Specs Attachment 1 - Submittal Register_AMDT 0004.pdf

PDF 558 KB Posted

Attached to
Dexter Adult Fish Facility Upgrades
Solicitation number
W9127N23R0005
Issued by

About this file

This document outlines a federal contract opportunity for the Dexter Adult Fish Facility Upgrades project. The project scope involves major improvements, replacements and additions to Dexter Fish Facility to meet criteria approved by the National Marine Fisheries Service.

The period of performance is from March 2023 through November 2026. The estimated magnitude of construction is between $25 million to $100 million. The solicitation is unrestricted and full and open with the HUBZone price evaluation preference applied as required. The NAICS code is 237990 for other heavy and civil engineering construction, with a $39.5 million small business size standard. The solicitation is being conducted by the U.S. Army Corps of Engineers Portland District. Responses are due by the date specified in the solicitation.

View the file

Other files

File Type Posted
Dexter Fish Facility W9127N23R0005 Amend 0005.pdf PDF
Dexter_Pre-Bid and Follow On Site Visit_Attendance List.pdf PDF
ProjectNet Inquiries and Responses - Dexter Fish Facilities.pdf PDF
Section 00 10 00 CLINS Structure AMDT 0004.pdf PDF
Drawings SR701_SR101_AMDT 0004.pdf PDF
Drawings MK502_M-600_M-002_MQ501_AMDT 0004.pdf PDF
DB Wage Rate OR20230057 01.06.2023_AMDT 0004.pdf PDF
Dexter Fish Facility W9127N23R0005 Amend 0004.pdf PDF
Spec 26 42 13.00 25_AMDT 0004.pdf PDF
Drawings SK523_SK516-2_SK516_SK516-1_SK516-3_AMDT 0004.pdf PDF
Spec 33 61 13.19 25_AMDT 0004.pdf PDF
Spec 01 22 00.00 25_AMDT 0004.pdf PDF
Drawings CS103_CU105_CU201_CU102_CU103_AMDT 0004.pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part4.pdf PDF
Clean Sol Package Drawings MECHANICAL_AMDT 0003.pdf PDF
Dexter W9127N23R0005 Clean Solicitation Package.pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part1.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 5 (SP).pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part2.pdf PDF
Clean Sol Package Drawings GENERAL_AMDT 0003.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 3 (SL-SN).pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part3.pdf PDF
Clean Sol Package Drawings LANDSCAPE_AMDT 0003.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 4 (SO-ST).pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 1 (S-SJ) - Part2.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 2 (SK).pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 1 (S-SJ) - Part1.pdf PDF
Dexter Fish Facility W9127N23R0005 Amend 0003.pdf PDF
Clean Sol Package Drawings CIVIL_AMDT 0003.pdf PDF
STRUCTURES_AMDT 0002.pdf PDF
CU502_19DEC22_AMDT 0002.pdf PDF
M-600_AMDT 0002.pdf PDF
MK502_AMDT 0002.pdf PDF
E-603_EL602_EN602_M-601_ML524_AMDT 0002.pdf PDF
MZ101_23DEC22_AMDT 0002.pdf PDF
MW101-MW501-MW502_AMDT 0002.pdf PDF
MY103_AMDT0002.pdf PDF
STRUCTURES_AMDT 0002.pdf PDF
CD501_19DEC22_AMDT 0002.pdf PDF
Dexter Amendment 0002 Spec Changes Package.pdf PDF
W9127N23R0005 Amendment 0002 12.29.22.pdf PDF
Dexter Road Photo Tour.pdf PDF
Dexter Fish Facility Photo Tour.pdf PDF
DXF1.101_ES101-A2 (Electrical_Update_Amend0002).pdf PDF
Attach 8 - Dexter GBR Update Amend0002.pdf PDF
DXF1.101_DEXTER FF UPGRADE_STRUCTURAL UPDATE AMEND 0002.pdf PDF
Attachment 10 - DSL Removal Fill Permit.pdf PDF
W9127N23R0005-Amendment 0001 12.5.2022.pdf PDF
Specs 01 22 00.00 25 M&P Amend 0001.pdf PDF
Site Visit Attendance Sheet - Dexter.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 74 PAGES

Dexter Dam Adult Fish Facility Upgrades

01 10 10.00 25 SD-01 Preconstruction Submittals

1.7.6Interim Facility Water Supply Plan

1.7.8Backup Power Generator Plan

1.12Utility Outage Request

1.12Utility Connection Request

1.16 GAccess Agreements and Work

Areas

1.18 GSecurity Procedures

1.19 GSecurity Training

1.21.3.2 GTemporary Electrical Wiring Plan

1.22.1 GContractor's Planned Equipment

Methods

1.22.2 GPlant and Equipment List

1.22.3 GLoading Diagram

1.11Notification Of Equipment Outage

1.30Pre-Construction Survey

SD-06 Test Reports

1.32.1Survey Field Notebooks

1.32.2Data Storage

01 32 01.00 25 SD-01 Preconstruction Submittals

1.7.1 G ECCCPreliminary Schedule

1.7.2 G ECCCInitial Schedule

01 33 00 SD-01 Preconstruction Submittals

1.5 GSubmittal Register

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

A1-1

AMD 0004

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 74 PAGES

01 33 00 1.10.2Authorized Shop Drawing

Approvers

01 35 26.00 25 SD-01 Preconstruction Submittals

1.6.1.3 GCrane Operators

1.7.3 GTraining Plan

1.7.4 GHazardous Energy Control Plan

and HEC Procedures Training

Certification

1.8 GAccident Prevention Plan (APP)

1.8.2 GFall Prevention and Protection

Plan

1.8.2 GFatigue Management Plan (FMP)

1.9 GActivity Hazard Analysis (AHA)

1.18 GInclement Weather and

Heat/Cold Stress Management

Plans

3.3 GScaffolding

3.6.2 GArc Flash Hazard (AFH) Program

SD-06 Test Reports

1.4Regulatory Citations, Violations, and Corrective Action

1.5Drug and Alcohol Use Prevention

Program

1.15.2Accident or Mishap Reports

1.15.3Crane Testing Reports

3.5.2Utility Locations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 74 PAGES

01 35 26.00 25 SD-07 Certificates

1.7.6Arc Flash Hazard (AFH) Training

Certificate

1.10Confined Space Entry Permit

1.10Hot Work Permit

1.14Third Party Certification of

Barge-Mounted Mobile Cranes and

Mobile Equipment

1.15.4Certificate of Compliance

01 35 27.00 25 SD-01 Preconstruction Submittals

1.4 GDive Team Personnel

1.6 GDive Plan and General Schedule

1.6 GEquipment Certification

1.6 GEmergency Management Plan

1.6 GActivity Hazard Analysis

1.7 GCompany Safe Practice Manual

For Diving

01 45 00.00 25 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control Plan

3.4.4Construction Quality

Management for Contractors

01 57 19.00 25 SD-01 Preconstruction Submittals

1.7.1Environmental Preconstruction

Survey

1.8 GEnvironmental Protection Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-3

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 74 PAGES

01 57 19.00 25 3.2 G ECDGErosion and Sediment Control

Plan (ESCP)

3.2.2.1 GApplication For NPDES Permit

SD-06 Test Reports

3.2.1 G ECDGESCP Modifications

3.2.2.2 GInspections and Reports

SD-11 Closeout Submittals

1.9 GEnvironmental Records Binder

3.2.2.3 GStormwater Notice of Termination

01 78 23.00 25 SD-01 Preconstruction Submittals

1.2 GO&M Manual Execution Plan

SD-10 Operation and Maintenance

Data

1.3 GOperation and Maintenance

Manual

01 78 39.10 25 SD-01 Preconstruction Submittals

1.4 GAs-Built Drawings Execution Plan

1.5Working As-Built Redline

Drawings

SD-11 Closeout Submittals

1.7 GFinal Working As-Built Redline

Drawings

1.8 GFinal Contractor-prepared CAD

Drawings

1.6 GDigital Images

02 41 00.00 25 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 74 PAGES

02 41 00.00 25 1.2.2 GDemolition Plan

1.9Existing Conditions

SD-07 Certificates

1.7 GNotification

03 11 13.00 25 SD-02 Shop Drawings

2.2.6 GFormwork

3.1.1 GFormwork

2.2.6 GForm Removal Schedule

SD-03 Product Data

1.3Design

2.2Form Materials

2.2.5Form Releasing Agents

SD-04 Samples

1.4 GSample Panels

2.2.8 GFiber Voids

SD-05 Design Data

2.1Calculations

SD-06 Test Reports

3.4Job-cured Test Specimens

3.5Inspection

SD-07 Certificates

2.2.8Fiber Voids

03 15 00.00 25 SD-02 Shop Drawings

2.4 GWaterstops

SD-03 Product Data

2.2Preformed Expansion Joint Filler

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-5

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 74 PAGES

03 15 00.00 25 2.3Sealant

2.4Waterstops

SD-04 Samples

2.3.2Lubricant for Preformed

Compression Seals

2.3.3Field-Molded Type

2.4Waterstops

2.5.2 GSplicing Waterstops

SD-07 Certificates

2.2Preformed Expansion Joint Filler

2.3Sealant

2.4Waterstops

03 20 00.00 25 SD-01 Preconstruction Submittals

3.1.3.2 GButt-Splices

SD-02 Shop Drawings

3.1 GReinforcement

SD-03 Product Data

2.3 GReinforcing Steel

2.3.1 GMechanical Butt-Splices

1.3.1Welding

SD-06 Test Reports

2.8 GTests, Inspections, and

Verifications

SD-07 Certificates

1.3.1Qualified Welders

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-6

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 74 PAGES

03 20 00.00 25 1.3.2Qualification of Steel Bar

Butt-Splicers

2.3Reinforcing Steel

03 31 01.00 25 SD-03 Product Data

1.3 GConcrete Mixture Proportions

2.2.1Placing Equipment

2.2.1Capacity

2.2.1 GBatch Plant

2.1.4Curing Compound

2.2.6Concrete Mixers

2.2.7Conveying Equipment

3.1.4 GConstruction Joint Treatment

3.2.4 GCold-Weather Placing

3.2.5 GHot-Weather Placing

3.3 GFinishing

3.4 GCuring and Protection

3.6Tests and Inspections

SD-04 Samples

1.5.4 GCementitious Materials, Admixtures, and Curing

Compound

2.1.2 GAggregates

SD-06 Test Reports

2.1.5Water

3.6.2.3 GQuality of Aggregates

3.6.2.12Mixer Uniformity

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-7

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 74 PAGES

03 31 01.00 25 3.6Tests and Inspections

3.4.1 GTesting and Inspection for CQC

SD-07 Certificates

1.5.2Testing Technicians

1.5.2Concrete Construction Inspector

(CCI)

2.1.1 GCementitious Materials

2.1.3Other Chemical Admixtures

2.1.3.2 GAir-Entraining Admixture

2.1.6Grouting Materials

03 42 13.00 25 SD-01 Preconstruction Submittals

1.4.2.2Quality Control Procedures

SD-02 Shop Drawings

2.1.1 GStandard Precast Units

2.1.2 GCustom-Made Precast Units

3.2.4.3Special Finishes

SD-03 Product Data

2.1.1Standard Precast Units

2.1.3Proprietary Precast Units

3.1.3Embedded Items

2.2.4Accessories

SD-05 Design Data

2.1.2 GDesign Calculations

2.1.5.1Concrete Mix Proportions

SD-06 Test Reports

1.4.2.4Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-8

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 74 PAGES

03 42 13.00 25 SD-07 Certificates

1.4.2.2Quality Control Procedures

05 05 20.00 25 SD-01 Preconstruction Submittals

1.5.1.1 GInstaller Qualifications

1.5.1.2 GPost-Installed Anchor Special

Inspector Qualifications

SD-03 Product Data

2.1.1.3 GMechanical Anchors in Concrete

2.1.1.4 GAdhesive Anchor System in

Concrete

3.1.3 GNon-Shrink, Non-Metallic Grout

SD-06 Test Reports

3.3.4 GPost-Installed Anchor Special

Inspections Report

SD-07 Certificates

2.1.1.1 GPost-Installed Anchor

Certification

SD-08 Manufacturer’s Instructions

2.1.1.2 GManufacturer's Printed

Installation Instructions

3.1.3 GNon-Shrink, Non-Metallic Grout

1.5Manufacturer's Material Safety

Data Sheets

05 05 23.16 25 SD-01 Preconstruction Submittals

3.2 G ECDSWelding Quality Assurance Plan

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-9

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 74 PAGES

05 05 23.16 25 1.3 G ECDSWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification

1.3.2Previous Qualifications

1.3.3 G ECDSPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3Nondestructive Testing

3.2Weld Inspection Log

SD-07 Certificates

1.3.1Certified Welding Procedure

Specifications (WPS)

1.3.1Certified Brazing Procedure

Specifications (BPS)

1.3.1Certified Procedure Qualification

Records (PQR)

1.3.1Certified Welder Performance

Qualifications (WPQ)

1.3.1Certified Brazer Performance

Qualifications (BPQ)

1.3.5Certified Welding Inspector

1.3.5Nondestructive Testing Personnel

05 12 00.00 25 SD-02 Shop Drawings

1.5.1 G ECDSFabrication Drawings

SD-03 Product Data

2.5.2Shop Primer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-10

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 74 PAGES

05 12 00.00 25 2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.2.1 G ECDSRecycled Content for Structural

Steel

2.2.2 G ECDSRecycled Content for Structural

Steel Tubing

2.2.3 G ECDSRecycled Content for Steel Pipe

SD-06 Test Reports

2.5.2Class B Coating

2.3Bolts, Nuts, and Washers

3.6.1.2Weld Inspection Reports

3.6.2.1Direct Tension Indicator Washer

Inspection Reports

3.6.3.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

1.5.2.1 G ECDSWelding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.6.1.1 G ECDSCertified Welding Inspector

3.6.1.2 G ENCDNDT Technician

3.4 G ECDSWelding Procedure Specifications

(WPS)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-11

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 74 PAGES

05 12 00.00 25 1.5.2.2 G ECDSOverhead, Top Running Crane

Rail Beam

05 14 00.13 25 SD-03 Product Data

1.6.2 G ECDSWelding Procedure Specifications

3.5 G ECDSWeld Repair Plan

SD-06 Test Reports

3.4.1 G ECDSQuality Control Plan

3.4.2.2 G ECDSNDE Test Records

SD-07 Certificates

1.6.1 G ECDSQualifications Of Welders and

Welding Operators

1.6.1 G ECDSQualifications Of Welding

Inspectors

05 30 00.00 25 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.1.3Galvanizing Repair Paint

2.2.7Mechanical Fasteners

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

SD-04 Samples

2.1.1Metal Roof Deck Units

SD-05 Design Data

2.1 GDeck Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-12

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 74 PAGES

05 30 00.00 25 SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Wind Storm Resistance

1.3.1Manufacturer's Certificates

2.2.5Stud Manufacture's Certification

2.2.5Stud Manufacture's Test Reports

05 40 00.00 25 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists

2.1 SRecycled Content of Steel

Products

SD-05 Design Data

1.6.2 GMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

05 50 13.00 25 SD-02 Shop Drawings

2.4 G ECDSFloor Gratings

2.5 G ECDSBollards/Pipe Guards

SD-03 Product Data

2.4 G ECDSFloor Gratings

2.1Recycled Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-13

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 74 PAGES

05 50 15.00 25 SD-02 Shop Drawings

1.4.1 GDetail Drawings

2.2 GShop Fabricated Metal Items

SD-03 Product Data

2.1.3Expansion Anchors

2.1.5Gratings

2.2 GShop Fabricated Metal Items

05 51 00.00 25 SD-02 Shop Drawings

2.1 GIron and Steel Hardware

2.1 GSteel Shapes, Plates, Bars, and

Strips

2.2.1 GMetal Stair System, platform, and

walkway

SD-03 Product Data

2.4.1 GStructural Steel Plates, Shapes, and Bars

2.4.2 GStructural Steel Tubing

2.4.4 GCold-Finished Steel Bars

2.4.3 GHot-Rolled Carbon Steel Bars

2.4.5 GCold-Drawn Steel Tubing

2.3.2 GConcrete Inserts

2.2.3 GProtective Coating

2.3.1 GSteel Stairs, Platforms, and

Walkways

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-14

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 74 PAGES

05 51 00.00 25 1.4 GDesign Analysis (Structural

Calculations)

SD-07 Certificates

1.3.1 GWelding Procedures

1.3.1 GWelder Qualification

SD-08 Manufacturer’s Instructions

2.4.1 GStructural Steel Plates, Shapes, and Bars

2.4.2 GStructural Steel Tubing

2.4.4 GCold-Finished Steel Bars

2.4.3 GHot-Rolled Carbon Steel Bars

2.4.5 GCold-Drawn Steel Tubing

2.2.3 GProtective Coating

05 51 33.00 25 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

2.3.2Ladder Safety Devices

SD-07 Certificates

1.4Fabricator Certification for Ladder

Assembly

05 52 00.00 25 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-15

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 74 PAGES

05 52 00.00 25 SD-03 Product Data

2.2.1 GStructural-Steel Plates, Shapes, and Bars

2.2.2 GStructural-Steel Tubing

2.2.4 GCold-Finished Steel Bars

2.2.3 GHot-Rolled Carbon Steel Bars

2.2.5 GCold-Drawn Steel Tubing

2.2.7 GConcrete Inserts

2.1.3 GProtective Coating

2.2.9 GSteel Railings and Handrails

2.2.10 GAluminum Railings and Handrails

1.2.1 GAnchorage and Fastening

Systems

SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

05 59 20.00 25 SD-01 Preconstruction Submittals

1.4.5 GShop Drawings

1.2.3 GWelding Procedure Specifications

(WPS)

1.2.4.1 GFracture Control Plan (FCP)

1.2.1 GWeld Tracking Log Template

1.2.2 GWeld Tracking Log

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-16

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 74 PAGES

05 59 20.00 25 1.4.1 GQualification of Welders and

Welding Operators

1.4.2 GInspector Qualifications

1.4.3 GQualification of Structural Steel

Fabricator

2.2.3.2.1 GNDT Inspector Certification

2.2.7 GWelding Repairs - Non-Fracture

Critical Members

2.2.7 GWelding Repairs - Fracture

Critical Members

2.1.4.2 GPerformance Qualification

Records

2.2.3.2.4.1GUltrasonic Written Procedure

SD-02 Shop Drawings

2.1.2 GAssembly

1.5 GDelivery/Shipping Plan

1.4.6 GErection Drawings

SD-03 Product Data

2.1.3Materials Disposition Record

3.1.1 GAnti-Galling Compound

SD-06 Test Reports

2.2 GCertified Test Reports

1.4Witness Points

2.1.5.2 GRepair of Mislocated or Misdrilled

Holes

2.2.4.2 GSchedule of Random Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-17

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 74 PAGES

05 59 20.00 25 2.1.5.3 GManufacturer Certified Test

Reports

2.1.5.3 GDistributor Certified Test Reports

SD-07 Certificates

1.2 GWork Plan

SD-09 Manufacturer’s Field

Reports

2.2.8 GControl Dimensions

07 11 13.00 28 SD-03 Product Data

2.3 GEmulsion-Based Asphalt

Dampproofing

SD-07 Certificates

2.1Manufacturer's Safety Data

Sheets (SDS)

07 21 13.00 28 SD-03 Product Data

2.1 GFoundation Insulation

2.2 GConcrete Floor Slab Vapor

Barrier

2.3 GProtection Coating

2.1.1 GTape

2.2.1 GTape

1.3 GManufacturer's Standard Details

2.1.3 GMechanical Fasteners

2.1.2 GAdhesive

SD-07 Certificates

2.1.4 GRecycled Material Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-18

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 74 PAGES

07 21 13.00 28 SD-08 Manufacturer’s Instructions

2.1 GFoundation Insulation

2.2 GConcrete Floor Slab Vapor

Barrier

2.3 GProtection Coating

07 21 16.00 28 SD-03 Product Data

2.1 GMineral Wool Batt Insulation

SD-08 Manufacturer’s Instructions

2.1 GMineral Wool Batt Insulation

07 42 13.00 28 SD-01 Preconstruction Submittals

1.6.3 GQualification of Manufacturer

1.6.4 GQualification of Applicator

1.9.5 GSample Warranty

SD-02 Shop Drawings

2.2 GInsulated Sheet Metal Wall

Panels

1.4.2.2 GSheet Metal Wall Trims and

Accessories

2.3 GSheet Metal Wall Trims and

Accessories

1.4.3 GStandard Manufacturer Details

SD-03 Product Data

2.2 GInsulated Sheet Metal Wall

Panels

2.4 GFactory-Applied Color Finish

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-19

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 74 PAGES

07 42 13.00 28 2.3.2 GPre-Manufactured Sheet Metal

Wall Trims And Accessories

2.6 GFasteners

2.7 GJoint Sealants

2.8 GButyl Mastic Tape

SD-04 Samples

2.2 GInsulated Sheet Metal Wall

Panels

2.4 GFactory-Applied Color Finish

1.4.2.2 GSheet Metal Wall Trims and

Accessories

2.3 GSheet Metal Wall Trims and

Accessories

2.6 GFasteners

2.8 GButyl Mastic Tape

SD-05 Design Data

1.5.4 GWind Load Resistance

SD-06 Test Reports

2.4 GFactory-Applied Color Finish

SD-07 Certificates

1.6.3 GQualification of Manufacturer

1.6.4 GQualification of Applicator

1.9.5 GSample Warranty

SD-08 Manufacturer’s Instructions

1.4.5 GInstallation Manual

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-20

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 74 PAGES

07 42 13.00 28 SD-09 Manufacturer’s Field

Reports

3.8.2 GManufacturer's Field Inspection

Reports

SD-10 Operation and Maintenance

Data

2.2 GInsulated Sheet Metal Wall

Panels

SD-11 Closeout Submittals

1.9 GWarranties

07 61 14.00 28 SD-01 Preconstruction Submittals

1.7.1 GQualification of Manufacturer

1.7.2 GQualification of Applicator

1.11.6 GSample Warranty

SD-02 Shop Drawings

2.2.1 GInsulated Sheet Metal Roof

Panels

2.2.2 GNon-Insulated Sheet Metal Roof

Panels

2.4 GAttachment Clips

1.4.2.2 GSheet Metal Soffit Panels

1.4.2.3 GRoof Flashing and Accessories

2.8 GRoof Flashing and Accessories

1.4.2.4 GSheet Metal Gutters and

Downspouts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-21

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 74 PAGES

07 61 14.00 28 2.9 GSheet Metal Gutters and

Downspouts

1.4.3 GStandard Manufacturer Details

SD-03 Product Data

2.2.1 GInsulated Sheet Metal Roof

Panels

2.2.2 GNon-Insulated Sheet Metal Roof

Panels

2.4 GAttachment Clips

1.4.2.2 GSheet Metal Soffit Panels

2.12 GFactory-Applied Color Finish

2.8.2 GPre-Manufactured Roof Flashing

And Accessories

2.9.6 GGutter Guard Mesh

2.13 GFasteners

2.15 GButyl Mastic Tape

2.6 GCondensation Reduction

Membrane

2.7 GBreathable Synthetic Roof

Underlayment

SD-04 Samples

1.4.2.1 GSheet Metal Roof Panels

2.4 GAttachment Clips

1.4.2.2 GSheet Metal Soffit Panels

2.12 GFactory-Applied Color Finish

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-22

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 74 PAGES

07 61 14.00 28 2.6 GCondensation Reduction

Membrane

2.7 GBreathable Synthetic Roof

Underlayment

1.4.2.3 GRoof Flashing and Accessories

2.8 GRoof Flashing and Accessories

1.4.2.4 GSheet Metal Gutters and

Downspouts

2.9 GSheet Metal Gutters and

Downspouts

2.9.6 GGutter Guard Mesh

2.13 GFasteners

2.15 GButyl Mastic Tape

2.10 GDownspout Boot Manufacturer's

Standard Color Offering

SD-05 Design Data

1.6 GDesign Calculations

SD-06 Test Reports

1.5.1 GLeakage Test Report

3.9.2 GLeakage Test Report

1.5.4 GFM Wind Uplift Test Reports

1.5.6 GFire Rating Test Reports

2.12 GFactory-Applied Color Finish

SD-07 Certificates

1.7.1 GQualification of Manufacturer

1.7.2 GQualification of Applicator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-23

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 74 PAGES

07 61 14.00 28 1.11.6 GSample Warranty

SD-08 Manufacturer’s Instructions

1.4.5 GInstallation Manual

SD-09 Manufacturer’s Field

Reports

3.10.2 GManufacturer's Field Inspection

Reports

SD-10 Operation and Maintenance

Data

2.2.1 GInsulated Sheet Metal Roof

Panels

2.2.2 GNon-Insulated Sheet Metal Roof

Panels

1.4.2.2 GSheet Metal Soffit Panels

1.4.2.3 GRoof Flashing and Accessories

2.8 GRoof Flashing and Accessories

1.4.2.4 GSheet Metal Gutters and

Downspouts

2.9 GSheet Metal Gutters and

Downspouts

SD-11 Closeout Submittals

1.11 GWarranties

3.12 GInformation Card

07 92 00.00 28 SD-02 Shop Drawings

1.3.2 GSealant Schedule

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-24

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 74 PAGES

07 92 00.00 28 2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBacking Rod

2.1.5.1 GButyl Mastic Tape

SD-07 Certificates

2.1.1 GIndoor Air Quality For Interior

Sealants

2.1.2 GIndoor Air Quality For Interior

Sealants

1.3.1Manufacturer's Safety Data

Sheets (SDS)

08 11 13.00 28 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.4 GFrames

2.4 GFrames

2.3 GAccessories

SD-03 Product Data

2.1 GDoors

2.4 GFrames

2.3 GAccessories

SD-10 Operation and Maintenance

Data

2.1 GDoors

2.4 GFrames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-25

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 74 PAGES

08 33 23.00 28 SD-02 Shop Drawings

2.2.1 GOverhead Coiling Doors

2.1.1.1 GGuides

2.2.3.1 GMounting Brackets

2.1.1.1 GInstallation Drawings

2.2.2.2 GDoor Hood

SD-03 Product Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

2.2.4 GElectric Door Operators

2.2.5.1 GManual Chain Operator

2.2.6.2 GFinish For Door Curtain, Door

Hood, Guides, Bottom Bar And

Head Plate

SD-04 Samples

2.2.6.2 GManufacturer's Standard Color

Offering

SD-05 Design Data

2.1.2.1 GWind Loading

2.2.4 GElectric Door Operators

SD-10 Operation and Maintenance

Data

1.3.2 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-26

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 74 PAGES

08 33 23.00 28 1.3.1 GWarranty

08 51 13.00 28 SD-02 Shop Drawings

1.3.2 GWindow Shop Drawing

SD-03 Product Data

2.1 GWindows

1.8 GWindow Performance

2.3 GThermal-Barrier Windows

2.2.7 GMullions

2.2.8 GWeatherstripping

2.2.8 GAccessories

1.8.4 GThermal Performance

SD-04 Samples

1.3.3.1 GColor Sample

SD-05 Design Data

2.1 GStructural Calculations for

Deflection

SD-06 Test Reports

1.3.4 GMinimum Condensation

Resistance Factor

1.3.4 GResistance to Forced Entry

SD-10 Operation and Maintenance

Data

2.1 GWindows

08 71 00.00 28 SD-02 Shop Drawings

1.5 GHardware Schedule

2.2.5 GKeying System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-27

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 74 PAGES

08 71 00.00 28 SD-03 Product Data

2.2 GHardware Items

SD-08 Manufacturer’s Instructions

3.1 GInstallation Instructions

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.5.1 GAs-Built Hardware Schedule

2.2.7 GCloser Warranty

08 81 00.00 28 SD-03 Product Data

2.1.2.1 GGlass Mirrors

2.1.3 GTempered Glass

2.2 GInsulating Glass Units

2.3 GGlazing Accessories

SD-07 Certificates

2.2 GInsulating Glass Units

SD-10 Operation and Maintenance

Data

2.2 GInsulating Glass Units

SD-11 Closeout Submittals

1.6.1 GWarranty For Insulating Glass

Units

08 91 00.00 25 SD-02 Shop Drawings

1.4 GVenting Louvers

2.2 GVenting Louvers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-28

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 74 PAGES

08 91 00.00 25 1.4 GSun Shade Louvers

2.3 GSun Shade Louvers

SD-03 Product Data

1.4 GVenting Louvers

2.2 GVenting Louvers

1.4 GSun Shade Louvers

2.3 GSun Shade Louvers

SD-04 Samples

2.6 GColor Samples

SD-10 Operation and Maintenance

Data

1.4 GVenting Louvers

2.2 GVenting Louvers

1.4 GSun Shade Louvers

2.3 GSun Shade Louvers

09 22 00.00 28 SD-02 Shop Drawings

2.1 GMetal Support Systems

SD-03 Product Data

2.1 GMetal Support Systems

09 29 00.00 28 SD-03 Product Data

2.1.3 GCementitious Backer Units

2.1.1 GGypsum Board

2.1.8 GAccessories

2.1.4 GPlywood Wainscot

2.2 GWall Access Panels

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-29

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 74 PAGES

09 29 00.00 28 2.1Safety Data Sheets

09 30 10.00 28 SD-03 Product Data

2.1.1 GGauged Porcelain Tile

2.1.1 GManufacturer Color Pamphlets

2.1 GTransition Strips

2.8.1 GTransition Strips

2.1 GAccessories

2.2 GMortar Setting-Bed

2.4 GThin Set Mortar

2.9 GShower Base

SD-04 Samples

2.1.1 GGauged Porcelain Tile

2.5 GGrout Color

SD-08 Manufacturer’s Instructions

3.8 GInstallation of Shower Base

3.9Manufacturer's Approved

Cleaning Instructions

SD-10 Operation and Maintenance

Data

2.1.1 GGauged Porcelain Tile

09 51 00.00 28 SD-02 Shop Drawings

2.1 GShop Drawings

SD-03 Product Data

2.2 GAcoustical Ceiling Tiles

2.3 GCeiling Suspension System

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-30

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 74 PAGES

09 51 00.00 28 2.2 GAcoustical Ceiling Tiles

SD-07 Certificates

1.3.1Indoor Air Quality Certifications

SD-10 Operation and Maintenance

Data

2.2 GAcoustical Ceiling Tiles

2.3 GCeiling Suspension System

09 65 00.00 28 SD-03 Product Data

2.6 GResilient Flooring and

Accessories

2.4 GAdhesives

2.1 GVinyl Plank Flooring

2.2 GWall Base

SD-04 Samples

2.6 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests

SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance

Data

2.6 GResilient Flooring and

Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-31

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 74 PAGES

09 90 00.00 28 SD-02 Shop Drawings

3.8Piping Identification

SD-03 Product Data

2.1 GCoating

2.1 GProduct Data Sheets

SD-04 Samples

2.2 GColor

SD-07 Certificates

1.5.5Indoor Air Quality for Paints and

Primers

1.5.5Indoor Air Quality for

Consolidated Latex Paints

SD-08 Manufacturer’s Instructions

2.1 GApplication Instructions

2.1Mixing

1.7Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings

09 97 02.00 25 SD-01 Preconstruction Submittals

1.3 G ECDSSafety, Health, and

Environmental Requirements

1.3.1 G ECDSAccident Prevention Plan

1.3.1.5 G ECDSRespiratory Protection Plan

1.3.2.1 G ECDSAirborne Sampling Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-32

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 74 PAGES

09 97 02.00 25 1.3.1 G ECDSVentilation Assessment Plan

1.3.2 G ECDSMedical Surveillance Plan

1.3.3 G ECDSEnvironmental Protection Plan

1.3.3.1Waste Manifest

1.3.3.1 G ECDSWaste Disposal Plan

SD-03 Product Data

2.1 G ECDSManufacturer's Safety Data Sheet

SD-04 Samples

2.1 G ECDSProduct Samples

2.2 G ECDSSpecial Paint Formulas

2.4.3 G ECDSSolvent and Thinners

SD-06 Test Reports

3.4Inspection Reports

1.3.2.2Medical Status Records

1.3.2.3Change in Medical Status Report

1.3.2.1 G ECDSAir Monitoring Test Plan

1.3.2.1Air Monitoring Test Report

SD-07 Certificates

1.5.1Certified EHS Professional

1.5.2Coating Thickness Gage

Qualification

10 14 00.10 28 SD-02 Shop Drawings

3.1 GSign Installation

SD-03 Product Data

2.1 GExterior Signage

10 14 00.20 28 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-33

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 74 PAGES

10 14 00.20 28 1.3.2 GDetail Drawings

SD-03 Product Data

2.1 GRoom Identification

SD-04 Samples

1.3.1 GInterior Signage

2.1 GRoom Identification

SD-10 Operation and Maintenance

Data

3.1 GApproved Manufacturer's

Instructions

3.1.2 GProtection and Cleaning

10 28 13.00 28 SD-02 Shop Drawings

2.1.1 GProduct Schedule

SD-03 Product Data

2.1 GAccessory Items

2.1.3 GFinishes

SD-10 Operation and Maintenance

Data

2.1 GAccessory Items

10 44 16.00 28 SD-02 Shop Drawings

2.1 GSemi-Recessed Fire Extinguisher

Cabinets

SD-03 Product Data

2.1 GSemi-Recessed Fire Extinguisher

Cabinets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-34

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 74 PAGES

10 44 16.00 28 SD-10 Operation and Maintenance

Data

2.1 GSemi-Recessed Fire Extinguisher

Cabinets

10 81 13.00 28 SD-02 Shop Drawings

1.4 GBird Netting System

2.1 GBird Netting System

SD-03 Product Data

1.4 GBird Netting System

2.1 GBird Netting System

2.3 GBird Spike System

SD-04 Samples

1.4 GBird Netting System

2.1 GBird Netting System

2.3 GBird Spike System

SD-10 Operation and Maintenance

Data

1.4 GBird Netting System

2.1 GBird Netting System

2.3 GBird Spike System

SD-11 Closeout Submittals

2.1.8 GWarranty For Bird Netting System

2.3.4 GWarranty For Bird Spike System

11 24 29.00 25 SD-02 Shop Drawings

1.5 GShop Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-35

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 74 PAGES

11 24 29.00 25 1.5 GProduct Data

SD-05 Design Data

1.5 GDesign Data

SD-06 Test Reports

3.2.1 GTesting Plan

3.2.1 GStatic Load Testing Results

SD-10 Operation and Maintenance

Data

3.3 GOperation And Maintenance

Manual

SD-11 Closeout Submittals

3.4Field Training

12 21 00.00 28 SD-03 Product Data

2.1 GWindow Shades

SD-04 Samples

2.1 GWindow Shades

SD-08 Manufacturer’s Instructions

3.2 GInstallation

SD-10 Operation and Maintenance

Data

2.1 GWindow Shades

12 32 00.00 28 SD-02 Shop Drawings

2.3 GManufactured Cabinet Units

SD-03 Product Data

2.3.4 GLaminate Facing For Vertical

Exterior Cabinet Surfaces

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-36

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 74 PAGES

12 32 00.00 28 2.3.5 GUndecorated Backing Laminate for Interior Cabinet Surfaces

2.4 GCabinet Accessories

2.5 GSolid Polymer Countertops, Shower Walls, and Window Sills

2.5.5.3 GSolid Polymer Seam Adhesive

SD-04 Samples

1.3 GManufacturer's Standard Color

Charts

1.3 GSamples of Laminates and Solid

Polymer Sheeting

SD-07 Certificates

2.3.7 GLaminate Adhesive

SD-08 Manufacturer’s Instructions

Part 3 GManufacturer's Instructions

13 34 19.00 28 SD-01 Preconstruction Submittals

1.7.3 GManufacturer's Qualifications

SD-02 Shop Drawings

1.6.2 GDetail Drawings

1.6.5 GErection Plan

SD-03 Product Data

1.7.1 GManufacturer's Catalog Data

SD-05 Design Data

1.6.1 GManufacturer's Descriptive and

Technical Literature

1.6.3 GStructural Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-37

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 74 PAGES

13 34 19.00 28 1.7.1 GStructural Calculations

SD-06 Test Reports

1.7.1 GTest Reports

SD-07 Certificates

1.7.1 GQualification of Manufacturer

1.7.1 GQualification of Erector

SD-08 Manufacturer’s Instructions

1.14 GManufacturer's Installation

Instructions

1.8Shipping, Handling, and Storage

SD-10 Operation and Maintenance

Data

1.6.2 GDetail Drawings

1.7.1 GManufacturer's Catalog Data

SD-11 Closeout Submittals

1.15.1 GManufacturer's Metal Building

Framing System Warranty

3.6.1 GManufacturer's Metal Building

Framing System Warranty

3.6.2 GContractor's Warranty for

Installation

13 48 73.00 25 SD-02 Shop Drawings

3.1 GBracing

3.4 GResilient Vibration Isolation

Devices

2.1 GEquipment Requirements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-38

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 74 PAGES

13 48 73.00 25 SD-03 Product Data

3.1 GBracing

2.1 GEquipment Requirements

3.3 GAnchor Bolts

2.1.2 GVibration Isolators

3.4.2 GSnubbers

SD-05 Design Data

1.2.3 GDesign Calculations

SD-06 Test Reports

3.3 GAnchor Bolts

SD-07 Certificates

3.6 GICC ES AC156 Shake Table Test

22 00 00.00 25 SD-02 Shop Drawings

3.9.1 GPlumbing System

SD-03 Product Data

3.9.1.1 GBackflow Prevention Assemblies

2.4Fixtures

2.4.2Flush Valve Water Closets

2.4.2 SWaterSense Label for Flush

Valve Water Closet

2.4.3Kitchen Sinks

2.4.4Service Sinks

2.4.6WaterSense label for lavatory faucet

2.6.2Shower Faucets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-39

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 74 PAGES

22 00 00.00 25 2.6.2WaterSense label for showerhead

2.10 GWater Heaters

2.12 GPumps

1.5.1Welding

3.4 GVibration-Absorbing Features

SD-06 Test Reports

3.9Tests, Flushing and Disinfection

3.9.1.1 GTest of Backflow Prevention

Assemblies

SD-07 Certificates

1.3Materials and Equipment

2.1.1Bolts

SD-10 Operation and Maintenance

Data

3.9.1 GPlumbing System

22 07 19.00 25 SD-02 Shop Drawings

3.1 GInstallation Drawings

SD-03 Product Data

2.3 GAdhesives

2.3 GCoatings

2.3 GInsulating Cement

2.3 GInsulation Materials

2.3 GJacketing

2.3 GTape

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-40

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 74 PAGES

22 07 19.00 25 3.1 GInstallation Manual

SD-11 Closeout Submittals

3.4Record Drawings

2.3 SAdhesives

2.3 SCoatings

2.3 SInsulation Materials

1.3.1 SRecycled Materials

22 15 14.00 25 SD-02 Shop Drawings

2.1 GInstallation Drawings

SD-03 Product Data

2.1.1 GEquipment and Performance

Data

2.3.1 GUnderground Piping Materials

2.3.2 GAboveground Piping Materials

2.2.1 GPiping Specialties

2.4.2 GSupporting Elements

2.2.2 GAir Compressors

2.2.3 GValves

3.1.2.1 GAccessories

2.4.1 GMiscellaneous Materials

SD-05 Design Data

2.1.1 GDesign Analysis and Calculations

SD-06 Test Reports

3.2.1.4Piping System Test Report

SD-07 Certificates

2.3.1Underground Piping Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-41

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 74 PAGES

22 15 14.00 25 2.3.2Aboveground Piping Materials

2.4.2Supporting Elements

2.2.3Valves

2.4.1Miscellaneous Materials

SD-10 Operation and Maintenance

Data

3.4Operation and Maintenance

Manuals

23 05 48.19 25 SD-02 Shop Drawings

3.1Coupling and Bracing

3.3Flexible Couplings or Joints

2.2Equipment Restraint

1.2.4 GContractor Designed Bracing

SD-03 Product Data

3.1 GCoupling and Bracing

3.3 GFlexible Couplings Or Joints

2.2 GEquipment Restraint

1.2.4 GContractor Designed Bracing

2.6Snubbers

3.9Anchor Bolts

2.2.2Vibration Isolators

SD-05 Design Data

1.2.4 GDesign Calculations

SD-06 Test Reports

3.9 GAnchor Bolts

23 07 00.00 25 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

A1-42

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 74 PAGES

23 07 00.00 25 3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

2.3.1 SRecycled content for insulation

materials

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .