria and be awarded as a firm-fixed-price construction contract between $50 million to $100 million to the offeror with the lowest price after assessing experience, past performance, technical approach, and price. Offerors must register in the System for Award Management and check for any changes to the solicitation, which will not be issued on compact disc unless necessary.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAALAA UKA P UPUK E A ROAD

ANDRADE ROAD

ANDRADE ROAD

300A

2039 2037

DS

DS

DS

DS

DSDS

DS

DS

DS

DS

DS

DSDS

DSDS

DS

MOTOR POOL

SE

RVIC

E M

EM

B

ER

SUP

POR

T C E

NTER

FIRE

STATION

PMO/CCO

CD

C

P A A L A A U K A P U P U K E A R O A D

A N D R A D E R O A D

A N D R A D E R O A D

HIHI CT

IUKA CT

P A

A L A

A U

K A

P U

P U

K E

A R

O A

D

KA NI'O CT

KAI EHU CT

LOLOHE CT

APONO CT

ALA HIA CT

PUNI H ELE CT

NAU ANE

C

T

O

PU

HUE

C T

KOMOHANA

C

T

AKOAKOA

CT

M U

A R

A O

D

KOLOKO CT

K U

A P

A L

E R

O A

D

POKOL E CT

PAHALE CT

HAINA

CT

K E

K O

N A

R O

A D

HI KINA

CT

K U

A H

A

LE

C T

KAWELO

CT

P

AALA

A U

KA

P

U P

U K

E A

R O

A D

M A

L O

H I

R O

A D

AHUNA COURT

N A W

A O

C O U

R

T

R O

M E

R O

R O

A D

R O M

E R

O R

D

300A

SMSC P

ARKING

SMSC PKG

PMO PKG

204820222016

2102 2104

21 9

23 0

21082107

2113 2115

20022004

2130 2132

20652063

21852

20562054

2039 2037

20432045

2044 2042

203 1

2024 2026

1 2

9 4

P-1

P-2

T-7

WADING

POOL

P O

OL

DS

DS

DS

DS

DS

DS

DS

DS

DS

DS

DS

DS

DS

DSDS

DS

PROJECT LOCATION

PAALAA UKA PUPUKEA RD

K A

M E

H A

M E

H A

H W

Y

WAIANAE

NORTH SHORE

WAIPAHU

WAHIAWA

OAHU

KANEOHE

HONOLULU

PROJECT LOCATION

HELEMANO

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

VOLUME:

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B

IM

/U

S H

I_ D

U

S A

C E

M

D T

F

B u ild in g

/R

Y J H

M R

B

L D

G D

M M

A I.

rv t

/2

/2

:5

:2

P

M

G-001

C O

V E

R S

H E

E T

H E

L E

M A

N O

M

IL

IT

A

R Y

R E

S E

R V

A T

IO

N

H O

N O

L U

L U

D

IS

T R

IC

T

B L D

G

R

O O

M

F

O R

T S

H A

F T

E R

H

I -5

J A

C O

B S

-A H

L J

V B

IS

H

O P

S T

S U

IT

E

H

O N

O L U

L U

H

I

J G

A N

O T

IS

I

R B

A L

IN

T O

N A

A H

L

C G

A Y

D O

S H

J U

L Y

W A

F

W A

-1 -D

-0

R T

A S

U B

M

IT

T A

L

O A

H U

H

I

R Y

J

HONOLULU DISTRICT

W9128A21F0031

W9128A-19-D-0011

JULY 2022

HELEMANO MILITARY RESERVATION,

OAHU, HI

RY006490J

FY22 MDTF #3 BUILDING 300

PROJECT TEAM

ARCHITECT: AHL

STRUCTURAL: JACOBS

FIRE PROTECTION: JACOBS

CIVIL: JACOBS

MECHANICAL: JACOBS

PLUMBING: JACOBS

GEOTECHNICAL: MFA

COST ESTIMATOR: JUNO

TELECOMMUNICATIONS: JACOBS

ELECTRICAL: JACOBS

SURVEYOR: CPS

HAZMAT: MHN

SUSTAINABILITY: JACOBS

Controlled by: CEPOH Controlled by: CEPOH CUI Category(ies): DEFENSE Limited Dissemination Control: FEDCON

POC: CEPOH, (808) 835-4629

LOCATION MAP SITE PLAN

SCALE: NTS

SCALE: NTS SCALE: NTS

T R

U E

N

PLAN

NORTH

T R

U E

N

PLAN

NORTH

T R

U E

N

PLAN

NORTH

VICINITY MAP AND HAUL ROUTE

HAUL ROUTE

A

M E

N D

M E

N T

J U

L Y

A

M E

N D

M E

N T

J U

L Y

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B

IM

/U

S H

I_ D

U

S A

C E

M

D T

F

B u ild in g

/R

Y J H

M R

B

L D

G D

M M

A I.

rv t

/2

/2

:1

:3

P

M

G-002

S H

E E

T I

N D

E X

H E

L E

M A

N O

M

IL

IT

A

R Y

R E

S E

R V

A T

IO

N

H O

N O

L U

L U

D

IS

T R

IC

T

B L D

G

R

O O

M

F

O R

T S

H A

F T

E R

H

I -5

J A

C O

B S

-A H

L J

V B

IS

H

O P

S T

S U

IT

E

H

O N

O L U

L U

H

I

J G

A N

O T

IS

I

R B

A L

IN

T O

N A

A H

L

C G

A Y

D O

S H

J U

L Y

W A

F

W A

-1 -D

-0

R T

A S

U B

M

IT

T A

L

O A

H U

H

I

R Y

J

SHEET INDEX 1

SHEET NO SHEET NAME

P-118 PLUMBING ABOVE 1ST FLOOR PLAN - MAIN BUILDING - SECTION C

P-121 PLUMBING 2ND FLOOR PLANS - MAIN BUILDING - SECTION A & B

P-122 PLUMBING 2ND FLOOR PLAN - MAIN BUILDING - SECTION C

P-131 PLUMBING 3RD FLOOR PLANS - MAIN BUILDING - SECTION A & B

P-132 PLUMBING 3RD FLOOR PLAN - MAIN BUILDING - SECTION C

P-401 PLUMBING ENLARGED BELOW 1ST FLOOR PLAN - MIDDLE WING

P-402 PLUMBING ENLARGED ABOVE 1ST FLOOR PLANS - MIDDLE WING

P-403 PLUMBING ENLARGED 1ST FLOOR PLANS - EAST WING

P-404 PLUMBING ENLARGED 2ND FLOOR PLANS - EAST WING

P-405 PLUMBING ENLARGED BELOW BASEMENT FLOOR PLAN - MAIN BUILDING -

SECTION C

P-406 PLUMBING ENLARGED ABOVE BASEMENT FLOOR PLANS - MAIN BUILDING -

SECTION C

P-407 PLUMBING ENLARGED ABOVE 1ST FLOOR PLANS - MAIN BUILDING - SECTION C

P-408 PLUMBING ENLARGED BELOW 1ST FLOOR PLAN - MAIN BUILDING - SECTION A

P-409 PLUMBING ENLARGED ABOVE 1ST FLOOR PLANS - MAIN BUILDING - SECTION A

P-410 PLUMBING ENLARGED 2ND FLOOR PLANS - MAIN BUILDING - SECTION A

P-411 PLUMBING ENLARGED 2ND FLOOR PLANS - MAIN BUILDING - SECTION C

P-412 PLUMBING ENLARGED 3RD FLOOR PLANS - MAIN BUILDING - SECTION A

P-413 PLUMBING ENLARGED 3RD FLOOR PLANS - MAIN BUILDING - SECTION C

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-602 PLUMBING SCHEDULES

P-901 PLUMBING PIPING DIAGRAMS - SANITARY

P-902 PLUMBING PIPING DIAGRAMS - SANITARY

P-903 PLUMBING PIPING DIAGRAMS - SANITARY

P-904 PLUMBING PIPING DIAGRAMS - DOMESTIC WATER

P-905 PLUMBING PIPING DIAGRAMS - DOMESTIC WATER

SHEET INDEX 1

SHEET NO SHEET NAME

AI203 INTERIOR ELEVATIONS - EAST WING

AI204 INTERIOR ELEVATIONS - EAST WING

AI205 INTERIOR ELEVATIONS

AI206 INTERIOR ELEVATIONS

AI207 INTERIOR ELEVATIONS

AI208 INTERIOR ELEVATIONS

AI209 INTERIOR ELEVATIONS

AI210 INTERIOR ELEVATIONS

AI211 INTERIOR ELEVATIONS

AI212 INTERIOR ELEVATIONS

AI213 INTERIOR ELEVATIONS

AF111 FLOOR FINISH PLAN MIDDLE WING

AF112 FLOOR FINISH PLAN EAST WING - 1ST & 2ND FLR

AF113 FLOOR FINISH PLAN BASEMENT

AF114 FLOOR FINISH PLAN 1ST FLR - SECTION A&B

AF115 FLOOR FINISH PLAN 1ST FLR - SECTION C

AF116 FLOOR FINISH PLAN 2ND FLR - SECTION A&B

AF117 FLOOR FINISH PLAN 2ND FLR - SECTION C

AF118 FLOOR FINISH PLAN 3RD FLR - SECTION A&B

AF119 FLOOR FINISH PLAN 3RD FLR - SECTION C

AF121 SIGNAGE PLAN MIDDLE WING

AF122 SIGNAGE PLAN EAST WING - 1ST & 2ND FLR

AF123 SIGNAGE PLAN BASEMENT

AF124 SIGNAGE PLAN 1ST FLR - SECTION A&B

AF125 SIGNAGE PLAN 1ST FLR - SECTION C

AF126 SIGNAGE PLAN 2ND FLR - SECTION A&B

AF127 SIGNAGE PLAN 2ND FLR - SECTION C

AF128 SIGNAGE PLAN 3RD FLR - SECTION A&B

AF129 SIGNAGE PLAN 3RD FLR - SECTION C

AF501 SIGNAGE TYPE DETAILS

AF502 SIGNAGE TYPE DETAILS

AF503 SIGNAGE TYPE DETAILS

AF504 TYPICAL SIGNAGE MOUNTING HEIGHTS

AF506 TYPICAL MOUNTING HEIGHTS

AF601 COLOR & MATERIAL SCHEDULE

AF602 ROOM FINISH SCHEDULE

AF603 ROOM FINISH SCHEDULE

AF604 ROOM FINISH SCHEDULE

AF605 SIGNAGE SCHEDULE

AF606 SIGNAGE SCHEDULE

AF607 SIGNAGE SCHEDULE

INTERIORS

IF101 OVERALL BASEMENT & 1ST FLR FF&E PLAN

IF103 OVERALL 2ND & 3RD FLR FF&E PLAN

IF111 FF&E PLAN MIDDLE WING

IF112 FF&E PLAN EAST WING - 1ST & 2ND FLOOR

IF113 FF&E PLAN BASEMENT - SECTION C

IF114 FF&E PLAN 1ST FLR - SECTION A&B

IF115 FF&E PLAN 1ST FLR - SECTION C

IF116 FF&E PLAN 2ND FLR - SECTION A&B

IF117 FF&E PLAN 2ND FLR - SECTION C

IF118 FF&E PLAN 3RD FLR - SECTION A&B

IF119 FF&E PLAN 3RD FLR - SECTION C

IF601 FURNITURE, FIXTURES & EQUIPMENT (FF&E) LEGEND

FIRE PROTECTION

F-001 FIRE ALARM/MASS NOTIFICATION LEGEND

F-002 FIRE PROTECTION LEGEND

FD101 MIDDLE WING, FIRE PROTECTION DEMO PLAN

FD102 EAST WING, 1ST & 2ND FLOOR FIRE PROTECTION DEMO PLAN

FD103 MAIN BUILDING, BASEMENT FIRE PROTECTION DEMO PLAN

FD104 MAIN BUILDING, 1ST FLOOR FIRE PROTECTION DEMO PLAN

FD105 MAIN BUILDING, 1ST FLOOR FIRE PROTECTION DEMO PLAN

FD106 MAIN BUILDING, 2ND FLOOR FIRE PROTECTION DEMO PLAN

FD107 MAIN BUILDING, 2ND FLOOR FIRE PROTECTION DEMO PLAN

FD108 MAIN BUILDING, 3RD FLOOR FIRE PROTECTION DEMO PLAN

FD109 MAIN BUILDING, 3RD FLOOR FIRE PROTECTION DEMO PLAN

FA101 MIDDLE WING, FIRE ALARM PLAN

FA102 EAST WING, 1ST & 2ND FLOOR FIRE ALARM PLAN

FA103 MAIN BUILDING, BASEMENT FIRE ALARM PLAN

FA104 MAIN BUILDING, 1ST FLOOR FIRE ALARM PLAN

FA105 MAIN BUILDING, 1ST FLOOR FIRE ALARM PLAN

FA106 MAIN BUILDING, 2ND FLOOR FIRE ALARM PLAN

FA107 MAIN BUILDING, 2ND FLOOR FIRE ALARM PLAN

FA108 MAIN BUILDING, 3RD FLOOR FIRE ALARM PLAN

FA109 MAIN BUILDING, 3RD FLOOR FIRE ALARM PLAN

FA501 FIRE ALARM DETAILS

FA502 FIRE ALARM DETAILS

FA601 FIRE ALARM RISER DIAGRAM

FA602 FIRE ALARM RISER DIAGRAM

FX001 OVERALL BASEMENT AND 1ST FLOOR FIRE SPRINKLER PLAN

FX002 OVERALL 2ND AND 3RD FLOOR FIRE SPRINKLER PLAN

FX101 MIDDLE WING, FIRE SPRINKLER PLAN

FX102 EAST WING, 1ST & 2ND FLOOR FIRE SPRINKLER PLAN

FX103 MAIN BUILDING, BASEMENT FIRE SPRINKLER PLAN

FX104 MAIN BUILDING, 1ST FLOOR FIRE SPRINKLER PLAN

FX105 MAIN BUILDING, 1ST FLOOR FIRE SPRINKLER PLAN

FX106 MAIN BUILDING, 2ND FLOOR FIRE SPRINKLER PLAN

FX107 MAIN BUILDING, 2ND FLOOR FIRE SPRINKLER PLAN

FX108 MAIN BUILDING, 3RD FLOOR FIRE SPRINKLER PLAN

FX109 MAIN BUILDING, 3RD FLOOR FIRE SPRINKLER PLAN

FX501 FIRE SPRINKLER DETAILS

FX502 FIRE SPRINKLER DETAILS

PLUMBING

P-001 PLUMBING LEGEND, NOTES, AND ABBREVIATIONS

PD101 PLUMBING DEMO 1ST FLOOR PLAN - MIDDLE WING

PD102 PLUMBING DEMO FLOOR PLANS - EAST WING

PD103 PLUMBING DEMO BASEMENT PLAN - MAIN BUILDING - SECTION C

PD104 PLUMBING DEMO 1ST FLOOR PLANS - MAIN BUILDING - SECTION A & B

PD105 PLUMBING DEMO 1ST FLOOR PLAN - MAIN BUILDING - SECTION C

PD121 PLUMBING DEMO 2ND FLOOR PLANS - MAIN BUILDING - SECTION A & B

PD122 PLUMBING DEMO 2ND FLOOR PLAN - MAIN BUILDING SECTION C

PD131 PLUMBING DEMO 3RD FLOOR PLANS - MAIN BUILDING SECTION A& B

PD132 PLUMBING DEMO 3RD FLOOR PLAN - MAIN BUILDING - SECTION C

P-101 PLUMBING OVERALL BASEMENT & 1ST FLOOR PLAN

P-102 PLUMBING OVERALL 2ND & 3RD FLOOR PLAN

P-111 PLUMBING BELOW 1ST FLOOR PLAN - MIDDLE WING

P-112 PLUMBING ABOVE 1ST FLOOR PLAN - MIDDLE WING

P-113 PLUMBING BELOW 1ST FLOOR PLAN - EAST WING

P-114 PLUMBING ABOVE FLOOR PLANS - EAST WING

P-115 PLUMBING BASEMENT FLOOR PLANS - MAIN BUILDING - SECTION C

P-116 PLUMBING BELOW 1ST FLOOR PLANS - MAIN BUILDING - SECTION A & B

P-117 PLUMBING ABOVE 1ST FLOOR PLANS - MAIN BUILDING - SECTION A & B

SHEET INDEX 1

SHEET NO SHEET NAME

S-302 CONCRETE WALL SECTIONS

S-303 BRIDGE SECTIONS

S-401 ELEVATOR ELEVATIONS & PLANS

S-402 RAMP ELEVATIONS

S-501 TYPICAL CONCRETE DETAILS

S-502 TYPICAL CONCRETE DETAILS

S-503 DETAILS

S-504 DETAILS

S-505 DETAILS

S-506 DETAILS

S-507 DETAILS

S-508 BRIDGE DETAILS

S-509 ARMS ROOM DETAILS

S-510 ARMS ROOM CABINET ANCHORAGE

ARCHITECTURAL

AD101 OVERALL BASEMENT & 1ST FLR DEMO PLAN

AD102 OVERALL 2ND & 3RD FLR DEMO PLAN

AD103 OVERALL ROOF DEMO PLAN

AD111 DEMO FLOOR PLAN MIDDLE WING

AD112 DEMO FLOOR PLAN EAST WING - 1ST & 2ND FLR

AD113 DEMO FLOOR PLAN BASEMENT

AD114 DEMO FLOOR PLAN 1ST FLR - SECTION A&B

AD115 DEMO FLOOR PLAN 1ST FLR - SECTION C

AD116 DEMO FLOOR PLAN 2ND FLR - SECTION A&B

AD117 DEMO FLOOR PLAN 2ND FLR - SECTION C

AD118 DEMO FLOOR PLAN 3RD FLR - SECTION A&B

AD119 DEMO FLOOR PLAN 3RD FLR - SECTION C

AD120 DEMO FLOOR PLAN ROOF - SECTION B

AD121 DEMO REFLECTED CEILING PLAN MIDDLE WING

AD122 DEMO REFLECTED CEILING PLAN EAST WING - 1ST & 2ND FLR

AD123 DEMO REFLECTED CEILING PLAN BASEMENT

AD124 DEMO REFLECTED CEILING PLAN 1ST FLR - SECTION A&B

AD125 DEMO REFLECTED CEILING PLAN 1ST FLR - SECTION C

AD126 DEMO REFLECTED CEILING PLAN 2ND FLR - SECTION A&B

AD127 DEMO REFLECTED CEILING PLAN 2ND FLR - SECTION C

AD128 DEMO REFLECTED CEILING PLAN 3RD FLR - SECTION A&B

AD129 DEMO REFLECTED CEILING PLAN 3RD FLR - SECTION C

AD211 DEMO EXTERIOR ELEVATIONS

AD212 DEMO EXTERIOR ELEVATIONS

AD213 DEMO EXTERIOR ELEVATIONS

AD214 DEMO EXTERIOR ELEVATIONS

A-101 OVERALL BASEMENT & 1ST FLR PLAN

A-102 OVERALL 2ND & 3RD FLR PLAN

A-105 OVERALL ROOF PLAN

A-111 FLOOR PLAN MIDDLE WING

A-112 FLOOR PLAN EAST WING - 1ST & 2ND FLR

A-113 FLOOR PLAN BASEMENT - SECTION B&C

A-114 FLOOR PLAN 1ST FLR - SECTION A&B

A-115 FLOOR PLAN 1ST FLR - SECTION C

A-116 FLOOR PLAN 2ND FLR - SECTION A&B

A-117 FLOOR PLAN 2ND FLR - SECTION C

A-118 FLOOR PLAN 3RD FLR - SECTION A&B

A-119 FLOOR PLAN 3RD FLR - SECTION C

A-120 FLOOR PLAN ROOF - SECTION B

A-121 REFLECTED CEILING PLAN MIDDLE WING

A-122 REFLECTED CEILING PLAN EAST WING - 1ST& 2ND FLR

A-123 REFLECTED CEILING PLAN BASEMENT

A-124 REFLECTED CEILING PLAN 1ST FLR - SECTION A&B

A-125 REFLECTED CEILING PLAN 1ST FLR - SECTION C

A-126 REFLECTED CEILING PLAN 2ND FLR - SECTION A&B

A-127 REFLECTED CEILING PLAN 2ND FLR - SECTION C

A-128 REFLECTED CEILING PLAN 3RD FLR - SECTION A&B

A-129 REFLECTED CEILING PLAN 3RD FLR - SECTION C

A-201 OVERALL EXTERIOR ELEVATIONS

A-211 EXTERIOR ELEVATIONS MIDDLE WING

A-212 EXTERIOR ELEVATIONS EAST WING

A-213 EXTERIOR ELEVATIONS

A-214 EXTERIOR ELEVATIONS

A-215 EXTERIOR ELEVATIONS

A-216 EXTERIOR ELEVATIONS

A-301 BUILDING SECTIONS EAST WING

A-302 BUILDING SECTIONS MIDDLE WING

A-303 BUILDING SECTIONS

A-304 BUILDING SECTIONS

A-310 WALL SECTIONS

A-311 WALL SECTIONS

A-401 DETAILED PLANS MIDDLE WING & EAST WING

A-402 DETAILED RESTROOM PLANS

A-403 DETAILED RESTROOM, CONFERENCE RM, BREAK RM. AND WELLNESS RM. PLANS

A-411 DETAILED PLANS, ELEVATIONS - ELEVATOR

A-412 DETAILED PLANS, SECTIONS, AND DETAILS - EXTERIOR RAMP

A-413 DETAILED PLANS, SECTIONS, AND DETAILS - STAIRS

A-414 DETAILED PLANS, SECTIONS, AND DETAILS - STAIRS

A-415 DETAILED PLANS, SECTIONS, AND DETAILS - STAIRS

A-416 DETAILED PLANS, SECTIONS, AND DETAILS - STAIRS

A-420 AIR BARRIER DIAGRAMS

A-421 AIR BARRIER DIAGRAMS

A-422 AIR BARRIER DIAGRAMS

A-501 PARTITION TYPES

A-502 DETAILS - DOOR

A-503 DETAILS - DOOR

A-504 DETAILS - DOOR

A-505 DETAILS - WINDOW

A-506 DETAILS

A-507 DETAILS

A-508 DETAILS

A-509 DETAILS

A-510 DETAILS - COLUMNS

A-511 DETAILS - COLUMNS

A-512 DETAILS - COLUMNS

A-513 DETAILS - RAILINGS AND ELEVATOR

A-514 DETAILS - RAILINGS AND STAIRS

A-515 DETAILS - RAILINGS AND STAIRS

A-516 DETAILS - ROOF

A-517 DETAILS - BRIDGE

A-518 DETAILS - TOILET & BATHROOM

A-601 DOOR SCHEDULE

A-602 DOOR SCHEDULE

A-603 DOOR SCHEDULE

A-604 WINDOW SCHEDULE, DOOR AND WINDOW TYPES

AI201 INTERIOR ELEVATIONS - MIDDLE WING

AI202 INTERIOR ELEVATIONS - MIDDLE WING

SHEET INDEX 1

SHEET NO SHEET NAME

GENERAL

G-001 COVER SHEET

G-002 SHEET INDEX

G-003 SHEET INDEX

G-004 ABBREVIATIONS, SYMBOLS, LOCATION & VICINITY MAP, GENERAL NOTES

G-005 CODE ANALYSIS

G-006 ROOM OCCUPANT LOAD SCHEDULE

G-007 ROOM OCCUPANT LOAD SCHEDULE

G-101 MIDDLE WING, LIFE SAFETY PLAN

G-102 EAST WING, 1ST & 2ND FLOOR LIFE SAFETY PLAN

G-103 MAIN BUILDING, BASEMENT LIFE SAFETY PLAN

G-104 MAIN BUILDING, 1ST FLOOR LIFE SAFETY PLAN

G-105 MAIN BUILDING, 1ST FLOOR LIFE SAFETY PLAN

G-106 MAIN BUILDING, 2ND FLOOR LIFE SAFETY PLAN

G-107 MAIN BUILDING, 2ND FLOOR LIFE SAFETY PLAN

G-108 MAIN BUILDING, 3RD FLOOR LIFE SAFETY PLAN

G-109 MAIN BUILDING, 3RD FLOOR LIFE SAFETY PLAN

GI101 CODE COMPLIANCE PLAN

GS101 OVERALL BUILDING PHASING PLAN

GS102 CONTROLLED AND SECURE AREA BOUNDARY - BASEMENT AND 1ST FLOOR PLAN

GS103 CONTROLLED AND SECURE AREA BOUNDARY - 2ND AND 3RD FLOOR PLAN

GS104 OVERALL SITE PHASING PLAN

GS105 PHASE 1 AND 2 BUILDING PLAN

GS106 PHASE 3 BUILDING PLAN

SURVEY

V-101 TOPOGRAPHIC SURVEY

V-102 TOPOGRAPHIC SURVEY

V-103 TOPOGRAPHIC SURVEY

V-104 TOPOGRAPHIC SURVEY

V-105 TOPOGRAPHIC SURVEY

V-106 TOPOGRAPHIC SURVEY

GEOTECHNICAL

B-101 BORING LOCATION PLAN

B-102 BORING LOGS

CIVIL

C-001 GENERAL NOTES AND SYMBOLS

C-002 GENERAL NOTES

CD101 OVERALL DEMOLITION PLAN

CS101 OVERALL SITE PLAN

CS102 SITE PLAN - AREA 1

CG101 OVERALL GRADING AND DRAINAGE PLAN

CG102 GRADING AND DRAINAGE PLAN - AREA 1

CG103 GRADING AND DRAINAGE PLAN - AREA 2

CG104 EROSION AND SEDIMENT CONTROL PLAN

CG201 STORM DRAIN PROFILES

CU101 OVERALL UTILITY PLAN

CU102 UTILITY PLAN - AREA 2

CU201 8-IN FIRE WATER LINE PROFILE

CU202 4-IN FIRE WATER LINE PROFILE

CP501 PAVEMENT AND DRIVEWAY DETAILS

CS501 SITE DETAILS

CS502 CHAIN LINK FENCE DETAILS

CS503 CHAIN LINK GATE DETAILS

CS504 CHAIN LINK GATE DETAILS

CG501 EROSION AND SEDIMENT CONTROL DETAILS

CG502 DRAINAGE DETAILS

CU501 UTILITY DETAILS

CU502 UTILITY DETAILS

CU503 UTILITY DETAILS

CU504 UTILITY DETAILS

CU505 UTILITY DETAILS

CU506 UTILITY DETAILS

CU507 UTILITY DETAILS

LANDSCAPING

L-001 LANDSCAPE PLANTING NOTES

LP101 LANDSCAPE PLANTING PLAN

LP501 PLANTING DETAILS

LP502 PLANTING DETAILS

STRUCTURAL

S-001 STRUCTURAL GENERAL NOTES

S-002 STRUCTURAL GENERAL NOTES, TESTS, AND INSPECTIONS

S-003 OVERALL LIVE LOAD PLAN - BASEMENT

S-004 OVERALL LIVE LOAD PLAN - 1ST FLOOR

S-005 OVERALL LIVE LOAD PLAN - 2ND FLOOR

S-006 OVERALL LIVE LOAD PLAN - 3RD FLOOR

SD101 OVERALL FOUNDATION & 1ST FLOOR DEMO PLAN

SD102 OVERALL 2ND & 3RD FLOOR FRAMING DEMO PLAN

SD103 OVERALL ROOF FRAMING DEMO PLAN

SD111 STRUCTURAL DEMO PLAN - MIDDLE WING, FOUNDATION

SD112 STRUCTURAL DEMO PLAN - MIDDLE WING, 1ST FLOOR

SD113 STRUCTURAL DEMO PLAN - MIDDLE WING, ROOF

SD114 STRUCTURAL DEMO PLAN - EAST WING, FOUNDATION & 2ND FLOOR & ROOF

SD121 STRUCTURAL DEMO PLAN - SECTION A & B, FOUNDATION

SD122 STRUCTURAL DEMO PLAN - SECTION C, BASEMENT

SD131 STRUCTURAL DEMO PLAN - SECTION A & B, 1ST FLOOR

SD132 STRUCTURAL DEMO PLAN - SECTION C, 1ST FLOOR

SD141 STRUCTURAL DEMO PLAN - SECTION A & B, 2ND FLOOR

SD142 STRUCTURAL DEMO PLAN - SECTION C, 2ND FLOOR

SD151 STRUCTURAL DEMO PLAN - SECTIONS A & B, 3RD FLOOR

SD152 STRUCTURAL DEMO PLAN - SECTION C, 3RD FLOOR

SD161 STRUCTURAL DEMO PLAN - SECTION B, ROOF

S-101 OVERALL FOUNDATION & 1ST FLOOR PLAN

S-102 OVERALL 2ND & 3RD FLOOR FRAMING PLAN

S-103 OVERALL ROOF FRAMING PLAN

S-111 STRUCTURAL PLAN - MIDDLE WING, FOUNDATION

S-112 STRUCTURAL PLAN - MIDDLE WING, 1ST FLOOR

S-113 STRUCTURAL PLAN - MIDDLE WING, ROOF

S-114 STRUCTURAL PLAN - EAST WING, FOUNDATION & 2ND FLOOR & ROOF

S-121 STRUCTURAL PLAN - SECTION A & B, FOUNDATION

S-122 STRUCTURAL PLAN - SECTION C, BASEMENT

S-131 STRUCTURAL PLAN - SECTION A & B, 1ST FLOOR

S-132 STRUCTURAL PLAN - SECTION C, 1ST FLOOR

S-141 STRUCTURAL PLAN - SECTION A & B, 2ND FLOOR

S-142 STRUCTURAL PLAN - SECTION C, 2ND FLOOR

S-151 STRUCTURAL PLAN - SECTIONS A & B, 3RD FLOOR

S-152 STRUCTURAL PLAN - SECTION C, 3RD FLOOR

S-161 STRUCTURAL PLAN - SECTION A & B, ROOF

S-201 CONCRETE WALL ELEVATIONS

S-202 CONCRETE WALL ELEVATIONS

S-203 CONCRETE WALL ELEVATIONS

S-204 CONCRETE WALL ELEVATIONS

S-301 CONCRETE WALL SECTIONS

A

M E

N D

M E

N T

J U

L Y

A

M E

N D

M E

N T

J U

L Y

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B

IM

/U

S H

I_ D

U

S A

C E

M

D T

F

B u ild in g

/R

Y J H

M R

B

L D

G D

M M

A I.

rv t

/2

/2

:1

:3

P

M

G-003

S H

E E

T I

N D

E X

H E

L E

M A

N O

M

IL

IT

A

R Y

R E

S E

R V

A T

IO

N

H O

N O

L U

L U

D

IS

T R

IC

T

B L D

G

R

O O

M

F

O R

T S

H A

F T

E R

H

I -5

J A

C O

B S

-A H

L J

V B

IS

H

O P

S T

S U

IT

E

H

O N

O L U

L U

H

I

J G

A N

O T

IS

I

C G

A Y

D O

S H

A H

L

C G

A Y

D O

S H

J U

L Y

W A

F

W A

-1 -D

-0

R T

A S

U B

M

IT

T A

L

O A

H U

H

I

R Y

J

SHEET INDEX 2

SHEET NO SHEET NAME

E-401 ENLARGED POWER PLANS (MIDDLE WING & EAST WING)

E-402 ENLARGED POWER PLANS (MAIN BUILDING)

E-403 ENLARGED POWER PLANS (MAIN BUILDING)

E-404 ENLARGED POWER PLANS (SITE)

E-501 ELECTRICAL DETAILS

E-502 ELECTRICAL DETAILS

E-503 ELECTRICAL DETAILS

E-504 LIGHTNING PROTECTION SYSTEM DETAILS

E-505 ELECTRICAL DETAILS

E-506 DETAILS

E-601 SINGLE LINE DIAGRAM - NORMAL POWER PHASE 1

E-602 SINGLE LINE DIAGRAM - EMERGENCY POWER PHASE 1

E-603 SINGLE LINE DIAGRAM - NORMAL POWER PHASE 2

E-604 SINGLE LINE DIAGRAM - EMERGENCY POWER PHASE 2

E-605 TYPICAL LIGHTING CONTROL WIRING DIAGRAMS

E-701 MECHANICAL EQUIPMENT CONNECTION SCHEDULE

E-702 LUMINAIRE AND FEEDER SCHEDULES

E-703 LIGHTING CONTROL MATRIX AND SEQUENCE OF OPERATION

E-801 PANEL SCHEDULES

E-802 PANEL SCHEDULES

E-803 PANEL SCHEDULES

E-804 PANEL SCHEDULES

E-805 PANEL SCHEDULES

E-806 PANEL SCHEDULES

E-807 PANEL SCHEDULES

E-808 PANEL SCHEDULES

E-809 PANEL SCHEDULES

E-810 PANEL SCHEDULES

E-811 PANEL SCHEDULES

E-812 PANEL SCHEDULES

E-813 PANEL SCHEDULES

E-814 PANEL SCHEDULES

TELECOMMUNICATIONS

T-001 TELECOM LEGEND, ABBREVIATIONS AND GENERAL NOTES

T-002 BUILDING CABLING SYSTEM LABLING MATRIX

TY001 SECURITY LEGEND, ABBREVIATIONS AND GENERAL NOTES

TS101 SITE TELECOMMUNICATIONS PLAN

TD101 OVERALL DEMO TELECOM PLAN - BASEMENT

TD102 OVERALL DEMO TELECOM PLAN - 1ST FLOOR

TD103 OVERALL DEMO TELECOM PLAN - 2ND FLOOR

TD104 OVERALL DEMO TELECOM PLAN - 3RD FLOOR

TD111 FLOOR PLAN MIDDLE WING - 1ST FLOOR COMMUNICATIONS DEMO

TD112 FLOOR PLAN SECTION EAST WING - 1ST & 2ND FLOOR COMMUNICATIONS DEMO

TD113 FLOOR PLAN SECTION C - BASEMENT COMMUNICATIONS DEMO

TD114 FLOOR PLAN SECTION A & B - 1ST FLOOR COMMUNICATIONS DEMO

TD115 FLOOR PLAN SECTION C - 1ST FLOOR COMMUNICATIONS

TD116 FLOOR PLAN SECTION A & B - 2ND FLOOR COMMUNICATIONS

TD117 FLOOR PLAN SECTION C - 2ND FLOOR COMMUNICATIONS DEMO

TD118 FLOOR PLAN SECTION A & B - 3RD FLOOR COMMUNICATIONS DEMO

TD119 FLOOR PLAN SECTION C - 3RD FLOOR COMMUNICATIONS DEMO

T-101 OVERALL BASEMENT FLOOR COMMUNICATIONS PLAN

T-102 OVERALL 1ST FLOOR COMMUNICATIONS PLAN

T-103 OVERALL 2ND FLOOR COMMUNICATIONS PLAN

T-104 OVERALL 3RD FLOOR COMMUNICATIONS PLAN

T-111 FLOOR PLAN MIDDLE WING - 1ST FLOOR COMMUNICATIONS

T-112 FLOOR PLAN SECTION EAST WING - 1ST & 2ND FLOOR COMMUNICATIONS

T-113 FLOOR PLAN SECTION C - BASEMENT COMMUNICATIONS

T-114 FLOOR PLAN SECTION A & B - 1ST FLOOR COMMUNICATIONS

T-115 FLOOR PLAN SECTION C - 1ST FLOOR COMMUNICATIONS

T-116 FLOOR PLAN SECTION A & B - 2ND FLOOR COMMUNICATIONS

T-117 FLOOR PLAN SECTION C - 2ND FLOOR COMMUNICATIONS

T-118 FLOOR PLAN SECTION A & B - 3RD FLOOR COMMUNICATIONS

T-119 FLOOR PLAN SECTION C - 3RD FLOOR COMMUNICATIONS

TY111 FLOOR PLAN MIDDLE WING - 1ST FLOOR SECURITY

TY112 FLOOR PLAN SECTION EAST WING - 1ST & 2ND FLOOR SECURITY

TY113 FLOOR PLAN SECTION C - BASEMENT SECURITY

TY114 FLOOR PLAN SECTION A & B - 1ST FLOOR SECURITY

TY115 FLOOR PLAN SECTION C - 1ST FLOOR SECURITY

TY116 FLOOR PLAN SECTION A & B - 2ND FLOOR SECURITY

TY117 FLOOR PLAN SECTION C - 2ND FLOOR SECURITY

TY118 FLOOR PLAN SECTION A & B - 3RD FLOOR SECURITY

TY119 FLOOR PLAN SECTION C - 3RD FLOOR SECURITY

T-401 ENLARGED TELECOM PLANS

T-402 ENLARGED TELECOM PLANS

T-403 CABINET ELEVATIONS

T-404 CABINET ELEVATIONS

T-405 CABINET ELEVATIONS

T-406 CABINET ELEVATIONS

T-407 CABINET ELEVATIONS

T-408 CABINET ELEVATIONS

T-409 CABINET ELEVATIONS

T-410 CABINET ELEVATIONS

T-411 CABINET ELEVATIONS

T-412 CABINET ELEVATIONS

T-501 DETAILS

T-502 DETAILS

T-503 DETAILS

T-504 DETAILS

T-505 DETAILS

T-506 DETAILS

T-507 DETAILS

T-508 DETAILS

T-509 DETAILS

T-510 DETAILS

T-511 DETAILS

T-512 DETAILS

T-513 DETAILS

T-601 PARTIAL TELECOM RISER DIAGRAM

T-602 PARTIAL TELECOM RISER DIAGRAM

T-603 PARTIAL TELECOM RISER DIAGRAM

T-604 GROUNDING AND BONDING RISER DIAGRAM

T-605 CATV RISER DIAGRAM

T-606 CATV RISER DIAGRAM

T-607 CATV RISER DIAGRAM

SHEET INDEX 2

SHEET NO SHEET NAME

MECHANICAL

M-001 HVAC COVER SHEET

M-002 HVAC GENERAL NOTES

MD101 HVAC OVERALL BASEMENT & 1ST FLOOR DEMO PLAN

MD102 HVAC OVERALL 2ND & 3RD FLOOR DEMO PLAN

MD111 HVAC DEMO PLANS MIDDLE WING

MD112 HVAC DEMO PLANS EAST WING

MD113 HVAC DEMO BASEMENT FLOOR PLAN MAIN BUILDING SECTION C

MD114 HVAC DEMO 1ST FLOOR PLAN MAIN BUILDING SECTION A & B

MD115 HVAC DEMO 1ST FLOOR PLAN MAIN BUILDING SECTION C

MD121 HVAC DEMO 2ND FLOOR PLAN MAIN BUILDING SECTION A & B

MD122 HVAC DEMO 2ND FLOOR PLAN MAIN BUILDING SECTION C

MD131 HVAC DEMO 3RD FLOOR PLAN MAIN BUILDING SECTION A & B

MD132 HVAC DEMO 3RD FLOOR MAIN BUILDING SECTION C

M-101 HVAC OVERALL BASEMENT & 1ST FLOOR PLAN

M-102 HVAC OVERALL 2ND & 3RD FLOOR PLAN

M-111 HVAC PLAN MIDDLE WING

M-112 HVAC PLANS EAST WING

M-113 HVAC BASEMENT FLOOR PLAN MAIN BUILDING

M-114 HVAC 1ST FLOOR PLAN MAIN BUILDING SECTION A& B

M-115 HVAC 1ST FLOOR MAIN BUILDING SECTION C

M-121 HVAC 2ND FLOOR PLAN MAIN BUILDING SECTION A& B

M-122 HVAC 2ND FLOOR PLAN MAIN BUILDING SECTION C

M-131 HVAC 3RD FLOOR PLAN MAIN BUILDING SECTION A& B

M-132 HVAC 3RD FLOOR PLAN MAIN BUILDING SECTION C

M-401 ENLARGED MECH YARD & MECH ROOMS

M-402 HVAC ENLARGED MECH ROOMS

MP111 HVAC PIPING PLAN MIDDLE WING

MP112 HVAC PIPING PLAN EAST WING

MP113 HVAC PIPING MAIN BUILDING BASEMENT SECTION A& B

MP114 HVAC PIPING PLAN MAIN BUILDING BASEMENT SECTION C

MP115 HVAC PIPING MAIN BUILDING 1ST FLOOR SECTION A& B

MP116 HVAC PIPING MAIN BUILDING 1ST FLOOR SECTION C

MP121 HVAC PIPING MAIN BUILDING 2ND FLOOR SECTION A& B

MP122 HVAC PIPING MAIN BUILDING 2ND FLOOR SECTION C

MP131 HVAC PIPING MAIN BUILDING 3RD FLOOR SECTION A& B

MP132 HVAC PIPING MAIN BUILDING 3RD FLOOR SECTION C

M-501 DETAILS

M-502 DETAILS

M-503 DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-603 MECHANICAL SCHEDULES

M-604 MECHANICAL SCHEDULES

M-605 MECHANICAL SCHEDULES

M-612 CHILLED WATER PIPING DIAGRAM

M-621 CONTROL DIAGRAMS

M-701 CONTROLS

M-702 CONTROLS

M-703 CONTROLS

M-704 CONTROLS

M-705 CONTROLS

M-706 CONTROLS

M-707 CONTROLS

ELECTRICAL

E-001 ELECTRICAL LEGEND, ABBREVIATIONS, AND GENERAL NOTES

ES101 ELECTRICAL SITE PLAN

ED101 OVERALL DEMO ELECTRICAL PLAN - BASEMENT

ED102 OVERALL DEMO ELECTRICAL PLAN - 1ST FLOOR

ED103 OVERALL DEMO ELECTRICAL PLAN - 2ND FLOOR

ED104 OVERALL DEMO ELECTRICAL PLAN - 3RD FLOOR

ED111 POWER DEMO PLAN - MIDDLE WING

ED112 POWER DEMO PLAN EAST WING - 1ST & 2ND FLOOR

ED113 POWER DEMO PLAN SECTION C - BASEMENT

ED114 POWER DEMO PLAN SECTION A & B - 1ST FLOOR

ED115 POWER DEMO PLAN SECTION C - 1ST FLOOR

ED116 POWER DEMO PLAN SECTION A & B - 2ND FLOOR

ED117 POWER DEMO PLAN SECTION C - 2ND FLOOR

ED118 POWER DEMO PLAN SECTION A & B 3RD FLOOR

ED119 POWER DEMO PLAN SECTION C - 3RD FLOOR

ED121 LIGHTING DEMO PLAN - MIDDLE WING

ED122 LIGHTING DEMO PLAN - EAST WING

ED123 LIGHTING DEMO PLAN SECTION C - BASEMENT

ED124 LIGHTING DEMO PLAN SECTIONS A & B - 1ST FLOOR

ED125 LIGHTING DEMO PLAN SECTION C - 1ST FLOOR

ED126 LIGHTING DEMO PLAN SECTIONS A & B - 2ND FLOOR

ED127 LIGHTING DEMO PLAN SECTION C - 2ND FLOOR

ED128 LIGHTING DEMO PLAN SECTIONS A & B - 3RD FLOOR

ED129 LIGHTING DEMO PLAN SECTION C - 3RD FLOOR

ED601 DEMOLITION SINGLE LINE DIAGRAM (PHASE 1)

ED602 DEMOLITION SINGLE LINE DIAGRAM (PHASE 2)

E-101 OVERALL BASEMENT ELECTRICAL PLAN

E-102 OVERALL 1ST FLOOR ELECTRICAL PLAN

E-103 OVERALL 2ND FLOOR ELECTRICAL PLAN

E-104 OVERALL 3RD FLOOR ELECTRICAL PLAN

E-111 POWER PLAN - MIDDLE WING

E-112 POWER PLANS - EAST WING

E-113 POWER PLAN SECTION C - BASEMENT

E-114 POWER PLAN SECTION A & B - 1ST FLOOR

E-115 POWER PLAN SECTION C - 1ST FLOOR

E-116 POWER PLAN SECTION A & B - 2ND FLOOR

E-117 POWER PLAN SECTION C - 2ND FLOOR

E-118 POWER PLAN SECTION A & B - 3RD FLOOR

E-119 POWER PLAN SECTION C - 3RD FLOOR

E-121 LIGHTING PLAN - MIDDLE WING

E-122 LIGHTING PLAN - EAST WING

E-123 LIGHTING PLAN SECTION C - BASEMENT

E-124 LIGHTING PLAN SECTION A & B - 1ST FLOOR

E-125 LIGHTING PLAN SECTION C - 1ST FLOOR

E-126 LIGHTING PLAN SECTION A & B - 2ND FLOOR

E-127 LIGHTING PLAN SECTION C - 2ND FLOOR

E-128 LIGHTING PLAN SECTION A & B - 3RD FLOOR

E-129 LIGHTING PLAN SECTION C - 3RD FLOOR

E-130 OVERALL GROUNDING PLAN

E-131 GROUNDING PLAN - MIDDLE WING

E-132 GROUNDING PLAN - EAST WING

E-133 GROUNDING PLAN - SECTION C

E-134 GROUNDING PLAN - SECTION A & B

E-140 OVERALL ROOF LIGHTNING PROTECTION PLAN

E-141 LIGHTNING PROTECTION PLAN - MIDDLE WING

E-142 LIGHTNING PROTECTION PLAN - EAST WING

E-143 LIGHTNING PROTECTION PLAN - SECTION C

E-144 LIGHTNING PROTECTION PLAN - SECTION A & B

A

M E

N D

M E

N T

J U

L Y

A

M E

N D

M E

N T

J U

L Y

A/C AIR CONDITION

AFF ABOVE FINISHED FLOOR

ALT ALTERNATE

ALUM ALUMINIUM

ANOD ANODIZE

APROX APPROXIMATE

A

BD BOARD

BLDG BUILDING

BM BEAM

BRK BRICK

BOT BOTTOM

BR BEDROOM

CAB CABINET

CEM CEMENT

CEM BD CEMENT BOARD

CER CERAMIC

CG CORNER GUARD

CL / ℄ CENTERLINE

CLG CEILING

CLOS CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONN CONNECT

CONT CONTINUE

CORR CORRIDOR

CQ CHARGE OF QUARTERS

CR CLOTHES ROD

CT CERAMIC TILE

D DEEP OR DEPTH

DBL DOUBLE

DEMO DEMOLITION

DET DETAIL

DIA DIAMETER

DISP DISPENSER

DR DOOR

DS DOWNSPOUT

B

C

D

E EAST

EA EACH

EFS EXTERIOR FINISH SYSTEM

EL ELEVATION

ELEC ELECTRICAL

EMR ELEVATOR MACHINE ROOM

EQ EQUAL

EQUIP EQUIPMENT

EXST EXISTING

EXT EXTERIOR

E

FD FLOOR DRAIN

FEC FIRE EXTINGUISHER CABINET

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND EQUIPMENT

FIN FINISH

FIN FLOR FINISH FLOOR

FLG FLOORING

FLR FLOOR

FOF FACE OF FINISH

FR FRAME

FT FEET / FOOT

GSB GYPSUM SHEATHING BOARD

GYP BD GYPSUM BOARD

GWB GYPSUM WALLBOARD

H/HT HEIGHT

HDW HARDWARE

HM HOLLOW METAL

HMF HOLLOW METAL FRAME

HORIZ HORIZONTAL

INCL INCLUDED

INSUL INSULATION

INT INTERIOR

JAN JANITOR

KIT KITCHEN

LAM LAMINATE

LAV LAVATORY

LR LIVING ROOM

LT LIGHT

LTG LIGHTING

MATL MATERIAL

MAX MAXIMUM

MBH MOP BROOM HOLDER

MC MEDICINE CABINET

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MFR MANUFACTURER

MIN MINIMUM

MR MIRROR

MO MASONRY OPENING

MR MOISTURE RESISTENT

MTD MOUNTED

MTL METAL

MULL MULLION

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OC ON CENTER

OPNG OPENING

PLAS LAM PLASTIC LAMINATE

PLYWD PLYWOOD

PR PAIR

PT PAINT

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER

AND RECEPTACLE

PTN PARTITION

PTR PAPER TOWEL RECEPTACLE

F

G - CONTINUED

H

I

J

K

L

M

N

O

QTY QUANTITY

R RADIUS

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

REF REFERENCE / REFRIGERATOR

REG REGISTER

REQ REQUIRE

REQD REQUIRED

REV REVISION

RFG ROOFING

RF RESILIENT FLOORING

RFB RADIO FREQUENCY BARRIER

RH ROBE HOOK

RM ROOM

S SOUTH

SC SOLID CORE

SCHED SCHEDULE

SCR SHOWER CURTAIN ROD

SCRN SCREEN

SECT SECTION

SF SQUARE FEET

SGL SINGLE

SHR SHOWER

SHT SHEET

SIM SIMILAR

SL SLOPE

SLDG SLIDING

SND SANITARY NAPKIN DISPOSAL

SQ SQUARE

SST STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STOR STORAGE

STRUC STRUCTURAL

SUSP CLG SUSPENDED CEILING

SYMM SYMMETRICAL

SYS SYSTEM

T/S TUB / SHOWER

TB TOWEL BAR

THK THICKNESS

THRES THRESHOLD

TOW TOP OF WALL

TTH TOILET TISSUE HOLDER

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VIF VERIFY IN FIELD

VTR VENT THROUGH ROOF

W WEST

W/ WITH

WC WATERCLOSET / WALL COVERING

WD WOOD

WDW WINDOW

WGL WIRED GLASS

WPM WATERPROOF MEMBRANE

P

Q

R

S

T

U

V

W

GA GAUGE

GDR GUARD RAIL

GB GRAB BAR

GL GLASS

G

REVISION

TAG

NORTH ARROW w/

TRUE NORTH

INDICATION

ROOM TAG

ELEVATION NUMBER

SECTION

EXTERIOR ELEVATION

ENLARGEMENT,

DETAIL

SPOT ELEVATION

LEVEL NAME

SHEET NUMBER

SHEET NUMBER

SHEET NUMBER

SHEET KEYNOTE

INTERIOR ELEVATION

SHEET NUMBER

A201

A204

A301

A401

ROOM

100'

LEVEL 01

100'

A

TR

U E N

PLAN

NORTH

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B

IM

/U

S H

I_ D

U

S A

C E

M

D T

F

B u ild in g

/R

Y J H

M R

B

L D

G D

M M

A I.

rv t

/2

/2

:1

:3

P

M

G-004

A B

B R

E V

IA

T

IO

N

S

S Y

M B

O L S

L O

C A

T

IO

N

V

IC

IN

IT

Y M

A P

G

E N

E R

A L N

O T

E S

H E

L E

M A

N O

M

IL

IT

A

R Y

R E

S E

R V

A T

IO

N

H O

N O

L U

L U

D

IS

T R

IC

T

B L D

G

R

O O

M

F

O R

T S

H A

F T

E R

H

I -5

J A

C O

B S

-A H

L J

V B

IS

H

O P

S T

S U

IT

E

H

O N

O L U

L U

H

I

J G

A N

O T

IS

I

R B

A L

IN

T O

N A

A H

L

C G

A Y

D O

S H

J U

L Y

W A

F

W A

-1 -D

-0

R T

A S

U B

M

IT

T A

L

O A

H U

H

I

R Y

J

ABBREVIATIONS GENERAL ARCHITECTURAL NOTES

ANNOTATION CALLOUTS / DRAWING SYMBOLS

1. FIELD VERIFY EXISTING DIMENSIONS AND CONDITIONS TO REMAIN AND PROTECT FROM INADVERT DAMAGE BEFORE COMMENCING WITH WORK.

2. EXISTING STRUCTURAL WALL CONSTRUCTION IS REINFORCED CONCRETE CAST-IN-PLACE SHEAR WALLS AND FULLY GROUTED REINFORCED MASONRY WALLS.

EXISTING FLOOR CONSTRUCTION IS CAST-IN-PLACE CONCRETE SLAB ON GRADE AND REINFORCED CONCRETE CAST-IN-PLACE SLABS WITH REINFORCED CONCRETE

BEAMS FOR UPPER FLOORS. THE ROOF CONSIST OF REINFORCED CONCRETE SLAB.

3. DO NOT SCALE THE DRAWINGS FOR CONSTRUCTION PURPOSES.

4. VERIFY SIZE, LOCATIONS, AND CHARACTERISTICS OF ALL EQUIPMENT TO BE FURNISHED WITH THE MANUFACTURERS OR VENDERS BEFORE COMMENCING WITH

INSTALLATION.

5. ALL DIMENSIONS ARE TO FACE OF FINISH, FACE OF MASONRY, FACE OF CONCRETE OR CENTER LINE OF EXISTING COLUMNS OR WALLS UNLESS OTHERWISE NOTED.

6. REFERENCE MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS FOR LOCATION OF PENETRATIONS THROUGH FLOOR, WALL PARTITIONS AND CEILINGS, AND TO COORDINATE EQUIPMENT AND OTHER WORK NOT SHOWN ON THE ARCHITECTURAL DRAWINGS.

7. CONSTRUCTION FOR CONTROLLED AREAS, AND CONTROLLED AREA MATERIAL AND COMPONENTS, SHALL FULLY COMPLY WITH UFC 4-010-05 AND IC TECH SPECS FOR

ICD/ICS 705 AND FULLY MEET AND PASS ALL ACCREDITATION.

A

M E

N D

M E

N T

J U

L Y

A

M E

N D

M E

N T

J U

L Y

DN

FS

FD

FD

FS

FS

FD

FD

FS

FD

FD FD

FSFS FD FD FD

FD

FS

FS

FD

FD

FS

FS

FD

FD

FS

FD

FD FD

FSFS FD FD FD

FD

FS

7 6 5 4 3 2 189A9B101112131415C15D16171819202122

D

E

F

M4M6M8M9 M2 M1M10

MA

MB

MC

MD

ME

MF

M5 M3M7

SECTION C SECTION B SECTION A

MIDDLE WING EAST WING

D.7

EB

EC

ED

EE

E1E3E4

EA

E2

LEGEND

PHASE 1 WORK

PHASE 2 WORK (TELECOM RM B114 AND ELECTRICAL RM 119)

PHASE 3 WORK

PHASE 1 AND 3 WORK

7 6 5 4 3 2 189A9B101112131415C15D16171819202122

D

E

F

M4M6M8M9 M2 M1M10

MA

MB

MC

MD

ME

MF

M5 M3M7

D.7

EB

EC

ED

EE

E1E3E4

EA

E2

SECTION C SECTION B SECTION A

MIDDLE WING EAST WING

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B

IM

/U

S H

I_ D

U

S A

C E

M

D T

F

B u ild in g

/R

Y J H

M R

B

L D

G D

M M

A I.

rv t

/2

/2

:1

:4

P

M

GS101

O V

E R

A L L B

U

IL

D

IN

G P

H A

S

IN

G P

L A

N

H E

L E

M A

N O

M

IL

IT

A

R Y

R E

S E

R V

A T

IO

N

H O

N O

L U

L U

D

IS

T R

IC

T

B L D

G

R

O O

M

F

O R

T S

H A

F T

E R

H

I -5

J A

C O

B S

-A H

L J

V B

IS

H

O P

S T

S U

IT

E

H

O N

O L U

L U

H

I

J G

A N

O T

IS

I

C G

A Y

D O

S H

A H

L

C G

A Y

D O

S H

J U

L Y

W A

F

W A

-1 -D

-0

R T

A S

U B

M

IT

T A

L

O A

H U

H

I

R Y

J

1" = 30'-0"A4

OVERALL PHASE 1 PLAN

T R

U E

N

PLAN

NORTH

0 15' 30' 60'

0 15' 30' 60'

1" = 30'-0"H4

OVERALL PHASE 3 PLAN

GENERAL SHEET NOTES

OVERALL GENERAL PHASING NOTES

1. SEE CIVIL, LANDSCAPE, STRUCTURAL, ARCHITECTURAL, INTERIORS, FIRE

PROTECTION, PLUMBING, MECHANICAL, ELECTRICAL, AND TELECOM FOR

ADDITIONAL INFORMATION.

2. PHASE 1 TO BE COMPLETED PRIOR TO THE START OF PHASE 3.

3. CONSTRUCT PHASE 2, TELECOM RM B114 AND ELECTRICAL RM 119, TO

COMPLETE PHASE 1, INCLUDING TESTING AND COMMISSIONING.

4. SEE SECTION 00 72 00, FAR 52.211-10.

5. SEE GS104 FOR OVERALL SITE WORK PHASING PLAN.

6. SEE GS105 FOR PHASE 1 AND 2 BUILDING PLAN.

7. SEE GS106 FOR PHASE 3 BUILDING PLAN.

8. SEE M-002 AND P-001 FOR MECHANICAL/PLUMBING PHASING NOTES.

9. SEE ED601, ED602, E-602, E-603, AND E-604 FOR ADDITIONAL ELECTRICAL

PHASING NOTES.

10. ALL ELECTRICAL AND TELECOMMUNICATION DEMOLITION AND NEW WORK IN

THE MIDDLE WING AND EAST WING BUILDINGS MUST BE DONE IN PHASE 1.

11. ALL ELECTRICAL AND TELECOMMUNICATION DEMOLITION AND NEW WORK IN

THE MAIN BUILDING MUST BE DONE IN PHASE 3, WITH EXCEPTION OF PHASE 2.

FIRE PROTECTION PHASING NOTES:

1. USERS TO MAINTAIN FIRE WATCH THROUGHOUT CONTRUCTION AND

COMMISSIONING PHASE OF THE PROJECT.

2. PHASE 1 FIRE ALARM: EAST WING AND MIDDLE WING BUILDINGS.

A. EAST WING AND MIDDLE WING PROVIDE 3/4 INCH STUB-OUTS FOR

FUTURE CONNECTION TO PHASE 3 AREA.

B. PROVIDE FIRE ALARM/MASS NOTIFICATION DEVICES AND ALL RELATED

APPARATUSES TO PHASE 1 AREA. FIRE ALARM/MASS NOTIFICATION

SUBPANEL WILL BE CONNECTED AT END OF PHASE 3 CONSTRUCTION.

3. PHASE 3 FIRE ALARM: MAIN BUILDING.

A. PROVIDE FIRE ALARM/MASS NOTIFICATION DEVICE AND ALL RELATED

APPARATUSES TO PHASE 3 AREA. CONNECT PHASE 1 AND PHASE 3

AREAS.

B. COORDINATE COMMISSIONING OF THE COMPLETE FIRE ALARM/MASS

NOTIFICATION SYSTEM IN ACCORDANCE WITH THE SPECIFICATIONS

SECTION 28 31 76.

4. PHASE 1 FIRE SPRINKLER: EAST WING, MIDDLE WING, AND BASEMENT ROOM

FP B105.

A. EAST WING AND MIDDLE WING PROVIDE 4 INCH STUB-OUTS FOR

FUTURE CONNECTION TO PHASE 3 AREA.

B. PROVIDE FIRE SPRINKLERS FIRE SPRINKLER PIPING, AND ALL RELATED

APPARATUSES TO PHASE 1 AREA. FIRE PROTECTION STUBOUT WILL BE

CONNECTED AT END OF PHASE 3 CONSTRUCTION.

C. BASEMENT ROOM FP B105 PROVIDE 6 INCH STUB-OUT FOR FUTURE

FIRE SPRINKLER RISER CONNECTION TO PHASE 3 AREA.

5. PHASE 3 FIRE SPRINKLER: MAIN BUILDING.

A. PROVIDE FIRE SPRINKLERS, FIRE SPRINKLER PIPING, AND ALL RELATED

APPARATUSES TO PHASE 3 AREA. CONNECT PHASE 1 AND PHASE 3

AREAS.

B. COORDINATE COMMISSIONING OF THE COMPLETE FIRE SPRINKLER

SYSTEM IN ACCORDANCE WITH THE SPECIFICATIONS SECTION 21 13 13.

A

M E

N D

M E

N T

J U

L Y

A

M E

N D

M E

N T

J U

L Y

UP

DN

DN

FS

FD

FD

FS

FS

FD

FD

FS

FD

FD FD

FS

FS FD FD FD

FD

UP

FS

FD

FD FD

FD

FS

FS

7 6 5 4 3 2 189A9B101112131415C15D16171819202122

D

E

F

M4M6M8M9 M2 M1M10

MA

MB

MC

MD

ME

MF

M5 M3M7

D.7

EB

EC

ED

EE

E1E3E4

EA

E2

CBRN 1

COMP LAB

MEETING ROOM 1

SUPPLY

CBRN

RETENTION

XO

XO

CBRN 2

MEETING ROOM 2

TRAINING

TRAINING

SUPPLY

FP

MECH-1A

WOMEN

MEN

TOILET

CO STOR

CO

ORDERLY

1ST SGT

CO

ORDERLY

TOILET

1ST SGT

STAIR

1B

JAN

CORRIDOR

100C

STAIR

1D

LOBBY

ELEV

EL-1

ELEC

SHARED CONF

TR-1A

150 STAIR

1F

MDTF SECURITY

307 ESB

SECURITY

STORAGE

ARMS RM

ARMS RM

BREAKROOM

STAFF SECT

STORAGE

SJA OFFICE

SJA

WELLNESS

EXIT LOBBY

STAIR

1C

BDE S1 OFFICE

BDE S1

MECHANICAL

M117

ELECTRICAL

M116

UPS

M118

ADOC COM

M114

SEC COM

M113

CMD VTC CONF

M115

CORRIDOR

M100

RF LAB

M105

BDE HQ (CDR)

M106

MEN

M108

BDE HQ DEPUTY

M107

BREAK RM

M112

JAN

M111

WELLNESS

M110

ADOC

M103

WOMEN

M109

DCO LAB

M104

SSO

M102

SECURED VEST

M101

S4 OFFICE

S4

CYBERSEC

TR-1B

ELEC

MECH 1-B

CMD STOR

PLATOON

TRAINING

1ST SGT

XO

CO

CONFERENCE

ROOM

SECURE

STORAGE

UNIT STORAGE

NBC STOR

COMM STOR

101 EXIT STAIR-

EXTERIOR

1A

WOMEN

MEN

JAN

WATER HEATER

TGT DEV

ELEMENT

S6 OFFICE

S6

S6 / INTWRK

STORAGE

STAIR

1G

TR

E114

UPS

E113

MECH

E112

ELEC

E111

SPACE OFFICE

E110

SPACE TEAM

E109

HHD TEAM

E108

HHD OFFICE

E107

SECURED VEST

E101

WELLNESS

E102

RESTROOM 1-A

E103

RESTROOM 1-B

E105

SHARED CONF

E106

ELEC

JAN

E104

CORRIDOR

100ACORRIDOR

100B

CORRIDOR 1

E100

TSVA

2' - 8"

CONTROLLED AREA BOUNDARY

SECURE AREA BOUNDARY

LEGEND

7 6 5 4 3 2 189A9B101112131415C15D16171819202122

D

E

F

D.7

LARGE

CONFERENCE

B101

ASSIST.

CHAPLAIN

B103

STORAGE 4

B104

FP

B105

STORAGE 5

B121

MEN

B106

WOMEN

B107

WATER HEATER

B109

ELEC CLOSET

B111

TR-0

B114

STORAGE 1

B113

ARMS RM

B120

ARMS RM

B119

ARMS RM

B118

JAN

B108

CORRIDOR

B117A

CORRIDOR

B117B

CRAWL SPACE

CHAPLAIN

B102 CRAWL SPACE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B

IM

/U

S H

I_ D

U

S A

C E

M

D T

F

B u ild in g

/R

Y J H

M R

B

L D

G D

M M

A I.

rv t

/2

/2

:1

:4

P

M

GS102

C O

N T

R O

L L E

D A

N D

S E

C U

R E

A R

E A

B O

U N

D A

R Y

B

A S

E M

E N

T A

N D

S

T F

L O

O R

P L A

N

H E

L E

M A

N O

M

IL

IT

A

R Y

R E

S E

R V

A T

IO

N

H O

N O

L U

L U

D

IS

T R

IC

T

B L D

G

R

O O

M

F

O R

T S

H A

F T

E R

H

I -5

J A

C O

B S

-A H

L J

V B

IS

H

O P

S T

S U

IT

E

H

O N

O L U

L U

H

I

J G

A N

O T

IS

I

R B

A L

IN

T O

N A

A H

L

C G

A Y

D O

S H

J U

L Y

W A

F

W A

-1 -D

-0

R T

A S

U B

M

IT

T A

L

O A

H U

H

I

R Y

J

1" = 20'-0"F1

OVERALL 1ST FLR PLAN

1" = 20'-0"A1

OVERALL BASEMENT FLR PLAN

0 10' 20' 40'

0 10' 20' 40'

A

M E

N D

M E

N T

J U

L Y

A

M E

N D

M E

N T

J U

L Y

FD

FD

FD FDFD FD

FD

FS

FD

FDFD DN

FS

FD

7 6 5 4 3 2 189A9B101112131415C15D16171819202122

D

E

F

M4M6M8M9 M2 M1M10

MA

MB

MC

MD

ME

MF

M5 M3M7

D.7

EB

EC

ED

EE

E1E3E4

EA

E2

STORAGE

STORAGE

STORAGE

S1 SHOP

STORAGE

NCOIC

S4 OIC

OIC

NCOIC

S4 SHOP

HHC STOR

HHC STOR

STAIR

2D

LOBBY

ELEV

EL-2

ELEC

SHARED CONF

(S2)

UNIT STORAGE

COMM STOR

NBC STOR

208 STAIR

2C

TRAINING

BDE CMD GROUP

BDE CMD OFFICE

BDE CMD OFFICE

BDE CMD OFFICE

EXIT STAIR

2B

HHC CONF

HHC CO

ORDERLY

ORDERLY

1SG

FP

MECH-2A

JAN

WOMEN

MEN

PBO

HHC SUPPLY

HHC XO

TR-2A

WELLNESS

SECURE STOR

SHARED CONF

(S2)

S2 CUOPS (INTEL

OPS)

INTEL FUOPS

TR-2B

MECH-2B

WOMEN

MEN

STORAGE

BDE S2 (INTEL

HQ)

EXIT STAIR

2A

BDE CDR CONF

RM

INTEL GEOINT

STAIR

2G

SHARED CONF

E208

CEMA OFFICE

E207

MI OFFICE

E206

MI TEAM

E205A

CEMA TEAM

E204

RESTROOM 2-B

E203

RESTROOM 2-A

E202

SECURED VEST

E201

CORRIDOR 2

E200

BRIDGE

CORRIDOR

200D

CORRIDOR

200B

CMD STOR

CO

XO

1ST SGT

247TRAINING

PLATOON

CONFERENCE

EXP/VISIT SPACE

ELEC

CORRIDOR

200C

ELEC

JAN

RESTROOM

SIPR CAFE

CORRIDOR

200A

7 6 5 4 3 2 189A9B101112131415C15D16171819202122

D

E

F

D.7

IMO SHOP

OIC

NCOIC

S3 SHOP

S3 SHOP

OIC

NCOIC

BC

CSM

STAIR

3D

LOBBY

ELEC

ELEV

EL-3

SHARED CONF

(S3)

SECURE

STORAGE

STAIR

3C

SPECIAL STAFF

(AUG TDA)

309EXIT STAIR

3B

NET OPS

NET OPS

SIPR CAFE

COMSEC VAULT

FP

MECH-3A

WOMEN

JAN

MEN

XO

S2

DRIVER

TR-3A

WELLNESS

EXP/VISIT SPACE

PLATOON

TRAINING

1ST SGT

XO

CO

CONFERENCE

CMD STOR

NBC STORAGE

COMM STOR

UNIT STORAGE

TR-3B

MECH-3B

WOMEN

MEN

STORAGE

AMD CELL

FIRES CELL HQ

FIRES CELL HQ

FIRES CONTROL

ELEMENT

EXIT STAIR

3A

AUG TDA OFFICE

AUG TDA OFFICE

AUG TDA OFFICE

AUG TDA OFFICE

TAC CURR OPS

304 DODIN

ENTERPRISE

DODIN CONTENT

FIRES LETHAL

EFFECTS

ELEMENT

CORRIDOR

300C

CORRIDOR

300B

CORRIDOR

300A

ELEC

JAN

CONTROLLED AREA BOUNDARY

SECURE AREA BOUNDARY

LEGEND

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B

IM

/U

S H

I_ D

U

S A

C E

M

D T

F

B u ild in g

/R

Y J H

M R

B

L D

G D

M M

A I.

rv t

/2

/2

:1

:5

P

M

GS103

C O

N T

R O

L L E

D A

N D

S E

C U

R E

A R

E A

B O

U N

D A

R Y

N

D A

N D

R

D F

L O

O R

P L A

N

H E

L E

M A

N O

M

IL

IT

A

R Y

R E

S E

R V

A T

IO

N

H O

N O

L U

L U

D

IS

T R

IC

T

B L D

G

R

O O

M

F

O R

T S

H A

F T

E R

H

I -5

J A

C O

B S

-A H

L J

V B

IS

H

O P

S T

S U

IT

E

H

O N

O L U

L U

H

I

J G

A N

O T

IS

I

R B

A L

IN

T O

N A

A H

L

C G

A Y

D O

S H

J U

L Y

W A

F

W A

-1 -D

-0

R T

A S

U B

M

IT

T A

L

O A

H U

H

I

R Y

J

1" = 20'-0"A1

OVERALL 2ND FLR PLAN

1" = 20'-0"J1

OVERALL 3RD FLR PLAN

0 10' 20' 40'

0 10' 20' 40'

A

M E

N D

M E

N T

J U

L Y

A

M E

N D

M E

N T

J U

L Y

DN

DN

UP

7 6 5 4 3 2 189A9B101112131415C15D16171819202122

D

E

F

SECTION C

CRAWL SPACE

AD113

A1

D.7

22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3" 2" 23' - 3" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3" 2" 23' - 3" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9"

AD113

H1

7 6 5 4 3 2 189A9B101112131415C15D16171819202122

AD114

H1

AD114

A1

D

E

F

AD115

A1

M4M6M8M9 M2 M1M10

MA

MB

MC

MD

ME

MF

M5 M3M7

SECTION C SECTION B SECTION A

MIDDLE WING

EAST WING

AD111

A6

AD112

A11

D.7

EB

EC

ED

EE

E1E3E4

EA

E2

22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3" 2" 23' - 3" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3" 2" 23' - 3" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9"

14' - 8 1/2" 6' - 3" 14' - 8 1/2"

22' - 2" 5' - 4"

9' - 8" 7' - 2" 12' - 9" 12' - 9" 7' - 2" 9' - 8" 5' - 4"

4' - 6"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B

IM

/U

S H

I_ D

U

S A

C E

M

D T

F

B u ild in g

/R

Y J H

M R

B

L D

G D

M M

A I.

rv t

/2

/2

:1

:1

P

M

AD101

O V

E R

A L L B

A S

E M

E N

T

S

T F

L R

D E

M O

P L A

N

H E

L E

M A

N O

M

IL

IT

A

R Y

R E

S E

R V

A T

IO

N

H O

N O

L U

L U

D

IS

T R

IC

T

B L D

G

R

O O

M

F

O R

T S

H A

F T

E R

H

I -5

J A

C O

B S

-A H

L J

V B

IS

H

O P

S T

S U

IT

E

H

O N

O L U

L U

H

I

J G

A N

O T

IS

I

R B

A L

IN

T O

N A

A H

L

C G

A Y

D O

S H

J U

L Y

W A

F

W A

-1 -D

-0

R T

A S

U B

M

IT

T A

L

O A

H U

H

I

R Y

J

1" = 20'-0"A1

OVERALL BASEMENT FLR DEMO PLAN

0 10' 20' 40'

T R

U E

N

PLAN

NORTH

C B A

MW EW

KEY PLAN

MAIN BUILDING

1" = 20'-0"F1

OVERALL 1ST FLOOR DEMO PLAN

0 10' 20' 40'

C B A

MW EW

KEY PLAN

MAIN BUILDING

A

M E

N D

M E

N T

J U

L Y

7 6 5 4 3 2 189A9B101112131415C15D16171819202122

AD116

H1

AD116

A1

D

E

F

AD117

A1SECTION C SECTION B SECTION A

EAST WING

AD112

A6

D.7

EB

EC

ED

EE

E1E3E4

EA

E2

MIDDLE WING

22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3" 2" 23' - 3" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3" 2" 23' - 3" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9"

14' - 8 1/2" 6' - 3" 14' - 8 1/2"

7 6 5 4 3 2 189A9B101112131415C15D16171819202122

D

E

F

AD118

A1AD118

H1

AD119

A1

SECTION C SECTION B SECTION A

D.7

EAST WING

22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3" 2" 23' - 3" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 23' - 3" 2" 23' - 3" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9" 22' - 9"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B

IM

/U

S H

I_ D

U

S A

C E

M

D T

F

B u ild in g

/R

Y J H

M R

B

L D

G D

M M

A I.

rv t

/2

/2

:1

:2

P

M

AD102

O V

E R

A L L

N D

R D

F L R

D E

M O

P L A

N

H E

L E

M A

N O

M

IL

IT

A

R Y

R E

S E

R V

A T

IO

N

H O

N O

L U

L U

D

IS

T R

IC

T

B L D

G

R

O O

M

F

O R

T S

H A

F T

E R

H

I -5

J A

C O

B S

-A H

L J

V B

IS

H

O P

S T

S U

IT

E

H

O N

O L U

L U

H

I

J G

A N

O T

IS

I

R B

A L

IN

T O

N A

A H

L

C G

A Y

D O

S H

J U

L Y

W A

F

W A

-1 -D

-0

R T

A S

U B

M

IT

T A

L

O A

H U

H

I

R Y

J

0 10' 20' 40'

T R

U E

N

PLAN

NORTH

C B A

MW EW

KEY PLAN

MAIN BUILDING

1" = 20'-0"A1

OVERALL 2ND FLR DEMO PLAN

1" = 20'-0"J1

OVERALL 3RD FLR DEMO PLAN

0 10' 20' 40'

A

M E

N D

M E

N T

J U

L Y

7 6 5 4 3 2 18

9A9B101112131415C15D

16171819202122

D

E

F

D.7

AD120

A1 Sim

SECTION C SECTION B SECTION A

MIDDLE WING

EAST WING

1. SEE MECHANICAL FOR ROOF EQUIPMENT DEMOLITION

REMOVE ROOF MECH EQUIP, TYP - SEE

MECH. PATCH ROOF AND ROOF CURBS

AS REQUIRED.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B

IM

/U

S H

I_ D

U

S A

C E

M

D T

F

B u ild in g

/R

Y J H

M R

B

L D

G D

M M

A I.

rv t

/2

/2

:1

:2

P

M

AD103

O V

E R

A L L R

O O

F D

E M

O P

L A

N

H E

L E

M A

N O

M

IL

IT

A

R Y

R E

S E

R V

A T

IO

N

H O

N O

L U

L U

D

IS

T R

IC

T

B L D

G

R

O O

M

F

O R

T S

H A

F T

E R

H

I -5

J A

C O

B S

-A H

L J

V B

IS

H

O P

S T

S U

IT

E

H

O N

O L U

L U

H

I

J G

A N

O T

IS

I

R B

A L

IN

T O

N A

A H

L

C G

A Y

D O

S H

J U

L Y

W A

F

W A

-1 -D

-0

R T

A S

U B

M

IT

T A

L

O A

H U

H

I

R Y

J

T R

U E

N

PLAN

NORTH

C B A

MW EW

KEY PLAN

MAIN BUILDING

1" = 20'-0"A1

OVERALL ROOF DEMO PLAN

0 10' 20' 40'

A

M E

N D

M E

N T

J U

L Y

FD FD FD

FDFDFD

FD FD

FD

FD

FD

FD

DN

F

M4M6M8M9 M2 M1M10

MA

MB

MC

MD

ME

MF

M5 M3M7

3 3

7 7

/H1 AD114

MATCHLINE

22' - 2" 5' - 4" 9' - 8" 7' - 2" 12' - 9" 12' - 9" 7' - 2" 9' - 8" 5' - 4"

1 1 1

7 7 7

7 7

MAIN BUILDING

26 26

26 26 26

262626

GENERAL SHEET NOTES

1. COORDINATE DEMO WORK/EXTENT WITH NEW WORK.

2. FIELD VERIFY EXST DIMENSIONS AND CONDITIONS TO REMAIN AND PROTECT

FROM INADVERTENT DAMAGE BEFORE COMMENCING WITH DEMO WORK.

3. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATION AND

FIRE PROTECTION DRAWINGS FOR DEMOLITION REQUIREMENTS FOR EACH

DISCIPLINE.

4. HAZARDOUS MATERIALS SURVEYS HAVE BEEN CONDUCTED TO IDENTIFY

POTENTIALLY HAZARDOUS MATERIALS THAT ARE EXPECTED TO BE

DISTURBED DURING CONSTRUCTION. CONTRACTOR MUST

REQUEST/REVIEW THE HAZMAT SURVEY REPORT, CONDUCT THE HAZMAT

INVESTIGATION TO IDENTIFY QUANTITY/LOCATION TO MAKE THE HAZMAT

PLAN AS APPROPRIATE PRIOR TO THE WORK.

5. CONTRACTOR SCOPE OF WORK INCLUDE REMOVAL OF EXISTING CMU

WALLS FOR THE INSTALLATION OF NEW SHEET METAL DUCTWORK – BOTH

RECTANGULAR AND ROUND. CONTRACTOR TO COORDINATE WITH

MECHANICAL DRAWINGS.

6. CONTRACTOR IS TO REMOVE CMU WALLS FROM THE BOTTOM OF THE NEW

DUCTWORK UP TO THE CONCRETE SLAB OR CONCRETE BEAM ABOVE.

7. OPENINGS ARE TO REMAIN CLEAR OF EXISTING DOOR OPENINGS WHERE

NEW DUCTS INCROACH ON EXISTING DOOR LINTEL STRUCTURES.

8. CONTRACTOR SCOPE OF WORK INCLUDES NEW CHILLED WATER SUPPLY

AND RETURN LINES. LOCATIONS ARE TO BE COORDINATED WITH

MECHANICAL DRAWINGS.

9. SEE STRUCTURAL FOR INTERIOR CONCRETE WALL SUPPORT WHERE

EXISTING CMU DEMOLITION OCCURS. SEE A4/A-509

LEGEND

(E) DEMO WALL

(E) DEMO DOOR

(E) WALL TO REMAIN

(E) DEMO WINDOW

(E) DOOR TO REMAIN

DEMO (E) RAISED FLOOR FLUSH WITH CORRIDOR CONCRETE SLAB

VEST

M100

VEST

M101

STORAGE

M102

DISHWASHING

M103

JANITOR

M104

SELF SERVICE

M105

FOOD SERVICE

SERGEANT

M106

ADMIN

M107

POT & PAN WASH

M108

KITCHEN

M109

VEST

M110

DRY STORAGE

M111

VEST

M112

WOMEN

M113

MEN

M114

VEST

M115

MAIN ENTREE

M116

DINING

M117

WALK-IN

FREEZER

M109A

WALK-IN

FREEZER

M109B

WALK-IN

FREEZER

M109C

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B

IM

/U

S H

I_ D

U

S A

C E

M

D T

F

B u ild in g

/R

Y J H

M R

B

L D

G D

M M

A I.

rv t

/2

/2

:1

:2

P

M

AD111

D E

M O

F L O

O R

P L A

N M

ID

D

L E

W

IN

G

H E

L E

M A

N O

M

IL

IT

A

R Y

R E

S E

R V

A T

IO

N

H O

N O

L U

L U

D

IS

T R

IC

T

B L D

G

R

O O

M

F

O R

T S

H A

F T

E R

H

I -5

J A

C O

B S

-A H

L J

V B

IS

H

O P

S T

S U

IT

E

H

O N

O L U

L U

H

I

J G

A N

O T

IS

I

R B

A L

IN

T O

N A

A H

L

C G

A Y

D O

S H

J U

L Y

W A

F

W A

-1 -D

-0

R T

A S

U B

M

IT

T A

L

O A

H U

H

I

R Y

J

1/8" = 1'-0"A6

ENLARGED DEMO PLAN MIDDLE WING

0 4' 8' 16'

1 REMOVE EXST DOOR, DOOR FRAME, DOOR HARDWARE INCLUDING

THRESHOLD AND WALL MOUNTED SIGNAGE

3 REMOVE EXST WINDOW FRAME AND WINDOW HARDWARE

5 REMOVE EXST PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINALS,

SINKS AND FAUCETS - SEE PLUMBING DRAWINGS

7 REMOVE EXST PARTITION AND BASE

8 REMOVE EXST TOILET ACCESSORIES

9 REMOVE EXST RESTROOM TOILET PARTITION

10 REMOVE EXST CERAMIC TILE FLOORING, WAINSCOT, BASE, AND 3" CONC

TOPPING

17 DEMO EXST CMU/CONC WALL

18 REMOVE EXST SHED ROOF

20 REMOVE EXST HANDRAIL, GUARDRAIL, AND BRACKETS

26 REMOVE EXST FLOOR DRAIN/FLOOR SINK

29 DEMO EXST CONC STAIRS AND RAILING

SHEET KEYNOTES

C B A

MW EW

KEY PLAN

MAIN BUILDING

T R

U E

N

PLAN

NORTH

A

M E

N D

M E

N T

J U

L Y

F

/A1 AD116

MATCHLINE

OPENING FOR

BRIDGE

EB

EC

ED

EE

E1E3E4

EA

E2

1 1

1 1

1 1

14' - 8 1/2" 6' - 3" 14' - 8 1/2"

MAIN BUILDING

GENERAL SHEET NOTES

1. COORDINATE DEMO WORK/EXTENT WITH NEW WORK.

2. FIELD VERIFY EXST DIMENSIONS AND CONDITIONS TO REMAIN AND PROTECT

FROM INADVERTENT DAMAGE BEFORE COMMENCING WITH DEMO WORK.

3. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATION AND

FIRE PROTECTION DRAWINGS FOR DEMOLITION REQUIREMENTS FOR EACH

DISCIPLINE.

4. HAZARDOUS MATERIALS SURVEYS HAVE BEEN CONDUCTED TO IDENTIFY

POTENTIALLY HAZARDOUS MATERIALS THAT ARE EXPECTED TO BE

DISTURBED DURING CONSTRUCTION. CONTRACTOR MUST

REQUEST/REVIEW THE HAZMAT SURVEY REPORT, CONDUCT THE HAZMAT

INVESTIGATION TO IDENTIFY QUANTITY/LOCATION TO MAKE THE HAZMAT

PLAN AS APPROPRIATE PRIOR TO THE WORK.

5. CONTRACTOR SCOPE OF WORK INCLUDE REMOVAL OF EXISTING CMU

WALLS FOR THE INSTALLATION OF NEW SHEET METAL DUCTWORK – BOTH

RECTANGULAR AND ROUND. CONTRACTOR TO COORDINATE WITH

MECHANICAL DRAWINGS.

6. CONTRACTOR IS TO REMOVE CMU WALLS FROM THE BOTTOM OF THE NEW

DUCTWORK UP TO THE CONCRETE SLAB OR CONCRETE BEAM ABOVE.

7. OPENINGS ARE TO REMAIN CLEAR OF EXISTING DOOR OPENINGS WHERE

NEW DUCTS INCROACH ON EXISTING DOOR LINTEL STRUCTURES.

8. CONTRACTOR SCOPE OF WORK INCLUDES NEW CHILLED WATER SUPPLY

AND RETURN LINES. LOCATIONS ARE TO BE COORDINATED WITH

MECHANICAL DRAWINGS.

9. SEE STRUCTURAL FOR INTERIOR CONCRETE WALL SUPPORT WHERE

EXISTING CMU DEMOLITION OCCURS. SEE A4/A-509

F

/A1 AD114

MATCHLINE

EB

EC

ED

EE

E1E3E4

EA

E2

5 5

14' - 8 1/2" 6' - 3" 14' - 8 1/2"

1 1

MAIN BUILDING

2' - 8"

3 3

LEGEND

(E) DEMO WALL

(E) DEMO DOOR

(E) WALL TO REMAIN

(E) DEMO WINDOW

(E) DOOR TO REMAIN

DEMO (E) RAISED FLOOR FLUSH WITH CORRIDOR CONCRETE SLAB

BN LECTURE

A101

VEST

A100

PROJECTION

A102

WOMEN

A103

JAN

A104

MEN

A105

ENTRY

A106

C O

R R

ID

O

R A

STAIR #8

A108

CHAPLAIN STOR

A109

BN CHAPLAIN

A110

VEST

A111

LAUNDRY

A201

BILLET SPACE

A202

ONE MAN NCO

A203

TOILET

A204

TOILET

A205

ONE MAN NCO

A206

NCO

A207

TOILET

A208

TOILET

A209

NCO

A210

TOILET

A211

NCO

A212

STAIR #8

A213

C O

R R

ID

O

R A

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B

IM

/U

S H

I_ D

U

S A

C E

M

D T

F

B u ild in g

/R

Y J H

M R

B

L D

G D

M M

A I.

rv t

/2

/2

:1

:2

P

M

AD112

D E

M O

F L O

O R

P L A

N E

A S

T W

IN

G

S

T

N

D F

L R

H E

L E

M A

N O

M

IL

IT

A

R Y

R E

S E

R V

A T

IO

N

H O

N O

L U

L U

D

IS

T R

IC

T

B L D

G

R

O O

M

F

O R

T S

H A

F T

E R

H

I -5

J A

C O

B S

-A H

L J

V B

IS

H

O P

S T

S U

IT

E

H

O N

O L U

L U

H

I

J G

A N

O T

IS

I

R B

A L

IN

T O

N A

A H

L

C G

A Y

D O

S H

J U

L Y

W A

F

W A

-1 -D

-0

R T

A S

U B

M

IT

T A

L

O A

H U

H

I

R Y

J

1/8" = 1'-0"A6

ENLARGED DEMO PLAN EAST WING - 2ND

FLR

0 4' 8' 16' 0 4' 8' 16' 1/8" = 1'-0"A11

ENLARGED DEMO PLAN EAST WING - 1ST

FLR

C B A

MW EW

KEY PLAN

MAIN BUILDING

T R

U E

N

PLAN

NORTH

1 REMOVE EXST DOOR, DOOR FRAME, DOOR HARDWARE INCLUDING

THRESHOLD AND WALL MOUNTED SIGNAGE

3 REMOVE EXST WINDOW FRAME AND WINDOW HARDWARE

5 REMOVE EXST PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINALS,

SINKS AND FAUCETS - SEE PLUMBING DRAWINGS

7 REMOVE EXST PARTITION AND BASE

8 REMOVE EXST TOILET ACCESSORIES

9 REMOVE EXST RESTROOM TOILET PARTITION

10 REMOVE EXST CERAMIC TILE FLOORING, WAINSCOT, BASE, AND 3" CONC

TOPPING

17 DEMO EXST CMU/CONC WALL

20 REMOVE EXST HANDRAIL, GUARDRAIL, AND BRACKETS

SHEET KEYNOTESSHEET KEYNOTES

A

M E

N D

M E

N T

J U

L Y

GENERAL SHEET NOTES

1. COORDINATE DEMO WORK/EXTENT WITH NEW WORK.

2. FIELD VERIFY EXST DIMENSIONS AND CONDITIONS TO REMAIN AND PROTECT

FROM INADVERTENT DAMAGE BEFORE COMMENCING WITH DEMO WORK.

3. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATION AND

FIRE PROTECTION DRAWINGS FOR DEMOLITION REQUIREMENTS FOR EACH

DISCIPLINE.

4. HAZARDOUS MATERIALS SURVEYS HAVE BEEN CONDUCTED TO IDENTIFY

POTENTIALLY HAZARDOUS MATERIALS THAT ARE EXPECTED TO BE

DISTURBED DURING CONSTRUCTION. CONTRACTOR MUST

REQUEST/REVIEW THE HAZMAT SURVEY REPORT, CONDUCT THE HAZMAT

INVESTIGATION TO IDENTIFY QUANTITY/LOCATION TO MAKE THE HAZMAT

PLAN AS APPROPRIATE PRIOR TO THE WORK.

5. CONTRACTOR SCOPE OF WORK…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .