MZ101_23DEC22_AMDT 0002.pdf
PDF 208 KB Posted
- Attached to
- Dexter Adult Fish Facility Upgrades
- Solicitation number
- W9127N23R0005
About this file
This document package includes plans and specifications for the Dexter Adult Fish Facility Upgrades project. The project will improve, replace, and add major features to the Dexter Fish Facility to meet criteria from the National Marine Fisheries Service. Upgrades include work on mechanical, electrical, and plumbing systems in the Mechanical and Electrical Building. The estimated value of construction is between $25-100 million. The period of performance is from March 2023 to November 2026. The solicitation is open to all contractors and utilizes full and open competition as well as price evaluation preferences for HUBZone small businesses. The NAICS code is 237990 for other heavy and civil engineering construction with a $39.5 million small business size standard. The procuring agency is the Department of the Army Corps of Engineers Portland District.
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B
C
D
E
1 2 3 4 5 6
A
D
ES
IG
N
ED
B
Y:
D
AT
E:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
SI
ZE
FI
L E N
AM
E:
US Army Corps of Engineers
PORTLAND DISTRICT
SHEET
IDENTIFICATION
MZ101
D
EX
TE
R
D
AM
A N
D R
ES
ER
VO
IR
AD
U
LT
F
IS
H
F
AC
IL
IT
Y U
PG
R
AD
E
M
EC
H
AN
IC
AL
E
LE
C
TR
IC
AL
B
U
IL
D
IN
G
H
VA
C
P
LU
M
BI
N G
P
LA
N
BE
N
F
IL
AN
P
.E
B.
F
IL
AN
C . Z
AG
AR
/1
7/
W
N
R
D
AN
IE
L M
. J
EN
SE
N
P .E
/1
7/
1:
AN
SI
F
PO
R
TL
AN
D D
IS
TR
IC
T
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
PO
R
TL
AN
D , O
R
EG
O N
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
D
XF
1.
1_
M Z1
.D
W G
NOTES:
1.ALL PIPE PENETRATIONS THROUGH FLOORS AND WALLS MUST BE SLEEVED AND SEALED.
2. FIELD ROUTE PIPING. SELECT PATH TO MINIMIZE FITTINGS AND PREFERENTIALLY RUN ADJACENT TO WALLS. ROUTE
PIPE TO MAXIMIZE WORKING AREA AROUND EQUIPMENT.
3.THE CONTRACTOR MUST PROVIDE OFFSETS IN THE PIPING RUNS, IN ADDITION TO WHAT IS SHOWN ON THE DRAWINGS, WHERE REQUIRED TO CLEAR NEW; HVAC, STRUCTURAL, ARCHITECTURAL, ELECTRICAL, MECHANICAL AND OTHER
SYSTEMS.
4.PLUMBING VENTS THROUGH ROOF MUST BE OFFSET AT ROOF TO PROVIDE MINIMUM DISTANCE OF 3'-6" FROM EXTERIOR
WALL.
5.REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF PLUMBING FIXTURES AND VENTS THRU ROOF.
6.CLEANOUT TO GRADE FITTINGS, WHERE SANITARY DRAIN EXITS THE BUILDING, ALLOW FOR RODDING BOTH WAYS.
7.COORDINATE FINAL LOCATIONS OF FLOOR AND HUB DRAINS THAT RECEIVE CONDENSATE DRAINAGE FROM HVAC
EQUIPMENT.
8.PROVIDE CLEANOUTS IN SANITARY WASTE PIPING AS SHOWN ON THE DRAWINGS. FURNISH AND INSTALL ADDITIONAL
CLEANOUTS AS REQUIRED BY CODE.
9.INSULATE ABOVE GRADE DRAINAGE PIPING THE RECEIVES CONDENSATE FROM AIR CONDITIONING UNITS.
10. PIPES PASSING THROUGH FIRE RATED WALLS AND FLOORS MUST BE INSTALLED TO MEET APPLICABLE UL SYSTEM REQUIREMENTS PERTAINING TO THE TYPE OF CONSTRUCTION. REFER TO ARCHITECTURAL DRAWING FOR WALLS WHICH
ARE FIRE RATED.
WALL MOUNTED EXHAUST FAN
Z-EF-1
UNIT HEATER, TYP
Z-UH-1
4" Ø VENT
SEE CIVIL DRAWINGS
FOR CONTINUATION
4" STAINLESS STEEL PIPE
FLOOR DRAIN, TYP.
SEE MY502
3" STAINLESS
STEEL PIPE
DRAIN CLEANOUT
SEE MY502
18" X 24" SUPPLY LOUVER
Z-LV-2
SCALE:
MECH./ELECTRICAL BUILDING
PLUMBING & HVAC PLAN
1/2"=1'-0"
12" 0 1' 2' 3' 4'
SCALE: 1
2"= 1'-0"
STAINLESS STEEL DUPLEX STRAINER
2 PLACES
HYDRO-PNEUMATIC TANK
CHARGE TANK 2 PSI BELOW CUTOFF
PIPE ROUTE NOT SHOWN
WASH DOWN SYSTEM MUST INCLUDE NON-POTABLE LABELING
AT EACH SERVICE LOCATION
OIL FREE AIR COMPRESSOR AND RECEIVER
-120 GALLON RECEIVER VOLUME
-10 HP
-460 3 PHASE, 60 HZ
-14 AMP
-AIR DELIVERY 35 ACFM@175 PSIG
-MAXIMUM EQUIPMENT ENVELOPE IS 44"W X 44"D X 90"H
-1" DELIVERY CONNECTIONS
UNIT HEATER, TYP
Z-UH-2
SKID MOUNTED
WASHDOWN WATER PUMP
WITH SILICON CARBIDE SEALS
RATED FOR 80 GPM@ 125 FT. OF HEAD
MOTOR POWER CANNOT EXCEED 7.5 HP
PIPE ROUTE NOT SHOWN
PROVIDE 60/40 PSI PRESSURE SWITCH
HEATLESS DESICCANT TYPE AIR DRYER
WITH 120VAC PLC CONTROLLER
SIZED FOR USE WITH SELECTED AIR COMPRESSOR
THERMOSTAT, TYP
2" NON-POTABLE
FACILITY WATER
SUPPLY
SEE MP508 FOR
CONTINUATION
2" NON-POTABLE
WASHDOWN PUMP LINE
SEE MP508 FOR
CONTINUATION
PRESSURE
SWITCH
PRESSURE
GAUGE
BALL VALVE
(TYP)
SWING CHECK VALVE
TYP. 2 PLACES
WALL MOUNTED EXHAUST FAN
Z-EF-2
18" X 24" SUPPLY LOUVER
Z-LV-1
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
D T
File details come from the government source that posted it. Updated .