A.2.11.3 W9128A22R0016 Am-0005 Specifications.pdf

PDF 994 KB Posted

Attached to
FY22 OMA Multi-Domain Task Force (MDTF) #3, Building 300, Helemano Military Reservation
Solicitation number
W9128A22R0016
Issued by

About this file

This is a solicitation notice for the project "FY22 OMA Multi-Domain Task Force (MDTF) #3, Building 300, Helemano Military Reservation." The project involves renovating and repairing Building 300 for the MDTF #3 and the 307th ESB to share occupancy. Work includes installing a new elevator, UPS, emergency generator, utility extensions, communications, site infrastructure and improvements, site lighting, grading, parking, fencing and landscaping. The period of performance is estimated at 912 calendar days. The acquisition will use lowest priced technically acceptable procedures based on experience, past performance, technical approach, and price. The project magnitude is between $50-100 million. The solicitation documents will be issued without a CD unless determined necessary. Offerors must register in SAM at https://www.sam.gov. The U.S. Army Corps of Engineers, Honolulu District will issue the solicitation.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY22 Multi-Domain Task Force #3 Building 300 W9128A-19-D-0011 Helemano Military Reservation, Oahu, Hawaii

FOR AIR TIGHTNESS

07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING

07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 24 00 05/11, CHG 4: 08/18 EXTERIOR INSULATION FINISH SYSTEM

07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM

07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 51 13 05/12, CHG 2: 11/18 BUILT-UP ASPHALT ROOFING

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS

08 34 59 08/08, CHG 1: 11/12 VAULT DOORS AND DAY GATES

08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16, CHG 3: 08/20 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC AND PORCELAIN TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 68 00 11/17, CHG 2: 08/20 CARPETING

09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS

09 90 00 02/21 PAINTS AND COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE

10 21 13 08/20 TOILET COMPARTMENTS

10 26 00 08/20 WALL PROTECTION

10 28 13 08/17 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHER CABINETS

DI VI SI ON 12 - FURNI SHI NGS

12 21 00 08/17, CHG 2: 11/18 WINDOW BLINDS

12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

PROJECT TABLE OF CONTENTS Page 2

YIS

Cloud

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 104 PAGES

MDTF #3 Building 300 Helemano Military Reservation

05 05 23.16 1.3.1Certified Brazer Performance

Qualifications (BPQ)

1.3.5Certified Welding Inspector

1.3.5Nondestructive Testing Personnel

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.3Tension Control Bolts

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 104 PAGES

05 12 00 3.7.3.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.4.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.1.4Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

2.1 SRecycled Content of Steel

Products

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 104 PAGES

05 30 00 1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

05 50 13 SD-02 Shop Drawings

2.4Expansion Joint Covers

2.5Bollards/Pipe Guards

2.7Angles and Plates

2.6Counter Mounting Bracket

SD-03 Product Data

2.4Expansion Joint Covers

2.6Counter Mounting Bracket

2.1 SRecycled Content

SD-04 Samples

2.4Expansion Joint Covers

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 104 PAGES

05 52 00 2.2.8Concrete Inserts

2.2.9Masonry Anchorage Devices

2.2.11Steel Railings and Handrails

2.2.12Aluminum Railings and Handrails

1.2.1Anchorage and Fastening

Systems

1.4.1 SRecycled Content Steel and

Aluminum

SD-07 Certificates

1.4.2Welding Procedures

1.4.3Welder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 20 00 SD-02 Shop Drawings

1.3Detail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.1Wood Products

1.4Treated Wood Products

2.4Hardware and Accessories

SD-07 Certificates

1.6.1.1Certificates of Grade

1.6.1.2 SCertified Sustainably Harvested

Wood

1.6.1.3.1 SIndoor Air Quality for Adhesives

and Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 104 PAGES

06 41 16.00 10 SD-02 Shop Drawings

1.5.2Shop Drawings

2.9Shop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

1.5.3Certification

SD-04 Samples

2.3 GPlastic Laminates

2.6Cabinet Hardware

SD-07 Certificates

1.5Quality Assurance

3.1Laminate Clad Casework

1.5.4 SIndoor Air Quality for Adhesives

and Sealants

1.5.3 SIndoor Air Quality for Cabinets

1.5.3 SCertified Sustainably Harvested

Wood Cabinets

06 61 16 SD-02 Shop Drawings

1.4.2Detail Fabrication Drawings

3.1Installation

SD-03 Product Data

2.1.1Solid Polymer

2.2.2 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 104 PAGES

06 61 16 2.1Material

SD-06 Test Reports

2.1.1Test Report Results

SD-07 Certificates

1.4.1Qualifications

2.1.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

2.1.1Solid Polymer

07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

1.6.4 GAir Leakage Test Report

3.5.8 GAir Leakage Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 104 PAGES

07 05 23 1.6.4 GDiagnostic Test Report

3.6.5 GDiagnostic Test Report

07 13 53 SD-03 Product Data

1.3Manufacturer's Standard Details

2.1Elastomeric Waterproofing Sheet

Material

2.3Protection Board

1.4Primers and Mastics

2.1Primers and Mastics

SD-06 Test Reports

2.1Elastomeric Waterproofing Sheet

Material

3.6Protective Covering

SD-07 Certificates

2.1Elastomeric Waterproofing Sheet

Material

1.4Primers and Mastics

2.1Primers and Mastics

1.4Protective Coverings

1.8Special Warranties

1.8Special Warranties

SD-08 Manufacturer’s Instructions

1.4Primers and Mastics

2.1Primers and Mastics

07 21 13 SD-03 Product Data

1.3 GManufacturer's Standard Details

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 104 PAGES

07 21 13 2.1 GBlock or Board Insulation

2.2 GPressure Sensitive Tape

2.3 GAccessories

2.1.3 SRecycled Content for Block or

Board Insulation

SD-07 Certificates

2.1 GBlock or Board Insulation

2.1.4 SIndoor Air Quality For Block Or

Board Insulation

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.3.1Adhesive

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.1.3 SRecycled Content for Insulation

Materials

SD-07 Certificates

2.1.5 SIndoor Air Quality for Insulation

Materials

1.3.2 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2.1Insulation

07 22 00 SD-02 Shop Drawings

1.3Insulation Board Layout

1.3Verification of Existing Conditions

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 104 PAGES

07 22 00 2.1Insulation

1.4Cover Board

2.4Fasteners

2.3Moisture Control

2.1.2 SRecycled Content For Insulation

SD-06 Test Reports

1.7.1Flame Spread Rating

SD-07 Certificates

1.6Installer Qualifications

SD-08 Manufacturer’s Instructions

2.4Fasteners

2.1Insulation

07 24 00 SD-02 Shop Drawings

3.3 GShop Drawings

SD-03 Product Data

2.2Sheathing Board

2.4Thermal Insulation

2.3Mechanical Fasteners

2.9Accessories

2.5Base Coat

2.6Reinforcing Fabric

2.7Finish Coat

2.10Joint Sealant

2.8Sealant Primer

2.11Bond Breaker

2.12Backer Rod

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 104 PAGES

07 24 00 1.4.5Insulation Board

2.4.2 SRecycled Content for Insulation

Materials

1.7Warranty

SD-04 Samples

1.2.3.6 GSample Boards

SD-05 Design Data

1.2.1.2Wind Load

1.2.4Moisture Analysis

SD-06 Test Reports

1.2.3.1Abrasion Resistance

1.2.3.2Accelerated Weathering

1.2.2.3Impact Resistance

1.2.3.3Mildew Resistance

1.2.3.4Salt Spray Resistance

1.2.4Vapor Transmission

1.2.1.3Wall Fire Test

1.2.1.1Water Penetration

1.2.3.5Water Resistance

1.2.1.3Full Scale or Intermediate Scale

Fire Test

1.2.2.1Surface Burning Characteristics

1.2.2.2Radiant Heat

3.1Substrate

1.2.1.2Wind Load

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 104 PAGES

07 24 00 1.4.1Qualifications of EIFS

Manufacturer

1.4.2Qualification of EIFS Installer

1.4.3Qualification of Sealant Applicator

1.4.4Qualifications of Third Party

Inspector

3.5.2Inspection Check List

SD-08 Manufacturer’s Instructions

3.3Installation

SD-10 Operation and Maintenance

Data

1.7EIFS

07 27 10.00 10 SD-04 Samples

3.1.2Mock-Up

SD-05 Design Data

1.8Design Data And Calculations

For The Air Barrier System

SD-06 Test Reports

1.8Design Review Report

3.1.3Testing and Inspection

SD-07 Certificates

1.7Air Barrier Inspector

07 27 26 SD-01 Preconstruction Submittals

1.9.1Qualifications of Manufacturer

1.9.2Qualifications of Installer

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 104 PAGES

07 27 26 1.4Fluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.4Fluid-Applied Membrane Air

Barrier

2.2Primers, Adhesives, and Mastics

2.5Reinforcement

1.4.2Safety Data Sheets

SD-04 Samples

1.4.3Mockup

SD-06 Test Reports

1.6Capillary Moisture Test

1.4.4Field Peel Adhesion Test

1.4.4Flame Propagation of Wall

Assemblies

1.4.4Flame Spread and Smoke

Developed Index Ratings

3.4.1Site Inspections

SD-07 Certificates

1.4Fluid-Applied Membrane Air

Barrier

SD-08 Manufacturer’s Instructions

1.4Fluid-Applied Membrane Air

Barrier

2.2Primers, Adhesives, and Mastics

07 51 13 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 104 PAGES

07 51 13 2.4Asphalt

2.3Flashing Membrane

2.8Fasteners

2.6Primer

2.7Asphalt Roof Cement

SD-06 Test Reports

3.5.2Samples of Built-Up Roofing

SD-07 Certificates

1.5.1Bill of Lading

1.4.1Qualifications of Applicator

SD-08 Manufacturer’s Instructions

3.5.1Flashings

2.4Asphalt

2.6Primer

2.8Fasteners

SD-11 Closeout Submittals

1.8Warranty

07 60 00 SD-02 Shop Drawings

3.1.7 GGutters

3.1.8 GDownspouts

3.1.9 GExpansion Joints

3.1.10 GFlashing at Roof Penetrations

2.2.4 GReglets

SD-03 Product Data

3.1.9Expansion Joints

2.1 SRecycled Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 104 PAGES

07 60 00 SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3Instructions for Installation

3.5Quality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3Cleaning and Maintenance

07 84 00 SD-02 Shop Drawings

2.1Firestopping System

SD-03 Product Data

2.2Firestopping Materials

SD-06 Test Reports

3.3Inspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1Installer Qualifications

07 92 00 SD-03 Product Data

2.1Sealants

2.2Primers

2.3Bond Breakers

2.4Backstops

SD-06 Test Reports

3.1Field Adhesion

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 104 PAGES

07 92 00 2.1.1 SIndoor Air Quality For Interior

Sealants

2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.1.4 SIndoor Air Quality For Interior

Acoustical Sealants

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.5 GFrames

2.5 GFrames

2.3Accessories

SD-03 Product Data

2.1Doors

2.1 SRecycled Content for Steel Door

Product

2.5Frames

2.5 SRecycled Content for Steel Frame

Product

2.3Accessories

08 11 16 SD-02 Shop Drawings

1.5.1 GDoor and Frame Assembly

SD-03 Product Data

1.5.1Door and Frame Assembly

2.2.3 SRecycled Content of Aluminum

Material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 104 PAGES

08 11 16 SD-04 Samples

1.5.2 GFinish Samples

1.2.3Air Infiltration

1.2.4Water Penetration

SD-08 Manufacturer’s Instructions

1.5.1Door and Frame Assembly

1.5.3Adjustments, Cleaning, and

Maintenance

08 31 00 SD-02 Shop Drawings

1.3Access Doors And Panels

SD-03 Product Data

1.3Access Doors And Panels

2.1 SRecycled Content

SD-04 Samples

2.5Finishes

08 34 59 SD-02 Shop Drawings

2.1 GVault Door Unit

2.3 GDay Gate

SD-03 Product Data

2.2Vault Door and Frame

SD-07 Certificates

2.2Vault Door and Frame

SD-08 Manufacturer’s Instructions

3.1Installation

08 34 73 SD-02 Shop Drawings

2.1Fabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 104 PAGES

08 34 73 SD-03 Product Data

2.1Hollow Metal Sound Retardant

Doors

2.1Door Frames

2.1Door Hardware

2.3.2Door Frame Sound Infill

2.1Intumescent Seals and Gasketing

2.1Thresholds

1.3.2 SRecycled Content of Doors

SD-06 Test Reports

2.4.4Acoustical Tests

2.4.4Positive Pressure Tests

SD-07 Certificates

2.1Hollow Metal Sound Retardant

Doors

2.1Door Frames

2.1Door Hardware

1.3.1.3Intumescent Seals,Gasketing and

Door Bottoms

2.1Thresholds

3.3.1Assembly Test Reports

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.6Fabrication Drawings

SD-03 Product Data

2.1Windows

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 104 PAGES

08 51 13 2.1 SRecycled Content of Aluminum

Windows

2.2.6.1Hardware

2.2.2Fasteners

1.7Window Performance

2.2.8Screens

2.1.6Weatherstripping

2.2.6Accessories

1.7.5Thermal Performance

SD-04 Samples

1.3.3.1Finish Sample

1.3.3.2Window Sample

SD-05 Design Data

2.1 GStructural Calculations for

Deflection

1.3.4 GDesign Analysis

SD-06 Test Reports

1.3.5Resistance to Forced Entry

1.7.6Windborne-Debris-Impact

Performance

SD-10 Operation and Maintenance

Data

2.1Windows

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 104 PAGES

08 71 00 1.5 GHardware Schedule

2.3.9 GKeying System

1.8.1.1 GWiring Diagram and Sequence of

Operations for all Electrified

Hardware

SD-03 Product Data

2.3 GHardware Items

1.8.1 GAccess System

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5Hardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

2.2Insulating Glass

1.4Glazing Accessories

2.3.2.1Sealants

SD-04 Samples

2.2Insulating Glass

2.3.4Tape

2.3.4Sealing Tapes

SD-07 Certificates

2.2Insulating Glass

1.3.1 SIndoor Air Quality for Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 104 PAGES

08 81 00 SD-08 Manufacturer’s Instructions

2.3Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.8.1Insulated Glass Units

08 91 00 SD-02 Shop Drawings

1.4Wall Louvers

SD-03 Product Data

2.2Metal Wall Louvers

SD-04 Samples

1.5 GWall Louver Samples

09 22 00 SD-02 Shop Drawings

2.1Metal Support Systems

SD-03 Product Data

2.1Metal Support Systems

2.1 SRecycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

2.1.3Cementitious Backer Units

2.1.7Accessories

2.1.1Gypsum Board

2.1.8Partition Closure

2.1.1 SRecycled Content for Gypsum

Board

2.1.4 SVOC Content of Joint Compound

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 104 PAGES

09 29 00 2.1.2.1ASTM E90 Factory Test Report

3.7ASTM E90 Factory Test Report

3.10ASTM E90 Factory Test Report

3.10ASTM E336 Field Test Report

SD-07 Certificates

2.1Asbestos Free Materials

2.1.1 SIndoor Air Quality for Gypsum

Board

09 30 10 SD-03 Product Data

2.1.1Porcelain Tile

2.1.1 SRecycled Content for Porcelain

Tile

2.1.2Glazed Ceramic Wall Tile

2.1.2 SRecycled Content for Glazed

Ceramic Wall Tile

2.1Transition Strips

2.6.1Transition Strips

2.6.2Metal Transition Strips

2.2Setting-Bed

2.4Mortar and Grout

2.7Waterproof Membrane

2.8Crack Isolation Membrane

SD-04 Samples

2.1 GTile

2.1 GTransition Strips

2.6.1 GTransition Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 104 PAGES

09 30 10 SD-07 Certificates

2.4 SIndoor Air Quality for Grout

2.7.1 SIndoor Air Quality for

Waterproofing Membrane

1.3.2Water Absorption Rates

SD-08 Manufacturer’s Instructions

3.8Manufacturer's Approved

Cleaning Instructions

SD-10 Operation and Maintenance

Data

2.1.1Porcelain Tile

2.1.2Glazed Ceramic Wall Tile

2.1Transition Strips

2.6.1Transition Strips

09 51 00 SD-02 Shop Drawings

2.1Detail Drawings

SD-03 Product Data

2.2.2.1 SRecycled Content for Type III

Ceiling Tiles

2.2.1.1 SRecycled Content for Type XII

Ceiling Tiles

2.3 SRecycled Content for Suspension

Systems

2.1.1Acoustical Performance

SD-04 Samples

2.2 GAcoustical Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 104 PAGES

09 51 00 SD-07 Certificates

2.2.2.1 SIndoor Air Quality for Type III

Ceiling Tiles

2.2.1.1 SIndoor Air Quality for Type XII

Ceiling Tiles

2.5 SIndoor Air Quality for Adhesives

2.8 SIndoor Air Quality for Sealants

09 62 38 SD-03 Product Data

2.1Static-Control Resilient Flooring

2.1.1.1 SRecycled content for

Static-Dissipative Vinyl Tile

2.4Accessories

2.2Adhesives

1.8Warranty

SD-04 Samples

2.1Static-Control Resilient Flooring

2.3Moldings Transitions

1.3.1.3Special Treatment Materials

2.4Accessories

SD-06 Test Reports

2.7Fire Resistance

3.2Moisture, Alkalinity and Bond

3.6Testing

SD-07 Certificates

2.1.1.1 SIndoor Air Quality for

Static-Dissipative Vinyl Tile

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 104 PAGES

09 62 38 2.2 SIndoor Air Quality for Adhesives

1.5Qualifications of Applicator

SD-08 Manufacturer’s Instructions

2.1Static-Control Resilient Flooring

2.4Accessories

SD-10 Operation and Maintenance

Data

2.1Static-Control Resilient Flooring

2.4Accessories

09 65 00 SD-03 Product Data

2.7Resilient Flooring and

Accessories

2.2Wall Base

2.1Luxury Vinyl Tile

2.1 SRecycled Content for Luxury Vinyl

Tile

2.4Adhesives

SD-04 Samples

2.7 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3Moisture, Alkalinity and Bond

Tests

SD-07 Certificates

2.1 SIndoor Air Quality for Luxury Vinyl

Tile

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 104 PAGES

09 65 00 2.2 SIndoor Air Quality for Wall Base

2.4 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2Surface Preparation

3.1Installation

SD-10 Operation and Maintenance

Data

2.7Resilient Flooring and

Accessories

09 68 00 SD-02 Shop Drawings

3.4 GInstallation Drawings

SD-03 Product Data

2.1Carpet

2.1.1 SRecycled Content for Carpeting

2.4Moldings Transitions

2.3 SIndoor Air Quality for Aerosol

Adhesives

2.3 SIndoor Air Quality for Non-Aerosol

Adhesives

2.3 SIndoor Air Quality for Concrete

Primer

SD-04 Samples

2.1 GCarpet

2.4 GMoldings Transitions

SD-06 Test Reports

3.2Moisture and Alkalinity Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 45 OF 104 PAGES

09 68 00 SD-07 Certificates

2.1.2 SIndoor Air Quality for Carpet

SD-08 Manufacturer’s Instructions

3.1Surface Preparation

SD-10 Operation and Maintenance

Data

3.5Cleaning and Protection

SD-11 Closeout Submittals

1.6Warranty

09 84 20 SD-02 Shop Drawings

2.2Detail Drawings

SD-03 Product Data

3.2Installation

2.2Acoustical Wall Panels

2.1.1.1 SRecycled Content for Fabric

Panels

SD-04 Samples

2.2 GAcoustical Wall Panels

SD-07 Certificates

2.2Acoustical Wall Panels

2.2 SIndoor Air Quality For Acoustical

Wall Panels

SD-11 Closeout Submittals

1.4Warranty

09 90 00 SD-02 Shop Drawings

3.10Piping Identification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 46 OF 104 PAGES

09 90 00 SD-03 Product Data

2.1Coating

2.1Product Data Sheets

SD-04 Samples

2.2 GColor

SD-07 Certificates

1.5.5.2Qualification Testing

1.5.4 SIndoor Air Quality for Paints and

Primers

1.5.4 SIndoor Air Quality for

Consolidated Latex Paints

SD-08 Manufacturer’s Instructions

3.2.1Application Instructions

2.1Mixing

1.7.1Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1Coatings

10 14 00.10 SD-02 Shop Drawings

3.1 GDetail Drawings

SD-03 Product Data

2.1Modular Exterior Signage System

3.1Installation

1.2 GExterior Signage

1.2.1Wind Load Requirements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 47 OF 104 PAGES

10 14 00.10 SD-04 Samples

1.2 GExterior Signage

SD-10 Operation and Maintenance

Data

3.1.2Protection and Cleaning

10 14 00.20 SD-02 Shop Drawings

1.3.2 GDetail Drawings

SD-03 Product Data

2.1Room Identification And

Directional Signage System

2.2Stair Signage

2.3Exit Door Tactile Sign

2.4Building Directories

SD-04 Samples

1.3.1 GInterior Signage

2.1Room Identification And

Directional Signage System

2.2Stair Signage

2.3Exit Door Tactile Sign

2.4Building Directories

10 14 53 SD-03 Product Data

2.1Traffic Sign Posts

10 21 13 SD-02 Shop Drawings

2.1Fabrication Drawings

3.2Installation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 48 OF 104 PAGES

10 21 13 2.1Cleaning and Maintenance

Instructions

2.7Colors And Finishes

2.2.2Anchoring Devices and Fasteners

2.2.4Hardware and Fittings

2.2.3Brackets

2.2.5Door Hardware

2.3.1Toilet Enclosures

2.3.2Urinal Screens

2.5Pilaster Shoes

2.2.4.2Finishes

2.7.2Finishes

2.3 SSolid Polyethylene Toilet

Partitions And Screens

SD-04 Samples

2.7 GColors and Finishes

2.2.4Hardware and Fittings

2.2.2Anchoring Devices and Fasteners

SD-07 Certificates

1.6Warranty

1.3.1 SIndoor Air Quality of Plastic

Products

SD-10 Operation and Maintenance

Data

2.1.1Plastic Identification

10 26 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 49 OF 104 PAGES

10 26 00 2.2Corner Guards

2.3Wall Guards

2.4Wall Covering and Panels

SD-03 Product Data

2.2Corner Guards

2.3Wall Guards

2.4 GWall Covering and Panels

2.3 SRecycled content for aluminum

component of wall guards, Combination Handrail/Wall guard and handrails

2.3.1 SRecycled content for aluminum

component of crash rail/bed locators

SD-04 Samples

2.2 GCorner Guards

2.3 GWall Guards

2.4 GWall Covering and Panels

SD-06 Test Reports

2.1.1.2Fire Resistance Rating

SD-07 Certificates

2.4 SIndoor air quality for wall

covering/panels

2.7 SIndoor air quality for adhesives

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 50 OF 104 PAGES

10 26 00 2.2Corner Guards

2.3Wall Guards

2.4Wall Covering and Panels

10 28 13 SD-03 Product Data

2.1.2Finishes

2.2Accessory Items

2.1 SRecycled content for stainless

steel toilet accessories

SD-04 Samples

2.1.2Finishes

2.2Accessory Items

SD-07 Certificates

2.2Accessory Items

10 44 16 SD-03 Product Data

2.1 GCabinets

12 21 00 SD-02 Shop Drawings

3.3Installation

SD-03 Product Data

2.1 GWindow Blinds

2.1 SRecycled Content for aluminum

components

SD-04 Samples

2.1 GWindow Blinds

SD-06 Test Reports

2.1Window Blinds

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 51 OF 104 PAGES

12 21 00 2.1 SIndoor Air Quality for window blinds

2.1 SIndoor Air Quality for window

blinds

SD-08 Manufacturer’s Instructions

2.1 GWindow Blinds

SD-10 Operation and Maintenance

Data

2.1 GWindow Blinds

12 48 13 SD-02 Shop Drawings

3.2Installation Drawings

3.2Detail Drawings

SD-03 Product Data

2.1.1Entrance Floor Mats and Frames

SD-04 Samples

2.1.1 GEntrance Floor Mats and Frames

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Instructions

SD-10 Operation and Maintenance

Data

3.2Protection, Maintenance, and

Repair Information

14 24 23 SD-02 Shop Drawings

2.1 GElevator

1.2.1 GElevator Components

1.2.2 GElevator Components

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 52 OF 104 PAGES

14 24 23 1.2.1 GElevator Machine

1.2.1 GElevator Controller

1.3.4 GWiring Diagrams

SD-03 Product Data

2.1Elevator

1.2.1Elevator Components

1.2.2Elevator Components

1.2.2Data Sheets

2.5.2Elevator Microprocessor

Controller

SD-05 Design Data

1.2.3.3Emergency Power Systems

1.2.3.2Heat Loads

1.2.3.1Reaction Loads

SD-07 Certificates

1.3.2Price Lists

1.4Warranty

1.3.1.1Endorsement Letter

1.2.4Welders' Qualifications

2.5.2.3Elevator Controller Certification

2.1.2 SIndoor Air Quality for Flooring and

Adhesive

SD-10 Operation and Maintenance

Data

2.1Elevator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 53 OF 104 PAGES

14 24 23 1.2.5Maintenance Control Program

(MCP)

2.5.2.2Software and Documentation

21 13 13 SD-01 Preconstruction Submittals

1.2.3 GQualified Fire Protection Engineer

(QFPE)

1.4.2.1 GSprinkler System Designer

1.4.2.2 GSprinkler System Installer

SD-02 Shop Drawings

1.2.1.1 GShop Drawing

SD-03 Product Data

2.2.1 GPipe

2.3.1.2 GFittings

2.3.4 GValves

2.8.5 GRelief Valves

2.7 GSprinklers

2.3.3 GPipe Hangers and Supports

2.4.1 GSprinkler Alarm Switch

2.4.2 GValve Supervisory (Tamper)

Switch

2.6 GFire Department Connection

2.5 GBackflow Prevention Assembly

2.8.6 GAir Vent

2.5.1 GHose Valve

2.3.3 GSeismic Bracing

2.1.2 GNameplates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 54 OF 104 PAGES

21 13 13 SD-05 Design Data

2.3.3 GSeismic Bracing

2.3.3Load calculations for sizing of seismic bracing

1.2.1.2 GHydraulic Calculations

SD-06 Test Reports

3.7.1 GTest Procedures

SD-07 Certificates

3.7.2.1 GVerification of Compliant

Installation

3.7.2.2 GRequest for Government Final

Test

SD-10 Operation and Maintenance

Data

3.9 GOperating and Maintenance

(O&M) Instructions

1.6 GSpare Parts

SD-11 Closeout Submittals

3.9 GAs-built drawings

22 00 00 SD-02 Shop Drawings

3.9.1 GPlumbing System

SD-03 Product Data

2.4.3 SWater Sense Label for Water

Closet Flush Valve

2.4.4 SWater Sense Label for Urinal

3.9.1.1 GBackflow Prevention Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 55 OF 104 PAGES

22 00 00 2.6.2Shower Faucets

2.4Fixtures

2.4.3Flush Valve Water Closets

2.4.4Flush Valve Urinals

2.4.6Wall Hung Lavatories

3.1.3 GDielectric Fittings

2.4.7Countertop Lavatories

2.4.8Sinks

2.4.9Service Sinks

2.4.10Drinking-Water Coolers

2.4.10 SEnergy Star Label for Electric

Water Cooler

2.8 GWater Heaters

2.10 GPumps

3.4 GVibration-Absorbing Features

3.9.1Plumbing System

SD-06 Test Reports

3.9Tests, Flushing and Disinfection

3.9.1.1Test of Backflow Prevention

Assemblies

SD-07 Certificates

1.3Materials and Equipment

2.1.1Bolts

SD-10 Operation and Maintenance

Data

3.9.1Plumbing System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 56 OF 104 PAGES

23 05 15 SD-01 Preconstruction Submittals

1.2Material, Equipment, and Fixture

Lists

SD-02 Shop Drawings

1.2 GRecord Drawings

1.2 GConnection Diagrams

1.2 GCoordination Drawings

1.2 GFabrication Drawings

3.1 GInstallation Drawings

SD-03 Product Data

2.1 GPipe and Fittings

2.2 GPiping Specialties

2.3 GValves

2.4 GMiscellaneous Materials

2.5 GSupporting Elements

1.2 GEquipment Foundation Data

SD-04 Samples

1.2 GManufacturer's Standard Color

Charts

SD-05 Design Data

2.1 GPipe and Fittings

2.2 GPiping Specialties

2.3 GValves

SD-06 Test Reports

3.1 GHydrostatic Tests

3.1 GAir Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 57 OF 104 PAGES

23 05 15 3.1 GValve-Operating Tests

3.1 GDrainage Tests

3.1 GPneumatic Tests

3.1 GNon-Destructive Electric Tests

3.1 GSystem Operation Tests

SD-07 Certificates

1.4.2 GRecord of Satisfactory Field

Operation

1.4.3 GList of Qualified Permanent

Service Organizations

1.2 GListing of Product Installations

1.2 GRecords of Existing Conditions

3.1 GSurface Resistance

3.1 GShear and Tensile Strengths

3.1 GTemperature Ratings

3.1 GBending Tests

3.1 GFlattening Tests

3.1 GTransverse Guided Weld Bend

Tests

SD-10 Operation and Maintenance

Data

3.10 GOperation and Maintenance

Manuals

23 05 48.19 SD-02 Shop Drawings

3.1Coupling and Bracing

3.3Flexible Couplings or Joints

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 58 OF 104 PAGES

23 05 48.19 2.2Equipment Restraint

1.2.4 GContractor Designed Bracing

SD-03 Product Data

3.1 GCoupling and Bracing

3.3 GFlexible Couplings Or Joints

2.2 GEquipment Restraint

1.2.4 GContractor Designed Bracing

2.6Snubbers

3.9Anchor Bolts

2.2.2Vibration Isolators

SD-05 Design Data

1.2.4Design Calculations

SD-06 Test Reports

3.9 GAnchor Bolts

23 05 93 SD-01 Preconstruction Submittals

1.3.3 GRecords of Existing Conditions

1.5.3.1 GTAB Firm

1.2 GTAB Team Assistants

1.2 GTAB Team Engineer

1.5.3.2 GTAB Specialist

1.2 GTAB Team Field Leader

SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 59 OF 104 PAGES

23 05 93 1.3 GEquipment and Performance

Data

1.5.3.4 GTAB Related HVAC Submittals

1.5.2 GTAB Procedures

1.5.2 GCalibration

1.3.3 GSystems Readiness Check

1.5.4 GTAB Execution

1.5.4.3 GTAB Verification

SD-06 Test Reports

3.3.5 GCompleted Pre-Final DALT

Report

3.3.8 GCertified Final DALT Report

1.5.5.2 GTAB Report for Season 1

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.7.2 GDALT and TAB Submittal and

Work Schedule

1.7.2.3 GTAB Pre-Field Engineering

Report

1.5.3.1 GTAB Firm

1.3.3 GDesign Review Report

1.7.2.2 GPre-field DALT Preliminary

Notification

1.7.2 GAdvanced Notice for TAB Field

Work

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 60 OF 104 PAGES

23 05 93 1.7.2 GPrerequisite HVAC Work Check

Out List

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

2.3.1 SRecycled content for insulation

materials

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

2.3.1 SRecycled Materials

SD-04 Samples

2.2.1.2 GThermal Insulation

3.1.1 GDisplay Samples

SD-07 Certificates

2.2.1 SIndoor air quality for adhesives

and sealants

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 61 OF 104 PAGES

23 07 00 3.4 GEquipment Insulation Systems

23 09 00 SD-02 Shop Drawings

3.3 GDDC Contractor Design Drawings

3.3 GDraft As-Built Drawings

3.3 GFinal As-Built Drawings

SD-03 Product Data

1.8.3 GProgramming Software

1.8.4 GController Application Programs

1.8.1 GConfiguration Software

1.8.2 GController Configuration Settings

2.2 GManufacturer's Product Data

1.8.5 GNiagara Framework Supervisory

Gateway Backups

1.8.6 GNiagara Framework Engineering

Tool

1.5 GNiagara Framework Wizards

SD-05 Design Data

1.9Boiler Or Chiller Plant Gateway

Request

SD-06 Test Reports

3.1.1Existing Conditions Report

3.5.2 GStart-Up Testing Report

3.6.1 GPVT Procedures

3.6.3 GPVT Report

1.10.1 GPre-Construction Quality Control

(QC) Checklist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE…