This document outlines a federal contract opportunity for the Dexter Adult Fish Facility Upgrades project. The project scope involves major improvements, replacements and additions to Dexter Fish Facility to meet criteria approved by the National Marine Fisheries Service.
The period of performance is from March 2023 through November 2026. The estimated magnitude of construction is between $25 million to $100 million. The solicitation is unrestricted and full and open with the HUBZone price evaluation preference applied as required. The NAICS code is 237990 for other heavy and civil engineering construction, with a $39.5 million small business size standard. The solicitation is being conducted by the U.S. Army Corps of Engineers Portland District. Responses are due by the date specified in the solicitation.
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 74 PAGES
Dexter Dam Adult Fish Facility Upgrades
01 10 10.00 25 SD-01 Preconstruction Submittals
1.7.6Interim Facility Water Supply Plan
1.7.8Backup Power Generator Plan
1.12Utility Outage Request
1.12Utility Connection Request
1.16 GAccess Agreements and Work
Areas
1.18 GSecurity Procedures
1.19 GSecurity Training
1.21.3.2 GTemporary Electrical Wiring Plan
1.22.1 GContractor's Planned Equipment
Methods
1.22.2 GPlant and Equipment List
1.22.3 GLoading Diagram
1.11Notification Of Equipment Outage
1.30Pre-Construction Survey
SD-06 Test Reports
1.32.1Survey Field Notebooks
1.32.2Data Storage
01 32 01.00 25 SD-01 Preconstruction Submittals
1.7.1 G ECCCPreliminary Schedule
1.7.2 G ECCCInitial Schedule
01 33 00 SD-01 Preconstruction Submittals
1.5 GSubmittal Register
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
A1-1
AMD 0004
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 74 PAGES
01 33 00 1.10.2Authorized Shop Drawing
Approvers
01 35 26.00 25 SD-01 Preconstruction Submittals
1.6.1.3 GCrane Operators
1.7.3 GTraining Plan
1.7.4 GHazardous Energy Control Plan
and HEC Procedures Training
Certification
1.8 GAccident Prevention Plan (APP)
1.8.2 GFall Prevention and Protection
Plan
1.8.2 GFatigue Management Plan (FMP)
1.9 GActivity Hazard Analysis (AHA)
1.18 GInclement Weather and
Heat/Cold Stress Management
Plans
3.3 GScaffolding
3.6.2 GArc Flash Hazard (AFH) Program
SD-06 Test Reports
1.4Regulatory Citations, Violations, and Corrective Action
1.5Drug and Alcohol Use Prevention
Program
1.15.2Accident or Mishap Reports
1.15.3Crane Testing Reports
3.5.2Utility Locations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 74 PAGES
01 35 26.00 25 SD-07 Certificates
1.7.6Arc Flash Hazard (AFH) Training
Certificate
1.10Confined Space Entry Permit
1.10Hot Work Permit
1.14Third Party Certification of
Barge-Mounted Mobile Cranes and
Mobile Equipment
1.15.4Certificate of Compliance
01 35 27.00 25 SD-01 Preconstruction Submittals
1.4 GDive Team Personnel
1.6 GDive Plan and General Schedule
1.6 GEquipment Certification
1.6 GEmergency Management Plan
1.6 GActivity Hazard Analysis
1.7 GCompany Safe Practice Manual
For Diving
01 45 00.00 25 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control Plan
3.4.4Construction Quality
Management for Contractors
01 57 19.00 25 SD-01 Preconstruction Submittals
1.7.1Environmental Preconstruction
Survey
1.8 GEnvironmental Protection Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 74 PAGES
01 57 19.00 25 3.2 G ECDGErosion and Sediment Control
Plan (ESCP)
3.2.2.1 GApplication For NPDES Permit
SD-06 Test Reports
3.2.1 G ECDGESCP Modifications
3.2.2.2 GInspections and Reports
SD-11 Closeout Submittals
1.9 GEnvironmental Records Binder
3.2.2.3 GStormwater Notice of Termination
01 78 23.00 25 SD-01 Preconstruction Submittals
1.2 GO&M Manual Execution Plan
SD-10 Operation and Maintenance
Data
1.3 GOperation and Maintenance
Manual
01 78 39.10 25 SD-01 Preconstruction Submittals
1.4 GAs-Built Drawings Execution Plan
1.5Working As-Built Redline
Drawings
SD-11 Closeout Submittals
1.7 GFinal Working As-Built Redline
Drawings
1.8 GFinal Contractor-prepared CAD
Drawings
1.6 GDigital Images
02 41 00.00 25 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 74 PAGES
02 41 00.00 25 1.2.2 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.7 GNotification
03 11 13.00 25 SD-02 Shop Drawings
2.2.6 GFormwork
3.1.1 GFormwork
2.2.6 GForm Removal Schedule
SD-03 Product Data
1.3Design
2.2Form Materials
2.2.5Form Releasing Agents
SD-04 Samples
1.4 GSample Panels
2.2.8 GFiber Voids
SD-05 Design Data
2.1Calculations
SD-06 Test Reports
3.4Job-cured Test Specimens
3.5Inspection
SD-07 Certificates
2.2.8Fiber Voids
03 15 00.00 25 SD-02 Shop Drawings
2.4 GWaterstops
SD-03 Product Data
2.2Preformed Expansion Joint Filler
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-5
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 74 PAGES
03 15 00.00 25 2.3Sealant
2.4Waterstops
SD-04 Samples
2.3.2Lubricant for Preformed
Compression Seals
2.3.3Field-Molded Type
2.4Waterstops
2.5.2 GSplicing Waterstops
SD-07 Certificates
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
03 20 00.00 25 SD-01 Preconstruction Submittals
3.1.3.2 GButt-Splices
SD-02 Shop Drawings
3.1 GReinforcement
SD-03 Product Data
2.3 GReinforcing Steel
2.3.1 GMechanical Butt-Splices
1.3.1Welding
SD-06 Test Reports
2.8 GTests, Inspections, and
Verifications
SD-07 Certificates
1.3.1Qualified Welders
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-6
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 74 PAGES
03 20 00.00 25 1.3.2Qualification of Steel Bar
Butt-Splicers
2.3Reinforcing Steel
03 31 01.00 25 SD-03 Product Data
1.3 GConcrete Mixture Proportions
2.2.1Placing Equipment
2.2.1Capacity
2.2.1 GBatch Plant
2.1.4Curing Compound
2.2.6Concrete Mixers
2.2.7Conveying Equipment
3.1.4 GConstruction Joint Treatment
3.2.4 GCold-Weather Placing
3.2.5 GHot-Weather Placing
3.3 GFinishing
3.4 GCuring and Protection
3.6Tests and Inspections
SD-04 Samples
1.5.4 GCementitious Materials, Admixtures, and Curing
Compound
2.1.2 GAggregates
SD-06 Test Reports
2.1.5Water
3.6.2.3 GQuality of Aggregates
3.6.2.12Mixer Uniformity
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-7
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 74 PAGES
03 31 01.00 25 3.6Tests and Inspections
3.4.1 GTesting and Inspection for CQC
SD-07 Certificates
1.5.2Testing Technicians
1.5.2Concrete Construction Inspector
(CCI)
2.1.1 GCementitious Materials
2.1.3Other Chemical Admixtures
2.1.3.2 GAir-Entraining Admixture
2.1.6Grouting Materials
03 42 13.00 25 SD-01 Preconstruction Submittals
1.4.2.2Quality Control Procedures
SD-02 Shop Drawings
2.1.1 GStandard Precast Units
2.1.2 GCustom-Made Precast Units
3.2.4.3Special Finishes
SD-03 Product Data
2.1.1Standard Precast Units
2.1.3Proprietary Precast Units
3.1.3Embedded Items
2.2.4Accessories
SD-05 Design Data
2.1.2 GDesign Calculations
2.1.5.1Concrete Mix Proportions
SD-06 Test Reports
1.4.2.4Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-8
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 74 PAGES
03 42 13.00 25 SD-07 Certificates
1.4.2.2Quality Control Procedures
05 05 20.00 25 SD-01 Preconstruction Submittals
1.5.1.1 GInstaller Qualifications
1.5.1.2 GPost-Installed Anchor Special
Inspector Qualifications
SD-03 Product Data
2.1.1.3 GMechanical Anchors in Concrete
2.1.1.4 GAdhesive Anchor System in
Concrete
3.1.3 GNon-Shrink, Non-Metallic Grout
SD-06 Test Reports
3.3.4 GPost-Installed Anchor Special
Inspections Report
SD-07 Certificates
2.1.1.1 GPost-Installed Anchor
Certification
SD-08 Manufacturer’s Instructions
2.1.1.2 GManufacturer's Printed
Installation Instructions
3.1.3 GNon-Shrink, Non-Metallic Grout
1.5Manufacturer's Material Safety
Data Sheets
05 05 23.16 25 SD-01 Preconstruction Submittals
3.2 G ECDSWelding Quality Assurance Plan
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-9
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 74 PAGES
05 05 23.16 25 1.3 G ECDSWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3 G ECDSPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
3.2Weld Inspection Log
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Brazing Procedure
Specifications (BPS)
1.3.1Certified Procedure Qualification
Records (PQR)
1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.1Certified Brazer Performance
Qualifications (BPQ)
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00.00 25 SD-02 Shop Drawings
1.5.1 G ECDSFabrication Drawings
SD-03 Product Data
2.5.2Shop Primer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-10
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 74 PAGES
05 12 00.00 25 2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.2.1 G ECDSRecycled Content for Structural
Steel
2.2.2 G ECDSRecycled Content for Structural
Steel Tubing
2.2.3 G ECDSRecycled Content for Steel Pipe
SD-06 Test Reports
2.5.2Class B Coating
2.3Bolts, Nuts, and Washers
3.6.1.2Weld Inspection Reports
3.6.2.1Direct Tension Indicator Washer
Inspection Reports
3.6.3.1Bolt Testing Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
1.5.2.1 G ECDSWelding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.6.1.1 G ECDSCertified Welding Inspector
3.6.1.2 G ENCDNDT Technician
3.4 G ECDSWelding Procedure Specifications
(WPS)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-11
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 74 PAGES
05 12 00.00 25 1.5.2.2 G ECDSOverhead, Top Running Crane
Rail Beam
05 14 00.13 25 SD-03 Product Data
1.6.2 G ECDSWelding Procedure Specifications
3.5 G ECDSWeld Repair Plan
SD-06 Test Reports
3.4.1 G ECDSQuality Control Plan
3.4.2.2 G ECDSNDE Test Records
SD-07 Certificates
1.6.1 G ECDSQualifications Of Welders and
Welding Operators
1.6.1 G ECDSQualifications Of Welding
Inspectors
05 30 00.00 25 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.3Galvanizing Repair Paint
2.2.7Mechanical Fasteners
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
SD-04 Samples
2.1.1Metal Roof Deck Units
SD-05 Design Data
2.1 GDeck Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-12
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 74 PAGES
05 30 00.00 25 SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.4.1Wind Storm Resistance
1.3.1Manufacturer's Certificates
2.2.5Stud Manufacture's Certification
2.2.5Stud Manufacture's Test Reports
05 40 00.00 25 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
05 50 13.00 25 SD-02 Shop Drawings
2.4 G ECDSFloor Gratings
2.5 G ECDSBollards/Pipe Guards
SD-03 Product Data
2.4 G ECDSFloor Gratings
2.1Recycled Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-13
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 74 PAGES
05 50 15.00 25 SD-02 Shop Drawings
1.4.1 GDetail Drawings
2.2 GShop Fabricated Metal Items
SD-03 Product Data
2.1.3Expansion Anchors
2.1.5Gratings
2.2 GShop Fabricated Metal Items
05 51 00.00 25 SD-02 Shop Drawings
2.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars, and
Strips
2.2.1 GMetal Stair System, platform, and
walkway
SD-03 Product Data
2.4.1 GStructural Steel Plates, Shapes, and Bars
2.4.2 GStructural Steel Tubing
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.5 GCold-Drawn Steel Tubing
2.3.2 GConcrete Inserts
2.2.3 GProtective Coating
2.3.1 GSteel Stairs, Platforms, and
Walkways
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-14
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 74 PAGES
05 51 00.00 25 1.4 GDesign Analysis (Structural
Calculations)
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.1 GWelder Qualification
SD-08 Manufacturer’s Instructions
2.4.1 GStructural Steel Plates, Shapes, and Bars
2.4.2 GStructural Steel Tubing
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.5 GCold-Drawn Steel Tubing
2.2.3 GProtective Coating
05 51 33.00 25 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
2.3.2Ladder Safety Devices
SD-07 Certificates
1.4Fabricator Certification for Ladder
Assembly
05 52 00.00 25 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-15
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 74 PAGES
05 52 00.00 25 SD-03 Product Data
2.2.1 GStructural-Steel Plates, Shapes, and Bars
2.2.2 GStructural-Steel Tubing
2.2.4 GCold-Finished Steel Bars
2.2.3 GHot-Rolled Carbon Steel Bars
2.2.5 GCold-Drawn Steel Tubing
2.2.7 GConcrete Inserts
2.1.3 GProtective Coating
2.2.9 GSteel Railings and Handrails
2.2.10 GAluminum Railings and Handrails
1.2.1 GAnchorage and Fastening
Systems
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
05 59 20.00 25 SD-01 Preconstruction Submittals
1.4.5 GShop Drawings
1.2.3 GWelding Procedure Specifications
(WPS)
1.2.4.1 GFracture Control Plan (FCP)
1.2.1 GWeld Tracking Log Template
1.2.2 GWeld Tracking Log
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-16
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 74 PAGES
05 59 20.00 25 1.4.1 GQualification of Welders and
Welding Operators
1.4.2 GInspector Qualifications
1.4.3 GQualification of Structural Steel
Fabricator
2.2.3.2.1 GNDT Inspector Certification
2.2.7 GWelding Repairs - Non-Fracture
Critical Members
2.2.7 GWelding Repairs - Fracture
Critical Members
2.1.4.2 GPerformance Qualification
Records
2.2.3.2.4.1GUltrasonic Written Procedure
SD-02 Shop Drawings
2.1.2 GAssembly
1.5 GDelivery/Shipping Plan
1.4.6 GErection Drawings
SD-03 Product Data
2.1.3Materials Disposition Record
3.1.1 GAnti-Galling Compound
SD-06 Test Reports
2.2 GCertified Test Reports
1.4Witness Points
2.1.5.2 GRepair of Mislocated or Misdrilled
Holes
2.2.4.2 GSchedule of Random Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-17
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 74 PAGES
05 59 20.00 25 2.1.5.3 GManufacturer Certified Test
Reports
2.1.5.3 GDistributor Certified Test Reports
SD-07 Certificates
1.2 GWork Plan
SD-09 Manufacturer’s Field
Reports
2.2.8 GControl Dimensions
07 11 13.00 28 SD-03 Product Data
2.3 GEmulsion-Based Asphalt
Dampproofing
SD-07 Certificates
2.1Manufacturer's Safety Data
Sheets (SDS)
07 21 13.00 28 SD-03 Product Data
2.1 GFoundation Insulation
2.2 GConcrete Floor Slab Vapor
Barrier
2.3 GProtection Coating
2.1.1 GTape
2.2.1 GTape
1.3 GManufacturer's Standard Details
2.1.3 GMechanical Fasteners
2.1.2 GAdhesive
SD-07 Certificates
2.1.4 GRecycled Material Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-18
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 74 PAGES
07 21 13.00 28 SD-08 Manufacturer’s Instructions
2.1 GFoundation Insulation
2.2 GConcrete Floor Slab Vapor
Barrier
2.3 GProtection Coating
07 21 16.00 28 SD-03 Product Data
2.1 GMineral Wool Batt Insulation
SD-08 Manufacturer’s Instructions
2.1 GMineral Wool Batt Insulation
07 42 13.00 28 SD-01 Preconstruction Submittals
1.6.3 GQualification of Manufacturer
1.6.4 GQualification of Applicator
1.9.5 GSample Warranty
SD-02 Shop Drawings
2.2 GInsulated Sheet Metal Wall
Panels
1.4.2.2 GSheet Metal Wall Trims and
Accessories
2.3 GSheet Metal Wall Trims and
Accessories
1.4.3 GStandard Manufacturer Details
SD-03 Product Data
2.2 GInsulated Sheet Metal Wall
Panels
2.4 GFactory-Applied Color Finish
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-19
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 74 PAGES
07 42 13.00 28 2.3.2 GPre-Manufactured Sheet Metal
Wall Trims And Accessories
2.6 GFasteners
2.7 GJoint Sealants
2.8 GButyl Mastic Tape
SD-04 Samples
2.2 GInsulated Sheet Metal Wall
Panels
2.4 GFactory-Applied Color Finish
1.4.2.2 GSheet Metal Wall Trims and
Accessories
2.3 GSheet Metal Wall Trims and
Accessories
2.6 GFasteners
2.8 GButyl Mastic Tape
SD-05 Design Data
1.5.4 GWind Load Resistance
SD-06 Test Reports
2.4 GFactory-Applied Color Finish
SD-07 Certificates
1.6.3 GQualification of Manufacturer
1.6.4 GQualification of Applicator
1.9.5 GSample Warranty
SD-08 Manufacturer’s Instructions
1.4.5 GInstallation Manual
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-20
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 74 PAGES
07 42 13.00 28 SD-09 Manufacturer’s Field
Reports
3.8.2 GManufacturer's Field Inspection
Reports
SD-10 Operation and Maintenance
Data
2.2 GInsulated Sheet Metal Wall
Panels
SD-11 Closeout Submittals
1.9 GWarranties
07 61 14.00 28 SD-01 Preconstruction Submittals
1.7.1 GQualification of Manufacturer
1.7.2 GQualification of Applicator
1.11.6 GSample Warranty
SD-02 Shop Drawings
2.2.1 GInsulated Sheet Metal Roof
Panels
2.2.2 GNon-Insulated Sheet Metal Roof
Panels
2.4 GAttachment Clips
1.4.2.2 GSheet Metal Soffit Panels
1.4.2.3 GRoof Flashing and Accessories
2.8 GRoof Flashing and Accessories
1.4.2.4 GSheet Metal Gutters and
Downspouts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-21
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 74 PAGES
07 61 14.00 28 2.9 GSheet Metal Gutters and
Downspouts
1.4.3 GStandard Manufacturer Details
SD-03 Product Data
2.2.1 GInsulated Sheet Metal Roof
Panels
2.2.2 GNon-Insulated Sheet Metal Roof
Panels
2.4 GAttachment Clips
1.4.2.2 GSheet Metal Soffit Panels
2.12 GFactory-Applied Color Finish
2.8.2 GPre-Manufactured Roof Flashing
And Accessories
2.9.6 GGutter Guard Mesh
2.13 GFasteners
2.15 GButyl Mastic Tape
2.6 GCondensation Reduction
Membrane
2.7 GBreathable Synthetic Roof
Underlayment
SD-04 Samples
1.4.2.1 GSheet Metal Roof Panels
2.4 GAttachment Clips
1.4.2.2 GSheet Metal Soffit Panels
2.12 GFactory-Applied Color Finish
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-22
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 74 PAGES
07 61 14.00 28 2.6 GCondensation Reduction
Membrane
2.7 GBreathable Synthetic Roof
Underlayment
1.4.2.3 GRoof Flashing and Accessories
2.8 GRoof Flashing and Accessories
1.4.2.4 GSheet Metal Gutters and
Downspouts
2.9 GSheet Metal Gutters and
Downspouts
2.9.6 GGutter Guard Mesh
2.13 GFasteners
2.15 GButyl Mastic Tape
2.10 GDownspout Boot Manufacturer's
Standard Color Offering
SD-05 Design Data
1.6 GDesign Calculations
SD-06 Test Reports
1.5.1 GLeakage Test Report
3.9.2 GLeakage Test Report
1.5.4 GFM Wind Uplift Test Reports
1.5.6 GFire Rating Test Reports
2.12 GFactory-Applied Color Finish
SD-07 Certificates
1.7.1 GQualification of Manufacturer
1.7.2 GQualification of Applicator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-23
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 74 PAGES
07 61 14.00 28 1.11.6 GSample Warranty
SD-08 Manufacturer’s Instructions
1.4.5 GInstallation Manual
SD-09 Manufacturer’s Field
Reports
3.10.2 GManufacturer's Field Inspection
Reports
SD-10 Operation and Maintenance
Data
2.2.1 GInsulated Sheet Metal Roof
Panels
2.2.2 GNon-Insulated Sheet Metal Roof
Panels
1.4.2.2 GSheet Metal Soffit Panels
1.4.2.3 GRoof Flashing and Accessories
2.8 GRoof Flashing and Accessories
1.4.2.4 GSheet Metal Gutters and
Downspouts
2.9 GSheet Metal Gutters and
Downspouts
SD-11 Closeout Submittals
1.11 GWarranties
3.12 GInformation Card
07 92 00.00 28 SD-02 Shop Drawings
1.3.2 GSealant Schedule
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-24
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 74 PAGES
07 92 00.00 28 2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBacking Rod
2.1.5.1 GButyl Mastic Tape
SD-07 Certificates
2.1.1 GIndoor Air Quality For Interior
Sealants
2.1.2 GIndoor Air Quality For Interior
Sealants
1.3.1Manufacturer's Safety Data
Sheets (SDS)
08 11 13.00 28 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.4 GFrames
2.4 GFrames
2.3 GAccessories
SD-03 Product Data
2.1 GDoors
2.4 GFrames
2.3 GAccessories
SD-10 Operation and Maintenance
Data
2.1 GDoors
2.4 GFrames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-25
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 74 PAGES
08 33 23.00 28 SD-02 Shop Drawings
2.2.1 GOverhead Coiling Doors
2.1.1.1 GGuides
2.2.3.1 GMounting Brackets
2.1.1.1 GInstallation Drawings
2.2.2.2 GDoor Hood
SD-03 Product Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
2.2.4 GElectric Door Operators
2.2.5.1 GManual Chain Operator
2.2.6.2 GFinish For Door Curtain, Door
Hood, Guides, Bottom Bar And
Head Plate
SD-04 Samples
2.2.6.2 GManufacturer's Standard Color
Offering
SD-05 Design Data
2.1.2.1 GWind Loading
2.2.4 GElectric Door Operators
SD-10 Operation and Maintenance
Data
1.3.2 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-26
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 74 PAGES
08 33 23.00 28 1.3.1 GWarranty
08 51 13.00 28 SD-02 Shop Drawings
1.3.2 GWindow Shop Drawing
SD-03 Product Data
2.1 GWindows
1.8 GWindow Performance
2.3 GThermal-Barrier Windows
2.2.7 GMullions
2.2.8 GWeatherstripping
2.2.8 GAccessories
1.8.4 GThermal Performance
SD-04 Samples
1.3.3.1 GColor Sample
SD-05 Design Data
2.1 GStructural Calculations for
Deflection
SD-06 Test Reports
1.3.4 GMinimum Condensation
Resistance Factor
1.3.4 GResistance to Forced Entry
SD-10 Operation and Maintenance
Data
2.1 GWindows
08 71 00.00 28 SD-02 Shop Drawings
1.5 GHardware Schedule
2.2.5 GKeying System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-27
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 74 PAGES
08 71 00.00 28 SD-03 Product Data
2.2 GHardware Items
SD-08 Manufacturer’s Instructions
3.1 GInstallation Instructions
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.5.1 GAs-Built Hardware Schedule
2.2.7 GCloser Warranty
08 81 00.00 28 SD-03 Product Data
2.1.2.1 GGlass Mirrors
2.1.3 GTempered Glass
2.2 GInsulating Glass Units
2.3 GGlazing Accessories
SD-07 Certificates
2.2 GInsulating Glass Units
SD-10 Operation and Maintenance
Data
2.2 GInsulating Glass Units
SD-11 Closeout Submittals
1.6.1 GWarranty For Insulating Glass
Units
08 91 00.00 25 SD-02 Shop Drawings
1.4 GVenting Louvers
2.2 GVenting Louvers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-28
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 74 PAGES
08 91 00.00 25 1.4 GSun Shade Louvers
2.3 GSun Shade Louvers
SD-03 Product Data
1.4 GVenting Louvers
2.2 GVenting Louvers
1.4 GSun Shade Louvers
2.3 GSun Shade Louvers
SD-04 Samples
2.6 GColor Samples
SD-10 Operation and Maintenance
Data
1.4 GVenting Louvers
2.2 GVenting Louvers
1.4 GSun Shade Louvers
2.3 GSun Shade Louvers
09 22 00.00 28 SD-02 Shop Drawings
2.1 GMetal Support Systems
SD-03 Product Data
2.1 GMetal Support Systems
09 29 00.00 28 SD-03 Product Data
2.1.3 GCementitious Backer Units
2.1.1 GGypsum Board
2.1.8 GAccessories
2.1.4 GPlywood Wainscot
2.2 GWall Access Panels
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-29
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 74 PAGES
09 29 00.00 28 2.1Safety Data Sheets
09 30 10.00 28 SD-03 Product Data
2.1.1 GGauged Porcelain Tile
2.1.1 GManufacturer Color Pamphlets
2.1 GTransition Strips
2.8.1 GTransition Strips
2.1 GAccessories
2.2 GMortar Setting-Bed
2.4 GThin Set Mortar
2.9 GShower Base
SD-04 Samples
2.1.1 GGauged Porcelain Tile
2.5 GGrout Color
SD-08 Manufacturer’s Instructions
3.8 GInstallation of Shower Base
3.9Manufacturer's Approved
Cleaning Instructions
SD-10 Operation and Maintenance
Data
2.1.1 GGauged Porcelain Tile
09 51 00.00 28 SD-02 Shop Drawings
2.1 GShop Drawings
SD-03 Product Data
2.2 GAcoustical Ceiling Tiles
2.3 GCeiling Suspension System
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-30
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 74 PAGES
09 51 00.00 28 2.2 GAcoustical Ceiling Tiles
SD-07 Certificates
1.3.1Indoor Air Quality Certifications
SD-10 Operation and Maintenance
Data
2.2 GAcoustical Ceiling Tiles
2.3 GCeiling Suspension System
09 65 00.00 28 SD-03 Product Data
2.6 GResilient Flooring and
Accessories
2.4 GAdhesives
2.1 GVinyl Plank Flooring
2.2 GWall Base
SD-04 Samples
2.6 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance
Data
2.6 GResilient Flooring and
Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-31
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 74 PAGES
09 90 00.00 28 SD-02 Shop Drawings
3.8Piping Identification
SD-03 Product Data
2.1 GCoating
2.1 GProduct Data Sheets
SD-04 Samples
2.2 GColor
SD-07 Certificates
1.5.5Indoor Air Quality for Paints and
Primers
1.5.5Indoor Air Quality for
Consolidated Latex Paints
SD-08 Manufacturer’s Instructions
2.1 GApplication Instructions
2.1Mixing
1.7Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
09 97 02.00 25 SD-01 Preconstruction Submittals
1.3 G ECDSSafety, Health, and
Environmental Requirements
1.3.1 G ECDSAccident Prevention Plan
1.3.1.5 G ECDSRespiratory Protection Plan
1.3.2.1 G ECDSAirborne Sampling Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-32
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 74 PAGES
09 97 02.00 25 1.3.1 G ECDSVentilation Assessment Plan
1.3.2 G ECDSMedical Surveillance Plan
1.3.3 G ECDSEnvironmental Protection Plan
1.3.3.1Waste Manifest
1.3.3.1 G ECDSWaste Disposal Plan
SD-03 Product Data
2.1 G ECDSManufacturer's Safety Data Sheet
SD-04 Samples
2.1 G ECDSProduct Samples
2.2 G ECDSSpecial Paint Formulas
2.4.3 G ECDSSolvent and Thinners
SD-06 Test Reports
3.4Inspection Reports
1.3.2.2Medical Status Records
1.3.2.3Change in Medical Status Report
1.3.2.1 G ECDSAir Monitoring Test Plan
1.3.2.1Air Monitoring Test Report
SD-07 Certificates
1.5.1Certified EHS Professional
1.5.2Coating Thickness Gage
Qualification
10 14 00.10 28 SD-02 Shop Drawings
3.1 GSign Installation
SD-03 Product Data
2.1 GExterior Signage
10 14 00.20 28 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-33
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 74 PAGES
10 14 00.20 28 1.3.2 GDetail Drawings
SD-03 Product Data
2.1 GRoom Identification
SD-04 Samples
1.3.1 GInterior Signage
2.1 GRoom Identification
SD-10 Operation and Maintenance
Data
3.1 GApproved Manufacturer's
Instructions
3.1.2 GProtection and Cleaning
10 28 13.00 28 SD-02 Shop Drawings
2.1.1 GProduct Schedule
SD-03 Product Data
2.1 GAccessory Items
2.1.3 GFinishes
SD-10 Operation and Maintenance
Data
2.1 GAccessory Items
10 44 16.00 28 SD-02 Shop Drawings
2.1 GSemi-Recessed Fire Extinguisher
Cabinets
SD-03 Product Data
2.1 GSemi-Recessed Fire Extinguisher
Cabinets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-34
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 74 PAGES
10 44 16.00 28 SD-10 Operation and Maintenance
Data
2.1 GSemi-Recessed Fire Extinguisher
Cabinets
10 81 13.00 28 SD-02 Shop Drawings
1.4 GBird Netting System
2.1 GBird Netting System
SD-03 Product Data
1.4 GBird Netting System
2.1 GBird Netting System
2.3 GBird Spike System
SD-04 Samples
1.4 GBird Netting System
2.1 GBird Netting System
2.3 GBird Spike System
SD-10 Operation and Maintenance
Data
1.4 GBird Netting System
2.1 GBird Netting System
2.3 GBird Spike System
SD-11 Closeout Submittals
2.1.8 GWarranty For Bird Netting System
2.3.4 GWarranty For Bird Spike System
11 24 29.00 25 SD-02 Shop Drawings
1.5 GShop Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-35
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 74 PAGES
11 24 29.00 25 1.5 GProduct Data
SD-05 Design Data
1.5 GDesign Data
SD-06 Test Reports
3.2.1 GTesting Plan
3.2.1 GStatic Load Testing Results
SD-10 Operation and Maintenance
Data
3.3 GOperation And Maintenance
Manual
SD-11 Closeout Submittals
3.4Field Training
12 21 00.00 28 SD-03 Product Data
2.1 GWindow Shades
SD-04 Samples
2.1 GWindow Shades
SD-08 Manufacturer’s Instructions
3.2 GInstallation
SD-10 Operation and Maintenance
Data
2.1 GWindow Shades
12 32 00.00 28 SD-02 Shop Drawings
2.3 GManufactured Cabinet Units
SD-03 Product Data
2.3.4 GLaminate Facing For Vertical
Exterior Cabinet Surfaces
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-36
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 74 PAGES
12 32 00.00 28 2.3.5 GUndecorated Backing Laminate for Interior Cabinet Surfaces
2.4 GCabinet Accessories
2.5 GSolid Polymer Countertops, Shower Walls, and Window Sills
2.5.5.3 GSolid Polymer Seam Adhesive
SD-04 Samples
1.3 GManufacturer's Standard Color
Charts
1.3 GSamples of Laminates and Solid
Polymer Sheeting
SD-07 Certificates
2.3.7 GLaminate Adhesive
SD-08 Manufacturer’s Instructions
Part 3 GManufacturer's Instructions
13 34 19.00 28 SD-01 Preconstruction Submittals
1.7.3 GManufacturer's Qualifications
SD-02 Shop Drawings
1.6.2 GDetail Drawings
1.6.5 GErection Plan
SD-03 Product Data
1.7.1 GManufacturer's Catalog Data
SD-05 Design Data
1.6.1 GManufacturer's Descriptive and
Technical Literature
1.6.3 GStructural Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-37
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 74 PAGES
13 34 19.00 28 1.7.1 GStructural Calculations
SD-06 Test Reports
1.7.1 GTest Reports
SD-07 Certificates
1.7.1 GQualification of Manufacturer
1.7.1 GQualification of Erector
SD-08 Manufacturer’s Instructions
1.14 GManufacturer's Installation
Instructions
1.8Shipping, Handling, and Storage
SD-10 Operation and Maintenance
Data
1.6.2 GDetail Drawings
1.7.1 GManufacturer's Catalog Data
SD-11 Closeout Submittals
1.15.1 GManufacturer's Metal Building
Framing System Warranty
3.6.1 GManufacturer's Metal Building
Framing System Warranty
3.6.2 GContractor's Warranty for
Installation
13 48 73.00 25 SD-02 Shop Drawings
3.1 GBracing
3.4 GResilient Vibration Isolation
Devices
2.1 GEquipment Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-38
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 74 PAGES
13 48 73.00 25 SD-03 Product Data
3.1 GBracing
2.1 GEquipment Requirements
3.3 GAnchor Bolts
2.1.2 GVibration Isolators
3.4.2 GSnubbers
SD-05 Design Data
1.2.3 GDesign Calculations
SD-06 Test Reports
3.3 GAnchor Bolts
SD-07 Certificates
3.6 GICC ES AC156 Shake Table Test
22 00 00.00 25 SD-02 Shop Drawings
3.9.1 GPlumbing System
SD-03 Product Data
3.9.1.1 GBackflow Prevention Assemblies
2.4Fixtures
2.4.2Flush Valve Water Closets
2.4.2 SWaterSense Label for Flush
Valve Water Closet
2.4.3Kitchen Sinks
2.4.4Service Sinks
2.4.6WaterSense label for lavatory faucet
2.6.2Shower Faucets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-39
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 74 PAGES
22 00 00.00 25 2.6.2WaterSense label for showerhead
2.10 GWater Heaters
2.12 GPumps
1.5.1Welding
3.4 GVibration-Absorbing Features
SD-06 Test Reports
3.9Tests, Flushing and Disinfection
3.9.1.1 GTest of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
2.1.1Bolts
SD-10 Operation and Maintenance
Data
3.9.1 GPlumbing System
22 07 19.00 25 SD-02 Shop Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.3 GAdhesives
2.3 GCoatings
2.3 GInsulating Cement
2.3 GInsulation Materials
2.3 GJacketing
2.3 GTape
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-40
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 74 PAGES
22 07 19.00 25 3.1 GInstallation Manual
SD-11 Closeout Submittals
3.4Record Drawings
2.3 SAdhesives
2.3 SCoatings
2.3 SInsulation Materials
1.3.1 SRecycled Materials
22 15 14.00 25 SD-02 Shop Drawings
2.1 GInstallation Drawings
SD-03 Product Data
2.1.1 GEquipment and Performance
Data
2.3.1 GUnderground Piping Materials
2.3.2 GAboveground Piping Materials
2.2.1 GPiping Specialties
2.4.2 GSupporting Elements
2.2.2 GAir Compressors
2.2.3 GValves
3.1.2.1 GAccessories
2.4.1 GMiscellaneous Materials
SD-05 Design Data
2.1.1 GDesign Analysis and Calculations
SD-06 Test Reports
3.2.1.4Piping System Test Report
SD-07 Certificates
2.3.1Underground Piping Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-41
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 74 PAGES
22 15 14.00 25 2.3.2Aboveground Piping Materials
2.4.2Supporting Elements
2.2.3Valves
2.4.1Miscellaneous Materials
SD-10 Operation and Maintenance
Data
3.4Operation and Maintenance
Manuals
23 05 48.19 25 SD-02 Shop Drawings
3.1Coupling and Bracing
3.3Flexible Couplings or Joints
2.2Equipment Restraint
1.2.4 GContractor Designed Bracing
SD-03 Product Data
3.1 GCoupling and Bracing
3.3 GFlexible Couplings Or Joints
2.2 GEquipment Restraint
1.2.4 GContractor Designed Bracing
2.6Snubbers
3.9Anchor Bolts
2.2.2Vibration Isolators
SD-05 Design Data
1.2.4 GDesign Calculations
SD-06 Test Reports
3.9 GAnchor Bolts
23 07 00.00 25 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-42
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 74 PAGES
23 07 00.00 25 3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
2.3.1 SRecycled content for insulation
materials
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe…