This is a solicitation notice for a construction project to renovate and repair Building 300 for the Multi-Domain Task Force #3 at Helemano Military Reservation. The project scope includes a new elevator, UPS, emergency generator, utility extensions, communications infrastructure, site work including lighting, grading, parking and fencing. The estimated period of performance is 912 calendar days with a project magnitude between $50-100 million. The acquisition will be lowest priced technically acceptable based on experience, past performance, technical approach, and price. Offerors must register in SAM and check for any changes to the solicitation, which will be issued as a firm-fixed-price construction contract by the U.S. Army Corps of Engineers, Honolulu District. The NAICS code is 236220 with a $39.5 million small business size standard.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 104 PAGES
MDTF #3 Building 300 Helemano Military Reservation
08 11 16 SD-04 Samples
1.5.2 GFinish Samples
1.2.3Air Infiltration
1.2.4Water Penetration
SD-08 Manufacturer’s Instructions
1.5.1Door and Frame Assembly
1.5.3Adjustments, Cleaning, and
Maintenance
08 31 00 SD-02 Shop Drawings
1.3Access Doors And Panels
SD-03 Product Data
1.3Access Doors And Panels
2.1 SRecycled Content
SD-04 Samples
2.5Finishes
08 34 59 SD-02 Shop Drawings
2.1 GVault Door Unit
2.3 GDay Gate
SD-03 Product Data
2.2Vault Door and Frame
SD-07 Certificates
2.2Vault Door and Frame
SD-08 Manufacturer’s Instructions
3.1Installation
08 34 73 SD-02 Shop Drawings
2.1Fabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 104 PAGES
08 34 73 SD-03 Product Data
2.1Hollow Metal Sound Retardant
Doors
2.1Door Frames
2.1Door Hardware
2.3.2Door Frame Sound Infill
2.1Intumescent Seals and Gasketing
2.1Thresholds
1.3.2 SRecycled Content of Doors
SD-06 Test Reports
2.4.4Acoustical Tests
2.4.4Positive Pressure Tests
SD-07 Certificates
2.1Hollow Metal Sound Retardant
Doors
2.1Door Frames
2.1Door Hardware
1.3.1.3Intumescent Seals,Gasketing and
Door Bottoms
2.1Thresholds
3.3.1Assembly Test Reports
08 51 13 SD-02 Shop Drawings
2.1 GWindows
1.6Fabrication Drawings
SD-03 Product Data
2.1Windows
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 104 PAGES
08 51 13 2.1 SRecycled Content of Aluminum
Windows
2.2.6.1Hardware
2.2.2Fasteners
1.7Window Performance
2.2.8Screens
2.1.6Weatherstripping
2.2.6Accessories
1.7.5Thermal Performance
SD-04 Samples
1.3.3.1Finish Sample
1.3.3.2Window Sample
SD-05 Design Data
2.1 GStructural Calculations for
Deflection
1.3.4 GDesign Analysis
SD-06 Test Reports
1.3.5Resistance to Forced Entry
1.7.6Windborne-Debris-Impact
Performance
SD-10 Operation and Maintenance
Data
2.1Windows
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 104 PAGES
08 71 00 1.5 GHardware Schedule
2.3.9 GKeying System
1.8.1.1 GWiring Diagram and Sequence of
Operations for all Electrified
Hardware
SD-03 Product Data
2.3 GHardware Items
1.8.1 GAccess System
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5Hardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
2.2Insulating Glass
1.4Glazing Accessories
2.3.2.1Sealants
SD-04 Samples
2.2Insulating Glass
2.3.4Tape
2.3.4Sealing Tapes
SD-07 Certificates
2.2Insulating Glass
1.3.1 SIndoor Air Quality for Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 104 PAGES
08 81 00 SD-08 Manufacturer’s Instructions
2.3Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.8.1Insulated Glass Units
08 91 00 SD-02 Shop Drawings
1.4Wall Louvers
SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.5 GWall Louver Samples
09 22 00 SD-02 Shop Drawings
2.1Metal Support Systems
SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.1.3Cementitious Backer Units
2.1.7Accessories
2.1.1Gypsum Board
2.1.8Partition Closure
2.1.1 SRecycled Content for Gypsum
Board
2.1.4 SVOC Content of Joint Compound
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 104 PAGES
09 29 00 2.1.2.1ASTM E90 Factory Test Report
3.7ASTM E90 Factory Test Report
3.10ASTM E90 Factory Test Report
3.10ASTM E336 Field Test Report
SD-07 Certificates
2.1Asbestos Free Materials
2.1.1 SIndoor Air Quality for Gypsum
Board
09 30 10 SD-03 Product Data
2.1.1Porcelain Tile
2.1.1 SRecycled Content for Porcelain
Tile
2.1.2Glazed Ceramic Wall Tile
2.1.2 SRecycled Content for Glazed
Ceramic Wall Tile
2.1Transition Strips
2.6.1Transition Strips
2.6.2Metal Transition Strips
2.2Setting-Bed
2.4Mortar and Grout
2.7Waterproof Membrane
2.8Crack Isolation Membrane
SD-04 Samples
2.1 GTile
2.1 GTransition Strips
2.6.1 GTransition Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 104 PAGES
09 30 10 SD-07 Certificates
2.4 SIndoor Air Quality for Grout
2.7.1 SIndoor Air Quality for
Waterproofing Membrane
1.3.2Water Absorption Rates
SD-08 Manufacturer’s Instructions
3.8Manufacturer's Approved
Cleaning Instructions
SD-10 Operation and Maintenance
Data
2.1.1Porcelain Tile
2.1.2Glazed Ceramic Wall Tile
2.1Transition Strips
2.6.1Transition Strips
09 51 00 SD-02 Shop Drawings
2.1Detail Drawings
SD-03 Product Data
2.2.2.1 SRecycled Content for Type III
Ceiling Tiles
2.2.1.1 SRecycled Content for Type XII
Ceiling Tiles
2.3 SRecycled Content for Suspension
Systems
2.1.1Acoustical Performance
SD-04 Samples
2.2 GAcoustical Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 104 PAGES
09 51 00 SD-07 Certificates
2.2.2.1 SIndoor Air Quality for Type III
Ceiling Tiles
2.2.1.1 SIndoor Air Quality for Type XII
Ceiling Tiles
2.5 SIndoor Air Quality for Adhesives
2.8 SIndoor Air Quality for Sealants
09 62 38 SD-03 Product Data
2.1Static-Control Resilient Flooring
2.1.1.1 SRecycled content for
Static-Dissipative Vinyl Tile
2.4Accessories
2.2Adhesives
1.8Warranty
SD-04 Samples
2.1Static-Control Resilient Flooring
2.3Moldings Transitions
1.3.1.3Special Treatment Materials
2.4Accessories
SD-06 Test Reports
2.7Fire Resistance
3.2Moisture, Alkalinity and Bond
3.6Testing
SD-07 Certificates
2.1.1.1 SIndoor Air Quality for
Static-Dissipative Vinyl Tile
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 104 PAGES
09 62 38 2.2 SIndoor Air Quality for Adhesives
1.5Qualifications of Applicator
SD-08 Manufacturer’s Instructions
2.1Static-Control Resilient Flooring
2.4Accessories
SD-10 Operation and Maintenance
Data
2.1Static-Control Resilient Flooring
2.4Accessories
09 65 00 SD-03 Product Data
2.7Resilient Flooring and
Accessories
2.2Wall Base
2.1Luxury Vinyl Tile
2.1 SRecycled Content for Luxury Vinyl
Tile
2.4Adhesives
SD-04 Samples
2.7 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3Moisture, Alkalinity and Bond
Tests
SD-07 Certificates
2.1 SIndoor Air Quality for Luxury Vinyl
Tile
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 104 PAGES
09 65 00 2.2 SIndoor Air Quality for Wall Base
2.4 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2Surface Preparation
3.1Installation
SD-10 Operation and Maintenance
Data
2.7Resilient Flooring and
Accessories
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
SD-03 Product Data
2.1Carpet
2.1.1 SRecycled Content for Carpeting
2.4Moldings Transitions
2.3 SIndoor Air Quality for Aerosol
Adhesives
2.3 SIndoor Air Quality for Non-Aerosol
Adhesives
2.3 SIndoor Air Quality for Concrete
Primer
SD-04 Samples
2.1 GCarpet
2.4 GMoldings Transitions
SD-06 Test Reports
3.2Moisture and Alkalinity Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 45 OF 104 PAGES
09 68 00 SD-07 Certificates
2.1.2 SIndoor Air Quality for Carpet
SD-08 Manufacturer’s Instructions
3.1Surface Preparation
SD-10 Operation and Maintenance
Data
3.5Cleaning and Protection
SD-11 Closeout Submittals
1.6Warranty
09 84 20 SD-02 Shop Drawings
2.2Detail Drawings
SD-03 Product Data
3.2Installation
2.2Acoustical Wall Panels
2.1.1.1 SRecycled Content for Fabric
Panels
SD-04 Samples
2.2 GAcoustical Wall Panels
SD-07 Certificates
2.2Acoustical Wall Panels
2.2 SIndoor Air Quality For Acoustical
Wall Panels
SD-11 Closeout Submittals
1.4Warranty
09 90 00 SD-02 Shop Drawings
3.10Piping Identification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 46 OF 104 PAGES
09 90 00 SD-03 Product Data
2.1Coating
2.1Product Data Sheets
SD-04 Samples
2.2 GColor
SD-07 Certificates
1.5.5.2Qualification Testing
1.5.4 SIndoor Air Quality for Paints and
Primers
1.5.4 SIndoor Air Quality for
Consolidated Latex Paints
SD-08 Manufacturer’s Instructions
3.2.1Application Instructions
2.1Mixing
1.7.1Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1Coatings
10 14 00.10 SD-02 Shop Drawings
3.1 GDetail Drawings
SD-03 Product Data
2.1Modular Exterior Signage System
3.1Installation
1.2 GExterior Signage
1.2.1Wind Load Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 47 OF 104 PAGES
10 14 00.10 SD-04 Samples
1.2 GExterior Signage
SD-10 Operation and Maintenance
Data
3.1.2Protection and Cleaning
10 14 00.20 SD-02 Shop Drawings
1.3.2 GDetail Drawings
SD-03 Product Data
2.1Room Identification And
Directional Signage System
2.2Stair Signage
2.3Exit Door Tactile Sign
2.4Building Directories
SD-04 Samples
1.3.1 GInterior Signage
2.1Room Identification And
Directional Signage System
2.2Stair Signage
2.3Exit Door Tactile Sign
2.4Building Directories
10 14 53 SD-03 Product Data
2.1Traffic Sign Posts
10 21 13 SD-02 Shop Drawings
2.1Fabrication Drawings
3.2Installation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 48 OF 104 PAGES
10 21 13 2.1Cleaning and Maintenance
Instructions
2.7Colors And Finishes
2.2.2Anchoring Devices and Fasteners
2.2.4Hardware and Fittings
2.2.3Brackets
2.2.5Door Hardware
2.3.1Toilet Enclosures
2.3.2Urinal Screens
2.5Pilaster Shoes
2.2.4.2Finishes
2.7.2Finishes
2.3 SSolid Polyethylene Toilet
Partitions And Screens
SD-04 Samples
2.7 GColors and Finishes
2.2.4Hardware and Fittings
2.2.2Anchoring Devices and Fasteners
SD-07 Certificates
1.6Warranty
1.3.1 SIndoor Air Quality of Plastic
Products
SD-10 Operation and Maintenance
Data
2.1.1Plastic Identification
10 26 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 49 OF 104 PAGES
10 26 00 2.2Corner Guards
2.3Wall Guards
2.4Wall Covering and Panels
SD-03 Product Data
2.2Corner Guards
2.3Wall Guards
2.4 GWall Covering and Panels
2.3 SRecycled content for aluminum
component of wall guards, Combination Handrail/Wall guard and handrails
2.3.1 SRecycled content for aluminum
component of crash rail/bed locators
SD-04 Samples
2.2 GCorner Guards
2.3 GWall Guards
2.4 GWall Covering and Panels
SD-06 Test Reports
2.1.1.2Fire Resistance Rating
SD-07 Certificates
2.4 SIndoor air quality for wall
covering/panels
2.7 SIndoor air quality for adhesives
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 50 OF 104 PAGES
10 26 00 2.2Corner Guards
2.3Wall Guards
2.4Wall Covering and Panels
10 28 13 SD-03 Product Data
2.1.2Finishes
2.2Accessory Items
2.1 SRecycled content for stainless
steel toilet accessories
SD-04 Samples
2.1.2Finishes
2.2Accessory Items
SD-07 Certificates
2.2Accessory Items
10 44 16 SD-03 Product Data
2.1Cabinets
12 21 00 SD-02 Shop Drawings
3.3Installation
SD-03 Product Data
2.1 GWindow Blinds
2.1 SRecycled Content for aluminum
components
SD-04 Samples
2.1 GWindow Blinds
SD-06 Test Reports
2.1Window Blinds
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 51 OF 104 PAGES
12 21 00 2.1 SIndoor Air Quality for window blinds
2.1 SIndoor Air Quality for window
blinds
SD-08 Manufacturer’s Instructions
2.1 GWindow Blinds
SD-10 Operation and Maintenance
Data
2.1 GWindow Blinds
12 48 13 SD-02 Shop Drawings
3.2Installation Drawings
3.2Detail Drawings
SD-03 Product Data
2.1.1Entrance Floor Mats and Frames
SD-04 Samples
2.1.1 GEntrance Floor Mats and Frames
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Instructions
SD-10 Operation and Maintenance
Data
3.2Protection, Maintenance, and
Repair Information
14 24 23 SD-02 Shop Drawings
2.1 GElevator
1.2.1 GElevator Components
1.2.2 GElevator Components
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 52 OF 104 PAGES
14 24 23 1.2.1 GElevator Machine
1.2.1 GElevator Controller
1.3.4 GWiring Diagrams
SD-03 Product Data
2.1Elevator
1.2.1Elevator Components
1.2.2Elevator Components
1.2.2Data Sheets
2.5.2Elevator Microprocessor
Controller
SD-05 Design Data
1.2.3.3Emergency Power Systems
1.2.3.2Heat Loads
1.2.3.1Reaction Loads
SD-07 Certificates
1.3.2Price Lists
1.4Warranty
1.3.1.1Endorsement Letter
1.2.4Welders' Qualifications
2.5.2.3Elevator Controller Certification
2.1.2 SIndoor Air Quality for Flooring and
Adhesive
SD-10 Operation and Maintenance
Data
2.1Elevator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 53 OF 104 PAGES
14 24 23 1.2.5Maintenance Control Program
(MCP)
2.5.2.2Software and Documentation
21 13 13 SD-01 Preconstruction Submittals
1.2.3 GQualified Fire Protection Engineer
(QFPE)
1.4.2.1 GSprinkler System Designer
1.4.2.2 GSprinkler System Installer
SD-02 Shop Drawings
1.2.1.1 GShop Drawing
SD-03 Product Data
2.2.1 GPipe
2.3.1.2 GFittings
2.3.4 GValves
2.8.5 GRelief Valves
2.7 GSprinklers
2.3.3 GPipe Hangers and Supports
2.4.1 GSprinkler Alarm Switch
2.4.2 GValve Supervisory (Tamper)
Switch
2.6 GFire Department Connection
2.5 GBackflow Prevention Assembly
2.8.6 GAir Vent
2.5.1 GHose Valve
2.3.3 GSeismic Bracing
2.1.2 GNameplates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 54 OF 104 PAGES
21 13 13 SD-05 Design Data
2.3.3 GSeismic Bracing
2.3.3Load calculations for sizing of seismic bracing
1.2.1.2 GHydraulic Calculations
SD-06 Test Reports
3.7.1 GTest Procedures
SD-07 Certificates
3.7.2.1 GVerification of Compliant
Installation
3.7.2.2 GRequest for Government Final
Test
SD-10 Operation and Maintenance
Data
3.9 GOperating and Maintenance
(O&M) Instructions
1.6 GSpare Parts
SD-11 Closeout Submittals
3.9 GAs-built drawings
22 00 00 SD-02 Shop Drawings
3.9.1 GPlumbing System
SD-03 Product Data
2.4.3 SWater Sense Label for Water
Closet Flush Valve
2.4.4 SWater Sense Label for Urinal
3.9.1.1 GBackflow Prevention Assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 55 OF 104 PAGES
22 00 00 2.6.2Shower Faucets
2.4Fixtures
2.4.3Flush Valve Water Closets
2.4.4Flush Valve Urinals
2.4.6Wall Hung Lavatories
3.1.3 GDielectric Fittings
2.4.7Countertop Lavatories
2.4.8Sinks
2.4.9Service Sinks
2.4.10Drinking-Water Coolers
2.4.10 SEnergy Star Label for Electric
Water Cooler
2.8 GWater Heaters
2.10 GPumps
3.4 GVibration-Absorbing Features
3.9.1Plumbing System
SD-06 Test Reports
3.9Tests, Flushing and Disinfection
3.9.1.1Test of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
2.1.1Bolts
SD-10 Operation and Maintenance
Data
3.9.1Plumbing System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 56 OF 104 PAGES
23 05 15 SD-01 Preconstruction Submittals
1.2Material, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2 GRecord Drawings
1.2 GConnection Diagrams
1.2 GCoordination Drawings
1.2 GFabrication Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.1 GPipe and Fittings
2.2 GPiping Specialties
2.3 GValves
2.4 GMiscellaneous Materials
2.5 GSupporting Elements
1.2 GEquipment Foundation Data
SD-04 Samples
1.2 GManufacturer's Standard Color
Charts
SD-05 Design Data
2.1 GPipe and Fittings
2.2 GPiping Specialties
2.3 GValves
SD-06 Test Reports
3.1 GHydrostatic Tests
3.1 GAir Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 57 OF 104 PAGES
23 05 15 3.1 GValve-Operating Tests
3.1 GDrainage Tests
3.1 GPneumatic Tests
3.1 GNon-Destructive Electric Tests
3.1 GSystem Operation Tests
SD-07 Certificates
1.4.2 GRecord of Satisfactory Field
Operation
1.4.3 GList of Qualified Permanent
Service Organizations
1.2 GListing of Product Installations
1.2 GRecords of Existing Conditions
3.1 GSurface Resistance
3.1 GShear and Tensile Strengths
3.1 GTemperature Ratings
3.1 GBending Tests
3.1 GFlattening Tests
3.1 GTransverse Guided Weld Bend
Tests
SD-10 Operation and Maintenance
Data
3.10 GOperation and Maintenance
Manuals
23 05 48.19 SD-02 Shop Drawings
3.1Coupling and Bracing
3.3Flexible Couplings or Joints
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 58 OF 104 PAGES
23 05 48.19 2.2Equipment Restraint
1.2.4 GContractor Designed Bracing
SD-03 Product Data
3.1 GCoupling and Bracing
3.3 GFlexible Couplings Or Joints
2.2 GEquipment Restraint
1.2.4 GContractor Designed Bracing
2.6Snubbers
3.9Anchor Bolts
2.2.2Vibration Isolators
SD-05 Design Data
1.2.4Design Calculations
SD-06 Test Reports
3.9 GAnchor Bolts
23 05 93 SD-01 Preconstruction Submittals
1.3.3 GRecords of Existing Conditions
1.5.3.1 GTAB Firm
1.2 GTAB Team Assistants
1.2 GTAB Team Engineer
1.5.3.2 GTAB Specialist
1.2 GTAB Team Field Leader
SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 59 OF 104 PAGES
23 05 93 1.3 GEquipment and Performance
Data
1.5.3.4 GTAB Related HVAC Submittals
1.5.2 GTAB Procedures
1.5.2 GCalibration
1.3.3 GSystems Readiness Check
1.5.4 GTAB Execution
1.5.4.3 GTAB Verification
SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
1.5.5.2 GTAB Report for Season 1
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.7.2 GDALT and TAB Submittal and
Work Schedule
1.7.2.3 GTAB Pre-Field Engineering
Report
1.5.3.1 GTAB Firm
1.3.3 GDesign Review Report
1.7.2.2 GPre-field DALT Preliminary
Notification
1.7.2 GAdvanced Notice for TAB Field
Work
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 60 OF 104 PAGES
23 05 93 1.7.2 GPrerequisite HVAC Work Check
Out List
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
2.3.1 SRecycled content for insulation
materials
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
2.3.1 SRecycled Materials
SD-04 Samples
2.2.1.2 GThermal Insulation
3.1.1 GDisplay Samples
SD-07 Certificates
2.2.1 SIndoor air quality for adhesives
and sealants
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 61 OF 104 PAGES
23 07 00 3.4 GEquipment Insulation Systems
23 09 00 SD-02 Shop Drawings
3.3 GDDC Contractor Design Drawings
3.3 GDraft As-Built Drawings
3.3 GFinal As-Built Drawings
SD-03 Product Data
1.8.3 GProgramming Software
1.8.4 GController Application Programs
1.8.1 GConfiguration Software
1.8.2 GController Configuration Settings
2.2 GManufacturer's Product Data
1.8.5 GNiagara Framework Supervisory
Gateway Backups
1.8.6 GNiagara Framework Engineering
Tool
1.5 GNiagara Framework Wizards
SD-05 Design Data
1.9Boiler Or Chiller Plant Gateway
Request
SD-06 Test Reports
3.1.1Existing Conditions Report
3.5.2 GStart-Up Testing Report
3.6.1 GPVT Procedures
3.6.3 GPVT Report
1.10.1 GPre-Construction Quality Control
(QC) Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 62 OF 104 PAGES
23 09 00 1.10.2 GPost-Construction Quality Control
(QC) Checklist
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
(O&M) Instructions
3.9.1 GTraining Documentation
SD-11 Closeout Submittals
2.5 GEnclosure Keys
1.10.3 GCloseout Quality Control (QC)
Checklist
23 21 23 SD-02 Shop Drawings
2.1.2 GSystem Coordination
SD-03 Product Data
2.2.2 GInstructions
2.2.5 GEquipment Data
3.5.2 GTraining Period
SD-06 Test Reports
2.8Factory Tests
3.3Field Quality Control
SD-07 Certificates
1.3.1Manufacturer's Representative
SD-10 Operation and Maintenance
Data
3.5.1 GOperation and Maintenance
Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 63 OF 104 PAGES
23 21 23 3.5.2 GTraining
23 23 00 SD-02 Shop Drawings
2.3 GRefrigerant Piping System
SD-03 Product Data
2.3Refrigerant Piping System
1.5.2Spare Parts
1.3.1Qualifications
3.5Refrigerant Piping Tests
3.1Verification of Dimensions
SD-06 Test Reports
3.5Refrigerant Piping Tests
SD-07 Certificates
2.1Service Organization
SD-10 Operation and Maintenance
Data
1.5 GMaintenance
3.4 GOperation and Maintenance
Manuals
3.4 GDemonstrations
23 30 00 SD-02 Shop Drawings
1.4.4 GDetail Drawings
SD-03 Product Data
2.9.1.1Metallic Flexible Duct
2.9.1.2Insulated Nonmetallic Flexible
Duct Runouts
2.9.1.2Duct Connectors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 64 OF 104 PAGES
23 30 00 2.9.2 GDuct Access Doors
2.9.3 GManual Balancing Dampers
2.9.6Sound Attenuation Equipment
2.9.7.1Diffusers
2.9.7.2Registers and Grilles
2.9.8Louvers
2.9.9Air Vents, Penthouses, and
Goosenecks
2.10.1.1Centrifugal Fans
2.10.1.2In-Line Centrifugal Fans
2.10.1.3Ceiling Exhaust Fans
2.10.1.3 SPL-109-58 label for ceiling
exhaust fan product
2.11 GAir Handling Units
2.12.1 GRoom Fan-Coil Units
2.12.2.1 GVariable Volume, Single Duct
Terminal Units
1.4.5Test Procedures
1.2.1.2 GDiagrams
2.10.3 SAir Filters
2.9.1 SIndoor Air Quality for Duct
Sealants
SD-06 Test Reports
3.12 GPerformance Tests
3.10 GDamper Acceptance Test
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 65 OF 104 PAGES
23 30 00 1.4.1Bolts
1.4.3Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.14.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.14.1 GOperation and Maintenance
Manuals
2.9.3 GManual Balancing Dampers
2.10.1.1 GCentrifugal Fans
2.10.1.2 GIn-Line Centrifugal Fans
2.10.1.3 GCeiling Exhaust Fans
2.11 GAir Handling Units
2.12.1 GRoom Fan-Coil Units
2.12.2.1 GVariable Volume, Single Duct
Terminal Units
SD-11 Closeout Submittals
3.13 SIndoor Air Quality During
Construction
23 64 10 SD-03 Product Data
3.1.3Posted Instructions
1.6.1Verification of Dimensions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 66 OF 104 PAGES
23 64 10 2.8Factory Tests
3.6System Performance Tests
3.7Demonstrations
2.5.1Refrigerant
3.5.1Water Chiller - Field Acceptance
Test Plan
SD-06 Test Reports
3.5Field Acceptance Testing
3.5.2Water Chiller - Field Acceptance
Test Report
2.8Factory Tests
3.6System Performance Tests
SD-07 Certificates
3.1.8 GRefrigeration System
1.3.1Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
3.1 GWater Chiller - Installation
Instructions
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.4 SIndoor Air Quality During
Construction
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 67 OF 104 PAGES
23 64 26 SD-03 Product Data
2.4.7 GAutomatic Flow Control Valves
2.4.8Pump Discharge Valve
2.4.9Pressure Relief Valve
2.5.8 GExpansion Joints
2.6 GPumps
2.5.2Combination Strainer and Pump
Suction Diffuser
2.7Expansion Tanks
2.8Air Separator Tanks
2.9 GWater Treatment Systems
SD-06 Test Reports
3.1.1.3Piping Welds NDE Report
3.4.2 GPressure Tests Reports
SD-07 Certificates
3.1.1.1Employer's Record Documents
(For Welding)
3.1.1.2Welding Procedures and
Qualifications
SD-08 Manufacturer’s Instructions
3.5 GLesson plan for the Instruction
Course
SD-10 Operation and Maintenance
Data
2.4.6 GCalibrated Balancing Valves
2.4.7 GAutomatic Flow Control Valves
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 68 OF 104 PAGES
23 64 26 2.4.8 GPump Discharge Valve
2.4.9 GPressure Relief Valve
2.5.8 GExpansion Joints
2.6 GPumps
2.5.2 GCombination Strainer and Pump
Suction Diffuser
2.7 GExpansion Tanks
2.8 GAir Separator Tanks
23 81 00 SD-03 Product Data
3.7.1Spare Parts
3.4Posted Instructions
2.6.1Coil Corrosion Protection
3.6System Performance Tests
3.4 GTraining
1.4Inventory
2.1Supplied Products
2.2Manufacturer's Standard Catalog
Data
2.1 SEnergy Star
2.3.2.1.7 SAir Filters
2.2.2.3 SEPA SNAP for Refrigerants
SD-06 Test Reports
3.5 GRefrigerant Tests, Charging, and
Start-Up
3.6 GSystem Performance Tests
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 69 OF 104 PAGES
23 81 00 3.7.2Service Organizations
SD-10 Operation and Maintenance
Data
3.4 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
2.2.2.3 SOzone Depleting Substances
23 81 23 SD-03 Product Data
2.1 GComputer Room Air Conditioner
2.5.2 GSpace Temperature Control
System Drawings
2.1.5Filters
1.4 SRefrigerants
1.4 SEPA SNAP for Refrigerants
SD-07 Certificates
2.3 GCertificate of Specification
Compliance
3.3.3 GCredentials of the Manufacturer's
Field Test Representative
1.5.1Ozone Depleting Substances
Technician Certification
1.6.3Certified List Of Qualified
Permanent Service Organizations
SD-08 Manufacturer’s Instructions
3.1.2Installation Manual for Each Type of CRAC
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 70 OF 104 PAGES
23 81 23 SD-10 Operation and Maintenance
Data
3.1.3 GComputer Room Air Conditioner
Operation and Maintenance Data
SD-11 Closeout Submittals
3.2 SIndoor Air Quality During
Construction
25 05 11.21 SD-01 Preconstruction Submittals
3.3.2 GDevice Account Lock Exception
Request
1.10.1.6 GContractor Computer
Cybersecurity Compliance
Statements
1.10.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
1.7.2 GCybersecurity Subject Matter
Expert Qualifications
SD-02 Shop Drawings
1.8.1 GNetwork Communication Report
1.8.4 GCybersecurity Riser Diagram
SD-03 Product Data
1.8.5 GControl System Cybersecurity
Documentation
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 71 OF 104 PAGES
25 05 11.21 3.13.1 GControl System Cybersecurity
Testing Procedures
3.13.3 GControl System Cybersecurity
Testing Report
SD-07 Certificates
1.9 GSoftware Licenses
SD-11 Closeout Submittals
3.4.5.4 GPassword Change Summary
Report
3.3.7 GEnclosure Keys
1.8.3 GSoftware and Configuration
Backups
3.5.3 GAuditing Front End Software
3.5.4.2 GDevice Audit Record Upload
Software
3.9 GSystem Maintenance Tool
Software
1.8.2 GControl System Inventory Report
3.12.1 GIntegrity Verification Software
25 05 11.23 SD-01 Preconstruction Submittals
3.3.2 GDevice Account Lock Exception
Request
3.2.2.2 GMultiple Ethernet Connection
Device Request
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 72 OF 104 PAGES
25 05 11.23 1.10.1.6 GContractor Computer
Cybersecurity Compliance
Statements
1.10.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
1.7.2 GCybersecurity Subject Matter
Expert Qualifications
1.8.1 GProposed STIG and SRG
Applicability Report
SD-02 Shop Drawings
1.8.2 GNetwork Communication Report
1.8.5 GCybersecurity Riser Diagram
SD-03 Product Data
1.8.7 GControl System Cybersecurity
Documentation
SD-06 Test Reports
3.13.1 GControl System Cybersecurity
Testing Procedures
3.13.3 GControl System Cybersecurity
Testing Report
SD-07 Certificates
1.9 GSoftware Licenses
SD-11 Closeout Submittals
3.4.5.4 GPassword Change Summary
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 73 OF 104 PAGES
25 05 11.23 3.3.5 GEnclosure Keys
1.8.4 GSoftware and Configuration
Backups
3.5.3 GAuditing Front End Software
3.5.4.1 GDevice Audit Record Upload
Software
3.9 GSystem Maintenance Tool
Software
3.11.1 GControl System Scanning Tools
1.8.6 GSTIG, SRG and Vendor Guide
Compliance Result Report
1.8.3 GControl System Inventory Report
25 05 11.26 SD-01 Preconstruction Submittals
3.3.2 GDevice Account Lock Exception
Request
3.2.2.2 GMultiple Ethernet Connection
Device Request
1.10.1.6 GContractor Computer
Cybersecurity Compliance
Statements
1.10.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
1.7.2 GCybersecurity Subject Matter
Expert Qualifications
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 74 OF 104 PAGES
25 05 11.26 1.8.1 GNetwork Communication Report
1.8.4 GCybersecurity Riser Diagram
SD-03 Product Data
1.8.5 GControl System Cybersecurity
Documentation
SD-06 Test Reports
3.13.1 GControl System Cybersecurity
Testing Procedures
3.13.3 GControl System Cybersecurity
Testing Report
SD-07 Certificates
1.9 GSoftware Licenses
SD-11 Closeout Submittals
3.4.5.4 GPassword Change Summary
Report
3.3.5 GEnclosure Keys
1.8.3 GSoftware and Configuration
Backups
3.5.3 GAuditing Front End Software
3.5.4.1 GDevice Audit Record Upload
Software
3.9 GSystem Maintenance Tool
Software
1.8.2 GControl System Inventory Report
25 10 10 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 75 OF 104 PAGES
25 10 10 3.3.2UMCS Contractor Design
Drawings
3.3.3Draft As-Built Drawings
3.3.3Final As-Built Drawings
SD-03 Product Data
2.1.5Product Data Sheets
2.4.1Enclosure Keys
SD-05 Design Data
3.3.1UMCS IP Network Bandwidth
Usage Estimate
SD-06 Test Reports
1.7Pre-Construction QC Checklist
1.7Post-Construction QC Checklist
3.1Factory Test Procedures
3.1Factory Test Report
3.2Existing Conditions Report
3.7 GStart-Up and Start-Up Testing
Report
3.8.1PVT Phase I Procedures
3.8.2 GPVT Phase I Report
3.8.3 GPVT Phase II Report
SD-10 Operation and Maintenance
Data
1.8Operation and Maintenance
(O&M) Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 76 OF 104 PAGES
25 10 10 3.9.8.1Preventive Maintenance Work
Plan
3.10.1Basic Training Documentation
3.10.1Advanced Training
Documentation
3.10.1Refresher Training
Documentation
SD-11 Closeout Submittals
1.7Closeout QC Checklist
26 05 19.10 10 SD-03 Product Data
2.1.1 GWire and Cable
2.1.3.1 GConductors
3.1Cable Manufacturing Data
SD-06 Test Reports
3.2 GTest Report(s), Inspection
Report(s), and Verification
Report(s)
26 05 48.00 10 SD-02 Shop Drawings
3.2Lighting Fixtures in Buildings
1.3Equipment Requirements
SD-03 Product Data
3.2 GLighting Fixtures in Buildings
1.3 GEquipment Requirements
1.2.4 GContractor Designed Bracing
26 08 00 SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 77 OF 104 PAGES
26 08 00 3.1 GAcceptance Tests and
Inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance Test and Inspections
Procedure
26 20 00 SD-02 Shop Drawings
2.13 GPanelboards
2.15 GTransformers
2.4 GCable Trays
SD-03 Product Data
3.1.5.1 GSurface Raceways
2.12 GReceptacles
2.13.3 GCircuit Breakers
2.10 GSwitches
2.15 GTransformers
2.14 GEnclosed Circuit Breakers
2.17 GMotor Controllers
2.18 GManual Motor Starters
2.27 GMetering
2.21.1 GCATV Outlets
2.22.2 GSecondary Bonding Busbar
2.28 GSurge Protective Devices
SD-06 Test Reports
3.5.2 G600-volt Wiring Test
3.5.6 GGrounding System Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 78 OF 104 PAGES
26 20 00 3.5.3 GTransformer Tests
3.5.4 GGround-fault Receptacle Test
3.5.5 GArc-fault Receptacle Test
SD-07 Certificates
2.11 GFuses
SD-09 Manufacturer’s Field
Reports
2.30.1Transformer Factory Tests
SD-10 Operation and Maintenance
Data
2.27 GMetering
26 24 13 SD-02 Shop Drawings
1.4.2 GSwitchboard Drawings
SD-03 Product Data
2.2 GSwitchboard
SD-06 Test Reports
2.5.2 GSwitchboard Design Tests
2.5.3 GSwitchboard Production Tests
3.5.1 GAcceptance Checks and Tests
SD-10 Operation and Maintenance
Data
1.5.1 GSwitchboard Operation and
Maintenance
SD-11 Closeout Submittals
1.5.2 GAssembled Operation and
Maintenance Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .