MW101-MW501-MW502_AMDT 0002.pdf

PDF 2 MB Posted

Attached to
Dexter Adult Fish Facility Upgrades
Solicitation number
W9127N23R0005
Issued by

About this file

This package includes plans and specifications for the Dexter Adult Fish Facility Upgrades project. Major work includes improving, replacing, and adding features to the facility to meet National Marine Fisheries Service criteria. The estimated construction cost is between $25-100 million. The period of performance is March 2023 through November 2026. The North American Industry Classification code is 237990 for other heavy civil engineering construction, with a $39.5 million small business size standard. The solicitation was released by the US Army Corps of Engineers Portland District for an unrestricted, full and open competition. The HUBZone price evaluation preference will apply as required.

View the file

Other files

File Type Posted
Dexter Fish Facility W9127N23R0005 Amend 0005.pdf PDF
Dexter_Pre-Bid and Follow On Site Visit_Attendance List.pdf PDF
ProjectNet Inquiries and Responses - Dexter Fish Facilities.pdf PDF
Section 00 10 00 CLINS Structure AMDT 0004.pdf PDF
Drawings SR701_SR101_AMDT 0004.pdf PDF
Drawings MK502_M-600_M-002_MQ501_AMDT 0004.pdf PDF
DB Wage Rate OR20230057 01.06.2023_AMDT 0004.pdf PDF
Dexter Fish Facility W9127N23R0005 Amend 0004.pdf PDF
Spec 26 42 13.00 25_AMDT 0004.pdf PDF
Specs Attachment 1 - Submittal Register_AMDT 0004.pdf PDF
Drawings SK523_SK516-2_SK516_SK516-1_SK516-3_AMDT 0004.pdf PDF
Spec 33 61 13.19 25_AMDT 0004.pdf PDF
Spec 01 22 00.00 25_AMDT 0004.pdf PDF
Drawings CS103_CU105_CU201_CU102_CU103_AMDT 0004.pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part4.pdf PDF
Clean Sol Package Drawings MECHANICAL_AMDT 0003.pdf PDF
Dexter W9127N23R0005 Clean Solicitation Package.pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part1.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 5 (SP).pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part2.pdf PDF
Clean Sol Package Drawings GENERAL_AMDT 0003.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 3 (SL-SN).pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part3.pdf PDF
Clean Sol Package Drawings LANDSCAPE_AMDT 0003.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 4 (SO-ST).pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 1 (S-SJ) - Part2.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 2 (SK).pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 1 (S-SJ) - Part1.pdf PDF
Dexter Fish Facility W9127N23R0005 Amend 0003.pdf PDF
Clean Sol Package Drawings CIVIL_AMDT 0003.pdf PDF
STRUCTURES_AMDT 0002.pdf PDF
CU502_19DEC22_AMDT 0002.pdf PDF
M-600_AMDT 0002.pdf PDF
MK502_AMDT 0002.pdf PDF
E-603_EL602_EN602_M-601_ML524_AMDT 0002.pdf PDF
MZ101_23DEC22_AMDT 0002.pdf PDF
MY103_AMDT0002.pdf PDF
STRUCTURES_AMDT 0002.pdf PDF
CD501_19DEC22_AMDT 0002.pdf PDF
Dexter Amendment 0002 Spec Changes Package.pdf PDF
W9127N23R0005 Amendment 0002 12.29.22.pdf PDF
Dexter Road Photo Tour.pdf PDF
Dexter Fish Facility Photo Tour.pdf PDF
DXF1.101_ES101-A2 (Electrical_Update_Amend0002).pdf PDF
Attach 8 - Dexter GBR Update Amend0002.pdf PDF
DXF1.101_DEXTER FF UPGRADE_STRUCTURAL UPDATE AMEND 0002.pdf PDF
Attachment 10 - DSL Removal Fill Permit.pdf PDF
W9127N23R0005-Amendment 0001 12.5.2022.pdf PDF
Specs 01 22 00.00 25 M&P Amend 0001.pdf PDF
Site Visit Attendance Sheet - Dexter.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B

C

D

E

1 2 3 4 5 6

A

D

ES

IG

N

ED

B

Y:

D

AT

E:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

PL

O

T

SC

AL

E:

PL

O

T D

AT

E:

SI

ZE

FI

L E N

AM

E:

US Army Corps of Engineers

PORTLAND DISTRICT

SHEET

IDENTIFICATION

MW101

D

EX

TE

R

D

AM

A N

D R

ES

ER

VO

IR

AD

U

LT

F

IS

H

F

AC

IL

IT

Y U

PG

R

AD

E

IN

TE

R

IM

W

AT

ER

S

U

PP

LY

SU

PP

LY

L O

C

AT

IO

N

S

PL

AN

BE

N

F

IL

AN

P

.E

B.

FI

LA

N

W H

IT

EH

EA

D

/1

7/

W

N

R

D

AN

IE

L M

. J

EN

SE

N

P .E

/1

7/

1:

AN

SI

F

PO

R

TL

AN

D D

IS

TR

IC

T

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

PO

R

TL

AN

D , O

R

EG

O N

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

D

XF

1.

1_

M W

1.

D W

G

SCALE:

INTERIM WATER SUPPLY CONCEPT - PLAN VIEW

1:500

INTERIM CONNECTION

MADE AT FACILITY HEADER

35 CFS DEMAND

6" TEE TO SUPPLY

2 CFS DEMAND

TO EXISTING ADULT

FACILITY TO BE VERIFIED

16" TEE TO SUPPLY POND DIFFUSER

10 CFS DEMAND

EXISTING

CONCRETE

RACEWAYS

ASPHALT POND

UNIT DISCHARGE AREA AND

FISH LADDER ENTRANCE

GENERAL NOTES:

1. DESIGN A GRAVITY FED INTERIM WATER SUPPLY INTERCEPTING THE

CURRENT WATER SUPPLY PIPE AT THE POWERHOUSE.

2. PROVIDE FLOW VERIFICATION VIA A FLOW METER AT THE THREE SUPPLY

POINT CONNECTIONS LISTED IN THE PLAN VIEW ON THIS SHEET.

3. OTHER PIPE SYSTEMS SUITABLE FOR SURFACE INSTALLATION AS PROPOSED

BY CONTRACTOR WILL BE ALLOWED IF POTABLE WATER COMPLIANT AND

ARE WITHOUT INTERNAL ZINC COATING SYSTEM.

4. DEMOLISH EXISTING MECHANICAL COUPLING AT DAM WALL AND INSTALL

NEW COUPLING FOR INTERIM WATER SUPPLY. THIS COUPLING MAY BE

RE-USED FOR THE NEW FACILITY WATER SUPPLY IF COMPATIBLE.

30" PIPE SURFACE

PLACED CONTRACTOR

CAN PROPOSE ALTERNATE

ROUTING MUST ALLOW

POWERHOUSE ACCESS

IDEALIZED TEMP.

SUPPORT STRUCTURE

EXISTING WATER SUPPLY PIPE

DEMOLISH AS NEEDED TO

ESTABLISH INTERIM CONNECTION

EXTENTS OF OPEN EXCAVATION

AFTER PIPE PRESSURE TESTING

AND FLOW VERIFICATION

PIT IS FILLED TO ALLOW

POWERHOUSE ACCESS

CONNECT TO

EXISTING FRESH

WATER SUPPLY PIPE

PROVIDE RATED SERVICE

WATER CONNECTION

EVALUATE EXISTING 48",

1/2" WALL SPOOL FOR

WATER SUPPLY SERVICE

INTERIM WATER SUPPLY CONCEPT - ISO VIEW

NTS

PIPE CONTINUES SURFACE INSTALLED TO FACILITY

SEE INTERIM PUMP PLAN FOR CONNECTIONS

EXISTING DUCT BACK

LOCATION (APPROX.)

SECURE AND PULL BACK

CONDUCTORS AS IS

PRACTICABLE

DEMO DUCT BANK AND

REROUTE CONDUCTORS

TO REESTABLISH EDG

CONNECTION

SHORE EXCAVATED PIT AS

NEEDED TO HAVE SAFE

ACCESS

PARTIAL DUCT BANK

REMOVAL IS REQUIRED,

DURING ENTRANCE AREA

CONSTRUCTION,

A NEW DUCT BANK MUST

BE CONSTRUCTED

RED HATCH INDICATES

IDEALIZED EXISTING

SURFACE EXCAVATION

SHOULD BE MINIMIZED AS

MUCH AS IS PRACTICABLE

SURFACE PLACED SUPPLY PIPE

POWERHOUSE

MW501

MW501

MW501

EXISTING WATER

SUPPLY PIPE

CL. EL. 643.82'

90 DEG ELBOW

90 DEG ELBOW

CL. EL. 664.71'

STILLING BASIN

'-5

69'-1"100'-0"

'-0

263'-1" 77'-8"194'-1"

'-2

9'-0"

'-8

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M D

T

EC

MW501

MW501

MW501

A

CL. EL. 643.82'

CL. EL. 664.71'

10'-0"

TYP

83'-4"

'-6

"CL. EL.

657.33'

CL. EL.

660.07'

DETAIL

SCALE:

- 1/8"=1'-0"

DETAIL

- 1/8"=1'-0"

SECTION

A

- 1:500

ITEMS OMITTED FOR CLARITY

5' 0 5' 10'

SCALE: 1

8"= 1'-0"

EARTHEN PIPE

SUPPORT BERM

EARTHEN PIPE

SUPPORT BERM

CL. EL. 656.85'

CL. EL. 655.88'

CL. EL. 665.79'

CL. EL. 664.76'

PIPE SUPPORTS

D

E

1 2 3 4 5 6

A

D

ES

IG

N

ED

B

Y:

D

AT

E:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

PL

O

T

SC

AL

E:

PL

O

T D

AT

E:

SI

ZE

FI

LE

N

AM

E:

US Army Corps of Engineers

PORTLAND DISTRICT

SHEET

IDENTIFICATION

MW501

D

EX

TE

R

D

AM

A N

D R

ES

ER

VO

IR

AD

U

LT

F

IS

H

F

AC

IL

IT

Y U

PG

R

R

IM

W

AT

ER

S

U

PP

LY

SU

PP

LY

L O

C

AT

IO

N

S D

ET

AI

LS

BE

N

F

IL

AN

P

.E

B.

F

IL

AN

W H

IT

EH

EA

D

/1

7/

W

N

R

IE

L M

. J

EN

SE

N

P .E

/1

7/

1:

AN

SI

F

PO

R

TL

AN

D D

IS

TR

IC

T

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

PO

R

TL

AN

D , O

R

EG

O N

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

D

XF

1.

1_

M W

1.

D W

G

DETAIL

SCALE:

MW101 3/16"=1'-0"

MW101 1/8"=1'-0"

MW101 1/8"=1'-0"

'-0

EXISTING 30" SUPPLY PIPE

TRANSITIONS ABOVE GRADE

TO GATE VALVE

EXISTING KNIFE GATE VALVE WITH OPERATOR

FUNCTIONALITY MUST BE MAINTAINED

CONCRETE POOL WALL

EXISTING ASPHALT DIFFUSER SUPPLY

EXCAVATE TO INTERCEPT VALVE CONNECTION

VALVE MAY BE REUSED DURING INTERIM WATER SUPPLY OPERATION

EXISTING BURIED 30" WATER SUPPLY PIPE

EXISTING FABRICATED PVC HEADER

TO SUPPLY AERATED WATER

EXISTING PVC HEADER ISOLATION VALVE

4"

TYP. EACH SUPPLY PIPE

SUPPLY

TO BE VERIFIED

SUPPLY

TO BE VERIFIED

BURIED 30" FACILITY WATER SUPPLY

EXISTING FISH LADDER

FLOW

FLOW TO CONCRETE RACEWAYS

FLOW TO OTHER AREAS

5' 0 5' 10'

SCALE: 1

8"= 1'-0" 12"0 5' 10'

SCALE: 3

16"= 1'-0"

1'-4"

2'-6"

CONCRETE MANHOLE

DEMO AS NEEDED TO FACILITATE

INTERIM WATER SUPPLY CONNECTION INSTALL

VALVE OPERATOR

GENERAL NOTES:

1. GRAVITY DESIGN, INTERCEPTING CURRENT WATER SUPPLY PIPE AT THE POWERHOUSE IS

CONTRACTOR DESIGNED.

3. FLOW VERIFICATION VIA FLOW METER INSTALLATION WILL BE MANDATED AT SUPPLY

POINTS. METHOD TO ALARM WHEN FLOWS ARE INTERRUPTED IS REQUIRED.

4. OTHER PIPE SYSTEMS SUITABLE FOR SURFACE INSTALLATION AS PROPOSED BY

CONTRACTOR WILL BE ALLOWED IF POTABLE WATER COMPLIANT AND ARE WITHOUT

INTERNAL ZINC COATING SYSTEM.

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M D

T

PROPOSED CONNECTION

TO EXISTING BLIND FLANGE.

CONTRACTOR TO VERIFY

CL. EL. 660.07'

PROPOSED

CONNECTION INTO

THE RACEWAY.

CONTRACTOR

TO VERIFY

CL. EL. 658.82'

PROPOSED CONNECTION TO

EXISTING BLIND FLANGE.

CONTRACTOR

TO VERIFY

CL. EL. 658.32'

DETAIL

SCALE:

MW101 3/16" = 1'-0"

D

E

1 2 3 4 5 6

A

D

ES

IG

N

ED

B

Y:

D

AT

E:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

PL

O

T

SC

AL

E:

PL

O

T D

AT

E:

SI

ZE

FI

LE

N

AM

E:

US Army Corps of Engineers

PORTLAND DISTRICT

SHEET

IDENTIFICATION

MW502

D

EX

TE

R

D

AM

A N

D R

ES

ER

VO

IR

AD

U

LT

F

IS

H

F

AC

IL

IT

Y U

PG

R

R

IM

W

AT

ER

S

U

PP

LY

PO

W

ER

H O

U

SE

P

IP

E

IN

SP

EC

TI

O

N D

ET

AI

LS

BE

N

F

IL

AN

P

.E

B.

F

IL

AN

W H

IT

EH

EA

D

/1

7/

W

N

R

IE

L M

. J

EN

SE

N

P .E

/1

7/

1:

AN

SI

F

PO

R

TL

AN

D D

IS

TR

IC

T

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

PO

R

TL

AN

D , O

R

EG

O N

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

D

XF

1.

1_

M W

2.

D W

G

2'-0"

EXISTING SPOOL

EXISTING WATER SUPPLY PIPE

PROPOSED INTERIM WATER SUPPLY FEATURE

INTERIM WATER SUPPLY PIPE

CONTRACTOR TO PROPOSE

ALTERNATE ROUTE

TO FACILITATE CONSTRUCTION

47 CFS

PIPE SPOOL AS-BUILT CONDITION INDICATES 1/2" PIPE WALL AT

POWERHOUSE WALL PENETRATION

MECHANICAL COUPLER IS INDICATED ON AS-BUILT DRAWINGS;

DEMO COUPLER

ASSESS PIPE CONNECTION FOR NEW MECHANICAL COUPLER

AS REQUIRED, REPAIR PIPE ENSURING NEW MECHANICAL

COUPLER CAN BE INSTALLED PER MFR. RECOMMENDATIONS.

FIELD PREPARE THE PIPE FOR AN EPOXY BASED COATING

SYSTEM AND PVC WRAP.

APPLY COATING SYSTEM AND WRAP PRIOR TO TEMPORARY BURIAL.

STANDARD SCHEDULE PIPE IS SPLICED HERE,

CONTINUES TO INTAKE TRANSITION

APPROXIMATE ROCK LAYER

INDICATED BY HATCH.

SEE CIVIL SHEETS

FACILITY WATER

INTAKE

POWERHOUSE FACE

PARKING LOT DECK

SCALE:

INTERIM WATER SUPPLY AREA - PLAN VIEW

1/16"=1'-0"

SECTION

SCALE:

A

- 3/32"=1'-0"

A

GENERAL NOTES:

1. SEE MW101 GENERAL NOTES.

2. INTERIM WATER SUPPLY FEATURES MUST BE TESTED AND LEAK FREE.

3. COMPLETE INTERIM WATER SUPPLY SYSTEM MUST BE PROVIDED BY CONTRACTOR.

4. SYSTEM MUST BE COMPLETELY REMOVED UPON CONSTRUCTION AND COMMISSIONING OF NEW BURIED SUPPLY

PIPE.

5. PIPE ROUTING CHANGES MUST BE COORDINATED WITH CONTRACTING OFFICER. COORDINATED DISRUPTIONS WHILE IN SERVICE MUST BE 30 MIN. OR LESS, UNLESS OCCURRING DURING FACILITY SHUTDOWN PERIOD.

6. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING WATER SUPPLY, ENSURING THERE IS NO DISRUPTION IN

SERVICE GREATER THAN 30 MIN. SUBMIT PLAN FOR APPROVAL.

7. AFTER INSTALLATION AND PRESSURE TESTING, CONTRACTOR MUST BACKFILL PIT TO ENSURE VEHICLE ACCESS

IS ALLOWED. SUBSEQUENT ACCESS DISRUPTIONS MAY BE ALLOWED, COORDINATE WITH GQAR.

8. CONTRACTOR MUST PROVIDE METHOD TO ALARM FOR A SERVICE DISRUPTION OR PROVIDE 24 HOUR

OVER-WATCH PERSONNEL.

EXISTING BURIED

WATER SUPPLY PIPE

GENERATING UNIT DISCHARGE

STILLING BASIN

TAILWATER

BAFFLE BLOCK

GENERATING UNIT INTAKE

SUPPORT, CONTRACTOR PROVIDED

AS REQUIRED BY SELECTED ROUTE

12" 6" 0 1' 2'

SCALE: 34"= 1'-0"

5' 0 5' 10' 15'5' 0 5' 10' 15'

SCALE: 3

32"= 1'-0" 12"0 5' 10'

SCALE: 3

16"= 1'-0"

PROPOSED INTERIM PIPE ROUTING

BULKHEAD

SCROLL CASE FILL

4' -0

DEMO AS REQUIRED

EXISTING CONCRETE, DEMO AS NEEDED TO

ESTABLISH REASONABLE PIT BOUNDARIES

6" COMBINATION

AIR RELEASE

VACUUM VALVE

30" GATE VALVE

CONTRACTOR MUST PROVIDE SAFE ACCESS

UPON DEMOLISHING PIPE PROVISIONS FOR LIGHTING

MUST BE PROVIDED BY THE CONTRACTOR NOTIFY GQAR.

CONTINUOUS ACCESS MUST BE PROVIDED FOR 72 HOURS

AS COORDINATED WITH CONTRACTING OFFICER.

ACCESS IS REQUIRED TO ASSESS PIPE CONDITION. THIS MAY BE

PERFORMED BY THIRD PARTY OR GOVERNMENT PERSONNEL.

AFTER INSPECTION, UNLESS SERIOUS CONDITION

EXISTS, CONTRACTOR WILL PROCEED

WITH INTERIM WATER SUPPLY INSTALLATION.

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M D

T

File details come from the government source that posted it. Updated .