This is a solicitation notice for a construction project to renovate and repair Building 300 for the Multi-Domain Task Force #3 at Helemano Military Reservation. The project scope includes a new elevator, UPS, emergency generator, utility extensions, communications infrastructure, site work including lighting, grading, parking and fencing. The estimated period of performance is 912 calendar days with a project magnitude between $50-100 million. The acquisition will be lowest priced technically acceptable based on experience, past performance, technical approach, and price. Offerors must register in SAM and check for any changes to the solicitation, which will be issued as a firm-fixed-price construction contract by the U.S. Army Corps of Engineers, Honolulu District. The NAICS code is 236220 with a $39.5 million small business size standard.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 104 PAGES

MDTF #3 Building 300 Helemano Military Reservation

08 11 16 SD-04 Samples

1.5.2 GFinish Samples

1.2.3Air Infiltration

1.2.4Water Penetration

SD-08 Manufacturer’s Instructions

1.5.1Door and Frame Assembly

1.5.3Adjustments, Cleaning, and

Maintenance

08 31 00 SD-02 Shop Drawings

1.3Access Doors And Panels

SD-03 Product Data

1.3Access Doors And Panels

2.1 SRecycled Content

SD-04 Samples

2.5Finishes

08 34 59 SD-02 Shop Drawings

2.1 GVault Door Unit

2.3 GDay Gate

SD-03 Product Data

2.2Vault Door and Frame

SD-07 Certificates

2.2Vault Door and Frame

SD-08 Manufacturer’s Instructions

3.1Installation

08 34 73 SD-02 Shop Drawings

2.1Fabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 104 PAGES

08 34 73 SD-03 Product Data

2.1Hollow Metal Sound Retardant

Doors

2.1Door Frames

2.1Door Hardware

2.3.2Door Frame Sound Infill

2.1Intumescent Seals and Gasketing

2.1Thresholds

1.3.2 SRecycled Content of Doors

SD-06 Test Reports

2.4.4Acoustical Tests

2.4.4Positive Pressure Tests

SD-07 Certificates

2.1Hollow Metal Sound Retardant

Doors

2.1Door Frames

2.1Door Hardware

1.3.1.3Intumescent Seals,Gasketing and

Door Bottoms

2.1Thresholds

3.3.1Assembly Test Reports

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.6Fabrication Drawings

SD-03 Product Data

2.1Windows

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 104 PAGES

08 51 13 2.1 SRecycled Content of Aluminum

Windows

2.2.6.1Hardware

2.2.2Fasteners

1.7Window Performance

2.2.8Screens

2.1.6Weatherstripping

2.2.6Accessories

1.7.5Thermal Performance

SD-04 Samples

1.3.3.1Finish Sample

1.3.3.2Window Sample

SD-05 Design Data

2.1 GStructural Calculations for

Deflection

1.3.4 GDesign Analysis

SD-06 Test Reports

1.3.5Resistance to Forced Entry

1.7.6Windborne-Debris-Impact

Performance

SD-10 Operation and Maintenance

Data

2.1Windows

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 104 PAGES

08 71 00 1.5 GHardware Schedule

2.3.9 GKeying System

1.8.1.1 GWiring Diagram and Sequence of

Operations for all Electrified

Hardware

SD-03 Product Data

2.3 GHardware Items

1.8.1 GAccess System

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5Hardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

2.2Insulating Glass

1.4Glazing Accessories

2.3.2.1Sealants

SD-04 Samples

2.2Insulating Glass

2.3.4Tape

2.3.4Sealing Tapes

SD-07 Certificates

2.2Insulating Glass

1.3.1 SIndoor Air Quality for Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 104 PAGES

08 81 00 SD-08 Manufacturer’s Instructions

2.3Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.8.1Insulated Glass Units

08 91 00 SD-02 Shop Drawings

1.4Wall Louvers

SD-03 Product Data

2.2Metal Wall Louvers

SD-04 Samples

1.5 GWall Louver Samples

09 22 00 SD-02 Shop Drawings

2.1Metal Support Systems

SD-03 Product Data

2.1Metal Support Systems

2.1 SRecycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

2.1.3Cementitious Backer Units

2.1.7Accessories

2.1.1Gypsum Board

2.1.8Partition Closure

2.1.1 SRecycled Content for Gypsum

Board

2.1.4 SVOC Content of Joint Compound

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 104 PAGES

09 29 00 2.1.2.1ASTM E90 Factory Test Report

3.7ASTM E90 Factory Test Report

3.10ASTM E90 Factory Test Report

3.10ASTM E336 Field Test Report

SD-07 Certificates

2.1Asbestos Free Materials

2.1.1 SIndoor Air Quality for Gypsum

Board

09 30 10 SD-03 Product Data

2.1.1Porcelain Tile

2.1.1 SRecycled Content for Porcelain

Tile

2.1.2Glazed Ceramic Wall Tile

2.1.2 SRecycled Content for Glazed

Ceramic Wall Tile

2.1Transition Strips

2.6.1Transition Strips

2.6.2Metal Transition Strips

2.2Setting-Bed

2.4Mortar and Grout

2.7Waterproof Membrane

2.8Crack Isolation Membrane

SD-04 Samples

2.1 GTile

2.1 GTransition Strips

2.6.1 GTransition Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 104 PAGES

09 30 10 SD-07 Certificates

2.4 SIndoor Air Quality for Grout

2.7.1 SIndoor Air Quality for

Waterproofing Membrane

1.3.2Water Absorption Rates

SD-08 Manufacturer’s Instructions

3.8Manufacturer's Approved

Cleaning Instructions

SD-10 Operation and Maintenance

Data

2.1.1Porcelain Tile

2.1.2Glazed Ceramic Wall Tile

2.1Transition Strips

2.6.1Transition Strips

09 51 00 SD-02 Shop Drawings

2.1Detail Drawings

SD-03 Product Data

2.2.2.1 SRecycled Content for Type III

Ceiling Tiles

2.2.1.1 SRecycled Content for Type XII

Ceiling Tiles

2.3 SRecycled Content for Suspension

Systems

2.1.1Acoustical Performance

SD-04 Samples

2.2 GAcoustical Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 104 PAGES

09 51 00 SD-07 Certificates

2.2.2.1 SIndoor Air Quality for Type III

Ceiling Tiles

2.2.1.1 SIndoor Air Quality for Type XII

Ceiling Tiles

2.5 SIndoor Air Quality for Adhesives

2.8 SIndoor Air Quality for Sealants

09 62 38 SD-03 Product Data

2.1Static-Control Resilient Flooring

2.1.1.1 SRecycled content for

Static-Dissipative Vinyl Tile

2.4Accessories

2.2Adhesives

1.8Warranty

SD-04 Samples

2.1Static-Control Resilient Flooring

2.3Moldings Transitions

1.3.1.3Special Treatment Materials

2.4Accessories

SD-06 Test Reports

2.7Fire Resistance

3.2Moisture, Alkalinity and Bond

3.6Testing

SD-07 Certificates

2.1.1.1 SIndoor Air Quality for

Static-Dissipative Vinyl Tile

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 104 PAGES

09 62 38 2.2 SIndoor Air Quality for Adhesives

1.5Qualifications of Applicator

SD-08 Manufacturer’s Instructions

2.1Static-Control Resilient Flooring

2.4Accessories

SD-10 Operation and Maintenance

Data

2.1Static-Control Resilient Flooring

2.4Accessories

09 65 00 SD-03 Product Data

2.7Resilient Flooring and

Accessories

2.2Wall Base

2.1Luxury Vinyl Tile

2.1 SRecycled Content for Luxury Vinyl

Tile

2.4Adhesives

SD-04 Samples

2.7 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3Moisture, Alkalinity and Bond

Tests

SD-07 Certificates

2.1 SIndoor Air Quality for Luxury Vinyl

Tile

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 104 PAGES

09 65 00 2.2 SIndoor Air Quality for Wall Base

2.4 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2Surface Preparation

3.1Installation

SD-10 Operation and Maintenance

Data

2.7Resilient Flooring and

Accessories

09 68 00 SD-02 Shop Drawings

3.4 GInstallation Drawings

SD-03 Product Data

2.1Carpet

2.1.1 SRecycled Content for Carpeting

2.4Moldings Transitions

2.3 SIndoor Air Quality for Aerosol

Adhesives

2.3 SIndoor Air Quality for Non-Aerosol

Adhesives

2.3 SIndoor Air Quality for Concrete

Primer

SD-04 Samples

2.1 GCarpet

2.4 GMoldings Transitions

SD-06 Test Reports

3.2Moisture and Alkalinity Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 45 OF 104 PAGES

09 68 00 SD-07 Certificates

2.1.2 SIndoor Air Quality for Carpet

SD-08 Manufacturer’s Instructions

3.1Surface Preparation

SD-10 Operation and Maintenance

Data

3.5Cleaning and Protection

SD-11 Closeout Submittals

1.6Warranty

09 84 20 SD-02 Shop Drawings

2.2Detail Drawings

SD-03 Product Data

3.2Installation

2.2Acoustical Wall Panels

2.1.1.1 SRecycled Content for Fabric

Panels

SD-04 Samples

2.2 GAcoustical Wall Panels

SD-07 Certificates

2.2Acoustical Wall Panels

2.2 SIndoor Air Quality For Acoustical

Wall Panels

SD-11 Closeout Submittals

1.4Warranty

09 90 00 SD-02 Shop Drawings

3.10Piping Identification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 46 OF 104 PAGES

09 90 00 SD-03 Product Data

2.1Coating

2.1Product Data Sheets

SD-04 Samples

2.2 GColor

SD-07 Certificates

1.5.5.2Qualification Testing

1.5.4 SIndoor Air Quality for Paints and

Primers

1.5.4 SIndoor Air Quality for

Consolidated Latex Paints

SD-08 Manufacturer’s Instructions

3.2.1Application Instructions

2.1Mixing

1.7.1Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1Coatings

10 14 00.10 SD-02 Shop Drawings

3.1 GDetail Drawings

SD-03 Product Data

2.1Modular Exterior Signage System

3.1Installation

1.2 GExterior Signage

1.2.1Wind Load Requirements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 47 OF 104 PAGES

10 14 00.10 SD-04 Samples

1.2 GExterior Signage

SD-10 Operation and Maintenance

Data

3.1.2Protection and Cleaning

10 14 00.20 SD-02 Shop Drawings

1.3.2 GDetail Drawings

SD-03 Product Data

2.1Room Identification And

Directional Signage System

2.2Stair Signage

2.3Exit Door Tactile Sign

2.4Building Directories

SD-04 Samples

1.3.1 GInterior Signage

2.1Room Identification And

Directional Signage System

2.2Stair Signage

2.3Exit Door Tactile Sign

2.4Building Directories

10 14 53 SD-03 Product Data

2.1Traffic Sign Posts

10 21 13 SD-02 Shop Drawings

2.1Fabrication Drawings

3.2Installation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 48 OF 104 PAGES

10 21 13 2.1Cleaning and Maintenance

Instructions

2.7Colors And Finishes

2.2.2Anchoring Devices and Fasteners

2.2.4Hardware and Fittings

2.2.3Brackets

2.2.5Door Hardware

2.3.1Toilet Enclosures

2.3.2Urinal Screens

2.5Pilaster Shoes

2.2.4.2Finishes

2.7.2Finishes

2.3 SSolid Polyethylene Toilet

Partitions And Screens

SD-04 Samples

2.7 GColors and Finishes

2.2.4Hardware and Fittings

2.2.2Anchoring Devices and Fasteners

SD-07 Certificates

1.6Warranty

1.3.1 SIndoor Air Quality of Plastic

Products

SD-10 Operation and Maintenance

Data

2.1.1Plastic Identification

10 26 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 49 OF 104 PAGES

10 26 00 2.2Corner Guards

2.3Wall Guards

2.4Wall Covering and Panels

SD-03 Product Data

2.2Corner Guards

2.3Wall Guards

2.4 GWall Covering and Panels

2.3 SRecycled content for aluminum

component of wall guards, Combination Handrail/Wall guard and handrails

2.3.1 SRecycled content for aluminum

component of crash rail/bed locators

SD-04 Samples

2.2 GCorner Guards

2.3 GWall Guards

2.4 GWall Covering and Panels

SD-06 Test Reports

2.1.1.2Fire Resistance Rating

SD-07 Certificates

2.4 SIndoor air quality for wall

covering/panels

2.7 SIndoor air quality for adhesives

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 50 OF 104 PAGES

10 26 00 2.2Corner Guards

2.3Wall Guards

2.4Wall Covering and Panels

10 28 13 SD-03 Product Data

2.1.2Finishes

2.2Accessory Items

2.1 SRecycled content for stainless

steel toilet accessories

SD-04 Samples

2.1.2Finishes

2.2Accessory Items

SD-07 Certificates

2.2Accessory Items

10 44 16 SD-03 Product Data

2.1Cabinets

12 21 00 SD-02 Shop Drawings

3.3Installation

SD-03 Product Data

2.1 GWindow Blinds

2.1 SRecycled Content for aluminum

components

SD-04 Samples

2.1 GWindow Blinds

SD-06 Test Reports

2.1Window Blinds

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 51 OF 104 PAGES

12 21 00 2.1 SIndoor Air Quality for window blinds

2.1 SIndoor Air Quality for window

blinds

SD-08 Manufacturer’s Instructions

2.1 GWindow Blinds

SD-10 Operation and Maintenance

Data

2.1 GWindow Blinds

12 48 13 SD-02 Shop Drawings

3.2Installation Drawings

3.2Detail Drawings

SD-03 Product Data

2.1.1Entrance Floor Mats and Frames

SD-04 Samples

2.1.1 GEntrance Floor Mats and Frames

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Instructions

SD-10 Operation and Maintenance

Data

3.2Protection, Maintenance, and

Repair Information

14 24 23 SD-02 Shop Drawings

2.1 GElevator

1.2.1 GElevator Components

1.2.2 GElevator Components

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 52 OF 104 PAGES

14 24 23 1.2.1 GElevator Machine

1.2.1 GElevator Controller

1.3.4 GWiring Diagrams

SD-03 Product Data

2.1Elevator

1.2.1Elevator Components

1.2.2Elevator Components

1.2.2Data Sheets

2.5.2Elevator Microprocessor

Controller

SD-05 Design Data

1.2.3.3Emergency Power Systems

1.2.3.2Heat Loads

1.2.3.1Reaction Loads

SD-07 Certificates

1.3.2Price Lists

1.4Warranty

1.3.1.1Endorsement Letter

1.2.4Welders' Qualifications

2.5.2.3Elevator Controller Certification

2.1.2 SIndoor Air Quality for Flooring and

Adhesive

SD-10 Operation and Maintenance

Data

2.1Elevator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 53 OF 104 PAGES

14 24 23 1.2.5Maintenance Control Program

(MCP)

2.5.2.2Software and Documentation

21 13 13 SD-01 Preconstruction Submittals

1.2.3 GQualified Fire Protection Engineer

(QFPE)

1.4.2.1 GSprinkler System Designer

1.4.2.2 GSprinkler System Installer

SD-02 Shop Drawings

1.2.1.1 GShop Drawing

SD-03 Product Data

2.2.1 GPipe

2.3.1.2 GFittings

2.3.4 GValves

2.8.5 GRelief Valves

2.7 GSprinklers

2.3.3 GPipe Hangers and Supports

2.4.1 GSprinkler Alarm Switch

2.4.2 GValve Supervisory (Tamper)

Switch

2.6 GFire Department Connection

2.5 GBackflow Prevention Assembly

2.8.6 GAir Vent

2.5.1 GHose Valve

2.3.3 GSeismic Bracing

2.1.2 GNameplates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 54 OF 104 PAGES

21 13 13 SD-05 Design Data

2.3.3 GSeismic Bracing

2.3.3Load calculations for sizing of seismic bracing

1.2.1.2 GHydraulic Calculations

SD-06 Test Reports

3.7.1 GTest Procedures

SD-07 Certificates

3.7.2.1 GVerification of Compliant

Installation

3.7.2.2 GRequest for Government Final

Test

SD-10 Operation and Maintenance

Data

3.9 GOperating and Maintenance

(O&M) Instructions

1.6 GSpare Parts

SD-11 Closeout Submittals

3.9 GAs-built drawings

22 00 00 SD-02 Shop Drawings

3.9.1 GPlumbing System

SD-03 Product Data

2.4.3 SWater Sense Label for Water

Closet Flush Valve

2.4.4 SWater Sense Label for Urinal

3.9.1.1 GBackflow Prevention Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 55 OF 104 PAGES

22 00 00 2.6.2Shower Faucets

2.4Fixtures

2.4.3Flush Valve Water Closets

2.4.4Flush Valve Urinals

2.4.6Wall Hung Lavatories

3.1.3 GDielectric Fittings

2.4.7Countertop Lavatories

2.4.8Sinks

2.4.9Service Sinks

2.4.10Drinking-Water Coolers

2.4.10 SEnergy Star Label for Electric

Water Cooler

2.8 GWater Heaters

2.10 GPumps

3.4 GVibration-Absorbing Features

3.9.1Plumbing System

SD-06 Test Reports

3.9Tests, Flushing and Disinfection

3.9.1.1Test of Backflow Prevention

Assemblies

SD-07 Certificates

1.3Materials and Equipment

2.1.1Bolts

SD-10 Operation and Maintenance

Data

3.9.1Plumbing System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 56 OF 104 PAGES

23 05 15 SD-01 Preconstruction Submittals

1.2Material, Equipment, and Fixture

Lists

SD-02 Shop Drawings

1.2 GRecord Drawings

1.2 GConnection Diagrams

1.2 GCoordination Drawings

1.2 GFabrication Drawings

3.1 GInstallation Drawings

SD-03 Product Data

2.1 GPipe and Fittings

2.2 GPiping Specialties

2.3 GValves

2.4 GMiscellaneous Materials

2.5 GSupporting Elements

1.2 GEquipment Foundation Data

SD-04 Samples

1.2 GManufacturer's Standard Color

Charts

SD-05 Design Data

2.1 GPipe and Fittings

2.2 GPiping Specialties

2.3 GValves

SD-06 Test Reports

3.1 GHydrostatic Tests

3.1 GAir Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 57 OF 104 PAGES

23 05 15 3.1 GValve-Operating Tests

3.1 GDrainage Tests

3.1 GPneumatic Tests

3.1 GNon-Destructive Electric Tests

3.1 GSystem Operation Tests

SD-07 Certificates

1.4.2 GRecord of Satisfactory Field

Operation

1.4.3 GList of Qualified Permanent

Service Organizations

1.2 GListing of Product Installations

1.2 GRecords of Existing Conditions

3.1 GSurface Resistance

3.1 GShear and Tensile Strengths

3.1 GTemperature Ratings

3.1 GBending Tests

3.1 GFlattening Tests

3.1 GTransverse Guided Weld Bend

Tests

SD-10 Operation and Maintenance

Data

3.10 GOperation and Maintenance

Manuals

23 05 48.19 SD-02 Shop Drawings

3.1Coupling and Bracing

3.3Flexible Couplings or Joints

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 58 OF 104 PAGES

23 05 48.19 2.2Equipment Restraint

1.2.4 GContractor Designed Bracing

SD-03 Product Data

3.1 GCoupling and Bracing

3.3 GFlexible Couplings Or Joints

2.2 GEquipment Restraint

1.2.4 GContractor Designed Bracing

2.6Snubbers

3.9Anchor Bolts

2.2.2Vibration Isolators

SD-05 Design Data

1.2.4Design Calculations

SD-06 Test Reports

3.9 GAnchor Bolts

23 05 93 SD-01 Preconstruction Submittals

1.3.3 GRecords of Existing Conditions

1.5.3.1 GTAB Firm

1.2 GTAB Team Assistants

1.2 GTAB Team Engineer

1.5.3.2 GTAB Specialist

1.2 GTAB Team Field Leader

SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 59 OF 104 PAGES

23 05 93 1.3 GEquipment and Performance

Data

1.5.3.4 GTAB Related HVAC Submittals

1.5.2 GTAB Procedures

1.5.2 GCalibration

1.3.3 GSystems Readiness Check

1.5.4 GTAB Execution

1.5.4.3 GTAB Verification

SD-06 Test Reports

3.3.5 GCompleted Pre-Final DALT

Report

3.3.8 GCertified Final DALT Report

1.5.5.2 GTAB Report for Season 1

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.7.2 GDALT and TAB Submittal and

Work Schedule

1.7.2.3 GTAB Pre-Field Engineering

Report

1.5.3.1 GTAB Firm

1.3.3 GDesign Review Report

1.7.2.2 GPre-field DALT Preliminary

Notification

1.7.2 GAdvanced Notice for TAB Field

Work

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 60 OF 104 PAGES

23 05 93 1.7.2 GPrerequisite HVAC Work Check

Out List

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

2.3.1 SRecycled content for insulation

materials

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

2.3.1 SRecycled Materials

SD-04 Samples

2.2.1.2 GThermal Insulation

3.1.1 GDisplay Samples

SD-07 Certificates

2.2.1 SIndoor air quality for adhesives

and sealants

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 61 OF 104 PAGES

23 07 00 3.4 GEquipment Insulation Systems

23 09 00 SD-02 Shop Drawings

3.3 GDDC Contractor Design Drawings

3.3 GDraft As-Built Drawings

3.3 GFinal As-Built Drawings

SD-03 Product Data

1.8.3 GProgramming Software

1.8.4 GController Application Programs

1.8.1 GConfiguration Software

1.8.2 GController Configuration Settings

2.2 GManufacturer's Product Data

1.8.5 GNiagara Framework Supervisory

Gateway Backups

1.8.6 GNiagara Framework Engineering

Tool

1.5 GNiagara Framework Wizards

SD-05 Design Data

1.9Boiler Or Chiller Plant Gateway

Request

SD-06 Test Reports

3.1.1Existing Conditions Report

3.5.2 GStart-Up Testing Report

3.6.1 GPVT Procedures

3.6.3 GPVT Report

1.10.1 GPre-Construction Quality Control

(QC) Checklist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 62 OF 104 PAGES

23 09 00 1.10.2 GPost-Construction Quality Control

(QC) Checklist

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

(O&M) Instructions

3.9.1 GTraining Documentation

SD-11 Closeout Submittals

2.5 GEnclosure Keys

1.10.3 GCloseout Quality Control (QC)

Checklist

23 21 23 SD-02 Shop Drawings

2.1.2 GSystem Coordination

SD-03 Product Data

2.2.2 GInstructions

2.2.5 GEquipment Data

3.5.2 GTraining Period

SD-06 Test Reports

2.8Factory Tests

3.3Field Quality Control

SD-07 Certificates

1.3.1Manufacturer's Representative

SD-10 Operation and Maintenance

Data

3.5.1 GOperation and Maintenance

Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 63 OF 104 PAGES

23 21 23 3.5.2 GTraining

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-03 Product Data

2.3Refrigerant Piping System

1.5.2Spare Parts

1.3.1Qualifications

3.5Refrigerant Piping Tests

3.1Verification of Dimensions

SD-06 Test Reports

3.5Refrigerant Piping Tests

SD-07 Certificates

2.1Service Organization

SD-10 Operation and Maintenance

Data

1.5 GMaintenance

3.4 GOperation and Maintenance

Manuals

3.4 GDemonstrations

23 30 00 SD-02 Shop Drawings

1.4.4 GDetail Drawings

SD-03 Product Data

2.9.1.1Metallic Flexible Duct

2.9.1.2Insulated Nonmetallic Flexible

Duct Runouts

2.9.1.2Duct Connectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 64 OF 104 PAGES

23 30 00 2.9.2 GDuct Access Doors

2.9.3 GManual Balancing Dampers

2.9.6Sound Attenuation Equipment

2.9.7.1Diffusers

2.9.7.2Registers and Grilles

2.9.8Louvers

2.9.9Air Vents, Penthouses, and

Goosenecks

2.10.1.1Centrifugal Fans

2.10.1.2In-Line Centrifugal Fans

2.10.1.3Ceiling Exhaust Fans

2.10.1.3 SPL-109-58 label for ceiling

exhaust fan product

2.11 GAir Handling Units

2.12.1 GRoom Fan-Coil Units

2.12.2.1 GVariable Volume, Single Duct

Terminal Units

1.4.5Test Procedures

1.2.1.2 GDiagrams

2.10.3 SAir Filters

2.9.1 SIndoor Air Quality for Duct

Sealants

SD-06 Test Reports

3.12 GPerformance Tests

3.10 GDamper Acceptance Test

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 65 OF 104 PAGES

23 30 00 1.4.1Bolts

1.4.3Ozone Depleting Substances

Technician Certification

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation

Instructions

3.14.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

3.14.1 GOperation and Maintenance

Manuals

2.9.3 GManual Balancing Dampers

2.10.1.1 GCentrifugal Fans

2.10.1.2 GIn-Line Centrifugal Fans

2.10.1.3 GCeiling Exhaust Fans

2.11 GAir Handling Units

2.12.1 GRoom Fan-Coil Units

2.12.2.1 GVariable Volume, Single Duct

Terminal Units

SD-11 Closeout Submittals

3.13 SIndoor Air Quality During

Construction

23 64 10 SD-03 Product Data

3.1.3Posted Instructions

1.6.1Verification of Dimensions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 66 OF 104 PAGES

23 64 10 2.8Factory Tests

3.6System Performance Tests

3.7Demonstrations

2.5.1Refrigerant

3.5.1Water Chiller - Field Acceptance

Test Plan

SD-06 Test Reports

3.5Field Acceptance Testing

3.5.2Water Chiller - Field Acceptance

Test Report

2.8Factory Tests

3.6System Performance Tests

SD-07 Certificates

3.1.8 GRefrigeration System

1.3.1Ozone Depleting Substances

Technician Certification

SD-08 Manufacturer’s Instructions

3.1 GWater Chiller - Installation

Instructions

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.4 SIndoor Air Quality During

Construction

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 67 OF 104 PAGES

23 64 26 SD-03 Product Data

2.4.7 GAutomatic Flow Control Valves

2.4.8Pump Discharge Valve

2.4.9Pressure Relief Valve

2.5.8 GExpansion Joints

2.6 GPumps

2.5.2Combination Strainer and Pump

Suction Diffuser

2.7Expansion Tanks

2.8Air Separator Tanks

2.9 GWater Treatment Systems

SD-06 Test Reports

3.1.1.3Piping Welds NDE Report

3.4.2 GPressure Tests Reports

SD-07 Certificates

3.1.1.1Employer's Record Documents

(For Welding)

3.1.1.2Welding Procedures and

Qualifications

SD-08 Manufacturer’s Instructions

3.5 GLesson plan for the Instruction

Course

SD-10 Operation and Maintenance

Data

2.4.6 GCalibrated Balancing Valves

2.4.7 GAutomatic Flow Control Valves

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 68 OF 104 PAGES

23 64 26 2.4.8 GPump Discharge Valve

2.4.9 GPressure Relief Valve

2.5.8 GExpansion Joints

2.6 GPumps

2.5.2 GCombination Strainer and Pump

Suction Diffuser

2.7 GExpansion Tanks

2.8 GAir Separator Tanks

23 81 00 SD-03 Product Data

3.7.1Spare Parts

3.4Posted Instructions

2.6.1Coil Corrosion Protection

3.6System Performance Tests

3.4 GTraining

1.4Inventory

2.1Supplied Products

2.2Manufacturer's Standard Catalog

Data

2.1 SEnergy Star

2.3.2.1.7 SAir Filters

2.2.2.3 SEPA SNAP for Refrigerants

SD-06 Test Reports

3.5 GRefrigerant Tests, Charging, and

Start-Up

3.6 GSystem Performance Tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 69 OF 104 PAGES

23 81 00 3.7.2Service Organizations

SD-10 Operation and Maintenance

Data

3.4 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

2.2.2.3 SOzone Depleting Substances

23 81 23 SD-03 Product Data

2.1 GComputer Room Air Conditioner

2.5.2 GSpace Temperature Control

System Drawings

2.1.5Filters

1.4 SRefrigerants

1.4 SEPA SNAP for Refrigerants

SD-07 Certificates

2.3 GCertificate of Specification

Compliance

3.3.3 GCredentials of the Manufacturer's

Field Test Representative

1.5.1Ozone Depleting Substances

Technician Certification

1.6.3Certified List Of Qualified

Permanent Service Organizations

SD-08 Manufacturer’s Instructions

3.1.2Installation Manual for Each Type of CRAC

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 70 OF 104 PAGES

23 81 23 SD-10 Operation and Maintenance

Data

3.1.3 GComputer Room Air Conditioner

Operation and Maintenance Data

SD-11 Closeout Submittals

3.2 SIndoor Air Quality During

Construction

25 05 11.21 SD-01 Preconstruction Submittals

3.3.2 GDevice Account Lock Exception

Request

1.10.1.6 GContractor Computer

Cybersecurity Compliance

Statements

1.10.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

1.7.2 GCybersecurity Subject Matter

Expert Qualifications

SD-02 Shop Drawings

1.8.1 GNetwork Communication Report

1.8.4 GCybersecurity Riser Diagram

SD-03 Product Data

1.8.5 GControl System Cybersecurity

Documentation

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 71 OF 104 PAGES

25 05 11.21 3.13.1 GControl System Cybersecurity

Testing Procedures

3.13.3 GControl System Cybersecurity

Testing Report

SD-07 Certificates

1.9 GSoftware Licenses

SD-11 Closeout Submittals

3.4.5.4 GPassword Change Summary

Report

3.3.7 GEnclosure Keys

1.8.3 GSoftware and Configuration

Backups

3.5.3 GAuditing Front End Software

3.5.4.2 GDevice Audit Record Upload

Software

3.9 GSystem Maintenance Tool

Software

1.8.2 GControl System Inventory Report

3.12.1 GIntegrity Verification Software

25 05 11.23 SD-01 Preconstruction Submittals

3.3.2 GDevice Account Lock Exception

Request

3.2.2.2 GMultiple Ethernet Connection

Device Request

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 72 OF 104 PAGES

25 05 11.23 1.10.1.6 GContractor Computer

Cybersecurity Compliance

Statements

1.10.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

1.7.2 GCybersecurity Subject Matter

Expert Qualifications

1.8.1 GProposed STIG and SRG

Applicability Report

SD-02 Shop Drawings

1.8.2 GNetwork Communication Report

1.8.5 GCybersecurity Riser Diagram

SD-03 Product Data

1.8.7 GControl System Cybersecurity

Documentation

SD-06 Test Reports

3.13.1 GControl System Cybersecurity

Testing Procedures

3.13.3 GControl System Cybersecurity

Testing Report

SD-07 Certificates

1.9 GSoftware Licenses

SD-11 Closeout Submittals

3.4.5.4 GPassword Change Summary

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 73 OF 104 PAGES

25 05 11.23 3.3.5 GEnclosure Keys

1.8.4 GSoftware and Configuration

Backups

3.5.3 GAuditing Front End Software

3.5.4.1 GDevice Audit Record Upload

Software

3.9 GSystem Maintenance Tool

Software

3.11.1 GControl System Scanning Tools

1.8.6 GSTIG, SRG and Vendor Guide

Compliance Result Report

1.8.3 GControl System Inventory Report

25 05 11.26 SD-01 Preconstruction Submittals

3.3.2 GDevice Account Lock Exception

Request

3.2.2.2 GMultiple Ethernet Connection

Device Request

1.10.1.6 GContractor Computer

Cybersecurity Compliance

Statements

1.10.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

1.7.2 GCybersecurity Subject Matter

Expert Qualifications

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 74 OF 104 PAGES

25 05 11.26 1.8.1 GNetwork Communication Report

1.8.4 GCybersecurity Riser Diagram

SD-03 Product Data

1.8.5 GControl System Cybersecurity

Documentation

SD-06 Test Reports

3.13.1 GControl System Cybersecurity

Testing Procedures

3.13.3 GControl System Cybersecurity

Testing Report

SD-07 Certificates

1.9 GSoftware Licenses

SD-11 Closeout Submittals

3.4.5.4 GPassword Change Summary

Report

3.3.5 GEnclosure Keys

1.8.3 GSoftware and Configuration

Backups

3.5.3 GAuditing Front End Software

3.5.4.1 GDevice Audit Record Upload

Software

3.9 GSystem Maintenance Tool

Software

1.8.2 GControl System Inventory Report

25 10 10 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 75 OF 104 PAGES

25 10 10 3.3.2UMCS Contractor Design

Drawings

3.3.3Draft As-Built Drawings

3.3.3Final As-Built Drawings

SD-03 Product Data

2.1.5Product Data Sheets

2.4.1Enclosure Keys

SD-05 Design Data

3.3.1UMCS IP Network Bandwidth

Usage Estimate

SD-06 Test Reports

1.7Pre-Construction QC Checklist

1.7Post-Construction QC Checklist

3.1Factory Test Procedures

3.1Factory Test Report

3.2Existing Conditions Report

3.7 GStart-Up and Start-Up Testing

Report

3.8.1PVT Phase I Procedures

3.8.2 GPVT Phase I Report

3.8.3 GPVT Phase II Report

SD-10 Operation and Maintenance

Data

1.8Operation and Maintenance

(O&M) Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 76 OF 104 PAGES

25 10 10 3.9.8.1Preventive Maintenance Work

Plan

3.10.1Basic Training Documentation

3.10.1Advanced Training

Documentation

3.10.1Refresher Training

Documentation

SD-11 Closeout Submittals

1.7Closeout QC Checklist

26 05 19.10 10 SD-03 Product Data

2.1.1 GWire and Cable

2.1.3.1 GConductors

3.1Cable Manufacturing Data

SD-06 Test Reports

3.2 GTest Report(s), Inspection

Report(s), and Verification

Report(s)

26 05 48.00 10 SD-02 Shop Drawings

3.2Lighting Fixtures in Buildings

1.3Equipment Requirements

SD-03 Product Data

3.2 GLighting Fixtures in Buildings

1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

26 08 00 SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 77 OF 104 PAGES

26 08 00 3.1 GAcceptance Tests and

Inspections

SD-07 Certificates

1.4.1 GQualifications

1.4.3 GAcceptance Test and Inspections

Procedure

26 20 00 SD-02 Shop Drawings

2.13 GPanelboards

2.15 GTransformers

2.4 GCable Trays

SD-03 Product Data

3.1.5.1 GSurface Raceways

2.12 GReceptacles

2.13.3 GCircuit Breakers

2.10 GSwitches

2.15 GTransformers

2.14 GEnclosed Circuit Breakers

2.17 GMotor Controllers

2.18 GManual Motor Starters

2.27 GMetering

2.21.1 GCATV Outlets

2.22.2 GSecondary Bonding Busbar

2.28 GSurge Protective Devices

SD-06 Test Reports

3.5.2 G600-volt Wiring Test

3.5.6 GGrounding System Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 78 OF 104 PAGES

26 20 00 3.5.3 GTransformer Tests

3.5.4 GGround-fault Receptacle Test

3.5.5 GArc-fault Receptacle Test

SD-07 Certificates

2.11 GFuses

SD-09 Manufacturer’s Field

Reports

2.30.1Transformer Factory Tests

SD-10 Operation and Maintenance

Data

2.27 GMetering

26 24 13 SD-02 Shop Drawings

1.4.2 GSwitchboard Drawings

SD-03 Product Data

2.2 GSwitchboard

SD-06 Test Reports

2.5.2 GSwitchboard Design Tests

2.5.3 GSwitchboard Production Tests

3.5.1 GAcceptance Checks and Tests

SD-10 Operation and Maintenance

Data

1.5.1 GSwitchboard Operation and

Maintenance

SD-11 Closeout Submittals

1.5.2 GAssembled Operation and

Maintenance Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .